Loading...
HomeMy WebLinkAboutSWP273635 rl � • 1 � Investing in Housing • Jobs • Education • Health • Environment • Transportation ;_ Vf � � r o A �rYrr Y � ii a J1 •c` 6 I` • • • • • • • • • • • • • • • • • • • • • w • • • • • • • • • • • • • • w • • • Printed by Print&Mail Services,City of Renton • • Sunset Neighborhood Park Master Plan • • COMMUNITY SERVICES DEPARTMENTWill" City of M E M O R A N D U M DATE: February 13, 2015 TO: Distribution List (See Page 2 on reverse side) FROM: Leslie Betlach, Parks Planning and Natural Resources 01 -6619) SUBJECT: "Final" Sunset Neighborhood Park Master Plan adopted November 3, 2014 We are pleased to provide you the final adopted Sunset Neighborhood Park Master Plan Report. The bound report documents the planning process for Sunset Neighborhood Park which occurred over a period of nine months, culminating in the adopted park master plan. Extensive public outreach utilizing multiple communication methods and community involvement reflects the priorities and interests of the Renton community. The future 3.1 acre Sunset Neighborhood Park will be a key component of the larger 269-acre Sunset Area and the "Sunset Area Community Reinvestment Strategy." The park will be a gateway facility and a catalyst for transforming a part of the City that was the site of World War II-era housing and is working to overcome academic, health care and obesity, public safety, and socio-economic challenges. Should you have any questions, please feel free to contact me at x-6619. Thank you for your participation and support. Attachment: Sunset Neighborhood Park Master Plan Report(dated December2014) Cc: Terry Higashiyama, Community Services Administrator h:\parkslpks secretary12015 files\2015-005mb(memo_distriblis-stakeholder&cor dept_final sunset neigh pk master plan).docx Memorandum Subject: "Final'Sunset Neighborhood Park Maser Plan adopted November 3,2014 February 13,2015 Page 2 of 2 DISTRIBUTION LIST Stakeholders: Scott Bucklin, Student, University of Washington Mark R. Gropper, Executive Director, Renton Housing Authority Steve Hanson, President, Renton Technical College Owen Mayfield, Director of Finance &Accounting, Renton Housing Authority Dave Nielsen, Director of Development, Colpitts Development Kaelene Nobis, Resident Outreach Coordinator, Renton Housing Authority Rich Senseney, Project Developer, Colpitts Development Bruce Sharpe, Maintenance Modernization Foreman, Renton Housing Authority John Sheller, Cluster Manager, King County Library System Stewart Shusterman, Facilities Project Manager, Renton School District Gregory Smith, Facilities Director, King County Library System Duc Tran, Business Owner,Vietwah Community and Economic Development(CED): Vanessa Dolbee, Current Planning Manager Jennifer Henning, Planning Director Elizabeth Higgins, Senior Planner Cliff Long, Economic Development Director Rocale Timmons, Senior Planner Mark Santos-Johnson, Community Development Project Manager Community Services: Karen Bergsvik, Human Services Manager Kelly Beymer, Parks and Golf Course Director Todd Black, Capital Project Coordinator Terry Flatley, Urban Forestry& Natural Resources Manager Maryjane Ortiz, Recreation Manager Peter Renner, Facilities Director Casey Stanley, Neighborhoods, Resources & Events Manager Elizabeth Stewart, Museum Manager Kris Stimpson, Recreation Director Public Works: Doug Jacobson, Deputy PW Administrator-Transportation Hebe Bernardo, Civil Engineer III Lys Hornsby, Utility Systems Director Bob Mahn, Civil Engineer III Jim Seitz, Transportation Planning Manager Ron Straka, Utility Engineering Manager-Surface Water h:\parks\pks secretary\2015 files\2015-005mb(memo_distriblis-stakeholder&cor dept_final sunset neigh pk master plan).docx Acknowledgements • Mayor • Denis Law • Chief Administrative Officer ' Jay Covington • City Council • Don Persson,Council President • Ed Prince,Council President Pro-Tem *Terri Briere • Randy Corman • Marcie Palmer . Armondo Pavone Greg Taylor • *Special acknowledgement to the Late Honorable Terri Briere for her dedication to the Sunset Area and this project. • Parks Commission • Cynthia Burns Al Dieckman Michael O'Donin Larry Reymann Tim Searing • Sojin Thompson • Troy Wigestrand Marlene Winter • Plan Lead Leslie Betlach,Community Services Department, Parks Planning and Natural Resources Director • Stakeholders Scott Bucklin,Student, University of Washington • Mark R.Gropper, Executive Director, Renton Housing Authority Steve Hanson, President, Renton Technical College Grace Kim, Principal,Schemata Workshop(Architect for Housing Authority) Owen Mayfield, Director of Finance&Accounting, Renton Housing Authority • Dave Nielsen, Director of Development, Colpitts Development Kaelene Nobis, Resident Outreach Coordinator, Renton Housing Authority • Christopher Palms,Architect,Schemata Workshop(Architect for Housing Authority) Rich Senseney, Project Developer,Colpitts Development Bruce Sharpe, Maintenance Modernization Foreman, Renton Housing Authority Stewart Shusterman, Facilities Project Manager, Renton School District Gregory Smith, Facilities Director, King County Library System Duc Tran,Business Owner,Vietwah • Judith Zelter,Senior Manager Librarian, King County Library System City Attorney • Larry Warren,City Attorney • Garmon Newsom, ll,Senior Assistant City Attorney Sunset Neighborhood Park Master Plan • • • • Acknowledgements • • Communications • Preeti Shridhar, Deputy Public Affairs Administrator • Kelley Balcomb-Bartok,Communications Specialist II Susie Bressan,Communications Specialist II t Beth Haglund,Web Specialist • Karl Hurst, Print/Mail Supervisor • Community and Economic Development(CED) • Chip Vincent,Community and Economic Development Administrator Adriana Abramovich,GIS Analyst I • Vanessa Dolbee,Current Planning Manager • Jennifer Henning, Planning Director Elizabeth Higgins,Senior Planner • Cliff Long, Economic Development Director • Bob MacOnie, Planning, Mapping Coordinator Rocale Timmons,Senior Planner • Mark Santos-Johnson,Community Development Project Manager • Community Services • Terry Higashiyama,Community Services Administrator • Margie Beitner,Community Services,Administrative Secretary I Kelly Beymer, Parks and Golf Course Director • Todd Black,Capital Project Coordinator • Norma McQuiller, Neighborhood Program Supervisor Maryjane Ortiz, Recreation Manager • Sandra Pilat,Community Services Administration,Administrative Assistant • Peter Renner, Facilities Director Kris Stimpson, Recreation Director Administrative Services • Iwen Wang,Administrative Services Administrator • Public Works • Gregg Zimmerman, Public Works Administrator • Doug Jacobson, Deputy PW Administrator-Transportation • Hebe Bernardo,Civil Engineer III Lys Hornsby, Utility Systems Director • Bob Mahn,Civil Engineer III • Jim Seitz,Transportation Planning Manager Ron Straka, Utility Engineering Manager-Surface Water • Neil Watts,Civil Engineer III • Consultant Team Colie Hough Beck, Principal, Hough Beck& Baird, Inc. • Dean Koonts, Principal, Hough Beck& Baird, Inc. • Annie Youngerman, Designer, Hough Beck&Baird, Inc. Dustin Atchison,Water Resources Engineer,CH2M Hill • Raymond Chung,Civil Engineer,CH2M Hill • A special"Thank You"to everyone who attended a community workshop and participated in the planning process,or made direct • contact to the City by email or telephone. We appreciate your comments and Plan support. • • Sunset Neighborhood Park Master Plan • • • • • • • Table of Contents • Introduction 1 • • Executive Summary • - Project Background • Public Outreach and Design Process • Final Master Plan 7 • • Final Plan Drawings • • Plan Elements • • Utility Infrastructure • Final Cost Estimate • • Project Phasing 19 • • • Appendices • • A: Site Analysis and Parameters 25 • • Inter-departmental Team Workshop • - Stakeholder Workshop B: Park Concept Alternatives 53 • • Community Open House #1 • • Parks Commission Briefing#1 • - Committee of the Whole Briefing#1 • C: Park Schematic Plans 89 • • Community Open House #2 • • Park Schematic Plan Order of Magnitude Cost Estimates • • Parks Commission Briefing#2 • • Committee of the Whole Briefing#2 D: Preliminary Master Plan 125 • a Community Open House #3 . 0 Parks Commission Briefing#3 • Committee of the Whole Briefing#3 • • E: Impervious Calculations 159 F: Utilities Exhibit 161 • • G: Plan Adoption 163 • • • Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan ' Introduction • • • • • • Introduction • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan -� • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • Executive Summary •• The Sunset Neighborhood Park Master Plan Report (Master Plan Report) documents ter planning process for Sunset Neighborhood Park. The process took place over a period of nine monthssand included extensive public outreach and� community involvement. The proposed park is a key component of the larger 269-acre Sunset Area and the "Sunset Area Community Reinvestment Strategy," a plan adopted by • the City of Renton in 2009 for comprehensive redevelopment of the Sunset Area of Renton. Sunset Neighborhood Park will be a new 3.1 acre park located east of 1-405 and north of NE Sunset Boulevard in the Sunset Area of Renton. The future park will be a gateway facility for the Sunset Area and a catalyst for transforming a part of the City that is working to overcome academic, health care, public safety, • and socio-economic challenges. The future park will serve a diverse population, both in age and race/ • ethnicity, and is intended to serve the community that lives within a one-half mile radius of the park, which is identified as the typical walking distance for a neighborhood park facility. Sunset Neighborhood Park will be part of a vibrant community where new mixed-use housing, a new S library, three nearby schools, and a nearby accessible playground will be or are located. Additionally, the • park will be linked to area residences and businesses through a "Complete Streets" approach that creates a walkable community with a connective set of pedestrian, bicycle, and public transportation friendly • streets. Prior to this park project, the City of Renton and local partners will have completed $48 million worth of transportation, library, school, playground, and rain garden/stormwater public infrastructure . investments in the Sunset Area. A previously funded and soon-to-be constructed regional stormwater • facility with rain gardens will be co-located within the future park. The future park will provide multiple • benefits, including: reduced storm water runoff; outdoor education opportunities; social gathering spaces; performance venues for local residents and visitors; increased property values; increased jobs, economic • growth and vitality; and opportunities for physical activity and healthy living. • • Emerging from the broad public involvement process, the future park design incorporates active and • passive recreation and environmental education opportunities. Park design elements include adult fitness equipment, two children's play areas, a looped circulation/path system with mile markers, a water feature, • picnic areas, a picnic gazebo with tables, performance seating/open space lawn area with pergola and • benches, a restroom building with notice boards, art locations, and interpretive signs. • The Master Plan Report includes a breakdown of the estimated construction costs for the park, and illustrates an option for phased construction. The park design can accommodate phasing to provide flexibility for funding options, anticipating funding from multiple sources or at different times. The adopted Master Plan and the Master Plan Report will be utilized to secure outside funding and grant opportunities • such as Land and Water Conservation Funding, Washington Wildlife and Recreation Program funding, and • Legislative funding. • • • • Sunset Neighborhood Park Master Plan • 1 Project Background 3• • V r4 , 4' ;' 'y Since the late 1990's the City of Renton has focused on the Renton . = t; ; Highlands as an area targeted for improvement and investment. �z•1 1 A variety of ideas and plans have emerged and multiple public a �'s and private partnerships have formed to generate investment in A�•s.,,>:� facilities and infrastructure. The City initiated a major work program -y evaluating the comprehensive plan and zoning in the Highlands sub-area during 2005 and 2006. The City's goal was to stimulate • private investment to create a more viable residential and business -> '- district, provide additional housing options, improve and upgrade N _ neighborhood infrastructure, and diversify the employment and • business tax base. In the fall of 2006,the Highlands Task Force • on Land Use and Zoning convened and recommendations were • adopted in May 2007. The land use and zoning changes were • !~ intended to stimulate revitalization of one of Renton's older i commercial and residential areas into a community with compact a urban development featuring a mix of residential and commercial • uses, a range of housing types, innovative design, transit • orientation, and pedestrian scale amenities. The City of Renton formed a Highlands Task II Force in late 2007 to • identify, prioritize, and recommend next steps needed to implement • the land use vision endorsed by the first task force. After over a year of intense study and discussion, and a public meeting, the Task Force produced a report with two dozen recommendations for City actions in the Renton Highlands. These recommendations were presented to City Council in December 2008 and included specific • code changes as well as "big ideas," such as: • • Neighbors and businesses are engaged and involved in the community. The neighborhood is an attractive place to live, conduct business and is affordable to many incomes; • • Growth and development are managed in a way that preserves . the quality of life and ensures safety and security. Cultural and • ethnic diversity is celebrated; • • The neighborhood is interconnected and walkable. In early 2009, City Council adopted these recommendations by • resolution and asked the administration to draw up a work program • to begin implementation. • Several Highlands Phase II Task Force recommendations • involved the initiation of new improvements to the Highlands • area. Recommendations included creating a "third place" or • public gathering space, initiating pedestrian and streetscape • Sunset Neighborhood Park Master Plan 2 improvements, advocating for boulevard improvements for Sunset Existing context . Boulevard, and the development of a sub-regional storm water • drainage facility. Any one of these projects requires a significant public investment. The Sunset Community Investment Strategy provided an assessment of the feasibility and funding for these recommendations. Outreach included ; ..:.� ... c c uded community stakeholders � . such as the Renton Housing Authority, the Renton School District, ^4 local business owners, and the general public. Council reviewed the final report and adopted the recommendations for community ry investment on November 23, 2009, under the title "Sunset Area Community Investment Strategy." To plan for the Sunset Area redevelopment and associated neighborhood revitalization, the City of Renton, in partnership with the Renton Housing Authority, completed the Sunset Area Planned Action Environmental Impact Statement (EIS). The NEPA/SEPA FEIS f ` • (National Environmental Policy Act/State Environmental Policy Act, i Final Environmental Impact Statement FEIS) was issued in April • 2011. The objective of the EIS was to promote the redevelopment _ of public housing, implement infrastructure improvements, and facilitate planning and environmental review for the Sunset Area. • The Preferred Alternative in the EIS report showed neighborhood - • growth based on investment in the Potential Sunset Terrace • Redevelopment Subarea, with a moderate number of dwellings provided in a mixed-income, mixed-use development, oriented around a larger park open space, and a loop road tying it all • together. These items represent a major public investment in the • study area infrastructure and services. Also in 2011, the City of Renton updated their "Parks, Recreation and Natural Areas Plan." During this process, and as identified in the Sunset Area Planned Action EIS, there are a limited number of • parks and recreation facilities in this area. (See the following page • for a plan of the Sunset Area Preferred Community Framework, which illustrates a park and pedestrian connection strategy). The Sunset Neighborhood Park Master Plan provides multiple, varied recreation opportunities and will be connected to and has a strong • relationship with the future public and private surrounding uses • including a new King County library, mixed-use developments, housing community, schools, and Meadow Crest Playground (Renton School District/City of Renton partnership project). The i 3.1 acre proposed Sunset Neighborhood Park is a key open space • component of the Sunset Area Community Revitalization Plan and • is located in the heart of the community. It will be a focal point where the community can come together for celebrations and for informal recreation. Sunset Neighborhood Park Master Plan 3 + { � Ca !y • s' 'a - 00 ------------------------- HillCres • i � E +, 5ctiool �� • r. , r North �.. � r �s - Ighlands 1 IL J ! Highlands - JIrL Library_ i - `�• t}°`Il �, \Ja � e� �' � :a t it - f �+ � icy ('•��...+ _ .. ,' ,� • ALu!'-. al r r Sset�e C: �` J�7 Y M 1 • ♦ LEGEND • ra L i Pedestrian Intersection • -,r, „- � ,I ',,,r••'�"ter � � Pedestrian Connections r •• Sunset BLVD Improvements • ' - Its Green Collector Arterial • �� ✓g a > Green Access Local Collector Woonerf/Green alley • Permeable Sidewalk • I. Is i ,`` • School/Civic =� me try _�� • Mixed Use • ,rl - •'"�►., C' ' ��;, *ttillTiN., O Residential x{{{ �••...•,�,(� 7th St enton Parks • OCommunity Garden . EIS Boundary ✓ �' 6 Imo-_!� 0 300 600 120 • • Graphic taken from Sunset Area Planned Action EIS , 4 Sunset Neighborhood Park Master Plan • • • • • • Open House#2 • The Sunset Neighborhood Park is also an integral part of the City's _ Sunset Terrace Regional Stormwater Facility Project. A portion of • the park's northeast corner is dedicated for a stormwater facility. Rain gardens in this area filter stormwater into the infiltration -- • gallery below and will incorporate habitat planting and education Jf- i about storm water bioretention. This stormwater facility is funded • in part by the Department of Ecology through a 2011 Stormwater retrofit grant. FAR n • • Public Outreach and Design Process A collaborative and engaging community-based process was _„- • used to develop the Sunset Neighborhood Park Master Plan. • The design process included a review and analysis of the existing • site, a public process to gather input and feedback on master t plan concepts, and cost estimates for the master plan. Multiple • communication methods were utilized to invite the community to participate in the public process including% page advertisements ��""•-``" • and public notifications in the Renton Reporter, e-mail and postal • invitations utilizing a data base of nearly 3,000 area residents, flier ProcessDesign • distribution, City web page postings and internal City postings. * } Both English and Spanish translations were utilized in the mailed _ • invitations and flier distributions. The public process involved an initial workshop with City of Renton • departments to set design parameters, and a workshop with • identified stakeholders to gain input on the Sunset Area as well as • J:set additional design parameters. Three community open house • meetings followed, and involved the public in park programming, . design character, and layout. Approximately fifty participants Design Process • were involved in the community open house meetings and the stakeholder workshop. The Parks Commission and Committee of • the Whole commented on the master plan, as it developed, during ! three of their regular meetings. The Committee of the Whole • adopted the master plan on November 3, 2014. r ' i • • • • • • Sunset Neighborhood Park Master Plan 5 • • • • • HouseOpen Sunset Neighborhood Park Master Plan Meeting Dates — 2014 • 1. Inter-departmental Team Workshop February 19 -- 2. Stakeholder Workshop March 19 • 3. Community Open House #1 May 1 .. , 4. Parks Commission Briefing#1 May 13 • t S. Committee of the Whole Briefing#1 June 2 !' 6. Community Open House #2 June 18 1 7. Parks Commission Briefing#2 August 12 • 8. Committee of the Whole Briefing#2 August 18 9. Community Open House#3 September 23 • 10. Parks Commission Briefing#3 October 14 • 11. Committee of the Whole Briefing#3 November 3 and Plan Adoption • • • • • • • • • • • • • • • • • • • • • • • 6 Sunset Neighborhood Park Master Plan • Final Master Plan • • • • • "A, • • Final Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan Final Master Plan Investing in Housing• Jobs Education 0 Health 0 Environment 0 Transportation • c a Design Concept • V,�,��, m The Master Plan for the Sunset Neighborhood • Z 2 v� Park provides a mix of spaces for the adjacent • �o RHA Housing "' RHA Housing �� and surrounding community: open lawn areas for v Z yJ�y play and events, structured play and picnic areas, • RHA Housing environmental facilities, restrooms, and convenient • Seatwafl, typ. NE'oTM access points all arranged in a curving, informal layout S • T Load/ toad that balances open vistas, focal points, and a pastoral • Raingarden aesthetic. �� l Interpretive Sign • d h The park is centrally located an provides connections Stage Area - - � �• Curve Bench e I d ' • to amenities to the north and south. Entry portals • Restroow✓ Raingarden ' 1 Purnproonn at the main entrances feature a combination of • '_ , ��: , °` Pergola w/ Seatwall "markers"for wayfinding, pergola, or potential art Notice locations. A network of pathways connects the portals • - Performance Boards - Potential Sculptural Seating/ Art Location, typ. with direct routes, defines different activity areas, • or Monument Park Sign and provides a variety of looped routes, both around Open Space Grass Berns »' • = Bicyc acks the perimeter and through the park. Active spaces, 4 including playgrounds and fitness area, are located in • the southeastern corner of the park, near the adjacent • -�� . Planter, typ. . Pergola, typ. i ,+* civic and multi-use buildings, while more passive, open • �� w/Curved Benches 1 spaces are focused along the residential sides of the • NGZ } S �►A, park. A regional stormwater facility is integrated with • ��� z �, Y p y ;o, �,�� garden-type planting and interpretive area. A large plaza, with an interactive water feature, is centrally • 1�1ZR` Picnic / located tying all sectors of the park together. The • Z I� roes r r restroom is located for ease of access but without G bO - © AV Library Fitness dominating the park. A variety of seating options are • - � -�`' �laggr nd included in addition to open and sheltered picnic Park s-12• Market Rate Pathway, Feature r. -Picnic, typ. areas. Trees emphasize main path connections,the- • Housing typ. surrounding streets, and focal areas within the park. • • Planting Legend • \{'� _ Flowering Tree • Market Rate Street Tree AV Housing/Mixed p • Use �r Accent Tree y • _, ,� Native, Evergreen Tree • v % y 2� • a Lawn Market Rate c • Housing Z a Planting Area: Groundcover/ Shrub • —���� ri'rJ ri ".BB 4 CH2NIHILL, • Adopted: November 3, 2014 • • • • Sunset Neighborhood Park Illustrations • .s HBB Stephanie Bower,Architectural Illustration • 1. Perspective View 1: Performance Seating/Open Space i • -- � � � .