HomeMy WebLinkAboutSWP272115 4 T ® � DODDS ENGINEERS, INC. CIVIL ENGINEERING SURVEYING PLANNING STORM DRAINAGE CALCULATIONS FOR 41 UNIT APARTMENTS Renton Washington MY OF P&90N RE C E I V ED DEC 2 81992 '•y 0. Z• DEI Project No. 91146 BUILDING DIVISION 27461 �91v Prepared For: Shulman Waddell III, Prepared By: James A. Olsen, P.E. EXPI December 5, 1992 4205 146TH AVE. N.E.. SUITE 200-SELLEVUE. WA 9SO07 (2061 8S5-7677 OR 4-t /� FAX:[206)665-7963 ) ( TABLE OF CONTENTS I. Project Overview If. Preliminary Conditions Summary III. Off-Site Analysis IV. Retention/Detention Analysis and Design V. Conveyance Systems Analysis and Design Vl. Special Reports and Studies CSo��S # PRi~t,1 SD C talcs Vil. Basin and Community Planning Areas Vlll. Other Permits IX. Eros ion/Sedimentation Control Design X. Bond Quantities Worksheet, Retention/Detention Facility Summary Sheet and Sketch, and Declaration of Covenant XI. Maintenance and Operations Manual Pago 1 of 2 King County Building and Land Development Division TECHNICAL INFORMATION REPORT (TIR) WORKSHEET r j PART 2 PROJECT LOCATION ,,4"ROJECT ENGINEER ANDIDESCRIPTION Projecl Owner project Name 4-I U►J 1 T 4\P`( CON PL,EX Address — Vz _ Po' we- 2Z0 Location Phone — 00 To 23 tJ Project Engineer t q _ S A, . QSEN PE Range cJ E Company '717,nCS &�-361}Joe-P-S TuG • Section 31 �r 14oT PUEslS Project Size Z .9 AC Address Phone Upstream Drainage Basin Sae I.O AC PART 3 TYPE OF PERMIT APPLICATION PART 4 OTHER PERMITS 71 Subdivision Q DOF/G HPA Shoreline Management C Short Subdivis'ton COE404 TE�j Rockery = Grading DOE Dam Safety Structural Vaults &rCommercial FEMA Floodplain Other Other COE Wetlands l] HPA DRAINAGE-PARIT 5 SITE COMMUNITY AND Community Drainage Basin T7 .tC CEO PARTS 811TECHARACTERISTICS ED River O Floodpiain = Stream 0 Wetlands ED Critical Stream Reach Seeps/Springs 'Dep�ressions/Swales High Groundwater Table yexe Slo p Groundwater Recharge Steep pes 4^O Other Lakeside/Erosion Hazard Sol Type Slopes Erosion Potenlial Erosive Velocities 177C�2V,10D0 — S I C-, l�'r' O Additional Shoots Attatched 1190 Page 2 of 2 King County Building and Land Development Division TECHNICAL INFORMATION REPORT (TIR) WORKSHEET ^/REFERENCE LIMITATIONISITE CONSTRAINT 1� Ch.4-Downstream AnaNsis N�Is E 0 0 a a Q Additional Sheets Attatched MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION FOLLOWING CONSTRUCTION Sedimentation Facilities Q Stabilize Exposed Surface t,`Stabilized Construction Entrance Q Remove and Restore Temporary ESC Facilities ®.'Perimeier Runoff Control ���loan and Remove All Silt and Debris O Clearing and Grading Restrictions -�" Ensurs Operation of Permanent Facilities 0 Cover Practices 0 Flag Umils of NGPES ,tiirConstruction Sequence Q Other Q Other PART 10 SURFACE WATER SYSTEM ,><Grass Lined Channel Q Tank Q Infiltration Me�r of Analysis AEJ�Opipe System Q Vault Q Depression Q Open Channel Q EnergyDlssapator Q Flow Dispersal Compensation/Mitigation O Dry Pond CD Welland Waiver of Ekminaled Site Storage EJ Wet Pond 0 Stream Regional Delention Brier Description of System Operation T1(>I47 I,JgE S1(SjrM 70 p iZ)-SWh+ E 1O 'DETEt�JTIo�J �'(S1�M It-to CMslT , cST, S, , Facility Related Site Limitations Q Additional Sheets Attatched Relerance Facility UrtYtatlon (May require special structural review) Q Drainage Easement E::] Cast in Place Vault Q Other J21 Aocess Easement Q Retaining Wall Q Native Growth Protection Easement (Rockery>4'1-ligh Q Tract 0 Structural on Steep Slope 0 Other PART 14 SIGNATURE OF PROFESSIONAL ENGINEER 7hemr, dull englnwr under my supervision have visited the site. Actual onditions as observed were Incorporated Into this workahaet and the hmenh. To the best of my knowledge the information provided v I s accurate. 1/90 I. Project Overview Cq L7a D ❑ DDS ENGINEERS, INC. JOB NO. 14(o CIVIL ENGINEERING 5 U R V E Y I N G PLANNING DATE Z- - 4205 146TH AVE. N.E., SUITE 200 - BELLEVUE. WA 96007 1206) BB5-7B77 OR 454-3743 BY � r 41ST ST I I A VALLEY S 177TH ST gS T aSH r �. MCEENTER QO S 1m °a 79TH i `THIS SIT>✓ IS ^FlMo1C�1-IATEL`( ST r DPP 2, 9 ^cz-tS IQ SITE tNp IS 160TH � —' ST 1 ` LoGfkTt>7 AC' TlI�{� S.US CCU �I p,5 c'F CAIZ� (C�AQ & �VTl �t 5E , I QI �� I oS 45THI SITE --THC- P�dl'o n DEV�Lc�PI 1�tJT -_$�'-� -�- - -rc F - - - - W I L L- Oct,,1 STFN Cx 4-I 31 Q ura ITs �m-1 cnt�Po,L7s � �Ak'-PCiE'S, I aQ � F r ��C1ST1►-� Coti101TloNS ConISlS'� � � I r l 1 OF THE PAIkOEL. F-'E�I kG PAbt L`r i { (18 c'LE:��lI eV W I(1-4 F�w 1--1 M--¢-1 A Lr i S 197TH ,� ON-SfTE STD 1 AS A FAIZ-T OF TPREVIC)(3S -� GCA0IQG ACTVITy. Tr+E C-US7110C) S 190TH ST SE 1901 vECCTATl�t.1 Go►.wslSTs OF 60-s'sj _ f( QjQ.I�-�l� Tt� SECOT.� G��lf1 IrT - S 192ND I. S 197ND ST TKCE s . (Fl(q. 2 ) _ ONE THE RMOI,R-CNEQTS OF THIS DEuCWPM tJT IS OAF S19EET I►�f G1C-M t`NTS 8C--- MADE -R7 g8T0 ACC S.Z. . ANt-,) Tt� Ct ESP I�h UTiI >'�it� EcT l,»QGD IC - NE Sp�1 jl i cV`C-V-l`f' UaE . r THE EXIS'T>JC,, 1Pi7AINACIF fL >"S 1=12ph ; rf?tt 3001-1 EAV To THE NO>e.'RfW�---t::;y Cc> jsC-i .. &F 'll� 5 SITE. Po(L rME MOST FAIT 1-11ts e�j-ccues As o.1EluAao Fww . l cv--sCJL:2 714G L\T 2,00' Quuoff- C-taT�2g A- V'>ITal (At'620C 11 X 4' )r CAe-aOFFS P-uwoFF -I0� Tn ►J021'FFWL=ST Wt{Cy(E THt pQJtNAC,E &,TtFEIP�S A CA-MN P�ASi11 AT 'TNE coi-wekL of vc- FiokA TOM potwl- Orl �CVAI1a(,-6,E Ft_OW$ �{IZI�YtI� A Trt�TtatSc SYSLr� �vmcN Co�rtuues -N -m NaZ�rlulEsT, -rt1L IW-c:pPMCP 5YD(-W '0`(WNAGE 1:5YSiEl-1 WkLL.- CONSIS--7 bF uQgc-4 v-oQ . > gE-[eFJTlt)N3 (`C�PG SfgTC/K) ANSI 69ASS L1N1F17 SWM-G5 I'D CNth Pc1aCE TIC WA T ti 4 OU A L1 T `� CF 'Ttt� 1J1SCr1A1LGE, T<-FE 17r�1G►J C'QITLIUA ?FoUAwS -ate lc.C . 2 , 1� M C-'fNODouOGY Q I'( R 30/ I t,-IML ASE e>jL-'2_ C<AtZuLATIFD R`(ENTIcytJ VOLUMES. SHEET I OF_ II. Preliminary Conditions Summary DODDS ENGINEERS, INC. JOB NO. 514�0 CIVIL ENGINEERING SURVEYING PLANNING DATE 4205 148TH AVE. N.E., SUITE 200 - BELLEVUE. WA 99007 1205i 9B5-7B77 OR 454-3743 BY AS ?Ft IouSLY ►-kC--KMOQC-D TtilS StrF M $S.� ACP-E.s tr l 151-F-E , 714E Pe-C' oSED Pt2C]ll'_CT W tL.L LM LA117- ( .9 ALA OF 7tT 7b7NL- 7}{E PDOIQ% 12�AiQtNCG Ut,r UCi+ . T1-1C FoLL-Owt Q(.q t_DC(-flblT5 tU JSTt2Al'F E US'R`i,� 'DC2At tJAGE GrtA2KTG2l STIG'?'. APPRox+ " ATL-l`( J .C) P,0eE Is 7RIg,JMM7`C UPsTt?I A" , THE EXtsT1k4 IjE;cCTA7t0►J Is TPae'= b & FROM ACC-A, ' BI 1 S cou.E�-0 VIA s l4A,-t irk w TZAV I l)E fw p n t IZeC•ED VIA pt7-eH 7c TftE SoU T 11a)GSi coeZ pF 7,,I4E (YlcjfEQ." Csc-a TIME OF CTONC!ENA I Ot•l CAtGU LATI O►.]S UJER� 'FC-I'Fo ZM GQ AS A fAI2T OF G Et lL W_A-Tl O+J CP TFt>✓ H'-r'D %ZAF I G , t-A- 12,3CIZ T-tE OI,'j - Pou_pWI �C, �Ic,U9-ems, SHEET _OF / � � v �-�-� i- �� � ,: r �� �► � ��, .� _ ,� � : . • � �•'` � ��_-- �, y,-� i� � ��\� �. ® +►♦ . � i � �► � �� I �` �, � � . � r � • � � � ` i .� . i 1 I) t. • �� .►� an • . lit ,e -I •Rh It �_ EvC __ ___I AkF • � • ♦ i ♦♦. ff q. ?�: •% ti a .. 0,9 it I _.... _ kh v • `��' F d Al 1._:_ 1 • m AkF I I _J •�, '� ti Ur ^'. O I InC ice[.•• 4r `•t 1 I .ii.L',: 1 � dl• ,1 X � AHC BM137 _ " AkF 1 7 1 I . i�Jul r AmC ++++++ec' - •__ r ---`,A,HC C ♦• -----------� .,\ •.. •i S'bstaiAmC'___ o.iy � ' ,+ M�,♦'�__F _ �'• • aP ' .. "\ AHC __ I•" A +•=Ax_ ' •.0 21 455 s I16 Pu i 1 aC ♦♦ A �4+++ `••t AkF Ur Pu •i• \ AQUE \e c •- J _ \�♦ ' D '•yeecl `• '• I I Wu eD '�• nAgO • I B Ur 76 I I 'fI q • Ur I I �'1 AHC ❑ R s rv01r O Sc Tu z Pu Sk Age BMC I 428 AmC u 0 .Jy IBM 29 AHB Ur 1 i69 9203 AHC 2 4,,• I I o 451 Ur Sk I _ o IAHC `,% I i 4 Ie . • Y �1 i ,` M G I Tu •//•�', 7 i .� A_mC �r a _o • • .gyp �� SH AHB j•. A D• ■.M 7 AmH _ •I PBS Ip(}/ITHKai EM a 4, I ..: So -- -- M 17 . ; ! A68.. '♦•` C. ,Sk R w.I �PAm .•t. •;� A',AHC 1 �+ YI " ' I 1 :�;.. ••�I:. •;i . Ev8 •:• '• I 9� y •AmO• ?gB "AHD• ' Sk F•14 j A % Ur I \ 80 32 BM`, 476 AHC, i 1 °• 3 •, •....• t I m •� 1' n •• ... IBC AeD•ui ?Ink Br Re a.Q I • . ` �♦ •n AHC • ,• a ♦ I Wo • I me m a • •I i• ,'a• I °s So So I I •. t I. c I •. ' AHC �1 1:.• AHB L• Ma I. n •BN y : HAYC! . Sk � .' � � � AHC •N� Ev8 No Aj •o X .� o •1 Tu •= IM1.. . r •• Pu ee0 1 AmC AkF AHC AHB . 5k •A C I ive • E ;� •t. Am0 H I ^ _ \ r. (,.wEsr .° o a '1°° •al q .S u'dek,:Jn iroinl G,�".'. `� 1F ,y NIRE GEHCE GE. COR 5 09 °LME• xa sp ¢w¢I Zia ='W � a � ♦L O ' I •e T. ppJ - 10 aOCT °h t0E °G .0%SLOPE R A M I6 6. 1 1 be a-1IE !f 96 ICOxG -wl • \ ceRM •.� ��Y •oa 16 • • 2."tE6J 3. J!41'CONC E !�IE.al.E]ICOHC.MI1 so • �� 0 0 V ltnLU ° F • c ae u za " E z. 9 �522si LOMT aH RsID.00 •RItGK E PE SbNII lC J d6 NI CONCRETE P•D LIGN} tYPI 4.93'3075'LIAO So1 b POwG 6 *0 W -E E% .9.C.I AU R•]0000�_ wir.Ru Clore xLEi yr RY IJJ as r R'tE.I4UIISWI ..EEL CN•R��`o OR�Rui o% /M _ R'S�Sre'—!! e- Ss JB�n AVL. J.E [%.ESN. T RINP - 0 _RY OB9JVPE I H Ii'OSI °, R- aM11HER'e AVE. 5] r (� RM pJ! �p .'C]"T R•IGK 1 4"IE.1.90•INI _ V , e IE NU gC RC .1 ONTxOL e0. R"IE N SS E% SSNN N IE.NEI¢OCC.WE: �. p•` e°,' RY N3l�— IE"1E Ni3 VVC SWI I t WATER \ry S9- ° e-IE IM53N IPVC xl ° LIES Is I IE a3.9 WVC EI IX Ce.iw 1 c h IiTPI ST.LIDMTN°e°% Ex.Ee.Tr.c I �1 �O 1 RM qtl . I.ee.Ill __ _. I pYl� Q, _ RY a20 ESOLO COVER IQ%'Q RY CO.T III. Off-Site Analysis ® � OOODS ENGINEERS, INC. JOB NO. CIVIL ENGINEERING SURVEYING PLANNING DATE 4205 146TH AVE. N.E., SUITE 200 - BELLEVUE, WA 9eO07 i206) eS5-7B77 OR 454-3743 B Y IC--"Cr D OT1 u i-L 17 FO/L C�U(A-n cws 15 ?NC- 5.