Raymond Avenue Center is a 10 .39 acre site located at the southwest
quadrant of the intersection of Southwest 19th Street and Raymond
Avenue South. The proposed development would occur on Parcel B.
Development would include the construction of a 99, 900 square foot
building and associated parking.
Spring Brook Creek defines the southern and western boundary of the
site. The original easement for Spring Brook Creek did not
coincide with the actual stream location. Bush, Roed & Hitchings
has prepared a lot line adjustment which defines the easements
according to the surveyed location of the stream. Lot lines shown
on the documents submitted for site plan and shoreline review
reflect the most current survey information.
Several years ago, the site was filled to approximately elevation
18. Fill slopes toe down to the banks of Spring Brook Creek on the
southern and western boundary. On the eastern boundary, the fill
slopes toe down approximately 60 feet west of the east property
line. Areas east of the fill slopes are classified wetlands. A 60
inch culvert discharges into a ditch on the west side of Raymond
Avenue. The ditch is located within the 19th Street right-of-way
just north of the north property line. Existing drainage maps
indicate the area tributary to the ditch include Panther Creek
Wetlands. From the 60 inch culvert, the ditch flows west to Spring
Brook Creek.
Existing grades on the developable areas are approximately 9 to 10
feet higher than surrounding grades . The ground surface where the
proposed development will occur is flat. Tall grasses cover the
area. There are no significant trees located within the buildable
area. Storm water run-off from the site sheet flows to the
surrounding low lands . No defined drainage courses were observed
on the site.
The proposed site plan maintains a minimum 50 foot setback from
Spring Brook Creek and a. 25 foot setback from the surrounding
wetlands. Storm water run-off from the developed areas will sheet
flow to catch basins located in the parking lot. The storm water
will then be conveyed directly to a combine wetpond/detention pond
facility.
A wetpond is required because the development is located next to
Spring Brook Creek, and has more than one acre of impervious
surface area subject to vehicular traffic. Also, since the storm
water will discharge into Spring Brook Creek the detention volume
will be calculated using Department of Fisheries guidelines. These
standards require a peak discharge rate from the detention system
equal to 1/2 the pre-developed 2 year rate for a 10 year developed
storm inflow. Peak discharge rates from the detention system for
storm events greater than the 10 year match pre-developed peak
rates for the same storm event .
Analysis of the combined wetpond/detention pond design shows that
it performs significantly better than the Department of Fisheries
guidelines . Initial sizing was based on maximizing the available
area. The goal was to make the detention volume shallow. By
making the detention volume shallow, there is not sufficient head
pressure to reach the pre-developed 25 year and 100 year peak
discharge rates . The calculations show the developed 25 year and
100 year storm will be discharged at approximately 1/2 the pre-
developed 10 year peak rate. Therefore, development of this site
will reduce the peak rates for all storm events .
Volume provided by the wetpond exceeds the required volume by
approximately a factor of three. This is also a result of
maximizing the available area. The design guidelines require a 3
foot minimum depth plus 1 foot of sediment storage. Maintaining
the depth requirement across the pond provides a storage volume of
approximately 28, 846 cubic feet. The required volume is
approximately 8, 514 cubic feet. Therefore, the storm water quality
will be significantly better than required by Department of
Fisheries guidelines . The additional wetpond volume will also
mitigate the two small areas filled within the 100 year flood plain
(below elevation 16) .
reports/92233 . 02
I
LONGACRES RACE TRACK \
� RFN N
T T 0d�d� m
r CiFiC M Sm =
^� 0li
/ \D THOMAS AV
O
RAYMOND AV S.W.
0
Z
D
(VALLEY FREEWAY)
STATE SIGN ROUTE 167
i
a uSLiNOTON
g
19�
RM333
suuimvvt. ——�
RM334
16
ZONE �
uwj
I W
Z � I
EET
IQ
ill
i
:
I
� I
I ZONE X
M
I
I
ZONE ZONE X j
X II
s-G-7—
Now
�DD ��
)088
16, •
BRIDGE UNDER
CONSIRUCII(A,
' c
c
sou-�1�FST 77Tf, RM338
STRFFT
Ftu-. I co Yp �loop
, CZ4 GF
16.40 BREAK
------------- -
IE 14.00 _
I
70 �\
SS MH �•
- TE=19.00+
- - - IE=11.26 EXIST. SS MH
.04
TSS 11 ` TH A N U E
i I
TE== CN EX. '
IE10.84 �~ 8' SAN SEWER RAYM AVENUE S
c
K 1��
ford s
L
EPP
Sam-
Ml
c mom OWN
MCI-
OR
kill,
JLMILW
IQr�1. f/�VNaf i� -
�. �
1
i o
llk
at
gig
MIMW
INN
• w��►ter:�
•
S
d
�1IWE
al
/,��'��
I�
MIR/�t'r!I�_
T
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
—ABLE 3.5.211 SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS
SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SCS in 1982)
Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A
rainfall distribution, 24-hour storm duration.
