HomeMy WebLinkAboutSWP272332(1) STORM DRAINAGE REPORT
FOR
CURTIS H, LLC
LOT 1 OF WASHINGTON TECHNICAL CENTER
LOCATED AT
SOUTHWEST 7TH STREET NEAR POWELL AVENUE
RENTON,WASHINGTON
FOR
SGA CORPORATION
BY
JOHN E. ANDERSON, P.E.
BUSH, ROED & KITCHINGS, INC.
2009 MINOR AVENUE EAST
SEATTLE, WA 98102
(206) 323-4144
BRH JOB NO. 97102.00
� xZ
DATE
268 �
July 15, 1997 �.c► �`'�tsT 7878
EXPIRES 12111
Lol, 4 59'
R—Mg 14*
------ - L-f28*;7'
3 LOT
A-lfr 29' 5f -p
L-115.
ASEMEN7
.tiff
it
,2W RAKROAD EASEMENT 20'RMAW
PER RFC. NO. 7907399548 EAW"T PER
REC. NQ
Le
=====)I rc =T-M!ll'-!ll
SO
'UTILITY&SIDEWALK ENT
LCORD', lf�1501(RVCORD)
12' W S.W. 7th ST.
Wv
12" W
Fli
14
J d"
J - y'i `�Z r / / ro 9
CT� W N H 0 M E
' '� �-�� I • I- �' , ��
r .r
70
60 UNITS $ / � ?Q ?S y�C/%
4 $ a
1/ e
Cy/C C tie .K -� , `10IbHAs i 11 nasls tts, , a ,
'' O 4 lQ E 1I A O '/3;
t �Av� s SA lC/�iC Q 3 b 1 B �`y A I �6 uNl S �
`Y
f414"go
wo
5 Ac. +ems A CO/y0
rc.86 1
776.?S writ irr _ E�SIwK.vr � I
13 /210
q L03Ac•C .
,ov t to30-1
�-
C A L I F ;C E E 3 R
6E0. A/ HORMEL 8 0.
P A R K 1 6
CENTRAL
a
PUGET INC.
SGA SITE E .1 2.113A� E/
Q a � n.t70 _ __f 457_fps n
/ r 37-77 5DIA6. '%� " A�%
`l 7 TA..254 4 i
—
.
" ' $
.o
AS OF TTLE TLAS OF SEATTLE
RIGHTED & PUBLISHED BY r 336W
ntent COPYRIGHTED 8 PUBLISHED BY
lipital KROLL MA OMPANY, INC., SEATT KROLL MAP COMPANY, INC., SEATTLE
SCALE: ET SCALE t INCH 200 FEET
't,-Z00 d
TABLE OF CONTENTS
I. Project Overview
H. Preliminary Conditions Summary
III. Core and Special Requirements
IV. Detention Analysis
V. Water Quality Design
VI. Level I Analysis
VII. Pipe Sizing Calculations
VIII. Erosion Control
I. PROJECT OVERVIEW
SGA is proposing to build a 34,585 square foot office/warehouse building on Parcel A of Washington
Technical Center. The total site is 2.88 acres in size. Rail road track are located on the northern and
eastern boundaries. The tracks are located within easements recorded with the plat. Southwest 7th
Street is the southern boundary of the site. Grades on the site vary from elevation 20 in the
northeastern corner to elevation 16 in the southwestern corner. The ground slopes within the
property are between 1 and 2 percent. Ground cover consists of blackberry bushes and grasses.
The proposed building would be dock high. Truck loading docks would be located on the north side
of the building. The building finish floor elevation would be approximately 2.5 feet above the
existing ground elevation. There will be approximately 1.3 acres of asphalt paving around the
building for vehicle parking lot and truck maneuvering areas. Storm water runoff from the asphalt
pavement will be conveyed to a combine wetpond/detention pond located at the southwest corner
of the site. The wetpond is oversize so biofiltration swales are not required. Filter strips will be used
for water quality improvements for the parking area along Southwest 7th Street. This area will have
the most vehicle traffic and the filter strips will provide additional water treatment.
Construction of an office/warehouse building on this site is consistent with surrounding
developments. Utilities within Southwest 7th Street have been sized for this type of development.
There is adequate depth for gravity storm water and sanitary sewer connections. According to City
records, a 10-inch water main is stubbed to the southeast corner and a 12-inch water main is located
within Southwest 7th Street. Therefore, the development of this property does not present any
significant design problems.
