HomeMy WebLinkAboutSWP272156 Short Plat (SHPL N__ )
REQUEST FOR PROJECT 11 Prelim. Plat (PP//
-- CAGH
To: Technical Services Date �Wou Green// �
From: Plan Rcvicw/Projcct Manager
Project Name
(70 characters max)
Description of Project:
d U�
Circle Size of Waterline: 8" 12" Circle One: New or Extension
Circle Size of Sewerline: 10" 12" Circle One: New or Extension
Circle Size of Stormline: 12" 15" 18" 24" Circle One: New or Extension/
Address or Street Name(s) zl-fk a S X �&
Dvip r/Contractor/Owner/Cnslt:
(70 characters max)
Check each discipline involved in Project Ltr Drwg fl of sheets per discipline
Trans-Storm
(Roadway/Drainage) (Off site ovemcnts)(include basin name) (include TT-SC sheets)
O Transportation (Signalizalion,Channelizatioq Lighting)
Wastewater
(Sanitary Main)(include basin name)
U Water (Mains,Valves.Hydrants) Y
(Include composite&Horizontal Ctrl Sheets)
TS Use Only12
� Q
ter.:
Approved by TSM Date:
rorms/misc/92-090.DOC/CD/bh
GEOTECH
CONSULTANTS
13256 N.E.20th St.(Northup Way),Suite 16 May 16 , 1991
Bellevue,WA 98005
(206)747-5618 J N 91148
(206)343-7959
Seattle-Renton Investors
27400 Southeast 132nd Street , Suite F-206
Kent , Washington 98042 ,y
CITY V 1�'Om'ON
Attention : Ron Trema i ne E 0 V D
Subject : Geotechnical Engineering Study MI L 91991
Proposed Tall Firs Townhouse Development
4802 - 4816 Northeast Sunset Boulevard FaE �pa�GDIV'ISION
Renton , Washington
Gentlemen :
We are pleased to present this geotechnical engineering report
for the proposed townhouse development to be constructed on
Northeast Sunset Boulevard in Renton , Washington . The purpose
of our work was to explore site surface and subsurface
conditions and to provide general earthwork recommendations
and design criteria for foundations , retaining walls , and
Pavements . The work was authorized by your acceptance of our
proposal , P-9513 dated April 29 , 1991 .
The subsurface conditions of the proposed building site were
explored with seven test pits . The explorations encountered
medium-dense to dense , glacial till and/or gravelly sand soils
at relatively shallow depths . These native soils can be
relied upon to support the proposed buildings founded on
conventional footings . However , the glacial till soils are
silty and thus are very moisture sensitive . It would be
advantageous to perform earthwork during the normally dry
summer months . If earthwork is performed during extended
periods of wet weather , imported pit-run gravel may be needed
for structural fill and as a protective covering for access
roads and bearing surfaces .
The attached report contains a discussion of the study and our
recommendations . If there are any questions , or if we can be
of further service , please contact us .
Respectfully submitted ,
GEOTECH CONSULTANTS , INC .
)a""Wl-f ' /0'
D. Robert Ward
Geotechnical Engineer
may_
GEOTECHNICAL ENGINEERING STUDY
PROPOSED TALL FIRS TOWNHOUSE DEVELOPMENT
4802 - 4816 NORTHEAST SUNSET BOULEVARD
RENTON , WASHINGTON
This report presents the findings and recommendations of our
geotechnical engineering study for the site of the proposed
Tall Firs Townhouse Development in Renton . The general
location of the site is illustrated on the Vicinity Map, Plate
1 .
Based on a building location plan furnished to us prior to our
explorations and a topographic/site grading plan furnished to
us following our explorations , we anticipate that the
development will consist of nine townhouse buildings located
throughout the site . Six of the buildings will have a slab-
on-grade finish floor , and cuts of up to seven feet are
proposed to reach the finish floor elevation . The remaining
three buildings will have a suspended-wood finish floor over a
crawl space, and the finish floor elevations will be
approximately two to five feet above the existing ground
surface . Much of the area around the buildings will be paved ,
and vehicle access to the site will be from Northeast Sunset
Boulevard on the south side .
SITE CONDITIONS
SURFACE
The tract is somewhat rectangular in shape , except that the
west side is approximately 459 feet in length and the east
side is 359 feet . It has approximately 314 feet of frontage
on the south border along Northeast Sunset Boulevard and is
_ located in the northeast portion of Renton . The highest
elevation of the site is approximately 430 feet at the
northern edge , near the middle . From that point the site
slopes gently to the south , east , and west , except for some
moderate slopes on the western portion . The southern one-
third of the site is relatively flat . There are three
existing houses on the south end of the property which are
constructed over crawl spaces . The vegetation surrounding the
houses consists of grasses and occasional fir trees . The
vegetation north of the houses and on the east portion of the
site also consists of grasses , but the fir trees are more
dense ; the vegetation on the west portion , north of the
houses , consists of brush with fir , alder , and maple trees .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 2
The adjacent properties to the north and south of the site are
undeveloped . The adjacent property to the west is developed
with commercial and retail buildings and is one to five feet
higher than the western edge of the subject site because fills
were added . The adjacent property to the east is developed
with single-family residences and is near the same elevation
as the eastern side of the subject site .
SUBSURFACE
The subsurface conditions were explored by seven test pits at
the approximate locations shown on the Soils Exploration Plan ,
Plate 2 . The field exploration program was based upon the
proposed construction and required design criteria , site
topography and access , subsurface conditions revealed during
excavation , the scope of work outlined in our proposal , and
time and budget constraints .
The test pits were excavated on May 3 , 1991 with a rubber-
tired backhoe owned and operated by Evans Brothers Excavating .
A geotechnical engineer from our staff observed the excavation
process , logged the test pits , and obtained representative
samples of the soils encountered . "Grab" samples of selected
subsurface soils were collected from the backhoe bucket . The
Test Pit Logs are attached to this report as Plates 3 through
6 .
The uppermost soils generally consist of approximately four to
five feet of loose to medium-dense , weathered glacial till
which is comprised of gravelly , silty sand . The weathered
glacial till is generally underlain by medium-dense to very
dense , gray glacial till to a maximum explored depth of nine
feet . However , in Test Pits 4 and 6 , the uppermost soils
consist of four to six feet of loose to medium-dense , very
gravelly sand .
The final logs represent our interpretations of the field logs
and laboratory tests . The stratification lines on the logs
represent the approximate boundary between soil types at the
exploration locations . In actuality , the transition between
soil types may be gradual . The relative densities and
moisture descriptions indicated on the test pit logs are
interpretive descriptions based on the conditions observed
during excavation . The logs should be reviewed for specific
subsurface information at the locations tested .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 3
GROUNDWATER
Groundwater seepage was observed at a depth of four feet in
Test Pit 4 . The test pit was left open only for a short time
therefore, the seepage levels on the logs represent the
location of transient water seepage and may not be the
location of the static groundwater level . It should be noted
that groundwater levels vary seasonally with rainfall and
other factors . We anticipate that perched groundwater could
be found on the dense glacial till soil within the near
surface weathered soil or gravelly sand soil .