CURVE NUMBERS BY
HYDROLOGIC SOIL GROUP
LAND USE DESCRIPTION A B C D
Cultivated land(1): winter condition 86 91 94 95
Mountain open areas: low growing brush and grasslands 74 82 89 92
Meadow or pasture: 65 78 85 89
Wood or forest land: undisturbed or older second growth 42 64 76 81
Wood or forest land: young second growth or brush 55 72 81 86
Orchard: with cover crop 81 88 92 94
Open spaces, lawns, parks, golf courses, cemeteries,
landscaping.
good condition: grass cover on 75%
or more of the area 68 (SD
86 90
fair condition: grass cover on 50%
to 75% of the area 77 85 90 92
Gravel roads and parking lots 76 85 89 91
Dirt roads and parking lots 72 82 87 89
i
Impervious surfaces, pavement, roofs, etc. 98 98 98 98
Open water bodies: lakes, wetlands, ponds, etc. 100 100 100 100
Single Family Residential (2)
Dwelling Unit/Gross Acre % Impervious (3)
0 DU/GA t5 Separate curve number
1. DU/GA 20 shall be selected
1.
2. DU/GA 25 5 for pervious and
2.5 DU/GA 30 impervious portion
3.0 DU/GA 34 of the site or basin
3.5 DU/GA 38
4.0 DU/GA 42
4.5 DU/GA 46
5.0 DU/GA 48
5.5 DU/GA 50
6.0 DU/GA 52
6.5 DU/GA 54
7.0 DU/GA 56
Planned unit developments, % impervious
condominiums, apartments, must be computed
commercial business and
industrial areas.
(1) For a more detailed description of agricultural land use curve numbers refer to National Engineering
Handbook, Section 4, Hydrology, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff is directed into street/storm system.
(3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers.
3.5.2-3 11/92
i 3/10/96 Bush, Roed & Hitchings, Inc. page 1
Raymond Industrial Center
John E. Anderson, P.E.
92233
BASIN SUMMARY
BASIN ID: B1 NAME: 2 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5.24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 2.00 inches AREA. . : 5. 24 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 30.30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres
CN. . . . . 98. 00
PEAK RATE: 0. 31 cfs VOL: 0.25 Ac-ft TIME: 490 min
BASIN ID: B2 NAME: 10 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 2 .90 inches AREA. . : 5. 24 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 30.30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0. 20 AREA. . : 0.00 Acres
CN. . . . . 98. 00
PEAK RATE: 0.89 cfs VOL: 0.51 Ac-ft TIME: 480 min
BASIN ID: B3 NAME: 25 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5.24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 3 .40 inches AREA. . : 5. 24 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 30. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres
CN. . . . . 98.00
PEAK RATE: 1.27 cfs VOL: 0.68 Ac-ft TIME: 480 min
t 3/10/96 Bush, Roed & Hitchings, Inc. page 2
Raymond Industrial Center
John E. Anderson, P.E.
92233
BASIN SUMMARY
BASIN ID: B4 NAME: 100 YEAR EXISTING
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 3.90 inches AREA. . : 5. 24 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 30. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres
CN. . . . . 98.00
PEAK RATE: 1.68 cfs VOL: 0.86 Ac-ft TIME: 480 min
BASIN ID: B5 NAME: 2 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 2.00 inches AREA. . : 0. 31 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 16. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 4.93 Acres
CN. . . . . 98.00
PEAK RATE: 2.05 cfs VOL: 0.74 Ac-ft TIME: 480 min
BASIN ID: B6 NAME: 10 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5.24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 2.90 inches AREA. . : 0. 31 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 16.30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 4.93 Acres
CN. . . . . 98.00
PEAK RATE: 3.08 cfs VOL: 1.13 Ac-ft TIME: 480 min
t 3/10/96 Bush, Roed & Hitchings, Inc. page 3
Raymond Industrial Center
John E. Anderson, P.E.
92233
BASIN SUMMARY
BASIN ID: B7 NAME: 25 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 3 .40 inches AREA. . : 0. 31 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 16. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0. 20 AREA. . : 4 .93 Acres
CN. . . . . 98.00
PEAK RATE: 3 .65 cfs VOL: 1. 34 Ac-ft TIME: 480 min
BASIN ID: B8 NAME: 100 YEAR DEVELOPED
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 3.90 inches AREA. . : 0. 31 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
\ TIME OF CONC. . . . . : 16. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 4.93 Acres
CN. . . . . 98.00
PEAK RATE: 4.22 cfs VOL: 1.56 Ac-ft TIME: 480 min
BASIN ID: B9 NAME: PTWQ VOLUME FOR WETPOND
SBUH METHODOLOGY
TOTAL AREA. . . . . . . : 5. 24 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE. . . . : USER1 PERVIOUS AREA
PRECIPITATION. . . . : 0.67 inches AREA. . : 0. 31 Acres
TIME INTERVAL. . . . : 10.00 min CN. . . . : 80.00
TIME OF CONC. . . . . : 16. 30 min IMPERVIOUS AREA
ABSTRACTION COEFF: 0.20 AREA. . : 4.93 Acres
CN. . . . . 98.00
PEAK RATE: 0.54 cfs VOL: 0.20 Ac-ft TIME: 480 min
J
S 3/10/96 Bush, Roed & Hitchings, Inc. page 1
Raymond Industrial Center
John E. Anderson, P.E.
