Loading...
HomeMy WebLinkAboutSWP272254(3) FOR DISTRIBUTION TO: Water Utility ® Building Division Wastewater Utility Public Works Constr Inspector Lam' Surface Water Utility Fire Prevention Maintenance Services Transportation Systems Project: Oil Location: -7 ) Q. r Attached please find copies of: BILLS OF SALE PERMIT - -_ ® COST DATA INVENTORY RECEIPT l LETTER OF SPECIAL BILLING ® EASEMENT(S) R STUB SERVICE AGREEMENT ® COPY OF AS-BUILT L PRECON NOTES PRECON ATTENDEES l DRAINAGE REPORT ® MEMO-WATER BREAKDOWN / MAP WITH NEW MAINS AND VALVES OTHER n t h �z7 From: Date: C:TB:PRECON:DISTFRM City of Renton WA Receipt Receipt Number: R9603556 Amount : 31, 993 . 69 07/11/96 13 : 39 Payment Method: CK Notation: #45086 JSOLOMON Init : SAB - - -- --- ---- ------ --- -- -- -- ----- - - - -- - -- - - -- -- - - -- - - - - -- - - - ---- - - Permit : C950229 Type : ENG ENG Construction Per Parcel No: 192305-9096 Site Address : 700 S GRADY WY Location: NEXT TO ARCO ON GRADY WY S Total Fees : 34 , 523 . 70 This Payment 31, 993 . 69 Total ALL Pmts : 34 , 523 . 70 Balance : . 00 **************************************************************** Account Code Description Amount 000 . 343 . 20 . 00 . 0000 Public Works Inspection 186 . 95 401 . 343 . 90 . 00 . 0003 Stormwater Insp Approval 1, 994 . 09 421 . 388 . 10 . 00 . 0020 Spec Util Connect Sewer 7, 203 . 61 401 . 343 . 90 . 00 . 0002 Sewer Inspection Approvl 249 . 26 401 . 322 . 10 . 00 . 0015 Sewer Permit 80 . 00 000 . 322 .40 . 00 . 0000 Right-of-way Constructn 90 . 00 421 . 388 . 10 . 00 . 0010 Spec Util Connect Water 10, 436 . 00 401 . 343 . 90 . 00 . 0001 Water Inspection Approvl 99 . 71 401 . 322 . 10 . 00 . 0020 Storm Water Permits 50 . 00 421 . 388 . 10 . 00 . 0040 Spec Util Connect Stormw 11, 604 . 07 --- --------- -- ------------------ ------ -------------------------- wim' CITY OF RENTON Construction Permit Permit Number C 9 5 0 2 2 9 Permission is hereby given to do the following described work, according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinances of the City of Renton. Work Description INSTALL UTILITIES, ROADWAY FOR AUTO DEALERSHIP Job Address 700 S GRADY WY NEXT TO ARCO ON GRADY WY S Owner SOLOMON, JERRY 201 S 7TH ST RENTON WA 98055 Contractor, THOMPSON CONSTRUCTION Contractor's License THOMPC*116B6 12 211 117 TH AVE E Contractor's Phone (2 0 6) 8 41-4 2 4 0 PUYALLUP, WA 98374 City License 6785 Contact SOLOMON, JERRY Contact's Phone 2 0 6-2 2 6-9 8 9 9 Other Information Date Issued 0 7/11/19 9 6 Work Order 87031 Date of Expiration 01/0 7/19 9 7 Parcel Number Date Finaled Inspector's Name BURGY, MARV Inspector's Phone 2 0 6-9 9 9-18 2 7 It is understood that the City of Renton shall be held harmless of any and all liability, damage or injury arising from the performance of the work described above. You will be billed time and material for any work done by City staff to repair damages. Any work performed within the right-of-way must be done by a licensed, bonded contractor. Call 277-5570 one working day in advance for inspections. Locate utilities before excavating. Call before you dig -48 Hour Locators 1-800-424-5555 I hereby certify that no work is to be done except Subject to compliance with the Ordinances of the as described above and in approved plans, and that City of Renton and information filed herewith this all work is to conform to Renton codes and permit is granted. ordinances. X ` �� X - Ap ant Publ c Works Rep THIS PERMIT MUST BE POSTED AT THE JOB SITE AT ALL TIMES. BD3203e 08/94 iif MEETING ATTENDANCE RECORD PROJECT: ��"l ��� DATE: LOCATION: �` � /'� �� & COORDLNATOR L/Ll�r�r/✓ '��y"/7/if N �tEJCOMP_uYY ADDRESSiCITY/ZIP PHONE VTl t1-I� 42 S—' K�,.� ��6���:� r2ati � � `-rT� x ,Sc �-. 8W ► ��I�.�o PLEASE NOTE:Ifvou visit to rcccivc the minutcs ofthis mccting,your fuil addr=must be iiszcd. 