Loading...
HomeMy WebLinkAboutSWP272243 Short Plat (SHPL H ) REQUEST FOR PROJECT II Prelim_ Plat (PP/I ) CAGH To: Technical Services Date �. / - Cl��j WOII 5 b 2 S Greenll From: Plan Revicw/Projcct Manager 17,�U Project Name M S 2 v/Z / f'ter,—�'s •� .S'�Zce7' (70 characters max) Description of Project: Al( (S. /�?.trS' t // Circle Size of Waterline: 8" 10" 12" Circle One: New or Extension Circle Size of Sewerline: 8" 10" 12" Circle One: New or Extension Circle Size ofStormline: 12" C05- 18" 24" Circle One: New or Extensi 6 ��� Address or Street Name(s) y/S j Dvlpr/Contractor/Owner/Cnslt: (70 characters ) Check each discipline involved in Project Ltr Drwg I/of sheets per discipline Trans-Storm SWn _51 d�p24-3 ✓ (Roadway/Drainage) (Offsite improvemcntsXincludc basin name) (include TESC sheets) C] Transportation (Signalizalion,Channclizatioq lighting) O Wastewater (Sanitary Sewer Main)(include basin name) O Water (Mains,Valves,Hydrants) (Include composite&Horizontal Ctrl Sheets) TS Use Only Approved by TSM Date: forms/misc/92-090.DOC/CD/bh 074-5483 SHORELINE CONSTRUCTION CO 101911 02/20/96 DEPARTMENT FILE COPY Vendor No. Vendor;Name ; PO Date �� Chapter 116, Laws of 1965 4� CITY OF RENTON Purchase Order City of Renton Certification I, the undersigned, do hereby certify under penalty of perjury, that the materials have been furnished, the services rendered, or the labor performed as described herein, and that the claim is a just, due and SHORELINE CONSTRUCTION CO unpaid obligation against the City of Renton, and that I am authorized to PO BOX 358 authenticate and certify to said claim: WOODINVILLE, WA 98072 Signed PLNG/BLDG/PUB WKS UTILITY SYS WALKER, BILL Qt Unit Descri ti6h Unit ftnee Est, Amourtt Account Number WO/Funs „Amount sliplining 121, storm pipe 12,010.00 E 421 .000600.018 .5960 .0038.65.065015 65015/5330 12, 010.00 I i I Authorized By 12, 010.00 12, 010.00 4ccounts Payable Div. •200 Mill Ave.S.•Renton,WA 98055•Phone(206)235-2618•Fax(206)235-25I3 DP 3119 11l94 l Insituform Wor ldwide Pipeline P.O.Box 1660(98035) Tel: (206)872 2550 � Technologies,I[W. Rehabilitation 20606 84th Ave.S. Fax:(206)873-3592 Kent,Washington 98032 February 13, 1996 Ron Shaffer Wastewater Supervisor Public Works Department 3555 N.E. 2nd St. Renton, Wa. 98056 RE.Morris Avenue Storm Line Dear Ron: Thank you for the opportunity to quote on the rehabilitation of the 12" storm line located at Morris Avenue. Based on the nature of the job, Insituform Technologies recommends the trenchless method of NuPipe which you are very well acquainted with. 4 The City of Renton is to provide at no cost to Insituform Technologies the following: i • Water from the nearest hydrant. • Dump site for the debris removed from the pipeline. • Removal of roots in the pipeline. • Bypass pumping of existing flows • Notification of affected property owners. • Surface restoration after construction • Any licenses,permits,fee, etc. Insituform Technologies will provide the following: f • Mobilization to the project site while crews are in the area. • Clean the pipeline prior to installation of the NuPipe. it Pre and post reconstruction TV inspection. • Installation of a 12"DR 35 NuPipe. l The cost of this project is as follows: i UQ ANTITY UNIT PRICE EXTENSION Mobdization/Demobilization 1.00 LS $3,400.00 $ 3,400.00 134 LF $ 82.00 $10,988.00 t Sales Tax will be added to the total cost. If you have any questions,please advisz S i Sincerely, INS=ORM TECHNOLOGIES,INC. 1 C Marcos de la Iglesia Technical Representative From:dis To:Ron Shafer Date:2MQI96 Time:14.41:22 Page 1 of 1 Shoreline Construction Co. � PO Box 358 Woodinville, WA 98072 Ph. (206) 483-0600 Fax (360) 668-5133 MBE/DBE #: D4M0701181 02/06/96 To: City of Renton 3555 N.E. 2nd St. Renton, WA 98056 Attn: Ron Shaffer Dear Ron, Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for a HDPE 10" pipe which has an O.D. of 10.75", this is dependent on the amount of deflection that the storm drain pipe has. Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add $3,200.00 to Alternate B. Alt8mate A UnitEstimate Unit Extended Description Measure Quantity Price Amount Mobilization Is 1 $1,7470-0 $1,740,00 Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 $60.00 $7,980.00 Restoration Is I1 $790.00 $790.00 Total 10 510.00 0 i2, a10. Additive to Alternate A: Pipeburst 12" Concrete and utilize 12" HDPE $1,5a ,00 Alternate B Units ma sd Uniten Description Measure Quantity Price Amount Mobilization Is 1 j $1,740.00 $1,740.00 Sli line 12" Concrete Pipe With 10" HDPE Pie If 133 ! $48.50 $6,450.50 Restoration Is 1 $500.00 I500.00 ,Total $8,690.50 Shoreline is also available to mobilize to the site immediatly. Respectfully Yours, Z�owglaa �. Sa�ukG 1 02/19/96 14:37 TX/RX N0.2207 P.001 INVOICE Shoreline Construction Co. PO Box 358 21326 87th Avenue S.E. WoodinviVe, WA 98072 206 483-0600 360 668-5133 SHIP TO: BILL TO: City of Renton 3555 N.E. 2nd St. Renton, WA 98056 Attn: Ron Shaffer Salesperson: Date of order. Payment terms: Date order shipped. Method of shipment: FOB point- Invoice number. 9699-01 Invoice date: 4/2/96 Purchase Order number. 101911 ITEM NO. QTY. I DESCRIPTION PRICE EACH AMOUNT 1 Pipe Burst 15'Storm Drain 19,724.89 19 7248 ' =_=_ .rt y _ z F IbnLi11N: Sub total: 15724 8 ° Tax rate: Tax: ti Shipping&handling: Previous amount owing: Credit: You pay this amount: 19 724 8 Ib CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM , DATE: March 1, 1996 TO: John Thompson FROM: Ron Straka v SUBJECT: Account Numbers for Storm System Repair Projects The following is a list of storm system repair projects which you have contractor quotes for and the Surface Water Utility Capital Improvement Program budget account number that you can use to make payment for the associated work: • MORRIS AND S. 28TH STREET 12"STORM SYSTEM REHABILITATION: Account Number .O.#/Function#): 421.000600.018.5960.0038.65.65015(65015/5460) Shoreline Construction Company's quote of 2/6/96 for the pipe bursting of 133 linear feet of 12" concrete pipe and installation of 12" HDPE storm pipe for $12,994.82 (including sales tax) is acceptable. Please let me know when the contractor will be performing this work, as I may want to observe the pipe bursting method of construction for future use on Surface Water Utility CIP's. • CULVERT REPLACEMENT PROJECTS IN THE GYPSY BASIN Account Number(W.O.#/Function#): 421.000600.018.5960.0038.65.65160(65160/5460) These projects include the installation of approximately 160 linear feet of 30" CPEP, 60 linear feet of 36" CPEP, and one Type 2 catch basin at the intersection of Lincoln Avenue and Monterey Place NE at minimum slopes of 5%and 3%respectively; along with the installation of approximately 100 linear feet of 24" CPEP at the intersection of Lincoln Avenue and NE 43rd Street at a minimum slope of 3%. The quote from Kohl Excavating Inc. for a total project cost of$38,742.09 (including sales tax) is acceptable. The construction of these culvert replacement projects needs to be monitored closely. Since there are no engineering plans for the construction of these projects, the control of material quantities used during the construction has to be monitored, or the final cost could be substantially different than the initial quote price. Please provide copies of all payments made to the contractors on these projects. We will need to know the total project cost and the final length of pipe installed at the end of the project so that we can include the information in our 1996 Annual Report to Finance. If you need any assistance regarding these projects, please contact me at X-5548. 96STRMRP/RJS:lf cc: Ron Olsen Jack Crumley r From:dis To:Ron Shafer Date:2/1QW Time:14:41:22 Page 1 of 1 Shoreline Construction Co. PO Box 358 Woodinville, WA 98072 Ph. (206) 483-0600 Fax (360) 668-5133 MBE/DBE #: D4M0701181 02/06/96 To: City of Renton 3555 N.E. 2nd St. Renton, WA 98056 Attn: Ron Shaffer Dear Ron, Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for a HDPE 10" pipe which has an O.D. of 10.75", this is dependent on the amount of deflection that the storm drain pipe has. Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add $3,200.00 to Alternate B. AlternateUnit s ima a ni en e Description Measure Quantity I Price Amount Mobilization_ Is — 1 $1,740.00 1,740.00 Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 1 $60.00 $7,980.00 Restoration Is 1 $790.00 u2 00 Total 10 510.00 Additive to Alternate A: Pipeburst 12" Concrete and utilize 12" HDPE $1,500.00 -o-A Alternate B Units ima a nit Extehdad Description Measure Quantity I Price Amount Mobilization Is 1 1 $1,740.00 $1,740.00 Sli li 12" Concrete Pipe With 10" HDPE Pie if 133 1 $48.50 $6,450.50 Restoration Is 1 $500.00 $5QQ.QQI Total $8,690.50 Shoreline is also available to mobilize to the site immediatly. Respectfully Yours, 1 02/19/96 14:37 TX/RX N0.2207 P.001 -S 5 z Insituform Worldwide Pipeline P.O. Box 1660(98035) Tel: (206)872-2550 Technologies, Aw. Rehabilitation 20606 84th Ave.S. Fax:(206)873-3592 Kent,Washington 98032 February 13, 1996 Ron Shaffer Wastewater Supervisor Public Works Department 3555 N.E. 2nd St. Renton, Wa. 98056 RE.Morris Avenue Storm Line Dear Ron: Thank you for the opportunity to quote on the rehabilitation of the 12 storm line located at Morris Avenue. Based on the nature of the job, Insituform Technologies recommends the trenchless method of NuPipe which you are very well acquainted with. The City of Renton is to provide at no cost to Insituform Technologies the following: i • Water from the nearest hydrant. • Dump site for the debris removed from the pipeline. • Removal of roots in the pipeline. • Bypass pumping of existing flows • Notification of affected property owners. • Surface restoration after construction • Any licenses,permits,fee, etc. Insituform Technologies will provide the following: • Mobilization to the project site while crews are in the area. • Clean the pipeline prior to installation of the NuPipe. • Pre and post reconstruction TV inspection. • Installation of a 12"DR 35 NuPipe. 4 , The cost of this project is as follows: QUANTITY UNIT PRICE EXTENSION Mobilization/Demobilization 1.00 LS $3,400.00 $ 3,400.00 134 LF $ 82.00 $10,988.00 Sales Tax will be added to the total cost. Ifyou have any questions,please advisz Sincerely, L VSIT UFO RM TECHNOL 0 GIES,INC.II// - 1 V VV Marcos de la Iglesia Technical Representative -k From:die To:Ron Shaffer Date:2U/96 Time:11:43:31 Page 1 of i Shoreline Construction Co. PO Box 358 Woodinville, WA 98072 Ph. (206) 483-0600 Fax (360) 668-5133 MBE/DBE #: D4M0701181 02/06/96 To: City of Renton 3555 N.E. 2nd St. Renton. WA 98056 Attn: Ron Shaffer Dear Ron, Shoreline proposes two alternates to rehabilitation of the storm drain 12" concrete pipe. Alternate A is to pipeburst the storm drain pipe and Alternate B which is slipling the storm drain pipe. This storm drain pipe may or may not allow for a HDPE 10" pipe which has an O.D. of 10.75', this is dependent on the amount of deflection that the storm drain pipe has. Shoreline would be willing to attempt to storm drain but if it does not work and had to be pipeburst we would expect add $3,200.00 to Alternate B. Altemate A Unit Estimated Unit; Extended Description . Measure QuantityPrice Amount Mobilization I Is 1 $1,740.001 $1,740.00 Reline 12" Concrete Pipe With 10" HDPE Pipe If 133 1 $60.001 $7,980.00 Restoration Is i 1 1 $790.00 $790.Q0 Total $10 510.00 Alternate B Unit Estimated Unit Extended Description I Measure ! Quantity Price Amount Mobilization Is 1 $1,74000 $1,74G.G0 lipline 12" Concrete Pipe With 10" HDPE Pipe If 133 $48.50 $6,450.50 Restoration Is 1 $500.00 5 0.00 otal $8 690.50 Shoreline is also available to mobilize to the site immediatly. Respectfully Yours, vaaglaa <f• Suk� 1 0*4 02/07/96 11:39 TX/RX N0.2100 P.001