92233
1 HYDROGRAPH SUMMARY
PEAK TIME VOLUME
HYD RUNOFF OF OF Contrib
NUM RATE PEAK HYDRO Area
cfs min. cf-ACFt Acres
1 0. 314 490 10699 cf 5. 24 2 Ex
2 0. 888 480 22360 -cf 5.24 --
Iv `�e �x�sTi �U
3 1. 272 480 29624 c5
8U 372��3 Cf —5:24 -
f_ _5• 24
lao (R CX�STtrJc�
•
80 — 49081 Cf ----5:2 Z `�2 D6�IEloPEb 1�lFI o�
10 `j2_DEVE�?cC� �rJFI.OW
. C 24
Z5 `�R bC'�Et�PED I t.tr �
•
2�C-----480 -- �
--- b7800--c -- ------- - --
100 �fR• DEvp,oPEt7 1�.1F�v-�
9 0.544 $-O -8-51�c f_-.-..-__ --_�2- ----- PTv.►fl FotZ wETt�ND �lo�uvtiE
11 0. 153 1470 22217 c� 5:-2� toYsz PoNv REl�E7�S'E
12 O. 0 -3-10D-3 cf`_ _ _5 24 zS�R R>,1� �2ELEr�S£
13 0.675 900 40325 C 5.24 \ao y� porwl_Et�S�
�- bETE't.1T�o�.1 Pbh1D t7E5LyrJ Fd�va��� F�SNE'R,\�S DES\bi�l STAI.apR12'pS,
� . p.lLpwAfly�E REI.ER5E F-P%TE FoR Ip `{GNIZ Dt'QC—:LoQC-D (NPl.ov�
�c�up.LS Y2, P2s - DF-vs DPED T>oN4 2c.TE,
�/Z PtzE-DE`IE�YED =
to �lEpkiZ r7EvEl-oPrcb = 3 0 $LG+FS
17.ETEt.17�cN LIr5 � b. 1S'1�FS
2, ALL-DwA re3LE 'RELa0-P5E IZ'ATE5 FOR Z5 '(OPktZ lS�r-ID too�E+
0E\/Et.!>-PE17 (Au s t 1-- oT (JE 6:qRe-PcTE-G-- -C'4Ni--1 TEE
Vat - TEvG L-U Pere PEp.LL 1ZkTE6.
ph., PRE bEvE LOPE r� ZS Y2 P�1� 1 2"12 GF5
17E TE 1,J TI otil PU IJ D FZE Uc S£= OZ = O 4210 C.G 5 ✓
F�zE - 'DC\PELD'SD \oc ® = I (o�Z GAS
Pe Te tom►T\D S-1 Poi n = p ,(6-15 c f=5 ✓
3. -F�+E DETEi-17, 10 .1 :PDQ\) �XGEEnS FtSI-�[�IES ST ►.�I�P�Zp
VJt5TPvn1D VOL-UME ��Qv�2Ep �QvAI,S pTWQ 5TORNA V0LUVj4_=
Von. Q = S 5 q• c,
Yo t_.u►✓vE p�ov r p Ev : 24��4loGF c/
2 3/10/96 Bush, Roed & Hitchings, Inc. page 2
Raymond Industrial Center
John E. Anderson, P.E.
92233
STORAGE STRUCTURE LIST
STORAGE LIST ID No. 1
Description: DETENTION POND
ARCS rPONA /L\,vTcC.A Z> ES16S1
4-z "S"I , A ZF-EA.
(0 -0 "7 G2-0 Sir
-1 . o S °I O Z S F vv CT Po D
�. o l0 2e1 SF �vo�=
a 11 -1S15 - -
I o ,0 12 `1 °12 S� r7G'CG►�'f�otil VvLur n� ��Qvt "'D
I I , 0 13 8'12 SF r—olz too YsZ SToRPit
12 o 14 9 q 4 5F - -- - - -- r w ATEV-1 ELSW%T I o&j
13 r-, 5 I FOR 100 \m S TO'R K"'�'
14 -o I-7 F,0A = IZ,Oct I
�•C�D iT►Ot�IA.� VoL-uME
?pzo�vlc�ED
1Co ,o
t 3/10/96 Bush, Roed & Hitchings, Inc. page 3
Raymond Industrial Center
John E. Anderson, P.E.
92233
DISCHARGE STRUCTURE LIST
MULTIPLE ORIFICE ID No. 1
Description: FISHERIES DESIGN RELEASE
Outlet Elev: 9.00
Elev: 9.00 ft Orifice Diameter: 1.8100 in.
Elev: 12.00 ft Orifice 2 Diameter: 8.0000 in.
OVC��LOu1
i
I
SU -
2 3/10/96 Bush, Roed & Hitchings, Inc. page 4
Raymond Industrial Center
John E. Anderson, P.E.