H. PRELIMINARY CONDITIONS SUMMARY
The 2.88 acre site is covered with blackberry bushes and grasses. Existing ground slopes from west
to east at slopes between 1 and 2 percent. A 60-inch storm drainage pipe is located in Southwest 7th
Street. According to the City, storm water runoff from the developed site can be discharge to the
60-inch pipe. Storm water detention is required prior to discharge from the site. The detention pond
will be sized using the King County Design Manual Method as adopted by city of Renton. No offsite
areas contribute to the storm water flows. An existing CN value of 82 will be used to calculate the
pre-developed storm water peak flows.
III. CORE AND SPECIAL REQUIREMENTS
CORE REQUIREMENT#1:
Storm water will be discharged to the existing 60-inch storm drainage pipe located in Southwest 7th
Street. The pipe design included this property in the tributary area. This is the City's recommended
storm drainage connection. Therefore Core Requirement #1 is met.
CORE REQUIREMENT#2
The railroad tracks and Southwest 7th Street grades prevent offsite storm water from entering the
site. Therefore, no upstream basin analysis is required for this property.
Storm water discharged from the site will be conveyed by 60-inch.storm pipes in Southwest 7th
Street. The 60-inch pipe flows west to Naches Avenue. The storm water then flows north in Naches
where it is discharged into a regional storm water mitigation area. The existing conveyance system
was design to convey storm water discharged from the site. Original sizing for the pipe used the
Rational Method of analysis. Current design standards use the hydrograph method that lowers peak
rate discharge from that calculated by the Rational Method. Therefore, the downstream system has
adequate capacity for the proposed development.
CORE REQUIREMENT#3
Peak rate control will be provided for the storm water runoff. A storm water detention system will
be located in the southwest corner of the site. Developed storm water peak rate discharges from
the site will be limited to the 2 year, 10 year and 100 year pre-developed values. Storm water
detention facility calculations are included in the report.
The City allows over-sizing the wetpond for mitigation of the biofiltration swale requirements. The
required wetpond volume is 3,955 cubic feet. The volume provided is 11,742 cubic feet. The
proposed wetpond also provides nearly 3 times the required surface area. Therefore, biofiltration
swales are not required. Wetpond sizing calculations are included in the report.
CORE REQUIREMENT#4
Detailed pipe sizing calculations are provided. The calculations show there is more than adequate
conveyance capacity for the 100 year storm water peak flows.
CORE REQUIREMENT#5
A detailed erosion/sedimentation control plan has been prepared for the site grading. The storm
water detention pond will be used for a settling basin during construction. According to the design
standards, a sediment trap would meet the requirements for this site. Using the detention pond
provides significantly more sediment volume and surface area than required. Since the pond is
oversized for the developed conditions, it will more than adequate for controlling run off during the
site grading phase.
Interceptor swales and filter fabric fence will be installed at the limits of clearing. Rock check dams
will be installed in the interceptor ditches. Rock construction entrances will be installed at the
proposed driveway locations.
SPECIAL REQUIREMENTS SECTION 1.3
The only Special Requirement that applies to this project is 1.3.5. A wetpond is required because the
development will have 1.3 acres of imperious surface area subject to vehicular use. A wetpond will
be constructed in the storm water detention pond area. According to the manual,the wetpond must
provide the PT-WQ Storm volume and have a surface area equal to 1% of the impervious surface
area. The proposed detention/wetpond design exceeds both of these conditions.
IV. DETENTION ANALYSIS
a BUSH, ROED&HITCHINGS, INC. ,JOB S(::�,�"
CIVIL ENGINEERS& LAND SURVEYORS SHEET NO. OF
2009 Minor Avenue East Seattle,WA 98102 CALCULATED BY DATE —7/ t Z 9 /
(206)323-4144 FAX(206)323-7135
BRH 1-800-935-0508 CHECKED BY DATE
SCALE
STOR rv� W RT`� ETk�T 0,,! / \,Aj ETPo,�-J_C) E nl LE S t"rt r'C,W tit_
P�PPRovatu __
L� ELEw►4zt��.f._. ..O.F ;`�-EC- :.."QETENT�orJ.__ FO►` 1> (JNS. M0VEX-) _hP
2 F't`ET. Ti-t�5 \Af I45 Po .IE __ Tb_ FI�DVCrE Tk- S ........ NGE OF
s-r�Rw-\ \,v A-rEIZ Bac K I►•.� (o _ 11,4 TO- .T+m . DZTc- .7 o.N
C't i NJ .. S W $4 .STD Te
TiEo-�t orb
DE E Tl.0�J_ �'S fJ'(�W .. 5 ? .....p.T P�PPf20`K t van A. L:�( "r --E
T
"rbP'.. . ar_ "r;- _.:._ ''_..P.�.......... e.► I .FLo�u_
v�.1 l -l- .. ALSO
...
..........--o. ............. "r............. Pav o . -F ...................... _ c. ..
