HomeMy WebLinkAboutSWP273472(14) 4
PROJECT`WOEST FORM
PLANNINQ10 PUBLIC WORKS
(SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS
9-3-08 CQNN` ACT: 5Wt Rosario WO#
FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable)
LOCATION My Work Space: I ❑ File Bay Shelf#: ❑ Other:
PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one)
(250 characters max)'
Allowable Folder Title: (SECONDAY): (CIP Only) (enter or open pick list below) (label line two)
(WORDING FILE)
List
Y-.c
DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of
Renton and record the information into the City's GIS system.
ADDRESS/STREET NAME(S): Renton City Limits
DEV/CNTR/OWN/CNSLT:
OTHER ALIASES: NPDES, Mapping project, Surface Water mapping
Size of Waterline: N/A New & N/A New
Size of Sewerline: N/A New & N/A New
Size of Stormline: N/A New & N/A New
CHECK EACHISCII'LINE IIWO " ,§ 26JEC7 Ltr Drwg a
❑ TED (roadway/drainage) ❑ ❑
(off site improvements) (include TESC)
❑ TRO (Signalization,Channelization,Lighting) ❑ ❑
❑ WWP (wastewater) ❑ ❑
(sanitary sewer main)
❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑
(inc.composite&HorizontalCtrl)
® SWP (surface water imp.) ® ❑
(CIP onlyxinclude basin name)
❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only)
PLEASE CHECK THE DISCIPLINES W11IC� U-t � IYLARS
QWATER, .., .❑.,WAS;iEt?StATEIZ ❑ SURFACE WATER ._ >. IAIION ❑ FIRE
FOR FILE MAINTAINANCE USE ONLY
File Codes: Date Entered and Labels Made:
7
ProjectRequestForm.doc
•
' 1
RETURN TO TOP
CIP PROJECT PICKLI ST
'UTILITIES
FILE TIT FOLDER SIZE* Qt1AN TrITl':-
CORRESPONDENCE Choose Folder size
®General -------------------------------------------------------------- 4S (4" StrePf)T4-!S
®Consultant---------------------------------------------------------- 1 TS (1"top side)
®City-------------------------------------------------------------------- 1TS (1"top side)
®Other Agencies ---------------------------------------------------- 1TS (1"top side)
®Contractor---------------------------------------------------------- 1TS (1"top side)
®Grants/Loans------------------------------------------------------- 1TS (1"top side)
DESIGN/PLANNING
®Design---------------------------------------------------------------- 4S (4" ) / +S
®Consultant Selection---------------------------------------------- 1TS (1"top side)
®Contracts---------------------------------------------------------- 1TS (1"top side)
®Reports/Studies/Calculations---------------------------------- 4S (4"�# )7`--� S'
®Consultant Payments--------------------------------------------- 1TS (1"top side)
® AGREEMENTS----------------------------------------------------------- 1 TS (1"top side)
❑ S E PA-----------------------------------------------------------------------
❑ PERMITS/PLAN REVIEW---------------------------------------------
Z EASEMENTS/DEEDS-------------------------------------------------- 1TS (1"top side)
CONSTRUCTION
BidInfo---------------------------------------------------------------
❑Insurance & Legal Review---------------------------------------
OContract Document-----------------------------------------------
❑S u b m i tta I s-----------------------------------------------------------
❑Pay Estimates------------------------------------------------------ _
®Change Orders----------------------------------------------------- 2S (2" &Teif} �S
®Inspection/Progress Reports ----------------------------------- 2S (2" 9 e}
❑Construction Management Services--------------------------
[]Operations & Maintenance--------------------------------------
F1LITIGATION---------------------------------------------------------------
LID--------------------------------------------------------------------------------
❑Public Notification -------------------------------------------------
❑Public Meetings----------------------------------------------------
❑Final Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
SAD ------------------------------------------------------------------------------
❑Public Notification-------------------------------------------------
❑Public Meetings----------------------------------------------------
❑Final Assessment Roll -------------------------------------------
❑Miscellaneous------------------------------------------------------
Proj ectRequestFonn.doc