92233
LEVEL POOL TABLE SUMMARY
MATCH INFLOW ST DI <-PEAK-> STORAGE
<--------DESCRIPTION---------> (cfs) (cfs) id id <-STAGE> id VOL (cf)
1/2-2 YR. FOR 10 YR . . . . . . . . . . 0.31 3.08 1 1 11.98 11 397
25 YEAR STORM . . . . . . . . . . . . . . . . 1.27 3.65 1 1 12.05 12 408
100 YEAR STORM . . . . . . . . . . . . . . . 1.68 4.22 1 1 12.09 13 415
File Basin Hydrograph Storage Discharge Level pool
Bush, Roed & Hitchings, Inc. 2
} ROUTING COMPARISON TABLE
MATCH INFLOW STO DIS PEAK PEAK OUT
DESCRIPTION PEAK PEAK No. No. STG OUT HYD
1/2-2 YR. FOR 10 YR 0.31 3 .08 1 1 11.98 0.15 11
25 YEAR STORM 1. 27 3.65 1 1 12.05 0.43 12
100 YEAR STORM 1.68 4. 22 1 1 12.09 0.68 13
______====>Done<====_______= F10 to Exit
Available Memory remaining: 151037 bytes
Current Data Set Name: a:\92233
File Basin Hydrograph Storage Discharge Level pool
Bush, Roed & Hitchings, Inc. 2
ROUTING COMPARISON TABLE
MATCH INFLOW STO DIS PEAK PEAK OUT
DESCRIPTION PEAK PEAK No. No. STG OUT HYD
1/2-2 YR. FOR 10 YR 0. 31 3.08 1 1 11.98 0.15 11
25 YEAR STORM 1. 27 3 .65 1 1 12.05 0.43 12
100 YEAR STORM 1.68 4.22 1 1 12.09 0.68 13
______====>Done<====_______= F10 to Exit
Available Memory remaining: 151037 bytes
Current Data Set Name: a:\92233
BUSH,ROED&HITCHINGS,INC. JOB
CIVIL ENGINEERS &LAND SURVEYORS SHEET NO. OF
2009 Minor Avenue East
Seattle,WA 98102 CALCULATED BY DATE
(206)323-4144
BRH (206)323-7135 -Fax CHECKED BY DATE
SCALE
G
.Lys �2 S L2S
T,
—a �02 TFfE Hyp&J4•UUL SoF�WA-reE v5E-U/ CALLv � { �D�•.1TS or.11 D.F. LU�2�lE
o.foS
21� ,S � nJ�GC r ZZs - ✓. �") C2.�06 � 5 A 5,, '
o.6S71 r
3. 3p J
60_ o.bs D. �3 CIA
--'� 71fc5C �- ��.� a., �--v .a F. Cv2�/� A-e� ,,.,PST ,.� /.►L%A2Av<<�
5��`►�/a-2F 7b G/'��.a� 77f� lc,i,/fo Go✓4>�"r->�A,F,c�" Z:�f c.-dvaa/�
�orL ?JCS Sr'T�,
PRODUCT 204-1(Single Sheets)205-1(PaM)®®Inc.Groton.Mass 01471 To Omer PHONE TOLL FREE I-800 225-6380
-IINGS,INC.
JOB
BUSH, ROED & H rC`I Z2i��-
CIVIL ENGINEERS & LAND SURVEYORS SHEET NO OF
2009 Minor Avenue East
Seattle,WA 98102 CALCULATED BY DATE �Q' 2�
r' (206)323-4144 CHECKED BY < G DATE
R (206)323-7135 ' Fax
SCALE
E�s�o � co,J i�� cra�..�J r✓,A�+ems .......... ....
�E,J �►� .sue A�rt t�-k�,T-o�
.... .... ....... ..
�..........v>=12-s� -� ........ _.. _E�41✓ E.(Z
_ r ..� ... _ . ._....................._
.........
.... .................. ...... ............ ...- - -- -- ........ ..
L .... _. AM of►.�T.:__ �.1�J I�.�1'( .�, .... :_ .�i A _ P�(LG 1� •.. ...5�.. .:. A��
....
�'_► ��.............. /sEpjr-�1E►.1T...lo ...;.......Po.�-► P ._..... PES 1.Ca+�,. +_�-l-
. . ,11.{'_ .. __T ...._.. -1.. _$....._ J4GR,6S_...i� 1To..__. ..... ..._.
As�►Js ( a-rc - ..........
TNT
P.�ASi►� �� �.., C_�.IoR.T.H ) _ 2 .53 Ace
w
A �/a = �. 1 v A �—
o
PRWX120A-1(S"b SMa)2W1 fP+dM)®.k GMIM M.oun to amp TDu FRFt 14*225 M
_ .1/22/95 Bush . Roed & Hitchings . Inc. paae 1
Winmar
John E. Anderson . P.E.
storm disk-92233
HYDROGRAPH SUMMARY
PEAK TIME VOLUME
HYD RUNOFF OF OF Contrib
NUM RATE PEAK HYDRO Area
cfs min. cf-AcFt Acres
1 0. 298 490 10148 cf 4 . 97
2 0. 843 480 21207 cf 4.97
3 1 . 206 480 28097 cf 4.97
4 1 . 596 480 35348 cf 4.97
5 1 . 955 480 30824 cf 4. 97
6 2 .932 480 46683 cf 4. 97
7 3 . 474 480 55555 cf 4. 97
8 4 .016 480 64455 cf 4.97
9 0. 515 480 8068 cf 4. 97
11 0 .129 1470 19342 cf 4.97
12 0 . 397 1450 26581 cf 4.97
13 0. 504 1030 35290 cf. 4.97
14 0. 281 480 6157 cf 1 .65 EAsT BAsii.1
15 0. 431 480 9441 cf 2. 53 aoe-TH 6AS1►.�
16 0 , 511 480 11194 cf 3. 00 wlEs�r Soa ,A
KING COUNTY , WASHINGTON , SURFACE WATER DESIGN MANUAL
5.4.5.1 SEDIMENT TRAP
Code: ST Symbol:
Purpose
To remove sediment from runoff originating from disturbed areas of the site. Sediment traps are
typically designed to only remove sediment as small as medium silt (0.02 mm). As a consequence,
they usually only result in a small reduction in turbidity.
