Loading...
HomeMy WebLinkAboutSWP272217(1) 1 1 TECHNICAL INFORMATION REPORT 1 RENTON PLACE ' CITY OF RENTON, WASHINGTON tGROUP FOUR JOB 995-8005 GROUP FOUR, Inc. 16030 Juanita-Woodinville Way AIE ' Bothell, WA 98011 FAX(206)362-3819 (206) 775-4581 • (206)362-4244 1 1 TECHNICAL INFORMATION REPORT 1 1 1 REWON PLACE 1 CITY OF RENTON, WASHNGTON 1 1 4-Z-96E 1 tiN0. VA, OF WH 1 �31�f9 �ONAL�cyG� " 1 EXPIRES 03/08/98 1 ' April 2, 1996 1 Prepared For: Prepared By: 1 Bob Tozer GROUP FOUR, Inc. PO Box 53312 16030 Juanita-Woodinville Way NE 1 Bellevue, WA 9801 5-3 3 12 Bothell, WA 98011 Phone: (206) 228-9731 (206) 362-4244 • (206) 775-4581 1 1 iRenton Place #95-8005 ■ TIR SECTION I Project Overview ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 ' Renton Place #95-8005 ' PROJECT OVERVIEW ' PROJECT: Renton Place SITE AREA: The site consists of approximately 97,138 square feet (2.23 acres). tSITE LOCATION: Sec. 19, Twp. 23N, Rge 5E The site is located at 728 S. 19th Street, between SR 515 and Talbot Road S. and between S. 18th Street and S. 19th Street in the City of Renton, Washington (see Figure 1 - Vicinity Map). EXISTING ZONING: Residential - 8 DU/GA(R-8) EXISTING LAND USE: The site is currently vegetated with deciduous trees (maple & fruit), evergreen trees (fir), and other shrubs and grass. A wood frame house and two (2) wood frame accessory structures currently ' occupy the site. It is proposed that the existing residence remain upon development. ' PROPOSED LAND USE: It is proposed that the site be developed with 11 additional single- family residences with accompanying roadway and utilities. ' SOILS: Based on inspection of Sheet No. 11 of the US Department of Agriculture 1973 Soil Survey of King County Area, Washington, the soil on-site consists of Beausite gravelly sandy loam, 6 to 15 ' percent slopes. Permeability is moderately rapid, available water capacity is low, runoff is medium, and the hazard of erosion is ' moderate. Beausite gravelly sandy loam belongs to Hydrologic Soil Group "C". Refer to Figure 4 - Soils Map. 1 GROUP FOUR, INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' Page 1 of 2 King County Building and Land Development Division TECHNICAL INFORMATION REPORT (TIR) WORKSHEET r PROJECT ENGINEER AND DESCRIPTION ' Project Owner BOB TOZER Project Name RENTON PL./,CF,, AddressPD BOX 53312,BELLEVUE,95015 Location 23N Phone (206)228- 9731 Township Project Engineer CARMEN 6• V^NIER Range 5E Company GROUP FOUR, INC• Section 1G Address Phone (Z06) 362 42L14 Project Size 2.23 AC Upstream Drainage Basin Size _�AC _ 1 ® Subdivision Q DOF/G HPA Q Shoreline Management Short Subdivision Q COE 404 Q Rookery ' a Grading Q DOE Dam Safety Structural Vaults Q Commercial Q FEMAFloodplain Q Other Q Other Q COE Wetlands ED HPA PART 5 SITE COMMUNITY AND DRAINAGE-BASIN Community Drainage Basin Q` o Q_River Q Floodplain ' Q Stream Q Wetlands Q Critical Stream Reach Q Seeps/Springs Q Depressions/Swales Q High Groundwater Table Q Lake Q Groundwater Recharge O Sleep Slopes � Other COAL MIN 5 H^Z A R D Q Lakeside/Erosion Hazard PART 7 SOILS Soil Ty Slopes Erosion Potential Erosive Velocities ' BEAUSPTL 6- 15 % MoDERATI". MEDIUM Q Additional Sheets Atlatched ' 1/90 1 Page 2 of 2 King County Building and Land Development Divlslon 1 TECHNICAL INFORMATION REPORT (TIR) WORKSHEET PART 8 DEVELOPMENT UMITATIONS J 1 REFERENCE LIMITATIOWSITE CONSTRAINT 1 Ej Ch.4-Downstream Analysis 0 1 0 0 1 (] it onal Sheets Attatched MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION FOLLOWING CONSTRUCTION Sedimentation Facilities Stabilize Exposed Surface 1 (� Stabilized Construction Entrance ® Remove and Restore Temporary ESC Facilities ® Perimeter Runoff Control Clean and Remove All Sill and Debris (] Clearing and Grading Restrictions ® Ensure Operation of Permanent Facilities 1 E::] Cover Practices 0 Flag Limits of NGPES 1� Construction Sequence Other (] Other PART 10 SURFACE WATER SYSTEM 1 CRI Grass Lined Channel E�:] Tank 0 Infiltration Method of Analysis Pipe System 0 Vault F--j Depression 551.1I-} (] Open Channel L-1 Energy Dissapator 0 Flow Dispersal Compensation/Mitigation 1 ED Dry Pond 0 Welland (] Waiver of Eliminated Site Storage E:1 Wet Pond 0 Stream O Regional Detention Brief Description of System Operation cDNVEY DEVELDPE0 STORK WATER RUNOFF IN 1 UNDFr"�GROUND PIPE DIrCHES TO NETVAULr/DET-ENrIbN VAULT. Facility Related Site Limitations Reference Facility Limitation Additional Sheets Attatched 1 PART 11 STRUCTURAL ANALYSIS (May require speM s1ruiftural review) [�jt Drainage Easement ElCast in Place Vault Other VAUL 0 Access Easement Retaining Wail E] Native Growth Protection Easement 1 Rockery>4'High Tract (] Structural on Steep Slope (] Other PROFESSIONAL 1 I or a civil engineer under my supervision have visited the site. Actual �) /I�' site conditions as observed were incorporated into this worksheet and the�G�} !�-i'• V attatchments. To the best of my knowledge the information provided �'l.(-Qh here is accurate. sp,.e-n.r. 3_Z 1190 ' Renton Place #95-8005 1 N 5oa . ' n T. 0 3� T F/ N R w a ' P{ N GR POY WAY 405 UN y' ' S. 1 lh ST. c o S. v PUGET O O m � J J F � S 1 Figure 2 - Site Location Map Not to Scale GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 Renton Place #95-8005 1 1 TIR SECTION II Preliminary Conditions Summary GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 Renton Place #95-8005 o _ E gy if L IFS � i ■ ��� •. iY � • fv 1 ��� • II ♦ O \ I• • , .rl •, Ii —————— -- •— •IIB — ` l3M . 2 10 12 eservoir w • •• r- w J m - y Figure 3-Basin Map Scale I" = 1,000' ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 •'r nr •K'1 • y� g. . � 4 .'s y s � -W �y�g,..Fl !