Loading...
HomeMy WebLinkAboutSWP273658(4) r Denis Law - Mayor City of t�,D". Public Works Department-Gregg Zimmerman,P.E.,Administrator November 14, 2013 Mr. Mark Gropper, Executive Director Renton Housing Authority PO Box 2316, 2900 NE 10th Street Renton, WA 98056-0316 RE: PROPOSED FINANCIAL AGREEMENT FOR THE USE OF THE SUNSET TERRACE REGIONAL STORMWATER FACILITY FOR ON-SITE MITIGATION OF THE PIHA SITE Dear Mr. Gropper: Per the FY 2012 Statewide Stormwater Grant Agreement No. G1200544 between the City and the Department of Ecology, the City is required to design and construct a facility that will infiltrate three-acres of impervious surface. The cost of designing and constructing a facility to mitigate for any additional areas needs to be covered by the private property owner or entity of which areas are being mitigated for. The City of Renton Surface Water Utility has completed a preliminary cost analysis to estimate Renton Housing Authority's (RHA) share of the cost for use of the Sunset Terrace Regional Stormwater Facility for stormwater mitigation for the on-site improvements on the PIHA site. For this exercise, we decided to do a proportional cost (including design and construction) based on tributary impervious area draining to the regional facility. Per the information provided by SvR Design Company on November 1, 2013, approximately 0.75 acres of impervious area are proposed to be constructed on the PIHA site. This will result in a 25% increase of tributary area to the Sunset Terrace Regional Stormwater Facility. The City is currently under contract with CH2MHILL (GAC-13-021) for the design of the facility. Total design cost for a regional facility that will provide mitigation for three- acres of impervious is $179,003. The estimated cost for additional engineering efforts to accommodate additional impervious areas from the PIHA site is $44,750 (25%of current design contract). The RHA will be responsible for the actual additional design cost to be determined as part of a contract addendum with CH2MHILL. We anticipate that the actual cost will be less than this estimated amount. Renton City Hall • 1055 South Grady Way• Renton,Washington 98057 • rentonwa.gov Mr.Gropper November 14,2013 Page 2 of 2 A pre-design report with approximately 15% sizing of the Sunset Terrace Regional Stormwater Facility was completed in 2012. Appendix E of the report includes a cost estimate of the regional facility estimated at a range between $597,000 and $900,000 for mitigation of three-acres of impervious). Construction cost for mitigation of additional mitigation of 0.75 acres of impervious is estimated at a range between $149,250 and $225,000 (25% of cost estimated in pre-design report for a facility mitigating for three-acres of impervious). The actual construction cost will be based on final construction contract amount at time of final pay estimate. Based on the explanation above, RHA's share of the cost for the use of the Regional Stormwater Facility for mitigation of the improvements constructed in the PIHA site is estimated to be between $194,000 and $269,750. The Department of Ecology indicated that we will need to track the eligible and ineligible grant cost for design and construction separately. The Department of Ecology will also need to review and approve the cost share agreement between the City and the Renton Housing Authority. To move forward with the design of the Sunset Terrace Regional Stormwater Facility, we will need a letter confirming RHA's intent to use the Sunset Terrace Regional Stormwater Facility for mitigation of the required on-site improvements of the PIHA site. If you have any questions, please contact Hebe Bernardo, Surface