C rev
R- M .. 1. .....0 ...�? ... ...-rc _., .. l,to ... .. T. __
kl►4t�. ......Pt\ .O_tJC�. 'C €,_..... JE.. T 1 e b Ca E... . t.Ao
Tc� . ._ .�-�. _► Tc�,... 5 Peso .._�. .� ss - '►-��
TPoN a .. va . w► Rcv�� rROI _fo,z c -ro
__..l l } _4� .G .
Tl-� . u1 NT _Qv p.t. Y . U�LS.�Yv�E REQ l 2. C>:........._
FotLT -� �'t'E ...................t .. . 3 . 95 .............
9"7... Tt 5.;. _ Pt'C'2 .Vol u m
t 4-t'� T1t�►`1 ..M►
Oc�E 1�0'C �EQv_t2D.•
PNOOMT 204-1(U*,We6)205 I(Padded)®®Im Grobn,Man.01471.To Order PHONE TOLL FREE 1-800-225 @80
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
1 FIGURE 3.5.2A HYDROLOGIC SOIL GROUP OF THE SOILS IN KING COUNTY:
HYDROLOGIC HYDROLOGIC
SOIL GROUP GROUP' SOIL GROUP GROUP*
Alderwood C Orcas Peat D
Arents,Akierwood Material C Oridia D
Arents..Everett Material B Ovall C
Beausite C Pichuck C
Bellingham D Puget D
Briscot D Puyallup B
Buckley D Ragnar B
Coastal Beaches Variable Renton D
Earlmont Sit Loam D Riverwash Variable
Edgewick C SaW C
Everett A Sammamish D
Indianola A Seattle D
K/tsap C Shacar D
Klaus C Si Sit C
Mixed Alluvial Land Variable _ Snohomish D
Newton A Sultan C
Newberg B Tukwila D
Nooksack C Urban Variabl
Normal Sandy Loam D Woodinville D
HYDROLOGIC SOIL GROUP CLASSIFICATIONS
A (Low runoff potentI4. Soils having high Infitration rates, even when thoroughly wetted,and consisting
chiefly-of deep,well-to-excessively drained sands or gravels. These sods have a high rate of water
transmission.
B. (Moderately low runoff potential). Sons having moderate infiltration rates when thoroughly wetted,and
consisting chiefly of moderately fine to moderately coarse textures. These soils have a moderate rate of
water transmission.
C. (Moderately high runoff potential). Sods having slow Infiltration rates when thoroughly wetted,and
consisting chiefly of soils with a layer that Impedes downward movement of water, or soils with moderately
fine to fine textures. These sods have a slow rate of water transmission.
D. (High runoff potential). Sods having very slow infiltration rates when thoroughly wetted and consisting
chiefly of clay sods with a high swelling potential, soils with a permanent high water table, sods with a
hardpan or day layer at or near the surface, and shallow soils over nearly impervious material. These sods
have a very slow rate of water transmission.
• From SCS,TR-55, Second Editkx-,June 1986. Exhibit A-1. Revisions made from SCS, Sol Interpretation
Record, Form #5,September 1988.
3.5.2-2 I/90
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TABLE 3.52E SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS
SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SCS In 1982)
Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A
rainfall distribution, 24-hour storm duration.
CURVE NUMBERS BY
HYDROLOGIC SOIL GROUP
LAND USE DESCRIPTION A B C D
Cultivated land(1): winter condition 86; 91 964 95
Mountain open areas: low growing brush and grasslands 74 V 89 92
Meadow or pasture: 65 78 85 89
Wood or forest land: undisturbed 42 64 76 81
Wood or forest land: young second growth or brush 55 72 81 86
Orchard: with cover crop 81 88 92 94
Open spaces, lawns, parks, golf courses, cemeteries,
landscaping.
good condition: grass cover on 75%
or more of the area 68 80 86 90
fair condition: grass cover on 50%
to 75% of the area 77 85 90 92
Gravel roads and parking lots 76 85 89 91
Dirt roads and parking lots 72 82 87 89
Impervious surfaces, pavement, roofs, etc. 98 98 98 98
Open water bodies: lakes, wetlands, ponds, etc. 100 100 100 100
Single Family Residential (2)
Dwelling Unit/Gross Acre % Impervious (3)
1.0 DU/GA 15 Separate curve number
1.5 DU/GA 20 shag be selected
2.0 DU/GA 25 for pervious and
2.5 DU/GA 30 Impervious portion
3.0 DU/GA 34 of the site or basin
3.5 DU/GA 38
4.0 DU/GA 42
4.5 DU/GA 46
5.0 DU/GA 48 .
5.5 DU/GA 50
6.0 DU/GA 52
6.5 DU/GA 54
7.0 DU/GA 56
Planned unit developments, % Impervious
condominiums, apartments, must be computed
commercial business and
Industrial areas.
