Loading...
HomeMy WebLinkAboutSWP272348(1) Return Address: City Clerk's Office City of Renton 1055 South Grady Way /L Renton, WA > BILL OF SALE Property Tax Parcel Number: 182305-9244 Project File#: 2348 Street Intersection: 430 Maple Ave SW Grantor(s): Grantee(s): 1. Schneider Hdimks, Inc. 1. City of Renton, aMunicipal Corporation The Grantor,as named above,for,and in consideration of mutual benefits,hereby grants,bargains,sells and delivers to the Grantee,as named above,the following described personal property now located at: 430 Maple Ave SW in the City of Renton,County of King and State of Washington,to-wit: Water Distrbution System Improvements Storm Drainage System Improvements Street Improvements Street Lighting By this conveyance,Grantor will warrant and defend the sale hereby made unto the Grantee against all and every person or persons,whomsoever,lawfully claiming or to claim the same. This conveyance shall bind the heirs,executors, administrators and assigns forever. A IN WITNESS WHEREOF,I have hereunto set my hand and seal day e n bel Notary Seal must be within box INDIVIDUAL FORM OFACKNOWLEDGMENT STATE OF WASHINGTON )SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that '' •'C-XON ��I-0 ( P r2�LD C%- SC �1�(-el` signed this instrument and f:r .h:�OTAR Y hacknowledged it to be his/her/their free and olunt act for the uses and purposes a �� p G. ; mentionedjin a instrument /r PUa;Jc, "tt 4..'• �, O� :. :'e Notary,Public in and for the State of Wj hi gton N�(Print) �lD� ifa My appointment expires: Dated: H:\FORMS\KCRECORD\BOS-DOC\bh Page 1 Return Address: City Clerk's Office City of Renton 200 Mill Avenue South Renton,WA 98055-2189 BILL OF SALE Property Tax Parcel Number. 182305-9244 Project File#: 2348 Street Intersection Address: 430 Maple Ave SW Reference Number(s)of Documents assigned or released:Additional reference numbers are on page Grantor(s): Grantee(s): 1. Schneider .Homes, INc. 1. City of Renton, aMunicipal Corporation 2. The Grantor,as named above,for,and in consideration of mutual benefits,hereby grants,bargains,sells and delivers to the Grantee,as named above,the following described personal property. WATER SYSTEM: jAngth 3 Size " � Water Main L.F.of 32 L.F.of 6 " DI Water Main L.F.of Water Main 3 each of 8 " Gate Valves each of " Gate Valves 2 each of Fire Hydrant Assemblies SANITARY SEWER SYSTEM: Length size Type L.F.of Sewer Main L.F.of " Sewer Main L.F.of " Sewer Main each of Diameter Manholes each of Diameter Manholes each of Diameter Manholes STORM DRAINAGE SYSTEM: Lmqth size iypne 307 L.F.of 12 " RCP Storm Line 190 L.F.of 12 " CPFP Storm Line L.F.of " Storm Line each of " Storm Inlet/Outlet 4 each of " 1 Storm Catch Basin each of Manhole STREET IMPROVEMENTS: (Including Curb,Gutter,Sidewalk,Asphalt Pavement) Curb,Gutter,Sidewalk 474 L.F. Asphalt Pavement: SY or L.F.of Width STREET LIGHTING: #of poles 2 By this conveyance,Grantor will warrant and defend the sale hereby made unto the Grantee against all and every perso ar n or persons,whomsoever,lawfully claiming or to claim the same. This conveyance shall bind the heirs,executors, administrators and assigns forever. H:1FU,E.SynT, i\84HNDOUI\BII.LSALE.DOC\MAB Page 1 Ownership Transferred to City of Benton CITY OF RENTON PLANNING, BUILDING/PUBLIC WORKS DEPARTMENT FINAL COST DATA AND INVENTORY NAME OF PROJECT WTR- WWP_ Ozbolt Condominiums SWP_ TRO- TED- Per the request of the City of Renton, the following information is furnished concerning final costs for improvements installed and turned over to the City for the above referenced project. WATER SYSTEM CONSTRUCTION COSTS: Length Size Type 403 L.F. of 8 DI WATERMAIN 32 L.F. of 6 DI WATERMAIN L.F. of WATERMAIN L.F. of WATERMAIN 3 EACH of �— ' — GATE VALVES EACH of GATE VALVES EACH of GATE VALVES 2 EACH of FIRE HYDRANT ASSEMBLIES S 20,436 (Cost of Fire Hydrants must be listed separately) S 3,500 — hydrants (Include Engineering and Sales Tax if applicable $ 4,452 . TOTAL COST FOR WATER SYSTEM S 28,388 SANITARY SEWER SYSTEM: STORM DRAINAGE SYSTEM: Length Size 'Type Length Size Type L.F. of ` SEWER MAIN 307 L.F.-or 12 RCP STORM LINE L.F. of SEWER MAIN 190 L.F.of 12 CPEP STORM LINE L.F. of SEWER MAIN L.F. of STORM LINE EA of DIAMETER MANHOLES EA of STORM INLET/OUTLET EA of ' DIAMETER MANHOLES 3 EA of Type 1 STORM CATCHBASIN (Including Engineering and Sales Tax EA of STORM CATCHBASIN if applicable) $ (Including Engineering and Sales Tax $18,241 TOTAL COST FOP.SANITARY SEWER SYSTEM S If applicable) $ 3,393 TOTAL COST FOR STORM DRAINAGE $21,634 SYSTEM STREET IMPROVEMENTS: (Including Curb, Gutter,Sidewalk, Asphalt Pavement) Curb, Gutter, Sidewalk: 474 L.F. $ 121134 Asphalt Pavement: 415. Sy or L.F. of varyinp, Width S 10,37 SIGNALIZATION: (Including Eng. Design Costs, City Permit Fees,'WA St Sales Tax) STREET LIGHTING: (Including-Eng. Design Costs, City Permit Fees, WA St Sales Tax) of Poles 2 S 13,046 Dennis Alfredson, P.E. (206) 2-4 2471 Print signatory name day phone j, ( TVRE) 1'orms/COSTDAT2.DOC/bh. / (Signatory mu33 be4uthorized agent or owner o�'s Oct development) ! y Return Address: City Clerk's Office City of Renton 1055 South Grady Way Renton, WA BILL OF SALE Property Tax Parcel Number: 182305-9244 Project File#: 2348 Street Intersection: 430 Maple Ave SW Grantor(s): Grantee(s): 1. Schneider H(ImEis, Inc. 1. City of Renton, a Municipal Corporation qd. The Grantor,as named above,for,and in consideration of mutual benefits,hereby grants,bargains,sells and delivers to the Grantee,as named above,the following described personal property now located at: 430 Maple Ave SW 0 in the City of Renton,County of King and State of Washington,to-wit: Water Distrbution System Improvements Storm Drainage System Improvements 0 Street Improvements Street Lighting By this conveyance,Grantor will warrant and defend the sale hereby made unto the Grantee against all and every person or persons,whomsoever,lawfully claiming or to claim the same. This conveyance shall bind the heirs,executors, administrators and assigns forever. A IN WITNESS WHEREOF,I have hereunto set my hand and seal 'day an e be�1 ). S 01 a; Notary Seal must be within box INDIVIDUAL FORM OFACKNOWLEDGMENT STATE OF WASHINGTON )SS COUNTY OF KING ) n, I certify that I know or have satisfactory evidence that a I�T �Uli1 C/�F�` signed this instrument and I acknowledged it to be his/her/their free and olunt act for the uses and purposes :0 c;�TA��Y �; �, mentionedTmthe-instrument R11't3L1v •�y:s Not ary;I'ublic in and for the State of W hi9gton �Jas_ fit" '• -� f':1� N&�(Print) J01Q<f",g My appointment expires: Dated: - 0 0 0 + H:\FORMS\KCRECORD\BOS.DOC\bh Page 1 co 0 r- ti 0 v, m r ; BILL OF SALE Property Tax Parcel Number. 