�-�c,,,o � ,,� �,, _ 1 � Pam. t • HBB Stephanie Bower,Architectural Illustration 2. Perspective View 2: Water Feature • Sunset Neighborhood Park Master Plan 9 • • • • • Park pathways Plan Elements • Park Pathways • A loop pathway circles the perimeter of the park and provides an • opportunity to include mileage markers. A main north-south path • connects the Harrington Avenue portals, providing an unobstructed • path recalling the original street route and maintaining community • connectivity. Meandering paths connect other entrance points and Performance area provide a variety of"loop routes" around the park. • 4 I �~ Open Space and Performance Area • The main open space area provides a flat lawn area for informal • field games, as well as a large area for events and neighborhood • picnics. An area designated for a movable stage is located along the northern edge and oriented so that the sun illuminates the stage • and is not in the audience's eyes. The load/unload area on NE 10th • Pergola Street provides maintenance and event access to the park. • Pergolas • A pergola marks the entrance across the street from the future • library. Pergolas also define the south edge of the open space and Ile • performance area. The pergolas may be covered and planted to • allow for all-weather use with curved benches underneath.Waterfeature • Water Feature • The central plaza includes an interactive water feature with natural • h- features such as channels and boulders. • a' t-p Play and Fitness Areas • The play area features two playgounds, separating play for children • ages 2-5 and children ages 5-12. Play equipment may include swings • and climbing structures. The fitness area includes outdoor fitness • equipment for adults. The fitness equipment is located adjacent • y to the playgrounds, allowing parents to watch children play while exercising. Poured in place rubberized safety surfacing is included in • all play and fitness areas. • 1 • = Picnic Areas • Picnic plazas are adjacent to play areas, arranged for family use. A • viewing/picnic gazebo provides a covered picnic area to allow for _"VW Fitness equipment all-season use, and provide views of the surrounding landscape in a • quieter setting. • Restroom • The public restroom features an architecturally contemporary design, with a wall for notice boards. The structure is located for • 10 Sunset Neighborhood Park Master Plan • • • maintenance access, utility connections, and pumproom location .. • while providing some separation from other park activities. Interpretative Area Interpretative signs are provided at the raingardens to explain the function of natural stormwater management systems. • Site Furnishines Seating includes concrete seatwalls at the Harrington Avenue entrances and under the pergola at the future library entrance. ` Circular seating is located under the pergolas that frame the open • space/performance area, as well as in the raingarden interpretative • area. Back to back benches ring the central plaza to allow for social seating and a choice of viewing options. Bicycle Racks are located at the entrance across the street from the future library. Litter receptacles will also be included. Benches • Ling Low-level pedestrian lighting is included along the main path connecting the Harrington Avenue entrances and around the �e imp perimeter of the park. Recessed lighting is incorporated within walls • and seatwalls. ArtRecessed lighting — Potential art locations are identified at the north and south ' Harrington Avenue portals, the portal across the street from Jpuwmrl I`V • the future library, and adjacent to the central plaza, to enhance 41, • wayfinding cues throughout the park. Topography The park is gradually sloped toward the southwest corner, following • existing topography. Both a grass berm and the southern lawn areas • slope gently to provide play opportunities and are oriented to take • advantage of sun exposure. All pathways are ADA accessible (under 5% grade). Planting • Flowering trees emphasize the north/south Harrington Avenue • connection. Smaller accent trees soften the play areas. Street trees are spaced to allow visibility into the park for safety. Native, Path accent trees evergreen trees provide focal points of visual interest. ,. • Planting areas, including shrubs and groundcover, mark the _ entrances. The gentle slopes and open space areas are planted with lawn. The raingardens will have native and drought tolerant plants, �= with a few accent plants and boulders. i Sunset Neighborhood Park Master Plan 11 • • • • Utility Infrastructure • Background • The proposed park site is located on Renton Housing Authority (RHA) property, formerly consisting of • public residential housing. This housing will be demolished after the property is transferred to the City of • Renton. Harrington Avenue and Glenwood Avenue right-of-way will be vacated (between NE 10th Street • and Sunset Lane NE) and NE 10th Street will be extended west to Glenwood Ave NE for construction of the • new park. The right-of-way and curb line for Sunset Lane NE along the south and west of the project site is shifting to the north and east to accommodate new development across the street from the proposed • park. This new curb line will be the southern boundary of the park. • • Site Civil • Site civil activities include but are not limited to: • Grading of the site • • Installing new impervious pathways, and pervious pathways • • Installing curb and gutter • • Relocating existing utilities • • Installing irrigation for landscaped areas • Installing pathway lighting • • Providing new water and sanitary service for the new park restroom and water features. • A new regional stormwater facility is also proposed to be constructed prior to the park and is discussed in • the following sections. • Utilities Existing underground utilities include water, gas, sewer, and storm lines. Existing overhead utilities include • power and telecommunication. There is overhead power and telecommunication on Harrington Ave • between NE 10th Street to Sunset Lane. There is underground gas, storm, and water, and overhead power • on Glennwood Ave NE west of Harrington Avenue. • Existing overhead power and telecommunications lines within the proposed park boundary will need to • be relocated underground. Proposed underground power and telecommunication lines will connect to • existing utilities at the intersection of Glennwood Ave NE and Sunset Lane NE and will run underground, • along the west portion of the park, and tie into existing utilities on the east side of Harrington Ave NE, near • Sunset Blvd NE. • Sewer, gas and storm lines in Harrington Avenue will remain and be maintained during and after • completion of the park project. The existing gas line and sanitary sewer main in Glennwood Ave NE will • also be maintained. The utilities exhibit, see Appendix F, shows the extent of utilities within the park site, • the right-of-way and adjacent properties. The existing water main in Harrington and Glennwood between NE 10th Street and Sunset Lane NE will be abandoned. A proposed water service line will connect to the existing main in NE 10th and serve the park bathroom and water feature. • • Utility relocation within the right-of-way • Water, storm, sanitary sewer and gas utilities in Sunset Lane NE will be relocated within the right-of-way, however this work is anticipated to be completed by others prior to the park project. Relocation is required • • 12 Sunset Neighborhood Park Master Plan • • s • • due to the reconstruction and shifting of the road right-of-way to serve the new developments in the • neighborhood (both by others). • New Fire Water Line Construction • A new water main will be constructed within the right-of-way and around the park along Sunset Ln • NE and NE 10th St. The majority of the water line will be constructed by others prior to the start of • the park project, however the last portion of the waterline may be constructed at the same time as • the NE 10th Street extension and park project. This portion of the water main is also anticipated to be • constructed by others to complete the loop for the fire line. • Stormwater Facilities and Requirements • A new regional stormwater facility will be constructed in 2015 prior to the construction of the park. • This stormwater facility consists of two bioretention cells (raingardens), and an underground infiltration gallery. The bioretention cells will be vegetated with native plants and shrubs. The facility will provide water quality treatment and flow control benefits for Sunset Blvd, NE 10th Street, and a commercial • property north of the park. Local storm drain systems within the park will be constructed to provide • drainage as needed. • The current layout of the park has approximately 25% impervious area and is meeting the Planned • Action EIS impervious area limit. Therefore no stormwater flow control is required. The onsite • stormwater management requirement can be achieved by maintaining sheet flow from impervious • areas onto pervious areas, and the construction of pervious pathways. • • • • • • • • • • • • • • • • • • i • Sunset Neighborhood Park Master Plan 13 • • • • • Final Master Plan Cost Estimate • The following pages provide a probable cost for the Sunset Neighborhood Park. Costs reflect 2014 in-place • construction costs, and assume normal site conditions. A 1% art line item is included as part of the Park • Construction Cost. • • • COST SUMMARY • Site Amenities(see page15): $1,950,370.10 Civil Infrastructure (see page 16): $2,043,504.00 • Subtotal(1): $3,993,874.10 • Sales Tax (9.5 %) $379,418.04 • Subtotal(2): $4,373,292.14 • Contingency (20 %) $798,774.82 • Subtotal(3): $5,172,066.96 • Art (1 %) $51,720.67 • Archeological/Cultural Assessment: $5,000.00 Permitting: $12,000.00 • Y arly Escalation 4% • 2015 2016 2017 PARK CONSTRUCTION COST $5,240,787.63 $5,450,419.13 $5,668,435.90 $5,895,173.34 • Survey Fee (see page 18): $23,287.34 • A&E Design Fee (12 %): $628,894.52 • FEE TOTAL $652,181.86 $678,269.13 $705,399.89 $733,615.89 • PROJECT TOTAL $5,892,969.48 $6,128,688.26 $6,373,835.79 $6,628,789.23 • POTENTIAL COST ITEMS (see page 17`) (1) Underground Existing Power, $830,173.00 $863,379.92 $897,915.12 $933,831.72 • MATV, and Telephone Lines • (2) Relocate 8" Fire Line between $222,928.00 $231,845.12 $241,118.92 $250,763.68 Glenwood Ave and Harrington • • * Potential Cost Items are assumed as Transportation Costs as a later pay. • • • • • • • • • • • 14 Sunset Neighborhood Park Master Plan • • • • • • Final Master Plan Cost Estimate continued • • • • SITE AMENITIES BREAKDOWN Item Unit Cost Qts. Item Total • 1. Site Preparation $2.00 /s.f. 138,450 s.f. $276,900.00 . 2. Trees $425.00 /ea 36 ea $15,300.00 3. Shrubs and Groundcover(soil prep included) $7.00 /s.f. 23,745 s.f. $166,215.00 • 4. Lawn (soil prep included) $3.00 /s.f. 73,453 s.f. $220,359.00 • 5. Play Areas(surfacing and structures included) $600,000.00 I.s. 1 I.S. $600,000.00 6. Fitness Stations $10,000.00 /ea 8 ea $80,000.00 . 7. Restroom Notice Boards $2,000.00 I.s. 2 I.s. $4,000.00 • 8. Water Feature: Pump& Filter Vault $20,000.00 I.s. 1 I.S. $20,000.00 9. Water Feature: Fountain Fixtures $2,150.00 /ea 24 ea $51,600.00 • 10. Water Feature: Boulders $150.00 /ea 15 ea $2,250.00 11. Picnic Tables w/Pad $2,500.00 /ea 10 ea $25,000.00 • 12. Benches $2,500.00 /ea 22 ea $55,000.00 13. Curved Bench $400.00 /I.f. 72 I.f. $28,800.00 14. Litter Receptacles $1,500.00 /ea 5 ea $7,500.00 15. Bicycle Racks $1,250.00 /ea 5 ea $6,250.00 . 16. Seatwalls $200.00 /I.f. 140 I.f. $28,000.00 17. Planters $450.00 /ea 4 ea $1,800.00 • 18. Picnic Gazebo(Shelter) $20,000.00 I.s. 1 I.S. $20,000.00 19. Pergola (Trellis/Arbor Structure) $300.00 /I.f. 260 I.f. $78,000.00 20. Interpretive Signs $2,000.00 I.s. 2 I.s. $4,000.00 • 21. Monument Park Sign $5,000.00 I.s. 1 I.S. $5,000.00 Subtotal: $1,695,974.00 Mobilization (15%) $254,396.10 Site Amenity Total: $1,950,370.10 • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 15 • • • • Final Master Plan Cost Estimate continued i • • • • CIVIL INFRASTRUCTURE BREAKDOWN , UNIT COSTS TOTAL TOTAL TOTAL DESCRIPTION QTY U/M LABOR UNIT PRICE EQUIPMENT TOTAL UNIT PRICE w/Mark Orginial-No.3 Rev 1 09125/2014 up • Utility Connections _ 6"Sanitary to Rest Room from SMH 50 If $45.00 $2,250 $2,250 • 4"Sanitary to Water Feature 160 If $34.00 $5,440 $5,440 Water _ ,... • 3"L Copper Service Water to Rest Room(from Harrington 130 If $198.00 $25,740 $25,740 Ave) I q I I • Rest Room DrainlWasteNerd 120 If $203.00 $24,360 $24,360 Rest Room Branch Service Water 150 If $91.00 $13,650 _- $13,650 • 1.5"L Copper to Water Feature(pump room to water feature) 175 If $32.00 $5.600 $5,600 Park Irrigation System 94,363 sf $1.50 $141.545 F $141,545 • Decommission&Abandon east/west water line on Harrington 1 Is $10,000.00 $10.000 $10,000 • Decommission&Abandon water line Glenwood Ave and 1 Is $10,000.00 $10,000 $10,000 • Harrington Ave to the north of site Civil Works • Grading(cut) 1,800 cy $748� $13,464 $13,464 Grading (haul spoils) 2,250 1 cy 1 $20.00 $45,000 $45,000 • Grading(fill&Compaction 1,875 Cy $49.75 $93,281 $93,281 Concrete Sidewalk 35,702 sf $7.75 $276,691 $276,691 Concrete Sidewalk(pervious) 19,003 sf $17.00 $323,051 $323,051 Concrete Curb&Gutter 1,500 If $20.00 $30,000 $30,000 • (68)Pergola Foundations w/cultured stone face 34 Cy $750.00 $25,500 $25,500 Gazebo Retaining Wall,cast-in-place,8-inch thick,1.5 ft high 75 LF $135.00 $10,125 $10,125 with reinforcement and footing ___ • Low Level Pedestrian Lighting 40 as $3,000.00 $120,000 $120,000 _ • Rest Room Structure 1 Is $363,000.00 $363,000 $363,000 Electrical Restroom-GFI,WP Receptacles,Vandal proof ! Lighting,Main Service,Branch Circuits to Heaters,Hand 1 Is $50,268.75 $50,269 $50 269 Dryers,HWr&Exhaust Fans _ _ • Mechanical Restroom- (3)Heaters,(1)HWr,S/S(3) 1 Is $54600 00 $54,800 $54,600 Toilets,(1)Urinal(2)Sinks,(2)Hand Dryer Toilet Partitioning Stalls 2 ea $5,944.15 $11,888 $11,888 Sub-Total $1,655,453 • INDIRECT: __ • Trailers,Conex,Dumpster(general use),Temp Power, 11 mo $3,050.00 1.0 $33,550 $33,551 Water,Porta-Jon Security 11 mo $3,000.00 1.0 $33,000 S33.001 Supervision of Sub Contractors 750 mhrs $O.DO $173,823 1.0 $0 $173,824 Temporary Fence 11 mo $2,583.00 1.0 $28,413 S28,414 Temporary Propane Heat 5 ea $945.00 1.1 $4,725 $4,726 Potable Water 11 ea S315.00 1.1 $3,465 $3,466 • Total Direct $173823 $8190 $94963 $276,976 Markups&Other-on Contractor's Indirects above: - • Labor L 15% $26,073.39 $26,073 . Materials m 15% _ $1,228.50 $1,229 Equipment _ a 15% $14,244.45 $14,244 GC Markup on Sub-Contractor se 6% _ _ $69,529.04 $69,529 Subtatal indirect Cost $199.896 $9.419 $109.207 $111,075 Sub Total $2,043,504 • Total Totai $$043,504 • • i • 16 Sunset Neighborhood Park Master Plan • • • • � _mr • Final Master Plan Cost Estimate continued • • • • POTENTIAL COST ITEMS BREAKDOWN • UNIT COSTS TOTAL TOTAL TOTAL • DESCRIPTION QTY U/M UNIT PRICE w/ LABOR UNIT PRICE EQUIPMENT TOTAL Mark-up • Water Temporary Relocate Existing 8"Fire Line between $581 82 $174,545 • Glenwood Ave and Harrington Ave 300 If $174 545 • Underground Existing Power,MAN,and Telephone Lines 650 If $1,000.00 $650,000 $650,000 • Sub Total $824,545 INDIRECT: Trailers,Conex,Dumpster(general use),Temp Power,• Water,Porta-Jon 1 m° $3,050.00 $3,050 $3,050 Security 1 mo $3,000.00 $3,000 $3,000 • Supervision of Sub Contractors 677 mhrs $105.00 $71,040 $142,080 Temporary Propane Heat 1 ea $900.00 $900 $gpp — - Potable Water 1 ea $300.00 $300 $300 Consumables&Small Tools 5%of labor 2,842 3.0% $6,393.60 $6,394 $6.394 Total Direct $71,040 $78,634 $6,050 $155,724 Markups&Other-on Contractor's Indirects above: • Labor L 15% $10,656 $10,656 Materials m 15% $11,7951 $11,795 . Equipment a 15% ON $908 GC Markup on Sub Contractor __ sc 6% _ $49,473 $49,473 • Subtotal Indirect Cost $81,696 $90,429 $6,958 $72,831 Sub Total $1,053,inn Total Total $1,053,100 • • Prorate of Potential Cost Items Separated Indirect cost Prorated Cost rotal Cost for Eact • 1.Temporary Relocate Existing 8"Fire Line between Glenwood Ave and Harrington Ave $174,545 21% $48,382 $ 222928 2.Underground Existing Power,MATV,and Telephone Lines $650,000 79% $180,173 $ 830:173 a $824,545 • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 17 • • • • • Final Master Plan Cost Estimate continued • • • • • SURVEY BREAKDOWN • CH2M HILL • O _ • A Y W YU Personnel Geospatial Geospatial Geospatial 3DLS\CAD Sr.Parry 3DLS\CAD CAD\Field Accounting Expenses • Manager ask Manage Technologist Technician Chief Tech Tech Admin Per E06 PR07 TE05 TE04 TE05 ST02 TE02 Task Rate at Costing Multiplier $217.95 $137.79 $128.16 $110.55 $127.23 $80.34 $78.51 $65.00 • TASK 1 Task 1-SURVEY 8 MAPPING 2 8 - 30 48 - 48 - $3,105.00 136 • 2 Task 2-RIGHT OF WAY 2 20 - - 10 - 10 - $203,00 42 Total Hours 4 28 30 58 58 178 LABOR BUDGET SUBTOTAL $ 871.80 $3,858.12 $ $3,316.50 $ 1,379.34 $ $ 4,553.58 $ 19,979.34 • EXPENSES $3,308.00 Survey Vehicle Mileage($0.90 per mile or$54 per day) Miles/Day= 1 6 $ 54.00 $ 324,00 • Smart Pole TPS Field Hrs/Day= 10 4 S 15000 $ 600.00 Smart Pole GPS Travel= No Yes or No 2 S 14900 $ 298.00 Digital Level Air Travel= No Yes or No 1 S 06.00 $ .00 .00 3D Laser Scanner 2 $ 000 00 $ 2,000 Per Diem(@$189.00/mar✓day) $ 169 00 $ - •Car Rental - $ 150.00 $ Air Travel - $ 5so.00 $ Computer($0.00/hr) • Communications($0.00/hr) $ • Survey Research - $ 40.00 $ - S 25.00 $ Deeds • Survey Supplies 2 $ 25,00 $ 50.00 Survey Filing Fee - s 240.00 $ _ • Flagging Per Day s $ Shipping $ $ Sub Consultant Survey Services $ $ • Costing-Multiplier:3.00 EXPENSE BUDGET SUBTOTAL $3,308.00 • TOTAL LABOR AND EXPENSES $23,287.34 • • • • • • • • • • • • • • • • 18 Sunset Neighborhood Park Master Plan • MONIMM Project Phasing lm� • 0 • • • • • • • • • • • i • r • • • • • • • • • • • • • • 0 • • ! • • • • • • • • • i • • • • • • Project Phasing • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • Sunset Neighborhood Park Master Plan • • • • • Project Phasing • Probable costs were calculated for a phased construction of Sunset Neighborhood Park. Costs reflect 2014 in-place construction costs, and assume normal site conditions. A 1% art line item is included in the • Phase II cost estimate, as 1% of the total of Phase I subtotal and Phase II subtotal. Archeological/Cultural • Assessment and Survey are included in Phase I. • • Phase • Sunset Neighborhood Park Master Plan Phase I Construction • �� RHA Housing s RHA Housing `s • RHA Housing �w a Install Seatwalls ?d Install Curb and �t3 • autter all around Iva rorM \ Install 3 Trees and I_— Install Interpretive Area(Curved bench&2 Signs) Install Paving Raingardens/Reyiona(Stormwater Facility installed • - \ Restroom& \ — before park construction,not included in cost Notice Boards Install Pergola w/Seatwall • \ \i\ tR� Install 4 Trees and Planting Install s Bicycle Racks e \ \ All Rough QradeC' and Seed b� �q, \., \ Instatl Cobb ♦ a ♦ Playg d n - • �'ts.�,y;:. \\ \ Install Beriche£_ Marko Rate \\ Tn�taIt 0layg?Qund Library • Housing \ 1 'Install.KcAlc _ l_FY ELEMENTS, I` Pad� A,Ins All F, ' •Install restroom&plumbing ') �,► • •Install playground/fitness areas •No Art Installed •Piping only for Water Feature i tt • (Placeholder in Plaza:Rock) . •All Future Planting Areas are �s Market Rate h Seed only(No Trees or Planting, Vis. Housing/Mixed use • except where noted) 0 Market Rate Housing HBB • September 25,2014 • • • • • • • • • • Sunset Neighborhood Park Master Plan 19 • • • • • Phase I Cost Estimate • • • • PHASE I COST SUMMARY • Site Amenities (see page20): $1,081,419.75 • Civil Infrastructure (see page21): $1,605,622.00 Subtotal (1): $2,687,041.75 • Sales Tax (9.5 %) $255,268.97 • Subtotal (2): $2,942,310.72 • Contingency (20 %) $537,408.35 • Subtotal (3) $3,479,719.07 • Archeological/Cultural Assessment: $5,000.00 • Permitting: $8,000.00 • Y rly Escalation 4% • 2015 2016 2017 PARK CONSTRUCTION TOTAL $3,492,719.07 $3,632,427.83 $3,777,724.94 $3,928,833.94 • Survey Fee (see page 22): $23,287.34 • A&E Design Fee (14 %): $488,980.67 • FEE TOTAL $512,268.01 $532,758.73 $554,069.08 $576,231.84 • PROJECT TOTAL $4,004,987.08 $4,165,186.56 $4,331,794.02 $4,505,065.78 • • • SITE AMENITIES BREAKDOWN • • Item Unit Cost Qts. Item Total • 1. Site Preparation $2.00 /s.f. 57,680 s.f. $115,360.00 • 2. Trees $425.00 /ea 7 ea $2,975.00 3. Shrubs and Groundcover(soil prep included) $7.00 /s.f. 480 s.f. $3,360.00 • 4. Permanent Lawn (soil prep included) $3.00 /s.f. 1,540 s.f. $4,620.00 5. Play Areas(surfacing and structures included) $600,000.00 I.s. 1 I.S. $600,000.00 • 6. Fitness Stations $10,000.00 lea 8 ea $80,000.00 • 7. Restroom Notice Boards $2,000.00 I.s. 2 I.s. $4,000.00 8. Picnic Tables w/Pad $2,500.00 /ea 6 ea $15,000.00 • 9. Benches $2,500.00 /ea 22 ea $55,000.00 • 10. Curved Bench $400.00 /I.f. 12 I.f. $4,800.00 11. Bicycle Racks $1,250.00 /ea 5 ea $6,250.00 • 12. Seatwalls $210.00 /I.f. 140 I.f. $29,400.00 13. Pergola (Trellis/Arbor Structure) $300.00 /I.f. 50 I.f. $15,000.00 • 14. Interpretive Signs $2,000.00 I.s. 2 I.s. $4,000.00 • Subtotal: $939,765.00 • Mobilization (15 %) $140,964.75 • Site Amenity Total: $1,080,729.75 • • • 20 Sunset Neighborhood Park Master Plan • • Phase I Cost Estimate continued • • • CIVIL INFRASTRUCTURE BREAKDOWN UNIT COSTS TOTAL TOTAL TOTAL DESCRIPTION QTY Ulm UNIT PRICE w/ LABOR UNIT PRICE EQUIPMENT TOTAL Phase 1 Rev 2 09/25/2014 Version 1 Mark-up • Utility Connections 6"Sanitary to Rest Room from SMH 50 If $45.00 $2,250 $2,250 4"Sanitary to Water Feature 160 If $34.00 $5,440 $5,440 Water • 3"L Copper Service Water to Rest Room(from Harrington 130 If $198.00 $25,740 $25,740 Ave) • Rest Room Drain/Waste/Vent 120 If $203.00 $24,360 $24,360 Rest Room Branch Service Water 150 If $91.00 $13,650 $13,650 • 1.5"L Copper to Water Feature(pump room to water 175 If $32.00 $5,600 $5,600 feature) . Park Irrigation System 109,195 sf $1.50 $163,793 $163,793 Decommission&Abandon east/west water line on 1 Is• $10,000.00 $10,000 $10,000 Harrington Decommission&Abandon water line Glenwood Ave and 1 Is $10,000.00 $10,000 $10,000 -- Civil Works - a HarringtonAve o e no o site • Clear and Grub 15,600 sy $2.00 $31,200 $31,200 Grading(cut) 1,800 Cy $7.48 $13,4641 $13,464 Grading (haul spoils) 2,250 Cy $20.00 $45,000 $45,000 Grading(fill&Compaction) 1,875 Cy $49.75 $93,281 $93,281 Concrete Sidewalk 20,780 sf $7.75 $161,045 $161,045 Concrete Sidewalk(pervious) 2,605 sf $17.00 $44,285 $44,285 • Concrete Curb&Gutter 1,500 If $20.00 _ $30,000 $30,000 Temporary Seeding(Hydro Seeding,Utility Mix) 11,900 sy $1.35 $16,065 $18,065 • Cobbels 17 Cy $110.00 - $1.870 _ - $1,870 Pergola Foundations w/cultured stone face 34 Cy $750.00 $25,500 $25,500 • Low Level Pedestrian Lighting-Conduit,Pullwire,and 40 as $315.00 $12,600 $12,600 Bollard Foundations • Rest Room Structure 1 Is $363,000.00 $363,000 $363,000 Electrical Restroom-GFI,WP Receptacles,Vandal proof Lighting,Main Service,Branch Circuits to Heaters,Hand 1 Is $50,268.75 $50,269 $50,269 • Dryers,HWF&Exhaust Fans - - Mechanical Restroom- (3)Heaters,(1)HWT,S/S(3) 1 Is $54,600.00 $54,600 $54,600 • Toilets,(1)Urinal(2)Sinks,(2)Hand Dryer Toilet Partitioning Stalls 2 as $5,944.15 $11,888 $11,888 • Sub-Total $1,214,900 • INDIRECT: Trailers,Conex,Dumpster(general use),Temp Power, 11 mo $3,660.00 $40,260 $40,261 • Water,Porta.lon Security 11 mo $3,600.00 $39,600 $39,601 • Supervision of Sub Contractors 1,653 mhrs $92 60 $153,068 $153,070 Temporary Fence 12 mo $3,080 00 ___ __ $36,960 $36,961 Temporary Propane Heat 5 as $1,125.00 $5,625 $5,626 • Potable Water - - -- _- - 11 as $360.00 $3,960 - - -- $3,961 Consumables&Small Tools(5% ,4 labor 5,658 3.0% $15,913.75 $15,914 $15,915 • Total In-direct $153,068 $25,499 $116.820 S295.388 • Markups&Other-on Contractor's Indirects above: Labor L 15% $22,960.26 $22,960 Materials m 1$% _ $3,824.61 _ $3,825 Equipment _ e 15% _ _ __ _ _$17,5_23.00 _ __ $17_,523 • p - rac .-... - -- -- - - - - --- -._ _- - - ---- - - ---- - ,026 GC markup on Sub-Contractor sc 6% $51,025.79 $51 Subtotal Indirect Cost $176,029 $29 324 $134 343 $95,334 • - Sub Total $1,605,622 • Total Total $1,605,622 • • Sunset Neighborhood Park Master Plan 21 • • • • Phase I Cost Estimate continued • • • • SURVEY BREAKDOWN • CH2M HILL • = i �o •f u rn E ` E v_ F = m in H x , • = m y a s v Personnel Geospatial Geospatial Geospatial 3DLSICAD Sr.Party 3DLS\CAD CAD\Field Accounting Expenses • Manager rask Manage Technologist Technician Chief Tech Tech Admin Per E06 PR07 TE05 TE04 TE05 ST02 TE02 Task Rate at Costing Multiplier $217,95 $137.79 $128.16 $110.55 $127.23 $80.34 $78.51 $65.00 • TASK 1 Task 1-SURVEY&MAPPING 2 8 30 48 48 $3,105.00 136 • 2 Task 2-RIGHT OF WAY 2 20 10 10 $203.00 42 Total Hours 4 28 30 58 58 178 • LABOR BUDGET SUBTOTAL $ 871.80 $3,858.12 1 $ $3,316.50 $ 7,379.34 $ $ 4,553.581$ $ 19,979.34 EXPENSES $3,308.00 Survey Vehicle Mileage($0.90 per mile or$54 per day) Miles/Day= 1 6 $ 54.00 $ 324.00 • Smart Pole TPS Field Hrs/Day= 10 4 $ 15000 $ 600.00 Smart Pole GPS Travel= No Yes or No 2 s 149.00 $ 298.00 • Digital Level Air Travel= No Yes or No 1 s 36.00 $ 36.00 3D Laser Scanner 2 s 1,000.00 $ 2,000.00 Per Diem(@$189.00/man/day) - $ 169.00 $ - • Car Rental $ 150.00 $ Air Travel $ 550.00 $ • Computer($0.00/hr) $ Communications($0.00/hr) Survey Research $ 40.00 $ Deeds $ 25.00 $ Survey Supplies 2 $ 25.00 $ 50.00 • Survey Filing Fee - $ 240.00 $ - Flagging Per Day s - $ • Shipping $ $ Sub Consultant Survey Services $ $ • Costing Multiplier:3.00 1EXPENSE BUDGET SUBTOTAL $3,308.00 • TOTAL LABOR AND EXPENSES $ 23,287.34 • • • • • • • • • • • • • • • • 22 Sunset Neighborhood Park Master Plan • Phase II Sunset Neighborhood Park Master Plan Master Plan _ < s� • - - -. - 's„7� RHA Housi.y � � �� ry RHA H"Sing • aMrg�cyp., town,typ.l Sestwslf bv, '. a � .hJP• _, 1 Lw/IS[eket ` I —1 -Nedy.nlr` Street 1 "> we"p-0-Syn • •uJP' _ - - 8enth.typ. :.y s..aw.n �4 % ~ Art tacHSeufplunl op..Sp... Gr.ss t7e r ��r� or Monur.+ent Park Sign Ra • Planter tYP _' "r 'o� \ Per typ w/Curved 8¢nches • ; s ,..PRrut •J� Dom, ® ` f F;t. Ly,,." • Market Rats ' n /�/ }� Market Rats t} Housing/Mixed ,p \\ Use w \\ \ acrznt T tup D-d-,Tree,typ.- Pfan["t9,typ. • '�� Market Rats • September 25,2014 • PHASE II COST SUMMARY Site Amenities(see page 24): $873,563.00 . Civil Infrastructure (see page 24): $689,224.00 • Subtotal(1): $1,562,787.00 • Sales Tax (9.5 %) $148,464.77 Subtotal(2): $1,711,251.77 • Contingency (20 %) $312,557.40 Subtotal(3) $2,023,809.17 • Art(1 %) $55,035.28 Permitting: $4,000.00 Yearly Escalation 4% 2015 2016 2017 • PARK CONSTRUCTION COST $2,082,844.45 $2,166,158.23 $2,252,804.55 $2,342,916.74 • A&E Design Fee (12 %): $249,941.33 FEE TOTAL $249,941.33 $259,938.99 $270,336.55 $281,150.01 • PROJECT TOTAL $2,332,785.78 $2,426,097.21 $2,523,141.10 $2,624,066.74 Sunset Neighborhood Park Master Plan 23 • °-' • ---------------------------------------------- • Phase II Cost Estimate continued • • SITE AMENITIES BREAKDOWN Item Unit Cost Qts. Item Total • 1. Site Preparation $2.00 /s.f. 80,780 s.f. $161,560.00 • 2. Trees $425.00 /ea 29 ea $12,325.00 • 3. Shrubs and Groundcover(soil prep included) $7.00 /s.f. 23,265 s.f. $162,855.00 4. Permanent Lawn (soil prep included) $3.00 /s.f. 71,910 s.f. $215,730.00 5. Water Feature: Pump&Filter Vault $20,000.00 I.s. 1 I.S. $20,000.00 • 6. Water Feature: Fountain Fixtures $2,150.00 /ea 24 ea $51,600.00 • 7. Water Feature: Boulders $150.00 /ea 15 ea $2,250.00 8. Picnic Tables w/Pad $2,500.00 /ea 4 ea $10,000.00 • 9. Curved Bench $400.00 /I.f. 60 I.f. $24,000.00 10. Litter Receptacles $1,500.00 /ea 5 ea $7,500.00 • 11. Planters $450.00 /ea 4 ea $1,800.00 • 12. Picnic Gazebo(Shelter) $22,000.00 I.s. 1 I.S. $22,000.00 13. Pergola(Trellis/Arbor Structure) $300.00 /I.f. 210 If $63,000.00 • 14. Monument Park Sign $5,000.00 I.s. 1 I.S. $5,000.00 • Subtotal: $759,620.00 • Mobilization (15%) $113,943.00 • Site Amenity Total: $873,563.00 • CIVIL INFRASTRUCTURE BREAKDOWN • • UNITCOSTS TOTAL TOTAL TOTAL • DESCRIPTION QTY U/M MH/Unit LABOR UNIT PRICE EQUIPMENT TOTAL UNIT PRICE w/ • Phase 2 Rev 2 09/26/2014 VERSION 1 Mark-up Water • Park Irrigation System 92.276 sf $1.50 $138,414 $138.414 Civil Works • Clear and Grub 11,901 sy $2 00 $23,802 $23,802 Concrete Sidewalk 2,813 sf $7.75 $21,801 $21,801 • Concrete Sidewalk(pervious) 10,847 j sf $17.00 $184,399 $184,399 Gazebo Retaining Wall,cast-in-place,8-inch thick,1.5 ft high 75 LF $135.00 $10,125 $10.125 • with reinforcement and footing Low Level Pedestrian Lighting-Wire,Bollard Fixture,and 40 ea $2,685.00 $107,400 $107,400 • Installation Total Direct $485,941 $485.941 • INDIRECT: Trailers,Conex,Dumpster(general use),Temp Power, 5 mo $4,776.00 $23 880 • Water,Porta-Jon Security 5 mo $4,200.00 S3 000 $15 000 • Supervision of Sub Contractors 524 mhrs 1.00 $168.00 $87,960 $87 960 Temporary Fence 4 mo $3,500.00 $2,500 $10.000 ---Heat - - -.