Conditions of Use
1. A sediment trap shall be used where the contributing drainage area is 3 acres or less.
Design and Installation Specifications
1. See Figure 5.4.5.11A for detail.
2. If permanent runoff control facilities are part of the project, they should be used for
sediment retention (see the introduction to this section).
3. To determine the trap geometry, first calculate the design surface area (SA) of the trap,
measured at the invert of the weir . Use the following equation:
SA = FS(Q2/Vs),
where:
Q2 = Design inflow based on the peak discharge from the developed 2-year, 24-hour
' design storm from the contributing drainage area as computed in the hydrologic
analysis. The 10-year, 24-hour design storm shall be used if the project size,
expected timing and duration of construction, or downstream conditions warrant
a higher level of protection. If no hydrologic analysis is required, the rational
method may be used (Section 4.3.3).
Vs = The settling velocity of the soil particle of interest. The 0.02 mm (medium silt)
particle with an assumed density of 2.65 g/cm3 has been selected as the particle
of interest and has a settling velocity (Vs) of 0.00096 ft/sec.
FS = A factor of safety of 2 to account for non-ideal settling.
Therefore, the equation for computing surface area becomes:
SA =2 x Q2/0.00096 or 2080 square feet per cfs of inflow
NOTE: Even if permanent facilities are used, they must still have a surface area that is at
least as large as that derived from the above formula. If they do not, the pond must be
enlarged.
4. To aid in determining sediment depth, all traps shall have a staff gauge with a prominent
mark 1 foot above the bottom of the trap.
5.4.5.1-1 11/94
KING COUNTY , WASHINGTON , SURFACE WATER DESIGN MANUAL
} FIGURE 5.4.5.1A SEDIMENT TRAP
SURFACE AREA DETERMINED
- AT TOP OF WEIR 4' MIN.
1 1' MIN. OVERFLOW
,fy 1' MIN. I1
1' MIN.
FLAT BOTTOM
3/4"-1.5' 2"-4" ROCK%RIPRAP!
WASHED GRAVEL
GEOTEXTILE
NOTE: TRAP MAY BE FORMED BY BERM OR BY
PARTIAL OR COMPLETE EXCAVATION DISCHARGE TO STABILIZED
CONVEYANCE, OUTLET OR
LEVEL SPREADER
CROSS-SECTION
�+- - 6' MIN.
III-III-III—III—III—II 1' MIN. DEPTH OVERFLOW SPILLWAY -III-II +II-II
Ii=iir—iii=ii►=1i1=1IEi III—Iii=i►i=1i�iTi=iI(—
NATIVE SOIL OR I I I r, (� ( MIN. 1' DEPTH
COMPACTED BACK FILL ��I 2"-4 ROCK
_ MIN. 1' DEPTH 3/4"-1.5"
cEOTExT►LE ' I—I II—I II—I II— IE
EE 1 I=III WASHED GRAVEL
II
a -III-1 I�I(1-III-1 I l-1 I l-1 I II I f=l
TRAP OUTLET
Maintenance Standards
1. Sediment shall be removed from the trap when it reaches 1 foot in depth.
2. Any damage io the trap embankments or slopes shall be repaired.
5.4.5.2 SEDIMENT POND
n
Code: SP Symbol:
Purpose
To remove sediment from runoff originating from disturbed areas of the site. Sediment traps are
typically designed to only remove sediment as small as medium silt (0.02 mm). As a consequence,
they usually reduce turbidity only slightly.
Conditions of Use
1. A sediment pond shall be used where the contributing drainage area is 3 acres or more.
5.4.5.2-1 11/94
BUSH,ROED& HTTCHINGS,INC. 1O8
CIVIL ENGINEERS& LAND SURVEYORS SHEET No. OF
2009 Minor Avenue East
CALCULATED BY DATE
Seattle,WA 98102
(206)323-4144 CHECKED BY DATE
B R H (206)323-7135 - Fax
SCALE
�OY J�J�� i� /1jY'--t �JG�V�•�-G I- `i
�rJCLs� __gq�t►-� -- 'L_ x Sl I_ c/�s D. 00®_`1 w
.. _ _
....
. ...........__ .. ----- ..... ...... .. .. .. .._... . 31 D .... .. .
- .� --s
_.. .. . --... ............. - - ....
.. _ _._..... ... ............ .... ........
S �f�St
o .oa0_5
AS
_ 5 a: _ .. ... . ...
- - ___. ,�' 1JiL S-�o _ r'--e(L 0����-c�Pl✓ _ Go�.lOi►toS.
