HomeMy WebLinkAboutSWP272158 I S� Short Plat (SHPL B )
RL-QUEST FOR PROJECT a Prclim. Plat (PPIi )
- CAGH
To: Technical Services Datc A WOII Grecnl/
From: Plan Revicw/Projcct Manager
Project Name
(70 characters max)
Description of Project:
J
Circle Size of Waterline: 8" 10" 12" Circle One: New or Extension
Circle Size of Sewerline: 10" 12" Circle One: New or Extension
Circle Size of Stormline: 15" 18" 24" Circle One: New or Extension
Address or Street Names) S,,
Dvlpr/Contractor/Owner/Cnslt. j�,�
(7o ch&cAcLcm max)
Check each discipline involved in Project Ltr Drwg #of sheets per discipline
F �� ✓ ��
Trans-Storm
(Roadway/Drainage) (Off site improwmcntsXncludc basin name) l�(includc TESC sheets)
Transportation (SigmliWion,Channelization,Lighting) v l
Wastewater
Scwcr Main) udc basin name)
Water
(Mains,Valves,Hydrants) 9
ncludc compo itc 6c Horizontal Ctrl Shccts)
TS Use Only ) _ L f 0-- �s l� _ C;L
Approved by TSM Date:
Comis/misd92-090.DOC/CD/bh
CITY-OF RENTON
MEMORANDUM
DATE: December 30, 1994
TO: -hrs H.
Dave C.
Bob M.
Ron S.
-% FROM: '"Atrtete'Plart'Review'X8198 ".
SUBJECT: SUMMIT PARK PLAT RSTW 2158
For your files.
0 REQUEST FOR FILE`AND NUMBER
0 PRECON NOTICE
9 PRECON MINUTES �
0 ATTENDEES AT PRECON
Z SCR Of SPECIAL-BIi1_1NG SIGNED
'0'.,A4EM0 TO='BECKY<AND RAY -STATING'T- + AT LETTIRR'.,(3F°SPECIAL�MLLWG-WAS
SIGNED
2 CONSTRUCTION PERMITS C-94014.4 AND C940236
0 RECEIPT FOR CONSTRUCTION PERMIT--SEE SIERRA SYSTEM LMDER PERMIT
C940144 AND.C940236
B STORM DRAINAGE REPORT--TWO BOUND COPIES ATTACI'-IED
PC: Neit N.
A�3_15' Shots Plat (SHPL N )
REQUEST FOR PROJECT u aim. Plat (PP/f )
- CAGd
- 9
To: Technical Services Datc WpJ! Grccnu
From Plan Revicw/Project Manager "
1
Project Name
(70 dwactm max)
Description of Project:
XL�
Circle Size of Waterline: 8" 10" 12" Circle One: New or Extension
Circle Size of Sewerline: 10" 12" Circle One: New or Extension
Circle Size of Stormline: 2 15" 18" 24" Circle One: New or Extension
Address or Street Name(s)
Dvlpr/Contractor/Owner/Cnslt:
(700 Tc max)
Check each discipline involved in Project Ltr Drw8 ft of sheets per discipline
Trans-Storm n
(Roadway/Drainage) (Of site improvementsxineludc basin name) — — / l J
(include MC sheets)
Transportation (Sigtalization,Channcliwion Ug}iting) `
V Wastewater
�/ Sewer Main) udc basin name)
Ad Water �--�
(Mains,Valves,Hydrants) L�
(include compcofitc 6c Horizontal Cul sheets)
TS Use only j C _ 1-40_
Approved by TSM Date
fonTLVmisd92-090.D0C ICD/bh
CITY OF RENTON
Y Q PUBLIC WORKS DEPARTMENT
235-2631
♦ .d! O PRECONSTRUCTION CONFERENCE
DATE: September 9, 1994
N� TIME: 10:00 am
PLACE: City Hall 1st Floor
Conference Room
DEVELOPER/CONTRACTOR OR SUBCONTRACTOR/NAME OF PROJECT:
COMPANY NAME: Environmental Development Corp.
