NELSON-COUVRETTE & ASSOCIATES, INC.
1 CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS
' GEOTECHNICAL EVALUATION REPORT
FOR TWO DETENTION PONDS
RENTON, WASHINGTON
FOR
' LAI{ERIDGE DEVELOPMENT
NELSON-COUVRETTE & ASSOCIATES, INC.
CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
\`��..... AND ENVIRONMENTAL SCIENTISTS
' 17311-135th Ave.NE,A-500 Snohomish County(206)794-4332
Woodinville,WA 98072
(206)486-1669•FAX 481-2510 Wenatchee/Chelan(509)784-2756
' August 4, 1994
Mr. Wayne Jones
' Lakeridge Development
P.O. Box 146
Renton,Washington 98057
' Geotechnical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
Renton,Washington
NCA File No. 10921394
Dear Wayne:
INTRODUCTION
' This report presents the results of our gcotechnical investigation for the two detention ponds of your Honey
Creek Ridge development. The site is located south and west of the intersection of S.E. 100th Street and
' 124th Avenue S.E., in the City of Renton, as shown on the Site Vicinity Map in Figure 1. You have
retained us to perform a subsurface investigation to locate a less permeable soil that could be used as a
pond liner and to provide additional comments on pond construction and stabilization of an erosion feature
located south of the project site. We, as David L. Nelson and Associates, Inc., have previously prepared
Geotechnical Evaluation Reports, dated July 7, 1989, May 17, 1991 and January 11, 1993. We have
recently been provided plans for the Basin A and B detention ponds showing the topography and planned
locations, prepared by City of Renton, dated February 20 &25, 1994, for our use in preparing this report.
PROJECT DESCRIPTION
' Basin A
Basin A detention pond is located in the northwest corner of the site. The pond facility will consist of a
water quality swale, detention pond and bioswale. The bottom of the water quality swale will be at an
elevation of 313.27 feet, with a maximum water level of 315.4 feet. The bottom of the pond will be at an
elevation of 308.77 feet, with a maximum water level of 314.87 feet. A gabion wall will be used to divide
' the pond into two cells. A gabion wall will also be constructed on the dowi-d-ull side of the biofiltration
Swale in order to prevent overtopping of water onto the slope below. The bioswale will have side slopes of
' Geoteclvlical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
' NCA File No. 1092B94
August 4, 1994
Page 2
' 3 Horizontal to 1 Vertical (H:V). A rockery 4 to 5 feet high is planned on the north and east sides of the
' detention facility. The rockery will be used to face cuts in this area. You have indicated that a gabion wall
may be substituted for the rockery in this area.
Basin B
Basin B detention pond is located in the west central portion of the site. The pond facility will consist of a
' detention pond with three cells and a biofiltration swale. The bottom of the pond will be at an elevation of
328.75 feet, with a maximum water elevation of 342.09 and a top of berm of 350. The pond is to be
located in an existing swale type feature.. A berm will be built across the swale forming the pond. The
' downstream face of the berm will have a total height of about 40 feet. Gabion walls are planned between
the cells of the pond. The elevation of the top of the gabion walls will be 340.0 feet. The bioswale will be
' located downslope of the berm in the center of the natural swale. The bioswale starts on one side of the
natural Swale, nuns roughly parallel to the contours, drops in elevation then turns in the upstream direction,
' then crosses the centerline and turns again toward the doN nstrcam direction. In order to make the required
grades, rockeries or gabion walls will be required for most of the length of the swale. It appears that the
' maximum exposed height of the rockery or gabion will be about 4 feet with a 3:1 (H:V) slope away from
the base of the rockery, according to the cross-section shown on the plans. The plan view of the bioswale
suggests that the exposed heights will be on the order of 3 feet or less. The bioswale will have side slopes
' of 3 Horizontal to 1 Vertical (H:V).
' Erosion Features
A large erosion feature is located at the south end of the project, south of SE 104th Court, between lots 25
' and 26. We understand that it was formed by concentrated storm runoff from adjacent development and
that it lies entirely in the City of Renton property. The city has asked for a review with respect to its
encroachment onto the planned SE 104th Court. You have indicated that you would like to place broken
' concrete on the lower portion of the feature and then wood waste to fill the bulk of it. The surface would
be capped with additional concrete pieces and topsoil to match adjacent grade. Your plan is to fill another
erosion feature located to the west in a similar manner. This feature was formed in a telephone cable
easement. It appears to have been created by soil eroding from around the telephone cable.
' SCOPE
The purpose of this study is to explore and characterize the subsurface conditions in the pond and around
' the site, and present recommendations for construction of the detention ponds, rockeries and restoration of
the two erosion features. The exploration program was designed to supplement the original data and to
NELSON-COUVRETTE & ASSOCIATES, INC.