(1) For a more detailed description of agricultural land use curve numbers refer to National Engineering
Handbook, Section 4, Hydrology, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff )s directed Into street/stoma system.
(3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers.
1 i
3.5.2-3 I/90
• • •
wow-
moo
ILI
FIRM!
i
. �il
w .
gets
4A Ill
Wig
wrist,
w► • � .
•ems e� ��.. r::i*
!,
� r
WAR
7/15/97 11 :38 :9 pm Bush, Roed & Hitchings, Inc page 1
SGA SITE AT WASHINGTON TECH CENTER
JOHN E . ANDERSON, P.E.
PROJECT NO. 97102
BASIN SUMMARY
BASIN ID: B1 NAME: 2 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE . . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 2 . 00 inches AREA. . : 2 . 88 Acres 0 . 00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 82 . 00 0 .00
TC. . . . . 18 . 00 min 0 .00 min
ABSTRACTION COEFF: 0 . 20
PEAK RATE: 0 .29 cfs VOL: 0 . 16 Ac-ft TIME : 480 min
BASIN ID: B2 NAME : 10 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE . . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 2 . 90 inches AREA. . : 2 . 88 Acres 0 .00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 82 . 00 0 . 00
TC. . . . . 18 . 00 min 0 .00 min
ABSTRACTION COEFF: 0 .20
PEAK RATE: 0 .72 cfs VOL: 0 .31 Ac-ft TIME: 480 min
BASIN ID: B3 NAME: 100 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 .88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE . . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 3 . 90 inches AREA. . : 2 .88 Acres 0 . 00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 82 . 00 0 . 00
TC. . . . . 18 . 00 min 0 . 00 min
ABSTRACTION COEFF: 0 . 20
PEAK RATE: 1 .27 cfs VOL: 0 .51 Ac-ft TIME : 480 min
BASIN ID: B4 NAME : 2 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 2 . 00 inches AREA. . : 0 . 60 Acres 2 .28 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 82 . 00 98 . 00
TC. . . . : 12 . 00 min 12 .00 min
ABSTRACTION COEFF: 0 . 20
PEAK RATE: 1 . 07 cfs VOL: 0 . 37 Ac-ft TIME: 480 min
7/15/97 11 : 38 : 13 pm Bush, Roed & Hitchings, Inc page 2
SGA SITE AT WASHINGTON TECH CENTER
JOHN E . ANDERSON, P.E .
PROJECT NO . 97102
BASIN SUMMARY
BASIN ID : B5 NAME: 10 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 2 . 90 inches AREA. . : 0 . 60 Acres 2 .28 Acres
TIME INTERVAL. . . . : 10 . 00 min - CN. . . . : 82 . 00 98 . 00
TC. . . . : 12 . 00 min 12 . 00 min
ABSTRACTION COEFF: 0 .20
PEAK RATE: 1 . 66 cfs VOL: 0 . 57 Ac-ft TIME : 480 min
BASIN ID: B6 NAME : 100 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 88 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE . . . . : KC24HR PERV IMP
PRECIPITATION. . . . : 3 .90 inches AREA. . : 0 . 60 Acres 2 . 28 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 82 . 00 98 . 00
TC. . . . . 12 . 00 min 12 . 00 min
ABSTRACTION COEFF: 0 . 20
PEAK RATE: 2 . 32 cfs VOL: 0 . 80 Ac-ft TIME: 480 min
d A
R
N
1
m A
O1 1
a 1
a 1
1
1
A
A
1
1
R
1 Y7" Y TT7 4 ITT
H N N o a N 0 0 0 0
H fl 1
H q A m q c0 a) c0 c0 c0 CO N N N N
m 1 l a v q CO CO 0 CO 0 ro N CO OD CO
H q 1J R N N N N N N N N N N
•� N 1 C Q Q I