.
PRODUCT M41 rO SMOI N5 I PWWi®*h crwn wA 01471 is oroK PfM rou FFE 14*2254 eo
04/17/96 STORM SEWER SUMMARY REPORT PAGE 1 OF 2
RAYMOND CENTER
FILE: 92233C.STM
RAINFALL FILE: CHARTIO.RND 25 YEAR DESIGN STORM I = 16.930/ ( To + 5.200) ^ 0.792
LINE ID I FLOW RATE INFO I PIPE INFO I HYDRAULIC INFO
LINE/1 DESCRIPTION JINC ARIRUNOFPCIINLTIMEIINLT IIINC CIAI INPUTQ JUNIFORMISIZE/INVERT IPIPE I NVAL JHGLSL.OPEJHYD GRD I VEL
DOWNLINEf ITOT ARIWEIGHTD1 Tc ITOTL 11TOT CIAO TOTALQ IFLOWCAPITYPE JUP/DOWN (LEN JINVSLOPJ JLC JUP/DOWN JUP/DOWN
(ec) C I (min) l(in/h)l (cfs) I (cfs) I (cfs) l(in) I (ft) l(ft) l(ft/ft)l (ft/ft)l (ft) I (ft/6)
1 cbl to pond 1 0.01 0.901 0.001 4.591 0.001 0.001 1 24DI 9.141 381 0.0131 0.0011 12.041 2.41
DNLN - O 1 5.41 0.901 15.271 1.551 7.571 7.571 13.81 24DI 9.001 1 0.0041 1.00 1 12.001 2.41
2 cb2 to cbl 1 0.41 0.901 0.001 4.591 1.531 0.001 1 18DI 9.411 721 0.0131 0.0041 12.451 3.97
DNLN - 1 1 5.01 0.901 14.971 1.571 7.021 7.021 6.41 18DI 9.141 1 0.0041 1.00 1 12.131 3.97
3 cb3 to cb2 1 0.31 0.901 0.001 4.591 1.401 0.001 1 18DI 10.251 2271 0.0131 0.0021 13.121 2.54
DNLN = 2 1 3.01 0.901 13.491 1.671 4.491 4.491 6.41 18DI 9.411 1 0.0041 1.00 1 12.701 2.54
1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 cb4 to cb3 1 0.61 0.901 0.001 4.591 2.271 0.001 1 18DI 11.021 2071 0.0131 0.0021 13.551 2.40
1 DNLN - 3 1 2.61 0.901 12.041 1.781 4.241 4.241 6.41 18DI 10.251 1 0.0041 1.00 1 13.221 2.40
5 1 cb5 to cb4 1 0.61 0.901 0.001 4.591 2.401 0.001 1 18DI 11.411 1051 0.0131 0.0011 13.761 1.98
1 DNLN = 4 1 2.11 0.901 11.151 1.851 3.501 3.501 6.41 18DI 11.021 1 0.0041 1.00 1 13.641 1.98
6 1 cb6 to cb5 1 1.01 0.901 0.001 4.591 4.211 0.001 1 18Dj 11.851 1181 0.0131 0.0011 13.901 1.53
.� DNLN - 5 1 1.51 0.901 9.841 1.981 2.711 2.711 6.41 18DI 11.411 1 0.0041 1.00 1 13.821 1.53
7 cb7 to cb6 1 0.51 0.901 6.301 2.451 1.101 0.001 1 12DI 13.461 3231 0.0131 0.0011 14.291 1.67
DNLN - 6 1 0.51 0.901 6.301 2.451 1.101 1.101 2.51 12DI 11.851 1 0.005I 1.00 1 13.941 1.40
S I CB9 - CBI 1 0.31 0.901 0.001 4.591 1.201 0.001 1 12DI 11.211 791 0.0131 0.0011 12.181 1.16
1 DNLN - 1 1 0.41 0.901 7.711 2.231 0.911 0.911 5.81 12DI 9.141 1 0.0261 1.00 1 12.131 1.15
1 1 ( 1 1 1 1 1 1 1 1 1 1 1 1
9 I CBS - CB9 1 0.21 0.901 6.301 2.451 0.351 0.001 1 12DI 14.211 1141 0.0131 0.0201 14.541 2.27
1 DNLN - 8 1 0.21 0.901 6.301 2.451 0.351 0.351 5.81 12DI 11.211 1 0.026I 1.00 1 12.201 0.45
10 1 CB10 -CB2 1 0.71 0.901 0.001 4.591 2.811 0.001 1 12DI 10.891 1311 0.0131 0.0071 13.591 3.73
1 DNLN - 2 1 1.61 0.901 9.461 2.021 2.931 2.931 3.81 12DI 9.401 ( 0.0111 1.00 1 12.701 3.73
11 1 CB11 - CB10 1 0.31 0.901 0.001 4.591 1.201 0.001 1 12DI 14.201 2931 0.0131 0.0041 14.841 3.49
1 DNLN = 10 1 0.91 0.901 7.811 2.221 1.861 1.861 3.81 12DI 10.891 1 0.0111 1.00 1 13.811 2.37
1 1 1 1 1 1 1 1 1 1 1 ( 1 1 1
12 1 CB12 - CB11 1 0.31 0.901 0.001 4.591 1.401 0.001 1 12DI 15.361 1021 0.0131 0.0081 15.851 3.49
1 DNLN a 11 1 0.61 0."1 7.171 2.311 1.331 1.331 3.81 12DI 14.201 1 0.0111 1.00 1 15.031 1.91
1 1 ( 1 1 1 1 1 1 1 1 1 1 1 1
13 1 CB13 - CB12 1 0.31 0.901 6.301 2.451 0.661 0.001 1 12DI 16.531 1021 0.0131 0.0091 16.991 2.75
1 DNLN = 12 1 0.31 0.901 6.301 2.451 0.661 0.66I 3.8l 12DI 15.361 1 0.0111 1.00 1 16.041 1.17
04/17/96 STORM SEWER SUMMARY REPORT PAGE 1 OF 2
RAYMOND CENTER
FILE: 92233C.STM
RAINFALL FILE: CRARTIO.RND 100 YEAR DESIGN STORM I = 21.753/ ( To + 5.600) ^ 0.787
LINE ID I FLOW RATE INFO I PIPE INFO I HYDRAULIC INFO