� z4�� `�� i .a rjzr» s. '•'',;+'•,� �r y,p`.. ..fir. i� - .,.,� a •9 I .� rpm r. YJ44i' -+7t1�a`r` "t •a r 'vim.. r R . t. .r• R� t �tl9iy �'Y �1�`�' - f'v . .f"�•4 a �� �'t 'x r• h k✓ +i.r.��'! r ib+td�F *� •fi a+"t> 1��• r -.. � :�� s f '"�✓� �-'\:e t•O+;y�'. H:t t tS -.. a '�.� �NCQYw3�i ^a� • 4wk r.:�,�ry r�+�F 1`}?.�,5t r<4 ..u� R •Y• 3N fi\ •� ® �� ''��t,• t�j��w���„t,�� l Y '>A Renton Place #95-8005 TIR SECTION III Off-Site Analysis i 1 GROUP FOUR, INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' Renton Place #95-8005 ' OFF-SITE ANALYSIS ' A Level 1 Downstream Analysis was previously submitted as a part of the Conceptual Drainage Report prepared by Group Four, Inc. dated November 29, 1995. 1 1 1 ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA"011 ' Renton Place #95-8005 1 TIR SECTION IV ' Retention Detention Analysis & Design ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 tRenton Place *95-8005 t PRELIMINARY STORAGE VOLUME CALCULATIONS ' PART A: EXISTING SITE HYDROLOGY Storm water runoff from the site is currently overland to the northeast at an average slope of roughly 9 percent. Approximately 0.23 acres of off-site area currently enters the site from the north half of S. 19th Street R/W and an existing residence located near the southwest corner of the site. ' I. Basin Input Parameters - Existing Area A. Total Area to be Analyzed=2.46 acres 1. On-Site=2.23 acres a. Existing Structures 0.03 acres ' b. Shrubs&Grass with Sparse Trees 2.20 acres 2. Off-Site= 0.23 acres a. Existing Structures 0.04 acres b. Existing Asphalt(S. 19th St) 0.08 acres c. Lawns/Landscaping(good condition) 0.11 acres Impervious Area= 0.15 acres Pervious Area= 2.31 acres B. Soils 1. Beausite gravelly sandy loam ' c. CN Values 1. Shrubs & Grass with Sparse Trees CN= 81 ' 2. Structures CN= 98 3. Asphalt CN= 98 4. Lawns/Landscaping (good condition) CN= 86 ' CN v�q = 98 ' CN a,„_= (0.11)86+(2.20)81/(2.31)=81.24 d. Time of Concentration=43.99 minutes 1. 185' Sheet Flow over forest @ 6.32 percent ns=0.40 Tt=28.04 min ' 2. 115' Sheet Flow over forest @ 11.3 percent ns=0.40 Tt=15.20 min 3. 80' Shallow Flow over forest @ 12.5 percent ks=5 Tt=0.75 min f. Precipitation 1. P2=2.0' 2. P10=2.9" ' GROUP FOUR,INC 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 + ' EX /2' CONC. CULbERT TOP-173.5 II 140.81 IE.-172.01 IE12' RCP.. TOP- N. 17 ,7O _ ,2' RCP. S. ,71.-19 IE12' CONC. N. IE ,9 W _ '172- S n e \ \ SO Is? I i o x 176 hill SCALE V =40' _ \ a•P a �' ON-SITE AREA = 2.2S ac�os \\ \\/ \�\\ \ 1� 11 I \\ \\ \1111 \ / / `6 EX CB t� ICE.2'CONQ W.'1 Q" yeaCB I / / \ \ �O>\ HOSE \ \ \ \ \ \ \ TO _ 59.10 \Ei2' C. I 14.1 0 IZ F ��/ ,� z rx Ey � W F, \ I 790 x \ \ \ \ \ \ O HOUSE �! HOUSE ts SHED I I x� I L1 ---- %64\ \ -�--- I-�-- V{'�{ I / N \ \ I JOB NO: 95-80 — — — \ i- \ -v • 0 68 w.. .... DATE: m m m m m m m m m = = � m = m m m i m Renton Place #95-8005 PRELIMINARY STORAGE VOLUME CALCULATIONS ' PART B: DEVELOPED SITE HYDROLOGY It is proposed that developed storm water runoff be conveyed in a system of conveyance swales and ' underground storm pipe to the northeast corner of the site. At this point, flow will be conveyed easterly to a wetvault/detention vault located off-site in the SR 515 right-of-way. It is proposed that the wetvault/detention vault be located approximately 10' behind the existing concrete sidewalk on the west side of SR 515. Maintenance access will be taken from SR 515. It is proposed that a wetvault be used in place of a bio5ltration Swale. A portion of the rear and side yard of Lot 1, the eastern portion of the 5' R/W dedication, and ' approximately 5' along the rear of Lots 4-8 will bypass the proposed detention facility. The allowable release rates from the proposed detention facility will be reduced as required to account for flows from this developed,undetained area. ' It is proposed that the site be developed with 12 DU/2.23 GA, which equals 5.38 DU/GA. This density corresponds to 49.52%impervious area. Therefore, the total impervious on-site area used in the analysis will consist of rooftops and paved roadway areas and will equal 1.10 acres (0.4952 x 2.23 acres). By ' inspection,the total pervious on-site area will equal 1.13 acres(2.23 acres- 1.10 acres). Approximately 0.23 acres of off-site area will be intercepted by the proposed storm system and conveyed ' to the wetvault/detention vault. As a result,this area will be included in the sizing of this facility. I. Basin Input Parameters - Detained Area a. Total Area=2.32 acres ' 1. On-Site Area= 2.09 acres a. 12DU/2.23GA=5.38 DU/GA=49.52°/u impervious=(2.23 ac)(0.4952)=1.10 ac b. Lawns/Landscaping(good condition)=0.99 2. Off-Site Area= 0.23 acres a. Existing Structures 0.04 acres ' b. Existing Asphalt(S. 19th St.) 0.08 acres c. Lawns/Landscaping(good condition) 0.11 acres ' Impervious Area= 1.22 acres Pervious Area= 1.10 acres ' b. Soils 1. Beausite gravelly sandy loam ' c. CN Values 1. Impervious CN=98 2. Lawns/Landscaping CN= 86 ' CN;,,w�,,.;a =98 CN P,„a,,,= 86 GROUPFOUR,INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 ' Renton Place #95-8005 ' PRELIMINARY STORAGE VOLUME CALCULATIONS PART B: DEVELOPED SITE HYDROLOGY L Basin_Input Parameters - Detained Area (con't1 d. Time of Concentration= 5.00 min 1. Assume a practical minimum time of concentration of 5.0 minutes for this relatively ' small,heavily developed property. f. Precipitation ' 1. P2=2.0" 2. P10= 2.9" H. Basin Input Parameters - Bypass Area a. Total Area= 0.14 acres 1. On-Site Area= 0.14 acres a. Lawns/Landscaping(good condition) 0.14 acres (5' of ex. water easement,portion of Lot 1,eastern 5'R/W dedication) ' Impervious Area= 0 acres Pervious Area= 0.14 acres b. Soils 1. Beausite gravelly sandy loam c. CN Values 1. Lawns/Landscaping CN= 86 CN = 98 CN,u a , = 86 ' d. Time of Concentration= 5.00 thin 1. Assume a practical minimum time of concentration of 5.0 minutes for this relatively ' small, heavily developed property. f. Precipitation ' 1. P2 = 2.0" 2. P10=2.9" GROUP FOUR,INC 16030 Juanita-Woodinville Way NE Bothell,WA 98011 i - - - --%i72---- IE.12" RCP. S. 171.13 , 4� _ d FIST. 12' CONC. CULVERT #di. ` \, 5 \ I Fy 1V_� � IE.ay�201 I, I 1 , � t 5 tt I � �IIee EXIST. I J 5 V It 5 I • X s HOUSE j�4 +I F, 1 1 1 f SIGN {TYP.