HomeMy WebLinkAboutSWP272245(1) STORM DRAINAGE REPORT
~~ FOR
BNRI8HT SHORT PLAT I
N� RENTON, WASHIN8TON
m�
File No. SHPL-101-90
r
FOR:
DONALD E. ENRIGHT
2120 SW 338TH STREET
FEDERAL WAY WA. 98023
PH. (206) 927-5914
U� �
� °. //
PREPARED BY
m� TOUMA ENGINEERS H.
6632 SOUTH 191ST PLACE, cc) WA
N� SUITE E-102
KENT, WA. 98032
(206) 251-0665
TABLE OF CONTENTS
' I . PROJECT OVERVIEW . . . . . . . . . . . . . 1-4 .
' II . PRELIMINARY CONDITIONS SUMMARY . . . . . . 1-4 . .
Core and Special Requirements and responses
TIR form
III. OFF-SITE ANALYSIS . . . . . . . . . . . . . 1-3. .
' IV. RETENTION/DETENTION ANALYSIS AND DESIGN . 1-2 . .
' V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN . 1-7 .
VI . SPECIAL REPORTS AND STUDIES . . . . . . 1 . . .
' Bio-filtration
' VII . BASIN AND COMMUNITY PLANNING AREAS . . . .N/A .
VIII . OTHER PERMITS . . . . . . . . . . . . . .N/A. .
' IX. EROSION/SEDIMENTATION CONTROL DESIGN . . 1-4 . . . . .
' X. BOND QUANTITIES WORKSHEET . . . . . . . . . .
' XI . MAINTENANCE AND OPERATIONS MANUAL . . . . . . . .
XII. APPENDIX
' STORM REPORT FOR RIDGEVIEW ESTATES . 1-4
D. PROJECT OVERVIEW
This project involves a parcel of land about 1 . 15 acres in
N� northeast Renton' The property is situated in the northwest
quarter of Section 3, Township 23 North, Range 5 East , W. M. It
is bounded on the south and east by Ridgeview Estates plat , a
w� single family development . The proposed site is located at the
northwest corner of Anacortes Ave. and NE 25th Street . The
N� surrounding properties on the north and west are large single
family parcels. The property is presently vacant with 5 single
family lots proposed for this short plat . The existing 30-foot
N� access right-of-way deeded to the City of Renton by Ridgeview
Estates (Lauralwood) will be improved to provide access to the
N� new lots. A dedication of future road right-of-way along the
southerly 30 feet of the property to the City of Renton will be a
portion of this short plat .
The existing soils as depicted by the King County Soil Survey are
Alderwood soil (AgC and AgD) . This soil type is characterized by
m� moderately high runoff potential and a relatively slow
infiltration rate.
A YI ►
A,;
Ah - illtop II
�
. , .i...� BeD
r
it
BM
• I a �� BM 22 :4- _ 02
It .23
`,21 ; i ,�: I 5 `�;:k vq*1 Hills g � I 985
PG oo •*•iF i. Ur ArnC 22 ` ` AgC
a ( 1 I I BeD
I"• J
I;c 1
_ Bh .� , AkF Low ABC ! I
' AkF C I AgD
pp-BN g B AgC i B
2 3z 'AgC r — — I BeC — -- ----- ----- I -----t — --
< ��
FQ h AgC' AgD I BeC
'Pin �: te
Wpo /ur I
N Hills BeC
InA ��' .• AgC I '0' Ur
' • EvB tWr) BeD I Ahf
•Kpp'/4 BeC ur i41 I
Newca BM 93 •
2 AgD 3 a_ '
' bM 996
8 AmC • I
I EvC BeD •eC
Bh ABC �' Bh• 1
j• �� AgC
AgC
K),C Y •EvC 9� / - P \ A B
- - J ----O- I OvD 9 g
• - ---- ISO• - -------\' - ------- --------- E
BMA A gM -----
1 AgD ' ' I I
690 692 I
y� dO _ :� AgC BMA n �' AgC
_ NO I ../ AgC
No .L l 605 OvD I
a• I
- Sm J 9 I
�• O �Q BeC
�p •`:•r. ;. 1 AgC
o .. AgD•• 1 1 AgD ; �r I •i; 34 i �3• LO AgD
D
AgC '•�, —i o� I. �•,
1
.l AkF I AkF AgC •• EVB !a. I AkF C T I OvD
g I BeC EvC V • I
PY.. c;r+AVEL AgC
PIT
a dkF C� 306 •I
r I ••• 13M
Ito rvl3
N BM111 ;
m s •BM 0$ ••• o
11 l Bh• Sc
EvC y` n Ev0 ABD �L
:., •, AgC
' 452- - -
AkF
it
r ° LAmC
AgC
FF
• ' (` AgD EvC
kF �� •I Ur 1 •� •� 1rf i ••Sm
.. '•i �,'1 r:e ` ;•'e .� �. •i R ry u.• �` ,• RaC•. •� — FJ z Trailer ark
i — EvC
RdE 900 tT4
'
ell 11 -
l:
SCALE 1"=200'
O
�FI F
I �
' 1 J r- -1 r-, ..........
�_r r Ir Y� 1
L r L r T I I F---1 ...........
T '
1 7 I I J J :ii•:Si•r\ L J
.....................
....................
r1 C -, ��i r--, r .,::::1 .- 1;- LJ J ! LLB r�a�,✓J
I I L L I I- 1_
--�
L_r �__J L ,1 _
r-1 r� L �l
I I I 1 f I I I J ? '�
LJ LJ SF
1
_ 1
v>/, 5th COURT
`
Iff
1 f 1 1 t, Z �LL
.-F r r �- , �--1 PARK `1
L I L I I I I J r--, I _�
1 i
L.l♦, i t i
NE 24th STREET v
Z
S
F
SF
% %. PRELIMINARY CONDITIONS
The proposal is consistant with present zoning and the
N� comprehensive plan. Per the zoning one of the lots will require
a variance because of the frontage width requirements. Fire and
N� police resources are adequate for this proposed development .
