HomeMy WebLinkAboutSWP272149(11) r, \\ GOLD Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTRQL REPORT DAY: DATE' 19 REPORT No.: PROJECT: rSGR- Cot n>_ ec:tillP. idmigL CONTRACT #: 54-054G-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max _• F mill .GQNTRACTQR & . U^� BCONTRACTOR LABOR ACTIVITY: (list nuinber woiking) a. GOLF suprvsr O labor( ) operator ( ) other ( ). b. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) outer ( ) d. suprvsr O labor ( ) operator ( ) other ( ) e. suprvsr O labor ( ) operator ( ) other ( ) F—QUIPMENT USED: a. Ilrs g. Ilrs_ b. I Irs� h. I lrs_ C. Mrs _ i. I lrs_ d. Mrs j. I lrs_ c. Ills_ k. Ilrs_ !'. I Irs 1. 111.3 — i ,10BSITE SHEET-Y: (Indicate items not in conformance to safely plan and corrective actions taken. Note any safety ntcclings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 i WDJU PEQFORMEQ-1QQpY; QMSTRUCTION QUALITY CQNTR0 1. ' ' ,S'I'S: (I► dica(e tests perfor►ned and tl►c results of suet► tests. Describe corrective action taken for those items of work not passing dic required tests and scheduled elate for retesting). 2. INSPECTIONS: (Indicate any visual inspections of n►atcrial or wo►k and note any def►ciencics and corrective action taken). CQN*1'1 ACTOR'S VERMCAIMN: Vie above job report is complete and correct; and all material and equipment used, and ieork peeformed during this reporting period is in compliance with the contract plans and spec fcalions, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 QAII Y CONSTRUCTION QUALITY CONTROL„REPORT DAY: DATE: 19_ REPORT No.: PROJECT: PS IR- otlnecthl"wimel_ CONTRACT #: 54-054G- WEATIIER: (clear) (ptly cloudy) (cloudy) WIND-"(calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max _' F ruin .QNTRAQTQR & SUBCOHMACIQR LAQQR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor ( ) operator O other ( ). b. suprvsr ( ) labor ( ) operator O other ( ) C. suprvsr ( ) labor ( ) operator O other ( ) d. suprvsr ( ) labor ( ) operator O other ( ) e. suprvsr ( ) labor ( ) operator O other ( ) EQUIPMENT USED: a. S� { I Irs_ g. l lrs_ b. Ilrs_ h. 1Irs_ C. Ilrs i. Ilrs_ d. Ilrs� j. Ilrs_ C. llrs_ k. Ilrs I'. I Irs I Irs_ I JQBSITE SAFETY: (Indicate items not in conformance to safely plan and corrective actions (aken. Note any safely ntcetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DA 'L.Y CQC REPORT PAGE 2of2 i S0l4.Ii(t PERFORMEQ IQ AY; QM5TRUCTION Q!JA-U1 Y CQN1B—QL; 1. '1L'ST,S: (Indicate tests performed and (lie results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled elate for re(esting). 2. INSPJ?�('HONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). r� CQN111ACTOIt'S V L111EICA'1'I A' 1'he above ja report is complele and correc4 and all rnalerial and equipment rued, and work performed during this repot ling period is in compliance tvith Me conlracl plans Mid spec fcalions, except as noted above. t�v CONTRACTOR QUALITY CONTROL INSPECTOR • �� - GOLF Landscaping and Construction, Inc. 38016 Military [toad South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19_ REPORT No.: PROJECT: FSGR- Connecting Cliam-,-L CONTRACT M 54-Qi G�� WEATHER: (clear) (plly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(show) inches Temperature: F max `' Frain cQNTRACTQR & SUBCONTRACTOR 1 ASOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor( ) operator ( ) other ( ). b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: l Irs I Irs g. a. — — b, Mrs h. I Irs— C. l lrs,__ i. I Irs_ d. Ilrs j. IIrs C. Ilrs, k. Mrs- 1' 111-s_ 1. I Irs— J013SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WQRK PER RMEVj—QQAY; -QQNSTRUQTION c4VALITY CONTROL: 1. 1=: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passim the rc(Iuircd tests and scheduled date for retesting). 2. INSPEC'FIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). C(ZIYLI3AC_1S2IVS VLl IFICA1 M 11te above job repvrl is corn/,lete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plant and spec fcations, except as noted above. c CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.: PROJECT: r-,,SC1R- Cotmect gfAim=L CONTRACT #: JA-054G9-1 WEATHER: (clear) )(ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max ' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) tabor ( ) operator ( ) other ( ). b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: Mrs I lrs g. a. _ — b. Ilrs h. Ilrs— c, 1-1rs_ _ i. Ilrs_ d. Mrs j. I1rs_ ; C. Ilrs— k. Ilrs— (' I Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 VVQRK PERFORMED TODAY: y -Q-QNSTRUQTION QUALITY CONTI3_21u . 'IDS 1�: (Indicate tests perforated and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled elate for re(esting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and rote any deficiencies and corrective action taken). Q NBUCUR'5 VLIIMCATIONt 'The above job report is complete and correct, and all material all equipment used and work performed during this repo ting period is in compliance tvdh the contract plans and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR ' GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL_REP-OR I DAY: DATE: 19 REPORT No.: PROJECT: rS GR- .otiflSrS:.t111v,-U1i.iuLe _ CONTRACT #: 54-0546-4-I WEATHER: (clear) (plly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(show) inches Temperature: I' max ' [ min SONTRACTQR & ,9U©CONTRACTOR LABOR ACTIVITY: (list number working) a. GOLD suprvsr ( ') labor(`s) operator ( ') other ( ) b. suprvsr O labor O operator O other ( ) C. suprvsr O labor ( ) operator O other ( ) d. suprvsr O labor ( ) operator O other ( ) C. suprvsr O labor ( ) operator O other ( ) EQUIPMENT USED: t a. -- 11 s_y,,.➢ 9. I Irs_ b. Ilrs h. Ilrs_ C. l Irs i. l Irs_ d. Ilrs j. llrs_ C. llrs_ k. Ilrs� !'. I Irs I. I Irs_ I OBSITE SAFETY: (Indicate items not in conformance to safely plan and corrective aclions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 r - YS o , PEREORMEIa TODAY. QONSTRUCTION ALITY CONTROI,i I. 1E,S 1 S: (Indicate tests performed and the results of such tests. Describe corrective action takers for those items of work not passing tlrc re(juircd tests ruin scheduled elate for retesting). 2. 1NSPL'•MMNS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CUN111ACIMI'S VERIFICAIMN: ]'he above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance tvith the contract plans and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR ^ \ GOLF Landscaping and Construction, Inc. 38016 Military Road South Aubwn, WA 98001 DAILY CONSTRUCTION QUALITY CQNTROI,,._REPD-RI DAY: DATE: 19_ REPORT No.: PROJECT: ES ,R- Cot nectha-U meL CONTRACT #: 54-0546-4-1 WEATIIER: (clear) ,,(ptly cloudy) (cloudy) WIND: (calm) ;(breezy) (strong wind) (rain)/(snow) inches Temperature: F max F ntin CQNTR .TQR & SUBCOMIRACTOR LABOR ACTIVITY: (list number woiking) a. GOLF suprvsr ( ) labor ( ) operator ( ) other ( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor ( ) operator ( ) other ( ) EQUIPMENT U$ED: a. Ilrs 6. Ilrs_ b. I Irs li. I Irs_ C. l lrs i. I Irs_ d. Ilrs— j. llrs_ C. 1 h s k. I Irs_ 1 Irs I. I Irs_ I JQBSITE SAFELTY: (Indicate items not in conformance to safely plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 YY9_Q1S.P�IIE4f3IY1�IZL4��1Y: -QM5IRUCTION QUALITY Q NIRQ_l� 1. TE,S S: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the rcquircd tests and scheduled elate for retesting). 2. INSPEC'HONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). r.� CQN 1'11ACIDIVS V RIFI ' 'PION: The above job report is complete and correct, and all malerial arrd equi inent used, and work performed during this repor ling period is in compliance with the contract plans arrd spec fcalions, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR f GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DATE: , ' 19 REPORT No.: DAY: — PROJECT: r,,.',CIR- Connecting C'liannel CONTRACT#: 54-Q 45 k-A WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) ;(strong wind) (rain)/(snow) inches Temperature:. F max _' r min CQNTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLD suprvsr ( ) labor( •) operator ( ) other ( ). b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e, suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: Ilrs g. Ilrs a. — b. Ilrs- h. Ilrs— c, Mrs i. I Irs— Ilrs— j. Ilrs d. -C. 1 I►.s_ k. I Irs_ I (' I Irs_ 1. I Irs— I ,10131,31TE 5 FF,TY; (Indicate items not in conformance to safely plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFQRMED TODAY; CONSTRUCTION QUALITY CQNTRQI�: I. 1;S LS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the rc({uircd tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CQN 11ACIDIUS VE"111FIC TION: ]'he above job report is conrplele and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and speci tcalions, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Lvtdscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 _DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: � (-) 19— REPORT No.: PROJECT: rSGR- Connecti1WChu=L , CONTRACT#: 54-054GA-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(show) inches Temperature: F max _' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor O operator ( ) other ( ) b, suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USEa. D: I-Irs g. l Irs b. I-Irs h. I Irs_ C. I Irs_— i. Mrs— d. Ilrs j. IIrs— e, I Irs_ k. Mrs_ I (' I Irs_ L I Irs-IQ — I BSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety mectings held and include meeting minutes). EQUIPMENT AND-MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. f .g- 'DAILY CQC REPORT PAGE 2 of 2 f, i" VVQRK PERFQRMEI] T00AY* -CONSTRUCTION QUALITY CQNTROI,i 1. :jESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those iteius of work not passing; the re(luircd tests acid scheduled elate for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note miy deficiencies and corrective action taken). Q NIMCIM'S VERWIS 'PION: The above job report is complete and correct, and all material and equipment used, and work performed during tliis reporting period is in compliance tvith the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR w GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT_ � DAY: DATE: l REPORT No.: `,. '';`�`. 9— PROJECT: r,SG - connectill);-01itt llel CONTRACT #: 54-0546-4A WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(show) inches Temperaturel_" F maxi_' F min cQNTRACTQR & SUBCONTRAQTOR LABOR ACTIVI_U: (list number working) a. GOLF suprvsr( ) labor (') operator O other ( ). b, suprvsr ( ) labor( ) operator O other ( ) C. suprvsr ( ) labor ( ) operator O other ( ) d, suprvsr ( ) labor ( ) operator O other ( ) e, suprvsr ( ) labor ( ) operator ( other ( ) EQUIPMENT USED; Ilrs Ilrs g. a. — — b. Ilrs h. Ilrs— c, Ilrs� i. Ilrs_ d I lrs_ j. I Irs_ ; e I lrs_ k. Mrs- 1' I Irs— 1. I Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safely plan and corrective actions taken. Note any safely mectings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 VVQRK PERFORMED TQVA—Y; CONSTRUCTION QUALITY CQNTROL; 1. 1=: (Indicate tests performed and llre results of such tests. Describe corrective action taken For those items of work not passing; the rc(luired tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CQN1I1AC1Q11'S V EJU BC PION: ]'he above job relm-1 is complete and correc4 and all material and equipment used, and work perfor-med during this reportrirg period is irr corni5liance tuith the contract plant and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR '�► GOLF Landscaping and Construction, Inc. 38016 Militairy Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE:— —a — C� 19_ REPORT No.: PROJECT: FSGR- Connecting-QlatuiL CONTRACT #: 54-0546-4-1 WEATHER: (clear) (plly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(splow) inches Temperature: P max ' Frain !QQNTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (` ) labors( ) operator (') other ( ). b. suprvsr O labor ( ) operator ( `) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. Ilrs 1? g. llrs_ b. Mrs- ' h, l Irs_ C. I Irs__'_ i. Mrs_ d. Mrs j. Ilrs_ C. 1 h-s k. I Irs_ I Irs_ L I Irs_ I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WQRK PEREORMEU TQDAY: �QN,9IRUQTIQN QUALITY CQNTRQL.i 1. ]=: (Indicate tests perfurnied and lire results of such tests. Describe corrective action taken for those items of work not passing the re(tuired tests and scheduled elate for relesting). 2. 1NSPEC'l*lQNS: (Indicate any visual inspections of material or work and tote any deficiencies and corrective action taken). CQN111ACI US VlaWeICA'I'ION: ?'he above job reporl is complele and correc4 and all material and equipment used and work performed during this reporling period is in compliance with the conlracl plant and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.: PROJECT: ESGR- Connecting-01 u r L CONTRACT M 54-0546-41 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm). (breezy) (strong wind) (rain)/(snow) inches Temperature'. F max° ``' F min CQNTRACTOR & SUBCONTRACTOR LABOR ACTIVITY; (list number working) a. GOLF suprvsr( ) labor O operator ( ') other ( ) b. suprvsr ( ) labor O operator O other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d, suprvsr ( ) labor ( ) operator ( ) other ( ) e, suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED; a Ilrs g. llrs_ b. I Irs Ir. I Irs_ C. Ilrs i. Mrs_ d. Ilrs j. Ilrs_ e. IIrS_ k. Mrs_ l' 1 Irs L I Irs_ i JOSSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED; (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 1r: - DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY; GONSTRUCTIO QUALITY CQ-XNTRQ—[u 1. .IE5,I�: (Indicate tests perforated and the results of such tests. Describe corrective action taken For those items of work not passim; the required tests aril scheduled date for retesting). 2. INSPECTIONS: (Indicate arty visual inspections of material or work and note airy deficiencies and corrective action taken). a CQN"I'IIA_CTOIZ'S VERIFICATION: 1'he above job report is con►plete and correct, and all material and equipment used, and work performed during this reporting period is in contptiance with the conlracl plans curd specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR .. GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19_ REPORT No.: PROJECT: j?SGR- Connecting Clis and CONTRACT #: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches- Temperature: F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor O operator ( ) other ( ) b. suprvsr( ) labor O operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d, suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a, Mrs g. l lrs_ b. Mrs_ h. 1Irs_ C. I-Irs i. I Irs_ d. llrs j. IIrs_ ; C. Ilrs_ k. IIrs_ l' Mrs_ 1. I Irs_ i JOUSITE SAFETY: (Indicate items not in conformance to safely plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r 'D,AILY CQC REPORT PAGE 2 of 2 r YILQRK PERFORMED TODAY; y , CONSTRUCTION QUALITY CQNTRQ4; I. I ?S LS: (Indicate tests perfor►ned and t11c results of such tests. Describe corrective action taken l'or those items of work not passing the rc({uircd tests sued scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). - �Zb►, CS?1`111ACTOIVS VERIFICAI M: The above job reporl is coniplete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance tvith the contract plans and specifications, except as rioted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Itic. '�• 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT r DAY: DATE: ? 19_ REPORT No.: PROJECT: FSGR- Connecting Cliamiel CONTRACT #: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm). (breezy) _(strong wind) (rain)/(snow) inches Temperature: F max Frain CONTQ ACTQR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ) labor operator other I ,R b, suprvsr ( ) labor( ) operator O other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d, suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED; a. 111.s� g I lrs_ b. Ilrs_ h. 1Irs_ C. Mrs i. I Irs_ d. llrs�_ i. 11rs_ e, Ilrs_ k. Mrs_ I I rs_ I. I Irs_ I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. -DAILY CQC REPORT PAGE 2 of 2 i WQRK PERFORMED TQJ)AYl ; QQNSTRUQTIQN QUALITY CQNTROL: 1. 'I'LS'1'S: (Indicate tests perfonned and the results of such tests. Describe corrective action taken for those itenis of work not passing the reyuircd tests and scheduled date for re(esting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CON1I1AC1Q1V,5 VERIFICATION: The above job report a complete and correct, and all malerial and equipment used, and work performed during this reporting period is in compliance tvith the contract plant and spectrzcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR - GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19_ REPORT No.: PROJECT: ESGR- Connecting-Chui tel _ CONTRACT#: 54-0546-4-I WEATHER: (clear) (ptly cloudy) , cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow)- — inches Temperature: " F max I- rain CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O labor( ) operator ( ) other ( ) b. suprvsr(') labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. Ilrs g. lirs_ b. Mrs_ h. Ilrs_ C. I Irs i. Mrs_ d. Mrs j. Ilrs_ e, Ilrs_ k. Ilrs_ 1'. I Irs_ 1. I Irs_ JOE351TE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. --------------- u u r j . G 6 rl GAILY CQC REPORT PAGE 2 of 2 WORK PERFOf3fl EQ TQDAY: -CONSIRUCT. IONQUALITY C TROL 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. 1NSPECLONS: (Indicate any visual inspections of material or work and note any d6cicncics and corrective action taken). CQN111ACIM'S VE,111EXA.BON: The above job report is complete and correct, and all material and equipment used and work performed during this reporting perr'od is in compliance tvdh the contract plans arrd speci rcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT_ DAY: DATE: 19_ REPORT No.: PROJECT: PSGR- Co nectine Cltallt CL CONTRACT M 54-0546-4-1 WEATHER: (clear) (filly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max Frain CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O labor( ) operator O other ( ) b. suprvsr O labor( ) operator O other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) e. suprvsr O labor( ) operator ( ) other ( ) EQUIPMENT USED: a. llrs g. llrs_ b. IIrs- h. IIrs_ C. I Irs i. Mrs_ d. Ilrs j. IIrs_ C. IIrs_ k. Ilrs� I I Irs (. l Irs_ I JQBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 0j DAILY CQC REPORT PAGE 2 of 2 ARK PERFORMED T AY; _CONSTRUCTION QUALyITC_C_ ROL,* I (Indicate tests perfonned and llic results of such tests. Describe corrective action taken for those itenis of work not passing the required tests mid scheduled elate for retesting). 2. 1JPL'.CTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). .C(?N_IIIACIDIUS VE11 L'1S PION: The above job report is complete and correc4 and all rrralerial and equipment used, and work performed dur-irrg this reporling penod is in compliance with the conlracl plans and specr cations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR �.--- t \\ GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 QAl Y CONSTRUCTION QUALITY CONTROL. REPORT DAY: DATE: 19 .r REPORT No.: — PROJECT: ESGR- Cotuiecting_Cltatuiel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max—° Frain CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( '') labor ( 1) operator ( ) other ( ) b. suprvsr O labor O operator ( ) other ( ) C. suprvsr O labor O operator ( ) other ( ) d. suprvsr O labor O operator ( ) other ( ) C. suprvsr O labor O operator ( ) other ( ) EQUIPMENT USED: a.- llrs g. llrs_ b. I Irs . h. I Irs — c, I Irs i. IIrs— d. Ilrs j. llrs— e, I Irs_ k. I Irs— I I Irs— I. I Irs— ,JOBSITE SAFETY: (Indicate items not in conformance to safely plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 i WQRK PERFORMED TOQ Yz QQNSIRUQTION QUALITY CQNTROIu I. TES: (Indicate tests performed and t(re results of such tests. Describe corrective action taken for those items of work not passing the rc(juircd tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 'Lb -CQN 'RA0'OR'S Vli RI 1CATMe 'Thee above job report rs complete and currec4 and all malerial and equipment used, and work perfor»red dining Ons reporling period is in compliance with the cornlracl plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 1 19_' REPORT No.: PROJECT: rSGR- Connectilig_Utamiel CONTRACT #: 54-05464-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rairl)/(Snow) inches Temperature. j,,_�^ F max 4�,` Frain S',,QNTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (1) labor ( ) operator ( ) other ( ) b. suprvsr( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED; a. l lrs g. 1Irs_ b. I Irs_ li. I Irs_ C. l lrs i. Mrs_ d. Ilrs j. IIrs_ C. IIrs_ k. IIrs_ I IIrs_ 1. I Irs_ i J1SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. � 4 DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY* NSTRUCTION QUALITY CQNTROL: 1. 'I'CS"I'S: (Indicate tests performed and the results of such tests. Describe corrective action taken For those items of work not passing the rc(luired tests mid scheduled date for retcsting). 2. INSPGCTIONS: (Indicate any visual inspections of material or work and Grote my deficiencies and corrective action taken). 