HomeMy WebLinkAboutSWP272243 Short Plat (SHPL H )
REQUEST FOR PROJECT II Prelim_ Plat (PP/I )
CAGH
To: Technical Services Date �. / - Cl��j WOII 5 b 2 S Greenll
From: Plan Revicw/Projcct Manager 17,�U
Project Name M S 2 v/Z / f'ter,—�'s •� .S'�Zce7'
(70 characters max)
Description of Project: Al( (S.
/�?.trS' t //
Circle Size of Waterline: 8" 10" 12" Circle One: New or Extension
Circle Size of Sewerline: 8" 10" 12" Circle One: New or Extension
Circle Size ofStormline: 12" C05- 18" 24" Circle One: New or Extensi 6 ���
Address or Street Name(s) y/S j
Dvlpr/Contractor/Owner/Cnslt:
(70 characters )
Check each discipline involved in Project Ltr Drwg I/of sheets per discipline
Trans-Storm SWn _51 d�p24-3 ✓
(Roadway/Drainage) (Offsite improvemcntsXincludc basin name) (include TESC sheets)
C] Transportation (Signalizalion,Channclizatioq lighting)
O Wastewater
(Sanitary Sewer Main)(include basin name)
O Water (Mains,Valves,Hydrants)
(Include composite&Horizontal Ctrl Sheets)
TS Use Only
Approved by TSM Date:
forms/misc/92-090.DOC/CD/bh
074-5483 SHORELINE CONSTRUCTION CO 101911 02/20/96 DEPARTMENT FILE COPY
Vendor No. Vendor;Name ; PO Date
�� Chapter 116, Laws of 1965
4� CITY OF RENTON Purchase Order City of Renton Certification
I, the undersigned, do hereby certify under penalty of perjury, that the
materials have been furnished, the services rendered, or the labor
performed as described herein, and that the claim is a just, due and
SHORELINE CONSTRUCTION CO unpaid obligation against the City of Renton, and that I am authorized to
PO BOX 358 authenticate and certify to said claim:
WOODINVILLE, WA 98072
Signed
PLNG/BLDG/PUB WKS UTILITY SYS
WALKER, BILL
Qt Unit Descri ti6h Unit ftnee Est, Amourtt Account Number WO/Funs „Amount
sliplining 121, storm pipe 12,010.00 E 421 .000600.018 .5960 .0038.65.065015 65015/5330 12, 010.00
I
i
I
Authorized By 12, 010.00 12, 010.00
4ccounts Payable Div. •200 Mill Ave.S.•Renton,WA 98055•Phone(206)235-2618•Fax(206)235-25I3
DP 3119 11l94
l
Insituform
Wor
ldwide Pipeline P.O.Box 1660(98035) Tel: (206)872 2550 �
Technologies,I[W. Rehabilitation 20606 84th Ave.S. Fax:(206)873-3592
Kent,Washington 98032
February 13, 1996
Ron Shaffer
Wastewater Supervisor
Public Works Department
3555 N.E. 2nd St.
Renton, Wa. 98056
RE.Morris Avenue Storm Line
Dear Ron:
Thank you for the opportunity to quote on the rehabilitation of the 12" storm line located at
Morris Avenue.
Based on the nature of the job, Insituform Technologies recommends the trenchless method of
NuPipe which you are very well acquainted with.
4
The City of Renton is to provide at no cost to Insituform Technologies the following:
i
• Water from the nearest hydrant.
• Dump site for the debris removed from the pipeline.
• Removal of roots in the pipeline.
• Bypass pumping of existing flows
• Notification of affected property owners.
• Surface restoration after construction
• Any licenses,permits,fee, etc.
Insituform Technologies will provide the following:
f
• Mobilization to the project site while crews are in the area.
• Clean the pipeline prior to installation of the NuPipe.
it
Pre and post reconstruction TV inspection.
• Installation of a 12"DR 35 NuPipe.
l
The cost of this project is as follows:
i
UQ ANTITY UNIT PRICE EXTENSION
Mobdization/Demobilization 1.00 LS $3,400.00 $ 3,400.00
134 LF $ 82.00 $10,988.00
t
Sales Tax will be added to the total cost.
If you have any questions,please advisz
S
i
Sincerely,
INS=ORM TECHNOLOGIES,INC.
