HomeMy WebLinkAboutSWP272153 w 3
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: January 15, 1996
TO: STORM
WATER
WASTEWATER
FROM: Arneta H. X6198
SUBJECT: SAFEWAY FINAL PROJECT CLOSEOUT
WOO RSTW 2153 C940106
4300 NE 4TH ST
The purpose of this memo is to inform you that this project is done.
Please refer to the attached two sheets for project information.
cc: Neil W.
MEMO.DOT/
IT PROJECT CHECKLIST
Project No. R-2153 Project Name: SAFEWAY
S-2153
W-2153
W.O.No. 87580 Address:4300
NE 4th St.
Permit No. C940106 Date Issued:
8/4/94
Issued to:Safewa
Preconstruction Meeting Sept. 13, 1994
Developer's Name Safeway
Address
Utility Contractor's Name: Abscher Construction
Rich Teddy 845-9544
City Project Manager Arneta Henninger
City Project Inspector Steve Pinkham
Letter Special Billing Yes No May Comments: Original is attached to thi
X be
Final Inspection Signoff Date
6/19/95
As-Built Plan Checkprint Date:Yes
Received
As-buillt Plan sent to Date:12/8/
inspector 95
As-Built Plans Mylars Date:1/15/
Received 96
Easement Yes No N/A Sent to Carrie 12/29/95
X on Date
Recording No.
Bill of Sale sent to Carrie Date 12/29/95 Recording No.
Cost-Data sent to Carrie Date 12/29/95
Backflow Test Reports Yes No N/A Date Received See Tom
Fire Sprinkler DDCVA
Domestic Water Meter
Stub Service Agreement Yes No N/A Date
Water Meters Size(inch) S.0 No.
Domestic Meter 2"
Landscape Meter 2"
Fire Protection Meter
Maintenance Bond to Dee Yes No N/A Expiration Date
X _T
AJH
, r
CITY OF RENTON
MEMORANDUM
DATE: December 30, 1994
TO: Lys H.
Dave C.
Bob M.
Ron S.
FROM: Arneta Plan Review X6198
SUBJECT: SAFEWAY NE 4TH & UNION RSW 2153
For your files.
0 REQUEST FOR FILE AND NUMBER
El PRECON NOTICE
0 PRECON MINUTES
0 ATTENDEES AT PRECON
0 LETTER OF SPECIAL BILLING SIGNED
0 MEMO TO BECKY AND RAY STATING THAT LETTER OF SPECIAL BILLING WAS
SIGNED
0 CONSTRUCTION PERMIT
0 RECEIPT FOR CONSTRUCTION PERMIT--SEE SIERRA SYSTEM UNDER PERMIT
C940106
0 STORM DRAINAGE REPORT WAS TURNED OVER TO STORM AT THE BEGINNING
OF THE PROJECT
PC: Neil w.
SPECIFY STORM OPTION:
1 Ll�
S.C.S. TYPE-lA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP(INCHES)
2,24,2.0
----------------------------------------------------------------------
******************** S.C.S. TYPE-IA DISTRIBUTION ********************
********* 2-YEAR 24-HOUR STORM **** 2.00" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1
8.07,85,0,0,24.7
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
8. 1 8. 1 85.0 .0 .0 24.7
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
1 .01 7.83 23210
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
SPECIFY STORM OPTION: GN Z5
1
S.C.S. TYPE-IA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP(INCHES)
10,24,3.4
----------------------------------------------------------------------
******************** S.C.S. TYPE-lA DISTRIBUTION ********************
********* 10-YEAR 24-HOUR STORM **** 3.40" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1
8.07,85,0,0,24.7
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
8. 1 8. 1 85.0 .0 .0 24.7
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
2.94 7.83 56276
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
Led G z .
100,24,3.9
----------------------------------------------------------------------
******************** S.C.S. TYPE-lA DISTRIBUTION ********************
********* 100-YEAR 24-HOUR STORM **** 3.90" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1
8.07,89,0,0,24.7
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
8. 1 8. 1 89.0 .0 .0 24.7
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
4.45 7.83 79488
ENTER [d:] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
d:\rons\junk
FILE ALREADY EXIST; OVERWRITE (Y or N) ?