COMPANY ADDRESS: P. 0. Box 1574 - Bellevue, WA 98004
PHONE: 451-8221 FAX NO: 821-3481 CONTACT: Tom Ichelson
NAME OF PROJECT: Summit Park
INSTALLATION: Water - Sewer - Storm
LOCATION: 5020 Talbot Rd S
PROJECT COORDINATOR: X Mike Mathia, Triad Associates - 821-8448
PLEASE CHECK DEPARTMENTS TO BE NOTIFIED AND SPECIFY PERSON TO ATTEND:
[X] PUBLIC WORKS DEPARTMENT
[X] Utility Plan Review Neil Watts
[X] Water Utility Lys Hornsby
[X] Wastewater Utility David Christensen
[X] Surface Water Utility Ron Straka
[X] Transportation Systems Karl Hamilton
[X] Maintenance Services Division Jack Crumley
[X] Customer Services P.I.C. Dee Beedle
[XI Construction Services Rick Kokko
[X] FIRE PREVENTION Corey Thomas
[ ] POLICE DEPARTMENT
[ ] PARK DEPARTMENT
[X] BUILDING DEPARTMENT Jim Chandler
[ ] OTHER Jae Lee
OUTSIDE DEPARTMENTS: [ X ] CONTRACTOR TO NOTIFY
[X] ALL ASSOCIATED CIVIL CONTRACTORS
[ ] Department of Transportation 872-6470
[X] U.S. West Communications 235-3012
[X] Puget Sound Power & Light Co. Karen Sharp 850-5560
[ ] Seattle City Light 684-3076
[X] TCI Cable of Washington (Phil Fisk) 433-3434 x3084
[X] Washington Natural Gas Company (Lorren Loveless) 224-2209
[ ] METRO - Bus Routes 684-2732
[ ] King County Inspection 244-0770
[ X] Other: Engineer, Surveyor
PKh:CUNF\9.I>61/hh
ATTACHMENT
PERMIT NOS. C940236 and C940144
SUMMIT PARK PLAT
PRECONSTRUCTION MEETING FOR INSTALLATION OF WATERMAIN, SANITARY
SEWER STORM SEWER, STREET LIGHTING AND STREET IMPROVEMENTS,
DRAWING #2158
SEPTEMBER 9, 1994 10:00 a.m.
First Floor Conference Room
Developer: Environmental Development Corp.
Engineer: Triad Associates, Mike Mathia Inspector: Rick Kokko
Phone: 821-8448 Phone: 999-1831
FRANCHISE UTILITIES:
1 . The franchise utilities require copies of the approved construction drawings
before designing their facilities.
2. Each franchise utility must apply for a separate permit prior to construction in
existing or future right-of-way. A blueline drawing showing the location of all
utilities, city and franchise, in redlines shall be submitted to the third floor
counter for City review two weeks before installation.
3. All franchise utilities shall be separated a minimum of five feet (5') horizontally
and twelve inches (12") vertically from City utilities.
Puget Power - Karen Sharp received the plans. She will be meeting with the
project contractor and the contractor for Talbot Road project next week.
FIRE PREVENTION:
1 . Maintain access to site at all times. Must be able to support emergency
equipment in all types of weather.
2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa
and Renselear are manufacturers of Cory type.
3. New hydrants are to be covered with burlap bags until operational.
4. All blocking must be inspected by a City inspector prior to backfill.
5. Leads that exceed 50 feet in length shall be 8".
Summit Park Preconstruction Meeting
Page 2
6. Call 911 from a local phone if the watermain needs to be shut off (emergency
only). All other water mains or valves shut down, call Renton Water
Department at 235-2646.
7. Fuel -- any temporary on-site fuel supplies shall have a permit from Fire
Prevention.
8. All underground mains serving fire sprinkler systems must be installed by a
Washington State certified fire sprinkler contractor.
9. Notify central dispatch 24 hours prior to work in the existing right-of-way.
(Local 91 1)
10.No construction above the foundation until the fire hydrants are operational.