The utilities, storm, water , and sanitary sewer are existing and
N� available to the site. The storm will be collected and tied into
the existing outfall from Ridgeview Estates (Lauralwood) . The
water supply and sanitary sewer will be extended to the end of
w� the proposed new private street . Because of a cul de sac length
of over 500' a covenant must be recorded with the short plat
N� requiring all new homes to have a fire sprinkler system
installed. The new private street will be 20' wide with an
inverted crown. The storm water runoff will be collected at the
N� north end and piped northward, then tied to an existing 12" dia.
outfall .
ADDRESS CORE REQUIREMENTS 1 THROUGH 5
From the King County Surface Water Design Manual (KCSWDM)
w� 1 . DISCHARGE AT THE NATURAL LOCATION: The developed discharge
from the proposed short plat will be located to the north
N� and east of the private road improvements. This location
will allow the construction of a catch basin and storm drain
pipe that ties into the existing outfall from a detention
N� system from Ridgeview Estates. This existing outfall is a
12" dia. drain, piped down slope at about 18. 06% for 2201f
to a type I catch basin. This outfall empties onto 25 feet
m� of rip rap leading to the centerline of a drainage ditch
along SE 95th Way. See the "Offsite Analysis" for the check
N� of this outfall system.
2. OFF-SITE ANALYSES: The off-site analyses is attached to this
report and is contained in section III .
Ii . - Pg. 1
3. RUNOFF CONTROL: The runoff control will be to KCSWDM
standards. It is anticipated that the peak rate runoff
control will not be required due to less than 5000 sq. ft .
m� Of new impervious asphalt surfacing. A new catch basin and
piping will be connected to the existing conveyance system
N� outfall from Ridgeview Estates. The additional impervious
roof top areas will be directed to indivdual lot
infiltration systems.
4. CONVEYANCE SYSTEM: The storm drainage conveyance system will
be composed of underground pipes and catch basins. This
=� system will be designed using the rational method to the
KCSWDM standards. The pipes will be designed for the 25
N� year storm and checked with the 100 year storm for overflows
and required freeboard.
N� 5. EROSION/SEDIMENTATION CONTROL PLAN: The erosion control plan
will be designed to the KCSWDM. The minimum requirements
N� will include but not be limited to the following; rock
construction entrance' filter fence, sediment trap and
hydroseeding of the exposed areas.
Page 1 of 2
' King County Building and Land Development Division
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
PROJECTPART I PROJECT OWNER AND PART 2 PROJECT LOCATION
r DESCRIPTION
ProjectOwner 001,11+�D_ IT Project Name
Address 2-12-o W,___ 3 8+'�_F, U/. lvp. Location
Phone __Zo1,- 927.- 5�._____ _. ____ Township
Project Engineer ram"^ Range
Section
Company 1 U� _�n r;---FNL�'NrEjQs - --
ProtectSize __. _,/�___--_— ACC
Address Phone _Z_5_L._-_ _ s__-_ Upstream Drainage Basin Size —_--___ AC
PART 3 TYPE OF • OTHER
' Subdivision El DOF/G HPA Shoreline Management
Short Subdivision C] COE 404 Rockery
Grading 0 DOE Dam Safety C] Structural Vaults
' Commercial O FEMA Floodplain EJ Other
Other _____._________ _ [] COE Wetlands HPA
COMMUNITYPART 5 SITE r DRAINAGE
' Community
Drainage Basin
PART 6 SITE CHARACTERISTICS
[_] River -__._ __ _ ___--.._--_ Lj Floodplain -
0 Stream - - - _ ----- [--] Wetlands - - ----- --- ---
0 Critical Stream Reach F ] Seeps/Springs
Depressions/Swales F-] High Groundwater Table
L Lake --- - -__--- [._ j Groundwater Recharge
' LD Steep Slopes - 1 1 Other
I_j Lakeside/Erosion Hazard
PART 7 SOILS
Soil Type Slopes Erosion Potential Erosive Velocities
[_I Additional Sheets Attatched
1/90
' Page 2 of 2
King County Building and Land Development Division
' TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
PART 8 .DEVELOPMENT LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
[� Ch.4Downstr-eam Analysis_
FA
L ---- - - ---- - - -- - -
' _[]—Additional Sheets Attatched —
REQUIREMENTSPART 9 ESC
' MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION FOLLOWING CONSTRUCTION
[ ] Sedimentation Facilities Stabilize Exposed Surface
' Stabilized Construction Entrance Remove and Restore Temporary ESC Facilities
Perimeter Runoff Control ® Clean and Remove All Silt and Debris
Clearing and Grading Restrictions ) Ensure Operation of Permanent Facilities
' [TX1 Cover Practices Flag Limits of NGPES
E71 Construction Sequence Other
0 Other
PART i SURFACE WATER SYSTEM
' C] Grass Lined Channel E�J- Tank ED Infiltration Method of Analysis
[� Pipe System J Vault Depression _
Open Channel [:::-] Energy Dissapator Flow Dispersal Compensation/Mitigation
E] Dry Pond El Wetland Cl Waiver of Eliminated Site Storage
t El Wet Pond F-- I Stream C] Regional Detention ----------------------- - ---- -—
Brief Description of System Operation -PLG]e-_ to P_S u!ef A I t7F F— LorLl /Pe
Facility Related Site Limitations N DCTr,l /T/oN, L So00 9i F A C. 0 Additional Sheets Attatched
Reference Facility Limitation
PART12 EASEMENTS/TRACTS
PART 111 STRUCTURAL ANALYSIS
(May require special sttUctUral review) L>�j Drainage Easement
' J Cast in Place Vault I -] Other -] Access Easement
FI Retaining Wall L_J Native Growth Protection Easement
EJ Rockery>4'High �] Tract
' F-::] Structural on Steep Slope [—] Other
PART 14 SIGNATURE OP PROFESSIONAL
' I or a civil engineer under my supervision have visited the site. Actual
site conditions as observed were incorporated into this worksheet and the
attatchments. To the best of my knowledge the information provided
here is accurate. sry»ev,re
II la� 1/9f1
IXI~ OFF-SITE ANALYSIS
A field inspection of the site was performed on October 10, of
U� 1995. The property slopes down to the north at about 2-3% to the
top of a bank that slopes down sharply to SE 95th Way. These
steeper slopes range up to about 27%. The site is covered with
native brush and some scattered mature trees. The trees are more
dense on the steeper slopes and consist primarily of alder and
fir .
