Loading...
HomeMy WebLinkAboutSWP273472(12) PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS) DATE: 9-3-08 CONTACT: Gary Del Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX) (if applicable) LOCATION My Work Space: I ❑ File Bay Shelf#: I ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (SECONDAY): (CIP Only)(enter or open pick list below) (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACH DISCIPLINE,INVOL'tED'.IN'PROJECT L tr Drwg of sheets ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESC) ❑ TRO (Signalization, Channelization, Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (me.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP only)(include basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MV YLARS: []WATER: ❑ WASTEWATER El SURFACE WATER ❑ TRANSPORTATION ❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: } ; ProjeetRequestForm.doc t RETURN TO TOP CIP PROJECT FILE PICKLIST UTILITIES FILE TITLE FOLDER SIZE* QUANTITY CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4"St,erf)T-f-5 ®Consultant---------------------------------------------------------- 1TS (1"top side) ®City-------------------------------------------------------------------- 1TS (1"top side) ®Other Agencies ---------------------------------------------------- 1TS (1"top side) ®Contractor---------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- 1TS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4" s4eff)T+S ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts------------------------------------------------------- --- 1TS (1"top side) ®Reports/Studies/Calculations----------------------------------- 4S (4"��)��S ®Consultant Payments--------------------------------------------- 1TS (1" top side) ® AGREEMENTS----------------------------------------------------------- 1 TS (1"top side) ❑ S E PA----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- ® EASEMENTS/DEEDS-------------------------------------------------- 1 TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- ElContract Document----------------------------------------------- ❑S u b m i tta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2"Shetf} �S ®Inspection/Progress Reports ----------------------------------- 2S (2" gheMr�—S ❑Construction Management Services-------------------------- E]Operations & Maintenance-------------------------------------- ❑ LITIGATION--------------------------------------------------------------- LI D-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- DFinal Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD------------------------------------------------------------------------------ ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ ProjectRequestForm.doc r PROJECT REQUEST FOIL PLANNING/BUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS) IiT) : q-3-08 CONTACT: Gary Del Rosario,< WO# FILE STATUS 10 EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION My Work Space: I ❑ File Bay Shelf#: ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (S>CONDAY): (CIP Only)(enter or open pick list below); (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New �T Ltr D .,sY EACH DISCIPLINE �� ' t h.. ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESC) ❑ TRO (Signalization, Channelization,Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves,Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP onlyxinclude basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CRECK THE D D TO SIGN MYL 1.0 t WATER' WASTEWATER Y,- ❑ TRANSPOI�I _.,yea .m. ❑ ' ❑ ❑ FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: 5 2 e ProjectRequestForm.doc f 1 RETURN TO TOP UP PROJECT FILE PICKL1IST . ,C�TILITtEs FILE TITLE" I=E)LC7ER SIZE" QUANTITY, CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4" S-t,urf)T-f-5 ®Consultant----------------------------------------------------------- ITS (1"top side) ®City------------------------------------------------------------------- ITS (1"top side) ®Other Agencies ---------------------------------------------------- 1 TS (1"top side) ®Contractor-------------------------------------------------------- 1TS (I"top side) ®Grants/Loans----------------------------------------------------- - ITS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4',s4e1F)T+S ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts---------------------------------------------------------- 1TS (1"top side) ®Reports/Studies/Calculations---------------------------------- 4S (4" el�)�T-� S ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1TS (1"top side) ❑ S E PA ----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- 0 EASEMENTS/DEEDS-------------------------------------------------- 1 TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- FIContract Document----------------------------------------------- ❑S u b m i tta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2"Sfreff �S ®Inspection/Progress Reports ----------------------------------- 2S (2"SHe}i;) ❑Construction Management Services-------------------------- FlOperations & Maintenance-------------------------------------- ❑ LITIGATION--------------------------------------------------------------- LI D-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD------------------------------------------------------------------------------ ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ElFinal Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ Proj ectRequestForm.doc