3� CONTRACTOR'S VER LUC ?;I M', 7'he above jolt report is complete and correct, and all material and equipment used and work pe►formed during this reporling period is in compliance tvith the contract plant and specificalions, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR C-ON TPA c-rok D�,� Ao r Wow -- — - -- --�- - - 1' - - 1' - _ _ _ - _ _ - _ - -fir _ - - \\ GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 UAl Y CONSTRUCTION QUALITY CONTROL REPORT_ DAY: DATE: i � 19— REPORT No.: PROJECT: L-9Gg - CorLlectii10U iwcL , CONTRACT #: 54-0546-4-1 WEATHER: (clear) (plly cloudy) (cloudy) WIND: (calm) . (breezy) (strong wind) (rain)/(snow) inches Temperature: F max —' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O labor(..) operator ( ) other ( ) b. suprvsr O labor( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. Mrs_ g. I Irs— b. Mrs_ h. 1lrs— c. Mrs i. I Irs— d. Ilrs� j. I1rs C. Ilrs_ k. Ilrs— i f. I Irs_ 1. I Irs_ ,J013SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. Y 1, 'GAILY CQC REPORT PAGE 2 of 2 14, WORK PERFORMED TQDAY• CONSTRUCTION QUALITY CONTRQL: I. 1ES"1'S: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work riot passim; the re(Iuired tests acid scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of raterial or work and note arty deficiencies and corrective action taken. CQN 11 A _TOR'S VERIFICA,TIQN: The above job report is complete and correct, and all material and equipment used, artd work performed during this reporting perr'od is in compliance tuith the contract plant and spectfrzcations, except as noted above. _ r _ CONTRACTOR QUALITY CONTROL INSPECTOR 101. GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19— REPORT No.: PROJECT: i?SCiR- Connecting Clia►ing CONTRACT #: 54-0546-4-I WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: P max _' F min QONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O labor (iir) operator f ) other ( ) b. suprvsr O labor O operator O other ( ) C. suprvsr O labor ( ) operator O other ( ) d. suprvsr O labor ( ) operator O other ( ) C. suprvsr ( ) labor ( ) operator O other ( ) EQUIPMENT USED: a. Ilrs g. Ilrs_ b. IIrsT h. 1Irs_ C. Ilrs i. Ilrs_ d. Ilrs j. Ilrs_ Ilrs Ilrs k. I C. _ - (', I Irs• 1. I Irs— I ,JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT ANC MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WQRK PERFQ3NII�.D T0,7A-Y; �ONSTRUQTION QUAUTYC-_QNTRQL : (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the re(tuircd tests mid scheduled elate for retesting). 2. INSPL"CTIONS: (Indicate any visual inspeetions of material or work and tote any deficiencies and corrective action taken). CQN111AUDIV5 V I_1' C TIQN; 1'he above jub report is complete and correc4 and all material and equipment used and work performed during this repodi'ng period is in compliance with the contract plans and specificalions, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR r GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL RESORT DAY' DATE: REPORT No.: PROJECT: RSOR- Connecting Channel CONTRACT#: 54-054-_4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr q) labor(9 operator (/) other( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. _ suprvsr ( ) labor ( ) operator( ) other ( ) e. suprvsr( ) labor ( operator ( ) other ( EQUIPMENT USED: a. I-IrsT g. I Irs_ b. I Irs_ h. Mrs_.___ C. I Irs_ i. Mrs, d. Ilrs_ j. IIrs— e. Ilrs_ k. Mrs_ F. I Irs 1. I lrs_ — I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. � E DAILY CQC REPORT PAGE 2 of 2 QONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the requircd tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). C0NTI1ACT0R1S VER1F[CA'I IONt Vie above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and speaftcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY QONSTRUCTION QUALITY CONTROL REPORT_DAY: DATE: -�--.! 1 REPORT No.: PROJECT: EUSUR- Connecting Climulel CONTRACT M 54-0546-4-1 WEATHER: (clear) (filly cloudy) (cloudy) WIND:((calm) )(breezy) (strong wind) (rain)/(snow) --- inches 'I'enrperature:XL__: F max: F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(F) operator other ( ) b. suprvsr ) labor( ) operator O other ( ) C. suprvsr( labor( ) operator O other( ) d. suprvsr O labor( ) operator O other( ) e. suprvsr O labor( ) operator O other ( ) EQUIPMENT USED: a. '�� 6 I-Irs' g. I-Irs_ b. Mrs_ h, I lrs_ C. I-Irs_ i. llrs_ d. Mrs_ j. Ilrs_ j e. lirs k. llrs_ f. I-Irs_ I. 1 Irs_ — 1 JOSSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED'(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: L '\ CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken Ifor those itenis of work not passing the required tests acid scheduled date for re(esting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment uses; and work performed during this reporting period is in compliance with the contract plant and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: _ 19 L REPORT No.: PROJECT: )1, ,- CO11l1Gclh & Chtuulel CONTRACT#: 54-0546-4-1 WEATHER: clear) tly---!u y (cloudy) WIND: ' (calm) (breezy) (strong wind) (rain)/(snow) inches Tcnlperature,�, _" F tnax F train CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLD suprvsr (�) labor Jj) operator (�4) other ( ) b. suprvsr O labor( ) • , operator ( other ( ) C. suprvsr O labor ( )r �perator( Other ( ) d, suprvsr O labor( ) operator ( other( ) e• suprvsr O labor ( ) operator ( other ( ) EQUIPMENT �j�� a• I-Irs__L g. I-Irs_ b• I I rq3,!� h. I Its c• V X41- IIrs'� t�" i. llrs_ d• I it j. l Irs_ e•"I1 IIr9, � k. llrs— �• I-Irs_ - 1. llrs_ I AMITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure ofequipment mid quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ► t .,� tj �z � 4 i 1 T . S. CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSP .C�TIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CQNTItACr jJjR'S VLRIFICA'FION: The above job report is complete and correct, and all material and equipment used and work performed during this reporting period is in compliance with the contract plans and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 191� REPORT No.: PROJECT: necting Channel CONTRACT M 54-0540-4-1 WE clearTtlyclou cloudy) wIND: cah (breezy) (strong wind) ATHER: tarn)/ ) inches I'emperatur F max�(�' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr d ) labor �1) operator (J other( ) b. suprvsr( ) labor( ) operator( tother ( ) C. suprvsr ( ) labor ( ) operator( other ( ) d. suprvsr( ) labor( ) operator( other ( ) e, suprvsr ( ) labor( ) operator ( other( ) EQUIPMENT USED: a. o-A I SLS 9. 1— Irs-b. I Irs 71� h. 1 Irs — c. Cl IIrs3 i. I-Irs_ d. ) IIrsF j. Ilrs_ I lrs7 k. I Irs � f. M 1-Irsrs 1. — JOBSITE SAFETY: (indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). EQUIPMENT AND-MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK P�RF0RMEDJSN2AY; CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work acid note any deficiencies and corrective action taken). y ICON' IZACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, ercept as noted above. i CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: - 19—i j REPORT No.: PROJECT: F—SGR - ConlicctinB li net CONTRACT#: 54-051fi ll (cloudy) WIND:- l (breezy) (strong wind) WEATHER: (clear (P Y cloudy) ( �- • F max!//�` • F min (rain)/(snow) inches 1 emperature 111-- CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY, (list number working) a. GOLF suprvsr d ) labor(I)• operator ( ) other( ) b. suprvsr O labor( ) operator ( ) other ( ) C. suprvsr O labor( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: U I-Irs �. g 0o 7 �L' Hrs)` J a. . �It� Ilrs� b. L. - C) IIrs7. h -5 Hrs c. [� ►� I-Irs i. ' .. d. - _ Mrs .Q J Hrs_ i 1 Ilrs Mrs _ I S S k. e. 1 I I Irs 1 f S�'u_c — 1 . JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any sa[ety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ` �aV 1 n �- ►� CONSTRUCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of sucli tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). ; C0NTI1ACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plant and spec cations, except as noted above. CONTRACTO QUALITY CONTROL GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY co REPORT DAY: DATE: �I 19r REPORT No.: PROJECT. ASC;R- Cont • 'nv Ch rune 5QNT CT M 54-051L -1 WEATHER: (clear) tly cloudy) (cloudy) WIND: Cahn_ eezy) (strong Wind) ~Traw / snow inches Temperature: F max`L n ' F mill l ( ) CONTRACTOR & SUgCONTRQ�'TOR LABOR ACTIVITY (list number working) a. GOLF suprvsr ( ) labor(10- operator ( ) other ( ) b. suprvsr( ) labor( ) operator ( ) other ( C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor( ) operator ( ) other O _— EQUIPMENT USED: a. — 1Irs L ) g. I-Irs_ b. _ � ) llr 1 Its ", Il. Mrs U 5 I-Irst ' i• d. Cc. . I-Its j• IIrs_ i Mrs_ C. Ilrs k' Mrs f I-Irs_ 1. — ,�OBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPME•�... •►•m ER AL DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 W DTODAY-. (c ►� C c N*4 N C( .4- CO ST UCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICA' 'II ON: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specf:cations, except as noted above. CONTRACTOR QUALI CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I —� 1913 REPORT No.: PROJECT: iecting CIraLnel CONTRACT M 54-0546-4-1 WEATHER: (clear) tly cloudy) (cloudy) WIND: calm) ( eezy) (strong wind) rau�j (snow) inches Tempera lure: " F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (f ) labor(S) operator (3} other( ) b. suprvsr O labor( ) operator ( f 6ther( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. , �� �-� Z ,)y I-Irs7 g. I Irs_ b. `)L ILA JU I Irs - 5 _ h. Mrs_ c. Se.d C_ I-IrsT i. I-Irs_ d. r p I-Irs"Irj. I Irs_ I lrsS k. Mrs_ f. 1Irs 1. Mrs_ — I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ra � � o cc AL) y �tJ c CONSTRUCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). t CQ14111ACIOR'S VERIFICABON: Vie above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR CILIALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT c DAY: DATE: C% 19�� REPORT No.: ro PROJECT: F,SCR- Connecting Channel CONTRACT#: 54-05469-1 WEATHER: (clear (ptly cloudy) (cloudy) WIND. (calm (breezy) (strong wind) -(rant /(snow) inches Temperature: F max yS' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor (5y. operator iother( I) f i b. suprvsr O labor( ) operator( ) other ( ) C. suprvsr O labor ( ) operator ( ) other( ) d. suprvsr O labor( ) operator( ) other ( ) e, suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. — I-IrsLS g. 1lrs_ b. IIrs�? h. 1Irs_ LIrs'J i. I-Irs_ d. S,�i'u- Llu� a I-Irs7 ' j. 1 Irs— c. I lrs_ k. I lrs_ ('. 1 Irs 1, l lrs_ i JOUSITE , A� FETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). I EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: 11< — ►i A- l CONSTRUCTION QUALITY CONTROL 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). if CONTRACTOR'S VEIZFICATION: 'The above job report is complete and correct, and all material and equipment used and work performed during this reporting period is in compliance with the conlracl plans and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: j y � 19 " REPORT No.: PROJECT: RSGR- Connecting Chatmel CONTRACT#: 54-0546-4-1 WEATHER: clear;) (ptly cloudy) (cloudy) WIND: arm (breezy) (strong wind) (rain)/(snow) inches Temperature:(" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr(I) labor(9 operator other ( ) b. suprvsr ( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. Hrs g. Hrs- b. I-Irs-L-15 h. Hrs_ c. PIS LM, I-Irs Z i. HrsT d. Vl>; P c Hrs_J j. Hrs_ e. 'r (� I Irs .S k. I-Irs_ i f. G C-, VACk'- Hrs . 1. Hrs_ ! JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. �. p a d 1'' -��L a i4pLcx - bib U rl DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY• 'it a � I�Z tiI& -- CONSTRUCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report:s complete and correct, and all material and equipment used and work performed duril:g this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: O '2 �Q 19 � REPORT No.: PROJECT: RSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max%° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( labor 4 operator (--). other ( ) b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. Hrs g. Hrs_ b. I-Irs 3 h. Hrs_ C. Hrs_ i. Hrs_ I d. Hrs_ j. Hrs_ e. H Hrsrs k. _ f. I-Irs 1. Hrs_ 1 — 1 JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY* CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of niaterial or work and note any deficiencies and corrective action taken). y , CONTRACTOR'S VERIFICATION:ION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONT AC OR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Aubum, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �) �'t 19-!��s, REPORT No.: PROJECT: ESGR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: clear,, (ptly cloudy) (cloudy) WIND: calm)' (breezy) (strong wind) (rain)/(snow) inches Temperature:' F max UQ-- F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY' (list number working) a. GOLF suprvsr(() labor(4 operator other( ) b. suprvsr( ) labor ( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. C Vl C 1260cL Hrs I.5 g. Hrs_ b. A6-&FO I-Irs 3 It. Hrs_ C. '�44 - D Hrs S i. Hrs_ d. [ n Hrs j. Hrs_ e. I Irs k. I-Irs_ j f. I-Irs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materi -jelivered to the jobsite. Os� �ti i 'DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY• CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and workpetformed during this reportingperiod is in compliance with the contractplans and speczrzcations, except as noted above. C TRACTOR QUALITY CONTROL INSPECTOR 4.r. GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: L Z 19ff REPORT No.: PROJECT: F.S TR - Connecting Channel CONTRACT M 54-05 EA- WEATHER: 0,clear, (ptly cloudy) (cloudy) WIND: calms (breezy) (strong wind) rain)/(snow) inches Temperature:* F max_Qg F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(I) labor(4 operator (5 other (1) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. T 0 - g Hrs < g. Hrs_ b. nrti-<,-L VA�u L I-Irs� h. flrs_ C. Fq S 2��' _ I Irs�� i. Hrs_ d. Hrs j. Hrs_ + e. 6� I Irs--;�� k. I-Irs_ f T ti �x Hrs-LS 1. Hrs_ I 11; I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY* CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y , CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used and work performed during this reporting period is in compliance with the contractplans and specifications, except as noted above. �- , -a z ONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: C tZ 19�S REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: cle (ptly cloudy) (cloudy) WIND: Ualm - (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max_ ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr (1) labor(�) operator ( other ( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor ( ) operator ( ) other( ) EQUIPMENT USED: a•/�V11VI ►�0( enit L firs g. firs b. )Ijs� flrs—.- h. firs_ c. T I-Irs a� i. firs d. S 2 uC firs S j. firs e. firs_ k. firs_ j f. firs 1. firs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 C( IF CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 1 . CONTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 �� REPORT No.: PROJECT: ESGR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) tly cloud' (cloudy) WIND: alm (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max-�L" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I ) labor(.I operator ( ) other ( ) b. suprvsr ( ) labor( ) operator( ) other ( ) C. suprvsr( ) labor( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. -�L',c firs: g. firs — b. firs L h. firs — c. `2 (�, -6, firs .4 i. firs d. firs 3 j. firs — e. dye ii firs k. firs — f. firs 1. firs i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings field and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. e DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work acid note any deficiencies and corrective action taken). C!2NTIR4CT0R1S VLRIFICA110L4o The above job report is complete and correct, and all material and equipment used, and work performed during this reportingperiod is in compliance with the contract plant and specifications, except as noted above. CO ACTOR UALITY CONTROL INSPECTOR r GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: t[ - t 19 2 REPORT No.: PROJECT: F.SGR- Connectine Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (1 ) labor(I operator (: ) other( ) b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrs 1 g. 2 Hrs i b. 15. Hrs I h. Hrs_ C. HrsT i. Hrs_ d. S CAT (',CjjakVrs j. Hrs_ e. S 2,60 Hrs EF k. Hrs_ j f. -Tp_ Hrs I 1. Hrs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED•(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. •r 'DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: Z JCC,C f c� St c& A H Ad n l CONSTRUCTION QUALITY CONTROL: 1. TESTS.: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTIRACTOR'S VERIFICA'TIONs: 'the above job report is complete and correct, and all material and equipment used and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. gNTRA�&OR--QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19(-1�-- REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (ram /(snow) inches Temperature:_(,.�V F max S" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr Q ) labor( operator (_')) other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. -Z g. Hrs_ b. (� '�l l'1 Hrs 1.-AS' h. Hrs_ C. Hrs i i. Hrs_ i d. ��` ?C Y Hrs j. Hrs_ e. 1 2Yj r firs k. Hrs_ f Hrs 1. Hrs I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK _PERFORMED_ i M t 1 (u+ 6CLU IOVI< J L b l Dr1 d � � CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTILACTOR'S VERIFICABON: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. ��2 6:j .. - CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: (,' 19 C� REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cam (breezy) (strong wind) (rain)/(snow) inches Temperature: (�' F max S 4 F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( labor(q) operator(,9 other()) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. .2,fC, Hrs g. Hrs- b. Hrs . h. Hrs C. q Hrs :5 i. Hrs_ d. () 31 Hrs j. Hrs_ e. 1�11 'L I-irs5 k. Hrs— f. Flrs—LL5' 1. Hrs_ OBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r„ DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAYs All- C CONSTRUCTION QUALITY CONTROL l. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y . CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CON RACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: —f 19 1 REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly clou y (cloudy) WIND: cal ;m (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max_° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I) labor(q) operator(:4 other( ) b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrs g. Hrs �� i� - � �S b. S Hrs q h. Hrs— c. Hrs_ i. Hrs_ d. Hrs_ j. Hrs_ e. I-Irs_ k. Hrs_ f. Hrs 1. Hrs — I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. v�, DAILY CQC REPORT PAGE 2 of 2 WORK PE T (e S7 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VF,1 [FICABON: The above job report is complete and correct and all material and equipment used, and work performed during this reportingperiod is in compliance with the contract plans and specifications, except as noted above. NTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: i o _ 11 19 f'� REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: ( ear (ptly cloudy) (cloudy) WIND: calm � (breezy) (strong wind) (rain)/(snow) inches Temperature:" F maxS��° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (1) labor(L� operator (-!� other( ) b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr ( ) labor( ) operator( ) other ( ) EQUIPMENT USED: i a. (:, firs g. firs b. - fIrs� h. firs c. Hrs i. firs d. firs_ j. firs_ e. firs k. firs_ j f. Firs 1. firs i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. . r DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: hLc CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. ��, Vos f Y"J, CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I ,- �q 19 CIS- REPORT No.: PROJECT: FSGR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: (cam (breezy) (strong wind) (rain)/(snow) inches Temperature:, F max ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I ) labor operator(3) other b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. = L'Y1 Hrsa-s- g. — Hrs b. I Irs S h. —P • l S V Hrs c. V/ l I 2 } I-Irs 'T i. Hrs_ d. 7 Hrs j. Hrs_ ` e. k. Hrs_ f. C Hrs Lc• 1. Hrs_ t JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFQRMED �, CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report cs complete and correct, and all material and equipment used, and workpeiformed during this reportingperiod is in compliance with the contractplans and specifications, except as noted above. CONTRACTOR QUALITY C6j4TROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 �/ REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: calla (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max�" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr( labor( ) operator (�) other(j) Ty 1,WW b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. &yL Hrs `' g. Hrs b. Q(' C Ilrs h. 94 4 Ij 0 rs� C. I-Irs 3 i. 5-15; CA( Hrs: d. Hrs�s j. Hrs_ k. Hrs_ j f. LEE---;c Hrs 45 Hrs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED T Y- CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y . CONTRACTOR'S VCRIFICA1I014: The above job report is complete and correct, and all material and equipment used, and work performed during thus reportingperiod is in compliance with the contract plans and speci cations, except as noted above. CON ACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: - a. 19 e-)S— REPORT No.: PROJECT: RSGR- Connecting Channel CONTRACT M 54-0. 