& O'H . ) Tt tc- SOIL, -VTFC- (FIE;-SD IS #<oeE _w00t:7 �. '7`(9E I c t . 2uNoFf= caarncieksTr> AIF svbLJ►J Se-Lot.-T. KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL FIGUREJ.SIA HYDROLOGIC SOIL GROUP OF THE SOILS INKING COUNTY HYDROLOGIC HYDROLOGIC SOIL GROUP GROUP* SOIL GROUP GROUP" Nderwood C Orcas Peat D Ork1 a D Arents, Everett Material B Ovall C Beaushe C Pilchuck C Bellingham D Puget D Briscot D Puyallup B Alickley _ D Ragnar - n Variable CURVE NUMBERS BY HYDROLOGIC SOIL GROUP LAND USE DESCRIPTION A 8 C D Cultivated land(t): winter condition 94 Mountaln open areas: low growing brush and grasslands 89 Meadow or pasture: B5 Wood or forest land: undisturbed 7S Wood or forest land: young second growth or brush ( ,] Orchard: with cover crop 2 Open spaces, lawns, parks, golf courses, cemeteries, landscaping. good condition: grass cover on 75% ^ or more of the area 88 fair condition: grass cover on 50% to 75% of the area 90 Gravel roads and parking lots 89 Dirt roads and parking lots 82 ,8877 � ASPNAI.T ' SHEET OF r • r • • r • • ' a IN IN Fw- FAIL ki Mimi r . .....�� �► !' v �'� tj �ii�r :g �� I. dill '� �E �•►'��'��1,/d�� �1�'4: ; � S � �w . � A M AwAr �IFiLYill 11as MW jw ki jai jr1wMAN y In ON fig � a P> APP . ,w, Lsll��7t�:M� _ IV. Retention/Detention Analysis and Design 1416 ® D ODD S ENGINEERS, INC. J O B NO. CIVIL ENGINEERING SURVEYING PLANNING DATE - 4205 14BTH AVE. N.E.. SUITE 200 - BELLEVUE. WA 98007 1206; eSS-7877 OR 454-3743 B Y USING. '[-IC P4G\11C*-3SL-�-( IDM-(Z-µIWC� TNG f-tx-L >-ks, wc, o(i5-Inv r, 60t-1DIT00 1-hf DQ IZA.{ N Ir.)-d.E C et'�4Air D Fc)fL 71 2 r I C7� t o0 Yf� S rOeM EV LF"75 YZ = 2. ) rX1 GN (I ,OR�IGN=BI� + �,b RG, @PSI + I.IPc( gE �o = 2,9 iU. 24 � t. , - ------------- BASIN SUMMARY Jr SUPS-I-P-A A � >y/ BASIN ID: E0002 NAME: EXISTING 2 YR EVENT 1 t. SITS_ ASS C>.Z. 1 SBUH METHODOLOGY' l TOTAL AREA. . . . . . . : 3.70 Acres BASEFLOWS: 0.00 cfs PL, RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2.00 inches AREA. . : 3.70 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 83.00 TIME OF CONC. . . . . : 49.12 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres CN. . . . : 98.00 TcReach - Sheet L: 300.00 ns:0.4000 p2yr: 2.00 s:0.0700 - TcReach - Shallow L: 150.00 ks:3.00 s:0.0700 TcReach - Shallow L: 170.00 ks:3.00 s:0.3200 TcReach - Shallow L: 145.00 ks:3.00 s:0.0500 TcReach - Channel L: 210.00 kc:15.00 s:0.0480 PEAR RATE: ' 0.26 fs VOL: 0.21 Ac-ft TIME: 490 min BASIN ID: EGU= NAME: EXISTING COND. 10 YR EVENT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 3.70 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2.90 inches AREA. . : 3.70 Acres ; TIME INTERVAL. . . . : 10.00 min CN. . . . : 83.00 TIME OF CONC. . . . . : 49.12 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres CN. . . . .. 98.00 TcReach - Sheet L: 300.00 ns:0.4000 p2yr: 2.00 s:0.0700 TcReach - Shallow L: 150.00 ks:3.00 s:0.0700 TcReach - Shallow L: 110.00 ks:3.00 s:0.3200 TcReach - Shallow L: 145.00 ks:3.00 s:0.0500 TcReach - Channel. 210.00 kc:15.00 s:0.0480 PEAK RATE: O.64 cf VOL: 0.42 Ac-ft TIME: 490 min , r4 BASIN ID: NAME: EXISTING COND. 100 YR EVENT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 3.70 Acres BASEFLOWS: 0.00 cfs JJ RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 3.90 inches AREA. . : 3.70 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 83.00 TIME OF CONC. . . . . : 49.12 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0.00 Acres CN. . . . : 98.00 TcReach - Sheet L: 300.00 ns:0.4000 p2yr: 2.00 s:0.0700 TcReach - Shallow L: 150.00 ks:3.00 s:0.0700 TcReach - Shallow L: 170.00 ks:3.00 s:0.3200 TcReach - Shallow L: 145.00 ks:3.00 s:0.0500 TcReach - CtjanneT-L:. 210.00 kc:15.00 s:0.0480 PEA& RATE: C 1.13 c!q VOL: 0.68 Ac-ft TIME: 490 min r SHEET OF_ Q � DODDS ENGINEERS, INC. JOB NO. 7E CIVIL ENGINEERING SURVEYING PLANNING _)A 42 C) '148TH AVE. N.E.. SUITE 200 - BELLEVUE. WA 88007 /Y L. v( ` 1 SITE (2061 BB5-71377 OR 454-3743 s Y 7He CrF-SITE -Tlz lbuT:11,�Y �-A 1.0 AC , soy- 'a 12cti+1� �,.,s Corysr^� FEY— Exls;1 VEvsLoPED CDrlp 1 1 IOtiS -TH& 17C-vtLpQrp CON1DIT1100S -PIe-: ^-S FoupWS PAY "Puk, I u c-T&4 * O. G I AG. W RA-i.T 0. 13 Ply, Sl9EWAU�s 013 I � 13�pC,S. 1. 0115 AG, T►�P��UIcvS �, - `�►Caefo12-E: 1.1 Pv- i0 p,, Sit AvWA, T kew, To Vc,c. IsYST&-j 0 .85 A�. P�12vi�us 1ZC-�-iR�Ni�•, f20v. Co�DI f1o�.► ; 1 . 05 0, 55 Ai 61' oj = g6 CLAW5CAPI► Y, 1 C-,QA5& cvG, sFICET FLO" (a 0.0- 7. ma- seconlq c[owM M- sEE 5�v�,►�,� N HYfleoG� �� a Sn= + 4L201 -TVW-J PIPE As?lo'L'T , 6aAs� Swf �. ETC. Co�Jy1V PIPE 0 I .1/a f� IC cSTJMPM-o \ ) I , ' SHEET _OF_ e 12/ 4/92 Dodds Engineers , Incorporated page 1 SHULMAN-WADDELL III RENTON APARTMENTS NOV. 30, 1992 ------------ -------------------------------------------- BASIN SUMMARY BASIN ID: D0002 NAME: DEV CONDITION FOR 2 YR EVENT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 3 .70 Acres BASEFLOWS : 0.00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2 . 00 inches AREA. . : 2.65 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 84.00 TIME OF CONC . . . . . : 48 . 02 min IMPERVIOUS AREA ABSTRACTION COEFF: 0. 20 AREA. . : 1.05 Acres CN. . . . . 98 .00 TcReach - Sheet L: 300.00 ns:0.4000 p2yr: 2 . 00 s:0.0700 TcReach - Shallow L: 150.00 ks :3.00 s:0.0700 TcReach - Shallow L: 170 .00 ks:3.00 s : 0 . 3200 TcReach - Channel L: 450.00 kc: 21 .00 s:0.0100 PEAK RATE:I 0. 51 cfs VOL: 0.32 Ac-ft TIME: 490 min BASIN ID: D0010 NAME: DEV COND. 10 YR EVENT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 3 .70 Acres BASEFLOWS : 0.00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2 .90 inches AREA. . : 2 .65 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 84 .00 TIME OF CONC. . . . . : 48 .02 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 1 .05 Acres CN. . . . . 98 .00 TcReach - Sheet L: 300 . 00 ns:0.4000 p2yr: 2. 00 s:0.0700 TcReach - Shallow L: 150 .00 ks :3 .00 s:0 .0700 TcReach - Shallow L: 170 .00 ks:3.00 s : 0 . 3200 TcReach - Channel L: 450 .00 kc:21 .00 s:0.0100 PEAK RATE: 0.93 cfs VOL: 0.55 Ac-ft TIME: 490 min BASIN ID: D0100 NAME: DEV. COND. 100 YR EVENT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 3.70 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 3.90 inches AREA. . : 2.65 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 84.00 TIME OF CONC. . . . . : 48 .02 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 1 .05 Acres _. CN. . 98 .00 TcReach - Sheet L: 300.00 ns:0.4000 p2yr: 2.00 s :0 .0700 TcReach - Shallow L: 150 .00 ks: 3.00 s:0.0700 TcReach - Shallow L: 170.00 ks:3.00 s:0. 3200 TcReach - Channel `L:•-450 . 00 kc:21 .00 s:0.0100 �DO YID PEAK RATE:( 1 .45 cfs OL: 0. 82 Ac-ft TIME: 490 min C T�L�I , ISO �('�, l ( Ex�s�In1C-a (oo Yt2 �JEA1T > '• uo R`!�A 12/ 4/92 Dodds Engineers , Incorporated page 3 SHULMAN-WADDELL III RENTON APARTMENTS NOV. 30, 1992 ------------------------------------------------------ BASIN SUMMARY BASIN ID: OFSIT NAME: OFFSITE AREA TRIB, 100 YR EVNT SBUH METHODOLOGY TOTAL AREA. . . . . . . : 1 .00 Acres BaSEFLOWS: 0 .00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 3 . 90 inches AREA. . : 1. 00 Acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 81 . 00 TIME OF CONC. . . . . : 42 .78 min IMPERVIOUS AREA ABSTRACTION COEFF: 0 . 20 AREA. . : 0.00 Acres CN. . . . . 98 .00 TcReach - Sheet L: 300.00 ns : 0 .4000 p2yr: 2.00 s:0.0700 TcReach - Shallow L: 150.00 ks: 3 .00 s:0.0700 PEAK RATE: 0. 29 cfs VOL: 0.17 Ac-ft TIME: 490 min 019 cfs < 1. +5 Cfs fe,,( 'fl'�L r rf o�ZC N� -�Y1'A5s 5�(ST�ti-t 15 12EOu ��t7. 12/ 4/92 Dodds Engineers , Incorporated page 4 SHULMAN-WADDELL III RENTON APARTMENTS NOV. 30 , 1992 --------------------------------------------------------------------- --------------------------------------------------------------------- HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib Num RATE PEAK HYDRO Area cfs min. cf-AcFt Acres --------------------------------------------- --------------------------------------------- 1 0 .264 490 9336 cf 3 .70 2 0 . 643 490 18353 cf 3 . 70 3 1 . 132 490 29543 cf 3 .70 4 0 . 506 490 13919 cf 3 .70 5 0. 933 490 23970 cf 3 . 70 6 1 .450 490 35934 cf 3 .70 10 0. 264 650 13917 cf 3 .70 11 0 .643 560 23969 cf 3 .70 12 1 .385 510 35933 cf 3 .70 DODDS ENGINEERS, INC. JOB NO. 91 CIVIL ENGINEERING SURVEYING P L A N N I N G D A T E 4205 16BTH AVE. N.E., SUITE 200 - BELLE VUE, WA 98007 R 454-3743 ��IoQNI 'DC-TErJT11 OtJ-7B77 Ot�ALY515 : BY laiULt.1 TIC Q�.EVIDVS �-l`fbte.OGRAt't�S �(L Tl-t� LXtSTIw�G I CAI ►JPG G� Ct�LLUL-A-T �N Z�, wee-E 6EN3EtIATEp . 8 s11.1 7A H`i D�LCYjII'APlA STID4W EV&)T E oeo Z I t::X z v . Z 4 ti iL not c� 2 LX to Y� Z4 N rZ c)o o2, 4 r� oo to S vEv. IoYlp l7 0 ► oca Pw Ico-n2 �Fst i - -ri-+>r ��c �+Ln�a-��►°Hs ( �-�) w�rl.c l�o.n-tp �-eo TrI>✓ 17ETC NTto SYS�H U sI►3 6, -TM (_. Q EL POOL, 12ov,IQC, f�o 'L1'1o�1 OF WA'T-ALWOIZV_S" ?F0C.Rj\H /\FTe%L 5C-VE(2-AL tr,-vLATIONS -ro wEt-'C- --------------------------------------------------- STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No 50 lE = lSZ. So Description: UNDERGROUND PI Diameter: 6 . 00 ft . Length: 94 . 00 ft . MAX w.S EI.&J 15g,S Slope . . . : 0 . 