LINESI DESCRIPTION ZINC ARIRUNOFPCIINLTIMEIINLT IIINC CIAI INPUTQ IUNIFORMISIZE/IINVERT IPIPE I NVAL IHGLSLOPEIHYD GRD I VEL
DOWNLINE# ITOT ARIWEIGHTDI To ITOTL IITOT CIAO TOTALQ IFLOWCAPITYPE IUP/DOWN ILEN IINVSLOPI JLC IUP/DOWN IUP/DOWN
I (ac) I C I (min) I(in/h)I (of&) I (of&) I (oft) 1(in) I (ft) I(ft) I(ft/ft)1 (ft/ft)1 (ft) I (ft/6)
I I I I 1 I I I I 1 I I I 1 I
1 I cbl to pond I 0.01 0.901 0.001 5.611 0.001 0.001 1 24DI 9.141 381 0.0131 0.0021 12.081 3.34
1 DNLN - 0 1 5.41 0.901 13.341 2.151 10.501 10.501 13.81 24DI 9.001 1 0.0041 1.00 1 12.001 3.34
I 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 cb2 to cbl 1 0.41 0.901 0.001 5.611 1.871 0.001 1 18DI 9.411 721 0.0131 0.0091 12.871 5.50
1 DNLN - 1 1 5.01 0.901 13.131 2.171 9.711 9.711 6.41 18DI 9.141 1 0.0041 1.00 1 12.261 5.50
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 1 cb3 to cb2 1 0.31 0.901 0.001 5.611 1.721 0.001 1 18DI 10.251 2271 0.0131 0.0031 14.111 3.46
1 DNLN = 2 1 3.01 0.901 12.041 2.281 6.121 6.121 6.41 18DI 9.411 1 0.0041 1.00 1 13.341 3.47
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 1 cb4 to cb3 1 0.61 0.901 0.001 5.611 2.781 0.001 I 18D1 11.021 2071 0.0131 0.0031 14.911 3.23
1 DNLN = 3 1 2.61 0.901 10.981 2.391 5.701 5.701 6.41 18D1 10.251 1 0.0041 1.00 1 14.301 3.23
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 1 cb5 to cb4 1 0.61 0.901 0.001 5.611 2.931 0.001 1 18DI 11.411 1051 0.0131 0.0021 15.281 2.64
1 DNLN - 4 1 2.11 0.901 10.311 2.471 4.661 4.661 6.41 18D1 11.021 1 0.0041 1.00 1 15.071 2.64
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 1 cb6 to cb5 1 1.01 0.901 0.001 5.611 5.151 0.001 1 18DI 11.851 1181 0.0131 0.0011 15.531 2.01
1 DNLN = 5 1 1.51 0.901 9.331 2.591 3.551 3.551 6.41 18DI 11.411 1 0.0041 1.00 1 15.391 2.01
I I I I I I I I I I I I ( I I
7 1 cb7 to Cb6 1 0.51 0.901 6.301 3.101 1.401 0.001 1 12DI 13.461 3231 0.0131 0.0021 16.131 1.78
1 DNLN = 6 1 0.51 0.901 6.301 3.101 1.401 1.401 2.51 12D1 11.851 1 0.0051 1.00 1 15.591 1.78
I 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 I CB9 - CBI 1 0.31 0.901 0.001 5.611 1.461 0.001 1 12DI 11.211 791 0.0131 0.0011 12.341 1.48
DNLN = 1 1 0.41 0.901 7.571 2.861 1.161 1.161 5.81 12DI 9.141 1 0.0261 1.00 1 12.261 1.48
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
9 I CBS - CB9 1 0.21 0.901 6.301 3.101 0.451 0.001 1 12DI 14.211 1141 0.0131 0.0191 14.591 2.44
1 DNLN - 8 1 0.21 0.901 6.301 3.101 0.451 0.451 5.81 12D1 11.211 1 0.0261 1.00 1 12.371 0.57
I I I I I I I I I I I I I I
10 1 CB10 -CB2 1 0.71 0.901 0.001 5.611 3.431 0.001 1 12DI 10.891 1311 0.0131 0.0111 14.761 4.70
1 DNLN = 2 1 1.61 0.901 9.691 2.551 3.691 3.691 3.81 12D1 9.401 1 0.0111 1.00 1 13.341 4.70
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
11 1 CB11 - CB10 1 0.31 0.901 0.001 5.611 1.461 0.001 1 12D1 14.201 2931 0.0131 0.0041 16.361 2.98
1 DNLN = 10 1 0.91 0.901 7.981 2.801 2.341 2.341 3.81 12D1 10.891 1 0.0111 1.00 1 15.101 2.98
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
12 1 CB12 - CB11 1 0.31 0.901 0.001 5.611 1.721 0.001 1 12DI 15.361 1021 0.0131 0.0021 16.731 2.15
1 DNLN - 11 1 0.61 0.901 7.151 2.941 1.691 1.691 3.81 12DI 14.201 1 0.0111 1.00 1 16.501 2.16
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
13 1 CB13 - CB12 1 0.31 0.901 6.301 3.101 0.841 0.001 1 12DI 16.531 1021 0.0131 0.0021 17.061 2.66
1 DNLN - 12 1 0.31 0.901 6.301 3.101 0.841 0.841 3.81 12DI 15.361 1 0.0111 1.00 1 16.811 1.07
PR0 FILE
Lin-e 1 cb 1 to pond
20
[F1]
Menu
18 Natural ground slope 0.5337S
0
w 1-0
w HO3L. slope 0.11237.