45 6-4-1 WEATHER: (clear) tly cloudy ' (cloudy) WIND: calm ' (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max'W° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(i.) labor(�) operator (�4 other(I) b. suprvsr( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. L Hrs: g. Hrs_ b. I-Irs I h. Hrs_ c. 54�1 •� --- I-Irs 4 i. Hrs_ d. HrsI j. Hrs_ e. 2L) I-Irs k. I-Irs_ I f. I-Irs 1. Hrs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFQRMED T + Wall c?,r 4 05 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). t CONTRACTOR'S VERIFICATION: flee above job report is complete and correct, and all material and equipment used, and workpeeformed during this reportingperiod is in compliance with the contractplans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT IYYff DAY: DATE: LVI- I I 19 CIS, REPORT No.: PROJECT: F.SGR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) Ctly (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max SC F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(() labor 0 operator (3). other ()) ct'L -t'Y b. suprvsr ( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor ( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( labor( ) operator( ) other( ) ,EQUIPMENT USED: a. Ak Ltw _ Firs g. Firs_ b. I Firs h. Firs_ C. - Firs Firs_ d. Firs j. Firs_ e. Firs_ k. Firs_ j f. Firs 1. Firs_ + JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. UAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED T rT 5Q � - �-a" d" L"I(L,, k-�a CONSTRUCTION QUALITY CONTROL: 1. CIS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y . CONTRACTOR'S VERIFICATION: The above job report is complete and correct; and all material and equipment used, and work performed during this reportingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR r GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I 19: REPORT No.: PROJECT: F.SC:R- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy WIND: (cal (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max�° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(() labor operator 4 other(i) rV— b. suprvsr ( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. q oA Aj.,c4 _ Hrs g. Hrs — b, It I-Irs 1 h. Hrs— C. I-Irs 33- i. Hrs d. Hrs J. Hrs_ e. I-Irs k. Hrs— f. I-Irs 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. *v DAILY CQC REPORT PAGE 2 of 2 U� I tog t b -CONSTRUCTION QUALITY CONTROL: 1. TES'FS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. I.NSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: the above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and spec cations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR f ' GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �� - 19:� REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly clog) (cloudy) WIND: ( alm (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max ap F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor(0 operator(1A other( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. ,'-,-)K' r,' I-Irs I,S g. Hrs_ b. I-Irs I h. Hrs_ C. ml Q; sa I-Irs: i. Hrs_ d. Z' Hrs Hrs_ e. C- Ilrs k. EIrs_ t f. U I lrs 1. Hrs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. OAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ST CONSTRUCTION QUALITY CONTROL: 1. TEST'S: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 4 0 -'1 19 ,--1� REPORT No.: PROJECT: RSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (:lear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature:( - ° F max ST2 F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr Q) labor operator(,- other( ) b. suprvsr( ) labor( ) operator ( other( ) C. suprvsr ( ) labor( ) operator( other ( ) d. suprvsr( ) labor( ) operator ( other( ) e. suprvsr( ) labor( ) operator( other ( ) EQUIPMENT USED: a. n - Hrs j S g. Hrs_ b. I-Irs I 11. Hrs_ c. � � n Hrs i. Hrs_ d. J N4.`t X Hrs 3 j. Hrs_ e. �� Hrs I k. Hrs_ I f. I-Irs L I-Irs_ ! IOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY* u— V-, ,�- 177 Cv CONSTRUCTION QUALITY CONTROL.• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICADONe The above job report is complete and correc4 and all material and equipment used, and work performed during this reportnag period is in compliance with the contract plans and specifications, except as noted above. c.- CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: Ltj V; 19: REPORT No.: PROJECT: F.SC'TR- Co nectin Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (ram)/(snow) inches Temperature:" F max SZ'° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(l) labor(4 operator(} other( ) b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 2 q j D Hrs g. Hrs_ b. ? ( j I-Irs � h. Hrs_ C. Hrs 5 i. Hrs_ d. Hrs j. Hrs_ e lirs_ k. I-Irs_ I f. Hrs 1. Hrs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 4� . DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: r CONSTRUCTION QUALITY CONTROL 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during thus reporting period is in compliance with the contract plans and spec fcations, except as noted above. X�CJ CONTRACTOR QUALITY CONTROL INSPECTOR M GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �� -5J 19--?<�'" REPORT No.: PROJECT: FSCIR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tl cloudy (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(J) labor 0) operator(5) other(j) tiCK l�Z� u�v b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. I V''l -� -L�c Hrs sf g. Hrs- b. 1�'Z;' I Irs h. Hrs_ C. ZK Hrs i. Hrs_ d. . Hrs j. Hrs_ I e. �� I-Irs_ �.�- >-1rs� k. Hrs � f. Hrs 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TOPAY; rl " 9/1', 54 to a�- l a off CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VG IFICA'fION: The above job report is complete and correc4 and all material and equipment used and work performed during this reportingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I�j - 19 REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear ,(ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (ram (snow) inches Temperature:" F max� F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor(I-) operator(5) other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. C Hrs ' g. firs_ b. �' ' firs5 h. firs c. Hrs i. firs d.—�,��' Hrs j. fir_a s . e. 2�G - firs k. Hrs— f. firs 1. firs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. iV . DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: if) kKL LUVQ)] A- �tul�40 &Jin;� CONSTRUCTION QUALITY CONTROL,• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y , CONTILACTOR'S VF IFICA'TION; The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: O - 19 I S REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloudy (cloudy) W1ND: alms (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max Ste' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list nurnber working) a. GOLF suprvsr (() labor(6) operator B) other( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor ( ) operator ( ) other ( ) e. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. firs g. firs — b. p� L5'TJ Hrs S h. firs C. — �j,' _ Firsi. firsd. 'I �_$ HrsL1 j• Hrs— e. firs k. firs— i f. firs 1. firs — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. A 5 DAILY CQC REPORT PAGE 2 of 2 bigfh /1e, U 1 Sl�wyzl LuitI a CONSTRUCTION QUALITY CONTROL: 1. TES: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). yam. CONTI;ACTOR'S VERIFICATION: the above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: V REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm (breezy) (strong wind) rainy(snow) inches Temperature:" F maxi F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(►) labor(>� operator(3) other(�) b. suprvsr( ) labor( operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor ( ) operator ( ) other( ) EQUIPMENT USED: a. �M I-�'� �_` Hrs g. Hrs_ b. Hrs ' h. Hrs_ C. 7)16, <3 1, Hrs i. Hrs_ d. Hrs j. Hrs_ e. Iirs k. I-Irs_ i f. I-Irs I Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED i x L�,p i +L ST wl 5L bar NNT14 W eQ CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests perfornied and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 1 CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used and work peFformed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19_ REPORT No.: PROJECT: F.SC'IR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND. (calm) (breezy) (strong wind) (rain)/(snow) inches 1'emperaturei, " F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor( ) operator ( ) other( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other( ) EQUIPMENT a. Hrs�� 9. Hrs_, b. I-Irs h. I-Irs C. I-Irs i. I-Irs_ d. I-Irsj. I-Irs e. Hrs k. I-Irs_ f. I-Irs 1. I-Irs_ J013SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY• ! y CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). if.S� CONTRACTOR'S V ERIFICA'11ON: Vie above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT tw; DAY: DATE: + 19 REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(,snow) inches Temperature:" F max '�J F min CONTgACTog n SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ) labor P operator( � other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor ( ) operator( ) other( ) d. suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. � Hrs �•S g Hrs_b. Hrs Hrsa h•C. �_ _ Hrsf S i. Hrs— Hr j. Hrs d. — HrL k. Hrs_ i e. --� IIrs f. firs— 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. .,' DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. I.NSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT ., ei 1�', G "*- DAY: DATE: 19_j REPORT No.: PROJECT: IRSGR- Connecting CONTRACT #: 54-U 6-A-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max F min CONTRACTOR & SUBCONTRAMR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (' ) tabor ( ) operator ( ) other ( ) b. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) e. suprvsr ( labor ( ) operator ( ) other ( ) EQUIPMENT USED; a. IIrs g. firs_ b. — IIrs h. IIrs_ C. Mrs i. IIrs— d, IIrs� j. Mrs— e. Ilrs k. firs— I 1' Firs 1. firs i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WQRK PERFORMED TODAY• r vY� t Grad �� F CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken For those items of work not passim the required tests and scheduled elate for retesting). 2. lNSPECTIONS: (Indicate any visual inspections of material or work and note airy deficiencies and corrective action taken). ri r CQN1HAC1OR'S VEl IFICATIQN: the above job report is complete and correct, and all material and equipment used and work performed during this reporting period is in compliance with the contract plant and spectfications, except as noted above, CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: _ r 19_ REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) .(breezy) (strong wind) { (rain)/snow) inches Temperature:" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(') labor(-) operator (') other C ) b. suprvsr O labor ( ) operator O other( ) C. suprvsr ( ) labor( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( labor( ) operator ( ) other( ) EQUIPMENT USED: ISO Hrs g. Hrs b. f' 1Irs~ lt. Hrs_ c. I-Irs i. Hrs_ d. Hrs j Hrs_ e. Hrs k. 11rs f. Hrs 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAYs CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). b ov 14 CONDIAC I'OR'S V LI IFICA'I'ION: Vie above job reporl is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. • 38016 Military Road South Auburn, WA 98001 pAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: k 19 REPORT No.: PROJECT: ESGR- Co necting.Cliai� CONTRACT#: 54-0546_4_I WEATHER: (clear) (ptly cloudy)' (cloudy) WIND: (calm)' (breezy) (strong wind) (rain)/(snow) inches Temperature:;_" F max F min QQNTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I) labor ( ) operator C other (_ ) TT dil Yr,�, b. suprvsr ( ) labor ( ) operator ( other ( ) C. suprvsr ( ) labor ( ) operator ( other ( ) d. suprvsr ( ) labor( ) operator ( other ( ) e. suprvsr ( ) labor ( ) operator ( other ( ) EQUIPMENT USED; a. ti Hrs t' g. firs_ b. - IIrs h. IIrs_ C. Hrs i. 1-Irs_ d. I Irs j. Mrs_ e. IIrsT k. _ Mrs_ I I Irs L I Irs_ f JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings lield and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 'DAILY CQC REPORT PAGE 2 of 2 k WORK PE ED TODAY: - A, c _ e 1 -QONSTRUQTION QUALITY CONTROL: l. T •.S'I'S: (Indicate tests perforaied and the results of such tests. Describe corrective action taken for those items of work not passing the required to is and scheduled elate for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and dote any deficiencies and corrective action taken). CON111ACTOR'S VERIFICATION The above job report is complete and correct, and all material and equipment used, and work perforated during this reporting period is in compliance with 1he contract plant and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR If ' * GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: _ 19— REPORT No.: PROJECT: ESGR- Connecting ClIamiel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature:" P max " P rnin CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY (list number working) a. GOLF suprvsr (I) labor(1) operator_q) other ( ) b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. llrs-L..S g. I irs_ b. I-Irs .S h. I Irs— c. dye C h ' 1 Mrs i. Mrs— d. f 1-1 rSTS. j. I Irs I Irs_ — k I Irs I e, — f, I Irs L I Irs_ JOBSITE, 5AFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r OA—tLY CQC REPORT PAGE 2 of 2 TODAY: vl ( �� � Az e, `. 5 U� r 'r trC t y CONSTRUQTION QUALITY CONTROL: 1. TESTS: (Indicate tests perforated and the results of such tests. Describe corrective action taken for those items.of wor not passing is required tests acid scheduled dale for retesting). 2. INS RCTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action takeu). Y� l CQN1RAC1OR'S VERIFICATION@ The above job report a complete and correct, and all material and equipment used, and work performed during this reporling period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: q 19,49 REPORT No.: PROJECT: F.SGR- Connecting Chi CONTRACT M 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max_° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor((o) operator(4) other(3) TV-Y ®IQT b. suprvsr( ) labor( ) operator( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other( ) d. suprvsr( ) labor ( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. SQL Sf7 Hrs S. g. 9 VA Hrs—Ls b. q— $ Hrs •S h. 191 Hrs C. S4y- 3D Hrs to i. Hrs_ d. $u �l�.�.(� Hrs j. 1Irs_ e. Hrs 1•S k. Hrs_ � f. Hrs_LS- 1. Hrs_ ! JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. � r DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 7,W CONDUCTOR'S VERIFICATION: 1'he above job report is complete and correct, acid all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and spec fcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR Z' S uS Pfe/ 711 it r s GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19!� REPORT No.: PROJECT: F.SGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: qclear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max�W F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr(I) labor(Z operator(o other(;} -fry 1)1,,A'*'-- b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. 4 Hrs ).S g. e& Hrs •S b. 1lrs_j.!� h. yoL I-Irs� c. Hrs'S i. Hrs_ d. '( 13 - $ Hrs j. Hrs_ e. Hrs 6 k. Hrs_ 1 f. C 15�0 Hrs Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: V)w 12dS Crane ha 9 Gil( SW Ids W CONSTRUCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests acid scheduled date for retesting). )A j%() 0'V% W WWRIO 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). a� CS?MMACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CO TRA TO Q LI CONTROL INSPECTOR r S uSPE,Cf1 rAtS IS 912// Nar S/2/ . 5W GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 hl S- REPORT No.: PROJECT: ESGR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max_° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I ) labor() operator( other(3) '(Y f Z*A-,r b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. l'o— i _ Firs g. Firs_ b. �,i- _ 1-Irs h. Firs_ C. Hrs i. Firs_ d. C ! Firs J. Firs C. Hrs�S k. I-Irs_ f. Hrs S 1. Firs_ ,IOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY• fir t 6,kA e-v+-S V.ACV - 1OW - o 0 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). i y(��f/. COMERACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: L O 19 5 REPORT No.: PROJECT: ESGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: lean (ptly cloudy) (cloudy) WIND: alm (breezy) (strong wind) (rain)/(snow) inches Temperature:_" F max SA" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(I) labor(9) operator ( ) other (a} "TV-V- ty b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. 2(0- b firs S g. firs b. fob 0 o f Irs-A-S h. Ar 1 SO firs 3.5 C. firs i. firs_ d. -TD- $ firs j. firs_ C. 544 first k. Hrs_ I f. —v�,�. Hrs 1. firs_ —Q JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: (-AY r x v ad cam- CONSTRUCTION QUALITY CONTROL' 1. TEST'S: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: oI- I9` REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature:2,�-Z F max SS F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(I) labor(6D operator (L) other (1) b. suprvsr( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. QU W Hrs—LS' g. �Ur� Hrs b. D ID Hrs ? h. Hrs_ c. Hrs i. Hrs_ d. --To- Hrs j. Hrs_ e. 1n r,,So Ilrs I k. Hrs_ I f. SUq Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. • ti DAILY CQC REPORT PAGE 2 of 2 WORK PERF013MED TODAY: u, A 1 tw l % ��� I( 1✓1 -1 ttrux CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the requircd tests slid scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y . CONTRACTOR'S VERIFICATION: 17he above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance wit/t the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: - (p 19-.5 REPORT No.: PROJECT: ESGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max_aL° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor(� operator ( ) other b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 1 Ux& Firs-7•'XS g. ��� Firs 9,r b. Firs :S h. Firs 3•'5 c. 26- fZ Firs • S i. M1"T S 2'%0 Hrs � d. -1 Firs a j. Firs e. SA Hrs?=S k. Firs_ j f. . 5 TA uSoZ Firs I—S- 1. Firs_ i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: III " mi fuj A to �W Tu CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: the above job report is complete and correct, and all malerial and equipment used, and workperformed during thu repo rtingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: C1 — I S l qq5— REPORT No.: PROJECT: ESGR- ConnectinE Channel CONTRACT#: 54-0546-4-1 WEATHER: ( le (ptly cloudy) (cloudy) WIND: (Zmo (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max_" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1 ) labor(Q operator(1) other(t f} b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor ( ) operator( ) other ( ) EQUIPMENT USED: a. ty� Hrs '�- g. Hrs_ b. .226._ Hrs 3 h. Hrs_ c. Hrs to i. Hrs_ d. Hrs7 j. Hrs_ e. Ilrs-Ir k. Hrs_ f. '1 Hrs Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: �, ' )e F-T q-K !j, N b6AL 6*ux-ru-j- 4 vtl CONSTRUCTION QUALITY CONTROL: ►. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). IZ/�,k horn (J 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICA11ON• 1'he above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �' 19 (4 REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: ( lean (ptly cloudy) (cloudy) WIND: al (breezy) (strong wind) (rain)/(snow) inches Temperature: -?� " F max 2[° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY.• (list number working) a. GOLF suprvsr(I) labor(3) operator (5) other (A b. suprvsr( ) labor ( ) operator ( ) other ( ) C. suprvsr( ) labor( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. .�VC— 150 Hrsl� g. �0h i•w- Hrs__2- b. '14A�Lv SoNf) I-Irs�L5 h. �N I-Irs C. �DC/U-e v Hrs5' i. T 0—S Hrs'7. `a d. Hrs j. Hrs_ e. �46L -d- k. Hrs_ j f. "l j, Hrs3 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: No+k 406 I 40 t WmW 40S- I�Vwl I�l e U Luc VkWbV_4kVvt CONSTRUCTION QUALITY CONTROL: 1. TEST'S: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period a in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 !� REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: 4cle (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr Q ) labor( ) operator (4) other(3) -TV-4 b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor ( ) operator( ) other( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. 'Do — Hrs g. 'l(Ad Hrs O b. fIrs I h. n 9firs C. I-Irs Hrs_ d. nokw U (2aV-0, Hrs I_s j. Hrs_ e. M FS - Hrs I k. Hrs_ f. Hrs 1—.5' 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED T �A J � " � �,t,,Ll� OV A &L"11, -- Mtm Wk V10Y% CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled dale for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I- ("� 19 � REPORT No.: PROJECT: RSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (cle (ptly cloudy) (cloudy) WIND: cam (breezy) (strong wind) (rain)/(snow) inches Temperature:�L" F max r ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY* (list number working) a. GOLF suprvsr(I) labor(�) operator( ) other(Lb b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 'r - $ firs I g. j yx�,t v�ol 00,1d- Hrs 1. b. Hrs�� h. firs_ C. 3 S"0 Hrs I i. firs _ d. 1 Hrs ` j. Hrs_ e. firs 3 k. IIrs_ f. HrsjQ.5' 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK DT VAAJ 10 I iyOD Lmt.,v avto. + Corn 'lilt G►J,vw OA 'c 0(4 ,k, 51 It mac. wti, t h CONSTRUCTION QUALITY CONTROL; 1. TES'rSS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). to> :��.