0000 ft/ft �C-Sr�1 GTU2 GPI WC) . I (vuw MULTIPLE ORIFICE ID Nod/ 51 1 Description: RESTRICTOR FO} EITION SITE Outlet Elev: 152. 40 Elev: 150 . 40 ft Orifice Diameter : 2 . 2646 in. Elev: 156 . 10 ft Orifice 2 Diameter: 2.7188 in. 6NEfi 14G S;014A6 5-MoMe - (5D) 7_qS1e_t67o4 s-t CE (jj) .A1.rp ----------------------------------------------- LEVEL POOL TABLE SUMMARY NATCN INFLOW -STD- -DIS- (-PEAK-) STORAGE (--------DESCRIPTION---------) (c.:) ids) --id- --id- (-STAGE) A VOL W) EX 2 YR/DEV 2 YR ............. 0.26 0.51 50 51 156.00 10 1610.11 SHEET -OF- 1 ;! A av 5A 51 t59.ifl 11 2nd5.21 Q O O D O S ENGINEERS, INC. J O B N O. 9114k> CIVIL ENGINEERING SURVEYING RLANNING 4205 149TH AVE. N.E.. SUITE 200 - BELLEVUE. WA 98007 DATE (2061 965-7677 OR 454-3743 BY 7NC f�ETE�1T1 p tJ SY S�r--1 GAUGV LAT IC N S 5k4-0(.j PAP& T::)rA.F 94' u�:t nrl i l'�RL DETEI.ITION SYSTE " lei 13p'/ . OF 1-ft THGvzC--fo2E 130,/. OF (�4)�28.2� � _ �2�5`j .o � ►,3) � 3q55. 1 �U . Fr �'�. Gu. Fr fT 0 10 MEET '34-% MPil ToTlt_ Vol✓ c6s - Z - 54-2' c B 's IS,9 to .Fr ifT Dr. -m �onhtEcti�ac, PIPE } -� G C4r � 7.07) y. f'f, _ Zgy 32Z3:3cU_ ir-T, G' 'PIA . fif'E , of ' -- � 'Dl A 12Cc.)ly TO 28.2� PGEf RColp VOL- . h7 1 -2� Vim. e�jffj�� =� 11 (o`F(ol�VrA. PIVC 'f I-lC-1ZC�oiL� Rt�s�l.Tlt.lG oi2lFlc.� �'f'�c {r.. C�t.►Si Kt7��5 t 21 O� IfICLS 15' 2��cF ItJ Ca FL-= 150.4.E MAX. 7-0 PAss VC-Q EVENT NEIL ►Z " olr-- t2isc%6 15 'D TC+(LMIN�1� 0+��° � fpLtOwIA1Cj Iasi= . SHEET _OF ' �tlYN�tQ11�YYtrt1_■■■N■P��B�OYA pppp�y ptHPN •.� tttttt��N�ttltlNptt/ltA�tN■■N Riser Inflowt�'ilpi�o=iirame�un �NN�I�tAStIN�pNnq Legend ��i N91YBNn v�I� fl•Wd®flfl �I♦/ ��®HiI>i �—/ ���■Olin muumuu 1i p IF 10 •• I��OMB■ititl.�//���I��NIo�H_�tlHBYBtl �0p N tQ• ■' YIl��9�NpPNHtl�tltlPN � ��Np�N�tt•�P,��////Nd■tNt���tNYNYtttt " �� tfN I�p�II q / HtPt1�tNPttN�O�■�■tt �UN�—�iUq Kpp/ RI/I �tNN�t�t�ApUNtt e��fl•v ■te� MIMnMuunnmN a�®■®nnN��■■ i r�rli��®��■■■■ggflll FAMOMIN Ron ®®®vn■E����//./tR6�1®®��■■nii�W II . �■un�■ i����i���®�n■■ullnnll MINUH11131HR imalimiummilill Y/ .�tMAhH��tiH��PtlNNORgt■ w�n■�st�saaaouuvu �./ ttlRJle -tH��Nwpt�tlHNN■■■t /I�� ��lC7U •B®®tN�tUN��UI••/�N HIM N/�N®�NNI®tUY�1HUNN � s �nanes�nm■t®o�■�a��Nn riY�`��Piy■aus�n■®®�®�■■■�imnn �����r Lr n�p�flfl11®�■w®���■n®nnu ./j�l�liii1u11®��i0n■■niii111u ■®� ���nnnll�®®n■n■■■■unlul �1�,�//�►/��11QI��iO®®®®��■11111111111 a r TECHNICAL INFORMATION REPORT Oro 1 is :=`o I 9i j <Mr trWrcaE, _ 7 li ICONC. =wl N ' � STERErN I ~ C e 3 �R �Y .YW ��._:P` � •- t - O Cy1 S II ff.rmrm' rn l; al 2oxc E CO hi AyY i. IVC wl ( /•�" ! '$ °'"Ekpp P R!M , EE lsB SN 1C -sf I CB 3 1a n / l l 3• j � i N.M/61IB rr I N M.M l)/.. Ire ' 4P 1 s d •F� rG ps�� na rf.lno �� ^ t P if lBs. f i ' �' � d9 ,' 3 - � E.�s fr e. Y• PP a rr.lrco � `Ih N ci i a / s _ � rr•mw f � �ti.., s��oe�rm //r 4 3 rto 92.13 ;ee .'Q�BE 4 o . F<r KYO I Y1 q '�' '' —1 • -=LSETB<�LxK� EPiS�Cx 1� Y` ed t1 rto N „ IOi L 11 i e• J1Lr R y!�,��.._ L/NLTRehOY S=N.E - I-) • 99• � � I- ML • .W r T _ CB 2 G� r W'_ Ofl. e• /L �M 1 R.i00001 - y H Je' /V Icy uP- 1,,v. n•s� sro1�-f3 —e__- -ueCo. 4vIE Vfei RRe Ma Ir 3 , P!?[R `.� �'' of ei'•_.-i' _ �.•r"_.� `nw%5M: -srw.0.3., vn., y !'-VEf� s 1 ✓ sra Sa 316. a?kE tE lg� g]•9:PVC L C ,IC,%Li-BLS �jry� •w - ie t; • :'.E iusKy COY E9 : ,r O C Y�C{-inE• t 456. • q'rt 9621 Q-LF lit?a 1IR + I TzICG . MAF � �j ' 50� � - DODOS ENGINEERS, INC. JOB NO. `46 CIVIL ENGINEERING SURVEYING PLANNING DATE p� 4205 14BTH AVE. N.E.. SUITE 200 - BELLEVUE. WA 98007 OA )AO 4 - 97 (2061 66S-7677 OR 454-3743 SIZE__ f�loF1�-�-�Tf� Sty.�At.�S - ��AKiF (fFS A► r, = 0.35 2'/. SLxc S��00 DoC- C�SSuµ� S EDO V , Su'OFACE + ,"A _ 100 �b (�° �� 'KEPT►-f =� 3� Pc�� Faf�. S��r SwP�. SVK-� ,s 6,15- 3 = 515 F�o-(TbM W IOTV+ . SI c 1 rC S w A-LE 15o�F— A�1kLA12)uE = Zo ((? l1C98>) t(O.z5)(so = LS9 0.35 + 0,33fk6, . A59RP,T GN 98 @ (2:4' -Dc- lY 4 suss ec5m" w l gTti is fi o.s' wive If @ 2O0' Lc-Q6kl'r ,' sa�FAOO-E Af-OA is "-Ioo sQ R. PK%)ko LPKf2,E7 = 4-.yl' 5AK-r s 'o- — 3 o ' fbe ->flc -5t-Cec YIELDS 2,0' eoTpM L.51 PTrt, SHEET _OF BASIN SUMMARY BASI\ ID: WQSWL NAME: TRIB AREA SWALE FROM CB 8 SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0. 50 Acres BASEFLOWS: 0 . 00 cfs RAINFALL TYPE. . . . : USER1 PERVIOUS AREA PRECIPITATION. . . . : 2 . 00 inches AREA. . : 0. 20 acres TIME INTERVAL. . . . : 10.00 min CN. . . . : 92.00 TIME OF CONC. . . . . : 6 . 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0 .30 Acres CN. . . . r 98 . 00 PEAK RATE: 0 . 21 cfs VOL: 0.06 Ac-ft TIME: 470 min C�� -" 12/ 8/92 Dodds Engineers, Incorporated 9 page 10- ��&LF-= i S160 r BASIN ID: WQSWL NAME: TRIB AREA TO SWALE ALONG 98TH �L 51G1� �1( S SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0.68 Acres BASEFLOWS: 0 .00 cfs ipe �1.�liVl LC'NCi RAINFALL TYPE. . . . : USER1 PERVIOUS AREA CPE�S PRECIPITATION. . . . : 2.00 inches AREA. . : 0 . 35 Acres TIME INTERVAL. . . . : 10. 00 min CN. . . . : 89 .00 TIME OF CONC. . . . . : 6 .00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0 . 33 Acres CN. . . . . 98 . 00 PEAK RATE: 0. 25 cfs VOL: 0.08 Ac-ft TIME: 470 min DITCH FLOW ANALYSIS BIOPILTRATION CALCULATION DITCH DATA: BOTTOM WIDTH(FT) 0.50 JOB NAME: k-5AV0ELL 4 1 L - LEFT SIDE SLOPE(L:1)- 3.00 JOB A '�)114-(p RIGHT SIDE SLOPE(R:1)- 3.00 OPERATOR: ). pLSe-j_) BOTTOM SLOPE(FUFI)- 0.0200 DATE: WJi 1992- , MANNING'S n 0.350 FLOW FLOW WETTED HYDRAULIC DITCH FLOW DEPTH AREA PERIMETER RADIUS CAPACITY VELOCITY (FEET) (SQ FT) (FEET) (FEET) (CFS) (PPS) f 0.00 0.0000 0.0000 0.0000 0.000 0.000 i 0.05 0.0325 0.8162 0.0398 0.002 0.070 0.10 0.0900 1.1325 0.0706 0.009 0.103 0.15 0.1425 1 1.4487 0.0994 0.018 0.128 0.20 0.2200 1.7649 0.1247 0.033 1 0.150 0.25 0.3125 2.0911 0.1502 0.053 1 0.170 0.30 0.4200 2.3974 0.1752 0.079 0.190 0.35 0.5425 2.71361 0.1999 0.111 0.205 r 11 0.40 0.6900 3.0299 0.2244 O.I51 0.222 0.239 =04-CFTI 0.50 1.00000 3.66231 0.2731 0.2531 0.253 � - DODDS ENGINEERS, INC. JOB Nk)Dv-?' CIVIL ENGINEERING SURVEYING PLANNING DATE 420514BTH AVE. N.E.. SUITE 200 - BELLEVUE. WA HBOO7 120G] BG5-7B77 OR 454-3743 BY -- !fir t�k c^vA GI rr-r Fcc. I CO `C SlDQ/ q I_VE�T •. Q,�= 1 ,45afs V1= D�12 ('BP-usJ-1 , WeTUSW0 PLA,, r -M fi.oL.) Sov,ZGE ctvro %r - oPra CEtnNNEI_ A TUAL- FLD yr 71?A e> 1-0 54G4-V s uJ kt-G 1Z}LL 61- Usss Terp%Q 1.4-5 6Fs . Itie 4.45 eFs . fiGUe-6 ?-p,p4c,6oNrs Tre 3T7 ft Z- TItC- @ �= '( 14'r�� • M� . ��+ = 3 -4`'� VcLoGiT`r 1S SHEET OF �� n,. m nnnnr n�rr,y��tii�`i.�.`.• Tv„ , .,• , . IY�LR�>L uvuvo ui�o � a, itil,. AAilfi 1 DITCH FL(1� ANALY�I ::: ` DITCH DATA: BOTTOM WIDTH (FT) = 6.00 JOB NAME: 41 UNIT APTS LEFT SIDE SLOPE (L:1) = 3.00 JOB #: 91146.00 RIGHT SIDE SLOPE (R:1) = 3.00 OPERATOR: J.OLSEN BOTTOM SLOPE (FTIPT) = 0.0310 DATE: DEC 5, 1992 MANNING'S n = 0.120 FLOW FLOW WBTTED HYDRAULIC DITCH FLOW DEPTH AREA PERIMETER RADIUS CAPACITY VELOCITY FEET SQFT FEET FEET CAS FPS 0.00 0.0000 0.0000 0.0000 0.000 0.000 0.05 0.3075 6.3162 0.0487 0.089 0.291 0.10 0.6300 6.6325 0,0950 0.286 0.454 0.15 0.9675 6.9487 0.1392 0.567 0.586 0.20 1.3200 7.2649 0.1817 0.923 0.699 0.25 1.6875 7.5811 0.2226 1.351 0.801 0.30 _ 2.07001 7.8974 0.2621 1.8481 0.893 Q-�•SLf 51��,7i�{ - - - �rl.r� • b9 F�Ps . ...................................................................................................................................... .. ..: . .. .:. ........................................................................................................... DITCH DATA: BOTTOM WIDTH (FT) = 3.00 JOB NAME. 41 UNIT APTS LEFT SIDE SLOPE (L:1) = 3.00 JOB *: 91146.00 RIGHT SIDE SLOPE (RA) = 3.00 OPERATOR: J.OLSEN BOTTOM SLOPE (FTIFT) = 0.0460 DATE: DEC 5, 1992 MANNING'S n = 0.120 FLOW FLOW WETTED HYDRAULIC DITCH FLOW DEPTH AREA PERIMETER RADIUS CAPACITY VELOCITY FEET SQFT FEBT FEET) (CFq) (FPS 0.00 0.0000 0.0000 0.0000 0.000 0.000 0.05 0.1575 3.3162 0.0475 0.055 0.348 0.10 0,3300 3.6325 0.0908 0.177 0.537 0.15 0.5175 3.9487 0.1311 0.355 0.685 0.20 0.7200 4.2649 0.1688 0.584 0.811 0.25 0.9375 4.5811 0.2046 0.865 0.922 0.30 1.17001 4.89741 0.2389 1.196 1.023 0,35 1.41751 5.21361 0.27191 1.580 1.115 _._� V. Conveyance Systems Analysis and Design 111!7-gl► OOOOS ENGINEERS, INC. JOB NO. hol-k6 CIVIL ENGINEERING SURVEYING PLANNING OAT E 4205 14BTH AVE. N.E., SUITE 200 - BELLEVUE, WA BBOO7 12061 BSS-7877 OR 454-3743 B Y r_IJW0FF CDEFFICt.&wTS USO-7D Iti T G CoNQE'fAINGE, Cl\LCu L, A-n om s ARE AS 0- = 0 .9 Asf KAL i >~Tc- , C'r- o,'t5 LgwNs C = 0115 Ld4NT Foe sr, -711?1& S I Ap b•2 �L . o;v owsk Tr-- Ac atfsae { . 11 CFS 4 0JZA&, @ C = P� b.3 CP, Z 0,5q C= D,9 CN LC-�T Lh+aN coowT As o,9 1�•11,C'� g G_ �D.3 ��o�9} •�- �0,3 �o,i5) � 0,53 yy n o� 6p {� ItiTA-1� 2 1(�, L� x� �� 41D, kII 0,zc? O SHEET OF i :;1 1� - �" .�Y i. EM � .� :eT LOGTION: KING CO[Ml'Y 24-FBt RAINFALL: 3.4 INCHES JOB NAME WADDELL 41 UNIT JOB NUMBER 91146 PREPARED BY: J.OLSEN DESIGN STORM: 25 YEAR IKCR86fElIl' AORIOFP YI `.^�i:': 91601OP :;MINFNL S$101fi� �IPB PIPH tIPO ii :i14CE11AL s 11tAH&. PIPCiCi%PhCI'tY�E1MMAYti'::: • .. . .. � :r:: is ;[..::.