12 —
10 38 ft. of 24 in. pip Q 0.370%
8 0 5 10 15 20 25 30 35 40
sTTI c:)N
PRO FILE
Lute+ 2 cb2 to cb 1
20
[Flj
Menu
1$
z Natural ground slope -1.46Pl.'
16
w 14
wHGL slope 0.el47%
10 72 fi. of 18 in. pipe « 0.370l4
8 0 10 20 30 40 50 60 70 60
�T.P�TI O N
PRE FILE
Lille 3 cb3 to cb2
20
[F1]
M anu
18 Natural ground slope 0.5532o'
C
r--a 16
w 14
HC3L slope O.183�0
12
228 ft. of 18 in. pipe (off 0.3701;1.
14
S
0 50 100 150 200 250
STATI�N
PRE FILE
Ling 4 cb4 to cb3 a•
20
[Flj
M enu
18
atural ground slope -1.54%
16
w14 HOL. slope 0.168,%
w
12
208 At of 18 in. pipe rl 0.370%
10
8
0 50 100 150 200
STATION
PRE FILE
Lin-e 5 cb5 to cb4
s
16
[F1]
Menu
15
z Natural gzound slope 0.00%
14 HOI E slope O.111%
w 13
w106 ft. of 18 in. pipe 0.970 7.
12
11
10 0 20 40 60 80 100 120
STATI O N
I'R�FILE 1��
Line 6 cb6 to cb5
16
[F1]
Menu
15
�i Natural ggound slope -0.08%
Q
F--r 14 -
w 13
a 118 ft. of 18 in. pipe Lab 0.37Q%
w
12
11
10 L
0 20 40 60 00 100 120
ST-4kTI 0 N
PR(]FILE
Lines 7 cb7 to cb6 •
7,.
18 (F1]
Menu
17
z 16
Natured ground slope ❑.59a7e
15
323 ft. of 12 in. pipe � C.500%0
_. - - -
_.. _.. _.. _.. _. _.. _.. - I�GL sla o
w 13
12
11
10 0 50 100 150 200 250 300 350
sTATI C)N
PRE FILE
Lines � �B$ - CBS
18 [F1]
17
Nmtural gxaund 31ope 0.26% Menu
16
Hi
�4 15 . -
115 ft. of 12 in. pipe 2.61
w 14 _
w 13 _, ---FIC C.. slope 2. e
12
11
10 0 20 40 60 80 100 120
STATION
PRE FILE 1* �
Line 14 C810 -CB2
18 [F1]
Natral gg ound slope 0.19% Menu
16 u
14
HGL 31ope 0.67670
w 12
32 ft. of 12 in. pipe (P 1. 1
10
8 0 20 40 60 80 100 120 140
Lines 11 CB 11 - CB 10
22
[FS]
Menu
20
z Nmtursl gxo=d slope 1.04`y
18
16
w293 ft. of 12 in. pipe Cgs 1. 1307,L _. -"
r-� 14 - - - - - -
w - - HGI_ 31
12
10
8 0 50 100 150 200 250 300
STALTI O N
PR.�FILE �
1>Line 12 CB 12 - CB 11
21
[F11
Menu
20 Namtural ground slope O.00%Q
19
F--1
18
w 17
a 103 ft. of 12 in. pipe (g> 1. 130 X.
is - - - - -i46L slope 0.798
14
13 0 20 40 60 80 100 120
ST2k7I c)N
PRE FILE
•13
Line 13 CB 13 - CB 1z
21 [F1]
Menu
20 Natural ground 510pe 0.00 i'o
19
18
103 ft. of 12 in. pipe �(9) 1. 13070
17
slope 0.92
16
15 .
14 0 20 40 60 80 100 120