Water Utility Engineer, at 425-430-7264 or by email at hbernardo@rentonwa.gov or me at 425-430-7248 or by email at rstraka@rentonwa.gov. Thank you for your efforts in assisting the City in the design of the Sunset Terrace Regional Stormwater Facility. We look forward to working with you and RHA's staff in the coming months on this important project. Sincerely, Ronald J. Straka, PE Surface Water Utility Engineering Supervisor Enclosures cc: Hebe Bernardo,Surface Water Utility Engineer H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-8889 Sunset Regional SW Facility\1004 RHA Corr\Cost_Sha re_letter_1_Nov2013.doc\HCBtp r r s E1-2012 Task . €?esrn lion LOE Labors 'Subs es _ Price ;. 1 ProSect Manageme{�t _ 162 $ 23 488 CS '� Basemap Pr,pam ton and SupptementafSurvey _ 3 Public.Involvement - $ 4 ro7 icM draulic IVWe4n < 5 Finalize Geotechncal Re ort 26 � -�,357 $ t $ Permit Support 3112 $ $ �► Fnal Design COnStFUafior � t - 3 Y 7 Dociirrients,grid Casf Estimate 828 $ 105 378 $ y. $ 243 $ 44}5 62f1r tr $ ervtces.During Biddmg and Constivchon 40 a Total 3 5 173,462 EXHIBIT C—Cost Estimate i Page 21 of 25 RENTON SUNSET PLAN ACTION EIS PROJECT DATE: 10/10/2012 REGIONAL FACILITIES PROJECT NO.:437060 ORDER OF MAGNITUDE ESTIMATE ESTIMATE BY:C Moore REVIEW BY:R Chung TOTAL UNIT TOTAL DESCRIPTION CITY UNIT COST COST Infiltration Gallery Excavation 2,535 CY $7.68 $19,475 Waste 1,455 CY $14.41 $20,966 Native Backfill 1,080 CY $9.37 $10,125 Bioretention Soil 285 CY $41.41 $11,802 Drain Rock 1,170 CY $39.32 $46,001 Geotextile 2,500 SY $3.00 $7,500 Seeding 1,140 SY $3.76 $4,282 Landscaping 570 SY $25.00 $14,250 8"Perforated Pipe 900 LF $17.83 $16,045 Cleanout 3 EA $350.00 $1,050 CB Type 2,48"dia 2 EA $2,221.59 $4,443 Birdcage Overflow Structure(CB Type 2,48"dia) 1 EA $3,221.72 $3,222 Misc.Detail Allowance 1 LS $15,916.02 $15,916 Infiltration Gallery Subtotal $175,076 Coveyance Line Excavation 924 CY $7.68 $7,095 Waste 924 CY $14.41 $13,308 Pipe Bed and Zone 461 CY $40.98 $18,902 Imported Backfill above Bed and Zone 394 CY $36.66 $14,434 12"RCP Storm Drain 40 LF $43.02 $1,721 18"RCP Storm Drain 1,030 LF $57.29 $59,010 CSBC(6"layer) 99 CY $37.97 $3,766 Sawcutting 1,260 LF $3.50 $4,410 Asphalt Demo over pipe trench 595 SY $9.15 $5,442 Asphalt Patching over pipe,6"depth 203 TON $120.00 $24,419 CB Type 2,48"dia 7 .EA $2,221.59 $15,551 Flow Control Structure,72"CB Type 2 1 EA $7,812.55 $7,813 CB Type 1 3 EA $763.87 $2,292 Tie into existing line 3 EA $1,253.39 $3,760 Traffic Control for Pipe in Roadway 10 DAY $620.34 $6,203 Misc.Detail Allowance 1 LS $18,192.01 $18,192 Conveyance Line Subtotal $206,315 SUBTOTAL $381,392 MOB,BONDS,INSUR,TEMP.FACIL,DEMOB,ETC 10.0% $38,139 SUBTOTAL $419,531 CONTINGENCY 30.0% $125,859 CONSTRUCTION TOTAL(ROUNDED) $545,000 SALES TAX 9.5% $51,775 CONSTRUCTION TOTAL(ROUNDED) $597,000 �- Low range -30.0% $420,000 High Range 50.0% $900,000 �--- NOTE: The above cost opinion is in October 2012 dollars and does not Include future escalation, financial or O&M costs. The cost opinion shown has been prepared for guidance in project evaluation from the information available at the time of preparation. The final costs of the project will depend on actual labor and material costs,actual site conditions,productivity,competitive market conditions,final project scope,final schedule and other variable factors. As a result,the final project costs will vary from those presented above. Because of these factors,funding needs must be carefully reviewed prior to making specific financial decisions or establishing final budgets. project scope,final schedule and other variable factors. As a result,the final project costs will vary from those