HomeMy WebLinkAboutSWP273472(12) PROJECT REQUEST FORM
PLANNINGBUILDING/PUBLIC WORKS
(SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS)
DATE: 9-3-08 CONTACT: Gary Del Rosario WO#
FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX) (if applicable)
LOCATION My Work Space: I ❑ File Bay Shelf#: I ❑ Other:
PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one)
(250 characters max)
Allowable Folder Title: (SECONDAY): (CIP Only)(enter or open pick list below) (label line two)
(WORKING FILE)
Go to Utilities Pick List
DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of
Renton and record the information into the City's GIS system.
ADDRESS/STREET NAME(S): Renton City Limits
DEV/CNTR/OWN/CNSLT:
OTHER ALIASES: NPDES, Mapping project, Surface Water mapping
Size of Waterline: N/A New & N/A New
Size of Sewerline: N/A New & N/A New
Size of Stormline: N/A New & N/A New
CHECK EACH DISCIPLINE,INVOL'tED'.IN'PROJECT L tr Drwg of sheets
❑ TED (roadway/drainage) ❑ ❑
(off site improvements) (include TESC)
❑ TRO (Signalization, Channelization, Lighting) ❑ ❑
❑ WWP (wastewater) ❑ ❑
(sanitary sewer main)
❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑
(me.composite&HorizontalCtrl)
® SWP (surface water imp.) ® ❑
(CIP only)(include basin name)
❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only)
PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MV YLARS:
[]WATER: ❑ WASTEWATER El SURFACE WATER ❑ TRANSPORTATION ❑ FIRE
FOR FILE MAINTAINANCE USE ONLY
File Codes: Date Entered and Labels Made:
} ;
ProjeetRequestForm.doc
t
RETURN TO TOP
CIP PROJECT FILE PICKLIST
UTILITIES
FILE TITLE FOLDER SIZE* QUANTITY
CORRESPONDENCE Choose Folder size
®General -------------------------------------------------------------- 4S (4"St,erf)T-f-5
®Consultant---------------------------------------------------------- 1TS (1"top side)
®City-------------------------------------------------------------------- 1TS (1"top side)
®Other Agencies ---------------------------------------------------- 1TS (1"top side)
®Contractor---------------------------------------------------------- 1TS (1"top side)
®Grants/Loans------------------------------------------------------- 1TS (1"top side)
DESIGN/PLANNING
®Design---------------------------------------------------------------- 4S (4" s4eff)T+S
®Consultant Selection---------------------------------------------- 1TS (1"top side)
®Contracts------------------------------------------------------- --- 1TS (1"top side)
®Reports/Studies/Calculations----------------------------------- 4S (4"��)��S
®Consultant Payments--------------------------------------------- 1TS (1" top side)
® AGREEMENTS----------------------------------------------------------- 1 TS (1"top side)
❑ S E PA-----------------------------------------------------------------------
❑ PERMITS/PLAN REVIEW---------------------------------------------
® EASEMENTS/DEEDS-------------------------------------------------- 1 TS (1"top side)
CONSTRUCTION
❑Bid Info---------------------------------------------------------------
❑Insurance & Legal Review---------------------------------------
ElContract Document-----------------------------------------------
❑S u b m i tta I s-----------------------------------------------------------
❑Pay Estimates------------------------------------------------------ _
®Change Orders----------------------------------------------------- 2S (2"Shetf} �S
®Inspection/Progress Reports ----------------------------------- 2S (2" gheMr�—S
❑Construction Management Services--------------------------
E]Operations & Maintenance--------------------------------------
❑ LITIGATION---------------------------------------------------------------
LI D--------------------------------------------------------------------------------
❑Public Notification -------------------------------------------------
❑Public Meetings----------------------------------------------------
DFinal Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
SAD------------------------------------------------------------------------------
❑Public Notification -------------------------------------------------
❑Public Meetings----------------------------------------------------
❑Final Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
ProjectRequestForm.doc
r
PROJECT REQUEST FOIL
PLANNING/BUILDING/PUBLIC WORKS
(SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS)
IiT) : q-3-08 CONTACT: Gary Del Rosario,< WO#
FILE STATUS 10 EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable)
LOCATION My Work Space: I ❑ File Bay Shelf#: ❑ Other:
PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one)
(250 characters max)
Allowable Folder Title: (S>CONDAY): (CIP Only)(enter or open pick list below); (label line two)
(WORKING FILE)
Go to Utilities Pick List
DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of
Renton and record the information into the City's GIS system.
