Loading...
HomeMy WebLinkAboutSWP272165 Short Plat (SHPL fJ ) REQUEST FOR PROJECT a Prclim. Plat (PP/! ) - CAGa To: Technical Services Date Vri 3 / 9 WOsr S From: Plan Review/P?icct Managcr Project Name (70 cturactcrs max) Description of Project: �Le i Circle Size of Waterline: 8" to" 12" Circle One: ee or Extension Circle Size of Sewerline: 8" 12" Circle One: or Extension Circle Size of Stormline: 15" 181, 24" Circle One: L:!!i) or Extension Address or St reet Name(s) /��,�� . Dvlpr/Contractor/Owner/Cnslt: t � Jl (70 character:max) ' Check each discipline involved in Project Ltr Dtwg W of sheets per discipline Q,/Trans-Storm (ROddWdy/Dr81111bC) (Offsttc tntprovcrncntsXncludc basin rune) _ �(mdudc TESC sheets) id /[dnS Ottatbon / l/ p (Sigulization,Cttattrrelvation,Lighting G/ v Wastewater (Sanitary Scwcr Muni(includc basin name) — — t5 Water (Mairu,Valves,Hydrants) I (include corrrpositc&Horizontal Ctrl Shccts) TS Use Only T,�Zo - i- a/6s sop -_50 -- aJ65 Le7VAO2 Approved by TSM Date: orms/miscJ'92-090.DOC/CD/bh CITY OF RENTON MEMORANDUM I 7-e, it 7,1, DATE: December 30, 1994 JAN 12 1995 TO: Lys H. Dave C. CITY OF RENTON Bob M. Engineering Dept. Ron S. FROM: Arneta Plan Review X6198 ` SUBJECT: FRED MEYER RSTW 2165 For your files. • REQUEST FOR FILE AND NUMBER 0 PRECON NOTICE 10 PRECON MINUTES Q ATTENDEES AT PRECON 0 LETTER OF SPECIAL BILLING SIGNED E MEMO TO BECKY AND RAY STATING THAT LETTER OF SPECIAL BILLING WAS SIGNED E CONSTRUCTION PERMIT C940122 0 RECEIPT FOR CONSTRUCTION PERMIT--SEE SIERRA SYSTEM UNDER PERMIT C940122 123 STORM DRAINAGE REPORT WAS TURNED OVER TO STORM DIV. AT BEGINNING OF PROJECT PC: Neil W. Shoe Plat (S1iPL If ) REQUEST FOR PROJECT a Prcltm. Plat (PP/f ) -- CAGa --------------- To: Tccltnical Services Daic ('-�S1 � / � WOa G� From: Plan Rcvicw/P(ojcct Manager G 94U ,og -2- Project Name (70 characters max) Description of Project: i Circle Size of Waterline: $" 10 l2'� � Circle One: &Ne )or Extension Circle Size of Sewerline: $" 1p 12" Circle One: or Extension Circle Size of Stormline: 12" 1 S" 18" 24" Circle One: -fie,-, i or Extension Address or Street Name(s) S(�` D vl p r/Contractor/Owner/C ru l t: (70 cturactca max) Check each discipline involved in Project Ltr Drwg a of sheets per discipline 011_�Trans-Storm 13ttic"� (Roadway _ CO — n /Drainage) (Ott Sac�mprovcmrnts)(tncludc basin Warne) ' — // (� ,�� /' 1 ransportation (sigutizati«L C}ur,nctizztiocL to tin C/ `/l/ (utcludc TESC sheets) 0 Wastewater Lam' (san'tary scwcr Main)(inCIudc basin name) C� Water (Mainz,Valvcs,Hydrants) �� v (include composite&&Horizontal Ctrl sheets) TS Use Only C'_ �/ s '17 — t Approved by TSM Date.- ornu/misd92-090"p0'C/CO/bh - CITY OF RENTON Y PUBLIC WORKS DEPARTMENT t� 235-2631 ♦ ma ♦ PRECONSTRUCTION CONFERENCE DATE: November 29, 1994 N� TIME: 1:00 pm PLACE: City Hall 3rd Floor Conference Room DEVELOPER/CONTRACTOR OR SUBCONTRACTOR/NAME OF PROJECT: COMPANY NAME: Musil Perkowitz & Ruth COMPANY ADDRESS: 9150 SW Pioneer Ct, Suite T, Wilsonville, OR 97070 PHONE: 503-685- FAX NO: 503-682- CONTACT: Ed Craker 7350 3348 NAME OF PROJECT: Fred Meyer (PERMIT #C940122) INSTALLATION: Water, sewer, storm, approved drawings #2165 LOCATION: 365 Renton Center Wy SW PROJECT COORDINATOR: Ameta Henninger 277-6198 PLEASE CHECK DEPARTMENTS TO BE NOTIFIED AND SPECIFY PERSON TO ATTEND: [X] PUBLIC WORKS DEPARTMENT [X] Utility Plan Review Neil Watts [X] Water Utility Lys Hornsby [X] Wastewater Utility David Christensen [X] Surface Water Utility Ron Straka [X] Transportation Systems Karl Hamilton [X] Maintenance Services Division Jack Crumley [X] Customer Services P.I.C. Dee Beedle [X] Construction Services Rick Kokko and Mark Wetherbee [X] FIRE PREVENTION Corey Thomas [ ] POLICE DEPARTMENT [ ) PARK DEPARTMENT [X] BUILDING DEPARTMENT Jim Chandler [ ] OTHER OUTSIDE DEPARTMENTS: [ X ] CONTRACTOR TO NOTIFY [X] ALL ASSOCIATED CIVIL CONTRACTORS [ ] Department of Transportation 872-6470 [X] U.S. West Communications 235-3012 [X] Puget