0 fl
u q
U u A N q
•rl N R
x � Rx tl
l a I W u Na 44 W W 14 V4 W qa
q iJ q u u u u U u u u u u
ro a ( 0 u q N 0 0 N 0 0 m 0 0 N
0 0 l a a 0 Q 1 R r, in H o m m m 0 m m
a u N 0 ?+ 0 fl w M N w d d M w I I
A x u fl H N H N M H N M
Q A x A
m N N q
W N w Q tl o o o o o o o o o o
fl H Q W A OD 00 (0 OD N m N N H
fl 1
fl H
Z fl tl
0 tl q h f` N M m N m H t, 0
N fl Iv W tl N ri 1, r M N W m w N
a 1 a H m 1 N N 0 W M N N M N
W fl Q 0 Q w 1
fl W u N 0 o H H H N 0 0 0 ri
fl a 1
f� fl a 1
m q N
\ fl q
N N N 1
q N rl N M d In w r, H N M
0 m N x A
H
CURTIS II DETENTION POND VOLUME
ELEV AREA VOL @ ELEV
17.00 3223.00 0.00 0.00 0.00
18.00 3785.00 1.00 3500.24 3500.24
19.00 4521.00 1.00 4147.55 7647.79
7647.79
a 8/27/97 Bush, Road Hitclzing6, Inc - page S
SC--.XL CORD. - Ci7RTI S =2
JOHN E_ ANDERS ON, P-E
97102
mesa-n-:a-s------------v---------: s:s:--»--s---------------------
S TORAGE STRUCTL7RE L S S T
STORAGE L 2 S T I D NO_ 1
Da B c r ip t i on: DETENT 2 ON POND
a 8/2 7/9 7 Su s ki, RoedC. H i t cri i ng s, I nc _ page 6
SGA CORP_ - CURT 2 S 12
JOHN E_ ANDERS ON, P_E _
9 7 1 0 2
---------------------------------------------------------------------
D 2 S CHARGE S TRVCTVRE L=S T
MULT=P LE OR=F I CE -2D NO_ 1
Description: FRO P-T
Ou t l e t E 1 eV: 1 6 _ 9 0
E 1 eV: 3-6 . 90 r t O r i r i c e D i ame t e r: 3 _2 5 00 i n.
R T S ER D=S CHARGE I D No_ 2
Description: ova r r 1 ow
Riser Diameter (in) : 12 . 00 e1ev: 18 _60 rt
weir Coerricierit . . . 3 _ 782 height . 0 .20 rt
Orir Coerriciant _ 9 . 739 irncrecn: O _3.0 rt
COMB SWAT 2 ON D S S CHARGE I D No. 3
Description: FRO PT W/ OVERFLOW
Structure : 1 St ructore
Structure: 2 Structure
structure :
• �8 •�V
�10AC)
S 8/27/97 13u62i, Roed a HitcYllrig6, Inc . page 7
Sc--A CORP_ - CURT S S 12
JOFII�T E_ ANDERSON, P-E.
973-02
-:--s-m e a s---------s a------m s a-s-------s-s s:-v-----s-m a--------------
LEVEL POOL TABLE SUMMARY
MATCH 2 NFLOW Sr D S <-PEAK- STORAGE
<--------DESCR2PTSON---------- (cta) (crs) id id id VOL (cE)
--s a s-----------:--s--a------�--a:--------e-s--------s--
2 YEAR - - - - - - - - - - - - - - - - - - - - - - 0 -2 9 1 . 07 1 3 3-7 . 93 1 1 32
1 O YEAR . . . . . . . . . . . . . . . . . . . . . . 0 -7 2 1 - 6 6 1 3 1 8 -5 4 3-2 63
1 O O YEAR - - - - - - - - - - - - - - - - - - - - - 3 -2 7 2 . 32 1 3 1 8 . 8 0 3.3 76
?r ��Z 2 f 3t (19 3— 1 6.9 u,
o �
Zy� Dz
(T
u
z U<7 Z CAS •� O'c—
aRw�u �
V. WATER QUALITY DESIGN
x 8/27/97 BusYi, Road R Hitcl-iirium, SnC _ pages 3
Sc--A COR P_ - CVRT 2 S 12
-TOFIN E _ ANDERSON, P_E_
972.02
---------------------------------------------------------------------
BAS 2N SS MMA4-nW
BAS I N MID: 197 NAME : WATER QLIAL S TY S TORM
SBLTH METHODOLOGY
TOTAL AREA_ _ . . . . _ _ 288 Acres BASEFLOWS : 0 . 00 cra
RA=NFALL TYPE . . . . _ VS ER 1 _ PERV 2 OUS AREA
O . 6 7 i ric Yta s AREA. . _ 0 . 60 AC=a B
T2ME SNTERVAL_ _ _ _ _ 10 . 00 man CN_ . . _ . 82 _ 00
T SME CIE' CONC. . _ _ . _ 3.2 _0 O mi ri =MPERV=OUS AREA
AB STRACT S ON COE FF: 0 _2 O AREA_ . _ 2 .2 8 AC=a s
CN_ _ _ _ _ 9 8 _ O 0
PEAK RATE : 0 .27 C=6 VOL c 0 . 09 Al--f t T 2 ME: 4 8 O min.