CONCLUSIONS AND RECOMMENDATIONS
GENERAL
Soils on this site are predominantly glacial tills . Glacial
till soils have an average silt content of about 30 percent
which makes them difficult to grade and compact if the soil
becomes wet . This soil type is the predominate soil in the
Puget Sound area with the exception of the river valley and
coastal flat areas . Therefore , earth construction operations
on this site are subject to the same constraints as the
earthwork construction operations on most sites in the area .
The constraints affect the economics of site development , but
not the engineering feasibility of development under any
weather conditions .
CONVENTIONAL FOUNDATIONS
The proposed structure can be supported on conventional
continuous and spread footings bearing on undisturbed ,
competent glacial till or gravelly sand soils , or on
structural fill placed above these competent soils . The upper
weathered soils are loose to medium-dense and exceeded the
optimum moisture content during our exploration . If the
weathered soils are near the optimum moisture content at the
time of foundation construction , then they should be
compacted , and the footings may be placed on them. However ,
if the weathered soils are wet and not compactible , they
should be removed and the footings placed on the dense ,
unweathered glacial till or gravelly sand . Continuous and
individual spread footings should have minimum widths of
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 4
twelve ( 12) and sixteen ( 16) inches and should be bottomed at
least twelve ( 12) inches below the lowest adjacent finish
ground surface.
As noted above , some overexcavation may be needed below
footings to expose competent native soils . Unless lean
concrete is used to fill the overexcavated hole , the
overexcavation must be at least as wide at the bottom as the
sum of the depth of the overexcavation and the footing width .
For example , an overexcavation extending two feet below the
bottom of a three-foot-wide footing must be at least five feet
wide at the base of the excavation .
Footings constructed according to the above recommendations
may be designed for an allowable soil bearing pressure of two
thousand (2000) pounds per square foot ( psf ) . If footings are
extended down to unweathered glacial till , a bearing capacity
of five thousand (5000 ) psf may be assumed . A one-third
increase in this design bearing pressure may be used when
considering short-term wind or seismic loads . For the above
design criteria , it is anticipated that total post-
construction settlement of footings founded on competent ,
native soils or on structural fill up to five (5) feet in
thickness) will be about one-half inch , with differential
settlements of less than one-half inch .
Lateral loads due to wind or seismic forces may be resisted by
friction between the foundations and the bearing soils , or by
passive earth pressure acting on the vertical , embedded
portions of the foundations . For the latter condition , the
foundations must either be poured directly against relatively
level , undisturbed soil or level structural fill must be
placed around the outside of the foundation . We recommend
the following design values be used for the foundation ' s
resistance to lateral loading :
Design
Parameter value
Coefficient of Friction 0 . 45
Passive Earth Pressure 400 pcf
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 5
Where :
( 1 ) Pcf is pounds per cubic foot
(2 ) Passive earth pressure is computed
using the equivalent fluid density .
if the ground in front of the foundation is loose or sloping ,
the passive earth pressure given above will not be
appropriate . We recommend that a safety factor of at least 1 . 5
be used for design of the foundation ' s resistance to lateral
loading .
SEISMIC CONSIDERATIONS
The site is located within Seismic Zone 3 as illustrated on
Figure No . 2 of the 1988 Uniform Building Code (UBC) . In
accordance with Table 23-1 of the 1988 UBC , the site soil
profile is best represented by Profile Type 51 .
SLABS-ON-GRADE
Slab-on-grade floors may be constructed atop native soils or
structural fill . The subgrade soils must be in a firm, non-
yielding condition at the time of slab construction . Any
soft areas encountered should be excavated and replaced with
select imported structural fill .
All slabs-on-grade should be underlain by a capillary break
layer consisting of a minimum four (4 ) inch thickness of free-
draining granular structural fill with a gradation similar to
that discussed later in PERMANENT FOUNDATION AND RETAINING
WALLS . In areas where the passage of moisture through the
slab is undesirable, a vapor barrier such as a 6-mil plastic
membrane should be placed beneath the slab. Additionally ,
sand should be used in the fine grading process to reduce
damage to the vapor barrier and to provide uniform support
under the slab.
PERMANENT FOUNDATION AND RETAINING WALLS
Retaining walls backfilled on one side only should be designed
to resist lateral earth pressures imposed by the soils
retained by these structures . The following recommended
design parameters are for walls less than twelve ( 12) feet in
height which restrain level backfill :
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 6
Design
Parameter value
Active Earth Pressure* 35 pcf
Passive Earth Pressure 400 pcf
Coefficient of Friction 0 . 45
Soil Unit Weight 135 pcf
Where :
1 ) Pcf is pounds per cubic foot
2) Active and passive earth pressures are
computed using equivalent the fluid
densities .
* For restrained walls which cannot deflect at
least 0 . 002 times the wall height , a uniform
lateral pressure of one hundred ( 100 ) psf
should be added to the active equivalent
fluid pressure .
The values given above are to be used for design of permanent
foundation and retaining walls only . The passive pressure
given is appropriate only for the depth of level structural
fill placed in front of a retaining or foundation wall . An
appropriate safety factor should be applied when designing the
walls . We recommend using a factor of safety of at least 1 . 5
for overturning and sliding .
The above design values do not include the effects of any
hydrostatic pressures behind the walls and assume that no
surcharge slopes or loads will be placed above the walls . If
these conditions exist, then those pressures should be added
to the above lateral pressures . Also , if sloping backfill is
desired behind the walls , then we will need to be given the
wall dimensions and slope of the backfill in order to provide
the appropriate design earth pressures .
Heavy construction equipment should not be operated behind
retaining and foundation walls within a distance equal to the
height of the wall , unless the walls are designed for the
additional lateral pressures resulting from the equipment .
Placement and compaction of retaining wall backfill should be
accomplished with hand-operated equipment .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 7
Retaining Wall Backfill
Backfill placed within eighteen ( 18 ) inches of any
retaining or foundation walls should be free-draining
structural fill containing no organics . This backfill
should contain no more than five (5 ) percent silt or clay
particles and have no particles greater than four (4 )
inches in diameter . The percentage of particles passing
the No . 4 sieve should be between 25 and 70 percent .
( Due to their high silt content , if the native sand soils
are used as backfill , a drainage composite , such as
Miradrain or Enkadrain , should be placed against the
retaining walls . The drainage composites should be
hydraulically connected to the foundation drain
system. )
The purpose of these backfill requirements is to assure
that the design criteria for the retaining wall are not
exceeded because of a build-up of hydrostatic pressure
behind the wall . The top foot to eighteen inches of the
backfill should consist of a relatively impermeable soil
or topsoil , or the surface should be paved . The sub-
section entitled GENERAL EARTHWORK AND STRUCTURAL FILL
contains recommendations regarding placement and
compaction of structural fill behind retaining and
foundation walls .
