HomeMy WebLinkAboutSWP272258 }
t
STORMWATER DRAINAGE REPORT
FOR
SPRINGSIDE BUILDING
OFFICE/WAREHOUSE FACILITY
BURLINGTON NORTHERN
INDUSTRIAL PARK LOT 6
RENTON, WASHINGTON
April 30, 1996
Z
2 ,
o
LY
F ask
Iw �1k
� o
Prepared for: Anderson Richardson Company
300 - 120th Avenue N.E. 32182
Building2, Suite 217 �o��SS�G1sT?,
TONAL
Bellevue, WA 98005
EXPIRES 8 130!
Engineering
e Planning
Surveying
Penhallegon Associates Consulting Engineers, Inc.
750 S=H STREET KIRKLAND, WA 98033 (206) 827-2014
e
Anderson Richardson Company
Springside building
New Office/Warehouse Facility
Drainage Report
April 30, 1996
PACE Job# 96517
Project Description:
The site of the proposed office/warehouse facility is approximately 3.70 acres in size and is
located at the end of the cul-de-sac on S.W. 39th Street just west of Raymond Avenue and east of
Springbrook Creek in Renton Washington. The site is currently a parking lot and was
constructed by the Boeing Company in late 1985. The site is flat with typical parking stalls and
planters associated with parking lots. The site is bordered to the north by S.W. 39th Street.
Railroad tracks and the Pac-Rim warehouse border the site to the east. The west side of the site
is bordered by Springbrook Creek and to the south is a commercial building. Both accesses to the
site are from the north from S.W. 39th Street.
Proposed development of the site consists of an 38,000 square foot office and warehouse facility.
Minor grading will occur to achieve a smooth transition from the new building to the existing
asphalt. Most earthwork will be fine grading with asphalt and no major earthwork will be
required for the proposed building construction.
Site Drainage Features:
Currently site runoff is controlled by the onsite storm and detention system. The existing system
consists of 12" to 18" diameter storm drain pipes and catch basins for the conveyance of
stormwater runoff. Detention for the site is contained in the same existing catch basins, storm
pipes, and also provided by surface ponding. A plan of the original storm system design has been
attached to this report as reference.
Due to the location of the proposed building, the entire storm system except the flow control
structure must be removed and relocated. The existing surface ponding will be eliminated due to
the relocation of the storm system and minor raising of the site near the building. The new
location of surface ponding will only be in the two loading dock areas. In order to provide an
equal amount of detention volume that is being removed, a pipe detention system with a detention
vault is proposed for this project. All volume lost due to the placement of the building will be
replaced with similar size pipes and storm structures for the proposed storm detention system.
The control structure will not be altered. The majority of the required detention volume will be
provided by surface ponding in the loading dock area and the detention vault
1
Anderson Richardson Company
Springside building
New Office/Warehouse Facility
Drainage Report
April 30, 1996
PACE Job# 96517
Core and Special Requirements:
Core Requirement #1: Discharge at the Natural Location -
This project will discharge stormwater runoff in the same storm
system as the existing system, and thereby satisfies this core
requirement.
Core Requirement #2: Off-Site Analysis -
The proposed new impervious surface for this project is less than
5,000 square feet and therefore is exempt from this core
requirement.
Core Requirement 93: Runoff Control -
The proposed new impervious surface for this project is less than
5,000 square feet and therefore is exempt from this core
requirement. This project has an existing detention system that will
be modified and is discussed within this report.
Core Requirement #4: Conveyance System -
The existing conveyance system will be modified and is discussed
later in this report.
Core Requirement #5: Erosion/Sedimentation Control Plan -
See engineering plans for the project erosion control. This project
does not propose major earthwork excavation . Erosion control for
this project will mostly consist of catch basin interim protection.
Sedimentation ponds, swales, etc. will not be required for this
project.
Special Requirements:
There are no Special Requirements that are applicable to this project.
2
w
Anderson Richardson Company
Springside building
New Office/Warehouse Facility
Drainage Report
April 30, 1996
PACE Job# 96517
Conveyance and Detention System Modifications Calculations:
As previously stated in this report, the existing conveyance and detention system for this site will
be modified. Attached as part of this report are the original design plans and calculations for this
project's existing storm system basin.
The intent of the proposed storm detention system is to replace all storage volume removedand
replacing it with an equal or greater amount of detention volume than is required per the original
calculations. The control structure will not be altered, only the area provided for detention
According to the original design plans and calculations, the total amount of required storage for
the site is 4,278 cubic feet.
On the following page is a summary of the proposed storm detention system and a summary of
volumes of the proposed structures and storm drain pipes. Catch basin numbers are in accordance
with the new design.
Temporary Erosion/Sedimentation Control:
Interim CB protection will be the only erosion control required for this project. Truck washes
may be required depending on site and weather conditions. No other calculations or facilities are
required or provided for this project.
3
PENHALLEGON ASSOCIATES CONSULTING ENGINEERS,INC.
.................
. ........ .....
.............
M
. .... . ...........
..........ud.................- ......... . ...... .........
....... .......
.. ..