CITY UTILITIES
Utility Contractor: Universal Land
Contact: Dick Allen
Address: PO Box 329
Woodinville, WA 98072
Phone #: 483-6200
START DATE: September 15, 1994 (approximately 75 working days for the
project)
WATER:
1 . Pipe materials, valves and fittings shall be as indicated in the approved plans
and standard notes. In the case of construction in proposed new roadways, all
construction of the road prism shall be accomplished and in place prior to utility
installation to avoid damage or disturbance of the infrastucture.
2. All connections to existing mains shall be accomplished by the City of Renton.
The contractor constructs the new water main to a point about ten feet short of
the existing main. All necessary excavation, shoring, and materials are supplied
by the contractor and shall be on-site prior to scheduling. Allowing at least two
working days advance notice, schedule the connection through the construction
inspector, Rick Kokko at 999-1831 .
3. Procedure for cleaning and construction testing of new water lines:
a. Pipe cleaning shall be by poly pigging through vertical crosses installed at the
ends of the water lines to serve as pig launches and sediment traps.
b. All water lines shall be pressure tested to minimum of 200 psi or 150 over
operating pressure (static) for 2 hours. Services may be tested separately by
visual inspection of the corp stop under static pressure.
Summit Park Preconstruction Meeting
Page 3
c. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly.
The inspector shall schedule chlorinating. Five working days advance notice
is required.
d. Water used for flushing water lines shall be drained into sanitary sewer only.
e Purity tests are collected by the construction inspector at blow-offs and
hydrants. Water purity tests are taken to the laboratory on Wednesdays.
Contractor shall arrange courier service for any other day. Test results are
available in 5-7 days.
f. Temporary and permanent thrust blocks shall be formed. Concrete for thrust
blocks shall be delivered to the job. No on-site mixes are allowed. All
blocking must be inspected before backfilling.
g. All watermains shall be polywrapped.
4. Crushed rock backfill to grade is required in City right-of-way. Recycled
concrete may be used in lieu of crushed rock backfill. Pit run type material may
be considered for use in backfill by the construction inspector. Compaction
testing may be required.
5. Where conflict exists, the water main shall go under other utilities, however, it
is preferred that no water mains shall have more than 6 feet of cover. All water
mains shall have a minimum of three feet of cover.
6. Final acceptance shall be after final walk through inspection, adjustment of all
structures, and approval of as-builts and cost data inventory.
7. Behind DDCVA (2 hour 200# test on underground) per Fire Department. Need
24 hour notice.
SANITARY SEWER:
1 . All pipes and materials shall be per approved plan and standard notes.
However, any sewer pipe with less than four feet or greater than fifteen feet of
cover shall be Ductile Iron, Class 50.
2. Pipe bedding for PVC pipe shall be pea gravel 6" above and below the pipe.
3. Select backfill shall be compacted to at least 951/o of maximum density. In the
case of new road construction, all roadway excavation and backfill for the road
prism shall occur prior to construction of the sanitary sewer to minimize
disturbance of the sanitary sewer line and appurtenances after installation.
4. Contractor will be responsible for TV of the sanitary line. TV after channeling is
complete. Air tests on main and sidesewers shall be per City specification.
Number 6 wire shall be wrapped around the stub and extended to the top.
5. Contractor shall asbuilt the invert elevation of side sewer stub.
6. Manholes shall be channeled and grouted. Sealed inside if in Zone 2.
Summit Park Preconstruction Meeting
Page 4
STORM:
1 . Approved temporary erosion control measures are to be maintained at all times.
2. All pipes and materials shall be per approved plan. All roadway excavation and
backfill for construction of the road prism shall be accomplished prior to
installation of the drainage facilities to avoid damage or disturbance of the new
infrastructure..
3. Contractor must notify engineer of any vertical conflict prior to proceeding with
construction. Submit a shop drawing to Plan Reviewer for review.
4. Bedding material shall be per Standard Specifications 9-03.12(3).
5. Backfill shall be compacted to at least 95% of maximum density.
6. Catch Basins shall be grouted smoothly.
7. System shall be flushed and cleaned. City may request that the line be lamped.
8. Smooth interior wall corrugated polyethylene storm water pipe, where
permitted, shall use heat shrunk or watertight couplings. It shall also be bedded
in pea gravel to the springline.