>...::::•::::::: ` kIPB48C1481'>•C^:i;iSi+1RW`S.. COEEPIC01Nt: NSBti i R41M OM., .GONG _iN1$N917'Y. ?PEQpr 7K4NryiNp'4 AwU4Q78R S49PII j:i .Ellitlk7# 3!0Gx3CPR ....... CB 7 CB 6 0200 0.34 a068 0.068 10.00 2.02 a138 0.012 12 1.000 79 2.11 0.62 3.860 4.91 16% CB 6 CBS 0.200 0.3410.3181 0.136 _ 1 u.62 1.95 O7b5 0.012 12 2.080 59 3.37 0.29 5.567 7.09 4.8% CBS CB 4 1.100 om 0318 10.92 1.91 0.723 0.012 12 1.970 105F4-059 0.39 5.417 6.90 13.3% CB4 0UT4 Q320 0.90 0.486 1130 1.87 0.909 0.012 12 OS00 20 all 2.729 3.47 33.3% CB3 CB2 03W 0.40 0.120 IOAD 2.02 0243 0.012 12 0.000 116 0.00 0.000 0.00 0.0% CB2 CBI o-W 0.90 0.606 10.00 2.02 1227 0.012 12 0.560 18 0.09 2" 3.66 42.5% CB 1 EX CB 0.000 0.90 0.606 10.09 2.01 1220 0.012 12 3.430 96 6.60 025 7.148 9.10 17.1% IN2 CB2 0.550 036 03% 11.41 1.86 0.572 0.012 12 18.920 37 9.19 Q07 16.789 21.38 3.4% mET OUTS 0.600 0330.318 10.OD 2.02 0.644 0.012 12 0.500 45 238 027 2.729 3.-7 23.6% V1. Special Reports and Studies ® - DODOS ENGINEERS, INC. CIVIL ENGINEERING S U R V E Y I N G P L A N N I N G PRELIMINARY STORM DRAINAGE CALCULATIONS FOR 41 UNIT APARTMENT COMPLEX RENTON WASHINGTON Prepared By: James A. Olsen, P.E. Prepared For: Shulman & Waddell ,4' DEI Project No. 91146 September 18, 1992 4205 146TH AVE. N.E., SUITE 200-6ELLEVUE. WA 96007 (2061 665-7677 OR 454-3743 FAX:[206]665-7963 � - DODDS ENGINEERS, INC. CIVIL ENGINEERING S U R V E Y I N G P L A N N I N G September 18, 1992 DEI Project No. 91146 Mr. Paul Forsander City of Renton Planning Department 200 Mill Avenue South Renton WA 98055 Subject: 41 Unit Apartments - Shulman Waddell Dear Paul: I have enclosed information regarding the storm drainage plan for the above referenced project. I understand this information is required prior to site plan approval. The report is tailored to the drainage list you supplied. If you have questions please call. Sincerely yours, DODDS ENGINEE INC. es Olsen,P.E. :sab cc: Doug Waddell 1750 - 112th Avenue NE Suite B-220 Bellevue WA 98004 4205 146TH AVE. N.E., SUITE 200-SELLEVUE. WA SB007 [2061 B65-7B77 OR 454-3743 FAX:(206)665-7963 �tJTi�Lo�c�'lo �J : j Con ITT-OLT JQI, S Al �ilt� 5,� , CO&C- , C(: CAdC12 (Rom TNS SC E Is AeMycj O A.Vz tY 2 ,9 AC, iu SIDE, 71-�e Paopo sED �oJEce-i WL L - UM U:Z:e OtJ L--( THE PaDJC-CT U& U coNs,�2vc�j ¢ �uIw� NC,S , ASSoG 0 ?hV( -kQGI 4J D PaMDE FN)►.Y�NmCE 1201�n IM P4W GWlEtaTS, A S-ro"N iF=rL SYSllc-M W 1IAt. 5E INCL-uDeL) Wt-�,C,4 toNSlw of RNo vNoc�6,d��►�r, 6 -1 1*]iAMEIPz4 , AtJo AP9"tom ,4ATC- C-(' 100' kQ (-F► ,q 'T�iE CXI�-nNc� py?p�Itli E flow S Fr SF. TO '1 N -Lly. MeU L LA W Q . A M 4,N1 M AIDE eH.At + eLj D I TLI� CAvL�I�S ST04" Wpr�Q ; -PIS UAC16 1po , 1 To b+. � �lS11Nt� co)lw c SF ,NF 1 �-T►oN , TNT CXi`s`I�4 ��C-tr `A�1��1 CON�aS I S QF bgJS H I C�YL. s AQD ?,C(O(ZC- __SPEC ►�L, �t:C�UItC�.srS: AT N 4 U"L, LDC#nat� : 'TrtLs S DN MWA-,TC4 Lulu, SE 'p� AGED eTD 'MC c6 M;OVo-, 2, q�sl'TE ANfn.'�sls : � tJPSTVzF.�M -1�1Pxr�� r��n io THE FeLzECT IS frP��OXin.l A1(El,`( l , O ACC o "TI�tS l}JIL,I, Pic CPOKSsc.l? IIJ iYtE C.owvC`{Av x CAL4uIATIO►J( A'T TRS rf (m C aF b.Av o, G 'j)Eahl 1TT� S t3 bA ill✓. 3. 'PEA-1-- p O►.1oFF COI-R' L — pW-S lle D E'St N-jloN t )lu, 6S PV-D,ID69 Fb(C 940-JeLT rto Ltq iT � eCU RATES f 64 `MC 2 � )1* Nt2 .M(IM EV EMITS iU 'Mic '�.�- DF�Et,o�M�^NT ¢�'Es , t!sCE rt��tbs�=J s►�Fo ) �}; CON�GYr4tJC� CA1.C.Ul.A-TtOttS ' Cv►�1Vr'fAN(.E C'AI,C.U(A-i7'0►�S 12;G 1 f u.0 o c-o c N iYrss fi N A t. eqDW c�LW LA j, cq pp.�PA,z.�n fOrZ 1 I1 DItJ� P��t t rr sot3o�1 L., 5� E, G. � SEv� M C►yTA-no+J Pr>u���n �S ; � 'D�=-s�G� a � Ji�rJ � SL-��71t�t�rJ�`1Ot�1 CD�1Lc�� �ACIL►'�tt`S t,J,1�t.(� cmNfoQ�^-t �O Itfc �eo,�o�Er� Srn� r>�4�J ArJO {-���w Tt�t MtT\-bDoL-oG`t 6nWDLEU►sEs of `QiE K.C , S ,D , " A-N U AL, SPECIAL. TLEQVI MENTg: l o C9411CAU '7Q,Ai r l MAC-- A GA : 11 A: , 2- Cb"(2t,1 rN A MASH FvZ gi.AlNA(,E S. 2cUU I S A M ASTE12 VtAI W AGE QLks)- `I= -moon PT00 CO AU N 1TY Off. bt65( N PLiW -- ►J (A 5, SPEGII LA V\,) MC�L CALMEATY � -ke(7L, " 1j(YT CCCAlV,1(1 MOZE 11.1At4 L Aq2►; OF TM1°Lr-VVjOUS SU\CFACE USED !E:>`( VSrtC -OS ?HSeM4C-- A W(2T(b► ) D l5 l�07 ePeuu►lz- of 7rt c-- JECT. �o. GOA LE Sit NCB a G►,vs 'f�E�I� SrO►J 1 I �S �JCC1 �aL� NV) GOts'-h,ti1 Off' D15cl+AfLGE 10 �N OPEN t7�P�s5►� 8 , LSL of- UA,V-FS '2 WWAMS I Wr\LANOS �oiL 1?(EA1'� QA7L� COtZ�jL- - N/A 5eC-L ON&E I. �. 'DGUQr4--�1o>J of A Ioo %f+- FLOG? PLAID P1IA . NC2 Gl C-C 'VOaS l)pT A(�xYS' A ' ST� EA�M I (N>rrlC�NO C-ZG. ribCs No; CDN'TAs1� 02 A�.jl'S 7�(�PI✓ l 02 Z S'11�AM ' I�LS�S ��11- k1J•i � S W�crDd, J�1�'T�o� � he ICQQ-} oN of-mom 09 -� Wal�J-5 30c) f roSgo�i ' �N►N�� Q1Z���� S(Arrclf� �Q �cr��3��5 ' ca,n���s svNt Not�'r7aoiZ�3�Q o N 39 CL) 3N1- CIL '!S3 1cq ' sSo-� M -01 � 3�vcv�C S3ni►�a� r=l1i O- NL. ��� �d1.1 'wV 3� - �3LN9) --O 3kU., O-L 1. �fiU-�ot� st`�o'►� QNV ScNPRL c "ZJ �►�7 nW)(:IaW 311E JO I-Uf Wa"L d».da t a�A wo7o :�AjoNozl 5 Hl ' n a72�dc) —AVO,�,V d a!A L 3Q a 5?Q D >.-r7► S�+Y1 ► J_1,MN %r)o)3 NG)i-u. ►-, LS).s +)-L. ' oasoS�cia ('Q, JH! -��UM avo-n-L)ws d NI S�►'i �ru�nztl-S slW- srno� aN �,�U��-u► s�`� r�v�7 �+ 51s �NI`1-H9l1- odor r 3�vr+ ' a s� 92 ?r►'► -SkL ' add z\749 :�o 3a�s KOQS ALL 11NQ'W J� 3bS0M ]�Jd N �Vt a � V--nNV-Z S l qL ' ddo� 32, VD N w SJ.S 3N I'1 1-H \) lL v S�3Lty� (' ao7 'M,N� 31)1 C� 7e►b m H?QilfS 3�a c9 IN 3 N y I c�\�i xa d'ti;:.{ ` LL o ► W03 t . w o O In -__ W - - - OaJ`•• r. . t� to ZIS t a Z z [j: nw a m =T N LLI r .• Ir i. Zuw cu ' y.. ., 1... .� 'ITV:�•h�i ' :... .. ,. �� ,.it ,7... ••f,,;�y ,f .ri GEOTECH v CONSULTANTS 13256 N.E.20th St.(Northup Way),Suite 16 Bellevue,WA 98005 (206)747-5618 f206)343-7959 June 17 , 1991 JN 91172 Shulman Realty, Inc. 1750 - 112th Avenue Northeast Bellevue , Washington 98004 Attention : Doug Waddell Subject : Geotechnical Engineering Study Proposed Carr Road Development 9747 Southeast Carr Road Renton , Washington Gentlemen : we are pleased to present this geotechnical engineering report for the proposed Carr Road Development to be constructed on the property at 9747 Southeast Carr Road in Renton , Washington . The purpose of our work was to explore site conditions and provide earthwork and foundation design criteria . The work was authorized by your acceptance of our proposal dated May 28 , 1991 . We explored the subsurface conditions of the proposed building site with nine test pits . We found the flat, cleared portion of the property which is adjacent to 98th Avenue South to be overlain with approximately four feet of loose to medium-dense gravelly silty sand. Under the fill , competent sandy soils were encountered . Bearing soils are typically within three feet of the ground surface on the portions of the site which have not been recently graded . Structures can utilize conventional continuous and spread footings bearing on the competent, native , sandy soils . The attached. report contains the results of our study and recommendations . If there are any questions , or if we can be of further service , please contact us . Respectfully submitted , GEOTECH CONSULTANTS , INC. Mark K. Dodd, P . E . Senior Engineer i GEOTECHNICAL ENGINEERING STUDY PROPOSED CARR ROAD DEVELOPMENT 9747 SOUTHEAST CARR ROAD RENTON , WASHINGTON This report represents the results of our geotechnical engineering study for the site of the proposed development in Renton , Washington . The site is located southeast of the intersection of Southeast Carr Road and 98th Avenue South . The general location of the site is illustrated on the Vicinity Map, Plate 1 . Based on preliminary information furnished to us , we anticipate that the development will consist of numerous lightly-loaded multiple story structures with associated parking . We expect finish grades to be near existing grades . Development of the property is in the planning stage , there- fore only conceptual plans were available to us . A site plan sketch given to us included the possible footprints of the proposed structures , and provided some topographic information . SITE CONDITIONS ,SURFACE The property is located on a west-facing slope looking across the Kent Valley. Roughly rectangular, the site encompasses more than three acres . The property used to be a gravel pit , but gravel mining operations ceased some time ago , and fill was placed to flatten much of the site. The fill placement dammed up the natural seepage out of the eastern slope , and has resulted in a relatively small , poorly drained localized depression . Other than the fill placement , the site remains undeveloped . Land use in the immediate .vicinity includes residential housing, and a medical center . SUBSURFACE We explored the subsurface conditions with nine test pits at the approximate locations shown on the Soils Exploration Plan , Plate 2 . We determined the field exploration program based upon the proposed construction , site topography, subsurface conditions revealed during excavation, and time and budget constraints . Shulman Realty, Inc . JN 91172 June 17, 1991 Page 2 The test pits were excavated on May 22 , 1991 with a rubber- tired backhoe owned and operated by Evans Brothers Excavating . A geotechnical engineer from our staff observed the excavation process , logged the test pits , and obtained representative samples of the soils encountered. "Grab" samples of selected subsurface soils were collected from the backhoe bucket . The Test Pit Logs are attached to this report as Plates 2 through 6 . Six test pits were excavated in the flat area where fill was previously placed . The test pits encountered one ( 1 ) to four and one-half (4 . 