EXCAVATIONS AND SLOPES
In no case should excavation slopes be greater than the limits
specified in local , state , and national government safety
regulations . Temporary cuts up to a height of four (4) feet
deep in unsaturated soils may be made vertical . For temporary
cuts having a height greater than four (4) feet , the cut
should have an inclination no steeper than 1 : 1
( Horizontal :Vertical ) from the top of the slope to the bottom
of the excavation . All permanent cuts into native soils
should be inclined no steeper than 2 : 1 (H :V) . Fill slopes
should not be constructed with an inclination greater than
2 : 1 ( H :V) . it is important to note that the gravelly sand soil
may cave suddenly , and without warning . The contractors
should be made aware of this potential hazard .
Water should not be allowed to flow uncontrolled over the top
of any temporary or permanent slope . Disturbed slopes should
be covered with plastic during wet weather to minimize the
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 8
potential for erosion . All permanently exposed slopes should
be seeded with an appropriate species of vegetation to reduce
erosion and improve stability of the surficial layer of soil .
DRAINAGE CONSIDERATIONS
We recommend the use of footing drains at the base of all
footings and backfilled earth retaining walls . These drains
should be surrounded by at least six (6) inches of one-inch-
minus washed rock wrapped in non-woven geotextile filter
fabric (Mirafi 140N , Supac 4NP , or similar material ) . At the
highest point , the perforated pipe invert should be at least
as low as the bottom of the footing or the crawl space , and it
should be sloped for drainage . All roof and surface water
drains must be kept separate from the foundation drain system.
A typical drain detail is attached to this report as Plate 9 .
Groundwater was observed I,n Test Pit 4 during our field work .
Seepage into planned excavations is possible , and if
encountered should be drained away from the site by use of
drainage ditches , perforated pipe or French drains , or by
pumping from sumps interconnected by shallow connector
trenches at the bottom of the excavation .
The excavation and site should be graded so that surface water
is directed off the site and away from the tops of slopes .
Water should not be allowed to stand in any area where
foundations , slabs , or pavements are to be constructed . Final
site grading in areas adjacent to building( s ) should be sloped
at least two (2) percent away from the building , except where
the area is paved .
PAVEMENT AREAS
All pavement sections may be supported on native soils or
structural fill , provided these soils can be compacted to 95
percent density and are stable at the time of construction .
We recommend that a contingency be put in the construction
budget for the placement of six (6) inches of select pit-run
gravel in the parking areas and twelve ( 12) inches in the
heavy traffic areas . Recommendations on the composition of
the select pit-run gravel are included in the GENERAL
EARTHWORK AND STRUCTURAL FILL SECTION . Additional pit-run
and/or fabric may be needed to stabilize soft , wet or unstable
areas . We recommend using Supac 5NP , manufactured by
Phillips Petroleum Company , or a non-woven fabric with
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 9
equivalent strength and permeability characteristics . The
subgrade should be evaluated by Geotech Consultants , Inc .
after the site is stripped and cut to grade . The upper twelve
( 12 ) inches of pavement subgrade should be compacted to at
least 95 percent of the ASTM D-1557-78 maximum density . Below
this level , a compactive effort of 90 percent would be
adequate . All subgrade areas must also be in a stable , non-
yielding condition prior to paving .
The pavement section for lightly loaded traffic and parking
areas should consist of two (2 ) inches of asphalt concrete
(AC) over four (4) inches of crushed rock base (CRB) or three
(3) inches of asphalt treated base (ATB) . We recommend that
heavily loaded areas be provided with three (3) inches of AC
over six (6) inches of CRB or four (4 ) inches of ATB . The
heavily loaded areas are typically main driveways and dumpster
areas . Where the subbase is composed of silty , water-
sensitive soils , and there is irrigated landscaping adjacent
to and at an elevation higher than the pavement , we suggest
that perimeter drains be installed to intercept the water that
would otherwise saturate the pavement subbase . The pavement
section recommendations and guidelines are based on our
experience in the area and on what has been successful in
similar situations . We can provide recommendations based on
expected traffic loads and R value tests , if requested . Some
maintenance and repair of limited areas can be expected . To
provide for a design without the need for any repair would be
uneconomical . We stress again , however , that the performance
of site pavements is related to the strength and stability of
the underlying subgrade .
GENERAL EARTHWORK AND STRUCTURAL FILL
We recommend that the building and pavement areas be stripped
and cleared of all surface vegetation , all organic matter , and
other deleterious material . The stripped or removed materials
should not be mixed with any materials to be used as
structural fill . Should the foundations and/or slabs for the
existing structure also be removed , and structural fill should
be placed in the crawl space areas where buildings are
located .
Structural fill is defined as any fill placed under the
building , behind permanent retaining or foundation walls , or
in other areas where the underlying soils need to support
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 10
loads . Geotech Consultants , Inc . should observe site
conditions during and after excavation prior to placement of
any structural fill .
All structural fill should be placed in horizontal lifts with
a moisture content at or near the optimum moisture content .
The optimum moisture content is that moisture content which
results in the greatest compacted dry density . The moisture
content of fill soils is very important and must be closely
controlled during the filling and compaction process .
The allowable thickness of the fill lift will depend on the
material type , compaction equipment used , and the number of
passes made to compact the lift . In no case should the lifts
exceed twelve ( 12 ) inches in loose thickness . The following
table presents recommended relative compaction for structural
fill :
Minimum Relative
Location of Fill Placement compaction
Beneath footings , slabs or 950
walkways
Behind retaining walls 900
Beneath pavements 95% for upper 12 inches
of subgrade , 90% below
that level
Where : Minimum Relative Compaction is the ratio ,
expressed in percentages , of the compacted
dry density to the maximum dry density , as
determined in accordance with ASTM Test
Designation D-1557-78 (Modified Proctor) .
Use of On-Site Soils
If grading activities take place during wet weather , or
when the silty , on-site soils are wet , site preparation
costs may be higher because of delays due to rains and
the potential need to import granular fill . The on-site
soils are generally silty and thus are moisture
sensitive . Grading operations will be very difficult
when the moisture content of these soils exceeds the
optimum moisture content by more than two percent .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 11
The moisture content of the silty , on-site soils must be
at or near the optimum as they cannot be consistently
compacted to the required density when the moisture
content is greater than optimum. The moisture content of
the on-site soils at the time of our explorations was
generally above the estimated optimum moisture content .
The on-site sand or gravel soils underlying the topsoil
could be used as structural fill if grading operations
are conducted during dry weather and when drying of the
wet soils by aeration is possible . During excessively
dry weather it may be necessary to add water to achieve
optimum moisture content .
Moisture sensitive soils may also be susceptible to
excessive softening and "pumping" from construction
equipment traffic when the moisture content is greater
than the optimum moisture content .
Ideally , structural fill which is to be placed in wet weather
should consist of a select pit-run gravel or granular material
having no more than five (5 ) percent silt or clay particles .
The percentage of particles passing the No . 200 sieve should be
measured from that portion of the soil passing the three-
quarter-inch sieve .