182305-9244 Project File#: 2348 Street Intersection Address: 430 Maple Ave SW Reference Number(s)of Documents assigned or:-pleased:Additional reference numbers are on page Grantoe(s): Grantee(s): 1. Schneider .Homes, INc. 1. City of Renton, a Municipal Corporation 2. The Grantor,as named above,for,and in consideration of mutual benefits,hereby grants,bargains,sells and delivers to the Grantee,as named above,the following described personal property. WATER SYSTEM: jAnath Size_ � L.F.of 8 DI Water Main 32 L.F.of 6 DI Water Main L.F.of Water Main 03 each of 8 " Gate Valves each of " Gate Valves 2 each of Fire Hydrant Assemblies SANITARY SEWER SYSTEM: Length size lyp—e C) L.F.of Sewer Main L.F.of Sewer Main L.F.of Sewer Main each of " Diameter Manholes each of " Diameter Manholes each of " Diameter Manholes STORM DRAINAGE SYSTEM: Length size �e 307 L.F.of 12 RCP Storm Line 190 L.F.of 12 C P F P Storm Line L.F.of Storm Line each of Storm Inlet/Outlet 4 each of Type 1 Storm Catch Basin each of Manhole STREET IMPROVEMENTS: (Including Curb,Gutter,Sidewalk,Asphalt Pavement) Curb,Gutter,Sidewalk 474 L.F. Asphalt Pavement: SY or L.F.of Width STREET LIGHTING: #of poles 2 By this conveyance,Grantor will warrant and defend the sale hereby made unto the Grantee against all and every person or persons,whomsoever,lawfully claiming or to claim the same. This conveyance shall bind the heirs,executors, administrators and assigns forever. H:\FIIB.SYS\FPI"4HNDOLrMILLSALE.DOCIMAB Page 1 Return Address: Cite Clerk's Office CiIN of Renton 200 Mill Avenue South Renton. WA 98055-2189 L7 Title: UTILITIES EASEMENT Pro erty Tax Parcel Number: 182305-9244 Project File#: 07gol T APARTMENTS I Street Intersection or Project Name: apl e SW +-1 Reference Number (s)of Documents assigned or released: Additional reference numbers are on page 0 Grantor(s): Grantee(s): 1. Schneider Homes, Inc. 1. City of Renton, a Municipal Corporation Additional legal is on page_�_of document. (.Abbreviated legal description MUST go here.) O LEGAL DESCRIPTION: A portion of Parcel 2, City of Renton lot line adjustment No. LLA-052-90, recorded under Recording No. 9011019001 and I)ing within the southwest quarter of Section 18,Township 23 North,Range 5 East, W.M., in King County, Washington. ai 14 (Tf CFf O V W CC F- U C:l x Y 7C 6 O 1 Is II:\FILE.SYS\FR"03EASENMOO]3.DOC\ Page I FORM 03 0013/bh/CA2-21-97 cc ti N tT That said Grantor(s), for and in consideration of mutual benefits,do by these presents,grant.bargain_ sell,convey,and warrants unto the said Grantee, its successors and assigns,an easement for public - utilities(including water,wastewater,and surface water)with necessan appurtenances over, under, through,across and upon the following described property(the right-of--way) in King County, Washington, more particularly described on page 1. (or if full legal is not on page I—Exhibit A.) For the purpose of constructing. reconstructing, installing,repairing,replacing,enlarging,operating and maintaining utilities and utility pipelines, including,but not limited to,water,sewer and storm drainage lines,together with the right of ingress and egress thereto without prior institution of any suit or proceedings of law and without incurring any legal obligation or liability therefor. Following the initial construction of its facilities, Grantee may from time to time construct such additional facilities as it may require. This easement is granted subject to the following terms and conditions: 1. The Grantee shall,upon completion of any work within the property covered by the easement, restore the surface of the easement,and any private improvements disturbed or destroyed during execution of the work,as nearly as practicable to the condition they were in immediately before commencement of the work or entry by the Grantee. 2. Grantor shall retain the right to use the surface of the easement as long as such use does not interfere with the easement rights granted to the Grantee. C Grantor shall not,however,have the right to: a. Erect or maintain any buildings or structures within the easement;or b. Plant trees, shrubs or vegetation having deep root patterns which may cause damage O to or interfere with the utilities to be placed within the easement by the Grantee-, or C. Develop, landscape,or beautify the easement area in any w,ay which would unreasonably increase the costs to the Grantee of restoring the easement area and any private improvements therein. d. Dig,tunnel or perform other forms of construction activities on the property which would disturb the compaction or unearth Grantee's facilities on the right-of-way, or endanger the lateral support facilities. e. Blast within fifteen(15)feet of the right-of-way. This easement shall run with the land described herein,and shall be binding upon the parties, their heirs, successors in interest and assigns. Grantors covenant that they are the lawful owners of the above properties and that they have a good and lawful right to execute this agreement. By this conveyance, Grantor will warrant and defend the sale hereby made unto the Grantee against all and every person or persons,whomsoever, lawfully claiming or to claim the same.This conveyance shall bind the heirs, executors. administrators and assigns forever. H:\FILE.SYSTRW3EASENIMOOI3.DOC\ Page 2 FORM 03 0013/bh/CA2-21-97 IN WITNESS REO , have hereunto set my hand and seal the day,and year as written below. J e Manager of Development I I47DUAL FORV OFACdNOWZEDGMEAT Notary Seal 60r�ff Homes FWASHNGTON ) COUNTY OF KING )SS I certify that I know or have satisfactory evidence that signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument Notary Public in and for the State of Washington Notary(Print) My appointment expires: Dated: L'? REPRESEATATIYE FORV OFACdh'OWLEDGMEAT Notary Seal must be within box STATE OF WASHNGTON ) Q COUNTY OF KING )SS I certify that I know or have satisfactory evidence that signed this instrument,on oath stated he/she/they was/were authorized to execute the instrument and O acknowledged it as the and of to be the free and voluntary act of such party/parties for the uses and purposes mentioned in