Loading...
HomeMy WebLinkAboutSWP273472(5) L � PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS DATE: 9-3-08 CONTACT: Gary Del Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION ® M Work S ace: ❑ File Bay Shelf#: I ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (SECONDAY): (CIP Only) (enter or open pick List below) (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACH DISCIPLINE,TIOLVED IN PROJECT Ltr Drwg #of sheets ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESL) ❑ TRO (Signalization, Channelization, Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CIP onlyxinclude basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN`MYLARS ❑WATER ❑ WASTEWATER ❑ SURFACE WATER ❑ TRANSPORTATrI❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: ProjectRequestForm.doc 1 RETURN TO TOP CIP PROJECT FILE PICKLIST UTILITIES` FILE TITLE FOLDER SIZE* QUANTITY CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4"ShePf)T� ®Consultant---------------------------------------------------------- 1TS (1"top side) ®City----------------------------------------------------------------- 1TS (1"top side) ®Other Agencies -------------------------------------------------- - 1TS (1"top side) ®Contractor----------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- 1TS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4" )�'�S ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts------------------------------------------------------------ 1TS (1"top side) ®Reports/Studies/Calculations----------------------------------- 4S (4" )T�-f ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1TS (1"top side) ❑ S E PA ----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- ® EASEMENTS/DEEDS-------------------------------------------------- 1TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- FIContract Document----------------------------------------------- ❑S u b m itta I s----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2"Sttefft �S ®Inspection/Progress Reports ----------------------------------- 2S (2" deft•) ❑Construction Management Services-------------------------- 00perations & Maintenance-------------------------------------- F] LITIGATION--------------------------------------------------------------- LID-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD------------------------------------------------------------------------------ ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ElMiscellaneous------------------------------------------------------ ProjectRequestForm.doc