Loading...
HomeMy WebLinkAboutSWP273483 PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS (SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS DATE: 10-9-08 CONTACT: Mike Dotson WO# FILE STATUS 10 EXISTING OR ® NEW I FILE CODE(PRI XX-XXXX)(if applicable) LOCATION I Z My Work Space: I ❑ File Bay Shelf#: ❑ Other: PROJECT NAME:(TERTIARY) New Life Chruch Expansion (label line one) (250 characters max) Allowable Folder Title: (sECONDAY): (CIP Only)(enter or open pick list below) (label line two) (WORKING FILE) Go to Utilities Pick List DESCRIPTION OF PROJECT: Addition of Church Sancturay and parking lot, storm drainage and frontage improvments along Maple Valley Highway(SR 169)and 152"d Ave SE ADDRESS/STREET NAME(S): 15711 152"d Ave SE DEV/CNTR/OWN/CNSLT: Barghausen OTHER ALIASES: Size of Waterline: N/A New & N/A New Size of Sewerline: N/A New & N/A New Size of Stormline: N/A New & N/A New CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg # of sheets ® TED(roadway/drainage) ® ® 12 (off site improvements) (include TESL) ❑ TRO (Signalization, Channelization, Lighting) ❑ ❑ ❑ WWP (wastewater) ❑ ❑ (sanitary sewer main) ❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑ (me.composite&HorizontalCtrl) SWP (surface water imp.) ❑ ❑ f (CIP only)(include basin name) ` ] PLR(plan review) (Neccessary for developer files) ❑ (letter only) PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MYLARS: ❑ WATER ❑ WASTEWATER ❑ SURFACE WATER ❑ TRANSPORTATION ❑ FIRE FOR FILE MAINTAINANCE USE ONLY File Codes: Date Entered and Labels Made: .1