Geoteclmical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
' NCA File No. 1092B94
August 4, 1994
Page 3
' n h i which could be used as and liner material. Specifically,
evaluate if a less permeable soil exists o the site p p y,
our scope of services include the following:
1. Explore the subsurface conditions at the site with test pits excavated with a backhoe.
' 2. Perform laboratory analysis of the soil to identify typical permeability rates.
3. Provide recommendations for the detention ponds; such as pond liner and construction.
' 4. Provide our opinions regarding restoration of the large and small erosion features.
' 5. Provide recommendations for rockery construction.
6. Prepare a written report to document our findings and recommendations.
' SITE CONDITIONS
Surface
' General: The site consists of 50 acres and is located west of 124th Avenue SE and between the alignments
of SE 104th Street and SE 98th Street. The topography consists of an upland area with moderate to steep
' slopes along the west side of the site. The development will be confined mostly to the upland portion with
the detention pond facilities located adjacent to the steep slope (Pond A) or at the base of the slope (Pond
B)
Pond A: Pond A is located in the northwest corner of the site. The ground surface in the area slopes
' gently to moderately down to the west and northwest in this area. Below the area of the proposed pond,the
ground surface slopes steeply done to a road located below. The area is vegetated with brush with large
' trees located on the slope.
Pond B: Bond B is located in the west central portion of the site. The area is in a natural occurring bowl
' shaped drainage feature. The feature was formed some time ago, in a geologic sense, as evidence of
significant flow (active stream channel) at the pond location was not observed. The ground surface slopes
' up steeply to the upper portion of the site to the east, north and south of this area. The vegetation consists
of mixed trees and underbrush. Downstream of the pond area, a defined drainage chamlel exists. This is
' where the bioswale will be constructed and the pipe that exits the storm system will be routed. This
channel continues down gradient and empties into Honey Creek. The lower reaches of this channel has
incised and shows signs of fairly recent downcutting.
NELSON-COUVRETTE & ASSOCIATES, INC.
Geotecluiical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
t NCA File No. 10921394
August 4, 1994
Page 4
Geology
' Most of the Puget Sound region was affected by past intrusion of continental glaciation. The last period of
glaciation, the Vashon Stade, ended approximately 10,000 years ago. Many of the geographic features
seen today are a result of scouring and overriding by glacial ice. During the Vashon Stade, the Puget
' Sound region was overridden by over 3,000 feet of ice. Soil layers overridden by the ice sheet were
compacted to a much greater extent than those that were not. A typical sequence includes glacial till (Qvt)
' mantling advance outwash sand (Qva). Glacial till is an unsorted mixture of sand, silt and gravel that is
deposited at the bottom of the glacier. The advance outwash sand is a water-sorted fine to coarse sand with
varying gravel content. It may contain finer-grained layers. Both the advance outwash and the till have
been overridden by the continental glaciers. The glacial till exhibits both high strength and low
' permeability. The advance sand, where confined, also has fairly high strengths and is moderately to highly
permeable. Our explorations encountered glacial till mantling advance outwash sands.
' Subsurface
We explored subsurface conditions in specific areas of the site by excavating 12 test pits using a rubber-
tired tractor-mounted backhoe. The main reason for the explorations was to identify location and quantities
of less permeable soils that could be used in the pond construction. The test pits were located in the field
' by our geologists who maintained logs of the conditions encountered. The location of the test pits
excavated are shown on the Site Plan in Figure 2. The specific test pit locations are in the areas of planned
cuts and the ponds. The soils were classified in general accordance to the Unified Soil Classification
system, a copy of which is presented in Figure 3. The test pit logs are presented in Figures 4 through 7.
' Soil samples were obtained to conduct laboratory permeability tests and grain size analysis. The gradation
curve is presented as Figure 8.
In general, the site was found to be primarily underlain by dense glacial deposits; glacial till within the
upland portion, and glacial outwash within the lower elevation areas. The till, which is a conmionly less
' permeable soil, consists of a gray to brown, dense, silty fine to medium sand with coarse sand and gravel.
Large quantities of the till did not exist where cuts are planned. The till is underlain by advance outwash.
The outwash consists of gray, medium dense to dense, fine to medium sand with trace amounts of silt. The
advance outwash sands were found in the vicinity of the two detention ponds and in the road cut areas in
the northwest portion of the site (122nd Avenue NE and SE 97th Court). The area of the deepest roadcut,
' at Test Pits 1, 3, 4, and 5, was found mostly to be underlain by outwash. Till was only found in this area
in the upper test pits located in this area, Test Pits 4 and 5. Till was found to the depths explored in the test
NELSON-COUVRETTE & ASSOCIATES, INC.
' Geotechnical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
NCA File No. 10921394
August 4, 1994
Page 5
i
pits located in the upper central portion of the site, Test Pits 8, 9, 10, 11, and 12. The data from Test Pits
' 4 and 5 suggest a till/outwash contact at approximately at elevation 360 to 370 feet. For the purposes of
detennining material quantities of till, we would not extrapolate this elevation over the entire site.