} � -JT -__ r"- 1"--1 --r- ` -�_ ...—...;.._..r...�_� \`♦ ` \ 1 I r "S SCALE 1 "=40' 1/ - _17 \ \\5 •.�vf., r r kV EXIST. 16" CI. H2O LINE 1 (PER CITY OF RENTON r ' \\ 5 5 i / / EXIST. SSNH. \ 1t 5 ASSUILS) � TOP-175.83 67,64 J � ,p $ i ' / • N I � to 8 (Rooftop 10 A4) / , 1 1 rJ \ 1 SWALE- I1���.. / r ; P\4ER 'VAULT \\ 7 �' 7i�/\ I -_ . •`� �\ o\ \ \\ \ ..1 g. e(T10 (ROOft0�,10 A4} \ WAL�� Eye 1 5. �, 55'1, Vim] '�.q.�,pP.E ` � 1 l 1 E° OR 1 \\ \\ ` p g r Z JTUFE \ ♦ `� �\\ .\ 1P / t /1 / (Rooftop f0A4)\\\ \\ _ I ��'��\ �\ � , , �, , \ \ 1 Y 5 1 I WOOD \ AIR RELE SE �+�'\` •, VALVE � Q o METER�� / I 3 EXIST. ^ I( a> \ 3 7gp `'. `� (Rooftop t HOUSE 1\ \t {. l 1 5l 11 StCII AL 1 2 o A4) 1 1 (Rooftop to A4) 1 ¢ iN eox (r P A o ` 2 5 C 1 c. ` NORTH -TaLBOr I 1 5 h t 1 c� ___ I p Qd \ I \ F11 LSTA N¢ 1 \ f S t �E - LOC w� \-___ \I ♦ i \ svau I RA , \ I I'FRVi tl \ — — 7I^ now WATER f _-- w _ W `Ix W _���� =— _ \ _ 6�WAIER (HIGH Fy $S!!RE) -- w — ^� '19I94 EXI 24" WATER MAIN (LOW PRESSURE) FROM RESERVOIR — fY - - �' ` I /r bb I I` I 6 , C ^ O' \ ^ ' - - - -�- -6 - BYPASS 1 I _, w / � `� I i JOB N0: 85-80 / -OWER POLE (TYP.) /" _ — — T — _ — — ._ — — — _ _ — — —. — — / — — — 1 ISB I DATE: r c — — — — — — — — — — ' Renton Place #95-8005 PRELIMINARY STORAGE VOLUME CALCULATIONS ' PART C: HYDROLOGIC ANALYSIS As required by the Renton Storm and Surface Water Drainage Ordinance (Chapter 22), the drainage t analysis will comply with the Core and Special Requirements contained in Section 1.2 and 1.3 of Chapter 1, the hydrologic analysis methods contained in Chapter 3, the hydraulic analysis and design criteria in Chapter 4, and the erosion/sedimentation control plan and practices contained in Chapter 5 of the current ' (1990)King County Surface Water Design Manual (KCSWDM), except where amended or appended by the Department. The Santa Barbara Urban Hydrograph Methodology with User 1 Rainfall Distribution and 24-hour design storm durations will be used in the analysis. The computer program "WaterWorks Version 3.1"will be used to develop and manipulate hydrographs. ' The proposed detention pond will be designed using the following performance requirements: • Release the 2-year/24-hour pre-developed peak rate of runoff during the 2-year/24-hour developed design storm. • Release the 10-year/24-hour pre-developed peak rate of runoff during the 10-year/24-how ' developed design storm PART D: SUPPORTING CALCULATIONS ' Attached is the Hydrograph Methodology, which provides an outline of the steps used in the level pool routing. The attached Hydrograph Methodology contains computer generated calculations used to determine the size of the proposed detention vault. Included are applicable basin summary information, hydrographs,a stage/storage and stageldischarge table,and a level pool table summary. 1 1 ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' Renton Place 495-8005 t HYDROGRAPH METHODOLOGY STEP 1. Generate hydrographs for the 2- and 10-year/24-hour design storms, existing site conditions. ' MOVE Basin 2EX to Hydrograph 91 Peak Rate of Runoff= 0.181 cfs ' Volume of Runoff= 0.141 ac-ft Time to Peak= 8.17 hrs MOVE Basin IOEX to Hydrograph 94 ' Peak Rate of Runoff= 0.432 cfs Volume of Runoff= 0274 ac-ft Time to Peak = 8.17 hrs 1 ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 1 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE ' #95-8005 _____________________________________________________________________ BASIN SUMMARY ' BASIN ID: 10EX NAME: 10yr:Existing Site Conditions SBUH METHODOLOGY TOTAL AREA. . . . . . . : 2.46 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA ' PRECIPITATION. . . . : 2.90 inches AREA. . : 2 . 31 Acres TIME INTERVAL. . . . : 10. O9 min CN. . . . : 81. 24 TIME OF CONC. . . . . : 43 .99 min IMPERVIOUS AREA ABSTRACTION COEFF: 0. 20 AREA. . : 0. 15 Acres CN. . 98 . 00 ' TcReach - Sheet L: 185. 00 ns: 0.4000 p2yr: 2.00 s: 0. 0632 TcReach - Sheet L: 115. 00 ns:O.4000 Kyr: 2 .00 s: 0. 1130 TcReach - Shallow L: 80. 00 ks:5.00 s:DD 11 PEAK RATE: 0.43 cfs VOL: 0.27 Ac-ft TIME: 490 min ' BASIN ID: 2EX NAME: 2yr:Existing Site Conditions SBUH METHODOLOGY ' TOTAL AREA. . . . . . . : 2.46 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE. . . . . USER1 PERVIOUS AREA PRECIPITATION. . . . : 2. 00 inches AREA. . : 2 . 31 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 81.24 TIME OF CONC. . . . . : 43 .99 min IMPERVIOUS AREA ' ABSTRACTION COEFF: 0. 20 AREA. . : 0. 15 Acres CN. . . . : 98 . 00 TcReach - Sheet L: 185. 00 ns: O.4000 p2yr: 2 .00 s: 0. 0632 TcReach - Sheet L: 115. 00 ns: 0.4000 p2y2502 .00 s: 0. 1130 ' TcReach - Shallow L: 80. 00 ks:5. 00 s:DD 11 PEAK RATE: 0. 18 cfs VOL: 0. 14 Ac-ft TIME: 490 min 1 1 Renton Place 495-8005 HYDROGRAPH METHODOLOGY ' STEP 2. Generate hydrographs for the 2- and 10-year/24-hour design storms for the on-site area to be detained, developed site conditions. ' MOVE Basin 2DET to Hydrograph #2 ' Peak Rate of Runoff= 0.833 cfs Volume of Runoff= 0.258 ac-ft Time to Peak= 7.83 hrs MOVE Basin I ODET to Hydrograph 95 ' Peak Rate of Runoff= 1.370 cfs Volume of Runoff= 0.416 ac-ft Time to Peak= 7.83 hrs ' GROUP FOUR, INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 1 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE 1 #95-8005 _______________________ BASIN SUMMARY 1 BASIN ID: 10DET NAME: 10yr:Detained Site Conditions SBUH METHODOLOGY TOTAL AREA. . . . . . . : 2. 