�C.l tpow!1� VOW►-^ Q eau i Qc-D
D,cat r►.c- FT
CURTIS II WETPOND VOLUME PROVIDED
ELEV 11 AREA 11 delta H Inc Vol Volume
13.00 572.00 0.00 0.00 0.00
14.00 1162.00 1.00 849.76 849.76
15.00 1391.00 1.00 1274.78 2124.54
16.00 1967.00 1.00 1670.71 3795.25
17.00 3223.00 1.00 2569.29 6364.53 A— rro-rAA-- Vltnpv� Vole PR0uIpl�-
�low�>✓ � � CS�� -ems °� �-� µ = 3, g V
Arr�a �E�1�b �2• zgac W 435�0 � � l�v) = a 33 S-F < A��t+�
VI. LEVEL I ANALYSIS
Storm water will be discharged from the detention pond at the pre-developed peak flow rates to a
60-inch pipe located within Southwest 7th Street. From the connection point the storm water will
be tight lined approximately 1,100 feet west to Naches Avenue. Storm water is then tight lined north
approximately 650 feet in the Naches Avenue storm pipe. From the Naches storm system the storm
water is discharged into an open conveyance ditch that flows west into a regional detention basin.
The tight line system and detention basin were sized using the Rational Design Method. Current City
design standards for peak rate control are more restrictive than used to size the existing system.
Therefore, development of this site will not adversely impact the existing storm system.
VII. PIPE SIZING CALCULATIONS
�
\ yi,
07/15/97 STORM SEWER SUMMARY REPORT PAGE 1 OF 1
CURTIS I1. LLC
FILE: 97102.STM
RAINFALL FILE: SEATTLE.RND 10 YEAR DESIGN STORM I = 13.080/ ( Tc + 5.000) - 0.770
LINE ID 1 FLOW RATE INFO 1 PIPE INFO I HYDRAULIC INFO
LINE#1 DESCRIPTION ZINC ARIRUNOFFCIINLTIMEIINLT 111NC CIA1 INPUTQ IUNIFORMISIZE/11NVERT 1PIPE 1 NVAL 1HGLSLOPEIHYD GRD 1 VEL
I DOWNLINE# 1TOT ARIWEIGHTDI Tc ITOTL IITOT CIA1 TOTALQ IFLOWCAPITYPE 1UP/DOWN ILEN IINVSLOPI JLC IUP/DOWN 1UP/DOWN
I I (ac) 1 C 1 (min) 1(in/h)1 (cfs) 1 (cfs) 1 (cfs) 1(in) 1 (ft) 1(ft) 1(ft/ft)1 (ft/ft)1 (ft) 1 (ft/s)
I I I I I I I I I I I I I I I
i I OUTFALL-CB1 1 0.41 0.871 0.001 3.791 1.191 0.001 1 12D1 14.931 551 0.0121 0.0071 15.711 3.70
1 DNLN = 0 1 1.91 0.881 12.531 1.441 2.441 2.441 2.71 12D1 14.651 1 0.0051 1.00 1 15.311 4.42
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 CBI-CB4 1 0.11 0.901 0.001 3.791 0.311 0.001 1 12D1 15.381 901 0.0121 0.0011 16.001 2.36
1 DNLN = 1 1 0.91 0.861 11.761 1.491 1.211 1.211 2.71 12D1 14.931 1 0.0051 1.00 1 15.921 1.54
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 1 CB4-CB5 1 0.31 0.851 0.001 3.791 0.801 0.001 1 12D1 15.801 841 0.0121 0.0021 16.251 3.23
1 DNLN = 2 1 0.91 0.861 11.221 1.531 1.121 1.121 2.71 12D1 15.381 1 0.0051 1.00 1 16.081 1.88
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 1 CB5-CB6 1 0.21 0.851 0.001 3.791 0.711 0.001 1 12D1 16.471 1341 0.0121 0.0031 16.851 2.97
1 DNLN = 3 1 0.61 0.861 10.251 1.611 0.831 0.831 2.71 12D1 15.801 1 0.0051 1.00 1 16.411 1.64
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 1 CB6-CB7 1 0.21 0.851 0.001 3.791 0.741 0.001 1 12D1 17.001 1081 0.0121 0.0031 17.321 2.61
1 DNLN = 4 1 0.41 0.871 9.341 1.681 0.561 0.561 2.71 1201 16.471 1 0.0051 1.00 1 16.991 1.34
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 1 CB7-CB8 1 0.21 0.901 8.301 1.781 0.241 0.001 1 12D1 17.441 871 0.0121 0.0031 17.711 2.04