Sound Power & Light Co. Karen Sharp 850-5560 [ ] Seattle City Light 684-3076 [X] TCI Cable of Washington (Phil Fisk) 433-3434 x3084 [X] Washington Natural Gas Company (Lorren Loveless) 224-2209 [ ] METRO - Bus Routes 684-2732 [ ] King County Inspection 244-0770 [X] Engineer Tony Freeland 206-336-5751 [X] Sound Utilities, Bob Middleton (FAX 206-854-6782) 206-859-9000 [X] Surveyor Fletcher Wright, Mike Allen 206-447-7654 PRECONFM.DOT/bh ATTACHMENT PERMIT NO. C940122 FRED MEYER PRECONSTRUCTION MEETING NOV. 29, 1994 1:00 P.M. 3 RD Floor Conference Room Fred Meyer Project Contact: Ed Craker Phone: 503-685-7350 Contractor: Sound Contact: Bob Middleton Phone: 206-859-9000 Utilities Engineer: Tony Freeland/ Phone: 206-336-5751 David Lee Inspector: Rick Kokko Phone: 206-999-1831 Surveyor: Fletcher Wright Contact: Mike Allen Phone: 206-447-7654 FRANCHISE UTILITIES: 1 . The franchise utilities require copies of the approved by the City construction drawings before designing their facilities. 2. Each franchise utility must apply for a separate permit prior to construction in existing or future right-of-way. A blueline drawing showing the location of all utilities, city and franchise, in redlines shall be submitted to the third floor counter for City review two weeks before installation. 3. All franchise utilities shall be separated a minimum of five feet (5') horizontally and twelve inches (12") vertically from City utilities. Puget Power: Karen Sharp has seen the approved plans and has been talking to Ed Craker. Contractor will coordinate with Puget Power. TCI - If there is an open trench they will put a pipe in. U.S. West Communications - No Representative present Fred Meyer C940122 1 2/6/94- 2 FIRE PREVENTION: 1 . Maintain access to site at all times. Must be able to support emergency equipment in all types of weather. 2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa and Renselear are manufacturers of Cory type. 3. New hydrants are to be covered with burlap bags until operational. 4. All blocking must be inspected by a City inspector prior to backfill. 5. Leads that exceed 50 feet in length shall be 8". 6. Call 911 from a local phone if the watermain needs to be shut off (emergency only). All other water mains or valves shut down, call Renton Water Department at 235-2646. 7. Fuel -- any temporary on-site fuel supplies shall have a permit from Fire Prevention. 8. All underground mains serving fire sprinkler systems must be installed by a Washington State certified fire sprinkler contractor. 9. Notify central dispatch 24 hours prior to work in the existing right-of-way. (Local 91 1 ) 10.No construction above the foundation until the fire hydrants are operational. CITY UTILITIES Utility Contractor: Sound Utilities - Bob Middleton Address: 841 N. Central Av, Kent, WA 98032 Phone #: (206) - 859-9000 START DATE: Approximately December 12, 1994 WATER: 1 . Pipe materials, valves and fittings shall be as indicated in the approved plans and standard notes. 2. All connections to existing mains shall be accomplished by the City of Renton. The contractor constructs the new water main to a point about ten feet short of the existing main. All necessary excavation, shoring, and materials are supplied by the contractor and shall be on-site prior to scheduling. Allowing at least two Fred Meyer C940122 1 2/6/94-3 working days advance notice, schedule the connection through the construction inspector. 3. Procedure for cleaning and construction testing of new water lines: a. Pipe cleaning shall be by poly pigging through vertical crosses installed at the ends of the water lines to serve as pig launches and sediment traps. b. All water lines shall be pressure tested to minimum of 200 psi or 150 over operating pressure (static) for 2 hours. Services may be tested separately by visual inspection of the corp stop under static pressure. c. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly. The inspector shall schedule chlorinating. Five working days advance notice is required. d. Water used for flushing water lines shall be drained into sanitary sewer only. e Purity tests are collected by the construction inspector at blow-offs and hydrants. Water purity tests are taken to the laboratory on Wednesdays. Contractor shall arrange courier service for any other day. Test results are available in 5-7 days. f. Temporary and permanent thrust blocks shall be formed. Concrete for thrust blocks shall be delivered to the job. No on-site mixes are allowed. All blocking must be inspected before backfilling. g. All watermains shall be polywrapped. 4. Crushed rock backfill to grade is required in City right-of-way. Recycled concrete may be used in lieu of crushed rock backfill. Pit run type material may be considered for use in backfill by the construction inspector. Compaction testing may be required. 5. Where conflict exists, the water main shall go under other utilities, however, it is preferred that no water mains shall have more than 6 feet of cover. All water mains shall have a minimum of three feet of cover. 6. Final acceptance shall be after final walk through inspection, adjustment of all structures, and approval of as-builts and cost data inventory. As-builts shall show horizontal and vertical control. As built shall be on original approved m ylars. SANITARY SEWER: 1 . All pipes and materials shall be per approved plan and standard notes. However, any sewer pipe with less than four feet or greater than fifteen feet of cover shall be Ductile Iron, Class 50. 2. Pipe bedding for PVC pipe shall be pea gravel 6" above and below the pipe. Fred Meyer C940122 1 2/6/94-4 3. Select backfill shall be compacted to at least 95% of maximum density. In the case of new road construction, all roadway excavation and backfill for the road prism shall occur prior to construction of the sanitary sewer to minimize disturbance of the sanitary sewer line and appurtenances after installation. 4. Contractor will be responsible for TV of the sanitary line. TV after channeling is complete. Air tests on main and sidesewers shall be per City specification. Number 6 wire shall be wrapped around the stub and extended to the top. 5. Contractor shall as-built the actual invert elevation of side sewer stub using horizontal and vertical control. 6. Manholes shall be channeled and grouted. STORM: 1 . Approved temporary erosion control measures are to be maintained at all times. 2. All pipes and materials shall be per approved plan. All roadway excavation and backfill for construction of the road prism shall be accomplished prior to installation of the drainage facilities to avoid damage or disturbance of the new infrastructure.. 3. Contractor must notify engineer of any vertical conflict prior to proceeding with construction. Submit a shop drawing to Plan Reviewer for review. 4. Bedding material shall be per Standard Specifications 9-03.12(3). 5. Backfill shall be compacted to at least 95% of maximum density. 6. Catch Basins shall be grouted smoothly. 7. System shall be flushed and cleaned. City may request that the line be lamped. 8. Smooth interior wall corrugated polyethylene storm water pipe, where permitted, shall use heat shrunk or watertight couplings. It shall also be bedded in pea gravel to the springline. TRANSPORTATION: 1 . Channelization plans not approved 2. Call out cross walk drawn on plans is not represenative of our detail. See detail HR13. 3. Prior to pouring sidewalk, coordinate with our crews to put up pedestrian signs. 4. It was decided that the service cabinet will be relocated out into the right-of- way - if this is the case, then an easement is not required. Fred Meyer C940122 1 2/6/94-5 5. Truck hauling to be in non-peak hours only. (8:30 to 3:30) 6. Watch for pedestrian traffic. Provide "sidewalk closed" signing as needed. GENERAL: 1. CALL FOR INSPECTION (24 HR NOTICE) BEFORE YOU START WORK. NOTIFY FIRE, POLICE AND METRO OF CONSTRUCTION SCHEDULE. 