the instrument Notary Public in and for the State of Washington Notary(Print) My appointment expires: Dated: CORPOR4TE FORVIOFACKNOWZEDGSIE`T Notary Seal must be within box STATE OF WASHNGTON ) COUNTY OF KING )SS On this day of , 19 bef re me personally appeared to me known to be of the corporation that executed the within PAU L E. MORROW in ent,and a owledge the said instrument to be the free and voluntary act and deed of said corporation,for the uses and purposes therein mentioned,and STATE OF WASHI NGTON each on oath stated that he/she was authorized to execute said instrument and that the rxed is the corpo to seal of said corporation. NOTARY PUBLIC ICY COMMISSION EXPIRES 7-15-00 1 t�m,Nothly Public in f r tfle State Washingto Notary(Print) My appointment expires: — Dated: � 1� EXHIBIT`A" LEGAL DESCRIPTION (Must be stamped by a P.E. or L.S.) WATER MAIN EASEMENT LEGAL DESCRIPTION THAT PORTION OF PARCEL 2, CITY OF RENTON LOT LINE ADJUSTMENT No.LLA-052-90, RECORDED UNDER RECORDING No. 901101900 1,RECORDS OF KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF SAID PARCEL 2; THENCE NORTH 29056'09"EAST ALONG THE WESTERLY LINE OF SAID PARCEL 2 AND ALONG THE EASTERLY MARGIN OF MAPLE AVENUE SOUTHWEST, A DISTANCE OF 210.56 FEET TO THE SOUTH LINE OF THE NORTH 15.00 FEET OF SAID PARCEL 2 AND TO THE POINT OF BEGINNING; THENCE CONTINUING NORTH 29056'09"EAST ALONG SAID WESTERLY LINE AND ALONG SAID 7) STREET MARGIN, A DISTANCE OF 17.07 FEET TO THE NORTHWEST CORNER OF SAID PARCEL O 2, THENCE SOUTH 88035'21"EAST ALONG THE NORTH LINE THEREOF, A DISTANCE OF 332.87 FEET TO THE NORTHEAST CORNER OF SAID PARCEL 2 AND TO THE WESTERLY MARGIN OF HARDIE AVENUE SOUTHWEST; THENCE SOUTH 22006'23"EAST ALONG THE EAST LINE OF SAID PARCEL 2 AND SAID WESTERLY STREET MARGIN, A DISTANCE OF 16.36 FEET TO THE SOUTH LINE OF THE NORTH 15.00 FEET OF SAID PARCEL 2; THENCE NORTH 88035'21"WEST ALONG SAID SOUTH LINE, A DISTANCE OF 144.73 FEET,- THENCE SOUTH 01024'39"WEST A DISTANCE OF 22.27 FEET; THENCE NORTH 88035'21"WEST A DISTANCE OF 15.00 FEET; THENCE NORTH 01024'39"EAST A DISTANCE OF 22.27 FEET; THENCE NORTH 88035'21"WEST A DISTANCE OF 187.81 FEET TO THE POINT OF BEGINNING. E. Mo9 z� H:\FILE.SYS\FRM\03EASEMN\0013.DOC\ Page 4 FORM 03 0013/bh/CA2-21-97 Map Exhibit a Nix°6 �3b L7 X m I QN O IZ CN � 1 r w•� cQi h N !-N 3 � z Im .Z I� h N 2 Z I 2 's H:\FII.E.SYS\FRM\03EASEMN\OOI3.DOC\ Page 5 FORM 03 0013/bh/CA2-21-97 :i 65 110I, NIA3AN,f ONIN]]NI N]\ \ Il 3' u-•cl r«� ns / lxlb w N J n tl • m 1 ' `N—_"14 M sa' t Ine nn Lir�M /Y 71tl J5 JIHdtl N') 1 e �l/•%r /" n c sva - aN db a3 MO! ,ns 3,,,,�,•" '"'^ maN3wrao3a -XXdwHJ)V,VE _ '3N7 31H100d-MO11a0W A31tl0 R 1iin -5-�'S VId m d �30 N g �wnz�a Niv3,Od axi 1-1130 3n • - 3 -fZ'BC} 3H f/ a.1r a,.,.....,v-W, a3 s Room•,.Is)1 b,Ir+n a3,n3a 3gn.s I^ 4 _ n0)s 300bn9 tl0 ruU01—3 03 3 .e. G du vv 1 v0 .r.lrt3 ] 3 - A3X- W .� M .Zt-XFXf L M3N SI SOM�Tr]r00103.3r>a >0 3xO eM Z n6 (M)3 3N av3,Na 3vl 313 Of 0 rrv'i _ \ , A i! Yx,iSxOJ•3u� bU0]X`TTmS v]Jn [2> Iw allam , a / y I YIS/ ALB YYZ 1 O 3NB3 �- • ofMl SHIe30 Z non .L fIS2-I.�N 1T'1sN, _ 4 a '+•�"V. 0 N\f 03).rx)o, f 1,nnxi n 1 alsHO>)r 1)dti'(J rin4�l ONIJ.vIX3 zl-fKZ�3 0� '151X3 3AOX3ti� 4 a I' ,'\ o'I 0 Ain-}r. s. I.NNa,4.Nari,br,vlar/feW• S310N " S Bf-�]'I M 0)MR.Lr ]V OfOON1 No tY YOvf � SVO�ONM3B nr 0[Z _� N]NL'9tlil]wLLN»f2 90]°J%] dip \ \ ML13 7N1>A Y]Nyw LSbJNI/b5 3XL �� ®_ - I � _ 11 l7_-.. .-.310N 11s ._--.-_- __ ,Bt'BES 13dA1 9TN B> 300 e i _. - '-_ -- W r� \ �Y•\ �s a d as I lwMi� 1 SZ £Msys 9YXL l3'ICl y \ 70 ada.I-°d 3»•n 13w-I=N eo Arttw r1s t- 1 s 3a Aa.1 3.`+sn-vw "'� - "" ¢`, -_•„s�. 7 rye t If f n !3dAl-LnN» SI f0 9 3s "rxO.YT'V a 91 Meoyddb l,v 9N Wv7,Z 1�' � lT1- )dr05 ]3\ -m9f 1"Sur%M 0 'n3Gral tm M aTaMW Hi FaLLb)LT53J1 N.• I _p3 �- \\ Q \ >IYourn O Ovb v fo A 3.tV1£,wi•JN ,n 3!�f ONtl r: r MS 3/.r \ sold TIrHS NbryTnnlSN,>3uo LWVJ%3 Nbr1>n yn0 b(Y ry�3n1 �) 03rd4N3tlr]bY SNrW+.Y H upyr UL Ovtl .ry t•`�/' �' � � t ,bN0 SS3f �/ _ Y \\ � \ \ 15100.o3NTlb ]d b A O Y Y '0 bN5 1"I j Z•3�add )lni Ntl0 3 3 '911 Il•A»%3 /� •' ' �, "' n. \ i Naunxunw am nxf:x,o 3NL,o T•Aow3n 31oN "'+ -.... _. � my0 is om \ I> I1 i`� R0Ai1 k�STORY PLAN \µ _ O � ' I � _ �•_ ^� NDTE-.RFMvl OeM MF,Ta4•NO DM]ixK,gN rNJ.-MnNrtE Of TY[dK ra[F PARCEL 1 SIRLL D[."S�ioR[D 0[•M1tereSH Z "I.—NEE ANO A TRlpgl rIDNrTOR.II Yvrux A[rRINc AR[IpNTIfIED \\ CAI;,wt TxEE$ALUk E.. `Z, •r�� .K�7r Dl.alw 1oNsrROclNx EJILgnox,r.NsraYcrw sNUE na y '•ND,xE�wsx�.w+w n.tt ofsrrc oc ARc aar..ID Nn>ealc 7, t TNEST E NQ +cD LINE U m NDSC!DE D4JN I' O� fKaR.�nwJ,TNF MIXN�t SxmT r[�eE�AnD ww•Nisx TWM `.�v-E� CL z I �k•xzme� NWE[E eox xew- Pf1 a Z\ [[7 iryl aN e�.wNx� [roeR'n nA..DD NEN vW, a Wl DE s cEn«*.1 a` ltv[ - T m r,-TYOE I iiFJ,x'E• •IyED' m a AN, DORT. A N /oPEA R 'S� Xl DE ' w a{{� / ,•///p�JylJ iac6F '" ' .x'N S� t"� \ ./ \\ 1Fr'�3'N' z 3 / i P . F 4 ' i, E� ��J' s•:`J �yA`'"e[[ �[ / TV u [ 41 `'1 ��.. ;'r "•' 't, r� ��� cr`�°,`' W\ .'Q'? 'C� \ % �� ib «:i.,: t 4 t..� e��., yy _ IIII • ... �: [w; fix. ____ _ _ -- .____ 5(t.NOTE_ R 6 i cOu N > STA >. 17w rx'fro E� f ' ( �F Cep pw r, REI._)i..N - c • !• NDTI'.Il[11fwvATI.N reR T y{N,Ir}11w[• uc � r�'�— a? � � TN[Wlx ucT Oe11rE[R eE TNfWIT[S 4 _ / ��I ��77�� [JG<CD6 2c uwnn[r6M Tx r J I rELOGR 4AS wLK •^•' :. u0•v.FtleN cNw K ,.�J// .o► eEe•D seDEiwu LE GEND NO7E5: A fllofWleN•l ARCN[eEea aR[a•MJ- -H'is(D•lAi ` `Lv. w I[ u iNOK EbSr. SCRARIN 2.1 -[EATIIRE 2 sTAu NE islJ_1[• EXISTING PROPOSED - �, f RFIID\E O69T. f•.nr i nlr[ •qK•kNj CpGIaUGigN E•[•vIION 5[OUb ro F.rEEO �t D 91YiALL IIEN-,iclf-Ir [/� OCP1N>UNAICa 1N•N T>CEw,AEI[R>(sol.TNEN �' •\\ i lBRllr.�•2mL n N /V .....� Sw1 —[—•,R:HERD CL•Oq aOt�Ea.•' aIEDINO COxc,NDt1gN 'q _ \ U 71va l PA ENen / _ Lull EC OEUTCO W,N•RSNNL Da00R•u Ti S �/ L JMo)•['.M'• - tF 1 T r>ENEx LINE • «xfTFO,0 O[Rb[t lxE PoRx,ul 51«•C. t �.r+r�rT ([.)/ry..• J��� _ —rr NACOlO«'Y OEPo>rts. E.E(h •. Y NE•E )lr —EDGC Or c•v[uCu, rw•E. Y�01DMi 30/ /F.'E .—R•r[a LNC Q .,E '2v[w' YEN]EN[k G �uP ".m'"" W.Elm, qNC N —G LN[ ••rEx NEr[o f >T-1-EL-OIL«•O NG 5[0 rb. '•�� n•,• E 3e/ [ TOO HIED—1Ns—IOL NNN al 11—ETE"f FS ti._..,,4" •.::�:: d A • .n. ^' i1s i,.-1r.. —"— uATD loR • n, LulL9C O[u.Eo .Esrw n[D re+i D E-KYDK ,[•( v- • 0 DETEMN[r -EN L01[Cu1tE Of[RCruE0LOUc4 JNJ+F� OIL o.N, DE-11 dh K DATUM: I$-BU►LT PLANS I PolE ! DAIEY-NORR011-POBIETE. INC. EC .N�slI..,u I — BENCHMARK: R,,,OMAMENDED ` "• q ''/ s•..N+,•.,.. GRAPHIC SCALE NIPo�If ss o-s s1—Eo—I rtsr NTww N - N f 3 _ cwn[x a—1>a1x0 vwtF•x0 Bv�,Q.