1 C
Marcos de la Iglesia
Technical Representative
From:dis To:Ron Shafer Date:2MQI96 Time:14.41:22 Page 1 of 1
Shoreline Construction Co. �
PO Box 358
Woodinville, WA 98072
Ph. (206) 483-0600 Fax (360) 668-5133
MBE/DBE #: D4M0701181
02/06/96
To: City of Renton
3555 N.E. 2nd St.
Renton, WA 98056
Attn: Ron Shaffer
Dear Ron,
Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the
storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for
a HDPE 10" pipe which has an O.D. of 10.75", this is dependent on the amount of deflection that the storm drain pipe has.
Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add
$3,200.00 to Alternate B.
Alt8mate A UnitEstimate Unit Extended
Description Measure Quantity Price Amount
Mobilization Is 1 $1,7470-0 $1,740,00
Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 $60.00 $7,980.00
Restoration Is I1 $790.00 $790.00
Total 10 510.00
0
i2, a10.
Additive to Alternate A:
Pipeburst 12" Concrete and utilize 12" HDPE $1,5a ,00
Alternate B Units ma sd Uniten
Description Measure Quantity Price Amount
Mobilization Is 1 j $1,740.00 $1,740.00
Sli line 12" Concrete Pipe With 10" HDPE Pie If 133 ! $48.50 $6,450.50
Restoration Is 1 $500.00 I500.00
,Total $8,690.50
Shoreline is also available to mobilize to the site immediatly.
Respectfully Yours,
Z�owglaa �. Sa�ukG
1
02/19/96 14:37 TX/RX N0.2207 P.001
INVOICE
Shoreline Construction Co.
PO Box 358
21326 87th Avenue S.E.
WoodinviVe, WA 98072
206 483-0600
360 668-5133
SHIP TO:
BILL TO: City of Renton
3555 N.E. 2nd St.
Renton, WA 98056
Attn: Ron Shaffer
Salesperson: Date of order.
Payment terms: Date order shipped.
Method of shipment: FOB point-
Invoice number. 9699-01 Invoice date: 4/2/96
Purchase Order number. 101911
ITEM NO. QTY. I DESCRIPTION PRICE EACH AMOUNT
1 Pipe Burst 15'Storm Drain 19,724.89 19 7248 '
=_=_
.rt y
_ z
F IbnLi11N:
Sub total: 15724 8 °
Tax rate: Tax: ti
Shipping&handling:
Previous amount owing:
Credit:
You pay this amount: 19 724 8
Ib
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM ,
DATE: March 1, 1996
TO: John Thompson
FROM: Ron Straka
v
SUBJECT: Account Numbers for Storm System Repair Projects
The following is a list of storm system repair projects which you have contractor quotes for and the
Surface Water Utility Capital Improvement Program budget account number that you can use to make
payment for the associated work:
• MORRIS AND S. 28TH STREET 12"STORM SYSTEM REHABILITATION:
Account Number .O.#/Function#): 421.000600.018.5960.0038.65.65015(65015/5460)
Shoreline Construction Company's quote of 2/6/96 for the pipe bursting of 133 linear feet of 12"
concrete pipe and installation of 12" HDPE storm pipe for $12,994.82 (including sales tax) is
acceptable. Please let me know when the contractor will be performing this work, as I may want to
observe the pipe bursting method of construction for future use on Surface Water Utility CIP's.
• CULVERT REPLACEMENT PROJECTS IN THE GYPSY BASIN
Account Number(W.O.#/Function#): 421.000600.018.5960.0038.65.65160(65160/5460)
These projects include the installation of approximately 160 linear feet of 30" CPEP, 60 linear feet of
36" CPEP, and one Type 2 catch basin at the intersection of Lincoln Avenue and Monterey Place NE
at minimum slopes of 5%and 3%respectively; along with the installation of approximately 100 linear
feet of 24" CPEP at the intersection of Lincoln Avenue and NE 43rd Street at a minimum slope of
3%. The quote from Kohl Excavating Inc. for a total project cost of$38,742.09 (including sales tax)
is acceptable. The construction of these culvert replacement projects needs to be monitored closely.
Since there are no engineering plans for the construction of these projects, the control of material
quantities used during the construction has to be monitored, or the final cost could be substantially
different than the initial quote price.
Please provide copies of all payments made to the contractors on these projects. We will need to know
the total project cost and the final length of pipe installed at the end of the project so that we can
include the information in our 1996 Annual Report to Finance.
If you need any assistance regarding these projects, please contact me at X-5548.
96STRMRP/RJS:lf
cc: Ron Olsen
Jack Crumley
r
From:dis To:Ron Shafer Date:2/1QW Time:14:41:22 Page 1 of 1
Shoreline Construction Co.