5) feet of fill below surficial grades . Below the fill , the subsurface consisted of medium-dense to dense granular soils such as sand and gravelly silty sand . Two test pits were excavated in the low-lying depressed area . At these locations the subsurface consisted of a surficial layer one-half (0 . 5) foot to one and one-half ( 1 . 5) feet thick of gray-brown silt . Below the silt, both test pits encountered a dense to very dense gravelly sand with variable amounts of silt. The lower layer had some cobbles and boulders in it, and was difficult to dig . One test pit was excavated on a north-facing slope, somewhat near Southeast Carr Road . The top one and one-half feet consisted of topsoil and duff . This was underlain , to a depth of six feet , by a medium-dense, silty sand with gravel , cobbles , and boulders . From six to eight feet below existing grades , a glacially-overridden dense sand to silty sand with some gravel , cobbles , and boulders was encountered . The final logs represent our interpretations of the field logs and laboratory tests . The stratification lines on the logs represent the approximate boundary between soil types at the exploration locations . In actuality, the transition may be gradual . The relative densities and moisture descriptions indicated on the test pit logs are interpretive descriptions based on the conditions observed during the excavation . The logs should be reviewed for specific subsurface information at the locations tested . GROUNDWATER Groundwater seepage was observed in some of the test pits at about three feet below existing grades . The test pits were left open only for a short time period , therefore the seepage levels on the logs represent the location of transient water seepage and may not be the location of the static groundwater Shulman Realty, Inc. JN 91172 June 17 , 1991 Page 3 level . It should be noted that groundwater levels vary seasonally with rainfall and other factors . We anticipate that groundwater could be found between the near surface fill soils and the underlying denser soils or glacial till , and in more permeable soil layers or pockets within the till soils . CONCLUSIONS AND RECOMMENDATIONS GENERAI The project appears feasible from a geotechnical engineering standpoint . Structures can utilize conventional continuous and spread footings bearing on the medium-dense to very dense native granular soil , or on structural fill built up from competent native soils . Often gravel pits are used as disposal areas for organic or otherwise unsuitable soils from construction sites . We found no evidence that this has occurred on the site . The building excavations and utility trench areas should be observed to verify that no unsuitable soil has been placed . Some of the soils available on site could be used as structural fill . Quality control and density testing will be necessary during fill placement to verify specified compaction percentages are met. Geotech Consultants , Inc . should be given the opportunity to review the final plans and specifications to verify site specific subsurface requirements are met . FOUNDATIONS Structures' may be supported on conventional continuous and spread footings bearing on the medium-dense to very dense, granular soils underlying the existing fills , or on structural fill placed above competent native soils . Overexcavation of soil below the footings may be required depending on final site grades . Fill placed under footings should extend outward from the edge of the footings at least a distance equal to the depth of fill underneath the footings . Exterior footings should be bottomed at a minimum depth of twelve ( 12) inches below the lowest adjacent outside finish grade . Footings founded on competent, granular native soils at least one foot below the finish ground surface may be designed for an Shulman Realty, Inc. JN 91172 June 17, 1991 Page 4 allowable soil bearing capacity of three thousand (3000 ) pounds per square foot (psf ) . Footings bearing on structural fill may also be designed for a bearing pressure of two thousand (2000 ) psf . Continuous and individual spread footings should have minimum widths of sixteen ( 16) and twenty-four (24 ) inches , respectively. A one-third increase in the above bearing pressures may be used when considering short term wind or seismic loads . For the above design criteria , it is anticipated that total settlement of footings founded on medium-dense to very dense granular soils and on fills less than five (5 ) feet thick will be about three- quarters of an inch , with differential settlements of one-half inch between building corners . Much of the settlement due to dead loads from the building structure should occur during construction . Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils (or compacted fill subgrade) or by passive earth pressure on the foundations . For the latter, the foundations must either be poured "neat" against the existing soil or the wall backfill must be compacted structural fill . A coefficient of friction of 0 . 45 may be used between the structural foundation concrete and the supporting subgrade. The passive resistance of undisturbed native soils and well compacted fill may be taken as equal to the pressure of a fluid having a density of three hundred fifty (350) pounds per cubic foot (pef ) . SLAB-ON-GRADE FLOORS We recommend that concrete slabs be placed over at least one foot of structural fill . Isolation joints should be provided where the slabs intersect columns and walls . Control and expansion joints should also be used to control cracking from expansion and contraction . Saw cuts or preformed strip joints , used to control shrinkage cracking , should extend through the upper one-fourth of the slab. The spacing of control or expansion joints is a function of the amount of steel placed in the slab. Reducing the water/cement ratio of the concrete and curing the concrete by preventing evaporation of free water until cement hydration occurs will also reduce shrinkage cracking . A 6-mil polyethylene plastic vapor barrier should be used under floors likely to receive an impermeable floor finish or where passage of water vapor through the floor is undesirable . Based on American Concrete Institute recommendations , we Shulman Realty, Inc. JN 91172 June 17, 1991 Page 5 suggest placing a two to three-inch layer of sand over the vapor barrier to protect the vapor barrier and to allow some moisture loss through the bottom of the slab, reducing warping in the curing process . Sand should be used to aid in the fine grading process of the subgrade to provide uniform support under the slab. PERMANENT RETAINING AND FOUNDATION WALLS Retaining and foundation walls should be designed to resist the lateral earth pressures imposed by the retained soils . The following recommendations are for walls less than twelve ( 12) feet high which restrain level backfill : Design Parameter Value Active Earth Pressure* 30 pcf Passive Earth Pressure 350 pcf coefficient of Friction 0 . 45 Soil Unit Weight 125 pcf Where: 1 ) Pcf is pounds per cubic foot . 2) Active and passive earth pressures are computed using equivalent fluid densities . * For restrained walls which cannot deflect at least 0 .002 times the wall height , a uniform lateral pressure of one hundred ( 100) psf should be added to the active equivalent fluid pressure . The values given above are ultimate 'values . An appropriate safety factor should be applied when designing the walls . We recommend using a minimum factor of safety of 1 .5 for overturning and sliding . The resultant force, which can be determined by taking moments about the toe of the wall while neglecting the passive pressure force, should pass through the middle third of the footing . The above design values also do not include the effects of any hydrostatic pressures behind the walls and assume that _ no surcharge slopes or loads will be placed above the walls . In addition , construction equipment should not operate within a Shulman Realty, Inc . JN 91172 June 17, 1991 Page 6 prism defined by a 1 : 1 (Horizontal :Vertical ) line extending from the back end of the footing to the retained soil behind the structure. If these conditions exist, then those pressures should be added to the above lateral pressures . Also , if sloping backfill is desired behind the walls , then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures . Retaining and foundation walls should be backfilled with compacted, free-draining , granular soils containing no organics . The wall backfill should contain no more than five percent silt or clay and no particles greater than four inches in diameter . The percentage of particles passing the No . 