Laboratory Testing
Soil samples from the bottom of Detention Pond B and from road cut areas were returned to our laboratory
' for permeability testing. Since insufficient quantities of till were found, permeability tests were only run on
the material at the base of Detention Pond B. A constant head permeability test was nm on the advance
' outwash sand in general accordance with ASTM D 2434. Constant head tests were run on samples
compacted to a dry density of 113.8 pounds per cubic foot (PCF) and 112.2 PCP (Modified and Standard
Proctors respectively). Permeability values (k) of 1.3 X 10 -3 and 2.7 X 10 -3 centimeters per second
' (cm/sec) were calculated for the modified and standard proctor samples respectively. A grain size analysis
was performed on the same sample and is presented as Figure 8.
' CONCLUSIONS AND RECOMMENDATIONS
' General
Our explorations encountered advance outwash sands in.the area of the planned detention ponds. The
advance outwash sand in the pond area is uniformed grained, moderately to highly permeable and would be
' susceptible to piping if an unlined detention pond were constructed on it. Piping occurs when the water
flow through the soil mass has a high enough velocity that it carries soil particles away from the point
' where the seepage exits the ground surface. As soils is carried away from the exit location, it starts to form
a "pipe" under the embankment which could lead to ultimate failure of the embankment. It is our opinion
' that the detention ponds should be lined to prevent excessive seepage and possibly this type of failure. We
have discussed various options for lining of the two detention ponds. Our subsurface investigation has
' indicated that not enough low permeability soil (glacial till, etc.) exists on the site. Rather than importing
additional soil liner material you have chosen to line both ponds and the bioswales with a synthetic liner.
The previous report presents specific recommendations for design and construction of the pond. The pond
should be constructed by stripping off of the existing fill down to native bearing soils in the area of the
planned berms. The berms should then be constructed with a suitable material by compacting to the
appropriate density. The till or outwash could be used as suitable material provided the appropriate
moisture can be obtained. The pond slope angles and construction method should be performed as outline
' in the Detention Pond sub-section of this report.
NELSON-COUVRETTE & ASSOCIATES, INC.
' Geotechnical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
NCA File No. 10921394
August 4, 1994
Page 6
The spillway for Pond B will be approximately 40 feet long and located on a 2:1 (H:V) slope. Control of
erosion and seepage into the embanlumcnt will be critical. We have discussed various options for the
spillway design. The option chosen would be to construct the dowi-lbill face of the embankment such that
there is a minimum of 3 feet of low permeable soils below the spillway. We recommend that these soils
have a maximum permeability of 1xl0-5 cnVsec. The glacial till found in the upland portions of the site
should be suitable for this use. The spillway itself should be lined with geoweb filled with soil and seeded.
' It is our opinion that this type of erosion protection would be better suited for the spillway than rock spalls.
' Detention Ponds
General: The ponds are both located in areas underlain by sand and should be lined to prevent excess
seepage. The soil placed in the berms should be compacted as outlined in our May 17, 1991 report.
Recommendations for liner placement are included in this report. We also recommend that liner
manufacturers recommendations be followed. Where there is a discrepancy, we should be contacted to
' review the discrepancy and provide recommendations as appropriate.
Wet Pond and Berm Design: We recommend that a 20 mil liner be used for this project. Since the
' environment is not considered chemically hostile, it is our opinion that any liner made to be placed in soil
and not degrade could be used. Typically, a 20 mil un-reinforced PVC material is appropriate. The liner
should have a minimum of 1 foot of cover. Additional cover may be desired for sustaining plant life. This
should be determined by a landscape type designer. The liner should have a maximum slope angle of 3:1
(H:V). Steeper slopes would most likely require a geotextile to be placed over the liner to increase soil
friction. The liner should be anchored at the top of the berm by placing it into a trench. The trench should
' have a minimum depth and width of 18 inches and 12 inches respectively. The liner should be placed on
the slope, and be continued to line the trench. The trench should then be filled and the fill compacted to
meet the berm compaction specifications. Piping will be placed in the pond that will cross through the
' liner. Where ever this occurs, the liner should be scaled to the pipe using appropriate methods as
reconunendcd by the manufacturer.
' The liner should prevent water from the pond seeping into the subsoils and impacting downslope
' conditions. Even with small leaks in the liner, enough water to cause significant impacts arc not expected.
Natural occurring ground water was not observed in the area of the pond. Therefore, it is our opinion that
the lined pond should not have downstream stability problems.
NELSON-CO UVRETTE & ASSOCIATES, INC.