n
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
(A-9
SPECIFY STORM OPTION: G�/
1
S.C.S. TYPE-IA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP(INCHES)
100,24,3.9
----------------------------------------------------------------------
******************** S.C.S. TYPE-lA DISTRIBUTION ********************
********* 100-YEAR 24-HOUR STORM **** 3.90" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1
8.07,85,0,0,24.7
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
8. 1 8. 1 85.0 .0 .0 24.7
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
3.70 7.83 69094
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
Short Plat (S1'PL !! )
RE--QUEST FOR PROJECT!! Prclim. Plat (PP!! )
Cy 46 I o(o CAGR
To: Technical Services Datc �� �9`�WQ!! GrccnM
1�
From. Plan Review/Project Manager
Project NameL�
(70 characters max)
Description of Project:
'3p" /0
Circle Size of Wa"terline: 8" 10" 12" Circle One- Ne\v or Extension
Circle Size of Sewerline: 101, 12 Circle One: Nety or Extension
Circle Size of Stormline: 12" 15" 18" 24" Circle One: Nety or Extension
Address or Street Name(s) � (J y �(
Dvlpr/Contractor/Owner/Cnslt:s Q�
(70 characters max)
Check each discipline involved in Project Ltr Drwg #of sheets per discipline
✓ ✓
Trans-Storm _���
(RoadwaynXainage) (Off site improvementsXinclude basin name) (include TESC sheets)
Q Transportation (Sigalization,Channelization,Ughting)
or i
Wastewater
anitary Sewer Main)(include basin name)
Water (Mains,Valves.Hydrants) bbb"'
' /
��� (include composite&Horizontal Ctrl Sheets)
r— nn TS Use my / �� C�— / s 1
S ICJ
C
Approved by TSM Date:
rorms/misc/92-090.DOC/CD/bh
City of Renton Department of Planning/Building/Public Works
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: COMMENTS DUE:
APPLICATION NO: LUA-93-948, SA, ECF DATE CIRCULATED:
APPLICANT: Safeway, Inc./ Baylis Brand Wagner PROJECT MANAGER: Paul ForsandR'—_-N'Tr''" �17 DEPT.
Architects FIRE FRLVLI i iulV 6UREAU
? PROJECT TITLE: New Safeway at NE 4th &Union Ave. WORK ORDER NO: 79706 DEC
)� LOCATION: Approx 400 feet.east of NE 4th and Union,Intersection
kP
SITE AREA: 8.07 acres I BUILDING AREA(gross):
SUMMARY OF PROPOSAL: Environmental Review and Site Plan Approval for development of approximately 78,800 gsf
of retail space on an 8.07 acre site abutting the east side of the existing Safeway store. Three development phases are
proposed: Phase I is a new 62,500 gsf grocery store and all site improvements; Phase II is 8,500 gsf of retail shops
located between the existing grocery store and Phase I construction; Phase III is a free standing 7,800 gsf structure
adjacent to NE 4th for either retail use or a fast food restaurant. This proposal also requires Binding Site Plan
Approval.
NOTE: This portion of the application along with Architectural Elevations will be submitted separately, prior to SEPA
review.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS
� Element of the -Probable - Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts` Impacts Necessary Impacts Impacts Necessary
Earth-;"' Housing
Air' - Aesthetics
Water -- Li htlGlare
Plants Recreation
LandIShoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ HistoriclCultural
Natural Resources` - Preservation
B. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
�. ;
We have reviewed this application with particular attenbon to those areas in which we have expertise and have identified areas of probable impact or areas
where addition -information is ne ed to properly assess this proposal,
nature of Di tafor Authorized Representative Date
DEVAPP.DOC / Rev 10193
NARRATIVE FOR SAFEWAY AT 4TH & UNION - RENTON, WASHINGTON
This proposal is for the development of an 8.07 acre site adjacent the northeast corner of 4th
and Union in Renton, Washington. The proposal includes approximately 78,800 SF of retail
space which will be developed in phases. Phase I will include a 62,500 SF Safeway grocery
store and all site improvements. Phase II will include the adjacent 8,500 SF in-line retail
shops. Phase III will include the 7,800 SF retail pad/fast food restaurant.
The existing site is undeveloped with the exceptions of two structures which were abandoned
years ago. The site is surrounded on the west by the existing Safeway store, gas station, and
Taco Time restaurant; to the north and east is the Windsor Apartments; to the south, across
the five-lane frontage road is undeveloped land and two-single family residences.
The comprehensive plan shows this site designated as Community Center which allows for the
proposed development. The underlying zoning is CB-Commercial as adopted in the Interim
Zoning Code of June 7, 1993.
The development of the site includes the removal of the abandoned residential improvements,
and removal of overhead power and telephone lines currently bifurcating the site. Earthwork
includes clearing and grubbing of the entire parcel and cutting, filling and importing as
necessary to achieve workable grades for a retail ;development. Those grades to the
northeastern corner of the site will be substantially lowered allowing the retail development
to be recessed into the ground relative to the adjacent multi-family residential neighbors.