1`7 PRE-CONSTRUCTION COFERENCE Jerry Solomon Car Dealership 700 South Grady Way July 11, 1966 Addendum Please Note Action Items Addressed At The Meeting: GENERAL ITEM: 10. An approved Traffic Control plan will be required to work in the Public Right-of-Way to be submitted to the City's Transportation office. Forms available 4th Floor Counter. WATER 1. Two foot pig tail on setter required; City of Renton sets water meter. Not on drawing detail. SANITARY SEWER: 1. Before work starts,provide calculations for Lift Station 24-hour alarm system (auto dialer for station if pumps fail)to Dave Christensen,Wastewater Utility. Ductile iron sewer pipe not PVC pipe is required for sewer line crossing water line. An explosion proof Duplex Station is required which meets sewer Industrial Standards. An Electrical Permit will be required from the Building Department(3rd Floor)to accomplish change. Leesee will provide name for legal ownership of property for Bill of Sale for 3" forced main sewer line. Type 1 Catch Basin with an inverted Tee is acceptable instead of the 800-gallon oil/water separator vault. hirley 4BXat Customer Service Utilities Copies to: Marvin Burgy Dav hristensen pXfimt Morgan Jerry Solomon Allen Stakset Ken Thompson PRE-CONSTRUCTION CONFERENCE Jerry Solomon Car Dealership 701 Grady Way South. July 1996 GENERAL ITEM: 1. Pass attendance sheet and provide copies if requested.. Authorization of Special Billing signature required._ 2. Provide metro form for signature. 3. Information to complete computer input for City Permit. a) Contractor's Name b) Address c) Telephone Number d) Washington State Contractor's License Number e) City of Renton's Business License Number. 4. Provide Project Description: Car Dealership Lot, office building and car preparation service area. 5. Franchise utilities will apply of a separate permit so they need your plans to show existing utilities. 6. Franchise utilities are to be separated a minimum of 5-ft. horizontally and 12-inches vertical from City Utilities. 7. Notify City Inspector 24-hours before starting to work. Phone number is (277-5570). If you are going to work in the Public Right of Way you will need to notify fire and police before starting to work. The Inspector can help you there. 8. Work in right-of-way is weekdays, 8:30 AM to 3:30 PM. Saturday work by approval. No Sunday work. 9. Call for inspection by 3:00 p.m. the previous day. Overtime takes special authorization and scheduling in advance. Inspection fee is $50.00 per hour for overtime. Provided for on Authorization for Special Billing Form. 10. An approved Traffic Control plan is required to work in the Public Right-of-Way. There is no cost,but submit plan to the City's Transportation office. Traffic control and signing to be in accordance the Manual on Uniform Traffic Control Devices. Flaggers shall have hard hats,vests, signs and certification card. Truck maneuvering to be on site. The right-of-way to remain unobstructed when possible. 11. All utilities to be inspected prior to backfilling. 96CM143.DOC/ 12. The contractor, as well as the Developers Engineer shall keep as-built drawings. All changes shall be shown on as-builts. Method, cross out what was change and then show the change made. 13. Field Changes if minor, submit a shop drawing or schematic through the inspector or Fax 277- 4428. If major, the Developer's Engineer should submit drawings and complete justification, information and calculations as applicable to the Plan Review Project Coordinator. The City will answer by memo or schedule a meeting Nvithin two days. The Field Inspector will not approval changes in the field. FRANCHISED UTILITIES: Open for question. FIRE PREVENTION: 1. Maintain access to site at all times. Must be able to support emergency equipment in all types of weather. 2. All blocking must be inspected by a City inspector prior to backfill. 3. Call 911 from a local phone if the water main needs to be shut off(emergency only). All other water mains or valves shut down,call Renton Water Department at 235-2646. 