TRANSPORTATION:
1 . Uniform traffic manual shall be followed for street closures and routing for
traffic. The approved traffic control plan shall be in place as required.
2. Paving -- The minimum compaction shall be 95% of maximum relative density
on subgrade and rock surfaces.
3. Contractor shall not leave open trenches overnight. Backfill, plate or fence all
trenches. The proposed method of cover or protection shall be submitted for
approval to the inspector. Shoring plates and cold mix to be on site at all times.
Cold mix for sidewalks and driveways may be required by the inspector for
safety.
4. Keep field records for asbuilts.
5. Truck hauling to be in non-peak hours only. (8:30 to 3:30)
6. Watch for pedestrian traffic. Provide "sidewalk closed" signing as needed.
GENERAL:
1 . CALL FOR INSPECTION (24 HR NOTICE) BEFORE YOU START WORK. NOTIFY
FIRE, POLICE AND METRO OF CONSTRUCTION SCHEDULE.
Summit Park Preconstruction Meeting
Page 5
2. Contractors are advised to only use sets of drawings stamped and signed by the
City of Renton for constructing utility and transportation improvements. The
approved plans do not constitute a fill and grade permit or grant any rights to fill
and/or grade outside of the right-of-way. Keep a set of approved (signed by City
of Renton) drawings on-site at all times.
3. Work hours for work in right-of-way are weekdays, 8:30 AM to 3:30 PM,
Saturday by approval only and no Sundays. Work hours other than ROW: 7:00
AM to 8:00 PM
4. Contractor must call for City inspection before 3:00 p.m. on the previous day.
Overtime takes special authorization and scheduling in advance. Pay schedule is
$50 per hour for overtime.
5. Keep the streets clean. Truck washing and other measures as approved required
for the duration of the project. Provide whatever measures necessary for
cleanup and dust control during job and at night.
6. A Traffic Control Plan shall be submitted for approval prior to permit issuance.
Traffic control and signing to be in accordance with the Manual on Uniform
Traffic Control Devices. Flaggers shall have hard hats, vests, signs and
certification card. Haul legal loads and observe all traffic laws. All truck
maneuvering and materials storage to be on-site only. Right of way to remain
unobstructed when possible. No stockpiles on right of way.
7. All utilities must be inspected prior to backfill.
8. The contractor, as well as the engineer, shall keep as-built drawings. All
changes shall be shown on as-builts. As-builts shall be per City specifications.
All bends on waterlines shall be surveyed prior to backfill with horizontal and
vertical control for all bends established. Sewer lines may be surveyed after
backfill at manhole access. As-built drawings must have a P.E. or L.P.S. stamp.
Final occupancy will not be issued until receipt and approval by the City of
project utility and transportation improvement as-built drawings.
9. For any field changes: If minor, submit a shop drawing or schematic through the
inspector or by FAX- 235-2541 . If major, the project engineer should submit
drawings and complete justification, information and calculations as applicable
to the Plan Review project coordinator. The City will answer by memo or
schedule a meeting within two days. The field inspector can not give approval
in the field for construction changes.
,i-
i
Arneta Henninger, Engineering�Specist
277-61 98
ATTENDANCE SIGN IN SHEET
DATE SEPT. 9, 1994
PURPOSE OF MEETING SUMMIT PARK PRECONSTRUCTION WATER, SEWER, STORM ST.1
.............. ......
RE
.......... xr T
N
...... ............
............ .....