' Gcoteclmical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
NCA File No. 10921394
August 4, 1994
Page 7
Filling of Erosion Feature
A description and restoration of the large erosion feature has been described in our geotechnical engineering
report dated January 11, 1993 (DLN Job No. 0193). It is our opinion that the use of crushed concrete
placed in the bottom and on the sides of the washout followed by tree stumps and capped with additional
' crushed concrete, would be a suitable solution with the following addition. The intent of the fill would be
to protect the existing up hill face from further erosion and provide some lateral confinement. The fill
placed as described should be expected to settle with time. We reconunend that the upper portion of the
feature have additional material placed above the existing ground surface in order to offset the fixture
' settlement at this location. This would take the form of a 2 to 3 foot high mound. The materials described
as fill planned for this area will have significant voids. We reconunend that the walls of the upper portion
of the feature be lined with a suitable filter fabric in order to help prevent soil from washing or migrating
into the new fill. The fabric should extend a minimum distance of 30 feet onto the bottom of the feature.
We recommend that the final slope be graded to a 1.5 H to 1V inclination or flatter. This method may also
' be used to repair the telephone easement erosion feature. However, we recommend that the cable be
rebedded and compacted fill placed around it to protect it from abrasion by the cement pieces. It may be
prudent to have slack in the cable to allow for some differential settlement of the fill without stretching the
cable. We recommend that the owners of the cable be contacted and the plamied discussed. Settlement of
' the fill around their cable may not be an acceptable solution.
Rockeries
' Rockeries are plarined for facing the road cuts on 122nd Avenue SE, SE 97th Court and on the north and
cast sides of Detention Pond A. You have indicted that rockery heights will range from 4 to 8 feet in the
roadway cuts and 4 to 6 feet around the detention pond. Most of the planned rockeries will face advance
outwash with a 2:1 (H:V) backslope. For rockeries supporting this slope inclination, we reconunend that
the base rock extend into the face of the cut a minimum distance of one-half the wall height. This means
that for an 8 foot high wall, the base rock should extend 4 feet into the cut. An alternative to using the
' larger rocks would be to reinforce the fill behind the rockery with a suitable fabric or geogrid. We can
provide recommendations and designs for reinforced fills if desired. To prevent migration of the native
soils through the rockeries or gabions, we recommend that a filter of 2 inch minus crushed rock be
' substituted for rock spalls as back fill behind the wall. We reconunend that rockeries be constructed in
accordance with Associated Rockeries Contractors (ARC)guidelines.
NELSON-COUVRETTE & ASSOCIATES, INC.
' Gcoteclulical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
NCA File No. 1092B94
August 4, 1994
Page 8
Gabions
As an alternative to rockeries you are considering using gabions around the detention pond and bioswales.
Gabions are wire baskets filled with rock spalls. We reconunend that a filter consisting of 2 inch minus
' crushed rock be used behind the gabion walls to prevent the migration of the fine sands through the wall.
As an alternative an appropriate geotextile fabric may be used as a filter. We recommend that the gabion
walls be designed as gravity strictures using standard stability calculations. For gabions supporting a 2:1
(H:V) backslope, we recorrunend that the wall be designed to resist an active equivalent fluid pressure of 50
pounds per cubic foot. For gabions supporting a level backslope an active equivalent fluid pressure of 35
pounds per cubic foot may be used for design. A base friction of 0.5 may be used for design.
The actual design of gabion walls,rockery walls or reinforced soil walls is beyond the scope of this report.
We are available to provide a design at your request.
1 USE OF THIS REPORT AND WARRANTY
We have prepared this report for Mr. Wayne Jones of Lakeridge Development, and his agents use in
plamning and design of this project. The data and report should be provided to prospective contractors for
their bidding and estimating purposes, but our report conclusions and interpretations should not be
construed as a warranty of subgrade conditions.
1
The scope of our work does not include services related to construction safety precautions, and our
' reconunendations are not intended to direct the contractors' methods, techniques, sequences or procedures,
except as specifically described in our report for consideration in design. There are possible variations in
subsurface conditions. We recommend that project planning include contingencies in budget and schedule,
should areas be found with conditions that vary from those described in this report. Within the limitations
of scope, schedule and budget for our services, we have strived to take care to complete our services in
1 accordance with generally accepted practices followed in this area at the time this report was prepared. No
other conditions, expressed or implied, should be understood.
i
1
1
1
NELSON-CO UVRETTE & ASSOCIATES, INC.
Geotechnical Evaluation Report for Two Detention Ponds
Honey Creek Ridge
NCA File No. 10921394
August 4, 1994
Page 9
We appreciate the opportunity to be of service to you. If there are any questions concerning this report or
Pp pp
if we can provide additional services, please call.
Sincerely,
' NELSON-COUVRETTE & ASSOCIATES, INTC.
1I �//
Bill Benzer
' Project Manager
S P. CO&
' d , 2as p ww� 4Ig4
' Charles P. Couvrette, PE
Geoteclinical Engineer
Three Copies Submitted
Eight Figures
1
NELSON-COUVRETTE & ASSOCIATES, INC.