1 DNLN = 5 1 0.21 0.901 8.301 1.781 0.241 0.241 2.71 12D1 17.001 1 0.0051 1.00 1 17.431 0.76
I 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 1 CBI-CB2 1 0.41 0.901 0.001 3.791 1.261 0.001 1 12D1 17.001 1751 0.0121 0.0091 17.421 3.10
1 DNLN = 1 1 0.61 0.901 9.461 1.671 0.951 0.951 4.21 12D1 14.921 1 0.0121 1.00 1 15.921 1.21
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 1 CB2-CB3 1 0.31 0.901 8.501 1.761 0.411 0.001 1 1201 17.471 931 0.0121 0.0031 17.831 2.33
1 DNLN = 7 1 0.31 0.901 8.501 1.761 0.411 0.411 2.71 12D1 17.001 1 0.0051 1.00 1 17.561 0.91
07/15/97 STORM SEWER SUMMARY REPORT PAGE 1 OF 1
CURTIS II, LLC
FILE: 97102.STM
RAINFALL FILE: SEATTLE.RND 100 YEAR DESIGN STORM I = 26.250/ ( Tc + 6.750) - 0.830
LINE ID I FLOW RATE INFO I PIPE INFO I HYDRAULIC INFO
LINE#j DESCRIPTION JINC ARIRUNOFFCIINLTIMEIINLT IIINC CIAI INPUTQ JUNIFORMISIZE/lINVERT ]PIPE I NVAL JHGLSLOPEJHYD GRD I VEL
DOWNLINE# ITOT ARIWEIGHTD1 Tc ITOTL I1TOT CIAI TOTALQ IFLOWCAPITYPE JUP/DOWN ILEN JINVSLOPI JLC JUP/DOWN JUP/DOWN
(ad I C I (min) l(in/h)l (cfs) I (cfs) I (cfs) ](in) I (ft) l(ft) l(ft/ft)l (ft/ft)l (ft) I (ft/s)
1 1 OUTFALL-CB1 1 0.41 0.871 0.001 5.381 1.691 0.001 1 12DI 14.931 551 0.0121 0.0121 16.111 4.85
1 DNLN = 0 1 1.91 0.881 12.521 2.251 3.811 3.811 2.71 12DI 14.651 1 0.0051 1.00 1 15.481 5.48
2 1 CBI-CB4 1 0.11 0.901 0.001 5.381 0.441 0.001 1 12DI 15.381 901 0.0121 0.0021 16.691 2.39
1 DNLN = 1 1 0.91 0.861 11.901 2.311 1.881 1.881 2.71 12DI 14.931 1 0.0051 1.00 1 16.481 2.39
3 1 CB4-CB5 ( 0.31 0.851 0.001 5.381 1.141 0.001 1 12DI 15.801 841 0.0121 0.0021 16.951 2.21
1 DNLN = 2 1 0.91 0.861 11.281 2.381 1.741 1.741 2.71 12DI 15.381 1 0.0051 1.00 1 16.781 2.21
4 1 CB5-CB6 1 0.21 0.851 0.001 5.381 1.011 0.001 1 12DI 16.471 1341 0.0121 0.0011 17.181 2.18
1 DNLN = 3 1 0.61 0.861 10.101 2.521 1.301 1.301 2.71 12DI 15.801 1 0.0051 1.00 1 17.021 1.66
1 1 1 1 1 1 1 1 1 1 1 1 1 ( 1
5 1 CB6-CB7 1 0.21 0.851 0.001 5.381 1.051 0.001 1 12DI 17.001 1081 0.0121 0.0011 17.411 2.96
1 DNLN = 4 1 0.41 0.871 9.231 2.631 0.871 0.871 2.71 12DI 16.471 1 0.0051 1.00 1 17.251 1.31
6 1 CB7-CB8 1 0.21 0.901 8.301 2.771 0.371 0.001 1 12DI 17.441 871 0.0121 0.0031 17.781 2.26
1 DNLN = 5 1 0.21 0.901 8.301 2.771 0.371 0.371 2.71 12DI 17.001 1 0.0051 1.00 1 17.541 0.87
7 1 CBl-CB2 1 0.41 0.901 0.001 5.381 1.791 0.001 1 12DI 17.001 1751 0.0121 0.0061 17.521 3.62
1 DNLN = 1 1 0.61 0.901 9.381 2.611 1.481 1.481 4.21 12D] 14.921 1 0.0121 1.00 1 16.481 1.89
8 1 CB2-CB3 1 0.31 0.901 8.501 2.741 0.641 0.001 1 12DI 17.471 931 0.0121 0.0021 17.931 2.49
1 DNLN = 7 1 0.31 0.901 8.501 2.741 0.641 0.641 2.71 12DI 17.001 1 0.0051 1.00 1 17.721 1.06
09 09 Ob 06 02 OT 0
£i
bT
Si
��OOB'C) adid -uT ZT 30 -13 99
9T
LT m
8T
e do Is puno XIB remnI-em 6T
OF �
nue yq i Z
99
:q -iIA 0 I�3d
I'RCD FILE
Line 2 CBI-CBA
22
Natural ggoundslope 0.20% [F1]
21 M enu
Z 20
0 19
1@
17 HC3L slope 0.237�a
16
90 fi. of 12 in. pipe (—W 0.500%
15
l+i
13 0 20 40 60 80
STAT I C)N
PP ()FI L.E
Lirt� 3 CB4-CBS
22
[F1]
21 M enu
Natural gxound slope -1.52�
20
� 19
w 18
w17 1-1GL slope 0.2035;1.