4/30/96
STORAGE REQUIRED: 4,278.00 cu ft
STORAGE PROVIDED: 4,324.66 cu ft
NET DIFFERENCE: 46.7 cu ft (additional)
DEPTH FROM OVERFLOW MANHOLE DIAMETER(in) AREA(sq ft) VOLUME(cu.ft)
TO WVERT(ft)
CB#1 6.61 (Control M11) 54.00 15.90 105.13
CB#2 4.35 Type 1 3.97 17.28
CB#3 3.65 Type 1 3.97 14.50
CB#4 2.73 Type 1 3.97 10.94
CB#5 1.70 (Rim-Overflow) Type 1 3.97 6.75
CB#6 2.55 (Rim-Overflow) Type 1 3.97 10.13
164.63 CF
LENGTH OF PIPE(ft) PIPE DIAMETER(in) AREA(sq ft) VOLUME(cu ft)
CB-CB
Ex-1 210 12 0.79 164.93
2-3 139 12 0.79 109.17
34 120 12 0.79 94.25
4-5 94 8 0.35 29.32
6-Ex 115 12 0.79 90.32
Subtotal 487.99 CF
DETENTION VAULT (Inside Dimensions)
Depth Width Length Volume
(feet) (feet) (feet)
6.04 18 19.5 2,120.04 CF
SURFACE PONDING AT LOADING DOCK AREA
Total Volume= 1,380.00 CF (North Loading Dock)
Total Volume= 172 CF (South Loading Dock)
Loading Dock Total 1,552.00 CF
..........
DETSTORG.XLS 4
Anderson Richardson Company
Springside building
New Office/Warehouse Facility
Drainage Report
April 30, 1996
PACE Job# 96517
EXISTING PARKING LOT DESIGN
CALCULATIONS
Note: The attached calculations are only the relevant portion of the total calculations for the existing
parking lot. This project only proposes to modify a small portion of the overall parking area.
The drainage basin that this project lies within was termed Basin "A" of Parcel No. 2. The
attached calculations only show values for this project's portion of the existing site.
5
COMPUTATION SHEET JOB NO. =?2 'DI- c�J DATE SHEET _OF
ESM inC. JOB NAME *-
A CIVIL ENGINEERING.LAND SURVEY.AND PROJECT MANAGEMENT COMP.BY - CHK.BY
CONSULTING FIRM
451 Southwest loth Street Suite 106 Renton,Washington 98055 CONTENTS -`l' - —� -
(206)228-5628
Qce-� _ .o 0-10
of,5r
V) 6
I '
COMPUTATION SHEET JOB NO. `~ %2 DATE SHEET OF
JOB NAME — Kzr%��
ESM inc. -
CHK. BY
A CIVIL ENGINEERING.LAND SURVEY.AND PROJECT MANAGEMENT COMP. BY F�l
CONSULTING FIRM
451 Southwest 10th Street Suite 106 Renton.Washington 98055 CONTENTS
(206)228-5628
C, , ^--N
.._.viLy �.�v�p,y.c - ✓ ..:�r:GFST ".�iGC.ux-'�p�.
_ Cyr A(z< -' f};7SC•cZ}
J�
COMPUTATION SHEET JOB NO. DATE '_o' SHEET I OF
ESM inc. JOB NAME
A CIVIL ENGINEERING.LAND SURVEY,AND PROJECT MANAGEMENT COMP. BY � — CHK.BY
CONSULTING FIRM
451 Southwest loth Street Suite 106 Renton.Washington 98055 CONTENTS 2^ '7'•
(206)228-5628
`
Ct�15 w/ AZC-A
417
41 Z3 577(,,
11 ?4- zs�� �,s J 4--7 z
vo
1
1
i
1
a (
# 30
4t
COMPUTATION SHEET JOB NO. '- ^ - >1' DATE SHEET_ t 1 OF_ _
ESM in JOBNAME
A CIVIL ENGINEERING.LAND SURVEY.AND PROJECT MANAGEMENT COMP.BY CHK. BY _
CONSULTING FIRM
451 Southwest loth Street Suite 106 Renton,Washington 98055 CONTENTS ✓it='�!=/ — —
(206)228-5628
Ton•.-� c�r»�-,_ _ :�=�( .. _ - _
Q-
7��
r •i
y
4 Zc,
r �j
COMPUTATION SHEET JOB NO. --•��' %�' �5�= DATE 3 ' V_SHEETS—OF
ESM inc. JOB NAME �Or' '�.L� ��,,?,'1ji a�� — i�t • -�.,. �
217 A CIVIL ENGINEERING.LAND SURVEY.AND PROJECT MANAGEMENT COMP. BY CHK.BY
CONSULTING FIRM ^
451 Southwest 10th Street Suite 106 Renton,Washington 98055 CONTENTS --
(206)228-5628
�21g• TO A TAvEp' AgZZ ,
zz (a Zz): �_�� 0 13 0 42-
- -
�2 rp2-; J �Z �10 ✓ ��
I
I
I t
-,-7 ..
I
1
C
COMPUTATION SHEET JOB NO. a� =� "'=�~ DATE 7I ���"% SHEET 1-2
OF
ESM inc. JOB NAMEC E'n C., �T'
A CIVIL ENGINEERING.LAND SURVEY,AND PROJECT MANAGEMENT COMP. BY CHK.BY
CONSULTING FIRM
451 Southwest 10thStreet Suite 106 Renton,Washington98055 CONTENTS
(206)228-5628
IE ��
lL 11c r.� �crNr �Ass�rc IS';, J -7vJ 1 ✓ 9J = I•
2 b '
S�crc c 42- - 7 �, 3. 960�o
o
_ Tcl
(
It