VICINITY MAP
to,. X t�
SE•��68TH SE69x
$T
J nsr rL 2=
It E
` 7 D i ,W SE 72
3 J'k• 1 .;.j RAZELkWD SPA PND S I PL73
f ;, E �_ rJv u 7 > N EWCASTLE
N ,ii ST ° SPj6 c 5E 25 9
n¢� tPL UK
SE 7m1 7S 1� P od REH 4
ff S z9Tx sr ST, 0 n m d JF K I s�.ot ,'�vb•�v 5 9F
NE 43R •SE BOTH
Pl o� Nx esn OTN '<db.i 139TH Al`t'r
n u # 144 el Si s. 79
H� IISTH GS�
c Y' N 10 i s SE... AtwW..... •...4? 1�1 < sE 8trt R �.N,. ^ f ', I ��Si�'r�
N
r N 40TH ST:., Ins I iF sr
Si
I N 38TH ST
u A
N 3m ST VN�t�o SE 5M ST m tY x^• �. i �, S 6M�}. r` F g
IMVDAEE N 36TH $T ST..'r
r PARR
r fH ST u •Ziga
33RD .PL PROJECT TH ST 4 yX4T1
915T ST: GREFX+•. sls`^ !
N� 33RD = I' SATE a• SE
..:ST :>&'A 92N sr 5s .o-.�� .�. ^' 915T ST
C• tr. .:.tj;la N
Sj X 315T 5T" N ST" I. ra �t a i (,PcEK ii SE
d ST K
s: x 30TH 'A �SBM nl �N e ,9 � a.<. a 95TN IWV VALL
`C N 29TH ..'STy(tY $E tu'^ '�Y _' .y4r RD
PL ❑ ".•. �f6t'-,• '�� IIgP p, sE 9stx PL
NE 2BTH V -. 'a
Yf'or+ , S < tt cPff N''28TH - ST s `i HE 27TH Sii NE°+ A rru E t x lba`s a"'
- nrH w ZT I SIERRA
[7 t- 99-F HEIGHTS 3 o G 25TN N.: ""`TM� I� �
qYF N 26 H ST< KENNY E N S x �r SE 10 PARK ] T11 CT SE t N —SE MIN
LIONS N _ ..'G 4 OpTM W SE~ 100TN PL PL
w < < NE N Z3RD PL W < SE 102 N tvm ST --.. '� ti SE 102N0
$_ < I t"NE 5 22ND ST < iF SA-30.1PD t NO PL Q.�t� 1 ST
ST a' SE taTHE rt n�' W 'sN�
• � sE OSTN � i G � " �� �K �.3 � t SE 104TH I
'to t>TM i z NE t41N Si R7N h- ', I om STW 'NE sr SE IOSTH ST
' � �I,t< Y . NE I w'i/NA�RK��> � "i_.«E—�,- r ,� .•+w N`��°t� m, x� _� � d
G � Ji NE ST
sm x:
Z ''141H ST � _ <:g JR < $ W '4 NE ltrx ST �- I }},,�Q` F •+"•�"
NE i sr f9LL NE iltH sr 7~ O CREI K r C, T'< S pV�i
'tWWR/ALI - C°t',.NE < 12iH 3 - ' NE o� I7TH I SE 112 ST �N
'l9EACN/�1RIyy
Iyq�N'� t,`r+'4 �•`� uTx NE iLTN HA
PAR DR f ,Po 6 t it°4 t I�, HIEH
tf` t
-� NE 10TH ST HE ST
' •11 NE 97H _ y 9TH ST NE � __ fF•;
h�PARK2 _ SE I�>N G SQT
SE 120TH -ST_
"� Tx 7!/ NE NE 7TN ST< Fx -SE 1215i ST
�I Mom '° s�PL �i• g �; I; a ' 6TI ^� ��JE I122NO
-- I /MtlEt: .NE 6IN x d NE'ssN ,I 'ST
. p P
FIGURE
' NELSON-COUVRETTE&ASSOCIATES,INC. HONEY CREEK RIDGE 1
CONSULTING GEOTECHNICAL ENGINEERS,GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS FILE NO. DATE U N E 1994
1092B94
SITE PLAN
T _
-� Tr-11 ^�
.'T TP-12
5 51 J7 33 ?9 ?8
I 56 �� 1 30
32
I r 38� j/ i� ?7 I \+co
57
79
r5B ^.3 4 41 26
0
I ,50 42 1
/ 49 TP-9 4J J TP-1 TEST PIT NUMBER AND
60 47 46 45 17 2/ ✓'
T .B 16 /� - ' APPROXIMATE LOCATION
61 TP-g 22 /
I 15.:0 23
- 24 25
4 'Fo o
U 2 6 J .O
$.�. 1 7 +., 3J0
1 „o
'00
.w 25 24 2J IW 3,0
0
26 B ,+° 2a0
- 10
2,0
? 30 � Tr-6 \
29 10 rA
2 �
9° ?7 28 -
,. J2 ?0
I J4
i I 17
TP-1 TP-3TP-4TP-5
t 1130
°a
U �0
1 c 14 7 76
B
z
1 , Oi \i9'0110
CEO
I 9
I
12
W
7 \ 40
50
Tr-2 .�
po
may, 0 50 100
scale: 1" =50'
FIGURE
- NELSON-COUVRETTE&ASSOCIATES,INC. HONEY CREEK RIDGE 2
CONSULTING GEOTECHNICAL ENGINEERS,GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS FILE NO. DATE
10921394 JUNE 1994
SOIL CLASSIFICATION SYSTEM
GROUP GROUP NAME
MAJOR DIVISIONS SYME30L
WELL-GRADED GRAVEL, FINE TO
GRAVEL CLEAN GRAVEL aw COARBE GRAVEL
COARSE
' GRAINED Gp POOFILY-GRADCD GRAVEL
SOILS MORE THAN 150% GRAVEL GM SILTY GRAVEL
OF COAROC FRACTION WITH FINES
' RETAINED CLAYEY GRAVEL
ON NO. 4 OICVE aC
MO`tC THAN 60X
R�TAINCD ON CLEAN SAND 3W WCLL-GRADED BAND, FINE TO
Nc. 200 BIEVE SAND COARBE BAND
