Loading...
HomeMy WebLinkAboutSWP273472(4) f � PROJECT REQUEST FORM PLANNING/BUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS) / DATE: 9-3-08 CONTACT: Gary Del Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION ® M Work S ace: I ❑ File Ba Shelf#: I ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (SECONDAY): (CIP Only) (enter or open pick List below) (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg #of sheets ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESL) ❑ TRO (Signalization, Channelization,Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP onlyxinclude basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK THE DIS!P-, ES WHICH NEED TO SIGN MYLARS: ❑WATER ❑ WASTEWATER WATER ❑ TRANSPORTATION ❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: ' .7" ProjectRequestForm.doc 1 RETURN TO TOP CIP PROJECT FILE PICKLIST UTILITIES FILE TITLE FOLDER SIZE* QUANTITY CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4"StmIfi)T-f—f; ®Consultant---------------------------------------------------------- 1 TS (1"top side) ®City-------------------------------------------------------------------- 1TS (1"top side) ®Other Agencies ---------------------------------------------------- 1TS (1"top side) ®Contractor----------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- 1TS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4"Spelt")T S ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts------------------------------------------------------------ 1TS (1"top side) ®Reports/Studies/Calculations----------------------------------- 4S (4"x,-pe*)7-4-S ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1TS (1"top side) ❑ S E PA ----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- ® EASEMENTS/DEEDS-------------------------------------------------- 1 TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- ElContract Document----------------------------------------------- ❑S u b m itta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2"shelf} �S ®Inspection/Progress Reports ----------------------------------- 2S (2" S" ❑Construction Management Services-------------------------- FlOperations & Maintenance-------------------------------------- F-1 LITIGATION--------------------------------------------------------------- LID-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ElMiscellaneous------------------------------------------------------ SAD------------------------------------------------------------------------------ ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ ProjectRequestForm.doc