UPSTREAM ANALYSIS
N� There are no upstream drainage flows that enter this site. The
— plat and storm drainage system of Ridgeview Estates (Lauralwood)
intercepts any flows from the south. The storm drainage system
N� from this plat was constructed in 1988 and appears to be in good
working order . There did not appear to be any evidence of
overtopping, washing or flooding of it ' s conveyance or outflow
m� system.
DOWNSTREAM ANALYSIS
Surface runoff from the proposed short plat will sheet flow
northerly to the top of the steeper slope. The runoff will
travel in the brushy swales to SE 95th Way about 250' north of
the site. At this point any acumulated runoff will follow the
N� existing roadside ditch as it flows northwesterly to a low area
cross then a cross culvert under SE 95th Way roadway and to May
Creek.
The collected runoff for the proposed short plat will be emptied
N� into the existing 12" outfall from Ridgeview Estates
(Lauralwood) . This outfall begins at the detention tank and
drains toward Duvall Ave NE about 220' north. The outfall
N� terminates in a type I catch basin that bubbles up through the
grate as an energy dissipator . From the dissipator the runoff
flows over riprap to the westerly roadside ditch of Duvall Ave NE
III. - Pg. I
(Coal Creek Pkwy) . The runoff flows about 30' north to an 18"
concrete culvert under SE 95th Way. A roadside ditch carries the
storm water north about 700' to May Creek. This swale starts as
a graveled roadside ditch for about 501 . Then the broad ditch
becomes heavily vegetated for the remaining 650' leading to May
Creek.
There did not appear to be any undercutting, washing, or evidence
of flooding along the route leading from the existing detention
tank for Ridgeview Estates (Lauralwood) . We do not anticipate
having any more than the standard restrictions placed on this
m� proposed short plat .
N� SUMMARY
It was noted during the site visit that the existing outfall ,
ditch, and swale systems were not experiencing any undercutting
N� or uncontroled washing. It appears that a slight increase in
runoff could be tolerated by the existing downstream system.
N� There did not appear to be any reason to overly restrict or
~- control runoff outflows.
E E K P A
COUNT a REI;CRE,A T I ON 0 E P I
60 --—----
S.
L)
T
EC A#Ay>_ G
V A if
86 1!11
53 A c
\"\061Ac
0464C
I'*-- 050Ac Qlo� 06
W 0 5P Ac
I, 0 5?Ac D19
cl: I, 05?Ac
C) W H Marshall, Jr. "?Do,
loe Pignalard
rr-c�
19
13 -4 Ac
�z James Dalpay
0
Kenneth Mar5hall 6,
5 Ac
10. 247Ac
'7 Ac
6 78 Ac
(130ow
.14
Jr
4,
61/
4o 7Alit'
5
\0'
'04
�T
19 20 4:
it F—Pr
L)o\AJN STP
7 ON 4LYS I S
lb�; BS
9
r " mp
jo
in
'Il 4Z,r) 11 It tv
wo
\a
278773
r
NN IV. RETENTION/DETENTION ANALYSIS AND DESIGN
�
As noted above in the Project Overview for this short plat we are
U� going to construct a private street , 20' wide for the 5 proposed
lots. Our goal is to minimize impact to the existing site, and
U� downstream storm drain system by infiltrating the new house roof
— runoff, and keeping asphalt improvments as small as possible.
N� The requirement for storm water detention per Core requirement
#3, states two exceptions to peak rate runoff control on page
1 . 2. 3-5, of the KCSWDM:
� The proposed project site post-developed peak runoff rate
N� for the 100 year , 24 hour duration design storm event for
each discharge location to be less than 0. 5 cfs more than
the peak rate for the existing site conditions; OR,
� The project proposes to construct 5, 000 square feet or less
of new impervious surface.
The new 20' wide private street will add about 2611 square feet
N� of asphalt , impervious surface. The driveways for the 5 lots are
estimated to add another 2, 200 square feet of impervious
surfacing. Therefore the total new impervious surface will be
N� 4, 811 square feet , 0. 11 acres. This means that peak rate runoff
control and detention will not be required
m� INFILTRATION SYSTEM FOR EACH LOT
N� ROOF DOWNSPOUT INFILTRATION SYSTEM
From a soil study performed in this area the soils appear to be a
N� fine sany loam, soil texture 3. From Table 4. 5. 1B, in the Sea-
Tac area, the lineal feet of infiltration trench per 1000 sq ft
of roof area is 60 feet . Each of the lots is estimated to have a
IV. - Pg. 1
house with roof area of at least 1800 square feet . Thus each of
the 5 lots will have an infiltration system of at least:
N� L=(A/1000) ( I ) (k)
where:
N� A= tributary roof area in sq ft
— I= unit length of trench (601 )
k= reginal scale factor ( 1 . 0)
L = ( 1800/1000) (60) ( 1 .0) = 108 If of infiltration trench.