' 313 POORLY-GRADED BAND
MORE THAN 00'% SAND 3M BILTY BAND
OF COARBC FRACTION WITH FINES
PABBEO
NO, 4 BIEVE SC CLAYEY BAND
' SILT AND CLAY ML SILT
FINE INORGANIC
DRAINED CL CLAY
SOILS LFOUID LIMIT
LEBO THAN 50 ORGANIC OL ORGANIC SILT, OR
CLAY
SILT AND CLAY MH GILT OF HIGH PLAOTICITY, CLAOTIC SILT
' MO AC THAN 50% INORGANIC
PA116E0 NO, 200 CH CLAY OF HIGH PLAOTICITY, FAT CLAY
BICvE
LIQUID LIMIT
60 OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC GILT
' PT FEAT
HIGHLY ORGANIC SOILS
1 ,
r
NOTES: SOIL MOISTURE MODIFIERS:
' 1. Field classification le based on Dry - Absence of moisture, dusty, dry
visual examination of soil In general to the touch
accordance with A3TM D2400-03.
Molt - Damp, but no visible water
2. Sell clasalflcallon using laboratory
loata Is based on ASTM D2407-03. Wot - Visible free water .or saturated,
usually aoil Is obtained from
' 3. Doacrlptiona of soll density or below water table
conalstoncy are based on
Interpretation of bfowcount data,
' visual appearance of soils, and/or
lost data.
NELSON-COUVRETTE & ASSOCIATES,INC.
SOIL CLASSIFICATION SYSTEM
CONSULTING GEOTECHNICAL ENGINEERS,GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS FIGURE 3
LOG OF EXPLORATION
' DEPTH USC SOIL DESCRIPTION
TEST PIT ONE
0.0-0.5 DARK BROWN TOP SOIL
' 0.5-3.0 SP-SM MEDIUM REDDISH BROWN FINE TO MEDIUM SAND WITH SILT AND OCCASIONAL
COARSE SAND AND GRAVEL(MEDIUM DENSE,MOIST)ROOTS TO 1.0 FEET
3.0-6.0 SP MEDIUM GRAY FINE TO MEDIUM SAND WITH TRACE SILT (MEDIUM DENSE TO
DENSE,MOIST)(OUTWASH)
A SAMPLE WAS COLLECTED AT 2.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
' TEST PIT WAS COMPLETED AT 6.0 FEET ON 4113194
TEST PIT TWO
0.0-0.5 DARK BROWN TOP SOIL
' 0.5-1.5 SP-SM MEDIUM REDDISH BROWN FINE TO MEDIUM SAND WITH SILT(MEDIUM DENSE,
MOIST)ROOTS TO 1.0 FEET
1 1.5-4.0 SP MEDIUM GRAY FINE TO MEDIUM SAND WITH TRACE SILT (MEDIUM DENSE TO
DENSE,MOIST)(OUTWASH)
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
' SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 0.0-1.5 FEET
TEST PIT WAS COMPLETED AT 4.0 FEET ON 4113/94
TEST PIT THREE
0.0-0.5 DARK BROWN TOPSOIL WITH LEAVES AND ORGANIC MATERIAL
0.5-1.5 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH OCCASIONAL
COARSE SAND AND GRAVEL(MEDIUM DENSE,MOIST)
1.5-5.0 SP MEDIUM GRAY FINE SAND WITH TRACE SILT AND OCCASIONAL SANDSTONE
GRAVEL AND COBBLES(MEDIUM DENSE TO DENSE,MOIST)(OUTWASH) ROOTS
TO 2.5 FEET
A SAMPLE WAS COLLECTED AT 3.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 5.0 FEET ON 4/13/94
TEST PIT FOUR
0.0-0.5 DARK BROWN TOP SOIL WITH ROOTS AND LEAVES
' 0.5-2.0 SM MEDIUM TO DARK REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH
COARSE SAND AND GRAVEL AND ROOTS(MEDIUM DENSE,MOIST)
' 2.0-4.0 SM MEDIUM GRAY AND BROWN MOTTLED SILTY FINE TO MEDIUM SAND WITH
COARSE SAND AND GRAVEL AND OCCASIONAL ROOTS (DENSE, MOIST)
(WEATHERED TILL)
4.0-12.0 SM MEDIUM GRAY SILTY FINE TO MEDIUM SAND WITH COARSE SAND AND GRAVEL
' AND OCCASIONAL COBBLES(DENSE,MOIST)(TILL)
12.0-12.5 SP-SM MEDIUM GRAY FINE TO MEDIUM SAND WITH SILT AND OCCASIONAL COARSE
SAND AND GRAVEL(MEDIUM DENSE TO DENSE,MOIST)(OUTWASH)
' SAMPLES WERE COLLECTED AT 7.0 AND 12.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
' TEST PIT WAS COMPLETED AT 12.5 FEET ON 4113/94
NELSON-COUVRETTE& ASSOCIATES, INC.