� d Y SgIM sIOE pg5[uxr hW. E�00 B'fr+/r.Ri rfl'I't //- CNGINCCRING-SURYCYINO d `a Ra: L. EAeI tom. ��I rl uND YUNNENG ' { �����rRV 1•R,1• aF tN ANxv[SWM a wx5[l hW•Ec, r / ee ttE, cJ-..R._,re•e r •IxmN AP R_rFc',Y ti 4 nou 1199 T I Golder Associates Inc.4104-148th Avenue,NE _ - Golder Redmond,WA 98052 c Associates Telephone(206)883-0777 Fox(206)882-5498 September 27, 1996 Our ref: 963-1552 AUG 19 i997 1 Bt LDIIv3 _)!VISION Schneider Homes,Inc. 6510 Southcenter Boulevard,Suite #6 Tukwila,Washington 98188 ATTENTION: Mr. Ken Peckham RE: RESULTS OF PRELIMINARY GEOTECHNICAL STUDY OZBOLT SITE RENTON,WASHINGTON Dear Ken, Golder Associates Inc. is pleased to present the results of our preliminary geotechnical study for the above referenced project. The scope of work for this project was contained in our proposal to you dated September 12, 1996. We proceeded with our study based on your authorization given in the fax received from you on September 9, 1996. The study was completed in substantial compliance with our proposed scope of work We did not complete any environmental sampling or testing for this study. In general, the project can be constructed as proposed. Subsurface soil conditions indicate that conventional construction practices can be used throughout the project. The report text will first discuss the general site conditions and proposed project development plans, followed by the results of the geotechnical investigation. 1. PROJECT AND SITE DESCRIPTION The project site consists of a trapezoidal shaped lot of undeveloped land which is located in western Renton in King County,Washington(Figure 1). The property is located south of Southwest 4th Place,bounded by Maple Avenue Southwest along the west side and Hardie Avenue Southwest along the east side. The Plum Tree apartment complex borders the southern edge of the site and a single-family residence with several out buildings is located at the north edge of the site (Figure 2). Based on the preliminary site plan faxed by you on September 24, 1996,the proposed development plan consists of two multi-story,multi-family apartment buildings with a total of 36 units,with an optional two story building as shown on Figure 2. Building loads are expected to be moderate to light and no below grade structures are planned. Asphalt paved driveways and parking lots,and associated utilities will be constructed. (l��i(�C'iri f.i cTr,f.i it �rr .r.. ern.nnnii inin ir� n,i rr „ �,urr,�, „r� September 27, 1996 2 963-1552 The topography in the northwest portion of the site is generally undulating and slopes down from the northwest corner to the southeast to a prominent break in slope that extends across the site from the southwest to northeast. The southeast portion of the site is generally flat. No site topography was available for this study. The vegetation on the site consists of a combination of open grass and small scrub brush with one large tree in the middle of the site. Dense blackberries and mixed trees dominate the east and west edges of the site. A creek or deep drainage ditch runs along the eastern edge of the site,parallel to Hardie Avenue Southwest. We observed several piles of vegetative debris,household trash,and construction debris at scattered location across the site. 2. PREVIOUS INVESTIGATIONS We observed several shallow test pits that had been excavated on the site previously as part of an archeological survey. We are not aware of any other geotechnical or environmental investigations on this site. 3. GEOTECHNICAL INVESTIGATION 3.1 General The purpose of the geotechnical study was to investigate the soil and groundwater conditions on the site and provide preliminary geotechnical recommendations for proposed site development and construction. The following sections contain the scope of work and the results of our subsurface investigation. 3.2 Field Investigation Our field investigation was conducted on September 18, 1996 and consisted of excavating eight test pits (TP-1 through TP-8) on the site to a maximum depth of 11 feet. The approximate locations of the test pits are shown on the Site Plan Figure 2. The test pits were excavated using a rubber-tired backhoe under the full-time direction of a member of our engineering staff. Our field engineer observed and directed the test pit explorations, collected representative,but disturbed soil samples,and recorded soil descriptions, stratigraphy,density/consistency,and groundwater data on a test pit log form. Summary logs of the test pits are presented in Appendix A. Soil samples were described in accordance with Golder Associates Technical Procedure TP 1.2-6"Field Identification of Soil". An explanation of the classification system is included with the test pit logs. Soil samples were returned to our geotechnical laboratory for additional evaluation and review of descriptions. The test pits were backfilled at the conclusion of soil sampling and observations. The backfill was tamped in place with the backhoe bucket; however,some ground settlement over the test pits should be expected. Golder Associates r , September 27, 1996 3 963-1552 3.3 Geologic Setting Based on our field observations and review of published geologic maps,the project site is located on the north east edge of the Green River Valley. To the east lies the Cedar River and the west lies the Green and Duwamish Rivers. Prior to the construction of the Lake Washington Ship Canal between 1911 and 1916,Lake Washington drained to the south through Renton via the Black River to the Duwamish River at Tukwila. After the Lake levels were lowered in 1916,the Black River channel was largely abandoned and over the years portions were filled and developed. The Cedar River channel was relocated further to the west to its present channel along the Renton Airport. Based on the soil conditions summarized in the following section,we believe that the southeast portion of the Ozbolt site is located in the area of a former meander bend of the Black River. 