32 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA 1 PRECIPITATION. . . . : 2.90 inches AREA. . : 1. 10 Acres TIME INTERVAL. . . . : 10. 00 min CN. . . . : 86. 00 TIME OF CONC. . . . . : 5. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 1.22 Acres CN. . 98. 00 1 PEAK RATE: 1.37 cfs VOL: 0.42 Ac-ft TIME: 470 min 1 BASIN ID: 2DET NAME: 2yr:Detained Site Conditions SBUH METHODOLOGY ' TOTAL AREA. . . . . . . : 2. 32 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2. 00 inches AREA. . : 1. 10 Acres TIME INTERVAL. . . . : 10. 00 min CN. . . . : 86.00 TIME OF CONC. . . . . : 5.00 min IMPERVIOUS AREA 1 ABSTRACTION COEFF: 0.20 AREA. . : 1.22 Acres CN. . . . : 98 . 00 PEAK RATE: 0.83 cfs VOL: 0.26 Ac-ft TIME: 470 min 1 1 1 1 1 1 1 1 1 i 1 Renton Place #95-8005 HYDROGRAPH METHODOLOGY ' STEP 3. Generate hydrographs for the 2- and 10-year/24-hour design storms for the on-site bypass area, developed site conditions. ' MOVE Basin 2BY to Hydrograph #3 ' Peak Rate of Runoff= 0.028 cfs Volume of Runoff= 0.010 ac-ft Time to Peak= 8.00 hrs ' MOVE Basin 10BY to Hydrograph 96 ' Peak Rate of Runoff= 0.058 cfs Volume of Runoff= 0.018 ac-ft Time to Peak =7.83 hrs ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 1 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE 1 #95-8005 ---------------______________________________________________________ BASIN SUMMARY 1 BASIN ID: 10BY NAME: 10yr:Bypass Site Conditions SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0. 14 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA 1 PRECIPITATION. . . . : 2.90 inches AREA. . : 0. 14 Acres TIME INTERVAL. . . . : 10. 00 min CN. . . . : 86. 00 TIME OF CONC. . . . . : 5. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0. 00 Acres CN. . 98 .00 ' PEAK RATE: 0. 06 cfs VOL: 0. 02 Ac-ft TIME: 470 min BASIN ID: 2BY NAME: 2yr:Bypass Site Conditions SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0. 14 Acres BASEFLOWS: 0. 00 cfs ' RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2 . 00 inches AREA. . : 0. 14 Acres TIME INTERVAL. . . . : 10. 00 min CN. . . . : 86. 00 TIME OF CONC. . . . . : 5. 00 min IMPERVIOUS AREA 1 ABSTRACTION COEFF: 0.20 AREA. . : 0. 00 Acres CN. . . . : 98. 00 PEAK RATE: 0. 03 cfs VOL: 0. 01 Ac-ft TIME: 480 min 1 1 1 1 1 1 i 1 1 Renton Place #95-8005 HYDROGRAPH METHODOLOGY ' STEP 4: Perform the level pool routing. Note that the allowable release rates have been adjusted to account for undetained, developed flows from the bypass area. Use Stage/Storage Table 1 & Stage/Discharge Table 1. ' 2YR STORM: Developed Inflow Hydrograph#2 Peak Inflow= 0.833 cfs Controlled Outflow Hydrograph#10 Peak Outflow=0.173 cfs Peak Stage= 141.27' Required Volume=2,670.21 cf 1 OYR STORM: Developed Inflow Hydrograph#5 Peak Inflow= 1.370 cfs ' Controlled Outflow Hydrograph 911 Peak Outflow= 0.413 cfs ' Peak Stage= 143.18' ' Required Volume=4,081.53 cf The required volume will result in a vault approximately 20' wide x 36.8' long x 5.55' deep. However, per Section 1.2.3 of the King County Surface Water Design Manual, a 30% factor of safety must be applied to the required volume without increasing the total depth of storage. ' Therefore, a total storm water storage volume of 5,306 CF (1.30 x 4,081.53 CF) is required for detention. It is proposed that the vault length be increased to (1.30)36.8' = 47.84' = 48 lineal feet. GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' 3/28/96 GROUP FOUR, Inc. page 5 RENTON PLACE 195-8005 LEVEL POOL TABLE SUMMARY ' MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE <--------DESCRIPTION---------> (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf) =ec=ceo=ev=aces_see==ee=e=eeeeee-secs==ecece__________e==ececeee=vveeeeeeeev 2YR STORM .................... 0.17 0.83 1 1 141.27 10 2670.21 cf 10YR STORM ................... 0.41 1.37 1 1 143.18 11 4081.53 cf I i 1 1 1 1 1 1 1 1 1 1 1 1 ' 3/28/96 GROUP FOUR, Inc. page 3 ' RENTON PLACE #95-8005 STAGE STORAGE TABLE RECTANGULAR VAULT ID No. 1 Description: Conceptual Detention Vault Length: 36.90 ft. Width: 20.00 ft. STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- 137.65 0.0000 0.0000 139.10 1070 0.0246 140.60 2177 0.0500 142.10 3284 0.0754 137.70 36.900 0.0008 139.20 1144 0.0263 140.70 2251 0.0517 142.20 3358 0.0771 137.80 110.70 0.0025 139.30 1218 0.0280 140.80 2325 0.0534 142.30 3432 0.0788 ' 137.90 184.50 0.0042 139.40 1292 0.0296 140.90 2399 0.0551 142.40 3506 0.0805 138.00 258.30 0.0059 139.50 1365 0.0313 141.00 2472 0.0568 142.50 3579 0.0822 138.10 332.10 0.0076 139.60 1439 0.0330 141.10 2546 0.0585 142.60 3653 0.0839 138.20 405.90 0.0093 139.70 1513 0.0347 141.20 2620 0.0601 142.70 3727 0.0856 ' 138.30 479.70 0.01111 139.80 1587 0.0364 141.30 2694 0.0618 142.80 3801 0.01173 138.40 553.50 0.0127 139.90 1661 0.0381 141.40 2768 0.0635 142.90 3875 0.0889 138.50 627.30 0.0144 140.00 1734 0.0398 141.50 2841 0.0652 143.00 3948 0.0906 138.60 701.10 0.0161 140.10 1808 0.0415 141.60 2915 0.0669 143.10 4022 0.0923 138.70 774.90 0.0178 140.20 1882 0.0432 141.70 2989 0.0686 143.20 4096 0.0940 ' 138.80 848.70 0.0195 140.30 1956 0.0449 141.80 3063 0.0703 138.90 922.50 0.0212 140.40 2030 0.0466 141.90 3137 0.0720 139.00 996.30 0.0229 140.50 2103 0.0483 142.00 3210 0.0737 1 1 3/28/96 GROUP FOUR, Inc. page 4 1 RENTON PLACE #95-8005 ------------------------STAGE DISCHARGE TABLE ----_-------_-----_---- 1 MULTI$LEORIFICE ID No. 1 Description: Outlet Elev: 137.65 1 Elev: 135.65 ft Orifice Diameter: 1.8311 in. Elev: 141. 