---_- - - - - • Temporary Propane Heat 2 ea $1,260.00 $900 $1 800 Potable Water 5 ea $420.00 $2,100 $2 101 - -- - - - Consumables&Small Tools(5/of labor) 2,618 5 0% $8,075.20- $8,075 $8 C77 • Total In-direct $87.960 $109,311 $148,821 • Markups&Other-on Contractor's Indirects above: • Labor _ _ L 21% - $181471.64 _ $18,472 Materials m 21% $22,955.39 _ $22,955 • Equipment e 21% $2,295.54 __$2,296 GC Markup on Sub-Contractor sc 10% $10,740 00 $10,740 • Subtotal Indirect Cost 1 $18,4721 $22,9551 $13,0361 $54 463 S.b_T.taIj $689,224 • Total Totall $ti89,224 • 24 Sunset Neighborhood Park Master Plan • Appendix A • • • w • • Appendix A: Site Analysis and Parameters • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan • • • • • Inter-departmental Team Workshop Agenda • • Introductions All • • • Planned Action EIS & Park Master Plan Overview Leslie • • Parks, Recreation and Natural Areas Plan November 2011 • • Site Analysis Overview HBB • • Existing Conditions Sun/Shade Analysis • • • Storm Water Facility CH21VI HILL • • Park Parameters Exercise HBB Park Activities • • • On-street Parking Options • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 25 • • • • • Inter-departmental Team Workshop Photographs • • • • • • O1...:._ • 4 • U-7 M, r • r • • • 7 • z now w=, o�w�.. -- Ok ►_ • • • • • • • • 26 Sunset Neighborhood Park Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • N C U) N ,—r QZl S S O S 0 Sunset Neighborhood Park Master Plan Concept Plan Overview 0 Investing in Housing 4 Jobs * Education 6 Health Environment 4 Transportation -v v FEIS Sunset Area Prderred Community Framework Sunset Planned Action Park Concept Play, _.._.._.._._.._.._..�..1 '. LEGEND COirlmunily Garden nm a.e�waxrM I 1 B', I r senw.w j �;-jai •/ �.•� ��Play A— /,/p�r Outdoor Reading Room � 1 � a..j � �' '+ ' �iPf �m � -Fountain _ �� cmNwairrcw�nn.•.wgeN. 1 smee asuaaca� sia� -+� I a:.• ``�_ ;�/�'... -.�, wtcumtwninucm..;nwu-M• 1 m¢a Restroom Open Lawn II . re.lanv¢e suee Concert j •� �,,�- �' j �;�� Seating .. t; l Stormwaterl Hiy lands 1 Li a ( �w 'ECG �- �—Plata Area ti Shaded Seating Eating Areas �•,� Seatwalls �� a waraA l j LEGEND .�' .... s �•• = x,.wawrroroww,u j •� 'w•..w sa..w s i � xwd,cw. � wow •�••..•,—.ti�7th 5t � •ems N February 19,2014 V N 00 Sunset Neighborhood Park Master Plan Photo-Documentation Key Map Investing in Housing Jobs Education Hearth EnviTonment Transpod&,t,�ii 3 i� is is iz % a S J I ar a � - �+y~ ■ 16 15 �A� 1 J 2 To o 4as Station Facility raphic` p g point - -- 14 4, rz SUNSET 6 NEIGHBORHOOD ,1 PARK Renton . Mon c. Topographic 11 Highlands ' % low point 12 Library ' i 0 � _ r 4 / e � `AY ®Bus: rt ��, Route 240 LD r10 �' 6 (3uz:ll 7 � Route 240 ZS 0 O February 19,2014 SZ o.l Cu rD v • Investing in Housing • Jobs • Educallon • HeaRh • Environment • Transponation rD 0 Sunset Neighborhood Park Master Plan Sun/Shade Analysis • SHADE ., ■■■■■■■■■■■■ • III ■ ■ III/,, '■■■■■■■■■,�,• r Izz- r . ._ ............ Average Temperature SpringlFall September 21. ■�111111111■ Payfight Length Winter tD ® � � fir► �' �► � ■■■■\ii■■■■■ W Sunset Neighborhood Park Master Plan Character Images Investing in Housing Jobs Education Heafth Environment Transportatioti Pergola/Entry Outdoor Reading Room Stating Rain Garden Play Area �r r i Fountain M Community Garden Concert Area &Stage " Restroom Ln C7 0 aOPAHIU. 0 0 February 19,2014 Q v v Ln r-r rD v 00 * 0000000000000000000000 * 0* 000000000000000o I+ z T. a Sunset Neighborhood Park: Proposed Parking Exhibit#1 Qj Pros: 17 Site Area: 23,779 sff-11 Site Area: 47,602 sf � � ••0.OStDOl+19iY. � I 1 � i I —,�ry-`��0`0®CU�FtB11Y. IiA011 •Views into park zI v •Consistent align►xent N ti Cons: 12 Site Area: 143,502 sf / •Backing into traffic •Parking not on both sides �• / / •Limited pedestrian access 5 --- -_ � SUNSET 12 /. NEIGHBORHOOD sG PARK HIGH S� 2\ •..,• BRARY �\\ F ,,o�•.,.,.. " moo.. 9/10 y "\, fin„a,,, ��• J2' Parking Stalls:46 t a S' 8' 1 Park 4' 20' Sidewalk Planting 4s°Angled Parking Travel Lane .5'curb s-curb •. J 53'ROW - ` ..o,•.a 9/10 Site Area: 45,887 sf VpOPOSm OL'NSaY:1120 W HBB *J CF12nnHILL, Felxuery 19,2014 W I-� W Sunset Neighborhood Park: Parallel/Angled Parking Exhibit#2 r, Pros: i � I z W �� � � �f/• �r��j �� •Traffic calming •Views into park •Pedestrian access Cons: •Not a consistent alignment - •Backing into traffic / / 4 Z. Storm Ty3 .,. Pedestrian Access Points acifity T Crypicao SUNSET NEIGHBORHOOD Mukilteo Town Center PARK � i Angled Parking Exarnpla 1 617� RE N"` � $y UBRAW 9110 aL Parking Stallx 39 sa iv' Park Planting Travel Lane 4s-"fed Parking Sidewalk — 9/10 Site Area 45.887 s1 Ln s curb 5 r+ 53'ROW Z m GQ C7 ���•�,..!1" :� YI f r t HBB CH2MHILL. February 19,2014 J� O SZ 'O v L I m ai 0 . 0 . 0 . 00w0l9000 • 000000000000• 00000000000000 • z L w' a- 0 9 o Sunset Neighborhood Park: Parallel/Angled Parking Exhibit#3 o Z 77 Pros: u. •Consistent alignment 1 7,6,j� ; 16 a a 'ate •Parking on both sides .l-r Z O A [ }7 Y 12 St � rD •Landscape pockets �� :�m •Pedestrian access a � �}5 Cons: •Limited views into park l�✓/-' Stor •Ste out ark side - Pedestrian Access Points Facility p area on park (Typical) SUNSET NEIGHBORHOOD PARK Mukilteo Town Center 15 RENTON Parallel Parki Example HIGHLANDS n9 p LIBRARY silo + s T i� ` v� -� Parking Stalls:42 8' Park 9'10 Site Area 45.887 sr 6' 9' 20' 4' - Sidewalk Plantinng Parking Travel Lane Parking s'curb s curb 53'ROW February 19,2014 --��,,;f( I f J rl H uB GH2MHILL. low .�•K,.,„r„.„ ., W W Inter-departmental Team Workshop: Summary Notes Page 1 of 3 February 19, 2014 Council Chambers Room 702, City of Renton Planned Action EIS & Park Master Plan Overview Leslie Betlach provided an overview of the Park Master Plan process. She highlighted relevant background information including the Sunset Area Community Planned Action EIS, the Sunset Terrace Redevelopment Concept, and design guidelines in the Parks, Recreation and Natural Areas Plan. Site Analysis Overview • Existing Conditions: Dean W. Koonts, HBB, described existing conditions within the Park Master Plan project area. He presented a photo-documentation map illustrating key site components including topography, soils, overhead and • underground utilities, transit stops, viewsheds, and future location of the stormwater facility. He also reviewed microclimate of the site and a sun and shade analysis for the project area illustrating shadows produced by proposed adjacent development. Stormwater Facility: • Dustin Atchison, CH2M Hill, provided a summary of the future regional storm water facility located in the park area, and connection to the Harrington Ave NE Green Connection Stormwater Project. He also described the raingarden surface features and the underground infiltration gallery of the facility. He also described the Ecology grant funding sources and related schedule (construction completion by June 30, 2015) and design constraints (non-mitigation water quality function). . Park Parameters Colie Hough-Beck, HBB, introduced the existing park concept plan from the Planned Action EIS. Initial • questions and comments from the participants included: • • Are there significant trees or historic elements on site? Response: There are a few trees at the south of the project area that will be looked into further. • Will there be any issues with ponding water in the stormwater facility? Response: The facility should drain well and the ponding duration (approximately 6-24 hours) is significantly less than the incubation period for mosquitos. • Can planting be incorporated above the stormwater facility? Response: Shallow rooted shrubs and grass are suitable. • What type and frequency of access to the facility is needed, and where? Response: Likely a vactor truck, once a year, at the manholes located at the ends of the facility, and , maybe more frequent to the rain garden for plants maintenance. The maintenance vehicle access is 12' • to 15' wide and does not need to be pavement. In some examples, the maintenance access has been provided by pathways through the park. 34 Sunset Neighborhood Park Master Plan r Inter-departmental Team Workshop: Summary Notes Page 2of3 r • Consider the facility as an educational opportunity. Code/Regulation Parameters: Interdepartmental team input on potential code and regulation parameters included: • City will demolish the buildings on the land as part of the property acquisition process. i • Appraised land value does not include the buildings. S • Adjacent development is responsible for half of street improvement, including a minimum 20' width of roadway pavement needed for fire and emergency access, and sidewalks, planting and parking if any within their half of the street. • Existing utilities that serve the greater area will need to remain in service, and could be relocated or placed underground, but this will require coordination. Gas = PSE; Power = PSE; Water, storm and sewer = City; Telecoms = private franchises. It would be preferable to maintain the subsurface utilities, particularly city-owned facilities, for budget purposes. Aerial utilities may need to be relocated or r undergrounded. • Construction Sequencing: The Park would like to begin construction following the development/ ® construction of the surrounding planned structures which are anticipated to be completed 2017. The library is estimated to begin construction in 2014 with completion estimated in 2015. Colpitts is estimated to begin construction of their phased development (Buildings 6-10) in 2015 and complete approximately in 2017. Much of RHA's phased construction (Buildings 5, 11, 16 and 17) are dependent on financing. • • Infrastructure Abandonment within Park Area: The City will be exploring concepts for the abandonment • and/or relocation of existing utilities within Harrington Ave NE so as to not interfere with park improvements/programming. There will be questions about who pays for this and when does this happen which then lends itself to other questions about the sequencing for street dedications and vacations (of Harrington Ave NE, NE 10th St, and Sunset Lane) as well as the construction of physical . improvements within the right-of-way (street, water, sewer, and drainage). As part of that this • discussion will be concerns about who goes first, to what level of improvement is necessary, the use of latecomer agreements, etc. Park Components: Interdepartmental team input on specific park components included: • Buildings/Structures • Performance and outdoor educational activity spaces are needed. • Power, restrooms, ADA access, and amphitheater-like area should be considered. • Social services, such as job training and tutoring offered by the Renton School District and • Neighborhood House need space within the neighborhood should be located somewhere; library . provides this space for meeting and is open until 9pm. • The Human Services Strategic Plan is due to come out this year. • Cedar River Library is a good example of integration of outdoor space for contemplative reading areas and library associated activities. • Sight-lines should be considered in order not to obstruct future security cameras. • Fountain • Design water feature that allows children to have access. Sunset Neighborhood Park Master Plan 35 0 0 Inter-departmental Team Workshop: Summary Notes Page 3 of r • Crossroads project in Bellevue is a good example for size and use. • Design a fountain for use at a neighborhood level, not regional. 0 Open Space & Play Area • Un-programmed play space is important, simply have a lawn for flexible activities. 0 • Low-level safety lighting should be considered, such as bollards or pedestrian lights at edges of park. . • Integrate public art with the project, consider the stormwater facility as a potential. • Off-leash dog area may be important as density increases and outdoor dog accommodation areas 0 are needed. , • Views between building 5 and 6/7 provide an opportunity for a viewpoint off-site or on-site viewshed. • Outdoor fitness equipment should be considered adjacent to the children's play area. 0 Community Garden 0 • Will a community garden be large enough to have an impact at this location?This may have lower r priority at this location. There may be other better locations for this in the neighborhood. 0 • Looking at the sun/shade analysis, the park may not be appropriate for a garden, as presented in the Planned Action EIS. r On-street Parking Options: Colie presented three parking exhibits for Sunset Lane, surrounding the project area. Comments included: • Sidewalk should be shown as 12' with tree grates. • • For Exhibit 1, it will be difficult to park after turning off of Harrington northbound and making a left onto Sunset Lane due to orientation of the angled parking. • For Exhibit 3, is parallel parking difficult given make up of likely users of this park and neighborhood? S • For Exhibit 3, the bulb-outs provide green space. • For Exhibit 3, could you remove park-side parallel parking? It was noted that the neighborhood was • likely deficient of on-street parking and any reductions from code-required on-street parking are likely a • big impact. • Park-side step-out of car treatment would be outside of ROW. • Parking treatment in front of library and commercial should be angled parking, but also include bulb- • out for pedestrian crossing. Parking stalls on the park-side could be eliminated in that location. • Group consensus favored Exhibit 3 with 12' sidewalks integrated and the addition of angled parking • adjacent to building 9/10. Action Items By Whom • Revise parking exhibits to reflect wider sidewalk, and angled parking at building 9/10 HBB i Next Meeting March 19 Stakeholder Workshop • Renton City Hall Council Chambers, 1:30-3:30pm • 36 Sunset Neighborhood Park Master Plan • • • • Stakeholder Workshop Agenda • • • Introduction Leslie • • Planned Action EIS & Park Master Plan Overview Leslie • • Parks, Recreation and Natural Areas Plan November 2011 • • Site Analysis Overview • • r Existing Conditions HBB • " Sun/Shade Analysis HBB • e Storm Water Facility CH2M HILL • • • Park Components Exercise HBB • Park Components • • • • • • 0 0 • • • • • • • • • Sunset Neighborhood Park Master Plan 37 • • • • Stakeholder Workshop Photographs • • • ,., pi,y Area Outdoor Readir • - Fountain Seatwalls ! o I -Restroorr • .Y ADU Oprn Lawn Concert �► `�e� �` �Stomtwaterl • raingarden •w `"J Plaza Area •Shaded Seating y Eating Areas Seatwalls • • • • • • • • • • • • • • • • • • 38 Sunset Neighborhood Park Master Plan • • • • • • Stakeholder Workshop PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Stakeholder Workshop Agenda • Introduction • Planned Action EIS&Park Master Plan Overview • Stakeholder Workshop • Parks,Recreation and Natural Areas Plan November 2011 • Site Analysis Overview Existing Conditions • - Sun/Shade Analysis Storm Water Facility • Park Components Exercise • Park Components • -� :.:'14J1:. {!BB you...:_ __���"-.r.. IIQB...J...u..�. March 19 W14 March 19 2014 • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • • Planned Action EIS & • Introduction Park Master Plan Overview • • g • March 19 2014 t—h 19 1014 • • • • • • • • • • • Sunset Neighborhood Park Master Plan 39 • • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • 7= 7 I r _ Site Analysis Overview • ----`3.�.fULtt��� Y a......., --�Y�^fISGL g �os""� • Conce t Plan Overview Mach19 1014 Mach 19 1W4 • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master PlanMIA • \ — 44 ',: • 41.\ • S`r a..... ���`' it\ -_ • y}y�� • ��L", IMB.S o.sr... ��,'".�"P"�'*=awe • Existing Conditions Mach 19 2016 Sun Shade Analysis Mich 19 W14 • • • • • • • • • • • 40 Sunset Neighborhood Park Master Plan • • • • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan t1a �__.t `�- °:,� � �\ � ( • Natural edges with �' •,,� eltvatian ehange • y •Hardscapc rtlationship to i - the Library entrance *''� •Reinfarecs park enhy points -+� *� •Rain gardcns a stheticafly • t integrated into park t - •Ease of access for park _ ad stormwater facility -ainttna cd • t •Opportunities for art and asntan 2` education/intcrprctation �ares � Concepts 3�• Preferred Concept p SStorm Water Facilit M.7 ss mie Storm Water FacilityM>nis mia • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan Ip 7. i u" uu .... ... ". Proposed Parking Exhibit#1 �t r W_9- 1 Proposed Parking Exhibit#2 • Parking Layout M—hl9 mia Parking Layout M—hJ9 rasa • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 41 • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • 4 1 / � r�.ulSMa � 1 tea. >. � .�. _ -� • Proposed Parking Exhibit#3 x Y,,, Recommended Parking Exhibit#4 �• • w � _.M, S— Parking Layout Mach 19 ID34 Parking La out M—h 193014 • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • RPM—Xda L • Park Components ExerciseI P "`' • • M • M—Z9 74 Character Images March 19 W14 • • • • • • • • • • • 42 Sunset Neighborhood Park Master Plan • • • Sunset Neighborhood Park Master Plan • • Interdepartmental Team Workshop-February 19,2014 • Identified Park Components: Performance Space s5 • Passive Open Space • • Integration of Art • Fountain Area(Child Friendly) S • Play Area • • Outdoor Adult Fitness Equipment • Restroom Building • • Social Services Building • Community Garden • • Off-leash Dog Area M-h 19 MI. • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 43 Sunset Neighborhood Park: Proposed Parking Exhibit#1 Pros: 17 Site Area: 23,779 sf— I i / ``�/ ��-11 Site Area: 47,602 sf moro6Fn 0E+i9,ir: 14 / \ / rNUw1�5Eu bEitSm. vaw I I /y •Views into park 4 i z •Consistent alignment W16 Cons: i \ j /' 12 Site Area: 143,502 sf / - --- •Backing into traffic > �- - ) � � -__...,, /• /� / •Parking not on both sides �/ •• •Limited pedestrian access O.40f•G4+Mw1 �� / / t +` A•� . WIT+w hKVi(tfr,ti �•�{au�Am.LW w '{ On _ _ ; ram.....•. `\ '�ST� 12 SUNSET /- ,> NEIGHBORHOOD sG\ PARK V/ lr.onm,•a�( RED NG \ Cy\ .a,• .e� ....a.. .. HIGH S� SRARY .. y +,., Parking Stalls:46 :Al cn "� x 5 s' iq' 20 Park 4 y� rD Sidewalk Planting 45°Angled Parking Travel Lane ; Z .S'curb .,r curb Z say ROw 9/10 Site Area: 45,887 sf PROPOWO WNW It"Ou Uo - rs O HBB CH2MHILL. O February 19,2014 •••+••�•.•,„I,•., O Q .D v v 1 r-r v • • • • • • • • . • • • . • • • . • • • • • • • • • 0 0 0 0 0 0 0 0 • 0 0 9 0 0 0 0 CD z Uo 0 0 0 Sunset Neighborhood Park: Parallel/Angled Parking Exhibit#2 v v Pros: r •Traffic calming ((}�t z r�-F •Views into park rp •Pedestrian access �,�L�y 16 s 17) Cons: •Not a consistent alignment �' E � 1• •Backing into traffic •( ,' / Storm ". . Pedestrian Access Points Facility (Typical) SUNSET NEIGHBORHOOD PARK Mukilteo Town Center `I � Angled Parking Example RENTON HIGHLANDS LIBRARY f: h QL , Parking Stalls:3920, 24' Park Sidewalk P"-tmg Travel Lane 4s'A,,gled Parking t^ 9/10 Site Area; 45,887 sf .s curb s cuvb ` s3'ROW H B B CMWHlu. February 19,2014 �.,���.�� .•.....,..<,^,,,..., " A t!7 rn Sunset Neighborhood Park: Parallel/Angled Parking Exhibit#3 j1 Q z Pros: G I Q z Z •Consistent alignment a� •Parking on botA sides •Landscape pockets •Pedestrian access " f _ \\ ' Cons: •Limited views into park Stor •Step out area on park side -!- Pedestrian Access Points Facility (Typical) SUNSET °� NEIGHBORHOOD PARK \ Mukilteo Town Center REQNNDS Parallel Parking Example cS+ ` LIBRARY Tres in J�#? tregrates �- 7 f �0 9Lf� j aS Parking Stalls:42- v, `-5 9/10 Site Ar q, Park Ln (D Sidewalk Parking Travel I, Parking rt z 5'curb 5 curb (D 53,ROW S O HBB CMMHILL. O February 19,2014 �`• �J� : O ..>,,..,...„. .. v v In 1+ v • 9 • • • • • • • • • • • • • • • • • • • . • • • • • • • • • • • • . • • • • • • • • • V) c r+ z (D GO CT 0 :3- 0 Q Sunset Neighborhood Park: Recommended Parking Option Exhibit#4 v Pros: z ti •Consistent alignment u a) •Parking opportunity on both sides Cr ' •Landscape pockets � •Pedestrian access z 12 srte � •Angled parking compatible with Retail •Parallel parking compatible with Residential •Load/Unload accommodates Section B events and provides visual access Sto Pedestrian Access Points Facility Cons: (Typical) � ' •Partial limited views into park Section A SUNSET Mukilteo Town Center •Step out area on park side NEIGHBORHOOD Parallel Parking Example PARK RENTON HIGHLANDS LIBRARY Parking Stalls:43 9110 2 `, _ w zo' 6' Park +++ "s:_:.` 6' 24' j . Park ewaann PaSidewalk Pla g rking Travel Lane Loating Parking Travel Lane Parking UNlo S curb 5 curb 5'curb 53'ROW 5 b cur 53'ROW Section A Section B ,� � March 19,2014 �� 1 r,rl mil'� HBB CHZMHILL, CO _ " ~ SUNSET NEIGHBORHOOD PARK m STORMWATER FACILITY _ Load/Unl o t y�� Natural edges witk elevation clean C Hardsca e relationskip to �r t tke Library entrance • Reinforces park Y ' entry points _ ti F • Rain gardens aestketicall y �y integrated into park • Ease of access for parkLn and stormwater facility maintenance rD z Opportunities for art and _-- Renton Higktands s educationlinterpretation Library 3/ IW:L4 HBB v Ln I+ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Stakeholder Workshop: Summary Notes Page 1 of 4 • • March 19, 2014 . 7th Floor Conferencing Center 726, City of Renton • • Introductions • All stakeholders and project team members introduced themselves. Stakeholders included representatives from the City of Renton, Renton Housing Authority, Schemata Workshop, King County Library System, Viet • Wa, Renton School District, and Colpitts Development. • • Planned Action EIS & Park Master Plan Overview • • Leslie Betlach, City of Renton, provided an overview of the Park Master Plan process. She highlighted relevant background information including the Sunset Area Community Planned Action EIS and design guidelines in the Parks, Recreation and Natural Areas Plan. • • Site Analysis Overview • • Existing Conditions: • Dean W. Koonts, HBB, described existing conditions within the Park Master Plan project area. He presented the photo-documentation map illustrating key site components including topography, vegetation, soil • conditions, overhead and underground utilities, transit stops, viewsheds, and future location of the storm- water facility. He also reviewed the site's microclimate and a sun and shade analysis for the project area. • Stormwater Facility: i Dustin Atchison, CH21VI Hill, provided a summary of the proposed regional stormwater facility to be co- located in the park area, and its connection to the Harrington Ave NE Green Connection Stormwater • Project. He described how the bioretention stormwater facilities proposed for the Harrington Avenue • Green Connection will provide enhanced water quality treatment. The regional storm water facility, co- located in the future park, will consist of rain gardens, an infiltration gallery, and a vegetated detention facility to compliment the park features. The facility will serve as a demonstration project and utilize low • impact development to treat stormwater runoff. These improvements will retrofit existing storm systems in • the area to reduce the quantity and improve the quality of stormwater runoff, from the existing and future • land use within the Sunset Community Plan Area, which discharges to Johns Creek and Lake Washington. • He also described the grant funding source, design constraints and anticipated schedule (construction • completion by June 30, 2015). • Dean W. Koonts, HBB, provided an overview of the design concepts for the regional stormwater facility, • raingarden surface feature. He illustrated the components of the preferred layout for the raingarden, • including the relationship between the proposed Renton Highlands Library and the NE entrance into the • park, as well as opportunities for art and education, aesthetic integration with the park, and ease of facility maintenance access. • • Sunset Neighborhood Park Master Plan 49 • • • Stakeholder Workshop: Summary Notes Page 2of4 Surrounding Development • Stakeholders described their respective projects that surround the park. Library: • • 2,000 library visitors are anticipated daily. • • The library will be open 6 days a week from approximately 10am to 9pm, with the possibility of extending hours to Sunday. • There will be ± 1,000 SF of Community Room space. • Visibility into the park is important: A green view from the library (northwest face) is desired, such as . a learning garden. The library will have many windows allowing views of the park through the library • from Sunset Blvd. • The library organizes performances in Renton's parks with about 100 to 200 attendees Renton Housing Authority (RHA): • • The NW corner, building 5, will have 40 units. , • 10 to 14 townhomes intended for families will be located to the north of the park. • • 15 townhomes and 20 flats will be located north of NE 10th between Harrington Ave and Sunset Lane N E. • RHA has a 25 lb limit on size of dogs and a requirement to keep dogs leashed. • Colpitts Development: • • 111 market-rate units are anticipated, intended for singles and couples. • Approximately 45% of the units will be one-bedroom. • Community group rooms will be included. . • The population will be approximately 500 to 700 individuals. • • Pets will be allowed and the developer plans on providing dog "runs" as part of the development. • Viet Wa: • No changes are planned for the commercial/retail use. On-street Parking Colie Hough-Beck, HBB, summarized the alternative parking concepts for Sunset Lane NE as well as the preferred parking concept, Option #4. The preferred parking concept includes parallel parking in front • of the residential units, angled parking in front of the library and neighboring property, a load/unload • area along NE 10th on the park side, bulb-outs for pedestrian crossings, and typical sidewalk and planted treatment along the adjacent property frontages. Comments included: • Explain where people park when visiting the library and adjacent housing. Response: There will be dedicated parking for both the library and the adjacent housing. Sunset • Neighborhood Park is a neighborhood park and is intended to serve nearby