4 sieve should be between 25 and 70 percent . Alternatively , a geotextile drainage product such as Miradrain or Enkadrain may be used . When compacting backfill behind the retaining wall , methods should be used which will not damage the wall . The purpose of the backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall . Where the backfill is to support walks or other slabs , we recommend that the backfill consist of clean sand and gravel as this soil would be easier to compact in the excavation prism than siltier soils . Also , these soils will provide drainage behind the wall . The top foot to eighteen inches of the backfill should consist of a relatively impermeable soil or topsoil , or the surface should be paved . SITE DRAINAGE We recommend the use of footing drains at the base of all footings and earth retaining walls . Roof and surface water drains must be kept separate from the foundation drain system. The footing drains should be surrounded by at least six inches of one-inch-minus washed rock . The rock should be wrapped with non-woven geotextile filter fabric (Mirafi 140N , Supac 4NP; or similar material ) . At the highest point, the perfor- ated pipe invert should be at least as low as the bottom of the footing and/or crawl space and it should be sloped for drainage. A typical footing drain detail is attached to this report as Plate 8 . The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes . Water should not be allowed to stand in any area where buildings , slabs , or pavements are to be constructed . During construction, loose surfaces should be sealed at night by compacting the surface soils to reduce the infiltration of Shulman Realty, Inc . JN 91172 June 17, 1991 Page 7 rain into the soils . The slopes should be covered with plastic . Final site grading in areas adjacent to a building should be sloped at least two percent away from the building for a distance of ten feet , except where the area adjacent to the building is paved. Groundwater was observed during our field work at depths as shallow as 2 .5 feet below existing grades . Seepage into even minor excavations is possible, and if encountered , the water should be drained away from the site by use of drainage ditches , perforated pipe, French drains , or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation . EXCAVATIONS AND SLOP S In no case should excavation slopes be steeper or greater than the limits specified in local , state, and national government safety regulations . Temporary cuts to a depth of four feet in unsaturated soils may be attempted vertically. For slopes having a height greater than four (4 ) feet, the cut should have an inclination no steeper than 1 : 1 (Horizontal :Vertical ) from the top of the slope to the bottom of the excavation . It should be noted that sands do cave suddenly and without warning . Utility contractors should be made especially aware of this potential danger . All permanent cut slopes into native, dense soils should be inclined no steeper than 2 : 1 (H :V) . Fill slopes should not exceed 2 . 5 : 1 (H :V) . Water should not be allowed to flow uncontrolled over the top of any slope . Also , all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil . ROCKERIES We anticipate that rockeries may be used in the site develop- ment . A rockery is not intended to function as an engineered structure to resist lateral earth pressures , as a retaining wall would do. The primary function of a rockery is to cover the exposed excavated surface and thereby retard the erosion process . We recommend that rockeries be limited to a height of eight feet and that they be placed only against dense competent native soils . The construction of rockeries is to a large extent an art not entirely controllable by engineering methods and standards . It is imperative that rockeries , if Shulman Realty, Inc. JN 91172 June 17, 1991 Page 8 used , be constructed with care and in a proper manner by an experienced contractor with proven ability in rockery construction . The rockeries should be constructed with hard , sound, and durable rock in accordance with accepted local practice. Provisions for maintenance, such as access to the rockery , should be considered in the design . Keystone block walls may be used as retaining walls . The backfill behind the block walls should be compacted to structrual fill requirements , and it should be reinforced with geogrids . The amount of reinforcement will depend on the height . Generally the reinforcement should extend back from the block an amount equal to the height of the wall . PAVEMENT AREAS All pavement sections should be supported on a minimum of one foot of structural fill , provided the underlying soils are stable at the time of construction . Additional structural fill may be needed to stabilize soft, wet or unstable areas . structural fill under the roadway and parking area may need to be underlain with a stabilization fabric . we recommend using Supac 5NP, manufactured by Phillips Petroleum Company, or a non-woven fabric with equivalent strength and permeability characteristics . In most instances , twelve ( 12 ) inches of granular structural fill will stabilize the subgrade except for very soft areas where additional fill could be required . The subgrade should be evaluated by Geotech Consultants , Inc. after the site is stripped and cut to grade . structural fill under the roadway sections should be compacted to at least 95 percent of the ASTM D-1557-78 maximum density. All subgrade areas must also be in a stable, non-yielding condition prior to paving . The pavement section for lightly loaded traffic and parking areas should consist of two (2) inches of asphalt concrete (AC) over four (4 ) inches of crushed rock base (CRB) or three (3) inches of asphalt treated base (ATB) . We recommend that heavily loaded areas be provided with three (3) inches of AC over six (6) inches of CRB or four (4 ) inches of ATB. The heavily loaded areas are typically main driveways , dumpster areas , or areas of truck traffic, especially where trucks often turn . Where the subbase is composed of silty, water- sensitive soils , and there is irrigated landscaping adjacent to and at an elevation higher than the pavement, we suggest that perimeter drains be installed to intercept the water that would otherwise saturate the pavement subbase. The pavement i Shulman Realty, Inc . JN 91172 June 17, 1991 Page 9 section recommendations and guidelines are based on our experience in the area and on what has been successful in similar situations . We can provide recommendations based on expected traffic loads and R value tests , if requested . Some maintenance and repair of limited areas can be expected . To provide for a design without the need for any repair would be uneconomical . we stress again, however , that the performance of site pavements is related to the strength and stability of the underlying subgrade. SITE PREPARATION AND GENERAL EARTHWORK We recommend that the building and pavement areas be stripped and cleared of all surface vegetation , all organic matter and any other deleterious material . Stripped materials should be removed from the site or, if desired , stockpiled for later use in landscaping . The stripped materials should not be mixed with any materials to be used as structural fill . Structural fill is defined as any fill placed under buildings , pavements , walkways , or other areas where the underlying soils need to support loads . Geotech Consultants, Inc . should observe site conditions prior to fill placement. The surficial site soils are somewhat moisture-sensitive and can become soft when wet and disturbed . The more granular soils are less moisture sensitive. Structural fill under floor slabs and foundations should be placed in horizontal lifts and compacted to a density equal to or greater than 95 percent of the maximum dry density in accordance with ASTM Test Designation D-1557-78 (Modified Proctor) . The fill materials should be placed at or near the optimum moisture content. Fill under pavements and walks and behind retaining walls should also be placed in horizontal lifts and compacted to 90 percent of the maximum density except for the top twelve ( 12) inches which should be compacted to 95 percent of maximum density. The allowable thickness of the fill lift will depend on the material type, compaction equipment and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12 ) inches in loose thickness . The moisture content of the on-site soils at the time of our exploration was near/or above the estimated optimum moisture content . The on-site soils could be used as structural fill provided the grading operations are conducted during dry weather , when drying of the soils by aeration is possible . The moisture content of fill soils must be at or near the GEOTECH CONSULTANTS , INC . Shulman Realty, Inc. JN 91172 June 17, 1991 Page 10 optimum moisture content during compaction as soils cannot be consistently compacted to the required density when the moisture content is greater (or significantly less) than optimum. If grading activities take place during wet weather , or when the soils are wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill . Moisture sensitive soils will be susceptible to excessive softening and "pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content . During excessively dry weather such as may occur during the summer or early fall months , it may be necessary to add water to achieve optimum moisture content . Ideally, structural fill which is to be placed in wet weather should consist of a granular soil having no more than five percent material passing the No . 