LIMITATIONS
The analyses , conclusions and recommendations contained in
this report are based on site conditions as they existed at
the time of our exploration and assume that the soils
encountered in the test pits are representative of the
subsurface conditions of the site . If the subsurface
conditions encountered during construction are significantly
different from those observed in the explorations , we should
be advised at once so that we can review these conditions and
reconsider our recommendations where necessary . Unanticipated
soil conditions are commonly encountered on construction sites
and cannot be fully anticipated by merely taking soil samples
in test pits . Subsurface conditions can also vary between
exploration locations . Such unexpected conditions frequently
require that additional expenditures be made to attain a
properly constructed project . It is recommended that the
owner consider providing a contingency fund to accommodate
such potential extra costs and risks .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 12
This report has been prepared for the exclusive use of
Seattle-Renton Investors and their representatives for
specific application to this project and site . Our
recommendations and conclusions are based on the site
materials observed , and selective laboratory testing and
engineering analyses . The conclusions and recommendations are
professional opinions derived in accordance with current
standards of practice within the scope of our services and
within budget and time constraints . No warranty is expressed
or implied . The scope of our services does not include
services related to construction safety precautions and our
recommendations are not intended to direct the contractor' s
methods , techniques , sequences or procedures , except as
specifically described in our report for consideration in
design . The scope of our work did not include an
environmental audit , however , we can provide this service , if
requested . We recommend that this report , in its entirety , be
included in the project contract documents for the information
of the contractor .
ADDITIONAL SERVICES
It is recommended that Geotech Consultants , Inc . provide a
general review of the geotechnical aspects of the final
design and specifications to verify that the earthwork and
foundation recommendations have been properly interpreted and
implemented in the design and project specifications .
It is also recommended that Geotech Consultants , Inc . be
retained to provide geotechnical consultation , testing , and
observation services during construction . This is to confirm
that subsurface conditions are consistent with those indicated
by our exploration , to evaluate whether earthwork and
foundation construction activities comply with the intent of
contract plans and specifications , and to provide
recommendations for design changes in the event subsurface
conditions differ from those anticipated prior to the start of
construction . However , our work will not include supervision
or direction of the actual work of the contractor , his
employees or agents . Also , job and site safety , and
dimensional measurements , will be the responsibility of the
contractor .
GEOTECH CONSULTANTS , INC .
Seattle-Renton Investors JN 91148
May 16 , 1991 Page 13
The following plates are attached and complete this report :
Plate 1 Vicinity Map
Plate 2 Soils Exploration Plan
Plates 3 - 6 Test Pit Logs
Plate 7 - 8 Grain Size Analysis
Plate 9 Footing Drain Detail
Respectfully submitted ,
•`� �. F/� `'°e GEOTECH CONSULTANTS , INC.
4`
1 of ti ✓ s� d
� • ; D. Robert Ward
Geotechnical Engineer
/���
°+....• James R . Finley , Jr . P . E .
Principal
Attachments
DRW/JRF : cka
GEOTECH CONSULTANTS , INC .
34
�O Ft i 35 COUGAR MOUNTAIN 3 6 K
A 'P S�•rF _ �`, REGIONAL WILOLAND
tK. n SE 91 S7 SE 81ST ST ..�
PARK
9 7 SE 2
MAY
7i Y VALLEY RU g
95TH PL
_ W df
ERRAME/GHTS_—a r_<W — —> — —�i �aE—--——— ——
PARK
,I.ST ZI
MT11 ST -� .. 25 PL I 1SE
Q SE 100TH101 ST 1 TH PL
F 1 M \ G
L 4 a SE 102N � T NE NE N R
�y� �1WE
d SEJ
'-'1 r NE <a` PL ML1 :E• 1 I x W 9 Sl rt
<, � 12 ST r i 1
M =NE CT 7� SE 104T A"ST I a G 1 T �\ 2 1 y4,.i `'RT 1 I
NE
1 TH c F \
1•^H ST 1 1t N �P ^<
2 1P`ZMA C, > 1
�.. > NE 17TH�T BT CT W < SE 107TH ST'ST \
2 ijj]ISTM ST W K SE ¢I m ISSAH
< G
li
I HST \ > , `'5 T- >
Z V`V n `•
yDEPT Oi rj F r•" mUST S/NG lZ o .. \ w
'Ef,12T I1TH PL tM CO L�IELD
112TH _ $E 112TH T� �/'7Ty U1
_ = g NE IT + z <Ij OLIVER M ST SE 1177 H PL w a pN --
NE E
< ,11T 3u'"i T 1 NAZENt N N SE 113TH Si Q;> F
N N NS ■ SE 114TH > PL i < SE IIITH ST I Q _ V V,q14
'H ¢to a4 = NE IOTH PL 1<I z < t- 0 \ �I F
-IOTH LN >< F rrI SE 116TH ST SE I16TH T � SD a �y I�<>
11--5 --W 1S7 O idl _ a ---- $ 11TTHy--------I W — ¢
=$u-r- 119TH > ST > I —� ►L 9L
_ I ~1 S 118TH< Q 1\
OL NST x
E 8 CT i... < I -< < 2
ST < SE 120TH ST
z TTN w NE I SE 120TH ST O
0
i Y E 121ST ST
E_120TH ST
�PT1.e NE 1-••ST L QTH NE 8 NH CT
PL I ST
w I WNI s�;
mH .......... 1
> > 1
a = <= I I r- <
_
12.TH T ' •..- zl
wmm
P AV NE z I g E 2MSMTHa m I .-,�E 1{ITI
< I 1 H > >
N TO I� ST x x I W
4TH T —i SE lYDTH ST SE 121TH ST 1 !8
�/ I W1 I/ FS`
WOO W-- WI SE 129TH ST r,I i
< -- Q Q yj I uj
U I I I > S 0TH 81<N N <I
I <
bS�f_ 131 T>F-'�T.4 <I w: N SE 1 1STN 131ST < L
NEATNER-f.-.W T n >
DOWNS ° SE <I 1�2NQ1 1 T I 'SE 132ND ST SE
PARK 1S/Tfl } "C i--- ---- p I SE 1 P I N ST z 132N0
/ 1 I F R ST I I < < ~ g
ME 1ST I N I gE > x I
194TH ST >; = SE Q I74TH iT z SE 1 T
< S 136TN ST -I 135j)I <. Q SE 1 1 T H
1 0 - ^ Q
3STH 1-S -'w .SE 136TH ST ......
W:
SE 1 'x a H. TiS
----- L,15--- -- qj-d-- -;.- - ---
i > LSE 138TH� 5T 1n1 z �: a- SE 137TH PLW 137TH y
PL IlncoTv
1
VICINITY MAP
GEOTECH 4802 -4816 N.E. SUNSET BLVD.
CONSULTANTS, INC. RENTON, WASHINGTON
Job No_ Date: Plate:
z' 91148 MA Y 1991 1
03
O TP-7
\ 2 0
CY
t t tl
N LL LL {y
F.F.-423.0 ti •r !I u- aL
J 1 � �.
\ 0 TP-2
- ,
OTP-1
\ O F.F.-412.0 N
WITH CRAWL
SPACE N
F.F.-422.0
F.F.-418.0 Q
W
F.F.-412.0 ` Z
TP-6 WITH CRAWL
�jTP-4 O SPACE
ML= i
� J
O Q l O Q F.F.-412.0 /
a cc a; cc /
W T U W
i = U = U /
ti F- < t H Q
0.