residents who live and work • within walking and bicycling distance. • Can a walking route or loop be shown around the edges of the park? 50 Sunset Neighborhood Park Master Plan w • • • • • Stakeholder Workshop: Summary Notes Page 3of4 • • Response:This will be considered as part of the park design. . • Is there a regulation on parking time limits? Response: There is flexibility with parking time limits. • • Can the load/unload area move? Response: The load/unload area is located for maintenance vehicles accessing the stormwater facility • and the park. • • Why is there parallel parking shown in front of the residential units? Response: The preferred parking concept balances parking, pedestrian crossings into the park with • significant landscape bulb-outs and sightlines into the park. Angled parking adjacent to the proposed • residential developments poses a challenge for drivers turning left onto Sunset Lane from Harrington • northbound, because drivers would have to back into and pull out of stalls across traffic, or would need • to circle the entire park to access this angled parking by turning right onto Sunset Lane. • Park Components Exercise • Colie introduced park components that were included in the Planned Action EIS park concept plan, and • then summarized the park components identified by the Interdepartmental Team Workshop. Utilizing • paper cutouts overlaid on the park site plan, she demonstrated square footage requirements for some of the identified park features. Colie asked stakeholders for input on the identified park components, • including a performance space, a restroom building, art integration, a water feature, open space, a play • area, as well as what other elements would be/would not be desired. Comments included: • Buildings/Structures/Site furnishings: • • A permanent stage is not needed for performances,just space for a temporary stage. • • Picnic tables and benches are desirable, including a covered picnic table area • • Could some type of shelter to block wind and provide enclosure be considered? • Response: Structures raised a concern regarding visual accesses for Crime prevention through environmental design (CPTED), surveillance, and vandalism prevention. CPTED is a design approach to • deter criminal behavior by designing spaces to avoid potential attack. • • Restrooms should be located near children's play area, water feature, and performance gathering space • for easy access. • Restrooms should be located to provide convenient access for cleaning and maintenance personnel. • • Restrooms should not be a focal point in the park or block prominent views into the park. • • Water Feature: • • Portland's Jamison Square water feature is a good example of a successful water feature, and includes • the possibility to have performances in the space when the water is turned off. • Locate the water feature away from the library so that water does not track into the facility. • • Stormwater facility: • • Can the stormwater facility raingarden be incorporated as the water feature? • Response: The raingarden is not treated water and would not meet public health standards for use as a water feature where children may have contact. Additionally, the raingarden is vegetated and will not • Sunset Neighborhood Park Master Plan 51 • • • • • Stakeholder Workshop: Summary Notes Page 4of4 • • be designed to detain stormwater runoff. • Could the stormwater facility be located further to the south and west or is the current location in the northeast corner fixed? • Response: While there is some flexibility in the layout of the stormwater facility, the soils exploration • was conducted at the location currently shown; it is uncertain if the same high infiltration soils exist • further to the south. In addition, the current location considers the necessary conveyance from NE 10th • Street and Sunset Blvd. • If the corner of NE 10th Street and Sunset Lane (Park side near the stormwater facility) is mostly • hardscape, the additional right-of-way space between the park and NE 10th Street should be developed • to include a landscape buffer with sidewalk. • Open Space & Play Area: • • A perimeter walking trail is desired. Trail markers or bollards that show distance for runners and walkers • on the perimeter trail are preferred. • • Any lighting should be low-level, pathway lighting. • • An off-leash dog area is not preferred as part of this park. Dog bag stations should be provided. • • Hard surface courts (basketball or tennis) are not desired in the park. • • Locate the play area to the north side of the park area because family units will be on the northern properties. • • Divide the play areas and equipment (2-5 and 5-12 years of age) with hardscape so that parents can • simultaneously watch both areas. The hardscape can also provide children a path to ride wheels • (tricycles etc.) separate from park circulation. • • Outdoor fitness equipment should be considered adjacent to the children's play area. • An outdoor chess game could be located near the performance area. • Response: The library does not have the resources to be the custodian of outdoor game areas. • • Other: • • What is the funding/timing for the park? Response: Funding has not yet been secured and the City does not yet own the property. 2017 is an • approximate timeline for park construction. • Next Meeting • May 1, 2014 Community Open House #1, McKnight Middle School, 6pm-8pm • • • • • • • • • • 52 Sunset Neighborhood Park Master Plan • • Appendix B ` • • • • • • Appendix B: Park Concept Alternatives • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan • • • • • • • • • -- J-= `Investing in Housing 9 Jobs Education e Health Environment 9 Transportation Sunset Neighborhood Park • �t _` Jornada de Puerta Abierta Onete a nosotros en el proceso de • "� ��,�:I�i��f, planificacion para disenar un futuro parque en el sector de Highlands. • \ \ '� `� El parque tendra un area de 1.5 • hectareas. • Sunset Neighborhood Park 1I y Open House Meeting • q d j .' -• Please join us in the master planning • d process to design a future 3.7 • W acre neighborhood park as a part • _ of the Sunset Area Community Revitalization Program.This is the Jueves, 1 de Mayo del 2014/6:00-8:00 p.m. first of three interactive open house • McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 meetings. Se proveeran refrigerios.Tendremos disponible interprete en espanol. Thursday, May 1,2014/6:00-8:00 p.m. — • McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 r r f l ( 1 • Light refreshments will be served.Spanish interpreter available. • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 53 • • • • • Open House Meeting #1 Agenda • • Introduction • Parks, Recreation and Natural Areas Plan City of Renton . Site Analysis and Park Parameters HBB • Photo-Documentation Key Map • Climate Analysis Park Components • Park Concept Alternatives • • ®Park Concept Alternatives Overview HBB • ,,Questions and Answers • • • Activity • • ,,Small group discussion of Concept Alternative pros and cons • • Activity Summary • Summary of Concept Alternative pros and cons from each group °Next Steps • • • • • • • • • • • • • 54 Sunset Neighborhood Park Master Plan • • • • • Open House Meeting #1 Photographs • • • mm.6 y" • • • • i • E • • fit .. • e ■ • • • i • • • • • • Sunset Neighborhood Park Master Plan 55 • tr O1 Sunset Neighborhood Park Master Plan Background Information Investing in Housing 6 Jobs 4 Education 6 Heafth Environment 0 Transportation FEIS Sunset Area Preferred Community Framework Sunset Planned Action Park Concept P(an i._.._.._.._ _.._.._.1 16 n , C) ' _ \ a � Community Garden L- ` ' .._.i Play Area Outdoo g Room Fountain l' a� Sta e/Shaded ! e8 ©o g Pergola 00 � r ®o -�-- roo i © Open Lawn Concert Hid lands 1 \ Seating Stormwater/ / raingarden Library 4 } �•-% N '` Plaza Area -Shaded Seating f rp Z� q -Eating Areas f ` Seatwalls Y} ( LEGEND S �•' ;� ✓A sw,w aw 1 r,c I !r � wrncw.nnaro.m i a i �� Ilal[ Giw.kcn,lariCwav °� .. � i l 1 ' 1 ' ' aaaa wo.nrwnwy \ ig s i senmiia.a _ .. (D meat ry MWau. \�ti •.,�. 6FIPd51 I ne,w�.nw x rD anget B r+ ....._.NE 7th St r.., rD S O HBB Q May 1,2014 tv Ln 1 r+ rD 03 • • • • . . . . . . . . • • • • • • • • • i • • • • • • • • • • • • • • • • • • • • • • ID z rD w' 0 0 Sunset Neighborhood Park Master Plan Photo-Documentation Key Map CL I—sting in Housing 0 Jobs 0 Education 0 Health 0 Environment 0 Transportation (D — � 1 16 5 34 13 it � 4 q_ d 2 \L 1 # I S 0 11 t; 6 os le of �� r J 2 >forvhevater Poorly I Facility \ To o hic ♦ 4as Station 3 drainingra p g soils _ _ � p .♦hi h point Xo SUNSET s NEIGHBORHOOD PARK well ��♦ draning soils 1 \ ♦ Renton \ Topographic 11 Highlands + \ \\ low point 12 Library a C/\ \ \♦\ 1 X r au P 4 s a s 7 i� hd, /� „ Route 240 Bus: 0 �,10 0 I- 1—�-L(� Route 240 HBB t Cmrmi1L U'I May 1,2014 V .. ClimateSunset Neighborhood Park Master Plan Analysis Investing in Housing • Jo0.s • Education • HeaHh • Environment • Transportation SUN&SHAPE CLIMATE �i .. Summer K 41 Average Temperature ; :i�1111111�: September 21- Winter �► ............ ♦ �FAverage Hourty Winds Pecember 2-1 �s•� Ir, • • May 1,2014 V) z a s 0 a 0 Sunset Neighborhood Park Master Plan Identified Park Components Q Inwsting in Housing 6 Jobs Education Heafth * Environment Transportation 7 w Performance Space Water Feature Play Area Picnic Area • Performance Space a • Water Feature (Child Friendly) «u. ! Play Area Picnic Area • Restroom Building M Fitness Equipment ,ter • Walking Loop �. Integration of Art • Passive Open Space Restroom -:r �••� Fitb,ess Equipment Walking Loop Integration of Art Passive Open Space tx r Menwilu- v i (J I May 1,2014 lD rn Sunset Neighborhood Park Master Plan Park Concept Alternative Investing in Housing Jobs Edin;ation Health Environment * Transportation U I- -I z A PROMENADE rmz Pedestrian a Patkways Plaza �y z yJ : : . J� PICNIC %, 'r :. ,\ Water YY \ Feature ( Raua�ardty� ' i Play . Rr�rigarde,� �,, .'�. �� V j"�( Plaza g� { +r Play Fit 9111 N� �y PICNIC Performance y Viewing Area f " Plaza z G9 -q F Pp S 0 _ G B> v Diu 0 O May 11 2014 v v to CD v z rD S O S 0 Sunset Neighborhood Park Master Plan Park Concept Alternative 0 QInvesting is Housing Jobs Education Health Environment Transportation -o CU 9Q 7 L -J m a FLOW a s mZ rD Pedestrian Pathways Z ~F'Ortisr �y�� Plaza Plazain t •�; ,;.-'-�=., ,jam , -- � �? rzizingard Plaza . , PerFormcmce _ Viewing Area •agarc�ev�, F� .�: �• � ,Restroo�n, ��.�. Picnic `1{( 1+ (,y Play ! �y Play water Feature ✓ Prazal 7 � Jry HBB u,, May 1,2014 I-, i o� Sunset Neighborhood Park Master Plan Park Concept Alternative c � `ma U 14 CLUSTER Pedestrian °z �Fv 4v Pathways j �rysr Jyy� _ IZZ;`x jestroo- ir ' Play !Staging ' May Picnic Performance r Viewing Area ' Gay, . Water r3 Feature t FitneSS1 t / • i' �� �`'� s , YTIr 1 z T. m'°y O HBB O May 1,2014 Q v N r-r (D v 0 . . . . . . . . . . . 0000000000000000000000000000000 • U0 z rD w- C7 0 0 Sunset Neighborhood Park Master Plan Park Concept Alternative QInvesting In Housing Jobs Education Heafth Environment Transportation v Zt�O ZA ` PORTAL r-r p fD Pedestrian 2 Nis Y Pathways ��I111��1111�� 'OTysr t Plaza j (aingar�sy� Play Plaza Play Picnic ��, l Restroom ,17,ajnraY�etn � ~�' \ i °p Plaza \� \ Water \ Feature 9% �3,41 _ iewing Area //�� J� ? s� V.. ��— PlazaCHOMILL May 1,2014 W rn Sunset Neighborhood Park Master Plan Park Concept Alternatives CLUSTER i ; PORTALLl ' PMY16(i.s a 1 �.Uw.y{ A f U a.y awac �' �` f /" OnS 'Coo cWj ��.� � LU FLOW Li ICj� er., OMENADE t L J L- I 1 F' pious hn�al� ff t ,3 Ail LQ wny A.y z .•� �` o�`' o .shoo '��.4� �' 5 _ �"`°J Pis pMay 3,2024 v v v v v 0 0 Sunset Neighborhood Park Master Plan o g 1 V�� � Park Concept Alternatives 0 CLUSTER j�7 rD w TYMY7 ry per,,,, dO Yl 8L'�fl , FLow�'C� I' y S � T� PROMENADE F thwuys �� ro < N' PI v t is � ` ' f• Q1 May 1,2014 Ln Open House Meeting #1: Summary Notes Page 1 of 4 Date: May 1, 2014 • Time: 6pm to 8pm • Place: McKnight Middle School Commons Area, 1200 Edmonds Ave. NE, Renton Attendees: Seventeen community members attended. Team Presentation • Parks, Recreation and Natural Areas Plan: Leslie Betlach, City of Renton, introduced the team and provided an overview of the Park Master Plan process. She highlighted relevant background information including the Sunset Area Community Planned Action EIS and design guidelines in the Parks, Recreation and Natural Areas Plan. Site Analysis and Park Parameters: Colie Hough-Beck, HBB, introduced the design team. Dean W. Koonts, HBB, briefly described existing conditions within the Park Master Plan project area. He presented the photo-documentation map • illustrating key site components including topography, vegetation, soil conditions, overhead and underground utilities, transit stops, view sheds, and location of the stormwater facility. He presented the r site's microclimate, a sun and shade analysis for the project area, and provided an overview of the park S components identified in the City Interdepartmental Team Workshop and the Stakeholder Workshop. • Park Concept Alternatives: • Dean provided an overview of the layout of the park components and park circulation in each of the four concepts: Cluster, Portal, Flow, and Promenade. Participant comments and questions during the presentation included: 1) Question: What is the density and size of housing units in the proposed development surrounding • the park? • Response:The Renton Housing Authority (RHA) has committed to replacing the original 100 units of public housing at Sunset Terrace with 100 new public housing units. In addition, RHA plans to create approximately 150 additional affordable units. RHA's new public and affordable housing units will be located on, or adjacent to the Sunset Terrace property and at other locations in the • Sunset Area. In addition to the new park and library, the current Sunset Terrace property will be • redeveloped to include approximately 410 market-rate housing units and approximately 40 public or affordable housing units (of the 250 previously noted public housing and affordable units. The remaining 210 units will be located throughout the Sunset Planned Action Area). The Renton Housing Authority is currently working to provide relocation assistance to the current residents of S Sunset Terrace. Participants were directed to contact the Renton Housing Authority or the City's • Community and Economic Development Department for additional information. 2) Question: Have you looked at other parks in the area and evaluated their uses and walking distance to the proposed Sunset Neighborhood Park? Response: The City Interdepartmental team provided input on surrounding park uses. • 3) Question: Is this a "Neighborhood" Park (as defined by the Parks, Recreation and Natural Areas Plan)? Response: Sunset Neighborhood Park will be developed as a "Neighborhood" Park. 66 Sunset Neighborhood Park Master Plan • • • • • Open House Meeting #1: Summary Notes Page 2 of 4 • 4) Question: Is there a parking/loading area for the performances? Response: There is an unload/load area proposed at the northern side of the park. • 5) Question: Did the Design Team take into consideration potential views of Mount Rainier in the • design options? • Response:The anticipated height of the future building structures will limit views to Mount. • Rainier. There are views of the Olympic Mountains to the West and the Design Team will try to capture those views between the future building structures. 6) Question: What will be the hours of the park? Response: The Park will most likely be open from sunrise to sunset. . 7) Question: Is there lighting proposed for the park? • Response: Lighting has not been proposed at this stage of the design process. However low-level path lighting may be included in the park master plan. 8) Question: Does the park include Sunset Court Park? Response: Sunset Court Park is a separate park and is located to the north of Sunset Neighborhood • Park. • 9) Question: Will an off-leash dog park be included? Response: Off-leash dog facilities will be provided by the adjacent housing developments within each development. • 10)Comment: There is age diversity in the neighborhood. Sunset Neighborhood Park should • incorporate park components for teens. • Response: The park design will include elements appropriate to a broad range of potential users. • • Open House Workshop Activity • • Activity Summary: • Attendees were divided into two groups to participate in a facilitated, small group discussion regarding the Concept Alternatives. Each group sat at a table with a discussion leader and with the four Concept • Alternatives displayed for review. Discussion leaders, Dean and Colie, asked four questions: 1) What do you think about the park components? 2) Are there any missing park components? 3) How do you like the park circulation in each concept alternative? 4) What are the pros and cons of each concept alternatives? • The two groups reconvened as one audience, and Colie and Dean, the discussion leaders, presented a summary of their group discussions. • • Combined Summary of the Groups' Discussion: • A. Park Components: 1) Picnic shelters should be included for all-weather use. • 2) Active use areas for teens and a variety of ages should be included, such as a basketball court, • tether ball, a tennis court with backboard, and flat lawn areas for pick-up soccer and football. • 3) Porous concrete was suggested as a paving material for the basketball court in order to reduce noise. • Sunset Neighborhood Park Master Plan 67 • Open House Meeting #1: Summary Notes Page 3 of 4 4) A P-Patch community garden should be considered. • 5) Soft lighting should be considered along walking paths. Bright, overhead lights should not be considered. (No cobra head lighting) 6) Benches, tables, and an outdoor sink are all components that should be considered in the picnic areas and benches throughout the park. • 7) Education components should be considered. Botanical labels and signage for trees and plants • would be an opportunity for education. 8) A pavilion or flexible use area for craft and vegetable sales should be included. 9) School programs or community service at the park would provide opportunities to involve students • at the park. • 10) Pervious paving components could be included. However, maintenance should be considered • when specifying pervious pavement. 11)A pathway with fruit trees, "orchard lane" along the existing Harrington Avenue NE ROW (once the ROW is abandoned), or a mini-orchard could be considered as a way to incorporate the concept of community gardening into the park. 12)ADA parking stalls at the park should be provided. • 13)The water feature should not pond or have pooling water. Focus on interactive spray jets. 14) Concessionaires or commercialization of the park should not be considered. 15) Locate a public art feature near the library, at NE 10th Street and Sunset Lane NE. B. Park Circulation: • 1) Direct routes, or "senior friendly" routes, to park components and surrounding development entrance points should be incorporated. S 2) A path following the existing Harrington Ave NE route works well for connecting entrance points. These routes should include benches. 3) The perimeter loop is a good idea. • 4) All paths should be ADA accessible. • 5) "Cluster" does not provide direct routes. "Promenade" and "Flow" provide direct routes. 6) A few of the paths could be removed in "Promenade" to provide a simpler layout, and could include more plazas at entrance points. 7) "Portal" provides good entrance points into the park; however "Portal" can be revised to include some of the "Promenade" pathways to create more direct routes, such as the path connecting Harrington Ave. C. Pros and Cons of each Concept Alternative: Collectively the two discussion groups preferred the circulation in "Promenade", and favored the placement of park components in both "Portal" and "Flow". Participants liked the direct circulation routes S in the "Promenade" concept and liked the many entrance points in the "Portal" concept as well as the placement of activity near the commercial side of the park in the "Flow" concept. s 1) "Cluster" pros: The play area is centrally located. The hill is nice. • "Cluster" cons: The park components are too centrally clustered on top of each other, and do not • create opportunity for discovery. There is too much open space, which is weather-dependent. 2) "Portal" pros: The plazas provide opportunity for meeting and children pick-up locations. These 68 Sunset Neighborhood Park Master Plan • • • • • Open House Meeting #1: Summary Notes Page 4of4 • plazas could each have themes. The hierarchy of the plazas read well, and could be applied to the • "Promenade" concept. The water feature is centrally located. "Portal" cons: The water feature potentially blocks a thru-path. Paths do not connect across the '• park. Activities are too tightly clustered. A picnic area is needed by the play area. 3) "Flow" pros: The paths are simple and work well. The activities near the library and retail are well • located. • "Flow" cons: There is too much open space. The performance space is located too far from the library. • 4) "Promenade" pros: The relationship to the library and retail works well with the path layout. Two • picnic areas are useful. The restroom is centrally located. • "Promenade" cons:There are too many paths. The picnic areas are too far from the restroom. • • Action Items Leslie to record what and where the nearest facilities are in the area, including a community garden, courts • for basketball and tennis games, sports fields, and off-leash dog parks. Follow-up Action Taken • Within a%mile to the north: North Highlands Park and Neighborhood Center S 1. 1 Lighted Tennis Court proposed for refurbishment • 2. Portion of park area has been preliminarily identified for raised bed community garden • McKnight Middle School (School has first use priority) • 1. 4 Tennis Courts 2. 2 Basketball Courts • 3. 3 Baseball Fields 4. 3 Soccer Fields • a Within%mile to the south: • Highlands Park and Neighborhood Center 1. 2 Tennis Courts 2. 2 Basketball Courts 3. 1 Softball Field • 4. 1 Soccer/Multi-purpose Field • No Off-leash dog park facilities are located in the Planned Action EIS area. • • Next Meeting June 18, 2014 Community Open House#2, McKnight Middle School, 6pm-8pm • Sunset Neighborhood Park Master Plan 69 • • • • Renton Reporter Article • City gets feedback from • residents on new Highlands • g • park • • • • • • • • • Jon Troxel shares his thoughts on anew park planned for the Renton Highlands with Leslie Betlach of the City of • Renton. —Image Credit.,Tracey Compton,Renton Reporter • by TRACEY COMPTON,Renton Reporter Staff Writer • May 9,2014 at 4:19PM Community members got their first took at some of the ideas City of Renton Parks planners have for • anew park in the Highlands that is part of the Sunset Redevelopment project. • The project is the Sunset Neighborhood Master Plan and the open house was held last Thursday to • solicit feedback from the community. • Four concepts were presented,representing the last three months of work by landscape achitect, • HBB,and engineer,CH2MHILL.Only four components have been decided in each of the concepts: the park size,loading and unloading zones,the location and configuration of the regional • stormwater facility and the parking location. "I like the idea of having a park that is open to all generations to use and play,and after the • community members brought up the idea of spaces for teens,think that this park will be just that," • said Kaelene Nobis,resident outreach coordinator for Renton Housing Authority. • "I think it's going to end up being pretty cohesive for the residents and really entwined with the . library,"she said. About 20 people showed up for the meeting at McKnight Middle School.They listened to an • explanation of concepts by the project team and then gathered into groups to share their own ideas. • Some of the people present were intent upon asking about the number of housing units that will go into the property.The Sunset Redevelopment is intended to be a mix of market rate and low-income • housing. • Members of the audience were concerned if the city looked at areas of overlap in terms of amenities • at other nearby parks.According to officials,in trying to keep the park a neighborhood park and not a regional destination,some amenities came off the list. • What's known almost certainly is that it will not be a dog park. • 70 Sunset Neighborhood Park Master Plan • • • • • • Community members came up with a list of things they'd like to see,which included activities for • teens,all weather shelters,sports fields and courts,a flat lawn for creative play,a spray parka nd • pea patch,among many other ideas. • "I think it's wonderful to see picnic areas and play areas,environmentally safe areas for people in this community,"said Jon Troxel,an area apartment owner."I whole-heartedly support this • concept." Cynthia Burns,chair of the Parks Commission,was also in attendance and said she was amazed by the participation of those who turned out for the event. • "Everyone shared equally,"she said."It was no holding back and that's the kind of public involvement that we want in developing our parks." • Parks Planning and Natural Resources Director Leslie Betlach said she thought the exchange went well with the community.She has received a lot of"thankyous,"she said,for her work on the • project.People are surprised to be getting a redesigned neighborhood park. • The next steps are forthe project team to pull together all ofthe comments and come up with some alternative solutions for the next open house meeting,which is June 18.There is no timeframe for • construction yet.The land still has to be acquired and developed,Betlach said. • "It's not uncommon,"she said."We're planning for the future;there's opportunity out there through grants and other funding sources." • Betlach also said at this stage there is no budget projection for the project. • TRACEY COMPTON,Renton Reporter Staff Mer tcompton@rentonrepoder.com or 425-255.3484,ext.5052 • • • Find this article at: • http://www..e tonreporter.mWnews25870Ml.hdri • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 71 • 72 Sunset Neighborhood Park Master Plan • • • • • Parks Commission Briefing #1 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Sunset Planned Action EIS r=,' `•� Final NEPA/SEPA issued April2011 • Parks Commission Briefing #1 r I Completed in consultation with the Renton Housing Authority(RHA) 1 Initiated with the redevelopment of May 13,2014 j RHA's Sunset Terrace and associated neighborhood growth and • revitalization Evaluated the broader Sunset Area • = Community Determined the future land use and redevelopment HU • r . Fr FEIS Sunset Area Preferred Community Framework r ., • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • -- The Future r,F Revised Footprint - • '�.