35 ft Orifice 2 Diameter: 2. 3262 in. STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE...> STAGE <--DISCHARGE---> 1 _(=t)= cfs (ft)===-cfs (ft)===cfs (ft)====cfs=====_____-_ 137.65 0.0000 139.10 0.1096 140.60 0.1563 142.10 0.3191 137.70 0.0203 139.20 0.1133 140.70 0.1589 142.20 0.3295 1 137.80 0.0352 139.30 0.1169 140.80 0.1615 142.30 0.3393 137.90 0.0455 139.40 0.1204 140.90 0.1640 142.40 0.3488 138.00 0.0538 139.50 0.1238 141.00 0.1665 142.50 0.3578 138.10 0.0610 139.60 0.1271 141.10 0.1690 142.60 0.3666 138.20 0.0675 139.70 0.1303 141.20 0.1714 142.70 0.3751 1 138.30 0.0734 139.80 0.1334 141.30 0.1738 142.80 0.3833 138.40 0.0788 139.90 0.1365 141.40 0.2090 142.90 0.3913 138.50 0.0839 140.00 0.1395 141.50 0.2354 143.00 0.3991 138.60 0.0887 140.10 0.1424 141.60 0.2542 143.10 0.4067 1 138.70 0.0932 140,20 0.1453 141,70 0.2700 143,20 0.4141 138.80 0.0976 140.30 0.1481 141.80 0.2839 138.90 0.1017 140.40 0.1509 141.90 0.2965 139.00 0.1057 140.50 0.1536 142.00 0.3081 1 1 i 1 1 1 i 1 1 1 1 ' Renton Place #95-8005 ' HYDROGRAPH METHODOLOGY STEP 5: Calculate the post-developed peak rate of runoff, which is a combination of the controlled outflow hydrographs and the bypass area hydrographs. Post-Developed Peak Rate of Runoff= Bypass + Controlled Outflow 2yr Post-Developed Peak Rate of Runoff: tADD Hydrograph 410 +Hydrograph #3 =Hydrograph 913 ' Peak Rate of Runoff= 0.181 cfs Volume of Runoff= 0.268 ac-ft ' Time to Peak = 10.67 hrs 10yr Post-Developed Peak Rate of Runoff: ' ADD Hydrograph 411 +Hydrograph#6 =Hydrograph 414 ' Peak Rate of Runoff= 0.432 cfs Volume of Runoff= 0.434 ac-ft Time to Peak= 8.67 hrs 1 ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 1 ' o a LEGEND ' Hyd NO. 3_ Hyd No. 10...... Hyd No. 13 u u M ' 3 6 9 12 15 18 21 24 27 30 Time in Hours Hyd No. • 3 Rate: 0. 03 cfs Time: 8 . 00 hr Vol 0. 01 Ac-ft Int: 10. 00 min Hyd No. • 10 Rate: 0. 17 cfs Time: 11. 00 hr Vol 0. 26 Ac-ft Int: 10. 00 min Hyd No. : 13 Rate: 0. 18 cfs Time: 10. 67 hr Vol 0. 27 Ac-ft Int: 10. 00 min 1 LEGEND iHyd No, 6_ Hyd No, 11...... NO No. 14___ i 1 d w 1 ` 0 M 1 i i 6 1a 18 24 30 36 Tine in Hours Hyd No. 6 1 Rate: 0. 06 cfs Time: 7.83 hr Vol 0. 02 Ac-ft Int: 10. 00 min Hyd No. • 11 Rate: 0. 41 cfs Time: 8.83 hr 1 Vol 0. 42 Ac-ft Int: 10. 00 min Hyd No. : 14 Rate: 0.43 cfs Time: 8. 67 hr Vol 0.43 Ac-ft Int: 10. 00 min i 1 1 1 1 i 1 Renton Place #95-8005 HYDROGRAPH METHODOLOGY ' STEP 6: Compare the pre-developed peak rate of runoff (calculated in Step 1) with the post-developed peak rate of runoff(calculated in Step 5) to ensure that the performance requirements are met. 2YR STORM: Pre-Developed Peak Rate of Runoff= 0.181 cfs (Hydrograph #1) Post-Developed Peak Rate of Runoff= 0.181 cfs (Hydrograph #13) 10YR STORM: Pre-Developed Peak Rate of Runoff= 0.432 cfs (Hydrograph 44) Post-Developed Peak Rate of Runoff= 0.432 cfs (Hydrograph #14) GROUP FOUR, INC. 16030 Juanita-Woodimille Way NE ' Bothell,WA 98011 3/28/96 GROUP FOUR, Inc. page 2 RENTON PLACE #95-8005 HYDROGRAPH SUMMARY PEAK TIME VOLUME ' HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres --------------------------------------------- --------------------------------------------- 1 0. 181 490 6123 cf 2 .46 ' 2 0.833 470 11248 cf 2. 32 3 0. 028 480 431 cf 0. 14 4 0.432 490 11953 cf 2 .46 5 1. 370 470 18116 cf 2 .32 ' 6 0. 058 470 801 cf 0. 14 10 0. 173 660 11248 cf 2 . 32 11 0.413 530 18116 cf 2 . 32 13 0. 181 640 11679 cf 2.46 14 0. 432 520 18918 cf 2.46 1 1 Renton Place #95-8005 t 100-YR OVERFLOW ANALYSIS A system to control potential overflow must be provided as part of the proposed detention facility in the event of control structure failure or for storm events exceeding design. The overflow system will consist of the 12 inch control structure riser. This system will be designed to provide ' controlled discharge of the 100-year/24-hour developed design storm directly to the downstream conveyance system. The maximum allowable head above the top of the riser will be set at 6 inches, which is equal to the minimum inside top of the detention vault (elevation 143.70'). It will ' be assumed that the orifices are plugged, and the riser is the only means of discharge. It will also be assumed that the vault is full to the top of the riser (elevation 143.20'). The results of the analysis are tabulated below. Input Data: ' 100-yr/24-hr Developed Overflow=Hydrograph#10 = 1.99 cfs (ax attached B.in summary) Stage/Discharge Table=Riser Discharge ID No. 1 = Overflow Riser Top of Riser= 143.20' Riser Diameter= 12" ' Route Mdroaraph #10 through the Riser: Peak Inflow= (Hydrograph #10)= 1.99 cfs Peak Outflow= (Hydrograph#20) = 1.99 cfs Peak Stage= 143.55' < 143.70' - ;K See attached WaterWorks Version 3.1 computer output for supporting calculations. GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ! 3/29/96 GROUP FOUR, Inc. page 1 RENTON PLACE 1 #95-8005 _____________________________________________________________________ BASIN SUMMARY 1 BASIN ID: 1000F NAME: 100yr Overflow SBUH METHODOLOGY TOTAL AREA. . . . . . . : 2 .32 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA ! PRECIPITATION. . . . : 3 .90 inches AREA. . : 1. 10 Acres TIME INTERVAL. . . . : 10. 09 min CN. . . . : 86. 00 TIME OF CONC. . . . . : 5. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0. 20 AREA. . : 1.22 Acres CN. . 98. 00 ! PEAK RATE: 1.99 cfs VOL: 0.60 Ac-ft TIME: 470 min ! ! 1 ! 1 ! 1 1 1 1 1 3/29/96 GROUP FOUR, Inc. page 2 RENTON-PLACE=________________________________________________________ #95-8005 STAGE DISCHARGE TABLE RISER DISCHARGE ID No. 1 Description: Overflow Riser Riser Diameter (in) : 12 . 00 elev: 143 . 20 ft ' Weir Coefficient. . . : 3.782 height: 143 . 