PO Box 358
Woodinville, WA 98072
Ph. (206) 483-0600 Fax (360) 668-5133
MBE/DBE #: D4M0701181
02/06/96
To: City of Renton
3555 N.E. 2nd St.
Renton, WA 98056
Attn: Ron Shaffer
Dear Ron,
Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the
storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for
a HDPE 10" pipe which has an O.D. of 10.75", this is dependent on the amount of deflection that the storm drain pipe has.
Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add
$3,200.00 to Alternate B.
AlternateUnit s ima a ni en e
Description Measure Quantity I Price Amount
Mobilization_ Is — 1 $1,740.00 1,740.00
Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 1 $60.00 $7,980.00
Restoration Is 1 $790.00 u2 00
Total 10 510.00
Additive to Alternate A:
Pipeburst 12" Concrete and utilize 12" HDPE $1,500.00
-o-A
Alternate B Units ima a nit Extehdad
Description Measure Quantity I Price Amount
Mobilization Is 1 1 $1,740.00 $1,740.00
Sli li 12" Concrete Pipe With 10" HDPE Pie if 133 1 $48.50 $6,450.50
Restoration Is 1 $500.00 $5QQ.QQI
Total $8,690.50
Shoreline is also available to mobilize to the site immediatly.
Respectfully Yours,
1
02/19/96 14:37 TX/RX N0.2207 P.001
-S 5 z
Insituform
Worldwide Pipeline P.O. Box 1660(98035) Tel: (206)872-2550
Technologies, Aw. Rehabilitation 20606 84th Ave.S. Fax:(206)873-3592
Kent,Washington 98032
February 13, 1996
Ron Shaffer
Wastewater Supervisor
Public Works Department
3555 N.E. 2nd St.
Renton, Wa. 98056
RE.Morris Avenue Storm Line
Dear Ron:
Thank you for the opportunity to quote on the rehabilitation of the 12 storm line located at
Morris Avenue.
Based on the nature of the job, Insituform Technologies recommends the trenchless method of
NuPipe which you are very well acquainted with.
The City of Renton is to provide at no cost to Insituform Technologies the following:
i
• Water from the nearest hydrant.
• Dump site for the debris removed from the pipeline.
• Removal of roots in the pipeline.
• Bypass pumping of existing flows
• Notification of affected property owners.
• Surface restoration after construction
• Any licenses,permits,fee, etc.
Insituform Technologies will provide the following:
• Mobilization to the project site while crews are in the area.
• Clean the pipeline prior to installation of the NuPipe.
• Pre and post reconstruction TV inspection.
• Installation of a 12"DR 35 NuPipe.
4 ,
The cost of this project is as follows:
QUANTITY UNIT PRICE EXTENSION
Mobilization/Demobilization 1.00 LS $3,400.00 $ 3,400.00
134 LF $ 82.00 $10,988.00
Sales Tax will be added to the total cost.
Ifyou have any questions,please advisz
Sincerely,
L VSIT UFO RM TECHNOL 0 GIES,INC.II//
- 1 V VV
Marcos de la Iglesia
Technical Representative
-k
From:die To:Ron Shaffer Date:2U/96 Time:11:43:31 Page 1 of i
Shoreline Construction Co.
PO Box 358
Woodinville, WA 98072
Ph. (206) 483-0600 Fax (360) 668-5133
MBE/DBE #: D4M0701181
02/06/96
To: City of Renton
3555 N.E. 2nd St.
Renton. WA 98056
Attn: Ron Shaffer
Dear Ron,
Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the
storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for
a HDPE 10" pipe which has an O.D. of 10.75', this is dependent on the amount of deflection that the storm drain pipe has.
Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add
$3,200.00 to Alternate B.
Altemate A Unit Estimated Unit; Extended
Description . Measure QuantityPrice Amount
Mobilization I Is 1 $1,740.001 $1,740.00
Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 1 $60.001 $7,980.00
Restoration Is i 1 1 $790.00 $790.Q0
Total $10 510.00
Alternate B Unit Estimated Unit Extended
Description I Measure ! Quantity Price Amount
Mobilization Is 1 $1,74000 $1,74G.G0
lipline 12" Concrete Pipe With 10" HDPE Pipe If 133 $48.50 $6,450.50
Restoration Is 1 $500.00 5 0.00
otal $8 690.50
Shoreline is also available to mobilize to the site immediatly.
Respectfully Yours,
vaaglaa <f• Suk�
1
0*4
02/07/96 11:39 TX/RX N0.2100 P.001