200 sieve . The percentage of particles passing the No . 200 sieve should be measured on that portion of the soil passing the three-quarter-inch sieve. LIMITATIONS The analyses , conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soils encountered in the test pits are representative of the subsurface conditions of the site. If , during construction , subsurface conditions are found which are significantly different from those observed in the test pits , or assumed to exist in the excavations , we should be advised at once so that we can review these conditions and reconsider our recommenda- tions where necessary. unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples in test pits , as subsurface conditions can vary between test locations . Such unexpected conditions frequently require that additional expenditures be made to attain a properly constructed project . It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks . This report has been prepared for specific application to this project and for the exclusive use of Shulman Realty and their representatives . Our recommendations and conclusions are based on the site materials observed , selective laboratory testing , and engineering analyses . The conclusions and rrn-r^t rn �u T,n�r i r Shulman Realty, Inc. JN 91172 June 17 , 1991 Page 11 recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints . No warranty is expressed or implied . The scope of our services does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor' s methods , techniques , sequences or procedures , except as specifically described to our report for considera- tion in design . The scope of our work did not include a hazardous materials assessment, however we can provide this service if requested . We recommend that this report , in its entirety, be included in the project contract documents for the information of the contractor . ADDITIONAL SERVICES It is recommended that Geotech Consultants , Inc . provide a general review of the geotechnical aspects of the final design and specifications to verify that the earthwork and foundation recommendations have been properly interpreted and implemented in the design and project specifications . It is also recommended that Geotech Consultants , Inc. be retained to provide geotechnical consultation , testing , and observation services during construction . This is to confirm that subsurface conditions are consistent with those indicated by our exploration , to evaluate whether earthwork and foundation construction activities comply with the intent of contract plans and specifications , and to provide recommendations for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction . However , our work will not include supervision or direction of the actual work of the contractor , his employees or agents . Also , job and site safety, and dimensional measurements , will be the responsibility of the contractor . We recommend. that a representative of our firm be present during placement of structural fill to observe the process and to conduct density tests in the fill . Shulman Realty, Inc . JN 91172 June 17, 1991 Page 12 The following plates are attached and complete this report: Plate 1 Vicinity Map Plates 2 - 6 Test Pit Logs Plate 7 Grain size Analysis Plate 8 Footing Drain Detail Respectfully submitted, GEOTECH CONSULTANTS , INC . f��$ R�flyl��y OF yi Mark K. Dodds , P.E . Senior Engineer • f ames R . Finley, Jr . P.E. Principal IT 1 ..In I I 1`.. rNh. fl✓ ,l1Mt,: I �\1"M \ I •.pll°I YRIb[R r," � � I ��. !: '. • i 20 c Race .� '�♦ 1. '44♦ -. i [ �rX C ;"err '� t I: = F • r AN r FF 1 I tlrt!O "ry I W 1 ' arX , ff • ar,n N iT { C a urn r in .t 1411. IT _ 1 I I I I 1 I 4 � I �4 ' •'fit ' •. ,•. • 1 SIIIN-if i Mrw t• F. . Y 1 bi A6 r. {i d+J •• I - t IN 11, e I01 IAWIN3 I i I X I3,NIT ° NrS I 1 F �• J I p .T 1 Y rn u b I � Yrr nr €r • , f1 I I Y , r � ! ' I 1p 1 ,6 I S I 31 32 r ■ T IY.I(rr. -b x 3rr i N °I - I I 1 4v I 1 P f Y WII/` • 1 I 1 F immml— _rr'�y•7' � .`j ati_ J va;: I wrrl • ' py INr R E all IS j KE "• ` I •_iftAFaVJL Y1• It T I VICINITY MAP GEOTECH CARR ROAD DEVELOPMENT CONSULTANTS, LNC. RENTON, WASHINGTON Job No. Date: Plate: 91172 ✓UNE 1991 1 TEST PIT 1 FJovauon4'above USCS Descri tlon pavedroad Brown, silty SAND, moist, medium dense (fill). Fill Dark brown, silty SAND with gravel and cobbles, wood, cement,moist, loose to medium dense (fill). 5 SP Brown gravelly, medium to coarse SAND with some OP cobbles to sandy gravel with some cobbles, moist dense Test pit terminated at 7 feet below existing grade on 5/22191. No groundwater seepage encountered during excavation. 10 Location of test pit : 150 feet south of central telephone pole. 15 TEST PIT 2 .`5Ott USCS Description road Elevation 4'above 0 Fill Brown silty SAND moist loose with roots (fill). Brown gravelly medium SAND to gravelly sand with occasional cobbles, wet medium-dense. SP 5 = SAND becomes coarse below S feet. i Test pit terminated at 8 feet below existing grade on 5122/91. to -Moderate groundwater seepage encountered below S feet during excavation. Location of test pit : 110 feet south and 110 feet east of central telephone pole. 15 TEST PIT LOGS GEOTECH 9747 SOUTHEAST CARR ROAD CONSULTANTS, INC. RENTON WASHINGTON Job No: Dale: Loppedby: Plate: 91172 JUNE 1991 AIKD 2 u TEST PIT 3 eQ o�5 c`o G° h Non E/avitlon 2'above USCS Desc 0 0 ML Brown to gray, sandy SILT, very wet, firm LL-28.2 PI-5.0 Brown, gravelly, silty SAND with some cobbles and occasional boulders, very moist, very dense 5 Test pit terminated at 4 feet below existing grade on 5122/91. Moderate groundwater seepage encountered at 3.5 feet during excavation Location of test pit : 175 feet east of central telephone pole. 10 15 TEST PIT 4 USCS Descri lion Elevatlm 2'above 0rpad LU:14Gray to brown SLLT, wet, soft LL-30.2 PI-5.2 _ sPq Brown to gray, gravelly,medium to coarse SAND, wet, dense to very dense 5 Test pit terminated at 6 feet below existing grade on 5122/91. Moderate to heavy groundwater seepage encountered below 3 feet during excavation. 10 Location of test pit : 150 feet east and 30 feet north of central telephone pole 15 TEST PIT LOGS GEOTECH 9747 SOUTHEAST CARR ROAD CONSULTANTS, INC. RENTON, WASHINGTON _�� _ Job o 172 DaJ: 1991 Loy Eby: Plate:9 TEST PIT 5 lee a� cxe 0 Go USCS Descrl tlon E/evatlon road s Fill Brown, silty SAND with roots and charcoal, moist, loose (fill). sM :: Brown, silty, gravelly SAND with cobbles, moist, very dense (till). 5 Test pit terminated at 5.5 feet below existing grade on 5/22/91. Minor groundwater seepage encountered at 2.5 feet during excavation. 10 Location of test pit: 120 feet east and 25 feet south of central telephone pole. 15 TEST PIT 6 b 0 0 Gb USCS Descri lion E/evatlon 6'above - road Brown, gravelly, silty SAND with pockets of SILT, very moist, Fill loose to medium-dense (fill). 5 sM Red brown, gravelly, silty SAND,moist, very dense Test pit terminated at 5 feet below existing grade at 5122/91. No groundwater seepage encountered during excavation. Location of test pit : 80 feet east and 70 feet north of central 10 telephone pole. 15 TEST PIT LOGS GEOTECH 9747 SOUTHEAST CARR ROAD CONSULTANTS, INC. RENTON, WASHINGTON _ Job No: Date: Logged by: I Plate: '_� 91172 JUNE 1991 MKD 4 TEST PIT 7 USCS Description Eievatlon 6'above 0 Brown, gravelly, silt)' SAND, moist, medium-dense (fill) road Fill Red-brown,gravelly, silty SAND, moist, very dense 5 Test pit terminated at 5.5 feet below existing grade on 5/22191. No groundwater seepage encountered during excavation. 10 Location of test pit: 50 feet north and 25 feet east of telephone pole. 15 TEST PIT 8 X" l '0 G°C USCS Desai lion Elavatlm 4'above 0 Brown, gravelly, silty SAND with some cobbles,moist. Fill medium dense (fill). Silty D with o s and bricks (fill). 5 Sp Brown,medium SAND, moist, medium -dense boulders below R feet 10 Test pit terminated at 9 feet below existing grade due to boulders . No groundwater seepage encountered during excavation. Location of test pit : 50 feet east and 50 feet south of central telephone pole. 15 TEST PIT LOGS GEOTECH 9747 SOUTHEAST CARR ROAD tilt CONSULTANTS, INC. RENTON, WASHINGTON _ Job No: Dale: JL09j7edby: Plate: 81000 JUNE 199/ MKD 5 TEST PIT 9 e e Oe �e Ge( USCS Descrl llon Elevallon 8'above 0 11 area Topsoil and duff. 8M Brown,silty, medium SAND with some gravel and cobbles and 5 occasional boulders, very moist, medium dense. sP Brown SAND to silt}, SAND with some gravel, cobbles, and srn boulders, moist, dense. (glacially overridden). 10 Test pit terminated at R feet below existing grade on 5122191. No groundwater seepage encountered during excavation. Approximate location of test pit : 125 feet north and 100 feet east of central telephone pole. 15 TEST PIT LOGS �._ GEOTECH 9747 SOUTHEAST CARR ROAD CONSULTANTS, INC. RENTON, WASHINGTON Job No: Date: Lopped by: Plate: 91000 JUNE 1991 MKO 6 air-a.uA�.--M.ar.aaara��f♦`a.a.a s.r—r�.—..—r— �rMan; \--..—ra.aara.r-r—twl.a.r-.r-rr-.-a.-raa-. ..-�.■�■�.�--.-.--aa�/---a--■..-a aa�/a-t-t�a�a.-..-a■-aa- a.-ra.as.a/-.-a�a-aaa-a..raa--ra..�.-.a aaar-ra.f- ■.mrmum� -.all -raaa .�-•-- .