•.} 4 Neighborhood Park Future Neighborhood 2.1 Acres in size �., !� Park 3.7 Acres in size Supports future mixed 'a � use housing,new library �.` i Increases recreation and retail Development \ opportunities • t ' r\\\ "'_" Future site of a regional 1• Future site of a regional storm water facility � storm water facility • Connected to the v Connected to the ¢ Harrington Avenue Green _ 4 1 Harrington Avenue Green • Connection Connection Concept Plan Revised Footprint-Sunset Neighborhood Park • tea Y...., !IB{.�vo.... • Sunset Planned Action Park Concept Plan Sunset Planned Action Park Concept Plan r.� • • • • • • • • • • Sunset Neighborhood Park Master Plan 73 • • • • • Parks Commission Briefing #1 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master PlanZ/ • ,�.� • ..r v \ - .�� o v— � Will �a..,� Nee Y�..,; • Existing Conditions r i , Sun/Shade Analysis --fir • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Interdepartmental Team Meeting • February 19,2014 "�� • Community&Economic Development Community Services M �- =- • Public Works Executive ^� `•�0 � ___ • %�°+• � • •Srr��M wM � �� w•�w tiYy ti� L r � _ • Stakeholder Meeting March 19,2014 • • Renton Housing Authority i • Colpitts Development • King County Library System ' Renton Technical College — ,„;,__ •u +.. ,..,� .-. M • Renton School District ^ • Local Business �••- �• • • I nterdepartmenta l Tea m HU �•..+..-, _1 :ar.. Interdepartmental Team and Stakeholder Meetings Recommended Parking Layout ns • • • • • • • • • • 74 Sunset Neighborhood Park Master Plan • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • ; � ,., wa..futurt My M• Natural edges with � • +` '� eatration change ' • r.K• � Hardscape relationslu'p to Ow Library entrance • r .�Reinforces paste _ entry points � • 4111111111AM Ai Rain gardens aesthetically . integrated into park •East of attess for park -Ytrb'I and stor-water facility • n ai.ttnanez .• •Opportunities for art and • education/inte.pretallon r t,ba � VIL 0 NeeHN Y,,.,,.., NeB . Preferred Storm Water Facility Layout f Identified Park Components r • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • •fAe..•r..e 5►•u Fifuss 6q•:p..v..e b,,,..q.cup I. ,` ,,,,,,,,,,,,,,. �) w w..,.. CLUSTER - 4# ,Ilk • HU Y... Nee t.— Identified Park Components J—�ftr-7^^'7 Park Concept Alternative • • • • • • • • 46 Sunset Neighborhood Park Master Plan 75 Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • FLOW l` """'�"'. �� +w+v� PORTAL • ..� r --• i Free Y A. . NU Y ... • r,roncep t Alternative ,.�---�' Park Concept Alternative • —_ .il.+flrJfl �•"'".i ."� fJf� r' • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • LEI 11 �•✓�""�,",'�j�� /ROM[NADE • ` -��//` Open House Meeting#1 + �Q May 1,2014 • Parks,Recreation and '� ^�• _`� Natural Areas Plan Site Analysis and Park * /x Parameters �rY ®�� FS Q V ry Overview of 4 Park Concept • Q �a Alternatives l4�tir�c ,,�Y Workshop Activity • Workshop Recap • Park Concept Alternative • Open House Meeting N1 r� • • • • • • • • 76 Sunset Neighborhood Park Master Plan • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan . Facilitated Activity Summary 1) What do you think about the - • park components? 2) Are there any missing park js " components? 3) How do you like the park #" circulation in each concept ' ... 1 � • 4) What are the pros and cons of each concept alternatives? • Hes • Open House Meeting#1 r E Open House Meeting#1 Group Discussion:Table 1 • • ! • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • �� Desired Park Components: 1) Active use areas for teens and a variety of ages(open turf&hard court surfaces) 2) A pavilion or flexible use area for craft and vegetable sales • Preference for 3) Education components such as botanical labels and signage "Promenade" 4) Picnic shelters and"Portal" with a few 5) Benches,tables,and an outdoor sink • s "* . "� elements of "Flow"mixed in 6) Fruit tree walk/Community Garden • ® _ 7) ADA accessibility/connectivity 8) Water feature with a focus on interactive sprayjets 9) Public art • - .., 10)Perimeter walking loop nrri rraa Open House Meeting#1 Summary { Open House Meeting#1 Summary d ! • • • • • ! • • • • Sunset Neighborhood Park Master Plan 77 • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan S Reviewed Existing Park and • School Facilities in the Sunset Next Steps: • Planned Action EIS Area: 1) Committee of the Whole Presentation-June 2,2014 • Tennis Basketball 2) HBB to develop a Preferred Park Concept Alternative • Sports Fields based upon feedback received to date _ Community Garden Several Tennis/Basketball 3) Open House Meeting#2—June 18,2014 i Courts and Sports Fields are McKnight Middle School Commons Area within a%mile walking 4) Open House Meeting#3—Early fall 2014 -_—= distance • S Identified Potential Location • 17- for a Community Garden • �FEIS Sunset Area Preferred Community Framework • • • • • • • • • • • • • • • • • • • • 78 Sunset Neighborhood Park Master Plan • • • • • Parks Commission Briefing #1 Meeting Minutes • • City of Renton • • Board of Park Commissioners • City of • D o A • Meeting Minutes • May 13, 2014 North Highlands Neighborhood Center • • I. CALL TO ORDER • In Attendance The following members were present: • Members: Marlene Winter, Mike O'Donin,Al Dieckman,Cynthia Burns, • Troy Wigestrand,Tim Searing, Larry Reymann • Staff: Terry Higashiyama,Sandy Pilat, Leslie Betlach, Kelly Beymer, • Shirley Anderson, Kris Stimpson,Tom Puthoff,Todd Black Guests: Mike Hamilton,Chris Burns • • Chair,Cynthia Burns,called the May 13,2014, meeting to order at 4:35 p.m. Roll call was taken;Sojin Thompson,Youth Member was unable to attend. • II. APPROVAL OF AGENDA . Marlene Winter made a motion,seconded by Mike O'Donin,to approve the agenda as • presented. All were in favor, motion carried,the May 13, 2014,agenda was approved. • III. APPROVAL OF MINUTES • A motion was made by Mike O'Donin and seconded by Al Dieckman to approve the April 8,2014,minutes as written,all were in favor, motion carried. The minutes were approved as submitted. • IV. BOARD COMMUNICATION City Center Plan—Mike O'Donin • Mike was unable to attend the last meeting where the discussion was concerning the • • • • Sunset Neighborhood Park Master Plan 79 • .. City of Renton • Park Board Minutes • May 13,2014 Page 2 of 4 • • redevelopment of Columbia City. The next meeting will be on June 15t. Mike wanted • to comment on another subject,the Veteran's Park and how great it looks. • School Report-Sojin Thompson . Sojin was unable to attend the meeting this month. • V. DISCUSSION/ACTION ITEMS • Sunset Master Plan Update—Leslie Betlach • Leslie was present to review the future neighborhood park connected to the Harrington Avenue Green Connection,the Sunset Neighborhood Park Master Plan. In February of 2014 Community and Economic Development,Community Services, Public • Works,and the Executive Department held an Interdepartmental Team Meeting. A • Stakeholder Meeting followed in March including the Renton Housing Authority, Colpitts Development,King County Library System,Renton Technical College, Renton • School District,and local businesses as well as the Interdepartmental City Team. • Diagrams demonstrated the recommended parking layout and preferred storm water . facility layout. The Plan identifies park components including a picnic area,water • feature and play area. Additionally other components include performance space, fitness equipment,walking loop,restroom,integration of art,as well as passive open • space. • The first Open House meeting occurred May 1,2014,and reviewed parks,recreation • and natural areas plan,site analysis and park parameters,an overview of four park • concept alternatives,workshop activity and recap. Questions included what the public felt about the park components,was anything missing,how do you like the park circulation in each alternative,what are the pros and cons of each concept • alternative? Desired park components include active use areas for teens and a variety of ages, (including open turf and hard court surfaces),a pavilion for craft and/vegetable sales, . education components,picnic shelter,benches,tables,fruit tree walk/Community Garden,ADA accessibility,water feature, public art and a perimeter walking loop. • Due to space requirements,all desired park components cannot be accommodated in • the future park site. As a follow up to the meeting,staff inventoried existing recreation facilities(tennis,basketball,sports fields and community garden space) • located within a one half mile walking distance to the north and south of the future • pk. Seven tennis courts,four basketball courts,four baseball/softball fields,three soccer fields and one multi-purpose field are located within walking distance. There is potential space for a raised bed community garden location at the North Highlands Parks. H:\Bolrds and Commissions\Park Board\2014 Park Board\5.13.14min.docx • • • 80 Sunset Neighborhood Park Master Plan • City of Renton • Park Board Minutes • May 13,2014 Page 3 of 4 • The Parks Commission did not express any comments or concerns. • The next steps include a Committee of the Whole Presentation on June 2, HBB to develop a Preferred Park Concept Alternative based on up-to-date feedback,a second • Open House Meeting scheduled on June 18,2014,at McKnight Middle School,and the • third Open House to be determined in early fall of 2014. • VLOLD BUSINESS 2014 Goals&Employee Survey Terry quickly summarized the 2014 goals and the employee survey that was forwarded to the Board members for last month's meeting,but time did not allow • discussion. Larry Reymann inquired about following up with Chip Vincent,who spoke at last • month's meeting regarding new development. Larry had some questions on the impact on Coulon Park and traffic. Terry encouraged Larry and all Board members to • call on any of the staff whenever they have questions or concerns. • Vil. ADMINISTRATOR'S REPORT • Saturday, May 17 at 10:00 a.m. is the Meadow Crest opening. Leslie noted she is looking forward to more partnerships with the school district. Terry announced and thanked three of the Board members: Mike,Cynthia and Tim for • 20 years of services. A photo canvas was presented to them as a thank you for their service. • Terry reviewed the proposed reorganization of the parks maintenance to include promoting our current Parks Supervisor,Steve Brown,to Parks Manager. This will go forward for Council review June 2nd,as well as increasing the current.75 Farmers • Market position to full time. • Larry and Cynthia will work on a presentation for Council as an update outlining the work and involvement the Board of Park Commissioners has accomplished the last • couple of years. Vlll. INFORMATION • An update was given on vacancies and recruitment process for the Recreation Manager position and the Manager for Neighborhoods, Resources and Special Events. WkBoards and CommissionsTark Board12014 Park Boardl5.13.14min.doc-, • • Sunset Neighborhood Park Master Plan 81 m • • City of Renton • Park Board Minutes May 13,2014 • Page 4 of 4 • The 2014 Neighborhood Program Picnic Calendar was distributed. • An email was reviewed regarding signage for May Creek. It was also noted that Terry . Flatley successfully completed the requirements established by the Certification Board of the International Society of Arboriculture and was named as ISA Tree Risk Assessment Qualified. • IX. ADJOURNMENT • A motion was made by Tim Searing and seconded Al Dieckman to adjourn the May 13, 2014 meeting at 6:00 p.m. All were in favor,motion carried,meeting adjourned. Agnature "PF • NEXT REGULAR MEETING June 10,201 @ 4:30 P.M. City Hall Conferencing Center--7`6 Floor • WkBoards and CommissionsTark Board12014 Park Board\5.13.14min.docx . • • 82 Sunset Neighborhood Park Master Plan • • • re • • Committee of the Whole Briefing #1 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • �1V�. ? Sunset Planned Action EIS • 1 � L_ IFinal NEPA/SEPA issued April 2011 Committee of the Whole Briefing #1 Completed in consultation with the Renton Housing Authority(RHA) June 2,2014 1 Initiated with the redevelopment of ,: )• J RHA's Sunset Terrace and associated J^ neighborhood growth and +' revitalization i • +� - r. F •'i _ r�' t`. ,I �f Evaluated the broader Sunset Area • - _ - - Community to • Determined the future land use and • _ redevelopment . .., FEIS Sunset Area Preferred Community Framework r.�. - • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • — • - The Future Revised Footprint - • Neighborhood Park Future Neighborhood • _ __^, 2.1 Acres in size �r -, Park Supports future mixed 3.7 Acres in size use housing,new library v�°' Increases recreation _ and retail Development P ; opportunities Future site of a regional Future site of a regional • storm water facility storm water facility Connected to the Connected to the • Harrington Avenue Green - _ _ '�•• Harrington Avenue Green Connection Connection Concept Plan Revised Footprint-Sunset Neighborhood Park • Has e....« r88 • Sunset Planned Action Park Concept Plan ,.r."n�' Sunset Planned Action Park Concept Plan r r� 'flffjfl r��flfJfl • • • • • • • • • • • Sunset Neighborhood Park Master Plan 83 • • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Existing Conditions r + Sun/Shade Analysis �,r +, s —� 'err rlto� a r �'+f1t_wut, • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Interdepartmental Team Meeting • .otirr .,w��w k February 19,2014 Community&Economic Development " f-.,_. ,_.1�` Community Services --� f/// • Public Works ,.'•q, Executive a• s '�' � • l yi �I�W N[101YdYi]CO 11„Jy tiy,Iv,y Stakeholder Meeting March 19,2014 • Renton Housing Authority • Colpitts Development - _ r .4%� • King County Library System _ Renton Technical College ,,,,,, ..-„ • Renton School District • Local Business '••^^ "'�• • • Interdepartmental Team rWI HOR g�•� Interdepartmental Team and Stakeholder Meetings t Recommended Parking Layout r • ----..fir rfc LrDu • • • • • • • • • • 84 Sunset Neighborhood Park Master Plan • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan if�x pqu ,r, t.e rr Fetus =i�y lure " 1 �� 1' • Natural edges with . e(tvation change - • ' Hardscapt rtlationsNp to • tht Library entrance •Rtinforces park - entry points •Ran gardens aesthetically• �v ��integrated into park i . •East of access for park .� f and stormwattr facility • -aktennnet r • •Opportunities for art and s+e � education interpretation H'�le.ds VIL tree WIN M tee-g r,...., • Preferred Storm Water Facility Layout +-�rw_ Identified Park Components r� rlfun • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • a..tor. ,spu. ...: ;..f..e.a �wn+y scat' t` �, l� �M, CLVSnR • • Y�»., i flee Identified Park Components r Park Concept Alternative ---�'t :` f I f r.J f I se —_..�"'�t .-�(f l f J r I g• • • • • • • • Sunset Neighborhood Park Master Plan 85 • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • FLOW ---- 1�, wiwM..., ;! ..H..«..w PORTAL � $ �� � r.cn ra .ram • v�y f .`. f tip 00 ,_� f • Park Concept Alternative - - Park Concept Alternative . • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • ,� • w,r PROMEMACE • Open House Meeting#1 r- May 1,2014 • • Parks,Recreation and Natural Areas Plan • '\ •�� j ,'� Site Analysis and Park _�\ jj +!' ♦ f '�`'' Parameters �-•ti 4_ "' + " " Overview of 4 Park Concept • Alternatives `� +rlarrl � Workshop Activity • Workshop Recap Park Concept Alternative ��'"'d� Open House Meeting#1 • • • • • • • • • • • 86 Sunset Neighborhood Park Master Plan • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan . Facilitated Activity Summary 1) What do you think about the t y * t >' park components? - "M, /• 2) Are there any missing park • components? 3) How do you like the park , 'r (q�'+ ' )r gip'' • circulation in each concept '. +� ✓�� _ T yg; r alternative? 4) What are the pros and cons of a% r each concept alternatives? • Open House Meeting#1 Open House Meeting#1 Group Discussion:Table 1 ----�'" rl�'f1 fI .F' r��'ftfC fl • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Desired Park Components: _ 1) Active use areas for teens and a variety of ages(open turf&hard court surfaces) - v 2) A pavilion or flexible use area for craft and vegetable sales -y.- Preference for 3) Education components such as botanical labels and signage "Promenade"o --' 4) Picnic shelters f✓r' and"Portal" 1f — with a few 5) Benches,tables,and an outdoor sink elements of "Flow"mixed in 6) Fruit tree walk/Community Garden 7) ADA accessibility/connectivity 8) Waterfeature with a focus on interactive sprayjets 9) Public art HN• 10)Perimeter walking loop HBO • Open House Meeting#1 Summary �— Open House Meeting#1 Summary lrnr • • • • Sunset Neighborhood Park Master Plan 87 hCc P 1< j-ter I i r irt hberl cod f ark 1, :r F1 r It Reviewed Revi __. •• Existing Park and School Facilities in the Sunset Next Steps: • Planned Action EIS Area: 1) HBB to develop a Preferred Park Concept Alternative *' '1 Tennis based upon feedback received to date Basketball • f Sports Fields 2) Open House Meeting#2—June 18,2014 Community Garden McKnight Middle School Commons Area Several Tennis/Basketball • Courts and Sports Fields are 3) Open House Meeting#3-Early fall 2014 within a%mile walking • distance • _ Identified Potential Location s. for a Community Garden F`EIS Sunset Area Preferred Community Framework • • • • • • • • • • • • • • • • • 88 Sunset Neighborhood Park Master Plan ' Appendix C • • • • • • Appendix C: Park Schematic Plans • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • s s • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • • • • • �� __Investing in Housing e Jobs e Education Health e Environment * Transportation Sunset Neighborhood Park Jornada de Puerta Abierta • Onete a nosotros en el proceso de • ��I `'' ,� I planificacion para disenar un futuro A t • �� `� �� `1) j parque en el sector de Highlands. u El parque tendra un area de 1.5 hect6reas. • Sunset Neighborhood Park • �' ,� Open House Meeting 1: • 'h j - Please join us in the master planning process to design a future 3.7 acre neighborhood park as a part • :, . . ,, of the Sunset Area Community _�►- "�'`d"{ Revitalization Program.This will be Miercoles,18 de Junio del 2014/6:00-8:00 p.m. the second of three interactive open McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 house meetings. . Se proveeran refrigerios.Tendremos disponible interprete en espafiol. • Wednesday,June 18, 2014/6:00-8:00 p.m. McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 Light refreshments will be served.Spanish interpreter available. • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 89 • • • Open House Meeting #2 Agenda • • • Introduction ®Opening Remarks, City, Team Introductions City of Renton • ®Open House Meeting #1 Summary HBB , Brief Overview of four Concept Alternatives • Preferred Concept Alternative i • ®Nearby Park Facilities City of Renton • • • Park Schematic Plans • °Park Schematic Plans Overview HBB • °Questions and Answers • • Activity i °Schematic Plan Stations HBB S Activity Summary • ®Summary of Schematic Plan feedback HBB °Next Steps • • • • • • • • • • • 90 Sunset Neighborhood Park Master Plan • • • Open House Meeting #2 Photographs • • .r n ; • • • . r • `_lug � "":,..mom .� ,�,m.� ... ..._. �°� �� _ `_ 1 • 1 � • • • • • • Sunset Neighborhood Park Master Plan 91 N Sunset Neighborhood Park Master Plan Park Concept Alternatives Inwsting in Housing Jobs 0 Education 0 Health En%(ironment Transportation CLUSTER ; PORTAL 1 ,.... PedesM'an ' Pedestn'an Paetiway:l �''.. ` �. ... %a9 P Porn+ l: `e' ,\ ,✓ Plain W �� 4 A �y V ^9a� ' Feature O�C SPaPorn+nn Yis i^9 % FLOW � ' �J�J�� /yti � PROMENADE4/ Pedeeh$ � ♦ VJ�/, a', /' S\• t vtdelht Qy___.-i �S/.�L ,... Padwayf - 4 / -Ll✓lazn-r .• j Pfwq , � - I �\% Play A� rt /, {�.F�eata t1Tnnbw.n1 ♦ Cj �f ^..* 1� iaeMSe.�..� % b , 'p P,ay n S P'cni l -_� , Op Qa n e�a ,t water /7 m G'U1imULL O aL vV o May 1,2014 Q v v rt rD v 00000 ► • 0 • • 0 • • 00 • • s0 * 00 • 9 • • • * • 00 • • • • • 0 • • • 00 • o V V) z 0 J 0 Sunset Neighborhood Park Master Plan Park Concept Alternative 0 0_ Investing in Housing 0 Jobs 0 Education Health Divironment 0 Transportation -n v 77- �Z I I RHA Housing RHA Housing PREFERRED PROMENADE/PORTAL RHA Housing" Pedestrian Patkways 'Orys -� Load/Unload r �? fli � y . X-.. Plaza Plaza' j (P-ic nrc j aingarde Plaza Performance l �; ''�-' , • Viewing Area/,/ i. Picnic � � Open Space/ 1 71 estroo aing dcn itnes Playickli \ Open Space _ - - Water Feature s� Plaza `Play �' Market Rate s� _ _ _ . .. S_12 y,s �w t Housing Library l Open Space ' Plaza Market Rate Housing/Mixed Use Market Rate - 0 � t Housing +y X: HSB w CH2MHi1L June 18,201; l0 W Sunset Neighborhood Park Master Plan Village Green: Photo Examples Investing in Housing Jobs Education Heath EnviFonnnent Transportatioii pw Ln rD l .i. l .. _ - rt ML.. z L O o AIL. 0 0 Q June 18,2014 v v N (D v fp r� z �- O o Sunset Neighborhood Park Master Plan Schematic Plan 0 iZ -v v v t.� RHA Housing ;. .\ RHA Housing LbVILLAGE GREEN RHA Housing 3� Stagiry Bed,typ FA ft affnAt ftdn PetandW At tvp Performance Lpteppy pyp ° s 0 1° !' Seedy/ �1r,/•f4�,�� �.. 'V Open Span 'Notice Boards' SMkar,typ / Place \�M Water- .2-9yr � ftaWre ;f,• ,- Market Raft ' c _ 1.IbparJ Picnic.type Blro4"d �: ° �y-- - Market Rate ° s Housing/Mixed Use {o Market Rate Housing Inl z_ H B B V caeaua+iu lfl June 18,2014 Ln Investing in Housing • Jobs • Education • Health • Environment • TranspoAation y _ r .. k w _tt - •- � _ I�g `' -S q/Ills f a t ti Sunset Neighborhood Park Master Plan Vista Place: Photo Examples LA CrQ • i9 • June 18,2014 CD z rD C7 0 o Sunset Neighborhood Park Master Plan Schematic Plan 0 rz v v _ L VfSTA PLACE RHA Housing a: RNA Housing rD RHA Housing 's i � Potential T7 Seatwall,typ s Are Lo Oa chs,Qp& Intarp"Vve Siq f stagi-g Soft Surfau pathwayt Raingprdan y °� •Notfca s,' Boards• � 2;�' ,t l Performance y .. .� stati.y/ j "4.�.,,,...,C. Plea Open Space Wabr Q°'^9e�^ , • \..., , Feature -' a�f picnic,typ (5urface c, a . t slwt Flow) ' - ©each.typ P tantial Art Lowltion F' �^� play�rutu�! f Market Rots Nousiny s u Ur i t Viewi.y yI, t Place w •-park Pathway,typ r u� market Rate � Potentiar Nousitag/Mixed USt ,tO Art Location - • pia{ x Market Rate Housing 4 =t*471YWILL- l0 11 June 18,2014 V w 00 Sunset Neighborhood Park Master Plan Water Commons: Photo Examples Investing in Housing Jobs 0 Education Health Environment Transportation TMO )A IdOL - . � d i w, ('D Z OU ,t.. O" 0 C=wMuU. Q June 18,2014 v 1 rt fD v 000 • 000000000000000 0400i00004000000400090000 c Ln lD I+ z /D w' C7 0 o Sunset Neighborhood Park Master Plan Schematic Plan 0 CL WATER COMMONS vvs RHA Housing RHA Housing (D � RHA Housing -0 4•off Jrt� 3 8-ch.typ � j ;�1,C• stywmg �'> .. '4' Intarpntiw Sign S . pergola,tv 1 Pi-4.typ 'Notice !` Boards- t - -Patential Art Location,ty), • .• 5sati'y P?'' r cM`:. .✓ fro op'.spas" l 'r playgrouru( ���\ try" a • 2 s yr I+ r a�� `k Market Raft water Feature Housing ` (det/spal arp "J _ Library \ � fMygroand ., t� ., Park Pathway,typ water spillway , Market Rate Housing/Mixed Use ly Market Rate Housing HQS #A cMeNtHUL l0 June 18,2014 lD Sunset Neighborhood Park Master Plan Nearby Park Facilities • Investing in Housing Jobs 6 Education I Health I Environnnent 6 Transportation FEIS Sunset Area Preferred Community Framework • v w Within a V.mile to the north: • ....................�...�....' u i North Highlands Park and Neighborhood Center ' \ •1 Lighted Tennis Court it C' StrD proposed for refurbishment • I • _ Sc o_QI r 1 ' © : •Portion of park area has been iNo rf �••..-.. preliminarily identified for ` f.'h� ' raised bed community garden • r +��A;l `ram"T ! / McKnight Middle School (School has first use priority) _`` i - •4 Tennis Courts • - •z Basketball Courts • aa" "++ ' �' , ' •3 Baseball Fields � Mc 9 •� • •3 Soccer Fields ddle +- • Within Y.mile to the south: i Hig lands • r� Highlands Park and LI • rd�.� * ' Neighborhood Center "1' �� a ♦ i •2 Tennis Courts\, • `" �'—� --�, 9 ,� i •2 Basketball Courts � �G�� � � ��ti !"�,.i •I.Softball Field •1 Soccer/Multi-purpose Field ti U-1 No Off-leash dog park facilities • - A Z �`d v( are located in the Planned � �.� o Q Action EIS area. St 1's' Terrace G • :L' LEGEND t� I • Pedestrian Intersection :.� •,�•'�"ter ,x * Pedestrian Connections • Sunset BLVD Improvements • .' • • � .�,, '�e g _ Me Green Collector Arterial IS i -•�=µ Green Access Local Collector • ar Woonerf/Green alley Permeable Sidewalk i n 5 7 $ I • School/Civic M.entary (r °" • Mixed Use • Residential • •f �,N 7th St Parks=, • �'• Rento • '�`' - ,,: .-.•- O Community Garden EIS Boundary • 0. . 