Use at least 60' per 1000 sq ft of roof area.
The trench for each house may be divided, front , back, or sides,
N� depending on amount of roof area and drainage pattern to each
downspout .
IV. - Pg. 2
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
N� The outfall from Ridgeview Estates' s restrictor detention system
flows north down the hill to SE 95th Way. The capacity of the
N0 existing outfall pipe is about 8. 22 cfs. The orifice restrictor
�
was calculated to limit the allowable flow to 0. 56 cfs. (See the
attached copy of original calculations) . We plan to add the new
N0 private street and driveway collection area, then calculate the
combined conveyance flow' s assuming an overflow situation from
Ridgeview Estates. To calculate the combined runoff we will use
NN the runoff coefficient from the old storm detention calculations.
The total developed, 25, 50, and 100 year flows through the
U� outfall pipe are calculated to be 6. 37, 7 34 and 8 31cfs
N� ^ ' ^
— respectively. Please note that these amounts of runoff could
only happen when the restrictor from Ridgeview Estates was in
U� overflow circumstance. The downstream pipe is adequate to handle
the additional runoff generated from the new impervious surface
from the private street and driveways. For the 100 year storm it
«� will require the build up of 5' of headwater in a 10' deep catch
basin. See the attached calculation and data sheets.
V. - Pg. I
' 1/31/96 EngeniOUs Systems Inc: page 1
Ridgeview Estates
REACH SUMMARY
RoUtinq based on Seattle family G 25 yr freq
Network: 1 ine3:
Pipe Reach Basin Area --c- --c#A- --Sum- ---Tc- --i-- --QAct Dia -Mann -Slope -QFull Vfull -Vact -Length --tt--
' ---------- Id -----ac ------c#A- - min in/hr cfs in --a-- ft/ft cfs fps fps ft min
xx7--l--a----..----S-S----LS--S---II--..--7ax--..-----x----7x--------..------
p7 cb7 1.44 0.40 0.58 0.58 6.30 2.70 1.56 12 0.024 0.0177 2.57 3.29 3.43 235.00 1.14
' Network line2:
Pipe Reach Basin Area --c- --csA- --Sue- ---Tc- --i-- --QAct Dia -Mann -Slope -QFull Vfull -Vact -Length --tt--
---------- Id ac --c*A- - min in/hr cfs in --n-- ft/ft cfs fps fps ft min
' cs=za:zesxsss7zzasa7ss7saxcsxxxsexcc:axsxcxxzssszscsexssxxxxs7xx=c=II=xxxII=sc==czszIIzszsxzssIIsasscs7IIIIaxssxss7smssII
p3 cb3 0.11 0.90 0.10 0.10 6.30 2.70 0.27 12 0.024 0.0621 4.82 6.14 3.30 48.00 0.24
p2 0.10 6.54 2.65 0.26 12 0.024 0.6673 15.81 20.13 7.53 11.00 0.02
1 Network 1 inel :
Pipe Reach Basin Area --c- --c#A- --Sun- ---Tc- --i-- --QAct Dia -Mann -Slope -QFull Vfull -Vast -Length --tt--
---------- Id ac --c#A- - min in/hr cfs in --n-- ft/ft cfs fps fps it min
p5 cb6 1.83 0.40 0.73 0.73 6.30 2.70 1.98 12 0.024 0.0100 1.94 2.46 2.52 125.00 0.83
p5 cb5 3.12 0.40 1.25 1.9B 7.13 2.54 5.04 12 0.024 0.0120 2.12 2.70 6.41 283.00 0.74
1 p4 2.56 7.86 2.40 6.15 12 0.024 0.1806 9.22 10.47 11.48 15.00 0.02
pl 2.65 7.89 2.40 L6.n 12 0.024 0.1806 8.22 l0.47 11.56 205.00 0.30
1 cw-p4C_►Ty o ►e- rk?k'- e S NFA-k- � ,o
1
i
i
1
1
2/ 1/96 Engenimus Systems Inc page 1
1
Ridgeview Esta�es
=====================================================================
NN REACH 81JMMARY
�
NN Routing based on Seattle family @ 50 yr freq
Network line3:
Pipe Reach Basin Area --,- --c*A- --Sum- --Tc- -i'- -gAbt Uia -Mann -Slope -QFul} Vfuil -Vact -Length -tt-
NN ----- [d oc -c»A' - sin io/hr cfs in --o- ft/ft cfs fps fps yt sin
p/ ch7 1.44 0.40 0.50 0.58 6.30 3,05 1,76 12 0,024 0.0177 2.5/ 3.28 3.53 235.00 1.11
Network l ine2:
Pipe Reach Basin Area -c- -c*A- -Sum- --Tc- -QAck Uio -Mann -Slope -Q[ull Yfo|l -Vact -Length -tt-
----- 0 oc -'c*A- - sin io/hr cfs in -o- M/ft cfs fps fps ft min