��.�-�..c..�.r-rat.-m am ..-ram/ a .r■r-r.-...-...��ta.�-f�- -ta.r.�..rt...�.--.-r-r a--gain m t�'wa��raa.raa�-�-�am aaaaar-raaaa.-a.-raaa. •fir-r-.-►t•f.► �aa�■ate-r-aaaa.iar—rr—.-..-r.aa. • .a.- - -..���.meets►��-• all - -�-�---•-�-� a-- .--qwa�\r��. -�•aura�Ell Ell .�-tt-aaa�-..-mom ..ter-r-.--.----.ft/►�.■r-ra■t-■t-a a� ME .aa.r—ra..--.l.l—r _�.�- — ■I.a.aa�ar—raa�. —.—t-.--a--a■�t—�ta���..a—■.�--■��a..■—..--.--�------•� ---apt-ra...an�ft�-r—.u!a.r�aan rya.--.—�� .aa.r-r�.t/-.tlwl�f•�� -r—M.r.�/r—��.--.—ram .aa-rEll man-a-as--..\�raaa�it��-�-� aaa .--�aaaa �■-■- -.---- �.�-��..-/.-ram. aa-..- -.--.. -. .�����--././�..�-ra--.-..-■--■- aa-.--r-a--a.atti-ar-.aa.�.r.ia.t./�ar-r�-.-a.-raa- r—r-r—a--a.�a►\aaa�a�l\\�—.a/Maaaa.ar—ram.-..—r all ..- ral .\\--.....a..l.r-tom�.� -.r• WERE allin= in a�aaar-\�►�aaal-a aar/r-raa�..�.. NEW air-raa.--..�r��..�-�\ I��aaa.ar- .-r-,.f _-----------at��a.---tai►�n-...-.---- -----WE • ------------------- ----t-----------in ■----■---------■---�•�..t-...-.------■----- .aa.r-r-aa•-a.-r-aa.�a.r-a-afl�a■.aaa�ar-ra�.-...�r.r- aaaar-� ..-ra.a■�-aaraar-..a��.a aa.aaa.-raaa..-■.-raaa. . -.-ate • .a....l-.al...--a.-a-.aa. •I► -.--.\\./..aaa-..al-a.a.a.al-..-.-.� .aa...1-.-aa.a■-a..-a...aa�\.r�-a---.-tl. - aaaa.a.-raa./. ��r-a.-a-ta a..araa aa�ar, ---m►nata r-a-a-..-..-.�aaat. .��aaarar-raaaa.-a.f/raa- -_aa�._��_��..��.�.r_�.r_ _..-r_.� aaa-r-a-aataata.aa-aaaa-aaa--a--aaatt: a a. �, a--a--a--- • all am .3r-.a1 S/ope bock/ill oroy /ram /ourdotion. TlGHTL/N£ ROOF DRAIN Do not connect to looting droin. BACKFIL L See text for VAPOR BARRIER rewiremen/s. SLAB WASHED ROCK •••.'.'::•. '' •.��. 4 min. 6 min. FREE-DRAINING NONY�VEN 6EOTEXTlL£ SANG/GRAVEL FILTER FABRIC t'PERFORATED HARD PVc PIPE /fiver/ of Bost os /or os /oo/iny and/or crow/ Noce. S/ope to drain. P/oce rsepboler downward. FOOTING DRAIN DETAIL �..�, GEOTECH CARR ROAD DEVELOPMENT CONSULTANTS RENTON, WASHINGTON 91172 JUNE 1091 N.T.t. ♦! V11. Basin and Community Planning Areas Vill. Other Permits 'r IX. Eroslon/Sedimentation Control Design INC. JOB NO.DODDS ENGINEERS, � CIVIL ENGINEERING 5 U R V E Y I N G PLANNING DATE - I - 4205 145TH AVE. N.E.. SUITE 200 - BELLEVUE, WA 92007 1206) 365-7677 OR 454-3743 BY C-R(°SIC�4 Cer TP-OL GALCutATloN s ITC 15 2.C) Ault 5 I N S12C ' I .`} AceC�E' D tSTUt?UED . Z11L -rYPE IS AL C-12_b,�D G�UEI_LL-( L ^" AV E 2/Y, C SLoPG AC20S 5 O t STu4)c o P0y—Inc) -1 Is 1451 0 I-)SC UI`1\JGeS�NL fit_ LOSS E1VL)1smc0tQ pz- Z.0 ASS = 12 K L5 * Gv Fr_ �= Z .Z2 (Qz)&-L 10.2 GV = I. CD AsED K = TA�uL,n,� VAWE- O•IS -�seo 9. 9 ToNS L.S = 5.v (ix�g. UA1,ut) ACZE ao 3 /AC2E 1, 9KeES ots�u�t3ED y-> 3�� FT3 5C-.DItitc-NT ✓ t�5� 3- ) WNDs — 2 Sio�21�GC A'6oJc- SEDImEt QT �TDaAG, _ � �>�'� sCt'7tML-►J1 S�D�6E O, RB N D e>nPDH Z A3 2t x o Z �253 'L�. Ffi' �0 2rG� D ✓ SHEET OF X. Bond Quantities Worksheet, Retention/Detentlon Facility Summary Sheet and Sketch, and Declaration of Covenant BOND QUANTITIES PRICE SCHEDULE King County Building and Lord Development Divfsf on SIIDIVISION PRODUCTS SECTION The unit prices shown on this schedule are recommended minimum prices consultants shall follow when comptev ing the BOND QUANTITIES WORKSNEET for engineering plan submittals. Unit prices shown reflect auterial and instalati on costs averaged from bid quantities compiled by the Department of Public Works. Unit prices my not deviate from this schedule unless prior approval is obtained from the Subdivision Products Section. Unit Price Units Unit MISC.: ROAD CONSTRUCTION: Price Units Rip Rap Outfall Protection. 17.00 CY Clearing L Grubbing LS Access Road/Bollards. . . . 500.00 LS Excavation i Embankment s5.00 CY Fencing (around pond) . . . 9.00 LF A.C. Pavement L Rock Base 10.DO SY Inflltretion Trench . . . . 15.00 LF Cement Caoc. Curb S Gutter. 6.00 LF flow Spreader . . . . . . . 15.00 LF Extruded Asphalt Curb . . . 4.00 LF Trash Rocks . . . . . . . . 2DO.00 LF Concrete Sidewalk . . . . . 9.00 LF DRAINAGE PIPE: RETAINING WALLS i STRUCTURES: 12" Culvert . . . . . . . . 15.00 LF Retaining Walls . . . . . . LS 18" Culvert . . . . . . . . 20.00 LF Bridges . . . . . . . . . . LS 24" Culvert . . . . . . . . 26.00 LF Rockery Feels Walls . . . . 5.00 SF 36" Culvert . . . . . . . . 40.00 LF 48^ Culvert . . . . . . . . 50.00 LF TRAFFIC CNANNELIZATION: - 54" Culvert . . . . . . . . 60.00 LF Signalisatlon . . . . . . . LS 60^ Culvert . . . . . . . . 65.00 LF Channel isation. . . . . . . LS 1 72" Culvert . . . . . . . . 60.00 LF SITE STABLIZATION/EROSION CONTROL: CATCH BASINS: Rock Construction Entrance. 300.00 ea. INLET 4 Grate . . . . . . . 500.00 ea. Seeding/Mulch . . . . . . . 3000.00 ACRE CS TYPE I L Grate . . . . . 750.00 ea. Silt Fence. . . . . . . . . 4.00 LF CB TYPE 11 48" i Grate. . . 1400.OD ea. Netting/Jute Mesh . . . . . 5.00 SY CO TYPE II 54^ Sr Grate. . . 1600.00 ea. Sediment Pond Standpipe 200.00 ea. CB TYPE II 72" L Grate. . . 340D.00 to. CB TYPE II 96" i Grate. . . 4000.00 ea. Riprep (quarry spoils). . . 17.00 Cy RETENTION/DETENTION CONTROL: Pond Excavation i Spillway. 5.00 CY Restrictor/Separator 12". . 450.00 ea. Restrictor/Separstor W. . 600.00 on. Restrictor/Separator 24w. . 750.00 to. King Canty Building and Land Development Division BOND QUANTITIES WORKSHEET SUBDIVISION PRODUCTS SECTION 10010111 Page 1 of 2 Date: BALD File No. Project: Site Address: INSTRUCTIONS TO DESIGN ENGINEER: Using this form and the unit prices provided, fill in those items which pertain to road, drainage and erosion control for the above project. You moat submit this form with the plan submittal for approval. Compute the subtotals and complete the signature block. ••• EXISTING RIGHT-OF-WAY ••• ••• FUTURE RIGHT-OF-WAY ••• IMPROVEMENTS/SITE STABILIZATION AND ON-SITE IMPROVEMENTS Unit ............................... ........................... ROAD A ROAD DRAINAGE: Price Units Quantity Price Quantity Price Clearing S Grubbing LS S S Excavation S Embankment SS.DD CY S A.C. Pavement L Rock Base 10.OD SY Cement Conc. Curb i Gutter. 6.00 LF Extruded Asphalt Curb . . . 4.00 LF Concrete Sidewalk . . . . . 9.00 LF 12" Culvert . . . . . . . . 15.00 LF 18• Culvert . . . . . . . . 20.00 LF 24m Culvert . . . . . . . . 26.00 LF 36" Culvert . . . . . . . . 40.00 LF INLET It Grate . . . . . . . 500.00 ea. CB TYPE I i Grate . . . . . 750.00 ea. CB TYPE 11 48" L Grate. . . 1400.00 ea. CB TYPE II 54- i Grate. . . 1600.00 ea. Riprap (quarry spatts). . . 17.00 CY RETAINING WALLS i STRUCTURES: LS Rockery Facia Watts . . . . 5.00 SF TRAFFIC CHANNELIZATION: Signalization . . . . . . . LS Channelization. . . . . . . LS SITE STABLIZATION/EROSION CONTROL: Rock Construction Entrance. 300.00 on. Seeding/Mulch . . . . . . . 3000.00 ACRE Silt Fence. . . . . . . . . 4.00 LF Netting/Jute Mesh . . . . . 5.00 SY Sediment Pad Stsndpipe . . 200.00 ea. Temporary Pipe (_a dim) SUBTOTAL THIS PAGE SUBTOTAL: S SUBTOTAL f BOND QUANTITIES NORRBHEET King county Building and Lard Dewlopm nt Division Pape 2 of 2 SUDIVISION PRODUCTS SECTION RETENTIONIDETENTION FACILITIES AND CONVEYANCE SYSTEMS ........................... Unit Price units ouentIty Price RETENTION/DETENTION S CONVEYANCEt Pond Excavation & Spillway. 5.00 Cy Tark - 48• Culvert. . . . . 50.00 LF Tank - 60• Culvert. . . . . 65.00 LF Cs TYPE 1 i Lid . . . . . . 750.00 on. CS TYPE It 48w S Lid. . . . 1400.00 as. C8 TYPE It 54w i lid. . . . 1600.D0 ea. Restrictor/Seperstor 12w. A50.00 ea. 12• Culvert(Outfalt A Convey) 15.00 LF 18" Culvert . . . . . . . . 20.00 LF Rip Rap Outfall Protection. 17.00 CY Access Road/Bollards. . . . 500.00 LS Fencing (around pord) . . . 9.00 LF Infiltration Trench . . . . 15.00 LF Flow Spreader . . . . . . . 15.00 LF Trash Rack& . . . . . . . . 200.00 LF SUBTOTAL S Signature. Registration Nurber: Fires Name: Telephone Nurber: The following information will be coapleted by the Engineering Review Unit. EXISTING ROADWAY IMPROVEMENTS: S S SITE RESTORATION FUTURE OW-SITE IMPROVEMENTS: S RETENTION/DETENTION A CONVEYANCE S SUBTOTAL: S 20 % CONTINGENCY: S TOTAL BOND AMOUNT: S BONDOUAN.W52:880127 1/90 Short Plat (SHPL 9 ) REQUEST FOR PROJECT N Prelim. Plat (PP# ) CAG4 To: Technical Services Date Z % WO# B-N a7 GrccnN S9 a, From: Plan Review/Project Manager K. K ITTRAC y_ Project Name CA1212 RQ- WAp�ELL APA2TNE7 �1 (70 characters Max) (to,' S lt`J6 OlJUI Description of Project: WA'fEe SAPI'f &r k/ SELt.It t4 3TpK.}.l bP_41k)%C, ftA,4 A&r0 ST2EER7f4I4I- IMLZKoVwPAG'mr% r Circle Size of Waterline: 10" l2" Circle One: � or xtension Circle Size of Sewerline: 10" 12" Circle One: New or Extension Circle Size of Stormline: l2" 151, 18" 24" Circle One: New or Extension Address or Street Names) CAV-9- RoAia A4J0 9 b4% A-U'E S.C Dvlpr/Contractor/Owner/Cnslt: 5114uLMAU - WAfnt t . I I I LTA. (70 ehane,ers max) Check each discipline involved in Project Ltr Drwg # of sheets per discipline J ✓ q CY Trans-Storm -RAWIACZ C,2.EUti _ (Roadway/Drainage) (Off site improv=m uXinclude basin name) (include TESC sheets) Sy Transportation (Signah=io_Channcl'vation,Lighting) 3 lK Wastewater �/ )(include basin name) 1� Water (Mains, Valves, Hydrants) sS (Include composite&Horizonul C1rl Sheets) TS Use Only /Id -oLJ15 a 95 7- Pe) ql 9-05 v� a „ s Approved by TSM Date. forrnstmisr/92-090.DOC/CD.'bh