Loading...
HomeMy WebLinkAboutSWP273472(3) PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS) DATE: 9-3-08 CONTACT: Gary Del Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION My Work Space: I ❑ File Bay Shelf#: 10 Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (SECONDAY): (CIP Only) (enter or open pick list below) (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg #of sheets ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESL) ❑ TRO (Signalization, Channelization,Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP only)(include basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK.THE DIS=WATtR, WHICH NEED TO SIGN'MYLARS ❑WATER ❑ WASTEWATER ❑ , ❑ TRANSPORTATION ,❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: c.s ' - Proj ec tRequestForm.doc 1 RETURN TO TOP CIP PROJECT FILE PICKLIST UTILITIES FILE TITLE FOLDER SIZE* QUANTITY' CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4"S►m f)T-J-7�S ®Consultant----------------------------------------------------------- 1TS (1"top side) ®City-------------------------------------------------------------------- 1TS (1"top side) ®Other Agencies ---------------------------------------------------- 1TS (1"top side) ®Contractor----------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- ITS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4° S#ieff)T+S ®Consultant Selection--------------------------------------------- 1TS (1"top side) ®Contracts------------------------------------------------------------ 1TS (1"top side) ®Reports/Studies/Calculations----------------------------------- 4S (4"de4)-T�-E ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1TS (1"top side) ❑ S E PA ----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- X EASEMENTS/DEEDS-------------------------------------------------- 1TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- FIContract Document----------------------------------------------- ❑S u b m i tta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2"3hetf} �S ®Inspection/Progress Reports --------------------------------- - 2S (2" SHefl ❑Construction Management Services-------------------------- ❑Operations & Maintenance-------------------------------------- E:1 LITIGATION--------------------------------------------------------------- LID-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD------------------------------------------------------------------------------ ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- OFinal Assessment Roll ------------------------------------------- ❑Misce►laneous------------------------------------------------------ ProjectRequestForm.doc