70 ft Orif Coefficient. . . : 9.739 increm: 0. 10 ft ' STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---CfS-- ------- (ft) ---CIS-- ------- (ft) ---CfS-- ------- (ft) ---CfS-- ------- 143.20 0.0000 143.30 0.3080 143.50 1.6003 143.70 2.6743 ' 143.20 0.0000 143.40 0.8711 143.60 2.3919 1 ' 3/29/96 GROUP FOUR, Inc. page 3 ' RENTON PLACE #95-8005 LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> <--------DESCRIPTION.........> (cfs) (cfs) --id- --id- <-STAGE> id 100yr Overflow ............... 1.99 1.99 1 1 143.55 20 1 ' Renton Place #95-8005 I TIR SECTION V Conveyance System Analysis & Design i 1 GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 Renton Place #95-8005 i CONVEYANCE SYSTEM ANALYSIS & DESIGN Per Core Requirement#4 of the King County Surface Water Design Manual, all conveyance systems for proposed projects must be analyzed for existing tributary off-site runoff, and developed on-site runoff from the proposed project. ' 1.Convevance System A(Uostream of Detention Vault) a. Pipe System ' The pipe system located upstream of the proposed detention vault will be designed to convey and contain at least the peak runoff rate for the 25-year design storm calculated using the Rational Method as described in Section 4.3.3. Two methods of hydraulic analysis using Manning's equation will be used in the design and analysis of the proposed pipe system. First, the proposed pipe system will be analyzed using the Uniform Flow Analysis and must be demonstrated to adequately convey the peak rate of runoff for the 25-year design storm event. Second, the capacity of the proposed pipe system will be checked using the Backwater Analysis Method, and must be demonstrated to provide a minimum of 0.50 feet of freeboard between the hydraulic grade line and the top of all structures for the 25-year peak rate of runoff. The proposed conveyance system was analyzed for the 100-year design storm (refer to attatched supporting calculations). The results of the attached pipe system analysis show that at least 0.50' of freeboard in provided between the hydraulic grade line and the top of all structures for the 100-year peak rate of runoff. By inspection, it can be concluded that these criteria will also be met during the 25-year design storm. a. Drainage Ditch System ' Drainage ditches will be designed to convey the required design flow, which is the peak runoff rate from the 25-year design storm as calculated using the Rational Method as described in Section 4.3.3. Per Core Requirement #4, drainage ditches must be demonstrated to provide a minimum freeboard to overflow at design flow of 0.50 feet. Per Section 4.3.7 (see Table 4.3.7A), vegetation lined channels shall have a maximum velocity at design flow of 5 fps. Therefore, Manning's Equation will be used to check flow depth and velocity during the 25-year design storm. In addition, drainage ditches will be demonstrated to convey the peak runoff rate from the 100-year design storm without overtopping. As a result, Manning's ' Equation will also be used to check flow depth during the 100-year design storm. The results of the attached drainage ditch analysis show that a minimum of 0.50' of freeboard to overflow is provided in all cases and that no overtopping occurs during the 100-year design storm. In addition, rock-lined channels have been used when velocities at design flow have been determined to be greater than 5 fps. ' 2. onvgyance System B(Downstream of Detention Vault) The capacity of the proposed conveyance system located downstream of the detention vault will be ' checked for capacity using the Backwater Analysis method. This system must be demonstrated to adequately convey the 100-year/24-hour developed peak rate of runoff during overflow conditions. Note that all proposed conveyance systems located upstream of the detention vault will be analyzed using the Rational Method. However, to maintain consistency between methods, all proposed conveyance systems located downstream of the detention vault will be analyzed using hydrographs as outlined in Section 3.5 of the King County Surface Water Design Manual. ' The attached 100-yr overflow analysis shows that the downstream conveyance system has adequate capacity to convey developed storm water runoff during the 100-year/24-hour design storm. ' GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 i Renton Place #95-8005 ' CONVEYANCE SYSTEM ANALYSIS & DESIGN Peak Rate of Runoff Analysis ' The Rational Method, as outlined in Section 4.3.3 of the King County Surface Water Design Manual will be used as follows to generate the peak flows used in the analysis of the proposed conveyance system. Q =clA Where: Q = peak rate of runoff(cfs) A=total tributary drainage area(acres) ' c= runoff coefficient I=peak rainfall intensity (iph) tI, the peak rainfall intensity, is calculated below for the 25- and 100-year design storms: ' 25-year Design StMM: P25 = 3.40" Tc= 6.30 minutes (assumed minimum) a 25 =2.66 ' i 25 = (2.66)(6.30) t-o.es>= 0.80 b25 = 0.65 125= (3.40")(0.80) = 3.20 iph ' 100-year Design Storm: ptoo = 3.90" ' Tc=6.30 minutes (assumed minimum) a too= 2.61 b too =0.63 i too = (2.61)(6.30)<o.csl= 0.82 ' I too= (3.90")(0.82)= 3.20 iph The results of the analysis are tabulated below: ' IMPERVIOUS PERVIOUS I (25) Q (25) I (10D)of-sae on-sae off-sa Q (1 DO) ' AREA ID. TOTAL c=0.90 c=0.90 c=0.25 c=0.25 Weighted "c" (iph) (cfs) (iph) (cfs) A4 0.74 0.04 0.70 0.00 0.00 0.90 2.72 1.81 3.2 2.13 S-N (swale - north) 0.99 0.08 0.18 0.11 0.62 0.42 2.72 1.13 3.2 1.33 ' S-E (swale - east ) 0.59 0.00 0.22 0.00 0.37 0.49 2.72 0.79 3.2 0.93 TOTAL 2.32 1 0.12 1 1.10 0.11 0.99 GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE ' #95-8005 RATIONAL DRAINAGE AREA SUMMARY Drainage Area Id: A4 Description. . . . . : Area Tributary to CB#4 <---Description--> SubArea SubC L (ft) Slope -Kr-- (min) Impervious Area 0.74 0.90 ' Pervious Area 0. 