Loading...
HomeMy WebLinkAboutSWP273472(9) PLANN°INGBUI 1MMUBWWORCS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS) DATE: 9-3-08 CONTACT: Gary Del Rosario WO# FILE STATUS ❑ EXISTING OR ❑ NEW FILE CODE(PRI XX-XXXX)(if applicable) LOCATION ® M Work S ace: ElFile Ba Shelf#: ❑ Other: PROJECT NAME:(TERTIARY) City of Renton Storm System Field Mapping Project (label line one) (250 characters max) Allowable Folder Title: (SECONDAY): (Cll"Only)(enter or open pick list below) (label line two) (wORKM FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Field locate and map existing public storm system assets located in the City of Renton and record the information into the City's GIS system. ADDRESS/STREET NAME(S): Renton City Limits DEV/CNTR/OWN/CNSLT: OTHER ALIASES: NPDES, Mapping project, Surface Water mapping Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New IV T t Drwg #of sheets ❑ TED (roadway/drainage) ❑ ❑ (off site improvements) (include TESC) ❑ TRO (Signalization, Channelization,Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves,Hydrants) ❑ ❑ (inc.composite&HorizontalCtrl) ® SWP (surface water imp.) ® ❑ (CEP onlyxinclude basin name) ❑ PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK TIDE DISCIPLINES NAmWS O SIGN MY1LNRS ❑WATER ❑ WASTEWATER ❑,;;s mA, WATE R' ate . TRANSPORTATION FIRE FOR FILE MAINTAINANCE USE ONLY e� File Codes: Date Entered and Labels Made: t> P Proj ectRequestForm.doc ' t RETURN TO TOP C'IP PROJECT FILE_-PICKLIST UTILITIES' FILE tIT'E 1=fJLIER SIZE* G2UANTITY CORRESPONDENCE Choose Folder size ®General -------------------------------------------------------------- 4S (4"8t,uff)T4-:5 ®Consultant----------------------------------------------------------- 1TS (1"top side) ®City-------------------------------------------------------------------- 1TS (1"top side) ®Other Agencies ---------------------------------------------------- 1 TS (1"top side) ®Contractor----------------------------------------------------------- 1TS (1"top side) ®Grants/Loans------------------------------------------------------- 1TS (1"top side) DESIGN/PLANNING ®Design---------------------------------------------------------------- 4S (4"Slid) ®Consultant Selection---------------------------------------------- 1TS (1"top side) ®Contracts------------------------------------------------------ ---- 1 TS (1"top side) ®Reports/Studies/Calculations----------------------------------- 4S (4"�S l )�-�-5 ®Consultant Payments--------------------------------------------- 1TS (1"top side) ® AGREEMENTS----------------------------------------------------------- 1 TS (1"top side) ❑ S E PA ----------------------------------------------------------------------- ❑ PERMITS/PLAN REVIEW--------------------------------------------- M EASEMENTS/DEEDS-------------------------------------------------- 1TS (1"top side) CONSTRUCTION ❑Bid Info--------------------------------------------------------------- ❑Insurance & Legal Review--------------------------------------- FIContract Document----------------------------------------------- ❑Submittals----------------------------------------------------------- ❑Pay Estimates------------------------------------------------------ _ ®Change Orders----------------------------------------------------- 2S (2" Stteffj I �S ®Inspection/Progress Reports ----------------------------------- 2S (2" 9be ❑Construction Management Services-------------------------- 00perations & Maintenance-------------------------------------- F] LITIGATION--------------------------------------------------------------- LID-------------------------------------------------------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------- ❑Miscellaneous------------------------------------------------------ SAD ----------------------------------------------- ------------------------------- ❑Public Notification ------------------------------------------------- ❑Public Meetings---------------------------------------------------- ❑Final Assessment Roll ------------------------------------------ ❑Miscellaneous------------------------------------------------------ ProjectRequestForm.doc