Loading...
HomeMy WebLinkAboutSWP273472(14) 4 PROJECT`WOEST FORM PLANNINQ10 PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS 9-3-08 CQNN` ACT: 5Wt Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION My Work Space: I ❑ File Bay Shelf#: ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max)' Allowable Folder Title: (SECONDAY): (CIP Only) (enter or open pick list below) (label line two) (WORDING FILE) List Y-.c DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACHISCII'LINE IIWO " ,§ 26JEC7 Ltr Drwg a ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESC) ❑ TRO (Signalization,Channelization,Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP onlyxinclude basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK THE DISCIPLINES W11IC� U-t � IYLARS QWATER, .., .❑.,WAS;iEt?StATEIZ ❑ SURFACE WATER ._ >. IAIION ❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: 7 ProjectRequestForm.doc • ' 1 RETURN TO TOP CIP PROJECT PICKLI ST 'UTILITIES FILE TIT FOLDER SIZE* Qt1AN TrITl':- CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4" StrePf)T4-!S ®Consultant---------------------------------------------------------- 1 TS (1"top side) ®City-------------------------------------------------------------------- 1TS (1"top side) ®Other Agencies ---------------------------------------------------- 1TS (1"top side) ®Contractor---------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- 1TS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4" ) / +S ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts---------------------------------------------------------- 1TS (1"top side) ®Reports/Studies/Calculations---------------------------------- 4S (4"�# )7`--� S' ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1 TS (1"top side) ❑ S E PA----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- Z EASEMENTS/DEEDS-------------------------------------------------- 1TS (1"top side) CONSTRUCTION BidInfo--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- OContract Document----------------------------------------------- ❑S u b m i tta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2" &Teif} �S ®Inspection/Progress Reports ----------------------------------- 2S (2" 9 e} ❑Construction Management Services-------------------------- []Operations & Maintenance-------------------------------------- F1LITIGATION--------------------------------------------------------------- LID-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD ------------------------------------------------------------------------------ ❑Public Notification------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ Proj ectRequestFonn.doc