a4
k� fflq —f 'f7 y 2214- 7—
A/,,-H A 1Z, j,,l) n 76 1 , -r
5-r 60. F61D6N ?�,2q Woo(?IaVILL-6fgjj�! 4G 3-(-ZootIcK AL GAJ LNIV6ASAL L-�O Cbl�
V
7-0 1 Av A,-SSr---t�}7Y- 5 ::)ZFe7o1Q 4 V. :577,E 5n(-, rA-(---,-,4 96 74' Z4�/
cp
H/DEVSVCS/ADMINATTEND
PRECONSTUCTION SIGN-UP SHEET
Project: Talbot Road South Improvements Date: 9/9/94
CAG 94-088 Federal Aid No. M-STPUL-1125(001)
Contractor: Gary Merl ino Const Co. ,. Inc. Phone #: (206)762-9125
Project Manager: Jae Lee Phone #: (206)277-6218
235-2529
Construction Inspector: Rick Kokko Phone #: Mobil 999-1831
Name Affiliation/Representing Phone #
�yi{2 6t�4 er zotS/ zv� -312--ZY Zk,�
r�
��✓ i ri/ WA-5�v 2 Z 4, z 37 7
l 3
5 -�2(a q
F-,Z N o .ca,,,.srt 7&2 -,7 I z=
DICK AUU&I u��V�-L LAI O Cdr S-r co 4-g3 - 200 PAKIZt
D7e�Pr W06-TF wsDoT-
i WEL (��/')/J�L/�V� �i'n 1, C_8z,c�) 1 r'�'r ? Ce
�� r)
AUTHORIZATION OF SPECIAL BILLING
DATE: AUG. 23, 1994
PROJECT NAME: SUMMIT PARK TALBOT RD. S.
PROJECT NUMBER: PERMIT#C940144 1� C 9-�10Z.N/
f
WORK ORDER No.: 87599
It is the intent of this letter to authorize the City of Renton to bill the undersigned for all
costs incurred relative to the referenced project, by the City of Renton for the following
work:
TIME AND MATERIALS FURNISHED BY CITY OF RENTON WATER
DEPARTMENT TO PERFORM CONNECTIONS TO EXISTING WATER
MAINS, WATER PURITY SAMPLES, AND RELATED WORK.
TIME AND MATERIALS FOR ANY AND ALL ROAD CLEANUP EFFORTS
PERFORMED BY CITY FORCES OR CITY CONTRACT.
ALL OVERTIME FOR INSPECTION AND RELATED ACTIVITIES, BILLABLE
AT A RATE OF FIFTY DOLLARS ($50.00) AN HOUR
TIME AND MATERIAL FOR ANY WORK DONE BY CITY STAFF TO REPAIR
DAMAGES.
BILLING TO BE SENT TO:
Name:
Company:�.fi�/fo►tird.��l,GL .,�yi .�.✓i c,��,% +rc�.c/
Address:
Phone: ys� r-2 f
Owner/Developer or Authorized Agent
CITY OF RENTON
MEMORANDUM
DATE: September 14, 1994
TO: BECKY S.
RAY SLED
FROM: ARNETA X6198 k,
SUBJECT: SUMMIT PARK PLAT TALBOT RD. S & S 51ST CT WATER
FEES THAT HAVE BEEN PAID
s
PROJECT WO#: 87599
PERMITS: C940144 AND C940236
COPY OF LETTER OF SPECIAL BILING ATTACHED
WORK PAID FOR: WATERMAIN CONNECTION $400.00
mg
4%R
CITY OF RENTON Construction Permit
Permit Number C940144
Permission is hereby given to do the following described work,
according to the conditions hereon and according to the approved
plans and specifications pertaining thereto, subject to compliance
with the Ordinances of the City of Renton.
Work Description.
INSTALL WATER, SEWER, STORM PER APPROVED PLANS
PERMIT DOES NOT ALLOW ANY WORK IN TALBOT RD. S
NO WORK ON UTILITIES AT ALL ANYWHERE UNTIL PRECON
PROJECT NAME: SUMMIT PARK PLAT
Job Address
...........
< ; :>:>:
5020 TALBOT RD S ...;.;::;::.:.;:...:>;:.
........................
Owner
UK
SWANS
ON PAULA .. ...
26811 SE DUTHIE HILL RD
ISSAQUAH WA
Contractor .