16 84 fi. of 12 in. pipe (L�F) 0.500";,,',
15
14
0 10 20 30 40 50 60 70 00 90
STATIQN
PR�FIL.�
Line 4 CB5-CB6
21
[F1]
Menu
20 Natural ground slope 0.00
Z
19
f-r
18
" 134 ft. of 12 in. pipe (g) 0.500'i'o
w HGL slope 0.114M'¢
16
15
14
0 20 40 60 80 100 120 140
STATI�N
PR�CJ FILE
Line 6 CB7-CB8
23
[F1]
lv!enu
22
21 Natural ground slope 2.00
20
w
19 $7 fi. of 12 in. pipe a 0.500"
w
18
~ HG�L. sloloEB
17
16
0 10 20 30 40 50 60 70 80 90
STATI 0 N
PR�CJ►FI L.E ...�..�
Lirt� 7 CB1-CBS
22
[F1]
21 Menu
Natural ground Slope -O.69°T Il
,zr 20
H 19
18 175 ft. of 12 in. pipe (:gp 1. 19O',;o
slope O.59637''.
16
15
1q
13
0 20 40 60 80 100 120 140 160 160
ST.PlTI C)N
PRE FILE
22
Menu
21
z
Natured ground slope 1.0 2'N.
20
19
93 fi. of 12 in. pipe (LD
-------------4
HGL slope 0.220!;'.17
16
0 20 40 60 60 100
SPTA-r"r I Q N
r
nct-
CONCEPTUAL DRAINAGE REPORT
FOR 6 cSJ'"P
l Lra..�l J Y .t � ✓
PARCEL A - WASHINGTON TECHNICAL CENTER
LOCATED AT
SOUTHWEST 7TH STREET NEAR POWELL AVENUE
RENTON, WASHINGTON
FOR
SGA CORPORATION
BY
JOHN E. ANDERSON, P.E.
1997
BUSH, ROED & HITCHINGS, INC.
2009 MINOR AVENUE EAST CITY pF REN70NrvING
SEATTLE, WA 98102
(206) 323-4144
BRH JOB NO. 97102.00
DATE Z
APRIL 24, 1997
6878
N. ISTER�9
AL
EXPIRES 12/1/ d17
3_
p,tt EA N V OL.0 nnP-
.00 1089.00 0.00
0.00 0.00
0.00 1548.00 2.00 2623.58 2623.58
12.00 2057.00 2.00 3592.96 6216.54
— �'�oM I...1�{o RU C�2�'P K '13� �-�.E ��Z�,u�Q�-b �E.TPo►.�D
vo�ur�E = o .oq Ac-FZ = 3, °155 GF
7o vjsTPotQD VOLLU
MuST 1�GR-EASE �� A t•r1�r�l �rv.v,ir, vF 3a�o
VOLUME FRd�ltpE�
4--(D e-f
.a e Ad
�w J,
z --
4L 7
VIM EROSION CONTROL
1. The owner may decide to pre-load the building area. This will depend on the availability of
material at the time of building permit submittal. Separate pre-load plans have been prepared
in the event material can be obtained. The pre-load plan limits work area to the building pad,
stock pile area, sediment trap and construction entrances. All other areas will be undisturbed.
Pre-loading the building pad will not significantly change the existing storm run off pattern
for the site. All storm water run off will be conveyed to the natural low point of the site. The
duration of a pre-load should be approximately 2 to 3 months.
2. The ECP for the site utilizes the detention pond for peak rate and sediment control. The
detention pond sizing cLiculations show the pond has more than adequate volume for the
developed site conditions.. Since the pond meets the developed condition requirements, it will
also exceed the requirements for the grading phase.
Storm water will be conveyed to the detention pond using interceptor swales. The interceptor
swales will have rock check dams to improve sediment removal. The existing railroad tracks
are a physical barrier that prevents storm water from leaving the site. Rock construction
entrances will be installed at the proposed driveway locations and will help reduce the amount
of soil transported to Southwest 7th Street. These measure should be adequate for
controlling the drainage during site grading.