3.4 Subsurface Conditions 3.4.1 Soil The soil conditions described here represent those conditions observed in our test pits. Our test pits encountered a variable stratigraphic soil and bedrock section that consisted of topsoil,alluvial deposits of silt,sand and gravel,till,and a completely weathered to highly weathered sandstone. In general,the site can be divided into two areas based on the soil and rock types we observed.A description of the two areas are presented below. The soil and rock units we observed are described in greater detail in the section following the area descriptions. The Northwest Upland: This portion of the site encompasses about 2,/3 of the site and lies north and west of the prominent break in slope on the site. Test pits TP-3,4,6,7 and 8 were excavated in this area. Based on the test pits this area is underlain by about 2 to 3 feet of flood deposits,0 to 7 feet of Till,and highly weathered Sandstone. The till was absent in TP- 7 and only one foot thick in TP-8. The till thickened toward the break in slope in the central portion of the site to about 3 feet in TP-4 and about 7 feet in TP-6. The sandstone was encountered beneath the alluvium in TP-7 at a depth of only 3 feet. It was encountered below the till in TP4,6,and 8 at depths varying from 4 to 10 feet. The Southeast Lowland: This area lies in the relatively flat southeast 1/3 of the site. Test pits TP-1,2,and 5 were excavated in this area. Based on the test pits this area is underlain by three to seven feet of flood deposits consisting of loose,silty sand. Below the silty sand flood deposits we encountered a coarse sand and gravel alluvium to the full depth of test pits TP-2 and 5. In TP-1 a sandy silt alluvium was encountered below the sand and gravel alluvium at a depth of 9.5 feet. We would expect that this deposit is likely stratified and variable across this area. Golder Associates September 27 1996 4 _ 963-1552 The soil units are described in greater detail in the following section. Topsoil/Fill-Topsoil was observed in all of our test pits and was composed of a loose, organic rich silt and sand up to one foot in thickness. Although fill was not observed in our test pits,it may be encountered near the edges of the existing roads as part of the road construction. Flood Deposits -This unit was observed in all our test pits and consisted primarily of a stratified deposit consisting of loose,sandy silt and extended to a depth of two to three feet on the upper portions of the site,and about three to seven feet in the lower portion of the site. Alluvium-This unit was observed in our test pits in the lower southeast portion of the site below the flood deposits. and consisted of a compact,well graded sand and gravel with trace to some cobbles. These stratified alluvial deposits extended to the bottom of the excavations in TP-1,2,and 5 at seven to about ten feet Till-This unit was encountered above the sandstone in TP4,TP-6,and TP-8. The till consisted of a compact to dense,silty sand with some gravel,and a trace of organics. Near the contact with the completely weathered bedrock in TP-6 the till became softer and wet. Till typically contains sandier zones that can trap groundwater. In addition,occasional boulders are encountered. Sandstone -The sandstone unit consisted of a extremely weak to very weak, moderately to completely weathered,stratified,medium grained,arkosic sandstone of the Renton Formation. In TP-7 the sandstone was extremely difficult to excavated with the backhoe at a depth of 4 feet. In the remaining test pits the sandstone was difficult to excavate to the depths shown on the test pit logs. The sandstone encountered at the bottom of TP-6 was completely weathered and behaved like a compact, wet silty sand. 3.4.2 Groundwater We encountered groundwater seepage in TP-1 and TP-6 from a depth of approximately 10 feet.The other test pits in the lower portion of the site were unable to achieve this depth due to caving of sands and gravels,however,we feel that the groundwater elevation is likely similar across the lower portion of the site and likely can be shallow during the winter months. No groundwater was encountered in the upper portions of the site. The groundwater conditions described here are only for the time and locations described. These conditions likely change over time. 4. RECOMMENDATIONS AND CONCLUSIONS Based on the results of our geotechnical explorations the site appears suitable for the proposed development provided the recommendations presented in this report are followed. The site can be developed using conventional construction practices. The buildings can be founded on conventional spread footings bearing on competent native till, bedrock or alluvial deposits. In the area of TP-1 in the southeast corner of the site,the Golder Associates September 27 1996 5 963-1552 alluvium is about seven feet deep. We have provided a couple of alternative options for foundation subgrade in that area. Our preliminary recommendations are contained in the following sections. 4.1 Foundations Shallow conventional isolated or continuous spread footings may be used throughout the site provided they are founded on the native bedrock,till or the alluvium. Structural fill that has been compacted in accordance with the recommendations in Section 4.5"Site Preparation and Earthworks" are suitable for foundation support. Topsoil or fill is not considered acceptable foundation bearing soils and should be removed from all building footprints. Foundation subgrades should be inspected prior to placing the reinforcing steel and concrete. The subgrade should be firm and consist of competent native soil or compacted structural fill. All loose,soft,or wet soil should be removed from the foundation area. In the southeast corner of the site where the flood deposits are up to seven feet deep footings can be founded in the flood deposits using a reduced bearing capacity as listed below. Alternatively the bearing capacity can be raised if the footing bearing elevation is densified using a heavy vibratory compactor. Based on our field explorations this area of thicker,loose flood deposits will affect the southern third of Building 2. Conventional isolated or continuous strip spread footings should be designed using the following recommended values: • Minimum Lateral Dimension Isolated Spread Footings 18 inches Continuous Footings 12 inches • Minimum Depth of Embedment Depth Below Lowest Adjacent Grade Exterior Footings 18 inches Interior Footings 12 inches • Maximum Allowable Bearing Pressure Foundation Bearing In Weathered Bedrock and Till 6000 psf Alluvium 2500 psf Flood Deposits 1000 psf Densified Flood Deposits 2000 psf Compacted Structural Fill 3000 psf (Min. 95 percent ASTM D-1557) Golder Associates September 27 1996 