• CONTRACTOR'S VERIFICATION: 1'he above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: Ci— I 19AS, REPORT No.: PROJECT: ESSGR - Connectina Channel CONTRACT M 54-0546-4-1 WEATHER: ( ear (ptly cloudy) (cloudy) WIND: calm (breezy) (strong wind) (rain)/(snow) inches Temperature:_" F max SS" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(9) operator(3) other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrs 3 g. Hrs_ b. n 31 Hrs h. Hrs_ C. CkLc� IIrs i. Hrs_ d. 2f,-- 1; Hrs t��' j. Hrs_ e. Hrs_ k. Hrs_ f. Hrs 1. Hrs ,JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 4 DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY• CIS.;-,a �o NsT o�►•%�- r x '}' . QV rwN wo to"eug-Te1 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those itenis of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). VVI pQ0,t p YK pS — YV► A < S to . CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: — C� 19 9S REPORT No.: PROJECT: FCGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (:(c:le ) ,(ptly cloudy) (cloudy) WIND calm) breezy) (strong wind) (rain)/(snow) inches Temperature: " F max�� F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor 0 operator(/ other ( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. a� rSG�)Hrs g. Hrs_ b. Hrs_ h. Hrs_ C. Hrs i. Hrs_ d. Hrs`_ j. Hrs_ e. Hrs_ k. Hrs_ I f I-Irs_ 1. I-Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY:_ e CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: 7'he above job report is complete and correct; and all material and equipment used and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. -P CONTRACTOR QUALITY CONTROL INSPECTOR A R� GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: REPORT No.: PROJECT: FSGR- Connecting h nnel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (c lm) (breezy) (strong wind) (rain)/(snow) inches Temperature: ° F maxSS'F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr U) labor by operator ( ) other b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Firs 2.5- g. Hrs 1.�� — b.�� Hrs '� �' h. Hrs— c. HrsL� i. Hrs_ d. Hrs_o:�,S- j. Hrs— e. Hrs_ k. Hrs— I f Hrs_ 1. Hrs— I JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken Ifor those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. r � CONTRACTOR QUALITY CONTROL INSPECTOR ).A GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE:_ - 19 REPORT No.: PROJECT: FS R- Connecting ChannelCONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND. �(calm) (breezy) (strong wind) (rain)/(snow) inches Temperature:: F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor l`f) operator Q other b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: ,B 9. Hrs77 — b. Hrs h. Hrs_ C. 7 l>&(, /-/Z Hrs l� i. Hrs_ d.�, /A V-- Hrs j. Hrs_ e. Hrs_ k. Hrs_ f. Hrs_ 1. I-Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: IF CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken Ifor those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). i!1 CONTRACTOR'S VERIFICATION: T'he above job report is complete and correc4 and all material and equipment used, and work performed during tlu's repo rting period is in compliance with the contract plans and specifications, except as noted above. - -r C NTRACTOR QUALITY CONTROL INSPECTOR t - GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: ht DATE: -,- 19�I� REPORT No.: PROJECT: FSCYR - Connecting Channel CONTRACT#: 5 - - - WEATHER: clear (ptly cloudy) (cloudy) WIND: (calm,, (breezy) (strong wind) (rain)/(snow) inches Temperature:" F maxC5""F min ONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) CC. a. GOLF suprvsr(� labor( operator ( ) other(� b. suprvsr ( ) labor ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. el � O_ Hrs 2 75� g. Hrs— b. 1 Hrs. h. HrsC. — Hrs :�S i. Hrs d. Hrs_ j. Hrs— e. Hrs_ k. I-Irs_ f. I-Irs— 1. Hrs_ JOSSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. C XZ DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken Ifor those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONfROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAI Y CONSTRUCTION QUALITY CONTROL REPORT �/� REPORT No.: 19 DAY: !/u1L� DATE: dI -Li_ — PROJECT: FSC*R- Connecting,Channel CONTRACT#: 54-0546-4-1 WEATHER: (ptly cloudy) (cloudy) WIND: .(calm (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max�S° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr V) labor(-�)- operator(0 other ( ) b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr ( ) labor ( ) operator ( ) other( ) d. suprvsr ( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other( ) EQUIPMENT USED• a. Ga',1 _3 Hrs-Y g. Hrs— b. Hrs / h. Hrs — c PC, / Hrs a,S i. Hrs_ d. a Hrs /S-- j. Hrs_ Mrs �" k. Hrs I-Irs o2. 1. IIrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials deli ered to the jobsite. Y,' DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED.T D - CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken Ifor those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed durilag this reporting period is in compliance with the contract plans and specifications, except as noted above. J CO TRACTOR QUALITY CONTROL INSPECTOR we Y GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19�15- REPORT No.: PROJECT: FSr1R- Connecting Channel CONTRACT#: 54-054E-�� WEATHER: (clear) I cloud (cloudy) WIN : (cal (breezy) (strong wind) (rain)/(sno inches Temperature: " F maxi ° F min ;•ONT A QTO & SUBCONTgACTog LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(S'j operator other ( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor( ) operator( other( ) d. suprvsr( ) labor( ) operator( other( ) e. suprvsr( ) labor( ) operator( other( ) EQUIPMENT USED• a. /'" /S C` Hrs g. Hrs_ b. k1k) /T, Hrs-LJ7 h. Hrs_ c. Hrs Hrs i. _ d. /71 fzd HrsL j Hrs_ Hrs k. I-Irs f, firs_ 1. I-Irs_ JOB SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY' ��� 4 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATIQN: The above job report is complete and correct; and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South WEP 14 1995D Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 �'� REPORT No.: PROJECT: FgC7R- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max_ F min CONTRACTOR &4 SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(A labor A operator Q other ( ) b. suprvsr ( ) labor( ) operator( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. A-�.�r, i ,P Hrs g. Hrs b. '�7/z Hrs2-,' h. Hrs_ C. Hrs i. Hrs_ d. Hrs_ j. Hrs— C. Hrs_ k. Hrs ! f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrivaUdeparture of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERII+ICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this repo rting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY OONTROLINSPECTOR GOLF Landscaping and Construction, Inc. &an 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 192-f— REPORT No.: PROJECT: FSGR- orinecting Channel CONTRACT#: 54-05 L-4 1 WEATHER: (ptly cloudy) (cloudy) WIND' (calm (breezy) (strong wind) (rainAsnow) inches Tempe e:�Z " F max, F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(j) labor operator (I) other b. suprvsr( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d, suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: Hrs_ a. i�-� Hrs g Hrs_ b. #,Ze 77<' h. Hrs C. Hrs 5. t — d.—� �— Hrs��' j Hrs— " Hrs k. Hrs Hrs_, C. — f. Hrs— 1. — jI-QUITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). '"QUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. P�. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: J 7� CONSTRUCTION QUALITY CONTROL: 1. I=: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). C NTRACTOR'S VERIFICATION: The above job report is complete and correct', and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. Z CO TRACTOR QUALITY C NTROL INSPECTOR GOLF Landscaping and Construction, Inc. D 38016 Military Road South - Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROI REPORT DAY: DATE: 19 � REPORT No.: PROJECT: $SQ CONTRACT#: 54-054fi.A--1 WEATHER: (clear (ptly cloudy) (cloudy) WIND: (calm (breezy) (strong wind) (snow) inches Temper e: " F max F min CONTRM A ONT^� eJBCONTRACTOR LABOR ACTIVITY (list number working) � \ RU V \ LA V a. GOLF suprvsr V') labor operator other ( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED• a. Y�� � a� Hrsy-.-6- 9. Firs b. Firs b. ��-� Hrs, Hrs_ ' C. �.��/1� ���.��� Hrs_ i' Firs d. Firs J• — Firs k. Firs � e. — Firs f. Firs 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: - CONSTRUCTION QUALITY CONTROL: 1. :IESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). w CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. Cdj4fRACTOR QUALITY CONTROL INSPECTOR I GOLF Landscaping and Construction, Inc. 38016 Military Road South 1 4 1995Auburn,WA 98001 29� D DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �U 19�— REPORT No.: PROJECT: FS('*R- Connecting CONTRACT#: 54-0546-4� WEATHER: traln) lear) `(ptly cloudy) (cloudy) WIN (calm (breezy) (strong wind) /(snow) inches Temperature ° F max, min CONTRACTOR u SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( labor C operat (5)- other ( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: � , Hrs 9 S g. Hrs_ a' Hrs b. Y � /SD Hrs h. — C. % D — e Hrs (�.5 i. Hrs_ d. 7, )— �l' Hrs�.s- J Hrs— Hrs . Hrs k e. — I f. Hrs_ 1. Firs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: i CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and correctiv action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. DESE!p 1 4 1995 D 38016 Military Road South Auburn,WA 98001 pILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: -01-� 19 ��5— REPORT No.: PROJECT: R9GR- Connecting,Channel CONTRACT#: 54-0546-4-1 WEATHER: =(r-a—i (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) snow) inches Tempera 1 " F max—' ° F min CONTRACTOR u SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr 0 laborer operate) other ( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator ( ) other( ) d. suprvsr ( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: _ _ a. %O —� Hrs - 9. Hrs Hrs b. ;� �� i�1 Hrs, h• — o�c Hrs i. C. Hrs— moo,,,, � — Hrs • , d. Hrs_ j — e. Hrs k. Hrs— f Hrs— 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance h plan and corrective meeting minute jons taken. Note any safety meetings held and in EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: xjz CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). E/- CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CO TRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 pl!m D IDLY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �2 REPORT No.: PROJECT: F-I;GR- Connecting Chanel CONTRACT#: 54-054 - - WEATHER: 4in)1(snow) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) inches Temperature:° F maxz� F min CONTRACTQR Q SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(-4 operator other ( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: /, a. fz ' Hrs J g. Hrs— b. Hrs h. C. Hrs— �� i. Firs � l� —,� c�� Hrs�� . d. Hrs_ j Hrs— e' Hrs k. Hrs- - Hrs £ Hrs_ 1. — ,JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrivaUdeparture of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: -W 57 00VA-2 av CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). fr r,/— C off, 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. D 38016 Military Road South EP 1 5 95 Auburn,WA 98001 i DA11 Y CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: REPORT No.: PROJECT: G���'_R - ('nnnecting Channel_ CONTRACT#: 54-0 4 6-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: (ca (breezy) (strong wind) (rain)/(snow) inches Temperature:" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) (3� a. GOLF suprvsr ( ) labor b a operator (Z other( ) b, suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor ( ) operator ( ) other ( )_ d, suprvsr( ) labor( ) operator( ) other( ) e, suprvsr ( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. yY� 5 aka mifS Hrs 3 g. Hrs_ Hrs Hr ,S' h. _ b. la -C� - - Hrs C. :25- add Hrs — d. Hrs j k Hrs_ � e. 2 -" HrsILS� I-Irs Hrs f. Hrs_ 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. .d DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY, n1 CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPEC'TIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). rnnrTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRA�QUALITY ONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South M!m Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: d - o��n 19 REPORT No.: PROJECT: F.4CTR- Connecting Channel CONTRACT M 54-0546 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: ° F max_° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(Z) labor L:�— operatorL) other( ) b. suprvsr ( ) labor( ) operator( ) other ( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. vim/z) u Hrs g. Hrs Hrs�t /J Hrs h. Hrs_ C. Hrs i. Hrs— . ,r d. Ski /S ere el Hrs j. Hrs— _ e. :;;L C Hrs 2 k. Hrs— � f. Hrs Hrs— 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: -7'��?'-7//h CD a 4- CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VCRIFICA ION: The above job report is complete and correct, and all material and equipment used, and work performed during this reportilagperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. 38016 Military Road South D 1995 Auburn, WA 98001 EP 1 5 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: ' rL� 19j REPORT No.: PROJECT: $SGR - Connecting Channel CONTRACT#: 54-054L4_1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max F min CONTRACTOR SUBCONTRACTOR LABOR ACTIVITY: (list number working) 1\ N� V a. GOLF suprvsr ( ) labor operator other ( ) b. suprvsr ( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other( ) d. suprvsr ( ) labor( ) operator ( ) other( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. �Cf /n S CL�_ Hrs g Hrs_ b. Hrs h. Hrs_ Hrs_ C. Hrs_ d. Hrs} J. IIrs Hrs_ k• e. Hrs 1. Hrs f. — — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: S C CONSTRUCTION QUALITY CONTROL: I. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRArTOR'S YERIFICSTION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. 38016 Military Road South IDAuburn,WA 98001 FS 1 5 1995 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 12 REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloudy (cloudy) WIND. (calm) (breezy) (strong wind) (rain)/(snow inches Tempera " F max, F min CONTRACTO o & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( ) labor Q operator( ) other( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. �GYir�►cG7 /S0I-1rs g. Hrs_ b. HrsT- h. Hrs_ C. l�„�_ Hrs i. Hrs_ d. Hrs_ j. Hrs_ e. Hrs k. Hrs_ I f. Hrs_ 1. Hrs_ JOBSITE SAFELY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: I. Tom: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CO RACTOR QUALI CONTROL INSPECTOR Cal GOLF Landscaping and Construction,Inc. SEC 1W 38016 Military Road South 2 UJ Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: F ' 19-2�— REPORT No.: PROJECT: FSCTR- Connecting Ch=el CONTRACT#: 54-0545-41- WEATHER: (clear (ptly cloudy) (cloudy) WIND: (calm (breezy) (strong wind) /(snow) inches Temperature: " F max— F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr V) labor( operator( other( ) b, suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 9" Hrs /-,5— 9. Hrs_ b. -7-/0- Hrs,S- h. Hrs — c. Hrs a i. Hrs_ d. en Hrs��� j• Hrs_ — jUrs� k. Hrs_ I £ IIrs Hrs _ 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT-AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 W D TODAY: ui 5-1 ley CONSTRUCTION QUALITY CONTROL: 1. TITS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOWS VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. OEM 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 1912- 5— REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: 4ea )r) (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) )/(snow) inches Temperature.412 F maxS� F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor(3) operator other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrs g. Hrs_ b. Hrs_ h. Hrs_ C. Hrs_ i. Hrs_ d. Hrs_ j. Hrs_ C. Hrs_ k. Hrs_ e f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: fr CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). f CONTRACTOR'S VERIFICATION: The above job report is complete and correct; and all material and equipment used, and work performed during this reporti7ig period is in compliance with the contract plans and specifications, except as noted above. CON RACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South 9ffn Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: I`i 19 Cl S REPORT No.: I PROJECT: FSGR- Connecting Chaunf L CONTRACT#: 54-054G WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max _° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (I ) labor (I ) operator ( ) other ( ) b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. 1 i :, [' Hrs g. Hrs_ b. --Fn _ ,! IIrs_S h. Hrs_ C. 2/ I-Irs i. Hrs_ d. Hrs j. Hrs_ e I Irs_ k. I-Irs_ I f. Hrs_ 1. I-Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 1jF CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contractplans and specifications, except as noted above. 2Z�-2 CONTRACTOR QUALIT'-Y CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 affm DAILY CONSTRUCTION QUALITY CONTROL REPORT DATE: ;i 1 19` I J REPORT No.:� DAY: -1������ � �� — PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) cloudy) WIND: _ alm) (breezy) (strong wind) (rain)/(snow) inches Temperature:jr` F max F min CONTR ACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list nurnber working) a. GOLF suprvsr (I) labor ( ) operaf (! ) other ( ) b. suprvsr ( ) labor ( ) operator O other ( ) C. suprvsr ( ) labor ( ) operator( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. Hrs g. Hrs— b. I-Irs li. Hrs_ C. I-Irs i. I-Irs— d. Hrs_ j. Hrs— e. I-Irs k. I-Irs— I f. Hrs L Hrs— JQBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period zs in compliance with the contractplans and specifications, except as noted above. CON 4, AACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 P)9�Tn DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: -Tjjt t t DATE: ? 19 ( 5 REPORT No.: 5to PROJECT: F—SOR - Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) . reezy) (strong wind) (rain)7(snow) inches Temperature: c " max ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor(LI) operator( ) other ( ) b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. Hrs_ g. Hrs_ b. Hrs_ h. Hrs_ C. I-Irs_ i. Hrs_ d. Hrs_ j. Hrs_ e. Ilrs k. 1Irs_ �. f. Hrs 1. Mrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, arcept as noted above. CO,NfRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 fl�ffm DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 1c: Cry DATE: �,' I ( , 19 <<` REPORT No.: 55 PROJECT: ESQ - Connecting .hit nel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) cloudy) WIND: (calm) (reezy) (strong wind) (rain)/(snow) inches Temperature:Li:�° F maxim° F min CONTgACTOR Q SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (t ) labor (y) operat r(5) other ( ) b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) ' labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. �CA ry-ct---)C�-• 1 SC' Hrs g. Hrs_ b. c�- ,mC,,-�S D�z r r I-Irs_a h. Hrs_ Hrs_i. C. r��,-}-5 Z�� I-Irs.� Hrs d. Hrs_ j — I Irs k. Hrs— e. — f. firs_ 1. I-Irs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: r � CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). tt , �i CONTRACTOR'S VERIFICATIONS: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CO RACTOR QUA TY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. lqqc� 38016 Military Road South Auburn, WA 98001 Em DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: ! '�d _ DATE: l .5 19 `1 REPORT No.: 5� PROJECT: FSGR - Connecting ChUMel CONTRACT#: 54-0546-4 i WEATHER: (clear) (ptly cloudy) (cli oudy) WIND: calm) (breezy) (strong wind) (rain)/(snow) inches J Temperature:I,c " F max�:P F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (1) labor ( ) operator (�� other ( ) b. suprvsr ( ) labor ( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr ( ) labor ( ) operator ( ) other( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. Hrs1 g. Hrs— h. Hrs b. � (� 1� flrs-� — Hrs_ C. 7 u. S�', I-Irs � i. Hrs d. k 1_S w , �• D z.Ck' Hrs j — Hrs'l S k. Hrs 1 f Hrs— 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings field and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: A CONSTRUCTION QUALITY CONTROL: 1. ITS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRAC rOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction. Inc. 38016 Military Road South �'pjNDAuburn, WA 98001 (SEF � DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: l t"���lc1 & -L-1 DATE: - I 19 T REPORT No.: S� PROJECT: FSGR- Connecting Channel CONTRACT M 54-0546 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) ;(�)/(snow) inches Temperature: i S F max •`"" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (1 labor other (J� :ftcir " b. suprvsr O labor O operator ( ) other ( ) C. suprvsr O labor O operator ( ) other ( ) d. suprvsr( ) labor ( ) operator( ) other ( ) e. suprvsr ( ) labor ( ) operator ( ) other ( ) EQUIPMENT USED: a. Hrs*5 g• Iirs— _ I Hrs_ b. 70 •- S Firs 1h. Hrs I-Irs-2 d. Hrs— e. Hrs_ k. I-Irs_ f. Hrs— 1. I-Irs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: -At CONSTRUCTION QUALITY CONTROL: 1. TEAS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed during thzs reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTO QUALITY CONTROL INSPECTOR v GOLF Landscaping and Construction,Inc. D 38016 Military Road South AUG 2 1 a Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: Z DATE: � ! 