TP-3 " 3 w u 3 Co
O5 /
LEGEND: SITE EXPLORATION PLAN
TP-1 APPROXIMATE TEST PIT LOCATIONS
GEOTECH 4802-4816 N.E. SUNSET BLVD.
O BUILDING NUMBER CONSULTANTS RENTON, WASHINGTON
Job No.: Dote: scale
;T777�
91148 MAY 1991
TEST PIT 1
r,- t��e O'&
6Q� o�y �t0
0 G� USCS Description
Reddish-brown to tan, silty SAND with gravel, trace
of organics, fine grained, moist, loose to medium-dense
(weathered glacial till).
13.0 becomes grayish
:SM
5 becomes gray, dense (glacial till)
10 Test pit completed at 9 feet below existing grade on 5-3-91.
No groundwater encountered during excavation.
No caving.
15
TEST PIT 2
0 G USCS Description
Reddish-brown to tan, silty SAND with gravel, trace of
organics,moist, loose to medium-dense (weathered glacial till).
sM becomes gray, very dense (glacial till).
5 11.8
Test pit completed at 7 feet below existing grade on 5-3-91.
No groundwater encountered during excavation.
10 No caving.
15
TEST PIT LOGS
GEOTECH 4802 -4816 N.E. SUNSET BLVD.
CONSULTANTS, INC. RENTON, WASHINGTON
Job No: Date: Logged by: Plate:
91148 MAY 1991 DRW 3
�1
TEST PIT 3
oQ o`� oot
G USCS Description
Topsoil
Reddish-brown, gravelly, silty SAND with many organics,
very moist, loose (weathered glacial till)
TTITIT
sM lens of wet silt
5
becomes gray, very silty, dense (glacial till).
becomes less silty,moist, very dense.
Test pit completed at 8 feet below existing grade on 5-3-91.
10 No groundwater encountered during excavation.
No caving.
15
TEST PIT 4
Qt •�y �e
0 God USCS Description
Topsoil
SM
Reddish
-brown, silty SAND with gravel and organics, very moist, loose
3.8 ? Brown to gray, sandy GRAVEL, wet to saturated,
loose to medium-dense.
5 Gray, very silty SAND with gravel, very moist, medium-dense to dense
sM (glacial till).
10 Test pit completed at 9 feet below existing grade on 5-3-91.
Groundwater encountered at 4 feet during excavation.
No caving.
15
TEST PIT LOGS
GEOTECH 4802 -4816 N.E. SUNSET BLVD.
CONSULTANTS, INC. RENTON, WASHINGTON
Job No: Date: Logged by: Plate:
91148 MA Y 1991 DRW 4
TEST PIT 5
Go USCS Description
0
Reddish-brown, gravelly, silty SAND, some organics,
very moist, loose to medium-dense (weathered glacial till).
becomes gray, very silty, medium-dense to dense (glacial till).
SM
5 becomes less silty,moist, dense.
Test pit completed at 8 feet below existing grade on 5-3-91.
10 No groundwater encountered during excavation.
No caving.
15
TEST PIT 6
�l
oQ� o`y oot�
G USCS Description
0
i Gyy.i: Reddish-brown, slightly silty, sandy GRAVEL, few organics,
6.8 _: few cobbles, moist, loose to medium-dense.
.MGP : Brown to gray, very gravelly SAND, cobbles, very coarse grained,
moist,medium-dense.
5 Gray, gravelly, silty SAND, very moist, dense to very dense
(glacial till).
SM
10 Test pit completed at 9 feet below existing grade on 5-3-91.
No groundwater encountered during excavation.
Slight caving between 2 and 6 feet.
15
TEST PIT LOGS
GEOTECH 4802 -4816 N.E. SUNSET BLVD.
CONSULTANTS, INC. RENTON, WASHINGTON
Job No: Date. Logged by: Plate:
91148 MAY 1991 DRW 5
TEST PIT 7
eQ� o`el o�te
G USCS Descti tion
0
Reddish-brown, silty SAND with gravel, organics, moist, loose
to medium-dense (weathered glacial till).
becomes tan, more gravelly, cobbles.
SM
becomes gray, very dense (glacial till).
5
Test pit completed at 7 feet below existing grade on 5-3-91.
No groundwater encountered during excavation.
10 No caving.
15
TEST PIT LOGS
GEOTECH 4M2 -4816 N.E. SUNSET BLVD.
CONSULTANTS, INC. RENTON, WASHINGTON
Job No: Date: Logged by: I Plate:
91148 M4 Y 1991 DRW 6
HYDROMETER
Im
�����■�0 W,ME ����0IM M 0 M EonUNION
• �����■��■.����IL�����■fir�■������■���� :.
33
-100
cQ
• ®®
• � CLASSIFICATION
ca . ,
HYDROMETER
lQ
co
• •
SOIL
® • ®®
•
Slope bockfi/I away from
foundation, ---•�
\\ TIGHTL INE ROOF DRAIN
Do no/ connect to fooling drain.
BACKFIL L
See text for VAPOR BARRIER
requirements. SLAB
WASHED ROCK 11 v.° '.'°'. ` "� 4 min6 min.
FREE-DRAINING
NONWOVEN GEOTEXT/LE
SAND/GRAVEL
FILTER FABRIC
4"PERFORATED HARD PVC PIPE
Invert at least as low as fooling and/or
crawl space. Slope to drain. Place
weepho/es downward.
FOOTING DRAIN DETAIL
GEOTECH 4802 - 4816 N.E. SUNSET BLVD.
CONSULTANTS RENTON, WASHINGTON
Job No., Date: Soo/e+
91148 MAY 1991 N.T.S. 9
n
i
ILI
�P
.- �Vlklxl
CITY OF RENTON - S1ke
MEMORANDUM
DATE: December 30, 1994
TO: Lys H.
Dave C.
Bob M.
Ron S. \�
FROM: Arneta Plan Review X6198
SUBJECT: TALL FIRS RTSW 2156
For your files.
0 REQUEST FOR FILE AND NUMBER
0 PRECON NOTICE
0 PRECON MINUTES
2 ATTENDEES AT PRECON
0 LETTER OF SPECIAL BILLING SIGNED
0 MEMO TO BECKY AND RAY STATING THAT LETTER OF SPECIAL BILLING WAS
SIGNED
0 CONSTRUCTION PERMIT
0 RECEIPT FOR CONSTRUCTION PERMIT--SEE SIERRA SYSTEM UNDER PERMIT
C940079
0 TWO ORIGINAL BOUND DRAINAGE REPORTS
0 COPY OF LETTER AUTHORIZING DOWNSIZEING WATERMAIN TO 8"
0 COPY OF LETTER AUTHORIZING NOT HAVING TO SEAL
PC: Nei N.