ADDRESS/STREET NAME(S): Renton City Limits
DEV/CNTR/OWN/CNSLT:
OTHER ALIASES: NPDES, Mapping project, Surface Water mapping
Size of Waterline: N/A New & N/A New
Size of Sewerline: N/A New & N/A New
Size of Stormline: N/A New & N/A New
�T Ltr D .,sY
EACH DISCIPLINE �� '
t h..
❑ TED (roadway/drainage) ❑ ❑
(off site improvements) (include TESC)
❑ TRO (Signalization, Channelization,Lighting) ❑ ❑
❑ WWP (wastewater) ❑ ❑
(sanitary sewer main)
❑ WTR(water) (Mains, Valves,Hydrants) ❑ ❑
(inc.composite&HorizontalCtrl)
® SWP (surface water imp.) ® ❑
(CIP onlyxinclude basin name)
❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only)
PLEASE CRECK THE D D TO SIGN MYL 1.0 t
WATER' WASTEWATER Y,- ❑ TRANSPOI�I _.,yea .m.
❑ ' ❑ ❑
FOR FILE MAINTAINANCE USE ONLY
File Codes: Date Entered and Labels Made:
5 2 e
ProjectRequestForm.doc
f 1
RETURN TO TOP
UP PROJECT FILE PICKL1IST .
,C�TILITtEs
FILE TITLE" I=E)LC7ER SIZE" QUANTITY,
CORRESPONDENCE Choose Folder size
®General -------------------------------------------------------------- 4S (4" S-t,urf)T-f-5
®Consultant----------------------------------------------------------- ITS (1"top side)
®City------------------------------------------------------------------- ITS (1"top side)
®Other Agencies ---------------------------------------------------- 1 TS (1"top side)
®Contractor-------------------------------------------------------- 1TS (I"top side)
®Grants/Loans----------------------------------------------------- - ITS (1"top side)
DESIGN/PLANNING
®Design---------------------------------------------------------------- 4S (4',s4e1F)T+S
®Consultant Selection---------------------------------------------- 1TS (1"top side)
®Contracts---------------------------------------------------------- 1TS (1"top side)
®Reports/Studies/Calculations---------------------------------- 4S (4" el�)�T-� S
®Consultant Payments--------------------------------------------- 1TS (1"top side)
® AGREEMENTS----------------------------------------------------------- 1TS (1"top side)
❑ S E PA -----------------------------------------------------------------------
❑ PERMITS/PLAN REVIEW---------------------------------------------
0 EASEMENTS/DEEDS-------------------------------------------------- 1 TS (1"top side)
CONSTRUCTION
❑Bid Info---------------------------------------------------------------
❑Insurance & Legal Review---------------------------------------
FIContract Document-----------------------------------------------
❑S u b m i tta I s-----------------------------------------------------------
❑Pay Estimates------------------------------------------------------ _
®Change Orders----------------------------------------------------- 2S (2"Sfreff �S
®Inspection/Progress Reports ----------------------------------- 2S (2"SHe}i;)
❑Construction Management Services--------------------------
FlOperations & Maintenance--------------------------------------
❑ LITIGATION---------------------------------------------------------------
LI D--------------------------------------------------------------------------------
❑Public Notification -------------------------------------------------
❑Public Meetings----------------------------------------------------
❑Final Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
SAD------------------------------------------------------------------------------
❑Public Notification -------------------------------------------------
❑Public Meetings----------------------------------------------------
ElFinal Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
Proj ectRequestForm.doc