HomeMy WebLinkAboutSWP273483 PROJECT REQUEST FORM
PLANNINGBUILDING/PUBLIC WORKS
(SOME SECTIONS APPLY TO CIP AND SOME APPLY TO DEVELOPER PROJECTS
DATE: 10-9-08 CONTACT: Mike Dotson WO#
FILE STATUS 10 EXISTING OR ® NEW I FILE CODE(PRI XX-XXXX)(if applicable)
LOCATION I Z My Work Space: I ❑ File Bay Shelf#: ❑ Other:
PROJECT NAME:(TERTIARY) New Life Chruch Expansion (label line one)
(250 characters max)
Allowable Folder Title: (sECONDAY): (CIP Only)(enter or open pick list below) (label line two)
(WORKING FILE)
Go to Utilities Pick List
DESCRIPTION OF PROJECT: Addition of Church Sancturay and parking lot, storm drainage and frontage
improvments along Maple Valley Highway(SR 169)and 152"d Ave SE
ADDRESS/STREET NAME(S): 15711 152"d Ave SE
DEV/CNTR/OWN/CNSLT: Barghausen
OTHER ALIASES:
Size of Waterline: N/A New & N/A New
Size of Sewerline: N/A New & N/A New
Size of Stormline: N/A New & N/A New
CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg # of sheets
® TED(roadway/drainage) ® ® 12
(off site improvements) (include TESL)
❑ TRO (Signalization, Channelization, Lighting) ❑ ❑
❑ WWP (wastewater) ❑ ❑
(sanitary sewer main)
❑ WTR(water) (Mains, Valves, Hydrants) ❑ ❑
(me.composite&HorizontalCtrl)
SWP (surface water imp.) ❑ ❑
f
(CIP only)(include basin name)
` ] PLR(plan review) (Neccessary for developer files) ❑ (letter only)
PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MYLARS:
❑ WATER ❑ WASTEWATER ❑ SURFACE WATER ❑ TRANSPORTATION ❑ FIRE
FOR FILE MAINTAINANCE USE ONLY
File Codes: Date Entered and Labels Made:
.1