300 600 120 s ti {- t.St L._. • HBB ul c..avw+L. • June 18,2014 • • 100 Sunset Neighborhood Park Master Plan • • • • • Open House Meeting #2: Summary Notes Page 1 of • • Date:June 18, 2014 Time: 6pm to 8pm • Place: McKnight Middle School Commons Area, 1200 Edmonds Ave. NE, Renton Attendees: Seventeen community members attended, including residents and representatives of the • Renton Housing Authority, Renton Schools District, and the City of Renton Parks Commission. Five • attendees also previously attended the Open House Meeting#1, May 1, 2014. • • Team Presentation • • Leslie Betlach, City of Renton, introduced the City team and provided a summary of the Park Master Plan process. Colie Hough-Beck, HBB, introduced the design team and described the agenda for the Open House • #2 Meeting. • • Open House Meeting#1 Summary • Colie provided a brief overview of the four Park Concept Alternatives presented at the Open House • Meeting#1 and a summary of the feedback received during that meeting. Colie then presented the Preferred Park Concept, which consolidated the feedback from Open House Meeting#1 into one preferred • concept. Colie explained that this Preferred Park Concept guided the development of the three Park Schematic Plans which would be presented later in the Open House. The Preferred Park Concept illustrates the following main items: • • The north and south alignment of Harrington Avenue should be honored in the circulation and • pathway system. • • Provide multiple entry plazas (portal plazas) at key access points, such as the future library, • Glenwood Avenue, Sunset, Harrington, and the future housing developments. • • Circulation should provide direct access through the park. • Show the main use zones (play, plaza, etc.) located in the east half of the park, closer to the future • mixed-use development. • • Nearby Park Facilities: • Leslie Betlach described existing park facilities located within 1/2 mile of the proposed Sunset Neighborhood Park. Nearby park facilities were inventoried as a follow-up to the Open House #1 Meeting • in order to illustrate what park activities are being met in parks near the proposed Sunset Neighborhood • Park. Below is a list of these facilities described: • North Highlands Park and Neighborhood Center • 1) 1 Lighted Tennis Court proposed for refurbishment • 2) Portion of park area has been preliminarily identified for raised bed community garden • • McKnight Middle School (School has first use priority) • 1) 4 Tennis Courts 2) 2 Basketball Courts • 3) 3 Baseball Fields • • Sunset Neighborhood Park Master Plan 101 • Open House Meeting #2: Summary Notes Page 2of5 4) 3 Soccer Fields Highlands Park and Neighborhood Center 1) 2 Tennis Courts 2) 2 Basketball Courts 3) 1 Softball Field 4) 1 Soccer/Multi-purpose Field No Off-leash dog park facilities are located in the Planned Action EIS area. Park Schematic Plans: • Dean W. Koonts, HBB, provided an overview of the three Park Schematic Plans: Water Commons, Village Green, and Vista Place: Water Commons: • Water Commons translates the preferred park concept into a schematic plan through the use of the simple, • geometric design principles of the Modernist Landscape style. • Pathways and pedestrian circulation provide direct, geometrically curving routes into and through the park, defining the open spaces in a balanced way. S • The water feature has two main features: (1) bubbling jets provide water that stream down the • face of a low retaining wall; (2) this water collects into a channel that runs south to the south Harrington Ave portal plaza. • The play areas are separated and they, along with the fitness areas and picnic plaza (parent plaza) S radiate outward from the main plaza. • The restroom sits closest to the main open space/performance area and is integrated with a large • curving pergola structure that has benches underneath. • • The portal plazas incorporate hardscape and curving benches. The portal plaza across from the future library also includes a curving pergola structure with seating underneath. • The main sculptural art element occurs in the main plaza. i • Formal lines of trees follow the axial pathways and help define the open spaces. Village Green: Village Green translates the preferred park concept into a schematic plan through the use of S naturalistic, pastoral design principles of English Landscape park style. • Pathways and pedestrian circulation meander along the outer edges and the internal routes of the park looping back to each other. • The water feature incorporates a channel of flowing water with boulders and potentially pockets of • planting reminiscent of a stream's edge. • • The play areas, fitness areas, picnic spots, and restroom building are nestled into the planting areas which buffer the uses from each other. • The portal plazas incorporate vegetation to soften the entryways, with the portal across from the • future library integrating the main sculptural art element. • • Orchard trees line both sides of the main north-south pathway that curves gently through the • main plaza. • Clusters and groves of trees are grouped informally throughout the park framing views and 102 Sunset Neighborhood Park Master Plan • • • • • Open House Meeting #2: Summary Notes Page 3 of • • providing shade. • Seating consists of benches and of picnic table/shelter spots. • Vista Place: Vista Place translates the preferred park concept into a schematic plan through the use of the • symmetrical, classic design principles in the French formal style. • • Pathways and pedestrian circulation align with the several streets that dead-end at the park, providing straight and axial routes into the park and with park elements. • The water feature is multi-functional, providing a shallow sheet of flowing water that when turned off provides additional hardscape for events in the main plaza. • • The play and fitness areas are gathered together in a single use area adjoining the main plaza. • • The restroom is located near the north Harrington Avenue entrance for maintenance access. • • The portal plazas incorporate planting, with the main north and south portals aligning with Harrington Avenue integrating sculptural art elements. • Formal lines of trees follow the axial pathways and help define the open spaces. • A smaller viewpoint/art plaza aligns with the view through the gap of adjacent buildings to the southwest. • • A variety of seating options are provided: seat walls and double rows of backed benches in addition to picnic spots. • Participant comments and questions during the presentation included: . 1) Question: What is the purpose of the rain garden? • Response:The rain garden is a surface feature above an underground infiltration gallery that will treat stormwater. • 2) Question: Who selects the art for the park? • Response:The Renton Municipal Arts Commission will provide direction on art selection. • 3) Question: Was a skate park considered for the park? • Response: A skate park was not suggested in the earlier City of Renton Interdepartmental Team Workshop, the Stakeholder Workshop, nor the Open House Meeting#1. A skate park is generally • considered for a larger Community park. 4) Question: Will the rain garden be planted? • Response: The rain garden will be planted with water-friendly plants. 5) Question: Will there be lighting improvements to the area? Response: Low-level, safety lighting will be considered for the park. • 6) Question: Will there be speed limits on Harrington Avenue? Response: Yes, there will be speed limits placed on Harrington Ave. • 7) Question: How much will it cost to construct the park? • Response:The City does not want to limit itself as it's trying to define what components the public desires in the park and where they would like to have them located and the size and configuration. • The City doesn't want to constrain this part of the process with a number. • • Open House Workshop Activity Activity Summary: • Attendees visited three stations to review the Park Schematic Plans more closely and provide feedback. • Sunset Neighborhood Park Master Plan 103 • Open House Meeting #2: Summary Notes Page 4of5 There was one work station for each Park Schematic Plan and accompanying photo examples of park components shown in the plans. Station leaders from the design team recorded comments from attendees on the plans. Attendees were asked what they liked and didn't like in each plan. Attendees reconvened as one audience, and each station leader presented a summary of station comments. Summary of the Station Discussions: • A. Water Commons: 1) Likes the play area arrangement. 2) Likes the pergola around the performance space. • 3) Vines on the pergola should be considered. • 4) Likes the curved benches. 5) Needs a covered picnic area. 6) Keep slopes gentle. 7) Likes the rain garden as an opportunity for education. . 8) Likes the "marker", or potential art location, at the plaza across from the future library. 9) Prefers art at ends of Harrington Avenue. 10) Does not like the water feature, and it is too far from the restroom. 11) Likes the restroom location for maintenance access and its separation from other park activities. 12) Does not like the straight channel water feature. • 13)The water channel could be a tripping hazard. • 14)The water feature needs movement and noise. 15) Likes the sculptural aspect of the water feature. S B. Village Green: 1) Likes the meandering paths. • 2) Likes the right side of the park because activity is clustered away from the path. 3) Prefers the performance area shape in Water Commons. 4) Prefers seating near the performance area in Water Commons. 5) Likes the boulder, natural-looking water feature. 6) Likes this water feature the most. S 7) Likes the restroom location, because it is tucked away and not along the perimeter of the park. 8) Likes the trees that emphasize Harrington Avenue connection. 9) Likes the naturalistic character. 10) Likes the overall character of the photo examples for this plan. 11) Likes flexible performance space because it is not enclosed by trees or a pergola. • 12) Concerned about the rocks being slippery. • C. Vista Place: 1) Thinks the layout is too angular. S 2) Likes the options for seating, lots of choices for seating throughout the park. • 3) Not sure about the surface flow water feature. • 4) Likes the art locations. 5) Likes seating- benches, seatwalls and picnic areas throughout the park. 104 Sunset Neighborhood Park Master Plan • • • • • Page 5 of 5 • • 6) Likes the view from the plaza. 7) Wants to include orchard trees. • 8) Concerned about trees directly above benches causing a bird dropping conflict. 9) Likes the seatwalls. • 10) Likes the restroom photo. • 11) Likes the diversity of private spaces. 12)Thinks this is the best opportunity to integrate a slope for kids to roll down. • D. Overall Comments Comments that were made at each station, but were applicable to all three Park Schematic Plans are • recorded below: • 1) Include bicycle racks. The bicycle racks could be an opportunity to include art. 2) Concerned about the safety of the pedestrian crossing in front of the mixed-use building to the park. • 3) Likes the fitness equipment. 4) Review the shade analysis for lawn survivability information. 5) Likes the multiple portal entries for wayfinding. 6) Concerned about security at night. • 7) Incorporate Crime Prevention through environmental design, CPTED. S 8) Concerned that there will not be enough parking. 9) Include good sightlines through the park. Include low vegetation and high tree canopies for visibility into the park. 10) Connect the park system with Harrington Green Streets. • 11) Likes the Burien City Hall water feature. 12) Likes the Port of Olympia water feature. • 13) Incorporate lighting into the walls. • 14) Include bat boxes or bird houses into the rain gardens. 15) Include a flat area at the bottom of hills for kids to play and roll down. • • • Next Meeting • September 23, 2014 Community Open House #3, McKnight Middle School, 6pm-8pm. This will be the final Open House and the Draft Master Plan will be reviewed. • • • • • • • • • • • Sunset Neighborhood Park Master Plan 105 • • • • • Renton Reporter Article • Sunset neighborhood park is • coming into focus • — `, U "N'a.r"E i iI �ll'"�"w^r��' PREFERRED • CNOMEWWE/PORYN. a KI/ o LF$ T Al •arkrt r� � ' - . oy�svue • This is the proposed plan after two community meetings for the new Sunset Neighborhood Master Plan project. • —Image Credit-Submitted • byTRACEY COMPTON, Renton Reporter Staff Writer • Jun 25,2014 at 3:37PM The Sunset Neighborhood Park Master Plan continues to take shape with each passing community • meeting. • Project team representatives and community members convened for another check-in June 18 at • McKnight Middle School to see how feedback from the previous meeting has been incorporated into the master plan design. • "We took all that into consideration and came up with the'Preferred Bubble Concept,"'said Colie • Hough-Beck,of HBB,the landscape architect. • The Preferred Bubble Concept represents a combination of all the ideas that were presented in the • last master plan meeting May 1.Most of the 28 people in attendance seemed to find one concept of the three presented for the look of the park that they liked for the Preferred Bubble Concept.The city • has called those different looks the"Village Green,""Vista Place"and"Water Commons." The city presented the schematic designs for those three different looks and image example boards • of the components that would make up the overall concept.The"Village Green"concept has a nine- • foot grade change,with portals and pathways all around the park.It has a boulder channel water • feature and playgrounds for ages two to five and five to 12.There is also a plaza that coordinates with the library entrance to the park. • The"Vista Place"has a more formal geometric shape than the other designs,although a similar • layout.This concept features a larger surface area water feature.All the playground equipment is clustered in the same area and the lawn has gentle slopes.In the plaza next to the library,there are • seat-walls. • The last concept,"Water Commons,"is a blend of the two previous designs.The portals or pathways • now function in a semi circular fashion.The space lends itselfto a pergola around the central plaza. The water feature spills over a wall and their are pathways through the rain gardens. • "I find it very interesting and I like the Village Green,"said Stewart Shusterman,Renton School • District representative. He found it easy to make comments on the drawings,but more helpful to view the image examples • attached to each concept.With Highlands Elementary around the corner and Meadow Crest Early • Learning Center up the road,Shusterman said the district is a big part of this development. • 106 Sunset Neighborhood Park Master Plan • • • • • • • "I don't have kids,so I don't know if it's badly needed,"said Sheridan Botts,who lives in the area. • "There isn't really a good natural green space like a play field.So,I'm looking forward to having the • water features and the trees.And I'm really looking forward to the new library location." • The construction for the library is to start sometime this summer.There are components that did not make it into the design like the activity teen courts.Renton Housing Authority's Kaelene Nobis • understands why some components didn't make it and thinks the project team did a good job of explaining why. • "I really like the ones that are a tittle more flowey and less geometrical,"she said of the designs. • "But I think that they took a lot of what everyone wanted that they could put into it,into it." • City of Renton project lead Leslie Betlach was excited to see more people out forthis meeting than the previous one in May.There is still no budget for the project,as the city identifies grants and • other funding sources.The next step is for the project team to distill all the information into a draft master plan,which the public will get to comment on Sept.23 at another community meeting. • "Right now we don't want to limit ourselves;we're trying to define what components the public • desires in the park and where they would like to have them located and the size and configuration," said Betlach about a budget forthe project."So we don't want to constrain this part of the process • with a number," • TRACEY COMPTON,Renton Reporter Staff Writer tcompton@rentonreporter.com or 425-255-3484,ext.5052 • • • • Find this article at: http://w rentonreporter.coMcommunity/26466O751.html • ❑Check the box to include the list of links referenced in the article. • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 107 • 108 Sunset Neighborhood Park Master Plan • • • • • Park Schematic Plan Order of Magnitude Cost Estimates • • • VILLAGE GREEN VISTA PLACE WATER COMMONS Item Unit Cost Qts. Item Total Qts. Item Total Cite. Item Total • 1.Demolition(no demolition assumed) NA • B 2.Site Preparation $2.00/s.f. 141,500 s.f. $283,000.00 141,500 s.f. $283,000.00 141,500 s.f. $283,000.00 B 3.Grading $1.00/s.f. 141,500 s.f. $141,500.00 141,500 s.f. $141,500.00 141,500 s.f. $141,500.00 B 4.Electrical Receptacles $30,000.00 I.s. 1 I.S. $30,000.00 1 I.S. $30,000.00 1 I.S. $30,000.00 • B 5.Light Bollards $3,000.00/ea 20 ea $60,000.00 20 ea $60,000.00 20 ea $60,000.00 B 6.Utilities(Water/Sanitary) $150,000.00 I.s. 1 I.S. $150,000.00 1 I.S. $150,000.00 1 I.S. $150,000.00 • B 7.Storm Drainage $120,000.00 I.s. 1 I.S. $120,000.00 1 I.S. $120,000.00 1 I.S. $120,00.00 B 8.Trees $425.00/ea 60 ea $25,500.00 60 ea $25,500.00 60 ea $25,500.00 B 9.Shrubs and Groundcover(soil prep included) $7.00/s.f. 15,340 s.f. $107,380.00 15,620 s.f. $109,340.00 14,940 s.f. $104,580.00 • B 10.Lawn(soil prep included) $3.00/s.f. 71,730 s.f. $215,190.00 68,780 s.f. $206,340.00 71,660 s.f. $214,980.00 B 11.Irrigation $2.00/s.f. 87,070 s.f. $174,140.00 84,400 s.f. $168,800.00 86,600 s.f. $173,200.00 • B 12.Concrete Paving $9.50/s.f. 37,890 s.f. $359,955.00 37,190 s.f. $353,305.00 37,990 s.f. $360,905.00 S 13.Soft Surface Paving(includes edging) $12.00/s.f. 0 s.f. $0.0 1,590 s.f. $19,080.00 0 s.f. $0.0 • B 14.Play Areas(surfacing and structures included) $600,000.00 I.s. 1 I.S. $600,000.00 1 I.S. $600,000.00 1 I.S. $600,000.00 B 15.Fitness Stations $10,000.00/ea 5 ea $50,000.00 5 ea $50,000.00 5 ea $50,000.00 B 16.Restroom w/Pump Room $400.00/s.f. 1,000 s.f. $400,000.00 1,000 s.f. $400,000.00 1,000 s.f. $400,000.00 • B 17.Water Feature:Pump&Filter Vault $20,000.00 I.s. 1 I.S. $20,000.00 1 I.S. $20,000.00 1 I.S. $20,000.00 B 18.Water Feature:Fountain Fixtures $2,150.00/ea 24 ea $51,600.00 24 ea $51,600.00 24 ea $51,600.00 • S 19.Water Runnel Feature $30,000.00 I.s. 0 Ls. $0.0 0 I.S. $0.00 1 I.S. $30,000.00 B 20.Picnic Tables w/Pad $2,500.00/ea 10 ea $25,000.00 10 ea $25,000,00 10 ea $25,000.00 • B 21,Benches $2,500.00/ea 17 ea $42,500.00 35 ea $87,500.00 0 ea $0.00 S 22.Special Bench $400.00 A.f. 0 I.f. $0.00 0 I.f. $0.00 340 I.f. $136,000.00 B 23.Litter Receptacles $1,500.00/ea 5 ea $7,500.00 5 ea $7,500.00 5 ea $7,500.00 • B 24.Bicycle Racks $1,250.00/ea 5 ea $6,250.00 5 ea $6,250.00 5 ea $6,250.00 S 25.Seatwalls $200.00 A.f. 130 I.f. $26,000.00 870 I.f. $174,00.00 140 I.f. $28,000.00 38,000.00 • B 27.Interpretive Signs $2,000.00 I.s. 2 I.s. $4,000.00 46 $1 2 I.s. $4,0 0.00 2 I.s. $4,000.00 B 28.Monument Park Sign $5,000.00 I.s. 1 I.S. $5,000.00 1 I.S. $5,000.00 1 I.S. $5,000.00 • Assumptions: BASE(6)Subtotal: $2,878,515.00 $2,904,635.00 $2,833,015.00 • 1.Cost estimate reflects 2014 in-place construction costs. Mobilization(15%) $ 431,777.25 $ 435,695.25 $ 424,952.25 2.Cost estimate based on Schematic Plans. 3.Costs assume normal site conditions.Any soil stabilization,soil Subtotal: $3,310,292.25 $3,340,330.25 $3,257,967.25 dean-up,and/or special structural footing requirements is above Sales Tax (9.5%) $ 314,477.76 $ 317,331.37 $ 309,506.89 and beyond the scope of this estimate. • 4.A 1%art line item is included as part of the Probable Base Cost. Subtotal: $3,624,770.01 $3,657,661.62 $3,567,474.14 . Contingency(25%) $ 827,573.06 $ 835,082.56 $ 814,491.81 Subtotal: $4,452,343.08 $4,492,744.19 $4,381,965.95 • Art It%) $ 44,523.43 $ 44,927.44 $ 43,819.66 Probable BASE Construction Cost $4,496,866.61 $4,537,671.63 $4,425,785.61 • • SPECIALS(S)Subtotal: $26,000.00 $193,080.00 $332,000.00 Mobilization(15%) $ 3,900.00 $ 28,962.00 $ 49,80.00 • Subtotal: $29,900.00 $222,042.00 $381,800.00 Sales Tax (9.5%) $ 2,840.50 $ 21,093.99 $ 36,271.00 Subtotal: $32,740.50 $243,135.99 $418,071.00 Contingency(25%) $ 7,475.00 $ 55,510.50 $ 95,450.00 Probable SPECIALS Construction Cost $40,215.50 $298,646.49 $513,521.00 • Probable Total Construction Cost $4,537,082.01 $4,836,318.12 $4,939,306.61 • • • • • • • • • • Sunset Neighborhood Park Master Plan 109 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • s • • • • • 110 Sunset Neighborhood Park Master Plan • • • • • • • Parks Commission Briefing #2 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan Sunset Planned Action EIS Final NEPA/SEPA issued April 2011 Parks Commission Briefing #2 Completed in consultation with the • Renton Housing Authority(RHA) August• 12,2014 Initiated with the redevelopment of RHA's Sunset Terrace and associated Jneighborhood growth and • ; revitalization Evaluated the broader Sunset Area • — _ Community Determined the future land use and • redevelopment • ua Y�., t __ . eee Y�..,..,, • FEIS Sunset Area Preferred Community Framework >- - twflfJrI • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • - Interdepartmental Team Meeting Open House Meeting#1 February 19,2014 May 1,2014 - Community&Economic Development Community Services Overview of Sunset Planned Action • .; .per • Public Works . _ EIS Area and Work to Date Executive • Overview of 4 Park Concept • � :€ �$► Alternatives Stakeholder Meeting Facilitated Workshop Activity to • _ March 19,2014 Invite Public Feedback on Each • Renton Housing Authority t Alternative • Colpitts Development • Multiple Public Outreach Methods O King County Library System Utilized to Invite the Public to s f Renton Technical College . - ! Renton School District Participate _ Local Business _.___...._-.._. • Interdepartmental Team Interdepartmental Team and Stakeholder Meetings Previous Meetings • • • • • • • • • • • Sunset Neighborhood Park Master Plan 111 • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • U L, o �, Existing Park and School Facilities in • I , the Sunset Planned Action EIS Area • + North Highlands Park&Neighborhood Center • G� 9� Tennis Court Potential location for a Community Garden ��� ` '�► McKnight Middle School • 4 Tennis Courts _ 2 Basketball Courts • 3 Baseball Fields 3 Soccer Fields • = Highlands Park&Neighborhood Center • — — 2 Tennis Courts _= 2 Basketball Courts v_ 1 Softball Field 1 Soccer/Multi-purpose Field Preferred Park Concept r FEIS Sunset Area Nearby Park Facilities • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Open House Meeting#2 Facilitated Workshop Activity • June 18,2014 • {, •-- Three Schematic Plan/Photo Example Summary of Open House Stations Meeting#1 Park Concept Likes,Dislikes and Desires for each • i y Alternatives Plan/Photo Example Board • • Preferred Concept Plan Public Input Documented on Boards Nearby Park Facilities _ Recap/Summary • Overview of 3 Park Schematic Plans • • Workshop Activity • Workshop Recap • Open House Meeting#2 Open House Meeting#2 r d. rra, r i 112 Sunset Neighborhood Park Master Plan • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • WATER COMMONS WATER COMMONSIT w� et • HasY....�. r.. �.., • Park Schematic Plan —! Photo Examples ., jua • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan VMAA"GR M VILLA4E 4REEN • • V� ,-A ip Park Schematic Plan Photo Examples • • • • • • • • • • • Sunset Neighborhood Park Master Plan 113 • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan . VISTA PLACE VISTA PLACE • i • Park Schematic Plan r ., Photo Examples �,.Ir • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • General Park Questions Summary: Desired Park Features Summary: • 1) Play area/fitness area arrangement that includes a picnic area • 1) What is the purpose of the rain garden and will it be planted? 2) Pergola around the performance space • 2) Who selects the art for the park? 3) Covered picnic area 3) Was a skate park considered for the park? 4) Art locations at the Harrington Avenue and future library entrances • 5) Restroom located for maintenance access and separate from other park activities • 4) Will there be lighting improvements to the area? 6) Natural-looking,boulder water feature 5) Will there be speed limits on Harrington Avenue? 