presented above. Because of these factors,funding needs must be carefully reviewed prior to making specific financial decisions-or establishing final budgets. DESIGN COMPANY STORMWATER MEMORANDUM DATE: November 1, 2013 TO: Hebe Bernardo FROM: Patty Buchanan,PE Robert McCadden EIT RE: Piha Site Stormwater Renton Housing Authority, Sunset Terrace SvR Project No. 13015 Table 1-Stormwater Requirement Summa Flow Control Flow Control BMPs Water Quality COR Section 1.2.3 COR section 1.2.3.3 COR section 1.2.8 Site x x x ROW x x x Attachments • KCRTS Modeling Results • Existing Conditions Sketch with Areas • Proposed Conditions Sketch with Areas References/Assumptions • Pre-application Meeting Minutes prepared by the City of Renton and dated April 9, 2013 • Site Plan sketches by Schemata Workshop dated July 5,2013. • Geotechnical Report for Kirkland Townhomes Project, Dated July 25,2012: Design infiltration rate of 1.1 inch/hr with the stipulation that all infiltration facilities be located at least 20 feet from all structures. This memo assumes similar sub surface conditions for this preliminary analysis. Site specific geotechnical investigations will be required for design. Overall Piha Site Stormwater • Per the Pre-application Meeting Minutes, the Project is subject to the Peak Rate Flow Control Standard-Matching Existing. • Per Section 1.2.3 of the City of Renton Amendments to the 2009 King County Stormwater Design Manual(COR),the Project is not eligible for any flow control exemptions. • Per COR Sections 1.2.3.3 and 1.2.8,Flow control BMPs and water quality treatment are both required. F:\13\13015 Sunset Terrace\Design\Storm\PihaStormMemo_Jess.doc Stormwater Memorandum ' November 1,2013 Page 2 of 2 On-Site Flow Control,Flow Control BMWs and Water Quality • Flow Control Options include: o Flow control may be achieved by installing a traditional detention system. Based on KCRTS modeling, a 7,500 cubic feet of storage would be required to meet flow control requirements. This could be sized in a 43'x43'x4' (LxWxH)vault. o Flow control may also be achieved by installing a combination of low impact development (LID) to the fullest extent allowed by site constraints, likely in conjunction with a traditional detention system. o Meeting the Project's flow control requirements exclusively with LID does not appear feasible given the level of proposed impervious surface coverage needing mitigation,and setbacks. • For the on-site portion of the Project, the proposed 8,600 square feet of pollution generating parking lot/driveway is the only area that would require runoff treatment. Treatment requirements may be met through the use of Catchbasin Stormfilters or infiltrative BMPs if setbacks and soil property design conditions are met. Right of Way Flow Control, Stormwater BMPs and Water Quality • 425 cubic feet of storage volume would be required in order to meet the Project's flow control requirements with a vault. A 14'x8'x4' (LxWxH)vault is one potential configuration that would meet these requirements. • Pervious sidewalk paving and/or raingardens in the planter strip appear to be the most feasible options for meeting right-of-way flow control BMP requirements. • Water quality treatment is required for the pollution generating portions of the ROW improvements (new roadway surfaces). • If raingardens are utilized in the planter strip,they could provide both flow control and water quality treatment for the roadway surface. Runoff not infiltrated can be treated using a Catchbasin Stormfilter or another approved shallow treatment facility. Civil Engineering Landscape Architecture Environmental Restoration Planning 1205 Second Avenue Suite 200 Seattle,WA 98101 Phone: 206.223.0326 Fax: 206.223.0125 svr@svrdesign.com F:\13\13015 Sunset Terrace\Design\Storm\PihaStormMemo_Jess.doc Flow Frequency Analysis - Piha Existing All Time Series File:prepihaall.