25 Composite "c" Value. . . . . . . . 0. 90 Time of Conc (min) . . 6 . 30 Drainage Area Id: S-E Description. . . . . : Area Tributary to East Swale <---Description--> SubArea SubC L (ft) Slope -Kr-- (min) Impervious Area 0. 22 0. 90 Pervious Area 0 . 37 0. 25 ' Composite "c" Value. . . . . . . . 0. 49 Time of Conc (min) . . 6. 30 Drainage Area Id: S-N Description. . . . . : Area Tributary to North Swale <---Description--> SubArea SubC L (ft) Slope -Kr-- (min) Impervious Area 0.26 0. 90 Pervious Area 0.73 0. 25 Composite "c" Value. . . . . . . . 0.42 Time of Conc (min) . . 6. 30 t 1 ' Renton Place #95-8005 ' CONVEYANCE SYSTEM ANALYSIS & DESIGN Pipe System Analysis & Design Conveyance System A The computer programs "ciA" and "Waterworks Version 3.1" will be used to perform the ' analysis of the proposed pipe system for Conveyance System A Refer to the attached computer output for the results of the analysis. 1 GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE #95-8005 UNIFORM FLOW ANALYSIS REACH SUMMARY 1OOYR DESIGN STORM ' Network Reach LINE1 REACH <•DIA> LENGTH SLOPE < n > DSGN Q % PIPE Ndepth %Depth Vact Vfull c Area ID (ft) (ft) ft/ft ------ (cfs) ------ (ft) ------ (fps) (fps) ------------------------------ P4 1.00 127.68 0.0953 0.0240 2.13 33.14 0.41 41.26 6.97 8.40 Confluence with Network LINE2 Confluence with Network LINE3 P2 1.00 30.00 0.3000 0.0240 4.39 38.49 0.45 44.85 12.86 14.90 Network Reach LINE2 REACH <-DIA> LENGTH SLOPE < n > DSGN Q % PIPE Ndepth %Depth Vact Vfull C Area 'o (ft)=====(it) ft/ft (cfs) (ft)==------ ==(fps)===('ps'_______ P2A 1.00 10.00 0.1560 0.0240 0.93 11.31 0.24 23.55 6.59 10.74 S-E ' Network Reach LINE3 REACH <-DIA> LENGTH SLOPE < n > DSGN Q % PIPE Ndepth %Depth Vact Vfull C Area ID (ft) (ft) ft/ft ------ (cfs) ------ (it) ------ (fps) (fps) = P3A 1.00 10.00 0.0650 0.0240 1.33 25.02 0.35 35.44 5.33 6.93 S N P3 1.00 20.36 0.1130 0.0240 1.33 18.98 0.31 30.65 6.50 9.14 1 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE 1 195=8005BACKWATER ANALYS_I_S___=______________________ REACH SUMMARY 100YR DESIGN STORM 1 Hydraulic Gradeline for Reach HGL1 <-FROR-> <--TO--> <FLW> floss Ent HGL EntLoss ExtLoss OutLet Inlet AppHesd BndHead JunHead HeadNtr -cb/mh- -------- -------- cfs -loss- -Elev-- --loss- --loss- --Elev- --Elev- --loss- --loss- --loss- --Elev- --Rim-- VAULT 143.70 CB#2 VAULT 4.39 1.54 145.24 0.24 0.48 145.97 152.92 0.00 0.00 0.00 152.92 157.60 CB#4 CB#2 2.13 12.17 tw & do <dc- Inlet Ctrl Assumed 168.05 0.00 0.00 0.00 168.05 170.77 CB#2 155.84 INTAKE2A CB#2 0.93 1.56 tw & do <dc: Inlet Ctrl Assured 157.29 0.00 0.00 0.00 157.29 158.16 CB#2 152.92 CB#3 CB#2 1.33 0.10 153.02 0.02 0.04 153.09 153.69 0.04 0.05 0.00 153.69 155.50 1 INTAKE3A CB#3 1.33 6.95 tw & do <dc: Inlet Ctrl Assured 154.36 0.00 0.00 0.00 154.36 155.15 1 1 1 i 1 1 1 1 i 1 1 1 1 ' 3/28/96 GROUP FOUR, Inc. page 1 RENTON PLACE #95-8005 ----------------_____________________________________________________ REACH SUMMERY ' PIPE REACH ID No. P2 From: CB#2 To: VAULT Pipe Diameter: 1. 00 ft n: 0. 0240 Pipe Len th 30. 00 ft s: 0. �000 ' Up Inver 151.20 ft down invert: 142 . 20 Design Flow 4.39 cfs Dsgn Depth: 0 . 45 ft Pipe Capacity 11.40 cfs Design Vel 12.86 fps Travel Time: 0 . 04 min ' Pipe Full Vel 14.90 fps ' PIPE REACH ID No. P2A From: INTAKE2A To: CB#2 Pipe Diameter: 1.00 ft n: 0.0240 Pipe Length 10.00 ft s: 0. 1560 Up invert 157. 16 ft down invert: 155. 60 Design Flow 0.93 cfs Dsgn Depth: 0. 24 ft Pipe Cappacity 8.22 cfs Design Vel 659 fps Travel Time: 0. 03 min ' Pipe Full Vel 10..74 fps PIPE REACH ID No. P3 ' FVom: CB#3 To: CB#2 Pipe Diameter: 1.00 ft n: 0.0240 Pip@ Length 20. 36 ft s: 0.1130 Up invert 153 .50 ft down invert: 151. 20 Design Flow 1.33 cfs Dsgn Depth: 0. 31 ft Pipq Cappacity 7 . 00 cfs Design Vel 650 fps Travel Time: 0. 05 min Pipe Full Vel 9 .. 14 fps PIPE REACH ID No. P3A ' From: INTAKE3A To: CB#3 P}pe Diameter: 1. 00 ft n: 0. 0240 Pipe Length 10.00 ft s: 0.0650 Up invert 154.15 ft down invert: 153 . 50 Design Floe 1.33 cfs Dsgn Depth: 0. 35 ft Pipe Capacity 5.31 cfs Design Vel 5. 33 fps Travel Time: 0. 03 min Pipe Full Vel 6. 93 fps 3/28/96 GROUP FOUR, Inc. page 2 ' RENTON PLACE #95-8005 __________________________________________________________________ REACH SUMMARY ' PIPE REACH ID No. P4 From: CB#4 To: CB#2 Pipe Diameter: 1. 00 ft n: 0. 0240 ' Pipe Length 127. 68 ft s: 0. 0953 Up invert 167 .77 ft down invert: 155. 60 Design Flow 2 . 13 cfs Dsgn Depth: 0. 41 ft Pipe Capacity 6. 43 cfs Design Vel 6. 97 fps Travel Time: 0. 31 min Pipe Full Vel 8 . 40 fps Renton Place #95-8005 CONVEYANCE SYSTEM ANALYSIS & DESIGN Drainage Ditch Analysis & Design ' Conveyance System A The proposed drainage ditches will be analyzed using Manning's Equation as follows: ' Q = 1.49AR2JS12 n ' Where: Q =flow rate (cfs) Bottom Width= 0 (V-ditch cross section) Side Slopes= 3(M:I(V) Longitudinal Slope=varies t Manning's"n" = 0.027 (constructed channels, short grass,few weeds) Manning's "n" = 0,035 (constructed channels, rock-lined, smooth&uniform) ' North Swale: • Segment 1: Grass-lined, slope varies from 2.74% - 12.12% Q25= 1.13 cfs Q100 = 1.33 cfs Min. Sloe Max. Slope 2.74% 12.12% 25-yr Design Storm Flow Depth (ft) 0.36 0.28 Velocity (fps) 2.84 4.94 100-yr Design Storm Flow Depth (ft) 0.39 0.29 • Segment 2: Rock-lined, slope varies from 14.04% - 19.05% ' Q25= 1.13 cfs Qioo = 1.33 cfs Min. Slope Max. Slope 14.040/6 19.05% 25-yr Design Storm Flow Depth (ft) 0.30 0.28 Velocity (fps) 4.31 4.82 100-yr Design Storm ' Flow Depth (ft) 0.31 0.30 ' GROUP FOUR INC. 16030 Juanita-WoodinNillc Way NE Bothell,WA 98011 1 Renton Place 495-8005 1 CONVEYANCE SYSTEM ANALYSIS & DESIGN Drainage Ditch Analysis & Design 1 Conveyance System A East Swale: 1 • Segment l: Grass-lined, slope varies from 3.59% - 12.9% 1 Q25= 0.79 cfs Qioo = 0.93 cfs Min. Sloe Max. Slope 1 3.59% 12.90% 25-yr Design Storm Flow Depth (ft) 0.30 0.24 1 Velocity (fps) 2.86 4.63 100-yr Design Storm 1 Flow Depth (ft) 0.32 0.25 1 1 1 1 1 1 1 i 1 GROUP FOUR, INC. 16030 Juanita-Woodinville Way NE 1 Bothell,WA 98011 ' Renton Place #95-8005 CONVEYANCE SYSTEM ANALYSIS & DESIGN 100-yr Overflow Analysis Conveyance System B The 100-year/24-hour developed peak rate of runoff entering the downstream conveyance system from the proposed detention facility during overflow conditions was determined to be 1.99 cfs (see 100-yr Overflow Analysis, Hydrograph #20). Overflow from the control structure will be conveyed northerly approximately 52 lineal feet to CB41, then easterly approximately 21 lineal feet to an existing catch basin located in SR 515. The computer program "WaterWorks Version 3.1" will be used to perform the analysis of the ' proposed pipe system for Conveyance System B. See attached WaterWorks Version 3.1 computer output for supporting calculations. i 1 GROUP FOUR,INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 ' 3/29/96 GROUP FOUR, Inc. page 4 RENTON PLACE #95-8005 REACH SUMMARY BACKWATER ANALYSIS Hydraulic Gradeline for Reach HGO 1OOyr/24hr Overflow Analysis <-FROM-> <--TO--> <FLW> floss Ent HGL EntLoss ExtLoss OutLet Inlet AppHead BndHead JunHead HeadWtr -cb/mh- -------- -------- cfs -loss- -Elev-- --loss- --loss- --Elev- --Elev- --loss- --loss- --loss- --Elev- --Rim-- ' _________________vve=see=====________=====ace=====cease=veeeeceeeeeecc=========ceee=eeece=c=eeeeeecce_e=-=a==e _________________ EXCB 134.59 C61 El(CB 1.99 1.02 tw 8 do <dc• Inlet Ctrl Assumed 135.42 0.10 0.13 0.00 135.45 146.00 VAULT CB1 1.99 10.62 tw & do <dc: Inlet Ctrl Assured 137.94 0.00 0.00 0.00 137.94 143.70 i 1 ' 3/29/96 GROUP FOUR, Inc. page 1 RENTON PLACE #95-8005 REACH SUMMARY 100yr/24hr Overflow Analysis ' PIPE REACH ID No. P1 From: CB1 To: EXCB Pipe Diameter: 1.00 ft n: 0.0240 Pipe Length 20.92 ft s: 0.0488 ' Upol invert 135. 13 ft down invert: 134 . 11 Clection Area: 2 .32 Ac. Design Flow 1. 99 cfs Dsgn Depth: 0. 48 ft Pipe Cappacity 4 . 60 cfs Design Vel 5. 34 fps Travel Time: 0. 07 min Pipe Full Vel 6. 01 fps PIPE REACH ID No. PV From: VAULT To: CB1 Pipe Diameter: 1. 00 ft n: 0. 0240 Pipe Length 51. 06 ft s: 0.0494 ' Up invert 137. 65 ft down invert: 135. 13 Collection Area: 2 . 32 Ac. Design Flow 1. 99 cfs Dsgn Depth: 0. 48 ft Pipe Capacity 4. 62 cfs Design Vel 5. 37 fps Travel Time: 0. 16 min ' Pipe Full Vel 6. 04 fps t 1 ' Renton Place #95-8005 1 TIR SECTION VI Special Reports & Studies ' GROUPFOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 tRenton Place #95-8005 i SPECIAL REPORTS & STUDIES The following is a list of the special reports & studies prepared in support of the proposed development: • "Geotechnical Report" prepared by Terra Associates, Inc., dated September 16, 1995 (Project No. T-2970) ' • "Coal Mine Hazard Evaluation' prepared by Terra Associates, Inc., dated February 20, 1996 (Project No. T-2970-1) ' GROUP FOUR, INC 16030 Juanita-Woodinville Way NE Bothell,WA 98011 t ' Renton Place #95-8005 TIR SECTION VII Basin & Community Plan Areas ' N/A GROUPFOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011 ' Renton Place #95-8005 I TIR SECTION VIII Other Permits ' N/A GROUP FOUR, INC. 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 Renton Place 495-8005 TIR SECTION IX Erosion/Sedimentation Control Design ' GROUP FOUR,INC 16030 Juanita-Woodinville Way NE ' Bothell,WA 98011 fRenton Place #95-8005 t EROSION/SEDIMENTATION CONTROL DESIGN Filter fabric fence can be used to help reduce the amount of sediment transported beyond the disturbed areas of the construction site. Filter fabric fence is proposed along the north and east property lines to provide temporary erosion and sedimentation control. Per the King County Surface Water Design Manual Section 5.4.3, at the boundary of the site, perimeter protection may be used as the sole form of treatment when the flow path meets the following criteria: iAverage lope Flow Path Length 1.5H:1 V or less (66.67%) 100, ' 2H:1 V or less (50%) 115' 4H:1 V or less (25%) 150' 6H:1V or less (16.67%) 200' 1 OH:1 V or less (10%) 250' The average slope across the site is approximately 8.63%. Average Slope = (High Elev. - Low Elev.) (Diagonal Distance from SW comer to NE comer) Average Slope= (190' - 154')/(417')= 8.63% From the above table, the maximum flow path length for average slopes of 10% or less is 250 feet. The maximum flow path length proposed is greater than 250', however, the average flow path length is less than 250 lineal feet. In addition, the area tributary to the proposed filter farbric fence is relatively small. The total site area consists of 2.23 acres. Roughly one half of the site drains in each direction (i.e. northerly and easterly), resulting in just over one acre of upstream area tributary to each section of filter fabric fence. In addition, relatively steep slopes exist ' adjacent to the north and east property lines. As a result, it is desirable to maintain unconcentrated, overland flow patterns. Therefore, it would appear that the installation of filter ' fabric fence as proposed should be adequate for use as primary treatment of sediment laden water during construction of the proposed project. ' GROUPFOUR,INC. 16030 Juanita-Woodinville Way NE Bothell,WA 98011