FILE NO.10921393
' FIGURE 4
' LOG OF EXPLORATION
' DEPTH USC SOIL DESCRIPTION
TEST PIT FIVE
0.0-0.5 DARK BROWN TOP SOIL WITH LEAVES,ROOTS AND ORGANIC MATERIAL
' 0.5-2.0 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH OCCASIONAL
COARSE SAND,GRAVEL AND ROOTS(MEDIUM DENSE,MOIST)
2.0-4.0 SM MEDIUM GRAY AND BROWN MOTTLED SILTY FINE TO MEDIUM SAND WITH
COARSE SAND, GRAVEL AND ROOTS (MEDIUM DENSE TO DENSE, MOIST)
(WEATHERED TILL)
4.0-9.0 SM MEDIUM GRAY SILTY FINE TO MEDIUM SAND WITH COARSE SAND AND GRAVEL
' AND OCCASIONAL ROOTS TO 5.0 FEET(DENSE,MOIST)(TILL)
SAMPLES WERE COLLECTED AT 1.5 AND 7.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 9.0 FEET ON 4/13/94
TEST PIT SIX
1 0.0-4.0 SM DARK BROWN SILTY FINE TO MEDIUM SAND WITH OCCASIONAL COARSE SAND,
GRAVEL, ROOTS, SMALL PIECES OF WOOD AND SMALL ZONES OF ORGANIC
MATERIAL(LOOSE TO MEDIUM DENSE,MOIST)
4.0-7.0 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH OCCASIONAL
COARSE SAND, GRAVEL, ROOTS AND CHARRED WOOD (MEDIUM DENSE,
MOIST)
7.0-10.0 SP MEDIUM GRAY FINE TO MEDIUM SAND WITH TRACE SILT AND OCCASIONAL
COARSE SAND AND GRAVEL(MEDIUM DENSE,MOIST)(OUTWASH)
SAMPLES WERE COLLECTED AT 4.0 AND BETWEEN 7.0 AND 10.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 10.0 FEET ON 4/13/94
TEST PIT SEVEN
' 0.0-3.0 SM DARK BROWN SILTY FINE TO MEDIUM SAND WITH OCCASIONAL COARSE SAND
AND ROOTS(LOOSE TO MEDIUM DENSE,MOIST)
1 3.0-6.5 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH COARSE SAND
AND GRAVEL(MEDIUM DENSE,MOIST)
6.5-9.0 SP-SM MEDIUM GRAY FINE TO MEDIUM SAND WITH SILT AND OCCASIONAL COARSE
SAND AND GRAVEL(MEDIUM DENSE,MOIST)(OUTWASH)
' SAMPLES WERE COLLECTED AT 1.0,4.0 AND 8.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
' TEST PIT WAS COMPLETED AT 9.0 FEET ON 4/13/94
NELSON-COUVRETTE& ASSOCIATES, INC.