2. Contractors are advised to only use sets of drawings stamped and signed by the City of Renton for constructing utility and transportation improvements. The approved plans do not constitute a fill and grade permit or grant any rights to fill and/or grade outside of the right-of-way. Keep a set of approved drawings on- site at all times. 3. Work hours for work in right-of-way are weekdays, 8:30 AM to 3:30 PM, Saturday by approval only and no Sundays. Work hours other than ROW: 7:00 AM to 8:00 PM 4. Contractor must call for City inspection before 3:00 p.m. on the previous day. Overtime takes special authorization and scheduling in advance. Pay schedule is $50 per hour for overtime. 5. Keep the streets clean. Truck washing and other measures as approved required for the duration of the project. Provide whatever measures necessary for cleanup and dust control during job and at night. 6. A Traffic Control Plan shall be submitted and approved prior to any work in right-of-way. Traffic control and signing to be in accordance with the Manual on Uniform Traffic Control Devices. Flaggers shall have hard hats, vests, signs and certification card. Haul legal loads and observe all traffic laws. All truck maneuvering and materials storage to be on-site only. Right of way to remain unobstructed when possible. No stockpiles on right of way. 7. All utilities must be inspected prior to backfill. 8. The contractor, as well as the engineer, shall keep as-built drawings. All changes shall be shown on as-builts. As-builts shall be per City specifications. As-builts shall show horizontal and vertical use City of Renton Datum. All improvements shall be located and dimensioned to City of Renton survey monument-data was given to engineering firms. 9. For any field changes: If minor, submit a shop drawing or schematic through the inspector or by FAX- 235-2541 . If major, the project engineer should submit drawings and complete justification, information and calculations as applicable to the Plan Review project coordinator. The City will answer by memo or schedule a meeting within two days. The field inspector can not give approval in the field for construction changes. Fred Meyer C940122 1 2/6/94- 6 10. A bond shall be posted prior to any work in right-of-way. Copies sent to all attendees of record. Prepared and submitted by: Arneta Henninger MEETING ATTENDANCE RECORD Preconstruction SUBJECT FRED MEYER DRAWING #2165 DATE: Nov. 29, 1994 LOCATION: 365 Renton Center Wy SW THOSE IN ATTENDANCE A ADDRESS TELEPHONE NUMBER Mtn- r✓ C !iZ s ZrAr7onl -12EJj7vnl 27 7- 6 Z 2 Z I t L,lr y `U I c-xi r / ,5� �� St 0 2 'belle-✓a fr 2-S�5- 26 z u; (-AsQ Z 3.5 -Z6 Cz cNttJl wiLUAM C "Tc-( CA0b---Vl5(cW ING. L�/a., � v .k r-, FLL r(/fr; Jn ii;-ri L,✓ 2 06 - �/�/ � �G lJ T3o r ,rcL..Sa. S.w• t.�' �� I t o 7 410 o3- LG K. UiL 1 (?-D(v) 23-,,S---2c�c % AUTHORIZATION OF SPECIAL BILLING DATE: AUG. 23, 1994 PROJECT NAME: FRED MEYER RAINIER AVE S. PROJECT NUMBER: PERMIT 4C940122 WORK ORDER No.: 87585 It is the intent of this letter to authorize the City of Renton to bill the undersigned for all costs incurred relative to the referenced project, by the City of Renton for the following work: TIME AND MATERIALS FURNISHED BY CITY OF RENTON WATER DEPARTMENT TO PERFORM CONNECTIONS TO EXISTING WATER MAINS, WATER PURITY SAMPLES, AND RELATED WORK. TIME AND MATERIALS FOR ANY AND ALL ROAD CLEANUP EFFORTS PERFORMED BY CITY FORCES OR CITY CONTRACT. ALL OVERTIME FOR INSPECTION AND RELATED ACTIVITIES, BILLABLE AT A RATE OF FIFTY DOLLARS ($50.00) AN HOUR. TIME AND MATERIAL FOR ANY WORK DONE BY CITY STAFF TO REPAIR DAMAGES. BILLING TO BE SENT TO: Name: �� i L``fC t� \>>1 _ /)T111 1��21 t3c�5 � Company: Address: Pc� 6vu y Z t I pc_ i L_p,-1r `el CZ Ct-7 L q Z__ Phone: -7q-7 Owner/Developer or Authorized Agent CITY OF RENTON MEMORANDUM DATE: December 29, 1994 TO: Becky S. Ray Sled FROM: Arneta x6198 Ak SUBJECT: FRED MEYER ON RAINIER FEES THAT HAVE BEEN PAID PROJECT WO# : 87585 PERMIT: C940122 COPY OF LETTER OF SPECIAL BILLING ATTACHED WORK PAID FOR & AMOUNT: $3,800.00 FOR CONNECTIONS & CUT & CAP i �R CITY OF RENTON Construction Permit u Permit Number C940122 Permission is hereby given to do the following described work, according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinances of the City of Renton. Work Description INSTALL APPROVED PLANS #2165 WATER, SEWER STORM ST ALL PER APPROVED CITY PLANS Job Address 365 RENTON CENTER WY SW Owner ROUNDUP COMPANY 3800 SE 22ND AVE PORTLAND OR 97202 Contractor LEE, DAVID Contractor's License Contractor's Phone 206-336-5751 City License LEONARD BOUDINOT & SKOD Contact CRACKER, ED Contact's Phone 503-685-7350 Other Information Date Issued 11/22/1994 Work Order 87585 Date of Expiration 0 5/21/19 9 5 Parcel Number Date Finaled Inspector's Name WETHERBEE, MARK Inspector's Phone 999-1829 It is understood that the City of Renton shall be held harmless of any and all liability, damage or injury arising from the performance of the work described above. You will be billed time and material for any work done by City staff to repair damages. Any work performed within the right-of-way must be done by a licensed, bonded contractor. Call 277-5570 one working day in advance for inspections. Locate utilities before excavating. Call before you dig - 48 Hour Locators 1-800-424-5555 I hereby certify that no work is to be done except Subject to compliance with the Ordinances of the as described above and in approved plans, and that City of Renton and information filed herewith this all work is to conform to Renton codes and permit is granted. ordinances. X / X�� Applicant Public Works Rep THIS PERMIT MUST BE POSTED AT THE JOB SITE AT ALL TIMES. BD3203e 08/94 iif IN j j4 CITY OF RENTON � Plat Inspection Record Permit Number C940122� Address: 365 RENTON CENTER WY SW Date Issued: 11/22/1994 Date Expired 05/21/1995 Work Order: 87585 Work Description: INSTALL APPROVED PLANS #2165 WATER, SEWER STORM ST ALL PER APPROVED CITY PLANS Contractor: LEE, DAVID WATER: SANITARY SEWER: Pressure Test: Pressure Test: Chlorination: MH Channeled: Purity Test: MH Sealed: Tie-In by City: Side Sewer Visual: OK for Meters: Pressure Test (SS) : Valve Chambers to Grade: Maintenance Walk-thru: Maintenance Walk-thru STORM SEWER: RIGHT OF WAY: MH Sealed: Curb & Gutter, Driveway or Sidewalk: MH Ladders Sight Preparation: Visual Final: Final Visual: Maintenance Walk-thru: Maintenance Walk-thru: ROADWAY: STREET LIGHT OR SIGNALS: Compaction Test: Foundations: Final Lift or Patch: Concrete Pads: Maintenance Walk-thru: Wiring: Controller Cabinet: Overhead Inspection: Final Visual: NOTES: ASSIGNED INSPECTOR: JDATE OF FINAL ACCEPTANCE: bd3242a 03/94 drt CITY OF RENTON DEVELOPMENT SERVICES DIVISION AUTHORIZATION FOR SPECIAL BILLING Date: Project: Permit No.: Type of Inspection: �cc i Work Order No.: Inspector: Date(s) Work Scheduled: �— _ �� 4D -C9• It is the intent of this letter to authorize the City of Renton to bill the undersigned for actual costs incurred relative to the above referenced project by the City of Renton at the rate of $75 per hour. Certain other conditions apply: Weeknights: A minimum one hour will be charged. Weekends: The City discourages weekend overtime work. However, under certain unavoidable instances, weekend work will be authorized with a minimum two (2) hour portal-to-portal charge from the inspectors residence. Partial hours will be prorated to the nearest quarter hour at $18.75 per 15 minute increment. Holidays: Same as weekends with the exception: Four (4) hour portal-to- portal minimum charge. Authorization by the Building Official must be obtained prior to performing any requested overtim i tion. AUTHORIZED BY: DATE. CITY O RENTON BUILDING OFFICIAL BILLING SENT TO: NAME: ADDRESS: CITY, STATE, ZIP: 1--Ss 7 ATTN.: PHONE: It is understood and agreed that owner/developer agrees to pay for the requested overtime as sc O NER/DEVELOPER, CONTRACTOR, AUTHORI ED AGENT c:93-116