19' REPORT No.: PROJECT: FgrR- Connecting, CONTRACT#: 54-0546-4-1 WEATHER: (clear) Ctly cloud (cloudy) WIND: nq�a�IT (breezy) (strong wind) (rain)/(sno inches Temperature:° F max ° F min CONTRACTOR C C BO IV : (list number working) a. GOLF suprvsr O labor Q), operator-) other b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( labor( ) operator( ) other( ) EQUIPMENT USED: a. M 4A Hrs 9. Hrs— b. � 1LI 11) Hrs h. s— c. g�,' —+ y Z HrPS 1' Hr Hrs d. 1 �� �i 1 u�� Hrs J — Hrs' k. Hrs i 1. Hrs Hrs_ — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ' DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: p 1 cc { W 44'I, �- .�y CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S YERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. D 38016 Military Road South ` Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT �o DAY: DATE: �' !A r 19 y' REPORT No.: , PROJECT: F.S�Co ct• CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloud, (cloudy) WIND: ((calm reezy) (strong wind) (rain)/(snow) inches Temperature F max`( ° F min CONTRACTOR & SUBCONT OR LABOR ACTIVITY: (list number working) a. GOLF suprvsr Q) labor operator_6) other Q) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator( ) other( ) EQUIPMENT USED: a.�f to b4�L ITO Hrs • g• Hrs_ b. C Hrs h. 1�s— C. (�,�"1 —� �C� Hrs i. Hrs N d. ,�--LIt; �}� Hrs . C j. Hrs— e. Hrs Hrs k. Hrs i ' Hrs Hrs'a 1• JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: S CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. D 38016 Military Road South AUG 2 -tar Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 6j b DATE ! �19 REPORT No.: �. PROJECT: FSGR- Cop ec ' g ChanneL CONTRACT M 54-0546-41 WEATHER: dear l(ptly cloudy) (cloudy) WIND: calm) (breezy) (strong wind) (rai (snow) inches Temperature:° F ma< ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) ` a. GOLF suprvsr labor) operator) other(I) b• suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d• suprvsr O labor( ) operator( ) other( ) e• suprvsr( labor( ) operator( ) other( ) EQUIPMENT USED: Hrs g. Hrs_ b. C,- , Hrs h. His C. �b_ls 7�'U Hrs i. d.i�,- S� Hrs j• Hrs_ Hrs k. Hrs_ 1 e' —f. Hrs Hrs_ 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: Ila,P,� �{j/( ) ✓! f `^��� {� � r - r i^ --- ``{.^ r I 1. i h � CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONT L INSPECTOR 41 to GOLF Landscaping and Construction,Inc. Rpm 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 4 I DATE: ( - 9 19-95 REPORT No.: PROJECT: FSC'TR- Connecting C'h� CONTRACT#: 54-0546-4-1 WEATHER: lean) tly cloudy) (cloudy) WIND: ca (breezy) strong wind) / snow inches Temperatures ° F maid_° F min C BC NT B4 TIV TY (list number working) Q) a. GOLF suprvsr(� ) labor operator_6) other b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 1 Hrs2 g. Hrs Hrs!1 S Hrs -• h. Hrs— c. t, H'�— t' Hrs—" d. <uo_ C Hrsj— j. Hrse. - - Hrs I k. Hrs i f. 11 Hrs——7 S 1. Hrs— , JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). Q U-1-p: ENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. S l,_► o� H �" 't- t-1 '� C Lv�� cti• sic 1 DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMEP TODAY: a u CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR TM r,5rr—VMfM GOLF Landscaping and Construction, Inc. l 38016 Military Road South AUG 2 1 1995 O Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 4e) DATE — 19� REPORT No.: PROJECT: ESCR- Connecting Channel CONTRACT M 54-0546-41 clear tl cloud (cloudy) WIND: ct al (breezy) (strong wind) WEATHER: ( (P Y Y) ( ram)/(snow) inches Temperature?2 ° F max ' ° F min CONTRACTOR& SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( I) labor_G) operator�E) other ( ) b, suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d, suprvsr( ) labor( ) operator( ) other( ) e, suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. �'�+` S Z b a Hrs�L, g. Hrs_ b. -'��_ Hrs h. Hrs_ C. Hrs i. Hrs_ d. Hrs,_ j. Hrs 21� (� C.��� - _ I e' Hrs k. Hrs—f. Hrs Hrs_ 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. i t .�f c► 1 y i 1/ �v 11 V - DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: NO') CONSTRUCTION QUALITY-ITY CONTROL: 1. TEST: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct; and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTO QUA , O INSPECTOR GOLF Landscaping and Construction, Inc. D a 38016 Military Road South rAV� Auburn,WA 98001 DAl LY CONSTRUCTION QUALITY CONTROL REPORT DAY: �I DATE: _ 19�'� REPORT No.: PROJECT: FSGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) �Ily cloud (cloudy) WIND: realmv(breezy) (strong wind) (rain)/(snohes Temperature: ° F max_° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr()) labor S) operator ( ) other(j ) {�� b. suprvsr( ) labor ( ) operator ( ) other( ) C. suprvsr ( ) labor( ) operator( ) other ( ) d. suprvsr ( ) labor( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. ,�to h,r��U )J d Hrs g. Hrs_ b. ti 5 (� Y QUO Hrs- h. s— c. Hrs 4 i. Hrs— d. J r r..�`A v �it Z�r HI5 C j• Hrs_ � e. Hrs k. Hrs— y �' — l rs f. Hrs— H — JOBSITE SAFETY_: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 W D T D Y: \ UM C U. Q� S.., CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY C NTROL INSPECTOR l GOLF Landscaping and Construction, Inc. 38016 Military Road South D Auburn,WA 98001 SEP 14 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19t REPORT No.: — PROJECT: F-SGR- Connecting Channel CONTRACT M 54-0546-41 WEATHER: (clear) (ptly cloudy (cloudy) WIND: (calm) (l reezy) (strong wind) (rain)/(snow) inches Temperature:;Y, °Amax`° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(l) labor operator ( other (a) b. 7 suprvsr ( ) labor( ) operator(1) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. I' . .. .y c Hrs g. Hrs— b. �� t,� �� r Hrs 3 h. s— c. Hrs i. Hrs— Hrs d. ?" ✓c: �o Hrs— J. — e. Hrs� _ k. Hrs f. °' r- �- - Hrs� 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ee(,, ,. _ . .:r: "•-:wY.a:zstu.4•ri `:'..,.�wiar4R `m� 9t,ti�=..s:.: .,:.. 7 e'. � DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. JESPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR CIUALITY C TROL INSPECTOR 1 GOLF Landscaping and Construction, Inc. D 38016 Military Road South AU ° Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 ' REPORT No.: PROJECT: FSGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear (ptly cloudy) (cloudy) WIND: calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: ° F max—° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY, (list number working) a. GOLF suprvsr(1) labor(—� operator (1) other ( ) b. suprvsr ( ) labor( ) operator(j) other ( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr( ) labor ( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. R ry+t f� ) Hrs(� g. Hrs— b. Hrs h. Hrs— c. Hrs— i. Hrs— d. Firs j. Hrs— e. Hrs— k. Hrs— 1 £ Hrs— 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ? - ? 71 = f- CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR i GOLF Landscaping and Construction,Inc. 38016 Military Road South Rom Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 44 DATE: -3 19%,,1, REPORT No.: PROJECT: FSCR- Connecting C:h� CONTRACT M 54-0546-4-1 WEATHER: cle (ptly cloudy) (cloudy) WIND: (ealm) (breezy) (strong wind) (rain)/(snow) inches Temperature:S: "" F max F min CONTo n CTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) ' a. GOLF suprvsr( labor q operator(3) other( ) b• L. -,!r SA�,� L,.�;t suprvsr O labor( ) operator(l) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d• suprvsr( ) labor( ) operator( ) other( ) e, suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. i'Yt i rz- An Q a C o Hrs t g. Hrs— b. car Hrs h. s — c. 4{S Hrs & i ems— , d. C Hrs'l j. Hrs— Hrs k. Hrs— 1 e'f. Hrs— Hrs— 1. — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ;dt y ,: r DAILY COC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: r^= t CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifzcations, except as noted above. CONTRACTOR QUALITY CONTR PECTOR a GOLF Landscaping and Construction, Inc. 38016 Military Road South Imm Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: '"a 19':� -- REPORT No.: PROJECT: FS R- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: cle (ptly cloudy) (cloudy) WIND: ((calm)breezy) (strong wind) (rain)/(snow) inches Temperature: ?-Z-° F max S � F min CONTRACTOR A SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(t) labor(Lf� operator(3) other( ) b, T << suprvsr( ) labor( ) operator(I) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d• suprvsr( ) labor( ) operator( ) other( ) e• suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED• a. N r,e- Hrs? g. Hrs_ b. ZL '73 C d s cc Hrs h. Hrs_ C. `?r cA Hrs S i• Hrs_ d. [r t t st. r, Hrs "1 j. Hrse. _ Hrs k. Hrs 1 f Hrs_ 1. Hrs— JOBSITE SAFETY: . (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. fy.. t DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: F— CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). M CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR J ' GOLF Landscaping acid Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19-IS REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT M 54-Q54Ci_4_l WEATHER: (clear) , (plly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inclies Temperature: F max F thin COS.T RACTOR SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O tabor( ) operator ( ) other ( ) b. suprvsr O labor ( ) operator ( ) other ( ) C. suprvsr O labor ( ) operator ( ) other ( ) d. suprvsr O labor ( ) operator ( ) other ( ) e. suprvsr O labor( ) operator ( ) other ( ) EQUIPMENT USED; a. Ilrs g. 1lrs_ b. I-Irs h. I Irs_ c. Ilrs_ i. I Irs_ d. firs j. Firs_ firs k. Mrs_ I C. _ 1' firs 1. I I rs_ i JQBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. i e i 'DAILY CQC REPORT PAGE 2 of 2 WORK PEREMMED TO AY. 1 _CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those iteius of work not passing the re(Juired tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note my deficiencies and corrective action taken). v CONIRACIMS YLRIFICATIOM Vie above job report as complete and correc4 and all material and equipment used and work performed during this reporting period is in compliance with the contract plant and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR i GOLF Landscaping and Construction, Inc. rM LA It yj D 38016 Military Road South AUG 21 1995 Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: rI Z DATE: ? =r 19 REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: cle (ptly cloudy) (cloudy) WIND: cal (breezy) (strong wind) (rain)/(snow) inches Temperature: '"? ° F max"�-3° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY_ (list number working) a. GOLF suprvsr(1) labor(2) operator(4 other b. suprvsr O labor( ) operator( ) other( C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr O labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. �t� �. C ` ., I s -� g Hrs a. -r ` Hrs . h• s— c. � r� a "� <, Hrs i. Hrs— d. . - Hrs .- j. Hrs e' — Hrs k. Hrs— i —f. Hrs Hrs_ 1. — JOBSITE SAFETY: _ (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: ti CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTgACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR y GOLF Landscaping and Construction, Inc. 38016 Military Road South !AU!G !21! VZ D Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: ` DATE: Al -5-- 19_ REPORT No.: PROJECT: FSCIR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: clear) tly cloudy) (cloudy) WIND: ((breezy) (strong wind) rain snow) inches Temperature:�ro F max`S ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) ' a. GOLF suprvsr(I) labor(J) operator(4 other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED• a. j Q `(3 Hrs, 5 g. Hrs_ b. /h r> 2 O r14 S Hrs L4 ,j h. Hrsc. Hrs Hrs_ d. Hrs j• Hrs_ e. -? c Y Hrs k. Hrs_ j f. Hrs— 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. PAGE 2 of 2 DAILY CQC REPORT WORK PERFORMED TODAY: l`- i y nw�cTo��CT10N QUALITY CONTROL: 1. TF5T� Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPF.('TION3: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). s V The above job report is complete and correct, and all material i ON i r.�",, x• E ,, �mnn c RAF and equipment used, and work performed during this reporting period is in compliance with the contract p ans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction,Inc. r 38016 Military Road South Auburn,WA 98001 AUG D] 2 1 1995 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: ) --L°� 19 REPORT No.� PROJECT: ES R- Connecting Channel C-QNTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloudy) (cloudy) (calm) reezy) (strong wind) /(snow) inches Temperature: F max, ° F min CONTRACTOR & SUBCONTRACT O ACTIVITY: (list number working) a. GOLF suprvsr'(h labor SAS'o erator L other ( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrsa g. Hrs— b. ( 5 `l.� 'G A��F Hrsy� h. Hrs— ��- -"� n c�- His i. Hrs— d. Hrs— j. Hrs— e. Hrs k. Hrs— f. Firs 1. Hrs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. f IF • - ;_ r' •. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: \ CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPE R GOLF Landscaping and Construction, Inc. 38016 Military Road South Tr)T2 Auburn,WA 98001 RAUG 2 1w EE DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19�sl) REPORT Now I PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: ° F max—° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor op tor other 1rr b. suprvsr( ) labor( operator( ) other( ) C. suprvsr( ) labor( operator( ) other ( ) d. suprvsr( ) labor( operator( ) other ( ) e. suprvsr( ) labor( operator( ) other( ) EQUIPMENT USED: a.-[ }A-) g. Hrs— b. 60 rIKS Hrs `1. h. Hrs— c. Hrs-2,2,S i. Hrs— d. HrQ. j. Hrs— e. .E HrsS k. Hrs— f. L �. Hrs� 1. Hrs T- - JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r ►' v.�� �A �� DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRAC'TORIS VERIFICATION: The above job report is complete and correcA and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUAEITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT r_ DAY: DATE: — 19�� REPORT No. PROJECT: FSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max_F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor operator 21 other( b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( } labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. -1-��t j �jd Hrss-Q-s" g. Hrs_ b. `[I v j A tl v,,,0 Hrs '?� h. Hrs_ � t c: Hrs i. Hrs_ d. Hrst j. Hrs_ e. r,v Hrs4� k. Hrs_ f. Hrs 1. Hrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). s. EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to-the jobsite. 2 of 2 DAILY CQC REPORT , WORK PERE O Y• iiii` r CONSTRUCTION Q ALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2 IP T� IONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). �nNTUAC'TOR'S'VERIFICATION: THE ABO�ED AND WORK PERFORMED DURING CORRECT, AND ALL MATERIAL AND EQUIPMENT THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTR L INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 `A1fG 2 i e95 D DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: — 19-10� REPORT No.: PROJECT: ESGR- Connecting_Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: F max - F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr / labor rator5) other ( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other ( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. 2'AA V Mj Hrs-L g. Hrs_ b. -Z\ �" , Hrs-L h. Hrs_ C. -,-- Hrs i. Hrs_ d. �,, �_�y M\S Hrs j. Hrs_ e. Hrs_ k. Hrs_ f. Hrs 1. Hrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and 'include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. t 2 of 2 DAILY CQC REPORT WORK PERFORMED TODAY: f CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). PLETE AND CONTRACTOR'S VERIFI ATION: THE ABOVE JOB REPORT IS COM AND WORK PERFORMED DURING CORRECT, AND ALL MATERIAL AND EQUIPMENT USED THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR DUf&IC.Afvf 4 PAOA. W'14' -"j'rE0 ~ GOLF Landscaping and Construction, Inc. 1^� y,Qn aN g/W/4y 38016 Military Road South Auburn,WA 98001 pAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.: PROJECT: R- Connecting Channel- CONTRACT#: 54-0546-4-1 WEATHER: /• (cle (ptly cloudy) (cloudy) WIN : (calm (breezy) strong wind) gain)/(snow) inches Temperature: � F max ' F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(') labors) operator ') other :l YVf b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor( ) operator ( ) other ( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT AMP! a. d Hrs % g• Hrs_ b. Hr 5 h. Hrs_ llr i• Hrs— c' Hrs d. Hrs3 j. — Hrs k. Hrs— i e.f 1-Irs- - 1. I-Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. V~ DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: a+ r CONSTRUCTION QUALITY CONTROL: 1. TES: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRAC OR QUALI CO OL NS ECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South D Auburn,WA 98001 RAUG 2 1 1S DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY:_ DATE: 19n REPORT No—,.�L PROJECT: ect' C RACT#: 54-0546-4-1 WEATHER: S,(c,1e;ar)((ptly cloudy) (cloudy) WIND: -( (breezy) (strong wind) /(snow) inches Temperature, ' F max F min CONTRACTOR & SUBCONTRACTOR B R ACTIVITY: (list number working) a. GOLF suprvs ) labor Z operator b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. '�'y b +7 g. Hrs_ b. Hrs h. Hrs— C. . Hr •� i. Hrs_ d. �� t Hr •.2S j. Hrs_ Hrs ,'� k. Hrs_ f. Hrs 1. Hrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: o CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct; and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QU ITY C NTROL INSPECTOR GOLF Landscaping and Construction, Inc. P44o4 38016 Military Road South Auburn,WA 98001 G� q/ DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: --t 197) REPORT No.:,_:1. PROJECT: FSGR- Connecting Channel CONTRACT M 54-05464- WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) breezy) (strong wind) (rain)/(snow) inches Temperature:" F max ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( ) labor ) operator Q� other b. suprvsr( ) labor( operator( other( ) C. suprvsr ( ) labor( operator( other( ) d. suprvsr( ) labor( operator( other( ) e. suprvsr ( ) labor( operator( other( ) EQUIPMENT USED: a' Hrs3-.7,5 g. Firs_ Firs b. Firs IZ 2� h i. Firs— C. 7 6 M _ Firs d. Firs �� j. Firs Firs k. Firs I e. — f. Firs 1. I Irs_ J013SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. .,` - DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: o. , Ck CONSTRUCTION QUALITY CONTROL: 1. PESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). ` CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contractplans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL I PECTOR GOLF Landscaping and Construction,Inc. 38016 Military Road South fare Auburn,WA 98001 AUG 2 1 1995 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 3� DATE:_ '���\ 19 I� REPORT No.: PROJECT: ESGR- Connecting_Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear (ptly cloudy) (cloudy) WIND: (breezy) -(strong wind) (rain)/(snow) inches Temperature: �y° F max S F min CONTRACTOR & SUBCONTRACTOR LABO TY: Ilist number working) € .5A mE a. GOLF suprvsr ) labo ( ) perator.3 other c =2 b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( labor( ) operator( ) other( ) d. suprvsr ( ) labor( ) operator( ) other( ) e. suprvsr( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. U N+ Hrs�.7 S g. Hrs_ b. Hrl. h. Hrs_ C. �,t�-Y Hrs i. Hrs_ d. 1 n t o Hr j. I-rs_ e. 