UNIVERSAL/LAND CONST CO
Contractor's License UNIVELC159RL
P O BOX 329 Contractor's Phone (206) 483-6200
ZAHNOW, ALFRED J 98072 City License
Contact MATHIA, MIKE Contact's Phone 1-800 488 0756
Other.Information
Date Issued 09/26/1994 Work Order 87599
Date of Expiration 03/25/1995 Parcel Number 312305-9071
Date Finaled Inspector's Name RICK KOKKO
Inspector's Phone 999—18 31
ox
It is understood that the City of Renton shall be held harmless of any and all liability, damage or injury
arising from the performance of the work described above. You will be billed time and material for any work
done by City staff to repair damages. Any work performed within the right-of-way must be done by a
licensed, bonded contractor. Call 277-5570 one working day in advance for inspections.
Locate utilities before excavating.
Call before you dig - 48 Hour Locators 1-800-424-5555
I hereby certify that no work is to be done except Subject to compliance with the Ordinances of the
as described above and in approved plans, and that City of Renton and information filed herewith this
all work is to conform to Renton codes and permit is granted.
ordinances.
_ 1
Applicant Public Works Rep
THIS PERMIT MUST BE POSTED AT THE JOB SITE AT ALL TIMES.
BD3203e 08/94 iif
'4i CITY OE RENTON Construction Permit
Mu
Permit Number C940236
Permission is hereby given to do the following described work,.,:
according to the conditions hereon and according to the approved:�
plans and specifications pertaining thereto; subject to compliance
with the Ordinances of the City of Renton.
�V'ark'Dscrptzorr
.. - ... ....: .. ....:- :.'... .�:.ii
WATER, STORM, ST. IMPROVE i:.>LIGHT, TALBO.T. RD.. S
PER APPROVED DRAWING 2158 PERMIT'`IS FOR'WORK IN.
TALBOT RD S.PROJE= XAM SII1411'Tk P!I<RIC'PEAT`
Job Address
5020 TALBOT RD S
.:: >::::::
Owner :.:::::::.. ..... .:'
.... _
SWANSON PAULA
26911 SE DUTHIE HILL RD
ISSAQUAH WA
Contractor.
UNIVERSAL/LAND CONST CO Contractor's License UNIVELC159RL
PO BOX 329 Contractor's Phone (206) 483-6200
WOODINVILLE, WA 98072 City License 6059
Contact MATHIA, MIKE Contact's Phone 8 21 8 4 4 8
QtlletQLnlaLtOD }:a•v.{z�x:};}.>.�.•::::,..•:3.::}:- a yy { :3: 'r;.}
Date Issued 09/16/1994;-, .''; Work,Order 8759'9'
Date of Expiratiorr 03/15/1995-4 Parcel Number 312305-9,07L
Date Finaled IInssp�ee �cto ss Name KOK=, RIC7C
Plsnttc 99 — a
It is understood that the City of Renton shall be held harmless of any and all liability,damage or.injury,
arising franc the performaacr of the work described above. You wM be billed time and material for any work
done by City staff to repair damages_ Any work performed within the right-of-way must be done by a
licensed, bonded contractor. Call 277-5570 one working day In advance for inspections.
Locate utilities before excavating_
Call before you dig - 48 Hour Locators 1-800-424-5555
I hereby certify that no work is to be done except Subject to compliance with the Ordinances of the
as described above and in approved plans, and that City of Renton and information filed herewith this
all work is to conform to Renton codes and permit is granted.
ordinances.
h _ X
Applicant Public Works Rep
THIS PERKOT MUST'BE POSTED A THE IOB"SITE AT ALL TIMES.
HD=3e"I I"Rf
FOR DISTRIBUTION TO:
ON Water Utility Building Division
Wastewater Utility Public Works Constr Inspector
Surface Water Utility Fire Prevention
ENMaintenance Services
Transportation Systems
Project:
( 2
Location:
-rnq r'O
Attached please rind copies of:
IN PERMIT BILLS OF SALE
FE RECEIPT 5 COST DATA INVENTORY
LETTER OF SPECIAL BILLING EASEMENT(S)
STUB SERVICE AGREEMENT COPY OF AS-BUILT
PRECON NOTES
NO PRECON ATTENDEES 52-41
RAN DRAINAGE REPORT IN
t MEMO-WATER BREAKDOWN
MAP WITH NEW MAINS AND VALVES
OTHER
From: /l i
Date:
CTB:PRECON:DISTFRM