6 963-1552 These values are appropriate for all dead and live loads. A one-third increase is allowable for transient loadings such as due to wind and seismic loads. • Lateral Load Resistance Allowable Passive Resistance Coefficient of Base Friction Compact to Dense Till and Bedrock 350 pcf 0.40 Alluvium and Compacted Fill 250 pcf 0.40 The passive resistance values should neglect the top foot of soil unless confined by a floor slab or pavement. • Settlement Estimate Total Settlement less than 1/2 inch Differential Settlement less than 1/4 inch Rate approximately 90% during construction 4.2 Slabs Conventional slab-on-grade floors can be supported on compacted structural fill,till, bedrock or compacted native flood deposits underlying the topsoil. The surface of the native alluvial soils was loose and we recommend that it be compacted with a heavy,vibratory drum roller prior to casting the floor slab. To avoid degradation of the subgrade,compaction should only be done during dry periods and should not be done while the surface is wet or if groundwater levels are shallow. Any soft or organic zones observed during compacting should be removed and replaced with compacted structural fill. 4.3 Slopes The slopes located on the site appeared stable and no signs of slope instability were observed. We recommend that permanent site slopes be graded no steeper than 2H:1 V (Horizontal to Vertical) Temporary construction slopes in the till and weathered bedrock can normally stand at inclinations of about 1HAV. Based on the test pit excavations the alluvial soils in the lower southeast portion of the site will immediately seek the angle of repose and will not hold a steeper slope. 4.4 Cuts Cuts into stable native site soils such as the till and weathered rock can be faced with rockeries up to six feet in height. Higher rockeries may be feasible but will need to be evaluated on a case by case basis and will require additional investigations. Rockeries can be used to face fill walls provided the fill is internally reinforced with geotextile grid or fabric. Rockeries should be constructed in accordance with the Association of Rockery Contractors guidelines. Golder Associates September 27, 1996 7 963-1552 Cuts in the alluvial soils in the lower southeast portion of the site are not expected to be self supporting. Our test pit excavations in this area caved rapidly. We do not recommend deep cuts in this area without provisions for shoring and possible dewatering. 4.5 Site Preparation and Earthworks Site preparations will include clearing,grubbing and removal of fill and topsoil in all building and pavement areas. Native alluvium subgrade soils in the southeast lowland area shail be densified using a large steel drum vibratory roller prior to placement of fill to raise grade or final grading for roadways and foundations. The native site soils are considered moderately to highly moisture sensitive and generally are not well suited for use in structural fills. Under favorable conditions,the contractor may be able to place the native soils near the optimum moisture content and achieve the required compaction. All structural fill should be free of organics and debris and be compacted near the optimum moisture content. The highly weathered bedrock soils can be broken down and used as fill,but contain high percentages of fines and will likely have to be dried to reach optimum moisture content. Topsoil is not considered acceptable for use in structural fill and should be removed from all structural areas and used in non-structural and landscaping areas. All site structural fill should be placed in maximum 8 inch thick loose lifts and compacted to a minimum of 95% of the maximum Proctor value as determined by ASTM D-1557. In structural fill areas greater than three feet below pavement subgrade the material shall be compacted to a minimum of 90% of the maximum Proctor value as determined by ASTM D-1557. If compaction tests indicate that compaction is not being achieved,the fill shall be scarified,moisture conditioned and recompacted. We recommend that all site grading and earthworks be performed in the drier summer months. Winter construction will likely result in degradation of the site soils and result in increases earthwork costs. 4.6 Drainage Provisions We recommend that both short and long term drainage measures be incorporated into the project design and construction. The contractor should provide measures during construction to avoid the ponding of surface water on subgrade soils. Surface runoff can be controlled during construction by careful grading practices. Typically,these include the construction of shallow upgradient perimeter ditches or low earthen berms and the use of temporary sumps to collect runoff and prevent water from damaging slopes and exposed subgrades. All collected water should be directed under control to a positive and permanent discharge system such as the storm sewer or infiltration pond. 4.7 Liquefaction Although a liquefaction analysis was beyond the scope of this report,the loose to compact flood deposits and alluvium encountered in the southeast third of the site are possibly susceptible to liquefaction,during a moderate to severe seismic event. If requested,we can complete the liquefaction analysis and provide engineering recommendations to mitigate the possible effects. Our experience has been that multi-family developers typically assume Golder Associates September 27, 1996 8 963-1552 the risk of damage and do not design structures to withstand possible damage from seismic induced liquefaction. 