'L� - s Hr k. Hrs_ £ Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: IwA- CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION• The above job report is complete and correc4 and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specijzcations, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19`T REPORT No.:^_ PROJECT: rSGR- Connecting ChanneL CONTRACT M 54-0546-4- WEATHER: (clear (ptly cloudy) (cloudy) WIND: (calm(breezy) (strong wind) rain)/(snow) inches Temperature:° F max 7° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( ) labor( ) operator) other ( ) b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr ( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. I-IrsZ 9 Hrs_ b. S� t`� Hrs- — h. Hrs_ c. Hrs i. Hrs_ d. Hrs_ J Hrs_ Hrs k. Hrs_ 1 e. — f I-Irs_ 1. I-Irs_ i -IOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:_(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 4 R DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: { CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period a in cornpliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.: 'd PROJECT: F4C1R- Connecting Channel CONTRACT M 54-0546Ad clear tl cloud cloud WIND: (catti�i,) (breezy) (strong wind) WEATHER: '� (clear) Y Y) (cloudy) { /(snow) inches Temperature: " F max , F min CONTRACTOR ° "QCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( �) labor�- operator ) other ( ) b. suprvsr( ) labor( ) operator other( ) C. suprvsr ( ) labor ( ) operator( other ( ) d. suprvsr ( ) labor ( ) operator( other ( ) e. suprvsr ( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. Jt4 3�L r Ci firs 9. firs_ b. . . l Hr h. firs_ firs *I C7 i. firs d. - — firs �. j firs firs k. firs I e. — firs 1. firs JOSSITE SAFELY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). QUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ., G�l� DAILY CQC REPORT PAGE 2 of 2 PERFORMEDWORK T DAY: l tj vA N C- t q, �A �. CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correc4 and all material and equipment used and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTO QUALITY CONTROL W§PECTOR • t GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: - 19_ REPORT No.;_. a , PROJECT: RSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: " F max ° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr ( ) labor( ) operator) other( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other( ) d. suprvsr ( ) labor ( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. Firs g. Firs_ b. Firs 'I < h. Firs_ -, C. F Firs i. Firs_ d. Firs_ j. Firs_ e. Firs_ k. Firs_ I f. Firs— 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: , t -�- - hr er' CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). c y . vt a % 4(0 JA "qiwj � C CONTIZACTOR'S VERIFICATION: "the above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.: PROJECT: F.SGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (cle'arAtly cloudy) (cloudy) WIND: (calm)—(breezy) (strong wind) -fain)/(snow) inches Temperature:—° F max" F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(C) labor LI) operator Q) other fv) b. suprvsr ( ) labor( ) operator ( ) other( C. suprvsr ( ) labor ( ) operator( ) other ( ) d. suprvsr( ) labor ( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator ( ) other ( ) EQUIPMENT USED: a. Hrs- g. Hrs_ b. I Irs h. Hrs_ C. I-Irs i. Hrs_ d. Hrs.-4j. Hrs_ e. •� Hrs k. I-Irs_ I f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL; 1. TES: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CON'TIZACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: "" 19�j` REPORT No PROJECT: RSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear (ptly cloudy) (cloudy) WIND:' (caln P (breezy) (strong wind) (rain)/(snow) inches Temperature:_' " F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O labor ) operator( ) other( ) b. suprvsr( ) labor( operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator( ) other ( ) e. suprvsr( labor( ) operator ( ) other ( ) EQUIPMENT USED: a. ^- "N v w — Hrs g. Hrs_ b. Hrs li. Hrs_ C. I-Irs i. Hrs_ d.` t � I-Irs j. I Irs_ e. Mrs: k. IIrs_ I f. ^ Hrs 1. I-Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: C a i t t CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance will: the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR T t GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 pAll Y CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: "'' _ 19 REPORT No.: ! PROJECT: F4C,R- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature:' F max-4 F min CONTRACTOR & S.l BJ CONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( ) labor( ) operator ) other ( ) b. suprvsr( ) labor( ) operator other ( ) C. suprvsr( ) labor( ) operator ( other ( ) d. suprvsr( ) labor( ) operator ( other ( ) e. suprvsr( ) labor ( ) operator ( other ( ) EQUIPMENT USED• a. `� , Hrs_ �v+, `� firs .,.� g• b. firs_ h Hrs.C. firs i. Hrs_ d. firs_ j. Hrs____ Hrs k. Firse. I f. firs_ 1. firs ,JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. • r s DAILY CQC REPORT PAGE 2 of 2 IVIEDWORK PERE0 TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report a complete and correc4 and all material and equipment used, and work performed during this reportingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACT0 QUALITY CONTROL &SPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn,WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT I I 11 DAY: DATE: 19— REPORT No._ = PROJECT: FS R- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow) inches Temperature: ;- " F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr( ) labor operator (" other ( ) b. suprvsr ( ) labor ( ) operator('j other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) d. suprvsr ( ) labor ( ) operator ( ) other( ) e. suprvsr ( ) labor ( ) operator( ) other( ) EQUIPMENT USED• firs a. �� N � \c �.; ,,�,� firs g. — b. firs h. Hrs— c. ; ; � --ems ) I, I Ir� .. i firs ; d. firs_ J. firse. _ firs k. firs I f firs— 1. firs— i JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). i a CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19 REPORT No.:, PROJECT: FSGR- Connecting Channel- CONTRACT#: 54-0546-4-1 WEATHER: (clear] (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) (rai 11 n)/(snow) inches Temperature:_" F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(!') labor() operator (= ) other ( ) b, suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr ( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator ( ) other ( ) e. suprvsr ( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. rn 5 Z.b`D Hrt `, g. firs b. Hrs—F h. firs_ C. Hrsr i. firs_ ' d.� C.� T'��= firs' ,,� j• Hrs_ firs I e. Hrs____ k. f. firs 1. I-Irs_ J013SITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL: 1. Z ,STS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reporting period is in compliance with the contract plans and specifications, except as noted above. ...�Y 0-- CONTRACTOR QUALITY CONTROL INSPECTOR - L � GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: f ,� 19 REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear (ptly cloudy) (cloudy) WIND: (calm) ',(breezy) (strong wind) (rain)/(snow) inches Temperature:�`� " F max. `° F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(I) operator C9) other( ) b. suprvsr( ) labor( ) operator ( ) other ( ) C. suprvsr( ) labor ( ) operator ( ) other ( ) d. suprvsr( ) labor ( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. '(.,{, `!3� Hrs , 9. Hrs_ b. e,Ij .s Hrs �— h. Hrs_ C. `l' Hrs i. Hrs_ d. 2 :.r M 5 Hrsr j. Hrs_ e. Hrs_ k. Hrs_ 1 f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: r t j' Vi"Isq, 61( LC, 0 �. r CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corre•five action taken). C4 S �y -4- C'ONTIRACTOR'S VERIFICATION: The above job report :s complete and correct, and all material and equipment used and workperformed during this reportingperiod is in compliance with the contractplans and specifications, except as noted above. •f� CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT -Ii ti 0 t DAY: DATE: w ! 19 REPORT No.: �2 ''.. PROJECT: RSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: ((clear) tly cloudy) (cloudy) WIND: (calm) '(breezy) (strong wind) (snow) inches Temperature: " F maxim F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (y) labor(') operator( ) other( ) b. suprvsr( ') labor( ) operator ( ) other ( ) C. suprvsr O labor( ) operator ( ) other ( ) d. suprvsr( ) labor( ) operator ( ) other( ) e. suprvsr( ) labor ( ) operator( ) other ( ) EQUIPMENT USED: a. �1�'' �, � ', " Hrs g. Hrs_ b. ., Hr h. Hrs_ C. r Hr i. Hrs_ d. Hrs j. Hrs_ e. Hrs_ k. Hrs_ f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED: (Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK T 6 d a s v M t ` CONSTRUCTION QUALITY CONTROL: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. IHSP� F�CDONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). { 0. CONTRACTOR'S VERIFICATION: The above job report is complete and correct, and all material and equipment used, and work performed during this reportingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: 19—j'�) REPORT No.:y . PROJECT: F.SSR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) ly cloudy) (cloudy) WIND: (calm) )(breezy) (strong wind) (rain snow) inches 1'emperature:,'-' " F max F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (p) labor-( operator C)) other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator ( ) other ( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. lb,_� � 6 A� Hrs. g. Iirs_ b. >`s - .� taS I-Irsb., h. 1-irs, C. Hrs_ i. Hrs_ d. Hrs_ j. Hrs_ e. Hrs_ k. I-Irs_ f. Hrs 1. I Irs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. DAILY CQC REPORT PAGE 2 of 2 WORK PERFORMED TODAY: CONSTRUCTION QUALITY CONTROL• 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). y CONTRACTOR'S VERIFICABON: The above job report is complete and correct, and all material and equipment used, and work performed during this repo rtingperiod is in compliance with the contract plans and specifications, except as noted above. CONTRACTOR QUALITY CONTROL INSPECTOR u 3 , ,x .; ,-� ��eke t f: 'Sy..y"t.,ova.-.�° `,•rt..cixWi °t _ .a • r .n - ..�,. A. . 4 .'j'S Y3 � ?V xfi Iaj PT GOLF Landsca `m and Constrtictivn Inc: r g a b 38016 Military Roan South aw . # u Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT } DAY:_ 2) DATE: �' O 19 'S REPORT No.: r� PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) '(ptly cloudy (cloudy) WIND: 6—M-)"/(breezy) (strong wind) (rain)/(snow inches Temperature:j_�_F max LIF min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr(j labor(1) peral(�) other O Q ( l o b. - suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. Hrs_ g. Hrs b. Hrs_ h. Hrs C. Hrs_ i. Hrs d• Hrs_ j. Hrs_ C. Hrs_ k. Hrs_ f. I-Irs I. I-Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions , taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. t 414 E 2 of 2 i DAILY CQC REPORT r � `"CORK PERFORMED TOPS Ir e a � — Se - CONSTRI ION G1UAI my CONTRA—L: 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTI�ACT_OR'S VERIFICATION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND s SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR 9 r 3 GOLF Landscaptdg and'Construction-Inc. ;M 38016 Military Road South Y ' Auburn,WA 98001 . : . _ter DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: .2 O DATE: 7" 19 REPORT No.�_ PROJECT: ESGR-Connecting'Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) tly clou y) (cloudy) WIND: (calm) (breezy) (strong wind) (rain)/(snow inches Temperature:6 k F max"F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr(1) labor(1) operator(v other(�) j i' ,- - `'+' t► b. suprvsr( ) labor( ) operator O other( c.' suprvsr( ) labor( ) operator( ) other O t k d 1 , d. suprvsr( ) labor( ) operator( ) other( e. suprvsr( ) labor( ) operator( ) other( EQUIPMENT USED: a. Yam'" 2 6 U t n s Hrs g- l Irs_ b. S�Ir1 Iog�e1 fIrs h. I-Irs_ c•�4 7 �l r� . o Hrs,ZS' i. Hrs_ d.- x 6 ,� , Hrs J_ Hrs_ e. Hrs_ k. I Irs_ f. Hrs 1. Hrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). " EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. b may. 2of2 DAILY CQC REPORT W WO M P ERE ARMED TODAY: kLLjtC90 coNTROL: results of such tests. ken 1. (Indicate tests performed and the an� action scheduled d to forret sting) for those items of work not passing the required tests 2. INSPE TIO S: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). THE ABOVE JOB REPORT IS COMPLETE AND CORRECT,AND ALL MATERIAL AND EQUIPMENT USED AND WK RLORN AND DURING THIS REPORTING PERIOD ARE IN NOTED ABOVE. WITH THE CONTRACT SPECIFICATIONS, EXCEPT AS NO CONT CTOR QUALITY CONTROL INSPECTOR t ' � }2"�rT -!'r,�t E a-+ t #�•• '"` - it .e. yya�:kk •4.: }� �' and Construe GOLF Lean capm on 38016 Military Road Souths n c. • Auburn, WA 98001 • ti Y - DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: ' �{r 19 REPORT No.: PROJECT: RSGR - Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: . (clear) (ptly cloudy) (cloudy) WIND:`•(calm)'.(breezy) (strong wind) (rain)/(snow) inches Temperature: '. F max F min CONTRACTOR A SUBCONTRACTOR LABOR ACTIVITY• (list number working) wt z a. GOLF suprvsr O labor O operator? 1 other ' ! � � ,�1 f.) St!n)t b• suprvsr O labor( ) operator( other( C. suprvsr O labor( ) operator O other( ) d• suprvsr O labor( ) operator( other( ) e• suprvsr O labor( ) operator( other( ) EQUIPMENT USED6 a. �f�,' ` , to .tJ 1,;. Hrs •S g. Hrs_ b•; r s 1 ., r y"wr i l-Irsy� h• I Irs — Hrs d _ Hrs_ j. Hrs_ e I-Irs_ k. I Irs_ f. I Irs 1. Hrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions 5< taken. Note any safety meetings held and include meeting minutes). 4 �Yr + TZ EQUIPMENT AND MATERIALS DELIVERED•(Indicate arrival/departure of equipment and ti quantity,of materials delivered to the jobsite. { iQ3 xx^t . ��hac zr•�F"s�a kt r,�� eta}. ��Y+, .µ -: - - a. 2 of 2'W REpOR y.. WQ tK PERFORMED TODAY: 41 , ti Q A 1• (Indicate tests performed and the results of such tests.a d scheduled date for retesting). • D for those items of work not passing the required tests 2• (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). z rnNTRACTOR S VE R1FirC'ATIONe THE ABOVE JOB REPORT IS COMPLETE AND } CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PE PLO RMED NS AND DURING THIS REPORTING PERIOD ARE IN NOTED WITH THE SPECIFICATIONS, EXCEPT AS ABO S CONTRACTOR QUALITY CONTROL INSPECTOR .:'#F'". ,WriT,.*B;. -:'. . sr;... ..> , ,M r:...`? :.., t - - , :,:r-. '-:!' ;, 4.t ,w.. �'9'... .. 'ek,•.. :�.; ,- ar.- F s � 4 ro E ,ry fi � �f 'kxil � ' 4a x rM4 ��} x :.GOLF Landscaping and Construction,Inc 38016 Military Rond Saulh'` u Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: f 19 ,t��� REPORT Nol: C � PROJECT: ESGR- Connecting Channel CONTRACT M 54-05464-1 WEATHER: (clear)}(ptly cloudy) (cloudy) WIND: (calm) (breezy) f(strong wind) (rain)/(know) inches Temperature:..:, l+ max 0 F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF su rust O labor(�) operator O otherIr i r P p b. suprvsr O labor( operator O other( C. suprvsr( ) labor( operator( ) other( d. suprvsr( ) labor( operator( ) other( e. suprvsr( ) labor( operator( ) other( ) a� EQUIPMENT USED: 4f c i a. Yr! •w 5 �/ (? Hrs_, g. Hrs_ : r 1 b. Hrs" ',r, h. Hrs_ a j c.n}r.:t� �+�,•r v� Hrs2 r:' i. I-Irs_ d. Hrs_ j. Hrs_ I e. Hrs_ k. I Irs_ f. I-Irs 1. firs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. .. i , .. F'J 1, Day CQC REPORT Wnot( aFRFORMED TODAI�' ! .�, - t t .\ f rnr�STRl1GT10N QUALITY CONTROL: ctive on taken ti I. TEST• Indicate tests performed and the results of such tests. Describe scheduled date forcretesting). for those items of work not passing the required tests an INSPEr I0_N� Indicate any visual inspections of material or work and note any deficiencies 2. and corrective action taken). ------------------------ --------------- THE ABOVE JOB REPORT IS COMPLETE AND CT AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING CORRECT, THIS REPORTING PERIOD ARE IN COMPLIANCE, � PLI ANCE, WITH THE CO SPECIFICATIONS, EXCEPT AS NOTE CONTROL INSPECTOR CONTRACTOR QUALITY w 4 `q� e GOLF Landscaping and'Construction,Inc 38016 Military Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: "'` J(j REPORT No.:_T7 il PROJECT: ESGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloudy) (cloudy) WIND (calm) (breezy) (strong wind) `\yr now) inches Temperature F max_F min . y^�� ytS+ I .4� +x`• xgs+x:'r.s Iq, **;. OR &SUBCONTRACTOR LABOR AC TIVITY: (list number working) -CT , a. GOLF suprvsr(� labor( ) opera or O other Yyk b. suprvsr O labor( operator( other C. suprvsr O labor( ) operator O other d. suprvsr( ) labor( ) operator( other( ) e. suprvsr( ) labor( ) operator O other( h EQUIPMENT USED. .-uRrt'»m$ri'`Lt'. ''=7'.,{&.ix !aC a. �—�-5 ZZ14 Hrs g. Hrs_ b. i`1 A u>,Q S f Hrs li. Mrs_ c. v Hrs I i. Hrs_ d. I-Irs_ j. Hrs_ C. I Irs_ k. Mrs_ f. Hrs 1. I-Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r E202 DAILY CQC REPORT WORK PERFORMED TODAY: coNSTR� CTION QU L CONTROL: 1. Tom; (Indicate tests performed and the results of such bests and scheduled date for retesting) ests. Describe corrective action taken for those items of work not passing the required 2. INSPECT ONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK CT PLONS AND URING THIS REPORTING PERIOD ARE COMPLIANCE WITH THE CO SPECIFICATIONS, EXCEPT AS NOTED ABOVE COT CTOR QUAL TY CONTROL INSPECTOR 4�� GOLF.Landscaping and Construction,Inc. 38016 MilitAry Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORTtr DAY: DATE: —L`� 191d REPORT NoA PROJECT: FSQR- Connecting Channel CONTRACT#: 54-0546-4-1 l WEATHER: (clear) fitly cloudy) (cloudy) WIND: (calm(breezy) (strong wind) (rain /(snow) inches Temperature:ILF max k O F min 4 '?'"'-a VIP. ' I ,. . •` CONTRACTOR A SUBCONTRACTOR LABOR ACTIVITY: (list number working) k VAN ra. GOLF suprvsr(1) labor a operator(J) other(�) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr( ) labor( ) operator( ) other O d. suprvsr( ) labor( ) operator( ) other( e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: � 1lrs a. �' Lxd h I Hrs 9. — b. �..� �1 T T1_�y�,�, t Hrs h, Hrs_ C. —� Hrs_ i. Hrs_ , d. 1lrs j. Hrs_ C. 1-lrs k. I-Irs_ f. Hrs_ 1. 11rs_ ' JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 4�, .� . f ' y x7.,A . ` v E 2 ofWWI 2 a T v H i n 4 K CONSTRUCTION QUALITY CO TROL: I, Tom: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2, iNSP TIONS: (Indicate any visual inspections of material or work and note any deficiencies . and corrective action taken). CONTRACTOWS VRnIFIC'ATION: THE ABOVE JOB REPORT IS COMPLETE AND ' CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR r m and Con§truction, OT.F Land � . p ,Gsca P >� ,r� 38016 Military Road South"", ;< k >' Auburn,WA 98001 `� DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: v_. .� 19 � REPORT No.:- PROJECT: FSrR- Connecting ChannelChannelCONTRACT M 54-0546-4 1 k WEATHER: clear) (ptly cloudy) (cloudy) WIND: (calm) (I ee )(strong wind) (rain /(snow) inches Temperature:�F max_2F min f �AAtT<)A�`Tr1 R & SUBCONTRACTnR o�'ACTIVITY: (list number working) a. GOLF suprvsr O labor(2r I operator other( ) b. suprvsr( ) labor( ) operator O other( C. suprvsr( ) labor( ) operator( ) other( d. suprvsr( ) labor( ) operator( ) other( e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: Firs Firs g. a. �31:�-> ?,k�e! ri1`� Firs— C.b. firs_ h• — c. Firs i. Hrs— d. Firs— j. I-irs— e, I irs k. I Irs— f. Hrs_ 1. Firs — JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. MAW „.,. .;. PAlk of 2 DAILY CQC REPORT .. Wn K PERFORMED TODAY: r QU�CTInN ALITY CONTROL: C9NS�R�� I (Indicate tests performed and the results of such tests. Describe correctiveto for Lion take for those items of work not passing the required tests and scheduled E 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). C'ONTIZACTOR'S VEn�ri�ATION: THE, ABOVE, �AND WORKP B REPORT IS �FORMED DDURING CORRECT, AND ALL MATERIAL AND EQUIPMENT U THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE,. CONTRACTOR QUALITY CONTROL INSPECTOR ,Y # u i r.. ',_ ri x-.i � '. .. k. 1. .:. a 3'h••. i t iw.k. ',: .K ".. .. K,y ,;fix"* :5`. y� .. " y�.��(,�,` }1 3a .�z �r " tp�('L-�g 9'F _ �:Ti3'* "Y��- 3 34 "KRi W1I-�.: "9"!`�' 1•t x4u .F. dQ T'; 74'� 3,".t. .{'$"5y, i i C y •G s GOLF Landscaping andkConstruction, r 38016Militnry Rond South` '. { Auburn, WA 98001 s '�' '�'� G'"^� � a _yq�.K�t a�'E .+Y 1�.•ay.a; ! + �',� r. 't. �:""` �� DAILY CONSTRUCTION QUALITY ITY CONTROL REPORT DAY: DATE2 7 19i REPORT No.: PROJECT: FSGR- Connecting Channel CONTRACT#: 54-054 6C 4-1 k WEATHER: (clear) tly cloudy) (cloudy) WIND: calm) breezy) (strong wind) r ' snow) inches Temperature: F maxF min 14 ` C LA& SUBCONTRACTOR ABOR ACTIVITY: (list number working) a. GOLF suprvsr(I) labor G)�.� operat r(I ) other(a) ! �, _ - �?Yl v,• _# b. suprvsr( ) labor( ) operator( ) other( I!f M C. suprvsr( ) labor( ) operator O other( ) d, suprvsr( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED• f � r a. W 7210 W I Hrs..=� g Hrs � Hrs— b. t ��� �,P S! a Hrs Hrs h. Hrs i. — C. — _ d. Hrs_ j• Hrs— e. I-Irs k. I Irs— f. Hrs-- 1. I-Irs— JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. of 2 DAILY CQC aW �nFRFORnnFn TODAY• , , L� C s I GJ 'hSTRI�GTI�� �T11 CONTROL (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled dale for retesting). rial or work and note any deficiencies i 2. 1 N S P E7CTIONS: (Indicate any visual inspections of mate ` I and corrective action taken). , THE ABOVE JOB REPORT IS COMPLETE,FO MED DURING ; CORRECT, AND ALL MATERIAL AND EQUIPco MERE IN CN�USED TAND WORK CT PLANS AND THIS REPORTING PERIOD AS NOTED ABOVE. SPECIFICATIONS, E.Y CONTRACTOR QUALITY CONTROL INSIDE TOR Ir _ K x MV GOLF Landscaping and Construction,Inc. i wl. * f. 38016 Military`Road South • Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: �= DATE: — -Cb 19 I s REPORT No.: PROJECT: RSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear (ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) 'n /(snow) inches Temperature:�LF max 6QF min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr�o laborp,) operator I*) other Q) Te al�Vcr A1 .2 Ott ay,+ � b. suprvsr( ) labor( ) operator( ) other( - O 91 C. suprvsr( ) labor( ) operator( ) other O 1 A�`r - �A u d. suprvsr( ) labor( ) operator( ) other( 1 n 1,`�� pa e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: ` 6` `` a. �•�-i h1 S Z 0 H,s�` g. Hrs_ b. $ x J ��,,,,Q Hrs h, Hrs_ C. '7 ,---- Hrs i. Elrs_ Hrs d. J n� U I Irs j. _ C. I-Irs k. I Irs_ f. Hrs 1. Hrs_ JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED'(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. 