4. Fuel: Any temporary on-site fuel supplies shall have a permit from fire prevention. 5. Notify central dispatch 24 hours prior to working in the right-of-way, (Local 911), WATER 1. Pipe materials, valves and fittings shall be as indicated in the approved plans and standard notes. 2. All connection to existing mains shall be accomplished by the City of Renton. Schedule the connection through the construction inspector. 3. Crushed rock backfill to grade is required in City right-of-way. 4. Final acceptance shall be after final walk through inspection, adjustment of all structures, and approval of as-builts and cost data inventory. SANITARY SEWER: 1. All pipes and materials shall be per approved plan and standard notes. 2. Pipe bedding for PVC pipe shall be pea gravel 6" above and below the pipe. 3. Select backfill shall be compacted to at least 95%of maximum density. 96CM143.DOC/ STORM: 1. Good erosion control measures are to be exercised at all times. 2. All pipes and materials shall be per approved plan . 3. Contractor must notify the Engineer of any vertical conflicts prior to proceeding with construction. Submit a shop drawing for review. 4. Bedding material shall be per Standard Specifications 9-03.12(3). 5. Backfill shall be compacted to at least 95%of maximum density. 6. City wants a nice smooth grout inside the CB. 7. System is to be all flushed and cleaned. TRANSPORTATION 1. Use select backfill for open trenches and compact to at least 95%of maximum density. 2.. Truck hauling on the Arterials are limited to 8:30 AM to 3:30 PM. 3. Keep a set of approved drawings on-site at all times. 4. Saw cut patching. Use 5/8 inch crush rock. 5. Uniform manual shall be followed for lane closures, routing for traffic. Developer must file "Traffic Control Plan" with Transportation Division. Also note where flagman will be used if any. 6. Contractor shall not leave open trenches overnight with out proper cover. T. Restoration of Area's needs to be relatively immediate. 8. Use cold mix for temporary patching. 9. Use barricades where needed. The End 96CM143 96CM143.DOC/ AUTHORIZATION OF SPECIAL BILLING DATE July 3, 1996 PROJECT NAME: Jerry -Sol omom Car Dealership PROJECT NUMBER C 950229 WORK ORDER NO_ 87782 It is the intent of this letter to authorize the City of Renton to bill the undersigned for all costs incurred relative to the above-referenced project, by the City of Renton for the following work_ 1. Street Cleaning 2. Inspector Overti-me 3: Incomplete or uncorrected work the City must , in the public right-of-way if not satisfactorily addressed- by site contractor. BILLING TO BE SENT Tor Name: + Address S. ru YOU WILL BE BILLED TIME AND MATERIAL FOR ANY WORK DONE BY CITY STAFF TO City. REPAIR DAMAGES Attn: Phone No, Z 9- Z-2 er/Developer, Con to or Authorized Agent ` Short Plat (SHPL # ) REQUEST FOR PROJECT # Prelim. Plat (PP# CA To: Technical Services Date JUL WO# eT 76z Green# From: Plan Review/Project Manager '1 Project Name YU h� h C 1 (70 characters max) Description of Project: _, S LN [- A) S ,� �J•��I7.-�' � .�t'ti��t��' �2' Circle Size of Waterline: 8" 10" 12" Circle One: New or Extension Circle Size of Se,.verline: 8" tO" 12" Circle One: New or Extension ize of Stormline: 12" 15" 18" 24" Circle One: New or Extension Address or Street Name(s) 700 Dvlpr/Contractor/Owner/Cnslt: J e y y \S„X� / 0 characters max) Check each discipline involved in Project Ltr Drwg # of sheets per discipline 1 Trans-Storm (Roadway/Drainage) (Off sue improvemrn Xinelude basin name) 7 (include C sheets) O Transportation (Sigaalization,Channel ization,Lighting) — — ' Wastewater a 11--e Aj • (,t;'C a "a-`:)i 1.1 C (Sanitary Sewer Main)(include basin name) O Water (Mains,Valves,Hydrants) (Include composite&Horizontal Ctrl Sheets) TS Use Only L— 4 o ,2 1C4 Approved by TSM Date: Comu/misu92.090.DOC/CD/bh