4.8 Final Design Review We would like the opportunity to review the site grading plan prior to finalization for conformance with our geotechnical recommendations. Additional field explorations may be recommended depending on the results of the review of the site grading plan. 5. USE OF THIS REPORT This report has been prepared exclusively for the use of Schneider Homes and their consultants for the specific application to this project. The geotechnical exploration was performed in general accordance with locally accepted geotechnical engineering proactive to provide information for the area explored. There are possible variations in the subsurface conditions between exploration locations. We recommend that a contingency for unanticipated conditions be included in the construction schedule and budget. Further we recommend that our firm be retained to perform monitoring and testing during construction to confirm the conditions indicated by the explorations and/or provide corrective recommendations adapted to the conditions revealed during construction. Golder Associates has enjoyed working with you on this project. If you have any questions or require additional information,please give us a call. Sincerely, GOLDER ASSOCIATES INC. ames G.Johnson Senio Geol gist Rob rt L. Plum P.E Principal Attachments RLP/JGJ/ct amJcp.00c Golder Associates FIGURE 1 LOCATION MAP Golder Associates FIGURE 2 SITE PLAN Golder Associates -----------------------------------------------r. TP-3 y e / TP-7 N TP-4 r TP-2 \ ' e � \ Northviest IL P1anc, t ok� \ e�° optio a' �, �r \ TP-8 yak I'LC 3, I r, ,0"1 �r .s, TP-1 Pin " TP-6 P� TP-5 \ — — — -- — — — — — — —-—-—-—-—-—-—-—- -—,— — — — --- --- — — -- — Legend Proposed Building Location — — Property Boundary FIGURE 2 Test Pit Number and Approximate Location PRELIMINARY SITE PLAN TP-1 SCHNEIDER/OZBOLT/WA PROJECT NO 963 1552 DRAWING NO. 68165 DATE 9/26/96 DRAWN BY EA Golder Associates APPENDIX A SUMMARY TEST PIT LOGS Golder Associates Unified Soil Classification System Component Definitions by Gradation -- Soil Classification � -�------ --�� - Component Size Rcnce �,ter c for Assigning Group Symbols cnd Nomes Generalized Group Descriptions — — Boulders Accve 12 in. COARSE-GRA.NE:w S&LS GRAv-LS CLEAN GRAVELS [_CC Well-graded Grovels More lhon 50% More then 50% of Less than 5% fines Cobbles 3 •n. to 12 it retched on coarse fraction Poorly-graded grovels No. 200 sieve retained on Gravel 3 •n to No. 4 (4 76mm) No 4 Sieve ravel and ill GRAVELS WITH FINES Mixtures Coarse grcve� 3 -n to 3/4 in More then 12% finesGrovel and Cloy Fine grovel 3/4 in to No 4 (4 76mm) Mixtures SANDS CLEAN SANDS SW Wen-graced Sands Sand No 4 (4 76mm) to No. 200 (0.074mm) 50% cr rnoro of Less tnon 5% lines Coarse sort No 4 (4.76mm) to No. 10 (2.0mm) coarse fraction Sp Poorly-groped Sands Medium send No. 10 (2.Omm) to No. 40 (0.42mm.) posses No 4 Sieve SANDS WITH FINES SM Sand and Silt Mixtures Fine sand No. 40 (0.42mm) to No 200 (0.074mm) More than 12% fines Sill and Cloy Smaller than No. 200 (0074mm) SC Sand and Clay Mixtures FINE-GRAINED SOILS SILTS AND CLAYS CL Low-ploslkity Clays 50% or more posses Liquid limit INORGANIC the No. 200 s,eve less than 50 Non-plostic and Low- ML Plasticity Silts Samples Non-plastid and Low- ORGANIC OL Plasticity Organic Clays Non-plastic and Low- SS SPT So-pie, (2.0" OD) Plasticity Organic Silts HD Heavy Duty Split Spoon SILTS AND CLAYS CH High-plasticity Clays SH Shelby Tube Liquid limit INORGANIC p Pittner Sampler greater than 50 MH High-plosticlly Silts B Bulk High-plosliClly ORGANIC OH Organic Cloys C Cored High-plasticity Organic Silts Unless otherwise noted, drive samples HIGHLY ORGANIC SOILS Pnmanly organic molter, dark in color, and advanced with 140 lb, hammer with organic odor PT Peal 30 in. drop. Relative Density or Consistency Laboratory Tests Utilizing Standard Penetration Test Values Test Designotion Conesioniess Soils ob (Cohesive Soils ) Moislwe (1) Density D (c) (c) Relotive (c) Undrained (d) Groin Sze G Density N, blows/ft. Density Consistency N, blows/ft. Shear Strength (y) (psf) Hydrometer H Atterberg Limits (1) Very loose 0 to 4 0 - 15 Very soft 0 to 2 <250 Consolidation C Loose 4 to 10 15 - 35 Soft 2 to 4 250-500 Unconfined U Compact 10 to 30 35 - 65 Firm 4 to 8 500-1000 UU Trio, UU Dense 30 to 50 65 - 85 Stiff 8 to 15 1000-2000 CU Triax CU Very Dense over 50 >85 Very Stiff 15 to 30 2000-4000 CO Triox CO Hord over 30 >4000 permeability P (a) Soils consisting of grovel, sand, and sill, either separately or in combination, possessing no characteristics (1) Moisture and Atterberg Limits of plasticity, and exhibiting drained behavior. plotted on log. (b) Soils possessing the characteristics of plasticity, and exhibiting unconined behavior. (c) Refer to text of ASTM D 1586-84 for a definition of N; in normally consolidated cohesionless soils Relative Density terms ore based on N values corrected for overburden pressures. (d) Undroinea shear strength = 1/2 unconfined compression strength. Silt and Clay Descriptions Description Typical Unified Designotion Descriptive Terminology Denoting Component Proportions Silt ML (non-plastic) Cloyey Silt CL-ML (low plasticity) Descriptive Terms Ronge of Proportion Silty Cloy CL Clay CH Trace 0-5R Plastic Silt MH Little 5-12% Some or Adjective (0) 12-30% Organic Soils OL, OH, PI And 30-50% (d) Use Gravelly, Sandy or Silty as appropriate. Golder Associates Figure SOIL CLASSIFICATION/LEGEND 773-.1064/FORM573 _ ------ -- - Golder FIELD TEST PIT LOG Associates Temp. 60` Weather Partly cloudy Engineer TPM Operator Dave Nelson Test pit 1 --- Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location SE Site Corner Elevation No Topo Datum MSL Job 9631552 S E NW 0 5 10 15 20 0 Samples No Depth 1 .5-5.0 Q 2 7.0-9.5 3 9.5-1 0.5 6 t _ _ Oca`.q:OOd p oQQ.o.`J.o .co�O a..o _ o o_ti00000d:r 10 -- — _ __4 -= . . 15 — 120 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L shrubsSurface: Grass,blackberries, 1 Y_o_-75�-- Loose,moderate brown(5YR 4/4).sandy SILT,roots,sod 2 Special Notes — silry fine SAND trace roots(FLOOD'DEPOSITS) Some caving at 9-10.5' ht gray(N7) stratified.silty SAND(FLOOD Moderat seepage at 1 1-2 m Compact.moderate yellowish brown(10YR 6/6)to li Bottom of hole at 10.5'.0930 gLay(N7)oxidized,stratified. fine SAND and SILT 3 5'' Compact_reddish brown(I OR 3/4)to modEra _�5YH_3/4)-straiified-hae-1,zcoarse-SAND-and GRAVE trace cohbtes.trace silt(ALLUVIUM) 4 9.5 10.5': Firm grayish olive 10Y 4/2 to light brown 5YR 5/4 stratified sandy SILT ALLUVIUM PROJECT NO.963 1552 DRAWING NO. 68166 DATE 9/26/96 DRAWN BY EA - Golder FIELD TEST PIT LOG Associates Temp. 60' Weather Partly cloudy Engineer TPM Operator Dave Nelson Test Pit Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location Middle of East Side of Site Elevation No Topo Datum MSL Job 9631552 N S 0 5 10 15 20 0 = - - - - - - T Ir. Samples No Depth 1 2 5 - tr: 1 . 