1 � ' t. E2of2 DAILY CQC REPORT Wo PERFORMED TODAY: N \ � a rn�ir�r�nru Q�Jq� T1( CONTROL: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. IN&FCTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). c` U Yh 4- AND CO,.tenATO S VERIFICATION: THE ABOVE JOB REPORT IS COMPLETE �- CORRECT, AND ALL MATERIAL AND EQUIPMENT USED ANDW ORRKACT PE FORPLAM AND DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRA OR QUALITY CONTROL SPECTOR } A� GOLF Landscaping and Construction, Inc. 38016 Military Rood South 44p Woburn, WA 98001 ;1 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: 1 2 DATE: 1/ 19 � REPORT No.: PROJECT: ESGR- Connectinu Channel CONTRACT M 54-0546-4-1 WEATHER: C (clear) (plly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) .(rain)/(snow) inches Temperature: 1 k I- max j F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY! (list number working) a. GOLF suprvsr(I) labor( ) operator( ) other( ) b. suprvsr( ) labor( ) operator( ) other ( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suptvsr ( ) labor( ) operator( ) other ( ) C. _ suptvsr ( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. \ Hrs_ g. Hrs_ b. _ / IIrs_ h. Ilrs_ C. V I lrs i. I Irs_ d. I irs_ j. I-Irs_ C. llrs_ k. Ilrs_ f. I lrs 1. I Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. . E2of2 DAILY CQC REPORT WORK PERFORMED TODAY: ..� E CONSTRUCTION QUALITY COAL: 1. TLM: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRA TC OIZ,S VE1tIFICATION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. C CONTMGTOR QUALITY CON R ittSPEGT9R t � GOLF Landscaping and Construction, Inc. 38016 Militnry Road South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: t DATE: 19-r REPORT No.:� PROJECT: - ectinu Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) ptly cloudy) (cloudy) WIND: (calm) (breezy) (strong wind) i 1-)/( now) inches Temperature: 7LF max(_(,ff min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY' (list number working) NAoY M16 S-v br' a. GOLF suprvsr��� labor(I ) operator other( b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr ( ) labor( ) operator( ) other( ) e. suprvsr( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. I S Z �-c) IIrs g. firs_ 9 Y A o,,,o IIrs h. Mrs_ c. ` -7 y � 11rs� i. Ilrs ('1 � I I rs�. „r' d. jT�L�s �) j. Hrs_ e. IIrs—t— k. Ilrs_ f. I Irs 1. 1 Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED'(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r E2of2 DAILY CQC REPORT WORK PERFORMED TODAY 1 d(A v 12,1111,11) — 1 cj n fid, (le Ak YC- V i Ott CONSTRUCTION QUALITY CONTROL 1. JEM: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPRC'TIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). c OR T IS COMPLETE, AND FONT ACTOR'S VE1ZrICATION: UIPMENT USED AND'WORK PERFOR MED DURING CORRECT, AND ALL MATERIAL AND EQ THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABO VE,. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military lWad South Auburn, WA 98001 , � DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: n DATE: Z2 19 REPORT No.: PROJECT: E5GR- Conncctinu Chaimel CONTRACT M 54-0546-4-1 WEATHER: k,' (clear) , ptly cloudy) (cloudy) WIND:gcallmj (breezy) (strong wind) (rain)/(snow) inches Temperature:�I max� min CONTRACTOR & SUBCONTRACTOR-LABOR ACTIVITY: (list number working) a. GOLF suprvsr labor(3) operator(I) other( )� Sri h)( b. suprvsr ( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other ( ) d. suprvsr ( ) labor ( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. ZYCJ n) Ilrs_ g. Hrs_ c Ix j- X YES I Irs S h. I Its C-h ��N 7 Hrs_ d. I[)--v I-I rssts Hrs_ k. I Irs_ f. I Its 1. 1 Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. e a t�- ` DAILY CQC REPORT E2of2 40*, WORK PERFORMED TODAY: <r �-- �,J a lJ J G a u CONSTRUCTION QUALITY CONTROL: I, TI:M: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). S sa C C ' U nr i e CONTRACTOR'S VE1 IFICA ION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTE ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 , � DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: Z— Z 19--?5' REPORT No.:� PROJECT: FSGR- Connecting Channel CONTRACT#: 54-0546-4-1 WEATHER: (clear) (ptly cloudy (cloudy) WIND: (calm) (breezy) (strong wind) sno Inches Temperatureto F max S$ F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY' (list number working) a. GOLF suprvsr jX) labor�) op rator(I) other (2) TC ��►y�r� �Lwmc w� a��rer�) b. suprvsr labor operator( other C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor( ) operator ( ) other( ) EQUIPMENT USED: a. 2 keJ rni T4,V� I-Irs g. Firs_ b. 7 y h X,,,q I lrs� h. I-Irs_ c. 5S YA A.,,,�o Ilrs�" i. 11rs_ d. l n- fr at I-Irs j. I Irs_ e. Ilrs_ k. Ilrs_ f. I irs 1. 1Irs JOBSITE SAFETY: (hdicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ♦ r DAILY CQC REPORT 4�*� E2of2 WogK PERFORMED TODAY: �. Yt-so, I L It a GJ lu N CONST IUCTION QUALITY CONTROL: (Indicate tests performed acid the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPE TC IONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). coN rgACTOR'S VERIEH'ATION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR a GOLF Landscaping and Construction, Inc. 38016 Military Roncl South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: �- ZU 19 'r) REPORT No.: PROJECT: ILSOR- Comiccting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) Qitlycloudin) (cloudy) WIND: (calm�reezy) (strong wind) (rain)/( ches fc nperalure: l max._�JF tnin CONTRACTOR UBC NTR R LABOR ACTIV TY• (list number working) a. GOLF 0 suprvsr ) labor O oIator (I) other ( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor ( ) operator ( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr( ) labor( ) operator( ) other( ) EQUIPMENT USED: a. -M- 2- 06IYr IIrs1 g. Hrs_ b. Pl j j Zoo I Irs- }l I Irs_ C. I Irs_ i. I-Irs_ d. I Irs_ j. I Irs_ e. Ilrs k. llrs f. I Irs 1. I Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any sal:ety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. k4; 2 DAILY CQC REPORT WogK PER:ORMED TODAY: st -A- QUALITY CONTROL: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. IN5pRCTION5: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). NS CONTRACTOR'S VCR1I�IC TA ION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. )Y\ CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Rond South Auburn, WA 98001 �� DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE• ,_ / 2 19C REPORT No.:7 PROJECT: ESGR- Connecting CONTRACT#: 54-0546-4-1 WEATHER: (clear) tly cloudy�(cloudy) WINU:� alm (breezy) (strong wind) -- -- (rain)/(snow)- inches Temperature:Z,�__F max 6LLF inin CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr k<) labor-B) operator( ) other( ) b. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr( ) labor ( ) operator( ) other( ) e. suprvsr ( ) labor ( ) operator( other( ) EQUIPMENT USED: a. Ilrsl g. I-Irs_ b. 1Irs-� 11. 1Irs_ c. IIrs '� i. I-Irs_ d. I Irs_ j. I Irs_ C. 1 Irs_ k. I Irs f. I Irs 1. I Irs' JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions ee taken. Note any safety meetings held and include meetitminu�es). j ( (� I � ux� 4 I�Cc `� t �.t , �✓ls40-1Jc� Uk U� Fla/ c� �r� � � f- i EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r DAILY CQC REPORT E2of2 q� WORK PERFORMED TODAl1;. CONSTRUCTION,QUALITY CONTROL: I, TESTS,: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPLCTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). Mi- , + CONTRACTOR'S VEIZFICA'TION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH TIIE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 9800 I , � DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: — 19� REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACCT M 54-0546-4-1 WEATHER: �ele tly clo ) dy) WIND: (calm)` (breezy (strong wind) (rain) 4i�ow1;ichesC- Temperature: 61 ttJaxI min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr (j) labor ( ) operator( ) other( ) b. suprvsr( ) labor ( ) operator( ) other( ) C. suprvsr O labor( ) operator ( ) other( ) d. suprvsr O labor( ) operator( ) other( ) e. suprvsr O labor( ) operator( ) other( ) EQUIPMENT USED: a. Ilrs_ g. I-irs_ b. Ilrs h. I-Irs C. I Irs i. I-1rs_ d. Ilrs_ j. IIrs_ c. 1 Irs_ k. I Irs_ f. 1 Irs 1. I-Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. r ' IS ` E2of2 DAILY CQC REPORT WORK PERFORMED TODAY: n CONSTRUCTION QUALITY CONTRO 1. JEM: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. iNSPGCTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). r^^;.:' "rTOR'S VtlZrl('A�TION� THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERML AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EX EPT AS NOTED ABOVE. c� 49e CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Rued South Auburn, WA 98001 �� DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE:- 4— f b 19 n REPORT No.:—E— PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (p(fy cloudy) (cloudy) WIN"(caih (breezy) (strong wind) (rain)/(snow) inches Temperature:�F max LLF min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF oQvp r + suprvsr (1) labor O operator O other(� - *we- ar'�� 1410." b. suprvsr( ) labor( ) operator ( ) other( ) C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other ( ) e. suprvsr ( ) labor( ) operator( other( ) EQUIPMENT USED: a. I Z y � �VW, Hrs 7 g. I-Irs b. _7 Y il � , I lrs-�- h. Hrs_ c.2XU rh 5 yy�, }- I lrs i. Hrs_ d. SqL Mrs_ j. Mrs_ e. Mrs_ k. Ilrs_ f. I Irs 1. 1 Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. n e E2of2 DAILY CQC REPORT 4 `:'ORK PERFORMED TODAY: (�►� _t c v 4n IL 1-1 All Q VI C U J-i Pr �ONSTRUGTION UQ ALITY GONTRO_L_' 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). 'JOB REPORTIS COMPLETE AND CONTRACTOR'S VE1tIrIC:ATION: MINT USED AND WORK PERFORMED DURING OVE CORRECT, AND ALL MATERIAL AND EQUIPMENT THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. P CONTRACTOR'QUALITY CONTROL INSPECTOR ; GOLF Landscaping and Construction, Inc. 38016 Mililnry Rood South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY:q DATE: 6— I %3 19 `(S REPORT No.: Ll PROJECT: FSGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) .(plly cloud ) (cloudy) w1Ni7�(calm) (breezy) (strong wind) (rain)/(snow)- niches Temperafure. F max 6 min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF suprvsr O) labor operator( ) other( )�k ! y t b. suprvsr ( ) labor( ) operator( ) other ( IA`jj = S0,O)e c. suprvsr ( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) C. suprvsr ( ) labor( ) operator( ) other ( ) EQUIPMENT USED: a. 1 Y c)v M p IIrs !3 g. Mrs_ b. ,T� ��AW%0 I Irs h. 1 Irs_ C. ,�, L'„1.; 2rsu 3 l lrst j i. IIrs_ d• Ilrsa j. I-Irs_ e. )bA Tcj VANt Ilrs��RENT�� k IIrs_ f. IIrs L IIrs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). J EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. raL/ f�V Quv�Q �-z0 6"' g in , 1 lA 1LE S l�cll Pipe mil' - 'E- � N �p r., n l�M•. (�.,� r � w DAILY CQC REPORT E 2 of 2 �F WORK PERFORMED TODAIL: ixA CON STg CTION QUALITY CONTRQL_ 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPF�TIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRA('TOR'S VLIZFIC'A'TIOI�L� THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. G� Lcc�,�ayw CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Military Road South Auburn, WA 98001 �� DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: �j DATE: j� 19_ REPORT No.: PROJECT: ESGR- Connecting Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) 1�tly cloudy (cloudy) WIND:�(caltn)1 (breezy) (strong wind) (rain)/(suovb) inches Temperature:,7 max 4F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) / a. GOLD suprvsr(1) labor(1) operator( ) other(2)TK )' i r- �U-it Tl< o b. suprvsr( ) labor( ) operator( ) other( ) t a I,or J C. suprvsr( ) labor( ) operator( ) other( ) d. suprvsr( ) labor( ) operator( ) other( ) e. suprvsr ( ) labor ( ) operator( ) other( ) EQUIPMENT USED: a. 2 y j AU,,�p I-Irs g. I-Irs_ b. XA Au-,P Mrs ln. Mrs_ c• C! MI cpr 1*1lrst i. IIrs_ del I-lrsZ J. I-Irs_ c. I Irs_ k. Mrs_ f. I lrs 1. I Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantity of materials delivered to the jobsite. ` E2of2 DAILY CQC REPORT WORK PERFORMED TODAY: afty t✓c*zi r 1 � h I&/A- i A b y v ' h: �e d ri„y rro d,Y�r CONSTRUCTION QUALITY CONTROL 1. JESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). � a CONTRACTO1t,S VERIFI AT ION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. CONTRACTOR QUALITY CONTROL INSPECTOR GOLF Landscaping and Construction, Inc. 38016 Mililnry Itond South Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: �22 DATE: - 19-25 REPORT No.: PROJECT: ESGR- Connectinu Channel CONTRACT M 54-0546-4-1 WEATHER: (clear) (1`ly cloud ) (cloudy) WIND: (calm (breezy) (strong wind) (rain)/(snow inches Tempe � F maxS�F min CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY: (list number working) a. GOLF OQer -t suprvsiX) labor operator O other( ) b. suprvsr( ) labor( operator( ) other( ) C. suprvsr( ) labor( operator( ) other( ) d. suprvsr( ) labor( operator( ) other( ) e. suprvsr( ) labor( operator( ) other( ) EQUIPMENT USED: a. MS' ZED OCAYb l4 k I-IrsS. g. I-Irs_ b. y D 5111( I-Irs.,,2S ]n. llrs_ c. b)ow u j I A C I lrsL i. Hrs_ d. I-lrs_ j. I irs_ C. Ilrs k. IIrs_ f. IIrs 1. I-Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safety meetings held and include meeting minutes). i I EQUIPMENT AND MATERIALS DELIVERED:(Indicate arrival/departure of equipment and quantit of materials delivered to the jobsite. i r E2of 2 DAILY CQC REPORT WORK PERFORMED TODAY: ' CONSTRUCTION TION QUALITY CONTROL: 1. Tom: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). CONTRACTOR'S VERIFICATION: THE ABOVE JOB REPORT IS COMPLETE AND CORRECT, AND ALL MATERIAL AND EQUIPMENT USED AND WORK PERFORMED DURING THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. I CONTRACTOR QUALITY CONT IIL INSPECTOR 4 GOLF Landscaping and Construction, Inc. 38016 Military Ilond Soiilli Auburn, WA 98001 DAILY CONSTRUCTION QUALITY CONTROL REPORT DAY: DATE: -_./ cI? 19 / - REPORT No.: PROJECT: j?, IZ- C n�t;tint; Channel CONTRACT M _ 54- 540 G-4-1 WEATHER: (clear) (plly oudy) (cloudy) WIND: (calm) (b, ezy) (strong wind) (raid)/(suodv) inches Temperaturet� l" IIIx d0 I� loin i CONTRACTOR & SUBCONTRACTOR LABOR ACTIVITY• (list number working) a. GOLF suprvsr ( labor(1) operator O other ( _ b. _ suprvsr O labor ( ) operator( ) other (C. suprvsr O labor ( ) operator( ) other( d. _suprvsr O labor( ) operator ( ) other ( C. suprvsr O labor( ) operator( ) other ( EQUIPMENT_U$ED: a. MA Sv� ,a� _ I Irs_ L'S g• _ I-Irs— I b. 6J 1 I Irs h. _` I-Irs— c. Ilrs_ i. _ Mrs— d. Itrs— �• — --I Irs— e. _ IIrs— k. — _ Ilrs__ i 111•s I. --I Irs JOBSITE SAFETY: (Indicate items not in conformance to safety plan and corrective actions taken. Note any safely meetings held and include meeting minutes). EQUIPMENT AND MATERIALS DELIVERED:(Indicate at of equipment and quantity of materials delivered to the jobsite. 1. �``a`'- ( (� L i �� ` E2of2 DAILY CQC REPORT WORK PERFORMED TODAY: + U c r-4 L-4 hi C-V Y11 IMP Vk CoNSTR Cr10N QUALITY CONTROL 1. TESTS: (Indicate tests performed and the results of such tests. Describe corrective action taken for those items of work not passing the required tests and scheduled date for retesting). 2. INSPECTIONS: (Indicate any visual inspections of material or work and note any deficiencies and corrective action taken). t "KIs � (yr�c.la 1sl :c,l CONTRACTOR'S VERIFICATION: THE, ABOVE, JOB E UIPM NT USE, AND'ORTIS WORK P COMPLETE,FORMED D�RING CORRECT, AND ALL MATERIAL AND Q THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, EXCEPT AS NOTED ABOVE. C NTRACTOR QUALITY CONTROL INSPECTOR WEEKLY SAFETY MEETING FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines B�oxy638 Park Forest, IL 60466 708-481-6930 No. 44 Vol. 18 Week of 10/30/95 Company Name T' �+�� �'a Job Name S Date SCAFFOLDS Scaffolding violations accounted for 18% of the 100 Most Cited Physical Hazards in 1991. Three of the top 15 hazards were scaffolding violations. Number 6 was guardrail specifications for welded frame scaffolds, number 12 was safe access for all types of scaffolds, and number 15 was general requirements for guarding scaffolds. You may think that scaffolds are safe; but do you know that OSHA investigated 214 fatalities resulting from scaffold accidents between 1985 and 1989? Let's think about some of the hazards involved in using scaffolds. The first is the possibility of a fall from elevation. Just trying to get on the scaffold provides a place for a fall to occur. As a construction worker you are required to gain access to the scaffold so you can do your work. Do you climb up the frame braces or scaffold buck ends, or do you use a ladder? Of course, the danger of falling from the scaffold itself always exists. Using damaged scaffold members or erecting the scaffold improperly can result in a collapse. A collapse is likely to cause serious injuries and deaths. Now that we are aware of some of the hazards, we can take the steps necessary to prevent accidents. The first thing to remember is to follow the manufacturer's instructions exactly. Inspect all scaffold components prior to use. Damaged scaffold members should be removed from service. Make sure the scaffold legs are level and placed on solid material prior to erection. A scaffold is never complete until guardrails have been installed at all open sides and ends. A proper guardrail system includes a top rail, mid rail, and toeboard. All scaffolds more than 10 feet above the ground or floor must have guardrails in place. To decrease the risk of a fall, the scaffold standard requires a ladder or other equivalent means of access for scaffolds. Many times when ladders are not in place, workers climb the end frames (a common unsafe work practice in our industry). Unless the end frame is designed as a ladder access frame, it must not be used as such. Scaffolds are part of the construction industry, use them in a safe manner. Always follow scaffold safety rules so you don't become another construction fatality. SAFETY REMINDERS Scaffold cross braces are not acceptable guardrails. Special Topics For Your Project Employee Safety Recommendations F� V N 61� V �1 � _f, C r, y � ��r 1k tt �,r1�j a l Reviewed M.S.D.S.# Subject: Meeting Atten ed B j owl I C / rr Supervisors Signature 6 „s These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 43 Vol. 18 Week of 10/23/95 Company Name t` �", Job Name Date Ab RIGGING Rigging looks like an easy operation that requires no particular skill or experience. But, if you have an idea that just anybody can do it, think again, you're on the wrong track. Too many workers have lost fingers, hands or have suffered more serious injuries because they thought "Anybody can do that." Basic rigging requires that one member of the crew act as the signal person. Once you have determined who the signal person will be, instruct the equipment operator to recognize signals from that person only. The signal person must be very careful not to order a move until the "all clear" signal has been received from each member of the crew. Each rigger must be completely in the clear before giving the "all clear" to the signal person. If the sling or choker you positioned will stay in place, release it before you give your signal. Should you need to hold it in position, make sure your hands and fingers are clear of pinch points. Watch out for the roll or swing of the load. It's almost impossible to position the hook exactly over the load center, so the key is to anticipate the direction of the swing or roll and work away from it. Never place yourself between the load and equipment, material, or any other stationary object. Never stand under the load and avoid being under the boom as much as possible. Chances are that nothing will break, but don't take that chance! Look over the location where the load is to be set. Remove any objects that might fly up when the load is landed. When lowering or setting the load, be sure your feet and all other parts of your body are out from under it! Many foot, hand and finger injuries have taken place during this part of rigging. Use a tag line to guide the load into place. Tie the tag line so that it hangs down about ten feet. This will give you enough line to set the load down easily and slowly. If the load should roll or shift, that ten feet of tag line can give you the extra room needed to get out of the way. Teamwork is necessary on any job to prevent injury, SAFETY REMINDERS but in rigging, crew teamwork is doubly important. Special Topics For Your Project Employee Safety Recommendations Reviewed M.S.D.S.