NN =`========================================================
o3 ch3 O.|l 0,90 0,10 0.10 8.30 3.05 0.30 12 0.024 0,0621 4.0 6.14 3,42 49.00 0,23
p2 0,10 6.53 3,00 0,30 D 0.024 0.6673 15.81 20.0 7.83 11,00 0.02
- Network 1ine1 :
Pipe Reach Basin Area -c- '-c*A- --Sum- --lc- -i- -gAbt Dia -Mann -Slope -gFull YYull -Nat -Length -tk-
N� ----- 0 oc -c»0- ' min io/hr cfs in -o- ft//t cfs fps fps ft min
y6 ch6 1,83 0,40 0.73 0,/3 6,30 3.05 2,23 12 0,024 0.000 1,94 2,40 2.84 125.00 0.73
y5 ch5 3.12 0.40 1,25 1,9B 7,03 2.90 5.74 12 0,024 0,0120 2.13 2.70 7,31 2H3.00 0.64
N� p4 2.56 7.68 2,7/ /,08 12 0,024 0.006 8,22 0,47 11,78 15.00 0,02
p1 2'65 7,70 2.77 J 34. 12 0,024 0,IB06 H.-22 10.47 11.84 205.00 0,29
(7 V- F:�n&�
�
' 1/31/96 Engenious Systems, Inc page 1
Ridgeview Estates
REACH SUMMARY
IRouting based on Seattle family @ 100 yr freq
Network line3:
' Pipe Reach Basin Area --c- --cfA- _-Sue- --Tc- --i-- --QAct Dia _Mann -Slope -QFull Vfull -Vact -Length--tt--
- Id ac -cfA- - min in/hr CIS in -n-- ft/ft cfs fps fps ft min
asassaaazseaaaaaasxsxzsscxsxaaaszsssxscasseccxasesssssaasaccccxsssscssaxxsxsscscssscsssasassssssssssssss=xsasssaas
p7 c11 1,11 1,11 1,11 0.58 6.30 1,11 1,11 11 1,111 1,1171 1,11 1,11 3.61 135.00 1.09
Network line2:
Pipe Reach Basin Area --c- --cfA- --Sue- ---Tc- --i-- --QAct Dia -Mann -Slope -QFull Vfull -Vact -Length --tt--
' ---------- ld ac --c+A- - min in/hr cfs in --n-- ft/ft cfs fps fps It min
aesszsaasssaxss=sxxxxsxsssxesxsssexsssssxccxssssssssxxssscr-ssxssssssaxsszssassassxsssssssxssszssaxaessasssszsssza
p3 cb3 0.11 0." 0.10 0.10 6.30 3.40 0.34 12 0.024 0.0621 4.82 6.14 3.33 48.00 0.23
' p2 0.10 6.53 3.35 0.33 12 0.024 0.6673 15.81 20.13 8.09 11.00 0.02
Network lines :
Pipe Reach Basin Area --c- --c#A- --Sur ---Tc- --i-- --QAct Dia -Mann -Slope -QFull Vfull -Vact -Length --tt--
' ---------- Id ac --c*A- - min in/hr cfs in --n-- ft/ft cfs fps fps It min
ssssesseasassssssxaaxssaxsxsxxss:czaseaasassxszsassaeaxsxsssssaasaassszsssasssassssrsxcssxxsazsseszsaseasaszsaaess
p6 cb6 1.83 0.40 0.73 0.73 6.30 3.40 2.49 12 0.024 0.0100 1.94 2.46 3.17 125.00 0.66
' p5 cb5 3.12 0.40 1.25 1.98 6.96 3.26 6.45: 12 0.024 0.0120 2.12 2.70 8.21 283.00 0.57
p4 2.56 7.53 3.13 0.01 12 0.024 0.1806 8.22 10.47 11.93 15.00 0.02
pl 2.65 7.55 3.13 L!._3.0 12 0.024 0.1806 8.22 10.47 10.59 205.00 0.32
7 Fe OM F- 1C- tA �, rr 4-1 , , 5 D �V --IT ►'vGt`IU- D� T► IC 8, � I
' G P-S (a_) I �_ _ a-" 12 > �� ' (_) / 1, I
1'Z I G VY"1 CA/ I (_L. O h-! L -) ri---I F
-F-{c', V ID 1= hI T1 O N P L U. r S Ou /'c. Ft oel')L
f�! YGtrl C d� I (7) 0 1 Kn _TH F !2 E_: S ICr�OIr3
l Z F D u fGA 0,1I) F 0 .
1
- Si, 'G[7.�,• , ',. �. - SC1) r,. 7.�'L ____.�... .F__..L■". _� •\ C S �� D/O \`\ � '���\, �\,'r-.,
•� 'r'.a. ,.rt /A=G1 j'.^S:' ,.,111�,,,''v, Q \ T�''S�i 1' �� 9'y
N 2
r <,
C,13
dI. it � . ;. r
04
olo t'7(°� I I _ � y�vJ rn G 2FST.
tr 2J�p I 79n.oE�
L- 1 o d \3�ZhC v• �h 01 4�/G ,.+
i I _ yt
ISO Tv% S�I 'o ?� R:s,N� +✓ t
N i, 7-7 r.
). �. CT
ItIl�f ' ` NE 140.A2a�• `.� l
Dav ' tAq ?I r
_. �;`�. ._.__IIl:9 :,< "", J '� ° r'•.•-+ ...---•. ..__ rt ".1D�/:� a cs� _�ryV I,\.A •',' .� A \\ (,'\1.�q 1 Vt
m ,� }3 (Ifs I '�t G �b o ��1 1 q0 ht,U ? 'r ,
' (�
1 '9 � � `b o 160 Q�
n, (!rl(> 1+\ ' ,, o �'�` r` Z (.n \,ptfe0 Q'0151
1 \rl`��(1�'D ^i 1 �� ?.► qb\,�0 !}3:1 4Li
t� __OGo �..� - _4�_� '�`•'� 1 82,OL I�lrn
`���YC n;
,, ` phi•,. �� , �. fy ro 1 I.._ 0 r 40
'�'-0.,
rrj
^' l�'loo ci I I J.,�
ot
I }
.19 7 '1
f;• � ,•.•;. •:<� .gin ,vrwool
rh
10
to I
('1F � N 3y3� ,� }y(ir.t r,r �;�d i n� r.,t, - `-� � I � �f � �� - l3 ' ,,• r� ,' 'I c,
1(1 4 n )n pn a t AN' r•I n, 1 4 �hlf I lP
- !