7) Trees emphasizing the north/south Harrington Avenue connection • 6) How much will it cost to construct the park? 8) Meandering paths • 9) Multiple seating options and private spaces 10)Viewing plaza • 11)Gentle slopes for kids to play HU 12)Flexible and Diverse Space(s) Will Y s'O"" • Open House Meeting#2 ,. Open House Meeting#2 Summary r n•, • • • • • s • • • • • 114 Sunset Neighborhood Park Master Plan • a • • Sunset Neighborhood Park Master Plan • Next Steps: • 1) Committee of the Whole Presentation—August 18,2014 • 2) HBB to develop a Preliminary Master Plan based upon feedback received to date • 3) Open House Meeting#3—September 23,2014 • McKnight Middle School Commons Area 111.41 • • • • Sunset Neighborhood Park Master Plan 115 • • • • Parks Commission Briefing #2 Meeting Minutes • • City of Renton • • Board of Park Commissioners • D City of • • Meeting Minutes • August 12, 2014 • 4:30 p.m. — City Hall Lobby • I. CALL TO ORDER • In Attendance • The following members were present: • Members: Cynthia Burns, Larry Reymann, Mike O'Donin,Tim Searing,Troy • Wigestrand, Marlene Winter • Excused Absence: Al Dieckman, Sojin Thompson . Staff: Terry Higashiyama, Leslie Betlach, Kelly Beymer, Kris Stimpson, Doug • Jacobson,Sean Claggett, Casey Stanley • • Chair, Cynthia Burns,called the August 12, 2014,meeting to order at 4:30 p.m. Roll • call was taken;Al Dieckman and Sojin Thompson were not in attendance. • II. APPROVAL OF AGENDA • A motion was made and seconded to approve the agenda as presented. All were in • favor, motion carried,the August 12, 2014, agenda was approved. • III. APPROVAL OF MINUTES • A motion was made and seconded to approve the June 2014 minutes as written, all • were in favor, motion carried. The minutes were approved as submitted. • IV. TOUR Cedar River Boathouse • Kris introduced Courtney Moeller,the manager of the new Renton Rowing at the Cedar River Boathouse. Courtney explained the relationship of Renton Rowing to the • George Pocock Rowing Foundation in Seattle. She also outlined the programs being • offered; adult and youth rowing, camps, lessons,and rental of paddle boards and kayaks. She then gave a tour of the facility, including the upstairs workout area. • • • • • 116 Sunset Neighborhood Park Master Plan • • • • • • • City of Renton Park Board Minutes • August 12,2014 Page 2 of 2 ! Sunset Neighborhood Park Master Plan • Leslie outlined the progress and timeline on the Sunset Neighborhood Park Master • Plan including an overview of the second Open House Meeting held at McKnight Middle School on June 18,2014. In addition to the Open House meetings, • Interdepartmental Team Meetings and Stakeholder Meetings have been held. The • second Open House meeting invited public participation and feedback on three ! schematic plans. Desired park features include a play area/fitness area arrangement that also includes a picnic area,a pergola around a performance space,covered picnic • area, art locations at each end of Harrington Avenue and future library entrances,a ! restroom facility separated from park activities,boulder water feature,trees emphasizing the north/south Harrington Avenue connection,meandering paths, • multiple seating options,viewing plaza, gentle slopes and flexible and diverse spaces. • The construction sequence would be for the Harrington Green Connection to be constructed first followed by the library,regional storm water facility,surrounding • housing units and lastly,the park.The Board members voiced no questions or concerns on the second briefing. The final public Open House meeting will be in September to secure public feedback on the Draft Master Plan. • Renton Airport Doug Jacobson,Deputy Public Works Administrator,gave a presentation on the • Renton Airport. Doug is currently serving as the interim Airport Manager,with the ! departure of previous manager, Ryan Zulauf leaving for a job with the FAA. Doug explained the history of the airport and the new projects coming on line. The meeting was held at the old Chamber of Commerce building on Rainier Avenue,which is • planned to be the new aviation training center. . V. ADJOURNMENT • A motion was made and seconded to adjourn the August meeting at 6:40 p.m. • following the tour. All were in favor, motion carried,meeting adjourned. • Signature • NEXT REGULAR MEETING ! City Hall-7`h Floor Conferencing Center ! September 9,2014-430 p.m. • • • • • • Sunset Neighborhood Park Master Plan 117 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 118 Sunset Neighborhood Park Master Plan • • • • • • • Committee of the Whole Briefing #2 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • .`� % Sunset Planned Action EIS ' Final NEPA/SEPA issued April 2011 • Committee of the Whole Briefing #2 Completed in consultation with the • Renton Housing Authority(RHA) • August 18,2014 t Initiated with the redevelopment of g RHA's Sunset Terrace and associated neighborhood growth and revitalization • J •, ,,,� Evaluated the broader Sunset Area • '" _ Community -- Determined the future land use and • '" :_^ redevelopment NY Yaw.,, t ,—�•:� ttt;tt w ..... . . FEIS Sunset Area Preferred Community Framework . . • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Interdepartmental Team Meeting Open House Meeting#1 February 19,2014 May 1,2014 Community&Economic Development Community services r Overview of Sunset Planned Action Public Works . EIS Area and Work to Date Executive Overview of 4 Park Concept • ` _� Alternatives Stakeholder Meeting Facilitated Workshop Activity to _ March 19,2014 Invite Public Feedback on Each 0,4f: • Renton Housing Authority Alternative • Colpitts Development Multiple Public Outreach Methods • K ing County Library System =c' • 1�` Utilized to Invite the Public to • Renton Technical College At I School Di • Renton School District Participate Local Business ..__..' • Interdepartmental Team Interdepartmental Team and Stakeholder Meetings r�. .�— Previous Meetings • • • • • • • • • • • Sunset Neighborhood Park Master Plan 119 • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • .w 1- __,. � w—�• vae�axen ,---, Existing Park and School Facilities in � 3 the Sunset Planned Action EIS Area North Highlands Park&Neighborhood Center I Tennis Court LL Potential location for a Community Garden }� ,�• t McKnight Middle School • ��� ;;, `♦ , r 4 Tennis Courts �• '_� ! � r 2 Basketball Courts • 3 Baseball Fields • w-+- 1 -� 3 Soccer Fields c Highlands Park&Neighborhood Center • 2 Tennis Courts j -- �, 2 Basketball Courts • �+-_____ e` V_ .•= 1 Softball Field IrL �• * 1 Soccer/Multi-purpose Field KIM Y - �• ., Preferred Park Concept r ., FEIS Sunset Area Nearby Park Facilities r Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Open House Meeting#2 __ Facilitated Workshop Activity June 18,2014 f ! Three Schematic Plan/Photo Example Summary of Open House Stations .VA Meeting#1 Park Concept Likes,Dislikes and Desires for each • } Alternatives Plan/Photo Example Board • Preferred Concept Plan Public Input Documented on Boards • Nearby Park Facilities Recap/Summary • Overview of 3 Park Schematic p Plans • • Workshop Activity • Workshop Recap • HY.,x oar•. lM6.:Y oar... • Open House Meeting#2 r s_ Open House Meeting#2 r 120 Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan WATER COMMONS WATER COMMONS • \ f _ .1 / Maim 1 \ v • 0,r , • �.., ►ea t a.a., Park Schematic Plan . , Photo Examples • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • L'.,' NlA"CAEEN VILLAGE GREEN 16 _. M UNN • \ 0- LAW ' .� Park Schematic Plan E . Photo Examples . It • • • • • • • • • Sunset Neighborhood Park Master Plan 121 Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • V1S1rA PLACE VISTA PLACE:.. 1%\ t ■1 • RM•_ \ f i ME 37M Mir Park Schematic Plan r H Photo Examples r Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan General Park Questions Summary: Desired Park Features Summary: 1) Play area/fitness area arrangement that includes a picnic area 1) What is the purpose of the rain garden and will it be planted? 2) Pergola around the performance space 2) Who selects the art for the park? 3) Covered picnic area 3) Was a skate park considered for the park? 4) Art locations at the Harrington Avenue and future library entrances • 5) Restroom located for maintenance access and separate from other park activities 4) Will there be lighting improvements to the area? 6) Natural-looking,boulder water feature 5) Will there be speed limits on Harrington Avenue? 7) Trees emphasizing the north/south Harrington Avenue connection • 6) How much will it cost to construct the park? 8) Meandering paths 9) Multiple seating options and private spaces 10)Viewing plaza • 11)Gentle slopes for kids to play U!6 y�..}..,,. 12)Flexible and Diverse Space(s) fie Y^•^� • Open House Meeting#2 ram.,,.` Open House Meeting#2 Summary r ., • • • • • • • • • • 122 Sunset Neighborhood Park Master Plan • • • • • • • • Sunset Neighborhood Park Master Plan • • Next Steps: • 1) HBB to develop a Preliminary Master Plan based upon feedback received to date • 2) Open House Meeting#3—September 23,2014 McKnight Middle School Commons Area • ! • • Hu • ! • • • i • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 123 • 124 Sunset Neighborhood Park Master Plan Appendix D in wooldow 0000 * 00 * 0 0000i ! • • • i • • ! M • • r • • • 00 • • • i • • # • • ! • • • • • • • Appendix D: Preliminary Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • s • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • • • • • Investing in Housing Jobs * Transportation • � `� Sunset Neighborhood Park • J "` Jornada de Puerta Abierta Onete a nosotros en el proceso de • i,i� I planificacion para disenar un futuro parque en el sector de Highlands. • \ El parque tendra un area de 1.5 • ; hectareas. Sunset Neighborhood Park Open House Meeting • i i - Please join us in the master planning • 1 �a' process to design a future 3.7 acre neighborhood park as a part • ,• . . ,. of the Sunset Area Community Revitalization Program.This will be Manes,23 de Septiembre del 2014/6:00-8:00 p.m. the final of three interactive open • McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 house meetings. • Se proveeran refrigerios. Tuesday,September 23,2014/6:00-8:00 p.m. • r McKnight Middle School Commons Area/1200 Edmonds Ave NE,Renton,WA 98056 . Light refreshments will be served. • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan 125 • • • • • Open House Meeting #3 Agenda • • • Introduction • • °Opening Remarks, City, Team Introductions City of Renton • °Open House Meeting #2 Summary HBB • Summary of Comments Received • • • • Preliminary Master Plan ! • °Preliminary Master Plan Overview HBB • • Comments, and Questions and Answers HBB • • ®Next Steps City of Renton • • • • • • • i s • • ! • ! • • • • • • 126 Sunset Neighborhood Park Master Plan • • cam, r a a � � ,ter r 14 all 4--J 4-1 L N � I � L v o j � G Ili y Q � v� ! Sunset Neighborhood Park Master Plan Nearby Park Facilities • ln�esting in Housing 6 Jobs 0 Education 6 Health 0 Environment 4 Transportation • FEIS Sunset Area Preferred Community Framework • z Within a V.mile to the north: • 1 North Highlands Park and F j I Neighborhood Center >t �` • •1 Lighted Tennis Court " ""•' , SC Q i proposed for refurbishment • r t ' • %vim' ; •Portion of park area has been IL ,� ' O �••�.. preliminarily identified for ! ` a ' ( raised bed community garden • McKnight Middle School ! -` I (School has first use priority) ! _`` � •4 Tennis Courts - �• •2.Basketball Courts •3 Baseball Fields • 1 ddle •3 Soccer Fields • ' r- Ghoo ' f Within V.mile to the south; • • Highlands Highlands Park and • Librar�.• o Neighborhood Center w Ja f j •2 Tennis Courts • °__, -� .� �� � i •2 Basketball Courts • • 2 !17 � JCy !•"�,r •1 Softball Field - •1 Soccer/Multi-purpose Field • Z�• No Off-leash dog park facilities • y are located in the Planned • �•> Q= Action EIS area. - race C.• ! E t' LEGEND • Pedestrian intersection ! i:J i_ • • •� '••�••�•'�r � Pedestrian Connections w, • ..1�-fi- � �•' �"-k '- � ii Sunset BLVD Improvements + I P Mt Green Collector Arterial • t Green Access Local Collector • V=M Woonerf/Green alley t A 0�� y, � p(� � Permeable Sidewalk • School/Civic • i d .. tart - } • Mixed Use ¢. �'�. fh• ' A :- O Residential • •�„�,(y 7th St • Parks ® Community Garden • f�a t w � -y ..�... EISBoundary0 300 609 12!""i. z/,; • I� lk I{ HBB • June 18,2014 • ! 128 Sunset Neighborhood Park Master Plan ! V) rD r+ G c- 0 o Sunset Neighborhood Park Master Plan Schematic Plan v v VILLAGE GREEN Ln <�\✓ ` c N ` vM=4 RHA Housing RHA Housing rr '� RHA Housing "oo %* a1 �! - f.oaA/UnfoaA � soh G.. t^f ` + o � b Ru rden -Park Pathway, - 1'+!/.{3,. Patentad AK ® NJP Parfoneance °l a� Lacation.typ saati-V Open Space `Ll�y rdth�•y'�'t�+-'�; �. N �'� �.. •Nona 8o•rdP- � N r �'. �r shtktr,typ pfaa t ,may P PA Fi� ` �'•",,, ,,).� J„^c� 5 ace 3,= \ - 40ter 2 s gr Market Raft eh'„!O a Housing •� /r� +Q /FlawOF — LfYrrary r ,,\ �• �� .�,��� 4 4,� - Market Rats HO-5iny/Mixed Use ,0 Market Rate Housing N June 18,2014 tD Investing in Housing • Jobs • Education • Health • Environment • Transportation f w I• w r _t i ;f AT digLn LD • 0 Sunset Neighborhood Park Master Plan Village Green: Photo Examples • • June 18,2014 • V) rt z w CY 0 0 Sunset Neighborhood Park Master Plan Schematic Plan Open House#2 Comments QInvesting in Housing 6 Jobs 6 Education 6 Health * Environment * Transportati n I n, 77 VILLAGE GREEN Ln 1) Likes the meandering paths. 2.) Likes the right side of the park because activity is clustered away from the path. 3) Prefers the performance area shape in Water Commons. 4) Prefers seating near the performance area in Water Commons. s) Likes the boulder, Katural-looking water feature. (o) Likes this water feature the most. 7) Likes the restroom location, because it is tucked away and not along the perimeter of the park. 8) Likes the trees that emphasize Harrington Avenue connection. (?) Likes the naturalistic character. 10) Likes the overall character of the photo examples for this plan. 1-1) Likes flexible performance space because it is not enclosed by trees or a pergola. 1-2) Concerned about the rocks being slippery. HBB �► � �LL W September 23,2014 F' N N Sunset Neighborhood Park Master Plan Schematic Plan VISTA PLACE '4`aYs� RNA Housing n RHA Housing RHA ePotential ..S.•tw.lt.typ 2 4e Arf La[i0n A'f/p �-inb relive / Staging PfNA Z;, .,•,. t.: Soft Surf'acs Pathways K• ,_,� �.Y^. Faint.den •\ � Peltarr�wnee '' 5.6,11 • _ - Pfara Open Space FtAWre _ ua ngarden 1 4* t. •+P ._Pienic.tyP SencN typ 3. - • i v.tentid Market Rees Ant '� Pleygroerui. Housitey , s-s2 yr _ Library e Vi.wing o, Ptam - =Park Patl,way,typ ,•\q, �\e — \ _ Market Rate �. Potential _ Housing/Mixed Use JO - Art Location Y 1 m DA �' Market Rate � r�-r Housing z L O O tz June 18,2014 ly ni to rD v D • • * 0 0 • • • • • • • 00 00 0 00 0 9 0 0 0 . 0 0 0 0 0 0 0 0 0 9 0 0 0 9 0 010 ,610 0 Sunset Neighborhood Park Master Plan Vista Place: Photo Examples � Investing in Housing • Jobs • Education • Heatth • Environment • Transpodation �,y-�.�^�x .V yt �� fwq�-�-WOZ4 id U01 • ,� � -*1'^,r° ,` fir. .• . . .. ..��+ c i i•°' Feu`��, � :.' °`°I� . _. "\ - r ter. emu+ L w Sunset Neighborhood Park Master Plan Schematic Plan Open House#2 Comments Investing in Housing 0 Jobs Education Health Environment Transportation VISTA PLACE 1-) Thinks the layout is too avigular. 2) Likes tine options for seating, lots of choices for seating throughout the park. 3) Not sure about tine surface flow water feature. 4) Likes the art locations. 5) Likes seating - benches, seatwalls avid pica c areas throughout tine park. Likes tine view from tine plaza. 7) Wants to include orchard trees. s) Concerned about trees directly above benches causing a bird dropping conflict. q) Likes the seatwa(ls. 10) Likes the restroom photo. 11) Likes the diversity of private spaces. N 12) Thinks this is the best opportunity to integrate a slope for kids to roll down. Ln rD 1+ z LD cro' S O S ��i„• �ffj� :���D�.` s CH2MHILL. O O Q September 23,2014 "O fl1 v to r+ fD 'O N 10 . 9 . . . . . . . . . 0 . 0090000000100000000000000000000 0090 • 00000000000000000000000000000000000000 • N ID rt z L S 0 oSunset Neighborhood Park Master Plan Schematic Plan Iz Cu 77 WATER COMMONS v R RHA Housing z RHA Housing Ln rD RHA Housiry oD r Z n � 4W►O11Y r fl! 7 Bench.typ / Sla9ing �` 4 Interpretive sign typ � ..Picnic,typ •Not;a `.i'. �� • Boards' - _ Patent(al At 1 � � Location,tyP _ Per/orr.wnee ;} .i aal Orden • Seating/ >� 1 - �j� ro� Open Space Market Rats _ _ C Water Featant— _ Library Housing \ ` (.tuspilth-10 \ PIAyyrou,d ' Park Pathway,typ s-u yr (;L Water$pilfway — r Je,• p Market RAU \ Houting/Mixsd Use 'r P Market Rate Housing 0 HBB r cmmHILL. N W June 18,2014 Ln Sunset Neighborhood Park Master Plan Water Commons: Photo Examples Investing in Housing Jobs Education Health Environment Transportation � r 5 v � v ,a» .mil 'i _. . . �� r'�,r�.� A �_��� • -�-' k t - •• a• O CMZMHILL. O O Q June 18,2014 v v Ln 1+ (D CU 00100000000900000000001000000000000000000001000 V) c V) (D I+ z L un' s 0 0 Sunset Neighborhood Park Master Plan Schematic Plan Open House#2 Comments 0 Investing in Housing 0 Jobs 0 Education * Health 0 Environment 0 Transportation y �- WATER COMMONS Ln L, 1-) Likes the play area arrangement. Z) Likes the pergola around the performance space. 3) Vines on the pergola should be considered. 4) Likes the curved benches. s) Needs a covered picnic area. 6) Keep slopes gentle. 7) Likes the rain garden as an opportunity for education. 8) Likes the "marker ', or potential art location, at the plaza across from the future library. q) Prefers art at ends of Harrington Avenue. 1-0) Does mot like the water feature, and it is too far from the restroom. 11) Likes the restroom location for maintenance access and its separation from other park activities. 12) Does not like the straight channel water feature. 13) The water channel could be a tripping hazard. 14) The water feature needs movement and noise. 15) Likes the sculptural aspect of the water feature. tou r :BBB v cKWAHILL. ~' N September 23,2014 4 UjSunset Neighborhood Park Master Plan Schematic Plan Open House#2 Comments ,Investing in Housing - Jobs - Education - Heafth - Environment - Transportation OVERALL COMMENTS 1) Include bicycle racks. Tine bicycle racks could be am opportunity to include art. 2) Co►ncermed about safety of tke pedestrian crossing in Front of tke mixed-use building to tine park. 3) Likes tke Fitness equipment. 4) Review tine skode analysis For lawn survivability inFormatiom. 5) Likes tine multiple portal entries For woYftmdimg. 6) Concerned about security at v►igkt. 7) Incorporate Crime Prevention tkrougk environmental design, CPTED. 8) Concerned tkat there will not be eAougk parking. 9) Include sigktlimes tkrougk tine park. Include low vegetation & kigk tree canopies For visibility into park. 10) Connect tke park system with Harrington Green Streets. 1-1) Likes tine Buriev, City Hall water Feature. 12.) Likes tine Port of Olympia water Feature. 13) Incorporate ligkting into tke walls. 14) include bat boxes or bird !Houses into tine rain gordems. 0 1-5) include a Flat area at tine bottom of !Hills For kids to play avLd roll down. 0 O September 23,2014 N 77 v v • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • V) J ID, z T. S IS O O Sunset Neighborhood Park Master Plan Preliminary Master Plan 0- Investing in Housing Jobs Education Health Environment Transportation —s a= la if 2A rt� a RNA Housing ^ RHA HOutiny f� o py RHA Housing \\ z Plantings typ--1 Lawn,typ seatwall,typ E rglNn !� � � �'�toryr sT � �.typ / - Load/Unload Raingard¢n � Stnet Tree, lnterpr¢tive Sign GJP 4 Stgga Mad Qenck,typ ftestroo Raingarden Puropraowi, ?� 'Notice ��' i �. -c;� F¢rforma.u¢ Boards" - Potential Sculptural Art Location,typ Seating/ — � Open space arras 'A r- y r old,typ Planter.typ P `_ layground 'h' adp � .ti \ - `�� • F Picnic rt iewi si r am r F tntzs t l `� �r' L1yfYgr'cJ Market Rate \ 1 park water r' / \ dthway, Feature Si` Picnic typ Housing p er Cka—' \ � hanneQ yr Market Rate �, l \ / Housing/Mixed � / f Accent Tree,typ Use #1 Deeidious Tres,typ Jl \ Market Rate Housing —_= HBB N W September 23,2014 tp 0 Sunset Neighborhood Park Master Plan Preliminary Master Plan: Photo Examples Investing in Housing • Jobs • Education • Haagn • Environment • Transponation ti i r r: w iy �-�- tiff•, ' � ,.. r „- .i� _il■ill 7 V) •• 2014 • • • • • Open House Meeting #3: Summary Notes Page 1of3 • Date: September 23, 2014 Time: 6pm to 8pm • Place: McKnight Middle School Commons Area, 1200 Edmonds Ave. NE, Renton Attendees: Thirteen community members attended, including residents and representatives of the Renton • Housing Authority and the City of Renton Parks Commission. Six attendees had attended one of the • previous Community Open Houses. • Team Presentation • • Leslie Betlach, City of Renton, introduced the team and provided an overview of the Park Master Plan process. She described the Sunset Area Preferred Community Framework plan and the proposed Sunset Neighborhood Park location within this plan. • Open House Meeting#2 Summary Colie Hough-Beck, HBB, provided an overview of the three Park Schematic Plans presented at the Open • House Meeting#2 and a reviewed summary of the feedback received during that meeting. A summary of the desired park features includes: 1) Art locations at the Harrington Avenue and future library entrances. • 2) Trees emphasizing the north/south Harrington Avenue connection. • 3) Meandering paths. . 4) Flexible and Diverse Space(s). 5) Pergola around the performance space. • 6) Viewing plaza. 7) Covered picnic area. . 8) Multiple seating options and private spaces. • 9) Gentle slopes for kids to play. 10) Play area/fitness area arrangement that includes a picnic area. • 11) Restroom located for maintenance access and separate from other park activities. 12) Natural-looking, boulder water feature. • 13) Bicycle racks. • 14)Crime prevention through environmental design, CPTED. • Preliminary Master Plan Dean W. Koonts, HBB, described the Preliminary Master Plan and how the preferred components and Park Schematic Plans from the Open House Meeting#2 were incorporated. Key elements in the Preliminary • Master Plan include: • Entry portals feature "markers" for wayfinding or potential art locations. The library portal • entrance includes a pergola. • Tree planting emphasizes the Harrington Avenue connection, and street trees surround the park • while also allowing for clear sightlines into the park for safety. • • Paths meander throughout the park, with a loop trail at the perimeter, a main path connecting Harrington Avenue portals, and an east-west path that defines the open space/performance area. • • A diversity of spaces has been included. The main performance and open space area is framed • Sunset Neighborhood Park Master Plan 141 • Open House Meeting #3: Summary Notes Page 2of3 by pergolas and seating. An interpretive area sits within the rain gardens as an opportunity • for education and as a smaller, more intimate space. A picnic gazebo provides views of the surrounding landscape and features a covered picnic area. Some picnic areas are open. • Seating options include sheltered and unsheltered benches and seatwalls. • The play areas are separated and have adjacent picnic or "parent" plazas. The fitness area is • located adjacent to the play areas. • • Gentle slopes for kids to roll down are integrated into the park design through a grass berm adjacent to the playgrounds. • The central plaza incorporates a water feature with meandering channel and boulders. • Many options for seating are included throughout the park, including park benches in the central • plaza, seatwalls at park entrances, picnic table areas, and benches under the pergolas in the main • open space area. Low level lighting has been integrated into walls and/or stands alone. • The restroom is located for maintenance access, and is situated close to the plaza and to the main open space/performance area. Participant comments and questions during the presentation included: 1) Question: Is the lighting for the walls and seating going to be overhead lights or recessed lighting? Response: The lighting incorporated in the walls and seating is intended to be recessed lighting. 2) Comment: Likes the modern restroom photo example. Response:The restroom building will be architecturally modern. • 3) Comment: Likes that no hills (for kids to roll on) run directly into the street. • 4) Comment: Likes overhead structures that provide shade and cover during rainy season. 5) Question: What plants will be in the rain gardens? Response: The plant palette will be native and drought tolerant, with a few accent plants and boulders; more gardenesque. 6) Comment: The rain garden should look aesthetically appealing. • 7) Question: Will there be enough parking at the library? • Response: There will be 43 stalls around the park and underground parking will be included for the library and adjacent mixed use housing. There will also be underground parking for the other multi-housing units as they are developed. S 8) Question: Will the underground parking be available for people using the park? . Response:The surface parking will be available for park users. This park is classified as a . Neighborhood Park, which typically does not provide a parking lot and is intended to be accessed by people within a % mile walking distance. 9) Question: Will the restroom be open 24 hours a day? Response: The restroom will be open from dawn to dusk, following adopted Park Rules and • Regulations. . 10)Question: Will there be time limits on the parking stalls surrounding the park? Response: Parking may have time limits, but this has not been determined at this time. 11) Question: Will the turtle sculpture be saved? Response:The turtle sculpture will be saved, but will likely not be located within the park. A final • destination has not been identified. • 12)Comment: Likes the water feature. 13)Comment: The park should include a climbing feature. 142 Sunset Neighborhood Park Master Plan • • • • i Open House Meeting #3: Summary Notes Page 3 of 3 • • 14)Comment: Likes the circular bench in the interpretive area, because it could provide an area for reading. • 15)Question: Is seating provided under the pergolas? Response: Seating is provided under the pergolas. There is a seatwall under the pergola at the entrance near the library. There are benches under the pergolas in the main open space area. • 16)Question: Can you explain the street descriptions in the Nearby Facilities exhibit? Response: Collector Arterial and Local Collector streets are names for types of streets. Collector Arterials are major streets with high volumes of traffic (such as Sunset Boulevard). Local Collector streets are geared for lighter traffic flows. Green Collector Arterial and Green Access Local Collector streets will incorporate Complete Streets concepts, which are designed to create safe • access for all users including pedestrians, bicyclists, transit users, and cars with street landscape i improvements separating the walks from the streets. These streets are intended to create "green connections" as well, by providing treatment of stormwater through rain gardens. 17)Question: Does the park have a walkability score? Response:The park has not been scored at this time. The park creates pedestrian connections to the surrounding community and civic services. 18)Comment: Likes the designated art locations. 19)Question: Is there a budget for art in the park? Response:The budget has not been determined yet. Art is part of the programming for the park and will be included within the budget. Should the park construction be phased, there is the potential to include the art as part of the second phase. The value of the art will be based upon the full park build-out and not just the phase the art is installed. 20)Question: Could the pergolas provide more shelter from the rain and provide a continuous cover above? Response:This can be considered in further development of the design. 21)Comment: Mileage markers should be included on the loop trail. • 22)Comment: The play area should include swings. 