Short Plat (SHPL /I )
REQUEST FOR PROJECT/! Prelim. Plat (PPH. )
-- CAGE
To: Technical Services Date WOIq Green#
From: Plan Rcvicw/Projcct Manager —
Project Name
(70 charamm max)
Description of Project: 'u
e �- G
Circle Size of Waterline: 8" l2" Circle One: New or Extension
Circle Size of Sewerline: 10" 12"
Circle One: New or Extension
Circle Size of Stormline: 12" 15" 18" 24" Circle One: New or Extension/Q
Address or Street Name(s) fu
Dvlpr/Contractor/Owner/Cnslt:
(70 characters max)
Chereach discipline involved in Project Ltr Drwg H of sheets per discipline
Trans-storm • C .
(Roadway/Drainage) (Offs tc ovcmaUs)(include basin name) (include TESC sheds)
❑ Transportation (Signaliziti«t Channclization,UeAing)
er/Wastew-ater
(Sanitary Main)(include basin name)
O Water (Mains,Valves,Hydrants)
(Include composite&Horizontal Ctrl Sheets)
TS Use Onlyn Lf O
Approved by TSM Date:
Cornis/misd92-090.DOC JCDIbh
CITY OF RENTON
Y 0 PUBLIC WORKS DEPARTMENT
235-2631
..I! ♦ PRECONSTRUCTION CONFERENCE
DATE: August 24, 1994
TIME: 10:00 am
PLACE: City Hall 1st Floor
Conference Room
DEVELOPER/CONTRACTOR OR SUBCONTRACTOR/NAME OF PROJECT:
COMPANY NAME: Tall Firs Associates
COMPANY ADDRESS: 14200 S.E. 272nd Street #E203, Kent, WA. 98032
PHONE: 630-6845 FAX NO: 630-8273 CONTACT: Ron Tremaine
NAME OF PROJECT: Tall Firs
INSTALLATION: Water Sewer Storm Street Improvements
LOCATION: Sunset Blvd NE & Duvall Ave NE
PROJECT COORDINATOR: Arneta Henninger 277-6198
PLEASE CHECK DEPARTMENTS TO BE NOTIFIED AND SPECIFY PERSON TO ATTEND:
[X] PUBLIC WORKS DEPARTMENT
[X] Utility Plan Review Neil Watts
[X] Water Utility Lys Hornsby
[X] Wastewater Utility David Christensen
[X] Surface Water Utility Ron Straka
[X] Transportation Systems Karl Hamilton
[X] Maintenance Services Division Jack Crumley
[X] Customer Services P.I.C. Dee Beedle
[X] Construction Services Dan Thompson
[X] FIRE PREVENTION Corey Thomas
( ] POLICE DEPARTMENT
[ ] PARK DEPARTMENT
[X] BUILDING DEPARTMENT Jim Chandler
( ] OTHER
OUTSIDE DEPARTMENTS: [ X ] CONTRACTOR TO NOTIFY
[X] ALL ASSOCIATED CIVIL CONTRACTORS
[ ] Department of Transportation 872-6470
[X] U.S. West Communications 235-3012
[X] Puget Sound Power & Light Co. Karen Sharp 850-5560
[ ] Seattle City Light 684-3076
[X] TCI Cable of Washington (Phil Fisk) 433-3434 x3084
[X] Washington Natural Gas Company (Lorren Loveless) 224-2209
[ ] METRO - Bus Routes 684-2732
[ J King County Inspection 244-0770
[ X] Other: Engineer, Surveyor and Book Bales Developers
PRf•.CONFM.DOT/bh
ATTACHMENT
PERMIT NO. C940079
PRECONSTRUCTION MEETING
Tall Firs
4808 N.E. Sunset Blvd
August 24, 1994 10:00 a.m.
First Floor Conference Room
Owner: Prell Development
Inspector: Dan Thompson Developer/ Manager: Ron Tremaine
Phone: 999-1828 Phone: 630-6845
Engineer: Doug Conyers,
Barghausen Engineers
Phone: 251-6222
FRANCHISE UTILITIES:
1 . The franchise utilities require copies of the approved construction drawings
before designing their facilities.
2. Each franchise utility must apply for a separate permit prior to construction in
existing or future right-of-way. A blueline drawing showing the location of all
utilities, city and franchise, in redlines shall be submitted to the third floor
counter for City review two weeks before installation.
3. All franchise utilities shall be separated a minimum of five feet (5') horizontally
and twelve inches (12") vertically from City utilities.
Puget Power Representative Karen Sharp has seen plans. Development is
engineered to her satisfaction.
FIRE PREVENTION:
1 . Maintain access to site at all times. Must be able to support emergency
equipment in all types of weather. Secondary access shall be in place prior to
occupancy. To get a building permit there shall be a permanent fire access
easement recorded. This access road is a minimum of 20 feet. All to be
submitted to the attention of the Fire Prevention Department.
2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa
and Renselear are manufacturers of Cory type.
3. New hydrants are to be covered with burlap bags until operational. No building
above the foundation until fire hydrants are operational.
Tall Firs Precon
8/24/94
2
4. All blocking must be inspected by a City inspector prior to backfill.
5. Leads that exceed 50 feet in length shall be 8".
6. Call 911 from a local phone if the watermain needs to be shut off (emergency
only). All other water mains or valves shut down, call Renton Water
Department at 235-2646.
7. Fuel -- any temporary on-site fuel supplies shall have a permit from Fire
Prevention.
8. All underground mains serving fire sprinkler systems must be installed by a
Washington State certified fire sprinkler contractor.
9. Notify central dispatch 24 hours prior to work in the existing right-of-way.
(Local 91 1 )
CITY UTILITIES
Utility Contractor: Alpha Development Corporation
Contact: Mike Doyle
Pager: 502-0230
Address: 10015 19th Ave East
Tacoma, WA 98445
Phone #: 536-1988
FAX: 536-2565
START DATE: September 1, 1994
WATER:
1 . Pipe materials, valves and fittings shall be as indicated in the approved plans
and standard notes. All watermains shall be polywrapped. In the case of
construction in proposed new roadways, all construction of the road prism shall
be accomplished and in place prior to utility installation to avoid damage or
disturbance of the infrastucture.
2. All connections to existing mains shall be accomplished by the City of Renton.
The contractor constructs the new water main to a point about ten feet short of
the existing main. All necessary excavation, shoring, and materials are supplied
by the contractor and shall be on-site prior to scheduling. Allowing at least five
working days advance notice, schedule the connection through the construction
inspector, Dan Thompson.
3. Procedure for cleaning and construction testing of new water lines:
Tall Firs Precon
8/24/94
3
a. Temporary and permanent thrust blocks shall be formed. Concrete for thrust
blocks shall be delivered to the job. No on-site mixes are allowed. All
blocking must be inspected before backfilling.
b. Pipe cleaning shall be by poly pigging through vertical crosses installed at the
ends of the water lines to serve as pig launches and sediment traps.
c. All water lines shall be pressure tested to minimum of 200 psi or 150 over
operating pressure (static) for 2 hours. Services may be tested separately by
visual inspection of the corp stop under static pressure.
d. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly.