��._` \i r �I'11 '� _�._.... _._.....___..... ..._.__. _-•...__ ..._�. _.... ._ .. �. ... _
1/31/96 Engenious .Systems, Inc page 1
Ridgeview Estates
RATIONAL DRAINAGE AREA SUMMARY
Drainage Area Id: cb3
' Description. . . . . : drainage to cb #3
<---Description--> SubArea Subic L ( ft) Slope -Kr-- (min)
New AG driveway 0.06 0. 90 125. 00 0.0100 20.00 1 .04
' Composite "c" Value. . . . . . . . 0. 90 Time of Conc (min) . . 6. 30
Drainage Area Id: cb5
Description. . . . . : drainage to cb#5
<---Description--> SubArea SubC L ( ft ) Slope -Kr-- (min)
street & lots 3. 12 0.40 165.00 0,0200 7.00 .2. 78
' 200.00 0. 0100 20.00 1 .67
45.00 0.0356 20.00 0. 20
Composite "c" Value. . . . . . . . 0. 40 Time of Conc (min) . . 6. 30
Drainage Area Id: cb6
Description. . . . . : drainage to cb#6
' <---Description--> SubArea SubC L ( ft ) Slope -Kr-- (min)
street & lots 1 .83 0. 40 85.00 0.0100 7.00 2.02
200. 00 0.0100 20.00 1 .67
' 20. 00 0.0122 20. 00 0. 15
Composite Value. . . . . . . .0. 40 Time of Conc (min) . . 6. 30
' Drainage Area Id: cb7
Description. . . . . : drainage to cb#7
<---Description--> SubArea SubC L (ft ) Slope -Kr-- (min)
street & lots 1 . 44 0. 40 115.00 0.0100 7.00 2. 74
125. 00 0. 0100 20. 00 1 .04
Composite "c " Value. . . . . . . 0. 40 Time of Conc (min) . . 6. 30
Df�IC,( N L, OF - 1,1TION C4LC_t4L /4riONS ,
1
' KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
FIGURE 4.3.5D HEADWATER DEPTH FOR CORRUGATED PIPE CULVERTS WANLET CONTROL
Io,000
l68 - 8,000 EXAMPLE (I,
- 156 .6.000 0.36 inches 43.0 feet) 6.
— 5.000 0.66CIS �3� �� X DI► �
144 4,000
ttw' tlw ENTRANCE TYPE
132 3,000 0 (feet)
cot (1) 1.8 5.4 - �— 5' 6- HEADWALL PLAN
- 120 F 2,000 (2) 2.1 6.3 5.
' ; (3) 2.2 6.6 4'
108 n
4.
1 l
'0 in feet 3' t 1
a t l
- 96 1,000 3. ; t
' 800 3
84 N 600 2 (1)
500
' - 400 — _--' MITERED TO
N 72 /f 2. 2. CONFORM
Ei
w 300 — - - TO SLOPE
SECTION
Z_
Z 60 Z 200 �+s�Q � �
54 v
w
cr 0 Q
w 48 ¢ - 80� o
x- 60 ? PROJECTING
u 42 /N 5o F 1 O I ° SECTION
O / —
ao w I.o
x C3 --
rw �6 30 ENTRANCE a
'
w 0 SCALE TYPE w t- 9
33 a
0 20 (l) tfead.all 30 8
30 (2) Mitered to conform
� to slope x •6
' u
27 10 (3) Projecting
rc .7 - .7
a 8
0
a 24 .7
6
5
To use scale(2) or(]) project
21 4 horizontally to scale (1),then — ____-----_ _-- _--
use straight inclined line through .6 .6
3 0 and 0 scales, or reverse as 6
— 19 illustrated.
2
1.0 .5
121Nt = UZyrS `� 5 >< I1 _ `j � govr, LF
,q ) ND 0v TJ �� �/VG
4.3.5-12 1/90
' VI . BIOFILTRATION:
' The bicifiltration fc,r this shy-Irt plat will not be required. The
total amount cif asphalt paving for the street will be about 2611
square feet .
r
' VI . - Pg. 1
' VII. BASIN AND COMMUNITY PLANNING AREAS
1
VII . - Pg. 1
' VIII. OTHER PERMITS
1
1
' VIII . - Pg. 1
IX. ERQSXON/SEDIMENTA%0N CONTROL DESIGN
The initial improvments and clearing for this proposal will be
m� limited to the private street and the easements for the
utilities. The clearing limits will be limited to maximum of
N� about 0. 2 acres.
To design a sediment trap the peak discharge from the developed
N� 2-year , 24-hour design storm from the contributing area
hydrograph will be used. The required surface area of the
sediment trap at the top of the weir or 2. 5' min depth will be
w� determined as follows:
N� L = 1801 , S = 2. 8%, nm = 0. 40(existing)
L = 180' , S = 2. 8%, n* = 0. 05(cl ear ed)
N� Tc = ?