Othersite improvements include underground sanitary,water, gas,telephone, electricity, storm
water collection (including bio-filtration), paving, and landscaping. Additionally, surface
improvements include a pedestrian connector from the frontage sidewalk connecting all retail
facilities including a connection to the existing Safeway store on the adjacent westerly parcel.
The proposed buildings are scaled to be appropriate for the commercial neighborhood and
sited so as to not insult the multifamily neighbors. The exterior materials will be tilt-up
concrete, block masonry and/or stucco-like finishes with metal and wood trims. Pedestrian
walks along buildings will be covered by canopies and/or awnings constructed of fabric, metal
and/or shingles. Colors will be light earth tones with bright accents. Signs will be displayed
only on backgrounds designed for such purpose and will be consistent with governing
ordinances of the City.
CONSTRUCTION MITIGATION
Refer to Questions A6, 131(h), 132(a), 132(c), 137(b), 1311(d), and Civil Drawings.
RE'CEIVED
DEVEiUFTAENT F BANNING
CITY OF RENTON
2?99) = LA CON00_; � u 4.58 AC.
T (4) u `
&4 SP.064-83 !j c
Ij
2z9.59 ! j-J LtU I _"'
0.440 AC. 29 I 63 j
75 88 161.0� 274.01
Safewa New Safeway
yn Ln
r, Retail 1 "' 00
I
II n .n N
1 N
QJ
SITE OFB6
�--� 0.25 AC. �.•
PROPOSED DEVELOPMENT �z-LJ=Jb-Ij 8z 80 I50
2.84 Ac.
I � Q I Q Q 20 .21 12
GL
Retail
Texaco Taco Time t.J I � erg;
N.E.. 4 4T H S T I68.21. ,
133.2 -160.03 i 323.42 /]23�._ __.. -
o y I77tI 18795 ; fhf.l 430� I 80 lo0 1^ O I11 h 60 1 _-_ ---Z 1 �,M < 1
.o
/ o ~Z Ln
133a1 •I I NI _ `~-" z o . co
�2
/ o _ o ►<.
(2) ♦ I r(j15 _— Z
e ( o I 60 , 80.38 ZIZ6i Z73) S.F 1079069 ® !oz
3! ,O
LIMIT m
'
o3 8 0 0
4 1s3sz s'
— SP.084- 323.SZ o3.s I
I j1'A(fl 293 6SMY 'n / \
12
18
303.674
3°_MY'*R I N S C R E T 2.4-5
- - --- ACTS . ,
z® Q
l-so A c
(293.831 324.oi 1923.C31 R 36
294.02 NTON(323.8 )-3Z4.02 317 02 316.83 U I�'s 35 128
—zl
1„
323.8
.n "I 03.82T
v
S.P. 678160
=U N � Q R D E D SHOP I I
__ - - - � 25d (-1 n Iw
1 ♦ •♦
_ 1 ♦
»� \ MW3 ♦♦♦♦ Location Map
MW2 n. 150
1 — ♦♦
' i ': ■_ ��,..rs'.' � ;. NE - dth ♦ i strsel �
T 1 •r
o
o
,mm,-,
12 oh
_.
tr; � d.:•i ... ♦ ... - •-630 3'. - ~ rr' Hsi
MWI
v O ■ \ i ♦ -
eftwoo
r—� ^ - - - — r J •
•
3.2 4 ism
0299
.■/_��.■
�- 3.4 • ♦ .�. .p •
.. .y' •
G 5 0
d.e F9 �o • �
♦6 S2'' .....
dz �
36 R'n�on \dJ _ •
II
9R d.0 .6e_.
3.h �vll� 56 \
:� Rood O�flq 6.0 6.1 -
1 h° 02fl9 —
' �l — 6.4
_ o
1 7�o
t _`\f 1 U
t
Maplewood & Orting Hills Subbasin Conditions Map 20
Cedar River Basin Planning Area
i
Stream&Stream Number '0/0 Problem Location/Area e Locally Significant Resource Area
I
Lake River Areawide Non point Water Flooding
0.6• Stream Mile Quality Problem
I
� 5 Wetland&Wetland Number � Wetland Habitat Problem j
•�'• Subbasin Boundary 3 Stream Habitat Problem
t 1 Catchment Boundary o IA 'AhMie
MWl Catchment Number Erosion/Sedimentation