10 -- - 15 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L Grass.blackberries e 1sandySSILT.root 2 mpa_ct moderate yellowish brown(_10YR SIR)_ Special Notes ty fine SAND.trace roots Heamy caving from 3-5' and from 6-8.5' 3 Terminated at 8.5'duecaving 4/4).stratified,gravelly SAND,trace cobbles.trace suit (ALLUVIUM) No groundwater encountered 59-5.5' Compact-moderate-Wk wish brown(10YR 6/61 oxidized —stratitied-hne�AND-and-S1LL(ALLUV_LllM) --5.5-8.5'—LooseJighLokye-gr,ay-(5Y-512)-"rayishA2r=n j5YR 2"ravdy fine to coarse SAND.little_.cQhhles.trace sdQALLUVAUM PROJECT NO.963 1552 DRAWING NO. 68167 DATE 9/23/96 DRAWN BY EA VGolder FIELD TEST PIT LOG ssociates Temp. 60- Weather Overcast Engineer TPM Operator Dave Nelson Test Pit 3 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location NE Corner of Site Elevation No Topo Datum MSL Job 9631552 NW _ SE 0 5 10 15 20 0 Samples No Depth 1 2-9.5 III � L. 1 ,11► \��, 11 _,. 10 15 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L Surface: Grass,blackberries 1 y SILT,litfic uravel.little roots(TOPSOIL-SOD) 2 e-* Special Notes stratif�l d SsI�T aad-fine SAND trarp r of (FLOOD DEPOSITS) No caving 3 No aroundwater graded,dark yellowish orange(10YR 6/6)to grayish P to medium grained.extremely wea Terminated at 9. 1 (RO), SANDSTONE (RENTON FORMATION) PROJECT NO 963 1552 DRAWING NO. 68168 DATE 9/26196 DRAWN BY EA 11"'MAT - Golder FIELD TEST PIT LOG Associates Temp. 60' Weather Overcast Engineer TPM Operator Dave Nelson Test pit 4 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location Mid North Side of Site Elevation No Topo Datum MSL Job 9631552 SW -4 - — NE 0 5 10 15 20 Samples No Depth 1 2-5 t -lam 10 -- 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L Surfaced 3'on site fill over arass 1030 0. None SAND,trace oravel,trace roots(TOPSOIL-SOD)-0,10., Loose.dark yellowish brown(10YR 4/2).SILT and fine 2 -'T 1 n-_2(v compact moderate vellow MY 7/6) stratifopd -sandy SILT Special Notestrace,gravel (FLOO15 DEP6SIT) -- No cavin or roundwater ie little fine to coarse gravel.oxidized(T1I I Terminated a 'on 9/18 at 1050 4 v to completely l_ tely weak,non poorly— graded dark yellowish orange(1 QYR 6/6)to light bluish gray(58 7/1).fine to medium grained.extremely weak SANDSTONE PROJECT NO.963 1552 DRAWING NO. 68169 DATE 9/26/96 DRAWN BY EA (Z-i)AssociMes Golder FIELD TEST PIT LOG Temp. 60` Weather Overcast Engineer TPM Operator Dave Nelson Test Pit 5 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location Mid South Side Elevation No Topo Datum MSL Job 9631552 NE _ SW 0 5 10 15 20 0 Samples - - No Depth 1 O 1 37 �0,0 4 c�' o Q o• Q p O.�4.q p-'ca:p•;'p 3..9. ' . ' C?'D:DDoo.:..:_.0:9•:.o q;D.�od.pood��od�D:" 5 7. o Q'p:4D�Di riOc9oo..f 10 15 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L trace gravel,trace ro ts(TOPSOIL-SOD) Surface* Grass,blackberries 1105 0, None0-1.0'7 Loose,dark yellowish brown(10YR 4/2).sandy SILT, 2 Special Notes Oxidized,strat'fled.-s".. ce roots(FLOOD Heamy caving from 2-7' 3 -7.0': Compact.light brown(5YR 5/6)to light Terminated a 'due to caving 5/6).stratified.sandy coarse GRAVEL.some cobbles. trace silt(ALLUVIUM) Backfilled on 9/18 at 1122 PROJECT NO.963 1552 DRAWING NO. 68170 DATE 9/26/96 DRAWN BY EA - Golder FIELD TEST PIT LOG - associates Temp. 60` Weather Overcast Engineer TPM Operator Dave Nelson Test Pit 6 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location Mid SW Side of Site Elevation No Topo Datum MSL Job 9631552 SW NE 0 5 10 15 20 0 Samples 1 � � No Depth 2——- ---_—_ 1 7-11 5 — — T 15 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L Surfacee Grass.blackberries 1125 0, 1145 10-5 10,—1,F_ Loose,dark yakwish brown(10YR 4/2).sandy SILT — 2 Special Notes No caving 3 Slight seepAge at 10 5' coarse SAND,little fine to coarse gravel(TILL).becomes — softer and wet frQm dark yellowish Terminated at 1 1.0'on 9/18 at 1150 ckfillesl at 115.�,on 9/18graded.dark yellowish orange(10YR 6/6)to moderate -- 4 PROJECT NO.963 1552 DRAWING NO. 68171 DATE 9/26196 DRAWN BY EA -Golder FIELD TEST PIT LOG Associmes Temp. 60' Weather Overcast Engineer TPM Operator Dave Nelson Test Pit 7 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location NW Corner of Site Elevation No Topo Datum MSL Job 9631552 NW — — SE 0 5 10 15 20 Samples �- No Depth r- 3 - --/ k,- �1 5 I i 10 15 20 Sample Descriptions and Excavation Notes Time Depth of Hole De th to W/L gravel,trace roots(TOPSOIL) Surface: Grass,wood debris.trash 1155 0. None0-1.0': Loose,moderate brown(5YR 3/4).sandy SILT.trace fine 1210 4-0' 2 Special Notes (10YR 6/6) striitified,sandy Sill trace roots(FL No caving or groundwater 3 Terminated at 4'due to refusal poody graded-dark yellowish orange(10YR 6/6)to light bluish gray(58 7/1).fine to medium arained,extremely Ba Milled on 9/18 t1210 weak e0)to weak(Ri lSANDSTONE(RENTON Refusal at 4.0 feel PROJECT NO.963 1552 DRAWING NO- 68172 DATE 9/26/96 DRAWN BY EA _ - Golder FIELD TEST PIT LOG Associates Temp. 60' Weather Overcast showers Engineer TPM Operator Dave Nelson Test Pit 8 Equipment 580 Case Backhoe Contractor Schneider Date 9/18/96 Location SW Corner of Site Elevation No Topo Datum MSL Job 9631552 NE SW 0 5 10 15 20 0 — — — 1 — — — - Samples No Depth II1 � 10 - —15 20 Sample Descriptions and Excavation Notes Time Depth of Hole Depth to W/L Surfacem Brush,brambles,fallen trees 1215 la ---None- 1 oravel.trace roots(TOPSOIL) 2 Special Notes(I OYFI 6/6).SirififuAd-sandy SILT,trace roots(Fl Q Q No caving.no groundwater 3 rminated at 10'dueo refusal little fine IQ cQarse gravel (TILL) gray(513 7/1).fine to medium gramnad extremely weak Ul"ANDSTON FORMATION PROJECT NO.963 1552 DRAWING NO. 68173 DATE 9/26196 DRAWN BY EA Short Plat(SHPL# ) REQUEST FOR PROJECT It Prelim.Plat (PP# ) CAG It ) To: Technical Services Date WO# T-S Green# From: Plan Review/Project Manager c� ��) — Project Name //1���; % C®�/�Q 's (70 characters roan) Description of Project: -t -0-0,6 r� �r r rT(a.� Ql ;o �p �-a.i �,rYYLIl�.�o ✓l 10 Circle Size of Waterline: 0 10" 12" Circle One: New or Extension Circle Size of Sewerline: 8" 10" 12" Circle One: New or Extension Sl- Circle Size of StOrmline: 12" 15" 18" 24" Circle One: New or Extension Address or Street Name(s) LID Yl/) C 10- r_� 's (_J Dvlpr/Contractor/Owner/Cnslt:: o 4,,�� dM02=4_d (70 characters max) Check each discipline involved in Project Ltr Drwg It of sheets per discipline Trans-Storm ❑ ( ?� (Roadway/Drainage) (Off site improvementsxincude basin name) (include TESC shoos) us 1 ransportation (Signalization,Channelization,Ughting) ❑ ❑ Wastewater ❑ ❑ / Sanitary Sewer Main(include basin name.) ,, L� Water �c7 (Mains,Valves,Hydrants) ❑ M1 (Include composite&HorizonW Cui shccu) C1 Suface Water ❑ ❑ - 1111provements (CiP ONLY)(include basin name) TS Use Only q l? - a 3