Existing
N� t , = . 42( . 40x180' ) / (2. 0) 'ox ( . 028 89min
pervious area = 0. 2 @ cn = 81
impervious area = 0, @ cn = 98
Cleared
tx = . 42( . 05x180' ) / (2. 0) '»x ( . 028) '« = 46. 7min
m� pervious area = 0. 2 @ cn = 87
impervious area = 0, @ cn = 98
from the hydrograph calculation the peak 2-year flow is 0. 03cfs
SA = FS(Q~/V.) = 2 ( . 03/. 00096) = 62. 5 sq ft
A sediment trap that is 2' by 5' at the bottom with 3: 1 side
slopes will have a dimension of 17' by 25' at 2. 5' of depth.
This will yield a surface area of 425 sq ft at the 2. 5' depth.
More than adequate for the 62. 5 sq ft required. The trap should
be 2. 5 feet deep from the top of the weir , and 3. 5' deep to the
top of the berm. The dimensions at the top of berm will be a
N� min. of 23' by 31 '
IX. - Pg. 1
ii:BUH/SCS METHOD FOR COMPUTING RUNOFF HYDROGRAPH
STORM OPTIONS:
1 - S. C. S. TYPE-IA
2 - 7-DAY DESIGN STORM
N�3 - STORM DATA FILE
SPECIFY STORM OPTION:
�� 1
~~
S. C. S. TYPE-IA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
N�2,24, 2. 1
______________________________________________________________________
******************** S.C. S. TYPE-IA DISTRIBUTION ********************
2-YEAR 24-HOUR STORM **** 2. 10" TOTAL PRECIP. *********
______________________________________________________________________
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
06/ o re-,
DATA PRINT-OUT:
~~ AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
.2 . 2 81 . 0 . 0 98. 0 89. 0
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
.01 0. 67 481
—ENTER [d: ][pmth] filename[ . ext ] FOR STORAGE OF COMPUTED NYDRO8RAPN:
er
m�SPECIFY: C - CONTINUE, N - NEWST8RM, P - PRINT, S - STOP
C
II_________________________________ _ _ _ _ _ ___
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TCFORBASINNO. 2---
. 2,87,0,98, 46. 7
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A I.-:N A CN
.2 . 2 87. 0 . 0 98. 0 46. 7
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
N� .03 8.00 708
ENTER [d: ][path] filename[ . ext ] FOR STORAGE OF COMPUTED HYDRO8RAPH:
ER-DV2YR
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
-- / K ' --
PORTION OF THE NW 114 OF T1-/E NW 114 OF S
NW COR R 3.5 E, W. M. CITY OF REN TON, KING COON
' MON & CASE NORTH LINE OF 3-23-5
(10/94) N 8879 35' W (KCAS) 1317.81' (CAL)
160
--- ------- --
N 88 29 33" W (DEED) 1317.92' (DEED)
r
EAST LINE OF
IS ` \ `�\`\\��� ' `� ��\� \�`� o CISGOI�ERNMENT LOT 4
)LG b� D D7':1 D-��S`,\ �� �p�
LEGEND
- --- --
'�� ` � 4� x FD PK NA00
004 426 - ----i----- ___ � ;,�i �!� ® _ MON IN Cl
- � w
w w O - FD 112" R,
LOT 2 ��'� L'�T` ��`'= :` n in� w
• - SET 1/2' REB
�
AENT p i 9,447. s(I.ft'Lli
'
F RS F---. , 0.21 rres
3 - � ; \�S887 "E
i J r r i i �? _30' INGRESSAGRESS A
O- r ' ` r ' r UTILITIES EASMENT PER
F TI O N Z r ' S6S� — - -- -i RIDGEWIEW ES TA TE" PL.A
IE USE
ETS 3L_ -1" LOT 3
/ATE --
7,707. sq-ft. i Tract 11"A=l W — EXISTING Wt7
a 17 acres r2,720. �q.ft.r 11 O �
r _.
)�S i 10.06 acres rr
URPOSES, Q3 � c.;Q �� EXISTING I
h HOU5.F
lu c I
FILLS N- ---- LOT 4 N
THE r Ir
r o I ---- --- I
rrj • 11 — - -— ----.
SAID 1 7,190. sq.ft. .4 fA r a� __
0.16 acres r LOT 25 RIDGEVIEW ESTATES
' ER o
L------- �
t
IC --' -_-- r __- J 2600 k I
HOWN A -- --- ---- ---- 1-- __---- L
'URPOSES `3� L h� -_------------------
jlB U
' • r N.E. 26 TH c
E ; 7,858. sq.ft.
0.18 acres ' o
SUCH r �o / �-Ai ON IN CASE
(ALLY ' -----------------
J 0.11, S88'1 '480E ��,; '__`------
P R'SON p " 30' ROAD R/W
O Tract B CITY OF RENTO BY
3,9OJ. sq.f t. )6201121 MON IN CASE
--- i
!in/0AI
KING COUNTY, WASIIING 'FON, SURFACE WATER DESIGN MANtJAL
'I'ABI,E 3.5.2B SCS W[ S I LIZN WASI IINCTON RUNOFF CURVE NUMBERS
' SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SCS in 1982)
Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A
rainfall distribution, 24-hour storm duration.