# Subject: Meet i g A ten ed By ._< t% iW Supervisors Signature These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 42 Vol. 18 Week of 10/16/95 Company Name Job Name Date FALLING OBJECTS Falling objects include materials, tools, equipment, and workers; and if any of them land on you, you can be seriously injured or even killed. Let's look first at how and where materials are stored on the jobsite. All materials should be stacked securely and neatly on a sound base. Avoid tall stacks which can shift and tip over easily. When piling materials on a scaffold, be sure not to overload it. Don't box yourself in! Allow enough space so that you and your co- workers can do your jobs without accidentally causing something to fall to a lower level. This will safeguard workers below from falling objects such as loose bricks, tools, fasteners, etc. Never throw materials or tools. When moving materials, tools, or equipment from one level to another use containers or buckets and hand lines. When the load is being moved, be sure to stand to the side, clear of the loaded materials; don't stand directly under them. Keep an eye on the load as it goes up. If the load cannot be placed in a container, make sure that it is securely attached to the hand line. Materials like pipe, conduit, and rods should be fastened together in bundles so that pieces cannot be jerked loose and fall on the worker pulling the hand line. If you are working on an upper level, take only the tools you need for the job and don't allow either your tools or working materials to fall over the edge. When you work beneath other construction activities be alert to overhead operations and watch out for failing objects. Always wear your hard hat, it can save your life. Stripping form panels on the floor slab can result in large sections dropping at once. Make sure to block off the area to keep co-workers and others out of the danger zone. Failing objects injure and kill many construction workers every year. Do your part to prevent these accidents and encourage your co-workers to do the same. SAFETY REMINDERS Plan ahead to work safely, protect your co-workers and other tradespeople on the job. Special Topics For Your Project S� a c. Mra� ' Employee Safety Recommendations - C i v�� c.utti� c '� �,. � �► �. «, '. ��,1�� 6 y- a V41 �c aw e- 1 1, Reviewed M.S.D.S.#_ Subject: Me VAI' t ende By a� v aSupervisors tsars Stgnaturo4C5 These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638a, Park Forest, IL 60466 708-481-6930 No. 41 Vol. 18 Week of 10/9/95 Company Name ]614, �,� b1tyt► 4sk �__ Job Name ��" °n� t Date T I f 4 FIRE PREVENTION This week is National Fire Prevention Week. You may wonder why we have such a week. Its roots go back to the Great Chicago Fire which occurred on October 9, 1871. That fire killed 300 people, left 100,000 homeless, and destroyed more than 17,000 structures. Whether it is fact or fiction, many people say that the fire started when Mrs. O'Leary was milking her cow. The cow kicked over a lantern setting the O'Leary's barn on fire, starting the spectacular blaze. In less than 27 hours the fire took its toll, burning more than 2000 acres. Once the fire was out. Chicago quickly rebuilt and within a few years was celebrating the successful restoration. In 1920, President Woodrow Wilson issued the first National Fire Prevention Day proclamation, and for 75 years this week has been used to increase awareness of the dangers of fire. Still thousands of people die in fires every year and countless more are injured. What can you do to reduce this needless suffering? There are many things! First make sure your home is protected with a smoke detector -- smoke detectors have saved many lives. Never smoke in bed. Careless smokers cause 39% of fatal home fires. Children have a fascination with fire; make sure lighters and matches are kept out of their reach in a safe, secure place. Flammable liquids should never be stored near your furnace or hot water heater -- store them outside. Don't overload electrical outlets or use frayed or damaged electrical cords. How about here at work? You know what needs to be done. Keep exits, storage areas, and stairways free from waste paper, empty boxes, dirty rags, and other fire hazards. Never smoke or use an open flame around flammables. Turn engines off when refueling. Keep a fire extinguisher close by when welding or cutting. Post and learn building evacuation plans and discuss them during new-employee orientations. Post emergency phone numbers at all jobsite telephones. None of us wants to see another fire like the one that destroyed Chicago. Use this week to concentrate on fire prevention, but don't stop concentrating next week. Pay attention and eliminate fire hazards all year long. If fire strikes, sound the alarm and call the fire department... SAFETY REMINDERS no matter how small the fire appears to be. Special Topics For Your Project *� d N d�j'i -� tl►J c ,S M t �'� a 4 a�-�i j j — kc< ( wA4 c t j c Employee Safety Recommendations Luxy t & r t 6 < Au < r � 6 Ja • Reviewed M.S.D.S.# Subject: Meeting A ndded By hit 1 . Supervisors Signature These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 40 Vol. 18 Week of 10/2/95 A i a Company Name V S` Job Name Date CHISELS There are many misconceptions about chisels and chiseling which result in misuse and abuse and could lead to possible injury. The key words are "misuse and abuse". If you misuse or abuse any tool you can get into trouble. Chisels come in many sizes and varieties, each of them designed for a specific use, but if you choose to disregard the rules, you or a co-worker may very well be injured. Here are some do's and don'ts compiled by the Hand Tool Institute for the safe use of these tools. Before doing any kind of chiseling, put on safety goggles for eye protection. Be sure the work is securely braced or clamped down. Check the condition of the chisel. It should be sharp, with a properly ground cutting edge, not only to do a better job but to accomplish the work safely and more quickly. Also check the head or striking surface. If the head is mushroomed, chipped, or badly battered, the chisel should not be used. Cold chisels are made of hardened, tempered steel and are used for cutting and chipping metal -- they should never be used on stone or concrete. Never use a common nail hammer to strike a cold chisel because chipping of the hammer or chisel could occur, causing an eye injury. The face of the hammer should be larger than the head of the chisel. Brick chisels are designed for scoring and cutting brick. They should be struck with a heavy hand-drilling hammer, not a brickmason's hammer. A brick chisel should never be used on metal. Make sure you are using the proper chisel for the job. If you are in doubt, ask your supervisor. Remember that carrying tools in your pockets is dangerous, especially if the tools are sharp or pointed. Use a tool kit or belt. This applies to all hand tools, not just chisels. The Assured Equipment Grounding Conductor Program SAFETY REMINDERS color code for October, November, and December is Orange. All electrical cords and tools must be tested and color coded. i Special Topics For Your Project Li S Employee Safety Recommendations Reviewed M.S.D.S.# Subject: Melt' g tend d By vim V14- )Q (ia - C, ot k Supervisors Signature These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING � D FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638\ Park Forest, IL 60466 708-481-6930 No. 35 Vol. 18 Week of 8/28/95 Company Name Lo LaV c1 S A-T,nL Job Name Date WOOD WORKING TOOLS Take a moment to think about today's safety topic. Do you use any wood working tools at work? Do you have wood working tools at home? If you answered yes to either of these questions you need to listen. What you learn today may prevent an injury on the job or at home. Not surprisingly, wood working tools are designed to be used on wood. They are not to be used on metal, iron, or concrete; or for electrical work. Hammers, hand saws, air nailers, crosscut saws, ripsaws, planers, sanders, band saws, jointers, circular and radial saws, etc. are just a few of the wood working tools that can be found on a jobsite or at home. Each of these tools is designed for a specific task. Always read the manufacturer's recommendations prior to using a tool. Power wood working tools come with a guard or guards in place, to prevent you from coming in contact with a moving part. Never remove or bypass these guards or any other safety device. If you find a tool with a guard missing, take it out of service and notify your supervisor at once. An unguarded blade can kick back and as the saying goes, "Eat you alive." Always turn off the tool and disconnect the power before changing blades or bits, or making any adjustments or repairs. Wear personal protective equipment if there is the possibility of flying objects, and wear a mask if you are creating a lot of dust. Never wear loose clothing, or jewelry that could get caught in the tool, even if it's only a hand tool. Check electrical cords and switches, and look for cuts or wear in the insulation, as well as broken or damaged ground wires. Wood working tools come in handy both on the job and at home. Treat them with respect and inspect each tool before use. Never cant'a plugged-in tool with your finger on the switch. Keep your work area clean and always — keep tools of all kinds out of the reach of children. SAFETY REMINDERS A good tool deserves good care. Always store wood workil tools properly. { Lust, Special Topics For Your Project t n�jL hJ n W we•��Q D91, U�& A10-j Mv_\itiV Y4 C�MPgcu p �4��� Employee Safety Recommendations U`Y - PI 1cw St , k��w� Reviewed M.S.D.S.# Subject: Meetin Attended (B� C f i VI Supervisors Signature These instructions do not supersede local,state or federal regulations. i .^�-, �r6gr•.� _ q'�+�i,:�+:�.:•a: ., .<,�,t..._ ram NIP WEEKLY SAFETY MEETING SEP , d lgg5 � FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 34 Vol. 18 Week of 8/21/95 Company Name Job Name Date 2 1 BACKS AND LIFTING One out of four work injuries results from material handling. You are required to LIFT and PUSH and PULL many times during the day. Think about it for a moment. Do you pick up bags of cement? Do you handle 2 x 12 lumber? Do you move compressed gas cylinders? Do you move 15 gallon water coolers out on the job? Do you handle pipe? The list can go on and on. The bottom line is — sooner or later, you will use your back in the performance of your job. When it comes to backs and lifting there are several important things to remember. Before you start to lift, check the object that must be moved. Look for sharp edges, protruding nails and slivers. Determine whether or not you will need help. Certainly, if the object is too heavy to handle alone, you'll need help, but you may also require assistance with a lighter load that is awkward, unbalanced or bulky. The next step is to figure out how you will move the object. Make sure that you can get close enough to lift it safely. Also be sure the pathway you will be using is clear of tripping hazards and that you will have enough room to maintain a good lifting position when you put the load down. Plan ahead if you will have to tilt or turn the object to get through doorways or other tight places. Now, when you are ready to lift, do it correctly. Bend your knees, keep your feet apart and get a good grip. Lift by straightening your legs while keeping your back vertical. Let your legs do all the work. Keep the load close to your body. When lowering the load just reverse the steps. Go down with your back straight and knees bent, to a crouch position and then release. Never lift a load that's beyond your own physical capacity in size, shape, or weight. Ask for help! When carrying a load with another person be sure that each of you lowers the load at the same time. Many injuries have occurred when one worker lets his end down suddenly. Learning how to lift properly is one of the most important things you can do for your back. Back injuries are not caused by weight alone; oftentimes an injury occurs when a light load is lifted incorrectly. Don't become one of the 400,000 people who suffer a disabling back injury every year. Observe safe lifting rules and always, if the load is too large or too heavy, ask a co-worker for help, use a hand truck, or a pallet mover. SAFETY REMINDERS Twisting your body during a lift is a common cause of back injury! Special Topics For Your Project JS c A.) U*/ 0 !I — - a x Employee Safety Recommendations t` — Reviewed M.S.D.S.# Subject: Meting Attended By T,-V %u,� .4 \� \JINX\ � Ch� 1.�- o Y A- Supervisors Signature-65� These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY Y ME ETING D PSEP 1 4 FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 33 Vol. 18 Week of 8/14/95 �`-1� Company Name�r- (j\ 1 'V*l L '�� Job Name u N Date F i I GAS CYLINDERS Oxygen, Acetylene, Argon, Air, LPG, Nitrogen, and other gasses are found in metal cylinders on most every construction site. These portable containers, used for transporting and storing compressed gasses, can cause serious injuries. If used incorrectly, gas cylinders can cause an explosion, fire, or other hazardous situation. Handle them with care and follow appropriate safety rules. Let's review some of the safety do's and don'ts for using compressed gas. Do's j 1. You must always keep cylinders in a secure and upright position. 2. Keep the protective valve cap in place when a cylinder is not in use. 3. Mark the cylinder'Empty' or'MT' when the gas has been used. 4. Keep oil and grease away from oxygen cylinders (oil and oxygen can ignite spontaneously). 5. Open valves slowly, using the valve wheel or T-handle wrench provided by the supplier. 6. Store oxygen and fuel gas cylinders at least 20 feet apart or separated by a 5 foot high noncombustible barrier. 7. If the cylinder is too heavy to handle use a hand truck to move it, or ask a co-worker for help. Don'ts 1. Don't permit sparks, flames, or molten metal to contact the cylinder. 2. Never use grease or oil on valves. 3. Don't lift cylinders without safety caps in place. 4. Never use oxygen to blow or dust off your work clothes. 5. Don't roll cylinders horizontally on the ground. 6. Never drop cylinders on the ground or other work surfaces. 7. Don't store oxygen cylinders with other fuel gas cylinders. 8. Never use a leaking gas cylinder. Take it out of service immediately. SAFETY REMINDERS Never mix or match acetylene gauges with oxygen gauges. Special Topics For Your Project r y jj Employee Safety Recommendations Reviewed M.S.D.S.# Subject: Meeting Atten By t ) I � SRNctk ` tt Supervisors Signature es-�— These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING ETIN�` SEP 1 4 1995 D FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 32 vol. 18 Week of 8/7/9 t il: Job Name Date Company Name r"`r P t d POWDER-ACTUATED TOOLS Hilti, Ramset, and Red Head are just a few of the manufacturers of powder-actuated tools. These tools are designed to fire a special nail or fastening device into concrete, steel and masonry using a small caliber charge as a firing device. [See 1926.302(e)] The number one safety rule to remember is — only properly trained and qualified operators should ever use powder- actuated tools. Users should possess `Qualified Operations Cards' which, after thorough training, are issued by a particular manufacturer's authorized dealer or distributor or other competent source. When using the tool it must be held firmly against and perpendicular to the surface into which the fastening device is being driven. Never shoot into a blind surface. Take the necessary time to check the other side. Many innocent construction workers have been injured, and some even killed, from being struck by a wayward fastening device which ricocheted off or went completely through the target. Personal protective equipment must be wom by the operator, and the face should be protected if there is any danger of spalling materials. Check with your supervisor on the type of safety goggles required. [See 1926.102 Table E-1] All powder-actuated tools must be tested daily— before use -- and all defects discovered before or during use must be corrected. Tools must not be loaded until immediately before use. Loaded tools must not be left unattended. Keep your hands clear of the muzzle end. Powder-actuated tools should never be stored or used in explosive atmospheres, or in the vicinity of highly flammable materials, or anywhere nonsparking tools are required. When you are through using a powder-actuated tool, unload it and dispose of firing rounds properly; never leave them laying around. For proper training check with your powder-actuated vendor, who will often come to the work site and conduct a safety class. Finally, if you are not qualified to use the tool, don't! SAFETY REMINDERS Powder-actuated tools should never be pointed at anyone, whether the tool is loaded or not! . s Special Topics For Your Project t Employee Safety Recommendations Via` / 11i � v 4�t P _� tea•_ r .- Reviewed M.S.D.S.# Subject: Meeting Attended By h /i y wl l Supervisors Signature These instructions do not supersede local,state or federal regulations. WEEKLY SAFETY MEETING PSEp �14�SD FOR THE CONSTRUCTION INDUSTRY 2 © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 29 Vol. 18 Week of 7/17/95 / = i Company Name V L n °` �`A ' is -tt Job Name _�� �+'� Date ARC WELDING SAFETY Safe and accident free completion of any welding operation should be the goal of all welders. Here are a few welding safety tips that will help you achieve that goal. Wearing proper eye protection is very important. Welders and their helpers should be sure to use the correct filter lens in their goggles or helmets to protect their eyes from infrared and ultraviolet light. (See 1926.102, Tables E-1 and E-2 for a guide to eye and face protection and filter lens shade numbers.) Precautions for fire prevention must be taken in areas where welding is being done, for example, isolating the welding and cutting area and removing fire hazards from the vicinity. If normal fire prevention precautions are not sufficient, a qualified person should be assigned to guard against fire during the operation and for a suitable time after completion of the work, to ensure that no possibility of fire exists. Be sure that fire extinguishing equipment is available and ready for immediate use. In areas where heavy dust concentrations exist, or where flammable paints or other flammable materials are present, welding, cutting or heating can create a significant fire hazard. Proceed with extreme caution! A noncombustible or flameproof screen should isolate the welding or cutting area to protect other workers in the vicinity from direct arc rays. Watch your slag; it could cause a serious injury to someone working below. If the electrode holder is left unattended, the electrodes must be removed, and the holder must be placed so that electrical contact cannot be made with another employee or any conducting object. All arc welding and cutting cables must be completely insulated and capable of handling the maximum current requirements for the job. The insulation on any splice within 10 feet of the electrode holder must be equal to the insulation of the cable. Review 1926.351 through 1926.354 for additional information. All welding and cutting operations in a confined space SAFETY REMINDERS shall be ventilated to prevent the accumulation of toxic materials or possible oxygen deficiency. 4 r Special Topics For Your Project i Tv j�f ` r� !x 2 t t Employee Safety Recommendations u 'r Reviewed M.S.D.S.# Subject: Meeting Attended By i Supervisors Signature -� These instructions do not supersede local,state or federal regulations. I WEEKLY SAFETY MEETING F-ft14 l�5D FOR THE CONSTRUCTION INDUSTRY © Safety Meeting Outlines Box 638 Park Forest, IL 60466 708-481-6930 No. 28 Vol. 18 Week of 7/10/95 Company Name ( �`� f'!,"';Z Job Name C� A Date j/ SCREWDRIVERS The screwdriver is very versatile and certainly one of the most common and frequently used — or misused — tools we have. It comes in many sizes and lengths. The first time you may have used one was when you were a child to adjust the chain guard on your bicycle. Screwdrivers are usually made of well-tempered steel bar or rod, flattened or shaped at one end to fit into the slots in screw heads. The other end of the bar is fitted into a handle of wood, plastic, etc., which is often reinforced to prevent splitting. Screwdrivers are found in various craft worker's tool boxes or pouches. Carpenters, millwrights, electricians, mechanics, painters and plumbers all use them in their daily work. As with all hand tools, it is up to the user to make certain that his or her screwdrivers are in good shape; therefore, you should inspect them before each use. Look for split or cracked handles and check the tips to make sure that they are not damaged. It just take a few seconds to make a quick check, but those seconds could make the difference between an injury and just another turn of the screw. When using a screwdriver use it as the manufacturer intended. It is designed to be held with a firm grip and used with a taming motion. A screwdriver is not intended to be used as a pry-bar; nor is it intended to be used as a chisel. Using a screwdriver instead of one of these tools could cause the tip or shaft to chip or snap resulting in an injury. Avoid hitting the top of the handle with a hammer or other tool as this may cause the handle to crack or break. When carrying a screwdriver, keep it pointed away from your body with the sharp end pointing down. A lot of workers have the bad habit of putting screwdrivers in their back pockets with the pointed end sticking up; loss of balance, a backward fall, or even a quick turn could result in a serious puncture wound. Treat all sharp pointed tools with respect. SAFETY REMINDERS Prevent unnecessary accidents by carrying and using them with safety in mind. Special Topics For Your Project `� r a C Employee Safety Recommendations Reviewed M.S.D.S.# Subject: Meeting Attended By f ` na Supervisors Signature These instructions do not supersede local,state or federal regulations.