The inspector shall schedule chlorinating. Five working days advance notice
is required.
e. Water used for flushing water lines shall be drained into sanitary sewer only.
f. Purity tests are collected by the construction inspector at blow-offs and
hydrants. Water purity tests are taken to the laboratory on Wednesdays.
Contractor shall arrange courier service for any other day. Test results are
available in 5-7 days.
4. Crushed rock backfill to grade is required in City right-of-way. Recycled
concrete may be used in lieu of crushed rock backfill. Pit run type material may
be considered for use in backfill by the construction inspector. Compaction
testing may be required.
5. Where conflict exists, the water main shall go under other utilities, however, it
is preferred that no water mains shall have more than 6 feet of cover. All water
mains shall have a minimum of three feet of cover.
6. Final acceptance shall be after final walk through inspection, adjustment of all
structures, and approval of as-builts and cost data inventory.
SANITARY SEWER:
1 . All pipes and materials shall be per approved plan and standard notes.
However, any sewer pipe with less than four feet or greater than fifteen feet of
cover shall be Ductile Iron, Class 50.
2. Pipe bedding for PVC pipe sha►I be pea gravel 6" above and below the pipe.
3. Select backfill shall be compacted to at least 95% of maximum density. In the
case of new road construction, all roadway excavation and backfill for the road
prism shall occur prior to construction of the sanitary sewer to minimize
disturbance of the sanitary sewer line and appurtenances after installation.
Tall Firs Precon
8/24/94
4
4. Contractor will be responsible for TV of the sanitary line. TV after channeling is
complete. Air tests on main and sidesewers shall be per City specification.
Number 6 wire shall be wrapped around the stub and extended to the top.
5. Contractor shall asbuilt the invert elevation of side sewer stub.
6. Manholes shall be channeled and grouted.
STORM:
1 . Approved temporary erosion control measures are to be maintained at all times.
2. All pipes and materials shall be per approved plan. All roadway excavation and
backfill for construction of the road prism shall be accomplished prior to
installation of the drainage facilities to avoid damage or disturbance of the new
infrastructure.
3. Contractor must notify engineer of any vertical conflict prior to proceeding with
construction. Submit a shop drawing to Plan Reviewer for review.
4. Bedding material shall be per Standard Specifications 9-03.12(3).
5. Backfill shall be compacted to at least 95% of maximum density.
6. Catch Basins shall be grouted smoothly.
7. System shall be flushed and cleaned. City may request that the line be lamped.
8. Smooth interior wall corrugated polyethylene storm water pipe, where
permitted, shall use heat shrunk or watertight couplings. It shall also be bedded
in pea gravel to the springline.
TRANSPORTATION:
1 . Uniform traffic manual shall be followed for street closures and routing for
traffic. The approved traffic control plan shall be in place as required.
2. Paving -- The minimum compaction shall be 95% of maximum relative density
on subgrade and rock surfaces.
3. Contractor shall not leave open trenches overnight. Backfill, plate or fence all
trenches. The proposed method of cover or protection shall be submitted for
approval to the inspector. Shoring plates and cold mix to be on site at all times.
Cold mix for sidewalks and driveways may be required by the inspector for
safety.
4. Keep field records for asbuilts.
f
Tall Firs Precon
8/24/94
5
5. Watch for pedestrian traffic. Provide "sidewalk closed" signing as needed.
GENERAL:
1. CALL FOR INSPECTION (24 HR NOTICE) BEFORE YOU START WORK. NOTIFY
FIRE, POLICE AND METRO OF CONSTRUCTION SCHEDULE.
2. Contractors are advised to only use sets of drawings stamped and signed by the
City of Renton for constructing utility and transportation improvements. The
approved plans do not constitute a fill and grade permit or grant any rights to fill
and/or grade outside of the right-of-way. Keep a set of approved drawings on-
site at all times.
3. Work hours for work in right-of-way are weekdays, 8:30 AM to 3:00 PM,
Saturday by approval only and no Sundays. Work hours other than ROW: 7:00
AM to 8:00 PM
4. Contractor must call for City inspection before 3:00 p.m. on the previous day.
Overtime takes special authorization and scheduling in advance. Pay schedule is
$50 per hour for overtime.
5. Keep the streets clean. Truck washing and other measures as approved required
for the duration of the project. Provide whatever measures necessary for
cleanup and dust control during job and at night.
6. A Traffic Control Plan shall be submitted for approval prior to permit issuance.
Traffic control and signing to be in accordance with the Manual on Uniform
Traffic Control Devices. Flaggers shall have hard hats, vests, signs and
certification card. Haul legal loads and observe all traffic laws. All truck
maneuvering and materials storage to be on-site only. Right of way to remain
unobstructed when possible. No stockpiles on right of way.
7. All utilities must be inspected prior to backfill.
8. The contractor, as well as the engineer, shall keep as-built drawings. All
changes shall be shown on as-builts. As-builts shall be per City specifications.
All bends on waterlines shall be surveyed prior to backfill with horizontal and
vertical control for all bends established. Sewer lines may be surveyed after
backfill at manhole access. As-built drawings must have a P.E. or L.P.S. stamp.
Final occupancy will not be issued until receipt and approval by the City of
project utility and transportation improvement as-built drawings.
9. For any field changes: If minor, submit a shop drawing or schematic through the
inspector or by FAX- 235-2541 . If major, the project engineer should submit
drawings and complete justification, information and calculations as applicable
to the Plan Review project coordinator. The City will answer by memo or
Tall Firs Precon
8/24/94
6
schedule a meeting within two days. The field inspector can not give approval
in the field for construction changes.
Compiled by:
Arneta Henninger
Engineering Specialist
277-6198
PRECONSTRUCTION MEETING FOR TALL FIRS
ATTENDANCE SHEET
DATE AUG. 24, 1994 10 AM
NAME ADDRESS
-a,.,.ta 2 7 - /9
6ry ►
�o G T )2 P'ZS
D EJ p 3 6 6 3
,- O..J —23 r-2-r6 f
oo k� • o -ur W te✓
pov Cf Co v t1t :til F>,N(v. 5t-�222
11 142l)o SC a7 " ri-loA wA, 9pd q2
rtt
Ole �N d��✓ �8 R nor, 23 �'S
z�oft
AUTHORIZATION OF SPECIAL BILLING
DATE: AUG. 17, 1994
PROJECT NAME: TALL FIRS y
PROJECT NUMBER: C940079
WORK ORDER No.: 87576
It is the intent of this letter to authorize the City of Renton to bill the undersigned for all
costs incurred relative to the referenced project, by the City of Renton for the following
work:
TIME AND MATERIALS FURNISHED BY CITY OF RENTON WATER
DEPARTMENT TO PERFORM CONNECTIONS TO EXISTING WATER
MAINS, WATER PURITY SAMPLES, AND RELATED WORK.
TIME AND MATERIALS FOR ANY AND ALL ROAD CLEANUP EFFORTS
PERFORMED BY CITY FORCES OR CITY CONTRACT.