FILE NO.10921393
' FIGURE 5
LOG OF EXPLORATION
DEPTH USC SOIL DESCRIPTION
TEST PIT EIGHT
' 0.0-0.5 DARK BROWN TOP SOIL WITH ROOTS
0.5-2.0 SM MEDIUM BROWN SILTY FINE TO MEDIUM SAND WITH ROOTS AND OCCASIONAL
COARSE SAND AND GRAVEL(MEDIUM DENSE,MOIST)
' 2.0-4.0 SM MEDIUM GRAY AND BROWN SLIGHTLY MOTTLED SILTY FINE TO MEDIUM SAND
WITH COARSE SAND AND GRAVEL(DENSE,MOIST)(WEATHERED TILL)
SAMPLES WERE COLLECTED AT 1.0 AND 4.0 FEET
' SLIGHT TO MODERATE GROUND WATER SEEPAGE WAS ENCOUNTERED AT 2.0
FEET
SLIGHT TEST PIT CAVING WAS ENCOUNTERED BELOW 2.0 FEET
TEST PIT WAS COMPLETED AT 4.0 FEET ON 4113/94
TEST PIT NINE
0.0-2.5 SM MEDIUM GRAY AND BROWN SLIGHTLY MOTTLED (UPPER 1.0 FEET) SILTY FINE
TO MEDIUM SAND WITH COARSE SAND, GRAVEL, OCCASIONAL COBBLES AND
' OCCASIONAL ROOTS BETWEEN 0.0 AND 1.0 FEET(DENSE,MOIST)(WEATHERED
TILL)
A SAMPLE WAS COLLECTED AT 2.0 FEET
' VERY SLIGHT GROUND WATER SEEPAGE WAS ENCOUNTERED BETWEEN 0.5
AND 1.0 FEET
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 2.5 FEET ON 4/13/94
' TEST PIT TEN
0.0-3.0 SM MEDIUM TO DARK REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH
COARSE SAND,GRAVEL AND ROOTS(LOOSE TO MEDIUM DENSE,MOIST)
' 3.0-5.0 SM MEDIUM GRAY AND BROWN MOTTLED SILTY FINE TO MEDIUM SAND WITH
COARSE SAND AND GRAVEL(DENSE,MOIST)(WEATHERED TILL)
' SAMPLES WERE ENCOUNTERED AT 1.0 AND BETWEEN 4.0 AND 5.0 FEET
HEAVY GROUND WATER SEEPAGE WAS ENCOUNTERED AT 3.0 FEET
SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 2.5 AND 3.0 FEET
TEST PIT WAS COMPLETED AT 5.0 FEET ON 4113/94
TEST PIT 11
0.0-0.5 DARK BROWN TOP SOIL WITH ROOTS
' 0.5-1.5 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH COARSE SAND,
ROOTS AND OCCASIONAL GRAVEL(MEDIUM DENSE TO DENSE,MOIST)
1.5-2.0 SM MEDIUM GRAY AND BROWN MOTTLED SILTY FINE TO MEDIUM SAND WITH
COARSE SAND AND GRAVEL(DENSE,MOIST)(WEATHERED TILL)
2.0-8.0 SM MEDIUM GRAY SILTY FINE TO MEDIUM SAND WITH COARSE SAND AND GRAVEL
(DENSE,MOIST)(TILL)
' SAMPLES WERE COLLECTED AT 1.0,2.0 AND 4.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 8.0 FEET ON 4/13/94
NELSON-COUVRETTE&ASSOCIATES, INC.
FILE NO.10921393
FIGURE 6
LOG OF EXPLORATION
DEPTH USC SOIL DESCRIPTION
TEST PIT 12
' 0.0-1.5 SM DARK BROWN SILTY FINE TO MEDIUM SAND WITH ROOTS AND OCCASIONAL
COARSE SAND AND GRAVEL(LOOSE,MOIST)TOP SOIL
1.5-3.0 SM MEDIUM REDDISH BROWN SILTY FINE TO MEDIUM SAND WITH COARSE SAND,
ROOTS AND OCCASIONAL GRAVEL AND SANDY ZONES (MEDIUM DENSE TO
DENSE,MOIST)
3.0-4.0 SM MEDIUM GRAY AND BROWN SLIGHTLY MOTTLED SILTY FINE TO MEDIUM SAND
WITH COARSE SAND AND GRAVEL AND OCCASIONAL ROOTS (DENSE, MOIST)
(WEATHERED TILL)
4.0-7.0 SM MEDIUM GRAY SILTY FINE TO MEDIUM SAND WITH COARSE SAND AND GRAVEL
AND OCCASIONAL COBBLES(DENSE,MOIST)(TILL)
SAMPLES WERE COLLECTED BETWEEN 3.0-4.0 AND 4.0-6.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 7.0 FEET ON 4/13/94
I
' NELSON-COUVRETTE& ASSOCIATES, INC.
FILE NO.10921393
FIGURE 7
il' Z U. S . STANDARD SIEVE SI7E
1711
O \
IIn 100
g C) �I
nm 9 0 sidVE S ZE ASS �tl
o F- 8 0 3
n �11
z' w 70
rn
Z � O ' 60 I� I I I 10 7
3m n n
, 1 1#1,iol .o
~ y Li q
N
Li I IW
y
50I I k I I kI ' im( Z.9
m �
y� Z 40
z
Li
30 i
w
z = 20
jE
zz 10
0 _< �l I - 1+ 1 E I
m 1000 100 10 1 . 0 0 . 1 0 . 01 0 . 001
c° m
T� GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL SAND SILT OR CLAY
pa G) COARSE FINE COARSE MEDIUM FINE
q m
m EXPLORATION SAX,PLE
m SY,^'B0L NUMBER DEPTH SOIL DESCRIPTION
'Brown med;v m -sand wi fh trace Silt and grave
z m
m
CO