23)Comment: Likes the Port of Olympia water feature. • • • Next Steps • Presentation to the City of Renton Parks Commission and the City Council. • • Adoption of the Master Plan in November by the City Council. • • • • • • • • Sunset Neighborhood Park Master Plan 143 • • • • • Renton Reporter Article • Kids get a chance to weigh in on • new Sunset Park design • • • r • • • Highlands residents hear about features of anew neighborhood park that's being planned there. —image Credit.• • Tracey Compton,Renton Reporter • by 1RACEY COMFON,Renton Reporter Staff Writer • Sep 25,2014 at 2:03PM For the first time ever,kids weighed-in on what they thought belongs at a new park being planned in • the Renton Highlands. "There's a meeting for a playground and it's all adults;it's like how do you know what the kids are • gonna want?"said Madeline Bufort,11. Bufort spoke during Tuesday night's third and final community meetingon the Sunset • Neighborhood Park Master Plan at McKnight Middle School,which also featured great reviews for • what the City of Renton,landscape architect HBB and engineer CH2MHILL have come up with so far. • Bufort thought the plans for the park are really cool and she's excited to see it built.She is hoping • that city officials decide to move the turtle statue that currently sits outside the old Highlands Library to the new location once it's built.The library borders the park on the southeast corner. • "I thought the plans were really cool and I couldn't wait to play,"said her younger sister Sara."I . think Madeline's ideas are really great and I love the way they decided things and got other ideas • from other parks." Sara's hoping for a spinning toy at the new park. • Overall the feedback from the community members in the room was very positive.This iteration of • the master plan features a main access spine through the park along Harrington Avenue,a boulder • feature water channel,centrally located bathrooms,playgrounds for ages 2 to 5 and 5 to 12,an orchard tree concept,rain gardens,a grass hill and plenty of open space. • This was the third meeting to solicit feedback on the design. • Marsha Rollinger is on the Renton Arts Commission and attended to make sure that art and objects • like the Highlands Library turtle are incorporated into the park's final design. • • 144 Sunset Neighborhood Park Master Plan • • • "I think it's a good community meeting spot,especially with the new library addition,"she said."I'm • all forgetting people more out into nature and I think parks area great way to do this.This is a good example of a mixed-use park that should work." The Sunset Neighborhood Park is part of a larger built out of the Sunset Planned Action Environmental Impact Statement Area that includes the new Meadow Crest Early Education Center and its accessible playground,the new Highlands Library and the new housing and retail space planned around the park. Leslie Bettach is"very excited"and"really happy"aboutthe project.She is the city's parks planning • and natural resources director. • "We had great public feedback,great involvement and it's their park and I think they're realty going to enjoy it,"she said. • At this point it's still not clear how the project will be funded.Betlach's group has a budget request • in for 2017 to fund park construction and she says there are opportunities to get grants in between now and then to fund all or part of construction. "I think the hard part is going to be coming up with the construction money,"she said."That's the • first hurdle." • The next steps are to make any further revisions then present it to the Renton Parks Commission, who then can recommend the project to City Council.Betlach and herteam go before the Renton Parks Commission on October 14 and the project could be recommended to City Council as soon as November. • TRACEY COMPTON,Renton Reporter Staff Writer • tcompton@rentonreporter.com or 425-255-3484,ext.5052 • • Find this article at: • http://www.mntonmporter.mnVnews/277132251.html • • • • • • • • • • • • Srtnset Neighborhood Park Master Plan 145 146 Sunset Neighborhood Park Master Plan • ! • ! • Parks Commission Briefing #3 PowerPoint • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan Sunset Planned Action EIS r ` r Final NEPA/SEPA issued April 2011 Parks Commission Briefing #3 Completed in consultation with the Renton Housing Authority(RHA) October 14,2014 •� Initiated with the redevelopment of RHA's Sunset Terrace and associated neighborhood growth and revitalization • _ Evaluated the broader Sunset Area ! _ Community Determined the future land use and ! redevelopment • �.., �� FEIS Sunset Area Preferred Community Framework • ! • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Interdepartmental Team Meeting Open House Meeting#1 February 19,2014 May 1,2014 H • Community&Economic Development • Overview of Sunset Planned Action EIS Community Services Overview of 4 Park Concept Alternatives • Public Works dam', • Facilitated Workshop Activity to Invite • 'f Executive Public Feedback on Each Alternative • { Multiple Public Outreach Methods • ,��' - Utilized to Invite the Public to Participate Stakeholder Meeting • March 19,201a Open House Meeting#2 y June 18,2014 • Renton Housing Authority Colpitts Development Summary of Open House Meeting til King County Library System ' ` Overview of Preferred Concept Plan • I•• Renton Technical College _ Overview of Nearby Park Facilities • -4 Renton School District Overview of 3 Park Schematic Plans • Local Business } Facilitated Workshop Activity to Invite ! Interdepartmental Team Public Feedback on Each Schematic Plan rme Interdepartmental Team and Stakeholder Meetings Previous Meetings • ! • • • • s • • Sunset Neighborhood Park Master Plan 7 ! • • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan . Open House Meeting#3 • August 23,2014 ,�: ^�� • Overview of Sunset Planned — + Action EIS Area 'y • Summary of Open House �, q WATER COMMONS VILLA4E 4REEN Meeting#2 Schematic Park Plans and Comments Received • n.+ •`= — • • Overview of Preliminary — Master Plan C = \l • �• �r 011 Comments and Questions � f 7 'ss "Be •1 V(SfA PLACE Y • Open House Meeting#3 �- Open House#2 Schematic Plans • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Open House#2 Comments Received: c` w �f — �,� • 1) Art locations at the Harrington Avenue and future library entrances. '^•�- %,`„ y } 2) Trees emphasizing the north/south Harrington Avenue connection. �l„ '""'*•±�*8�S '^^..�- -'u • 3) Meandering paths. 4) Flexible and diverse space(s),as well as multiple seating options. `'S >� '= ® �. y z"^ •�r 5) Pergola around the performance space. 6) Viewing plaza and covered picnic area. 7) Gentle slopes for kids to play. �� _�•f """ • 8) Play area/fitness area arrangement that includes a picnic area. 9) Restroom located for maintenance access and separate from other park activities. „ - �1t� w • _- •10)Natural-looking,boulder water feature. \ f 11)Bicycle racks. i �Y • 12)Crime prevention through environmental design,OPTED. R8E Y HU '3'�""" Open House#2 Summary Preliminary Master Plan J`•I� .ram— • • • • • • s • • 148 Sunset Neighborhood Park Master Plan • s • n • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • � Questions&Comments Summary: • .- 1) How will the lighting be incorporated into the walls and seatwalls7 • 2) Likes the architecturally modern restroom. 3) Likes that no hills(for kids to roll down)run directly into the street. • t`b't 4) Likes overhead structures that provide shade and cover during rainy season. y 5) What will the rain gardens look like? • '' I 6) The rein garden should look aesthetically appealing. • -- 7) Will there be enough parking and will there be time limits on the parking? 8) What hours will the restroom be open? • 9) Will the turtle sculpture be saved? • 10)Likes the water feature. 11)A climbing feature should be included. • 1�>.j on,..,. IIBI ij a....... • Preliminary Master Plan r�^^�".�� Open House Meeting#3 • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • • Questions&Comments Summary(continued): Project Costs and Funding Opportunities 12) Likes the circular bench in the interpretive area. Full Build-out-Estimated 2014 costs=$5.9 million(Design and Construction) • 13) Is seating provided under the pergolas? Two-phased Construction-Estimated 2014 costs=$4 million(Design and • 14)What are the street designations for the Sunset Planned Action Area? Construction 15) Does the park have a walkability score? - Estimated 2014 costs for Phase 1 =$4 million(Design and Construction) 16) Likes the designated art locations. - Estimated 2014 costs for Phase II=$2.3 million(Design and Construction) • 17) Is there a budget for art in the park? Funding Opportunities 18) Can the pergolas provide more shelter from the rain? - State Appropriation • 19) Mileage markers should be included in the loop trail. - Federal,State and Local Grants 2013 King County Levy 20)The play area should include swings. - 2013 King County Levy • - Park Impact Fees,REEF,and the Custer Fund HN • Open House Meeting#3 r Open House Meeting#3 r • • • • • • • • i • • Sunset Neighborhood Park Master Plan 149 • Sunset Neighborhood Park Master Plan S Next Steps: • 1) Parks Commission action and referral • 2) Committee of the Whole Presentation—November 3,2014 • 3) HBB to finalize Master Plan based upon feedback received to date • 4) HBB to develop a Master Plan Report • • • • • • • • • • • • • • • • • • • • • 150 Sunset Neighborhood Park Master Plan • • • • • Parks Commission Briefing #3 Meeting Minutes • • City of Renton • • Board of Park Commissioners • • D City of Utity • • Meeting Minutes • • October 14, 2014 • 4:30 p.m. —City Hall—7th Floor Conferencing Center • I. CALL TO ORDER • • In Attendance The following members were present: • Members: Tim Searing,Marlene Winter,Al Dieckman,Cynthia Burns, • Mike O'Donin,Larry Reymann Staff: Terry Higashiyama,Sandy Pilat, Leslie Betlach, Kelly Beymer,,Paul Hintz, • Andy O'Brien, Donna Eken, Brandi Burke,Terry Flatley • Guests: Delaney Lafond, Underdog Sports Leagues • • Chair,Cynthia Burns, called the October 14,2014,meeting to order at 4:30 p.m. Roll • call was taken;Troy Wigestrand and Sojin Thompson were not present. • II. APPROVAL OF AGENDA • Tim Searing made a motion,seconded by Mike O'Donin,to approve the agenda as presented. All were in favor, motion carried,the October 14,2014,agenda was • approved. • III. APPROVAL OF MINUTES • A motion was made by Mike O'Donin and seconded by Al Dieckman to approve the • September 2014 minutes as written,all were in favor, motion carried. The minutes • were approved as submitted. • IV. ORAL COMMUNICATION Delaney Lafond, Underdog Sports Leagues, introduced herself and expressed interest • in potentially partnering with our recreation division on leagues utilizing Liberty and • Cedar River Park. Terry noted that Andy O'Brien was in attendance at the meeting • • • • Sunset Neighborhood Park Master Plan 151 • • • s • • City of Renton • Park Board Minutes October 14,2014 • Page 2 of 4 s and oversees those programs so he could facilitate a meeting to discuss the possibility of coordination. s V. BOARD COMMUNICATION • City Center Plan—Mike O'Donin s The meeting focused on discussion for the Renton core and setting standards for . buildings,way finding and landscaping. The next meeting will be on November 6. Larry Reymann noted that at the May Creek Park natural area the knotweed needs addressed. • Terry thanked Al and Cynthia for attending the budget presentation. VI. DISCUSSION/ACTION ITEMS • Sunset Neighborhood Park Master Plan—Leslie Betlach • Leslie Betlach, Parks Planning Natural Resources Director, presented the third briefing • to the Board on the Sunset Neighborhood Park Master Plan. Previous meetings included an Interdepartmental team meeting on February 19, 2014; a Stakeholder meeting on March 19; and Open Houses on May 1,June 18, and September 23. Leslie S outlined the major elernents were kept as previously discussed but a different layout. There was a question and answer period followed by a motion made by Larry Reymann to recommend to Council adoption of the Sunset Neighborhood Park Master Plan. The motion was seconded by Tim Searing,all present were in favor, motion • carried. Next steps include the Committee of the Whole Presentation on November 'd 3 ,followed by HBB developing a Master Plan based upon feedback and lastly development of a Master Plan Report. Comprehensive Plan Update—Paul Hintz,Associate Planner • Paul Hintz,Associate Planner CED, reviewed the necessity of the Comprehensive Plan Update including the Capital Facilities Element and level of service. A major update is • due in June of 2015 and will establish policies for growth and development for the next 20 years and provide the blueprint for City decisions and actions. Paul reviewed the current level of service in Renton and comparably to Tacoma and Redmond. • Upcoming key dates is a community workshop on November 18 and the Public Hearing on December 17ti' The LOS in the Capital Facilities Element of the existing Citywide Comprehensive Plan s for parks and recreational facilities is 18.57 acres for every 1,000 residents,which was • established in 2007. Since 2007 the population has increased from 60,000 to 97,000. • The current number of parkland acres per 1,000 residents is not being met. The minimum LOS is recommended to be.009 acres of parkland per capita (also written as • H:\Boards and Commissions\Park Board\2014 Park Board\101414min.docx `� • • • • 152 Sunset Neighborhood Park Master Plan • City of Renton Park Board Minutes • October 14,2014 • Page 3 of 4 • 9 acres per 1,000 residents). While the City does have discretion,the Level of Service needs to reflect a metric that is sustainable for the 20-year planning horizon. Larry Reymann made a motion seconded by Al Dieckman to recommend to the City Council • to update the Capital Facilities Element by revising the existing level of service for parks and recreational facilities to 0.009 acres of parkland per capita. All were in • favor, motion carried. Tree Report—Terry Flatley Terry Flatley, Urban Forester and Natural Resources Manager, presented a report on • the upcoming tree maintenance contract between the City of Renton and Seattle Tree Preservation. Terry outlined various locations and described recommended removal and pruning(s)needed. The summary of the project involves seven locations involving • 70 trees consisting of 43 removals and 27 prunings. The contract with Seattle Tree Preservations is currently being finalized. The completion date for this project is estimated December 31,2014. Terry serves as the City's representative on the Washington Community Forestry Council. The City is on track to receive its 7th Tree • City US Award in 2014 and additionally received a grant award from the Washington Department of Natural Resources providing free labor to prune 330 street trees in the • Landing during November. V11. OLD BUSINESS • CIP Budget • Due to time constraints we were unable to finish the Budget Review for 2015/2016 at last month's meeting. Terry distributed copies of the summary and associated costs for the next budget cycle and projected through 2020 requests for acquisition, development/redevelopment,maintenance/preservation,and planning requests. Some projects may have to be pushed out dependent on available funding. • Vill. ADMINISTRATOR'S REPORT Introduction Our new Recreation Coordinator,Brandi Burke,was introduced. Brandi assumed the duties overseeing the pool and swimming beaches. She briefly gave the Board a little • history about her previous experience. Information • Terry reminded everyone about the upcoming Employee Recognition luncheon and encouraged them to attend. Also our December meeting will be held jointly with the • Library Board at the Museum on December 9,2014,at 5:00 p.m. We will have a brief • meeting followed by a holiday social. • H:\Boards and Commissions\Park Board\2014 Park 8oard\101414m1n.doa • • • Sunset Neighborhood Park Master Plan 153 • • • • City of Renton • Park Board Minutes October 14,2014 • Page 4 of 4 • IX. ADJOURNMENT • A motion was made by Larry Reymann and seconded by Tim Searing to adjourn the • October meeting at 6:05 p.m. All were in favor,motion carried,meeting adjourned. • • • • • t • 019nature • • • • • NEXT REGULAR MEETING 1 • December 9,2014 @ 5:00 P.M. 1 • • Renton History Museum • • • • • • • • • • • H:\Boards and Commissions\Park Board\2014 Park Board\101414min.docx • • • • 154 Sunset Neighborhood Park Master Plan • • • • • • Committee of the Whole Briefing #3 PowerPoint • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan `•. Sunset Planned Action EIS r , Final NEPA/SEPA issued April 2011 • Committee of the Whole Completed in consultation with the • Renton Housing Authority(RHA) • November 3,2014 Initiated with the redevelopment of RHA's Sunset Terrace and associated neighborhood growth and dL• revitalization _ M Evaluated the broader Sunset Area • = Community — _ • Determined the future land use and redevelopment • ao. 1 ' _ Hg9 c..n... • r,,,.�------- FEIS Sunset Area Preferred Community Framework r • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Interdepartmental Team Meeting Open House Meeting#1 February 19,2014 May 1,2014 • ' Community&Economic Development Overview of Sunset Planned Action EIS `'. Overview of 4 Park Concept Alternatives Community Services P • Public Works - Facilitated Workshop Activity to Invite Executive Public Feedback on Each Alternative Multiple Public Outreach Methods • •?" Utilized to Invite the Public to Participate Stakeholder Meeting • March 19,2014 Open House Meeting#2 `rr June 18,2014 • Renton Housing Authority • _ Colpitts Development `.i Summary of Open House Meeting#1 �. King County Library System Overview of Preferred Concept Plan • 4 Renton Technical college • "y Overview of Nearby Park Facilities Renton School DistrictOverview of 3 Park Schematic Plans Local Business Facilitated Workshop Activity to Invite Interdepartmental Team - Public Feedback on Each Schematic Plan HIM Interdepartmental Team and Stakeholder Meetings ., Previous Meetings • • • • i • • • • • • Sunset Neighborhood Park Master Plan 155 • • • • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • A — j -- • Open House Meeting#3 �'�z�* / J • a September 23,2014 -'� ("•S ' • Overview of Sunset Planned �«" _�' — = i — • �• Action EIS Area • Summary of Open House _ , • WATER COMMONS VILLA4 Meeting#2 Schematic Park E GREEN Plans and Comments Received j�` J • • Overview of Preliminary 1-7 • Master Plan = '� — ' ASS • r ' Comments and Questions _ s . n VISTA PLACE Irog Y� • Open House Meeting#3 Open House rig Schematic Plans r r s -- 'r r` flffJr►$ • • • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Open House#2 Comments Received: .` ��� • 1) Art locations at the Harrington Avenue and future library entrances. •^'^ �, ` 2) Trees emphasizing the north/south Harrington Avenue connection. 3) Meandering paths. 4) flexible and diverse space(s),as well as multiple seating options. L` Y•— .— ��!! _ S"'Z" • 5) Pergola around the performance space. 6) Viewing plaza and covered picnic area. ' -� •\ 1 - • ' } "� • 7) Gentle slopes for kids to play. 8) Play area/fitness area arrangement that includes a picnic area. • �" -� a r .h • 9) Restroom located for maintenance access and separate from other park activities. 10)Natural-looking,boulder water feature. �� • 11)Bicycle racks. ,, w, • 12)Crime prevention through environmental design,CPTED. HU �••"� Y O1�'"" Open House#2 Summary Preliminary Master Plan rc • • • • • • • • • • • • 156 Sunset Neighborhood Park Master Plan • • i Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan Questions&Comments Summary: i 1) How will the lighting be incorporated into the walls and seatwalls? • 2) Likes the architecturally modern restroom. "y 3) Likes that no hills(for kids to roll down)run directly into the street. • '� �� '";� "fit"� 4) Likes overhead structures that provide shade and cover during rainy season. • ,, iaf #�� `• p- ,� 5) What will the rain gardens look like? r 6) The rain garden should look aesthetically appealing. • '' `- 7) Will there be enough parking and will there be time limits on the parking? T 8) What hours will the restroom be open? • _ 9) Will the turtle sculpture be saved? • 10)Likes the water feature. 11)A climbing feature should be included. • 1N6 Y v.,... �{-�or.. Preliminary Master Plan _____11r 1 I&U— Open House Meeting ri3 • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Questions&Comments Summary(continued): Project Costs and Funding Opportunities 12) Likes the circular bench in the interpretive area. Full Build-out-Estimated 2014 costs=$5.9 million(Design and Construction) 13) Is seating provided under the pergolas? Two-phased Construction 14) What are the street designations for the Sunset Planned Action Area? - Estimated 2014 costs for Phase 1 =$4 million(Design and Construction) 15) Does the park have a walkability score? - Estimated 2014 costs for Phase 11=$2.3 million(Design and Construction) • 16) Likes the designated art locations. Funding Opportunities 17) Is there a budget for art in the park? - State Appropriation 18)Can the pergolas provide more shelter from the rain? - Federal,State and Local Grants • 19) Mileage markers should be included in the loop trail. 2013 King County Levy • 20)The play area should include swings. - Park Impact Fees,REET,and the Custer Fund • Open House Meeting#3 ' Pr Open House Meeting p3V�F`. r I • • • • • • • Sunset Neighborhood Park Master Plan 157 s Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan vxtv MAW, � Yam, � Yam, • Sunset Neighborhood Park Master Plan Sunset Neighborhood Park Master Plan • Parks Commission: Next Steps: • The Parks Commission recommended the Sunset - -- _ 1) Committee of the Whole—Recommendation for Adoption • Neighborhood Park Master Plan be = ado "= \ adopted with the recommendation p (,> qlb __ - 2) HBB to finalize Master Plan based upon feedback received to date • forwarded to City Council. . _ y11V / 3) HBB to develop a Master Plan Report -Motion made by Reymann, _ seconded by Searing. All those present recommended adoption. • --� — • Motion carried. = / 158 Sunset Neighborhood Park Master Plan Appendix E • • • • • • Appendix E: Impervious Calculations • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • w • • • • • • • • • • • • • • • • • • • • • • • • • • w • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PRELIMINARY MASTER PLAN I' I VERSION 2 ro Z 9i RHA Housing ' _ RHA Housing 3?e IMPERVIOUS CALCULATIONS o �j 139,567 at Total(3.2 Acres) RHA Housing \ vy ?y� 94,363 sf Pervious(Planting) 1 � � + a T " .ve1O�'ar b 7,450 sf 50%Pervious O Evergreen Tree,typ load/UnWd f (Rubberized Safety Surfacing) O `® \f� Interpretive Sign 11,553 sf 50%Potential Pervious Q - Bench,typ Pavement(Interior pathways, Staging Pergola w/ 50%pervious assumed) v Restroorn/ Rai Seatwall / Pumproom �rdsn =35,702 sf Impervious once /o N 25.6 Impervious � \, ROW Line = o <_ `Performance Bo \ \\\ Open Space `.\ Ra[ngardep I�I Potential Art Location,typ / Planter,typ j„ ass Berm �\ a! Pergola,typ w/Benches �. / Plagg u�d \ � \PiAQic � _ Market Rate o' aarebo �t V � �4 � fitires4i Housing �i Library ., Playgrou f ; `v ark PathWQq'typ, 0 � Water Feature 0 (Soul r i Market Rate / Housing/Mixed Use Seatwalf,typ /V / N / Market Rate 't. i Housing SUNSET NEIGHBORHOOD PARK MASTE N a NORIx WALE U'I t0 y 160 Sunset Neighborhood Park Master Plan Appendix F • • • • • Appendix F: Utility Exhibit • • • • • • • • • • • • • • • • • • • • • • • M • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • 00 • • • • • • i • 0000000000000000000000000000000000 Abandon Ex OHP New Fire Line PROPOSED UTILITY PLAN rt � Cap Ex Water T. New UG Maintain or : C- Power/Comm ; Relocate O • Ex Gas 0 on Proposed Water O ` �� Abandon ® ( ` �/: opo O Abandon 7 x �'� Ex Water Ex Sewer I � Stormwater tj Facility 12 • 'm� ...i 0.1LA �✓ AbandonEx OHP Maintain Ex Sewer LIBRARY Connect to Abandon Ex Water �ExOHP Maintain Ex Storm and •' ^. Sanitary Sewer and Gas y Proposed Water Proposed Sewer —Proposed Gas F Oz _- ---, �,> • � Jib � 9 SUNSET NEIGHBORHOOD PARK MASTER PLAN ' iNORTH SCnLE l� IT 162 Sunset Neighborhood Park Master Plan Appendix G ` • • • • • • Appendix G: Plan Adoption • s i • • • • • i • • • • • • • • • • • • • • • • • • • • • • • • • .�.�tr.�. .,, ._..: ate.�...,.. �.,._..�,w �..,�.,�.-.a ^spa Sunset Neighborhood Park Master Plan • • • • • • • • • i • • • • • • • • • • • • • • • • • • • • • • • • • ! • • • • • • Sunset Neighborhood Park Master Plan • • • • • • Committee of the Whole Briefing #3 Report • • APPROVED BY • COMMITTEE OF THE WHOLE CITY COUNCIL COMMITTEE REPORT pats , • November 3,2014 • Sunset Neighborhood Park Master Plan • • The Sunset Neighborhood Park Master Plan supports the Sunset Area Community • Investment Strategy adopted by the Renton City Council on November 23,2009. The Master Plan represents a collaborative effort between multiple City departments, public and private partners, and the community to provide opportunities for active and healthy lifestyles; • environmental sustainability, interpretation and education; area culture and history; and community connections. • The Preliminary Sunset Neighborhood Park Master Plan was presented to the Board of Park • Commissioners on October 14, 2014. The Board of Park Commissioners recommended the • Sunset Neighborhood Park Master Plan be adopted with the recommendation forwarded to the City Council. The Committee of the Whole recommends concurrence in the Board of Park Commissioners' • recommendation to adopt the Sunset Neighborhood Park Master Plan. • • • • Don Persson,Council President • • • • cc: Leslie Betlach,Parks Planning and Natural Resources Director • Todd Black,Capital Project Coordinator Lys Hornsby,Utility Systems Director • Ron Straka,Surface Water Utility Engineering Manager Hebe Bernardo,Civil Engineer • Doug Jacobson,Deputy Public Works Administrator Cliff Long,Economic Development Director Mark Santos-Johnson,Community Development Project Manager • • • • • • Sunset Neighborhood Park Master Plan 163 • • • • • • • • i • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunset Neighborhood Park Master Plan • • • • • • ! • • • • • • • • • • • i • • • • • i • • • • • • • • • • • • • ! • • • • • • •