ALL OVERTIME FOR INSPECTION AND RELATED ACTIVITIES, BILLABLE
AT A RATE OF FIFTY DOLLARS ($50.00) AN HOUR
TIME AND MATERIAL FOR ANY WORK DONE BY CITY STAFF TO REPAIR
DAMAGES.
BILLING TO B SENT TO:
Name:
Company:
Address: /y 2 d d 5F 1 Z
Phone: )p e "o 6Fs V S
caner veloper or Authorized Agent
CITY OF RENTON
MEMORANDUM
DATE: September 13, 1994
TO: Becky S.
Ray Sled
FROM: Arneta H. X6198
SUBJECT: TALL FIRS SUNSET BLVD. NE EAST OF DUVALL AVE NE
WATER FEES THAT HAVE BEEN PAID
PROJECT WO#: 87576
PERMIT: C940079
COPY OF LETTER OF SPECIAL BILLING ATTACHED
WORK PAID FOR: WATERMAIN CONNECTIONS $1 ,200.00
0
" R
CITY OF RENTON Construction Permit
Permit Number C940079
Permission is hereby given to do the following described work,
according to the conditions -hereon and according to the approved
plans and specifications pertaining thereto, subject to compliance
with the Ordinances of the City of Renton.
Work Description
....... .....
INSTALL WATER,SEWER,STORM,STREE;TPER APPROVED PLANS
APPROVED PLANS #2156
..........
.?i:.? ti4??ii:?•??ii?i:•:�::�?:?J:^:•:::::::::.�:::::::.�::::::::::.:?:•Y.{•r?i:...:..:?:4:•i:^i:?4:b:v??i?ii?:vii???}??i?:!•?:•?Y.�:?�iiii}: ?}ii}:vi::4:i:i•i}}?}ii:4ii....
:<.}?i:h::?{S
4808 NE SUNSET BL
Oner :.::...;.;:::?.:...::.:.:::.::
SEATTLE—RENTON INVESTORS LT
PO BOX 270817
SAN DIEGO CA
..........
}�
:.::.::::::.::. :...:.N;.
Contractor :;:>.:;:.;,:.:,.,.. �: .,.?:?:..............
.:<:....:......:... :. : .
ALPHA DEVELOPMENT CORPORATION Contractor's License ALPHADC147JD
10015 19TH AVE E Contractor's Phone (206) 536-1988
ALLISON, LEE D 98445 City License 5387
Contact TREMAINE, RON Contact's Phone 630-6845
Other Information >::< :.:?.;::.:>}::.;:::.;::.:;.:.. .
..................
.:. ......:...........
Date Issued 10/28/1994 Work Order 87576
Date of Expiration 04/26/1995 Parcel Number 516970-0060
Date Finaled Inspector's Name THOMPSON, DAN
Inspector's Phone 999-1828
........ :• w:::::.:.::v: ..•:......�::•• :•-:::: .....:w.�:. ...... •::�•.::::..: ..:ii.: ..
It is understood that the City of Renton shall be held harmless of any and all liability, damage or injury
arising from the performance of the work described above. You will be billed time and material for any work
done by City staff to repair damages. Any work performed within the right-of-way must be done by a
licensed, bonded contractor. Call 277-5570 one working day In advance for inspections.
Locate utIlIties before excavating.
Call before you dig - 48 Hour Locators 1-800-424-5555
I hereby certify that no work is to be done except Subject to compliance with the Ordinances of the
as described above and in approved plans, and that City of Renton and information filed herewith this
all work is to conform to Renton codes and permit is granted.
ord 11 inances
it J-C"�w X
Alp- a v Public Works Rep
THIS PERMIT MUST BE POSTED AT THE JOB SITE AT ALL TIMES.
BD3203e 08/94 iif
CITY OF RENTON
Plat Inspection Record
Permit Number C940079
Address: 4808 NE SUNSET BL
Date Issued: 10/28/1994
Date Expired 04/26/1995
Work Order: 87576
Work Description:
INSTALL WATER,SEWER,STORM,STREETPER APPROVED PLANS
APPROVED PLANS #2156
Contractor:
ALPHA DEVELOPMENT CORPORATION
WATER: SANITARY SEWER:
Pressure Test: Pressure Test:
Chlorination: MH Channeled:
Purity Test: MH Sealed:
Tie-In by City: Side Sewer Visual:
OK for Meters: Pressure Test (SS) :
Valve Chambers to Grade: Maintenance Walk-thru:
Maintenance Walk-thru
STORM SEWER: RIGHT OF WAY: s
MH Sealed: Curb & Gutter, Driveway or
Sidewalk:
MH Ladders Sight Preparation:
Visual Final: Final Visual:
Maintenance Walk-thru: Maintenance Walk-thru:
ROADWAY: STREET LIGHT OR SIGNALS:
Compaction Test: Foundations:
Final Lift or Patch: Concrete Pads:
Maintenance Walk-thru: Wiring:
Controller Cabinet:
Overhead Inspection:
Final Visual:
NOTES:
ASSIGNED INSPECTOR: JDATE OF FINAL ACCEPTANCE:
bd3242a 03/94 drt
fAL
CITY OF RENTON
40 R Planning/Building/Public Works Department
Earl Clymer, Mayor Gregg Zimmerman Y.E., Administrator
September 22, 1994
Ron Tremaine
14200 S.E. 272nd St_ #E203
Kent, Washington 98032
Dear Mr. Tremaine:
Subject: Permit 9: C940079
Project- Tall Firs
The purpose of this letter is to iinform you that your project is NOT required to seal
the inside of the sanitary sawer and storm water structures with a bitumastic
coating as mentioned in the p-e construction meeting. All other requirements of the
APA Ordinance dealing with riethodology of construction in APA Zone 2 apply.
If you have any questions regar8ng this matfer, please call me at 277-6198.
Sincerely,
/�Z� x �
Arneta Henninger
pc: Neil Watts
Dave Christensen
Steve Pinkham
Dan Thompson
200 Mill Aver.:e South - Renton, Washington 98055
7HM Fs.'ER 5,—r RECYCLED MATERLIL,10%POST CONSUMER
411% �-}- CITY OF RENTON
. - Planning/Building/Public Works Department
Earl Clymer, Mayor Gregg Zimmerman P.E., Administrator
October 10, 1994
Ron Tremaine
14200 SE. 272nd St #E203
Kent, Washington 98032
Dear Mr. Tremaine:
SUBJECT: TALL FIRS WATERMAIN SIZE W2156 PERMIT C940079
The City of Renton fi(e marshal has informed me that the above-subject project now has a
fire flow of a maximum 2,000 GPM. After due deliberation, it was decided that you may
downsize the watermain from a 10" to a 8" diameter pipe. You may show this change on
the plans when you submit the as-built mylars.
If you have any questions regarding this matter, please call me at 277-6198.
Sincerely,
wale,
Arneta Henninger
Engineering Specialist
pc: Neil Watts
Abdoul Garfour
Corey Thomas
200 Mill Avenue South - Renton, Washington 98055
THIS PAPER CONTAINS 50 RECYCLED MATERIAL 10%POST CONSUMER