CURVE NUMBERS BY
HYDROLOGIC SOIL GROUP
' LAND USE DESCRIPTION A B C D
Cultivated land(1): winter condition 86 91 94 95
Mountain open areas: low growing brush and grasslands 74 82 89 92
Meadow or pasture: 65 78 85 89
' Wood or forest land: undisturbed or older second growth 42 64 76 81
Wood or forest land: young second growth or brush 55 72 W 66
Orchard: with cover crop 81 88 92 94
' Open spaces, lawns, parks, golf courses, cemeteries,
landscaping.
good condition: grass cover on 75%
or more of the area 68 80 86 90
fair condition: grass cover on 50%
to 75% of the area 77 85 90 92
Gravel roads and parking lots 76 85 89 91
Dirt roads and parking lots 72 82 87 89
Impervious surfaces, pavement, roofs, etc. 98 98 98 98
Open water bodies: lakes, wetlands, ponds, etc. 100 100 100 100
Single Family Residential (2)
Dwelling Unit/Gross Acre % Impervious (3)
1.0 DU/GA 15 Separate curve number
' 1.5 DU/GA 20 shall be selected
2.0 DU/GA 25 for pervious and
2.5 DU/GA 30 impervious portion
3.0 DU/GA 34 of the site or basin
3.5 DU/GA 38
4.0 DU/GA 42
4.5 DU/GA 46
5.0 DU/GA 48
5.5 DU/GA 50
6.0 DU/GA 52
6.5 DU/GA 54
7.0 DU/GA 56
tPlanned unit developments, % impervious
condominiums, apartments, must be computed
commercial business and
' industrial areas.
(1) For a more detailed description of agricultural land use curve numbers refer to National Engineering
Handbook, Section 4, Hydrology, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff is directed into street/storm system.
(3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers.
3.5.2-3 11/92
1
X. BOND QUANTITIES
X. Pg.
XI . MAINTENANCE AND OPERATIONS MANUAL
i
XI . - Pg. 1
i
i
i
i
1
I
I
1
' STORM REPORT
' FOR
RIDGVIEW ESTATES
PREPARED BY:
' TOUMA ENGINEERS
201 SW 41ST STREET
RENTON, WA. 98055
r '�',sn�eswo�,•
H.
r .+ WA C/
. �oF Sti' . ?
f N
i
+.... .m
1
1
' GENERAL CONDITION
Property Area = 7.8 Acres
Total Basin Area = 11.9 Acres
Land Cover = SPARES TREE C = .10 For S < 5%
Developed C = 3.00 - 3.5 DU/GA = 0.40
' ALLOWABLE FLOWS
A = 11.9 Acres
' Overland Flow = 1060' @ S = 1.2% V = D .26 fps
170' @ S = 26% V = 1.30 fps
TC = 10 + 1060/.26(60) = 170/1.30(60)
= 10 + 67.95 + 2. 18
= 80. 13 min
' I = 0.52in/hr
Q = ( C I A )5y + ( C I A ) 25yr
' = (. 10)(.52)(4. 1) + (.10)(.45)(7.8)
= .56 cfs
Since Q > .30 cfs , Two Orifices will be used.
1
STORAGE REQUIREMENTS
' Site Area As = 7.8 Acres
Overland Flow = 740' @ S = 1.2% V = .26 fps
' 170' @S = 26% V = 1.3 fps
- -
T 10 + 740/.26(60) 170/1.3(60)
= 10 + 47.44 + 2. 18
' = 59.62 min.
I = 0.45 in/hr
Q� = CIA
( . 10)( .45)(7.8)
.351 c f s
Q Q, CD A
.351/.40(7.8) o. fs
?U' o `U?s '•
V J
_ . 113 cfs/Acre
' -159.07ft
=-2429.5ft /Acre
__.2-42
T = -25 + 85500
( 29.9Q
1 - -
_ -25 fIN
500
.9(.113)
' 134.07 min
VS _ 3420 'r 29.9 Qa T
T + 25
' = (3420)( 134.07) -29.9(. 113)(134.07)
159.07ft
t = 2429.5ft /Acre
VT = VS Cj A
= 2429.5 (.40)(7.8)
= 7580 ft13
STORAGE FACILITIES WILL CONSIST OF UNDERGROUND PIPES.
' 2 x 135 = 27OLF - 72" 0, 28.274 ftz/LF = 7634 ft
3
' TOTAL: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... 7634 ft
Available Storage > Required Storage of 7580 FT.
ORIFICE SIZING
Two-Orifice Structure is proposed to control outflow.
' Total Flow Q =-.56 cfs
Flow Per Orifice - .28 cfs
' hl = 6.68 For Orifice #1
h2 = 5.68 For Orifice #2
' a, = Q/.62 f/2gh,
= .28/.62 64.4(6.68)
.0217 ft'
' d, V,4 a, = 4(.022)
_ n
. 167 ft
' = 2.00 inches. ZD
1
I
I
' a2 = Q/.62 1/2gh,
_ .28/.62 V64.4(5.68)
_ .024 ftl
d,z = J�+.a� - Y4( .024)_ .
_ . 176 ft
' = 2. 11 inches Use 2 1/8"
DOWN STREAM ANALYSIS
' The drainage from the subject property drain as sheet flow
northerly to ditches along the west side of Duvall Ave. Small
area of off-site drainage contributes to the subject property.
' Eventually, the runoff from the Site flows into the May Creek
approximately some 1000 feet downstream of the Site.
There is no evidence of restrictive structure exit dowmstream of
the Site.
TEMPORARY EROSION SEDIMENTATION CONTROL FACILITIES
' Drainage Basin Area = 11.9 Acres
' 40% of the Site Area will be cleared . . . . . . . 3. 12 Acres.
Balance of Basin Area . . . . . . . . . . . . . . . . . . . . . . .8.78 Acres.
Soil type and classification - Alderwood Gravelly Loam on a, 1.2%
slope with an average slope length of 1100 feet - type "C"
' RUN-OFF VOLUME DETENTION
The Ground Cover is Forest (ungrazed)
' 8.78 X 350 = 3073 ft for undeveloped Portion
3. 12 X 1250 = 3900 ft for cleared Acres.
' Total Runoff Volume = 6973 ft
SEDIMENT VOLUME
' 2 X 40 XC 3. 12 = 249.6 = 250 ft
TOTAL POND VOLUME 7223 ft.