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.148 4 2/09/01 2 : 00 0.332 1 100.00 0.990 0.091 6 1/05/02 16: 00 0.184 2 25. 00 0.960 0.184 2 2/27/03 7: 00 0.153 3 10. 00 0.900 0.065 8 8/26/04 2 : 00 0.148 4 5. 00 0.800 0.085 7 10/28/04 16 : 00 0.140 5 3 . 00 0.667 0.153 3 1/18/06 16 : 00 0.091 6 2 . 00 0.500 0.140 5 11/24/06 3 : 00 0. 085 7 1.30 0.231 0.332 1 1/09/08 6 : 00 0. 065 8 1. 10 0.091 Computed Peaks 0.283 50. 00 0.980 1 Flow Frequency Analysis - Piha Developed All Time Series File:devpihaall.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.261 6 2/09/01 2 : 00 0.525 1 100 . 00 0.990 0.215 8 1/05/02 16 : 00 0.342 2 25. 00 0.960 0.313 3 2/27/03 7 : 00 0.313 3 10 . 00 0.900 0.235 7 8/26/04 2 : 00 0.283 4 5. 00 0.800 0.283 4 10/28/04 16:00 0.277 5 3 . 00 0.667 0.277 5 1/18/06 16:00 0.261 6 2 . 00 0.500 0.342 2 10/26/06 0:00 0.235 7 1 .30 0.231 0.525 1 1/09/08 6:00 0.215 8 1 . 10 0.091 Computed Peaks 0.464 50 . 00 0.980 1 Flow Frequency Analysis - Piha Existing Site Time Series File:prepihasite.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.096 4 2/09/01 2 :00 0.226 1 100. 00 0.990 0.049 7 1/05/02 16: 00 0.121 2 25. 00 0.960 0.121 2 2/27/03 7:00 0.098 3 10 . 00 0.900 0. 020 8 8/26/04 2 : 00 0.096 4 5. 00 0.800 0. 053 6 1/05/05 8: 00 0.088 5 3 . 00 0.667 0. 098 3 1/18/06 16: 00 0. 053 6 2 . 00 0.500 0.088 5 11/24/06 3 : 00 0.049 7 1. 30 0 .231 0.226 1 1/09/08 6: 00 0.020 8 1. 10 0.091 Computed Peaks 0.191 50.00 0.980 1 Flow Frequency Analysis - Piha Developed Site Time Series File:devpihasite.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.201 6 2/09/01 2 : 00 0.406 1 100. 00 0.990 0.165 8 1/05/02 16: 00 0.260 2 25. 00 0.960 0.242 3 2/27/03 7: 00 0.242 3 10. 00 0.900 0.179 7 8/26/04 2 :00 0.215 4 5. 00 0.800 0.215 4 10/28/04 16:00 0.213 5 3 . 00 0.667 0.213 5 1/18/06 16: 00 0.201 6 2 . 00 0.500 0.260 2 10/26/06 0: 00 0.179 7 1.30 0.231 0.406 1 1/09/08 6: 00 0.165 8 1. 10 0.091 Computed Peaks 0.358 50. 00 0.980 1 Flow Frequency Analysis - Piha Existing ROW Time Series File:prepiharow.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0. 052 6 2/09/01 2 : 00 0.106 1 100. 00 0.990 0. 042 8 1/05/02 16 : 00 0.065 2 25. 00 0.960 0.062 3 2/27/03 7 : 00 0.062 3 10. 00 0.900 0.045 7 8/26/04 2 : 00 0.055 4 5. 00 0.800 0.054 5 10/28/04 16 : 00 0.054 5 3 . 00 0.667 0.055 4 1/18/06 16: 00 0.052 6 2 . 00 0.500 0.065 2 10/26/06 0:00 0.045 7 1.30 0.231 0.106 1 1/09/08 6:00 0.042 8 1. 10 0.091 Computed Peaks 0.092 50. 00 0.980 1 Flow Frequency Analysis - Piha Developed ROW Time Series File:devpiharow.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.058 6 2/09/01 2 : 00 0.114 1 100. 00 0.990 0.049 8 1/05/02 16: 00 0.080 2 25. 00 0.960 0.069 3 12/08/02 18 : 00 0. 069 3 10 . 00 0.900 0.055 7 8/26/04 2 : 00 0. 066 4 5. 00 0.800 0.066 4 10/28/04 16: 00 0. 062 5 3 . 00 0.667 0.062 5 1/18/06 16: 00 0. 058 6 2 . 00 0.500 0.080 2 10/26/06 0 : 00 0. 055 7 1. 30 0.231 0.114 1 1/09/08 6:00 0.049 8 1. 10 0 . 091 Computed Peaks 0.103 50 . 00 0.980 1 Retention/Detention Facility - ROW Type of Facility: Detention Vault Facility Length: 10.32 ft Facility Width: 10.32 ft Facility Area: 107. sq. ft Effective Storage Depth: 4.00 ft Stage 0 Elevation: 0.00 ft Storage Volume: 426. cu. ft Riser Head: 4.00 ft Riser Diameter: 18.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 1.13 0.069 2 3.00 1.17 0.037 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 0.00 0. 0 .000 0 .000 0.00 0.01 0.01 1. 0 .000 0.004 0.00 0.02 0.02 2. 0 .000 0.005 0.00 0.04 0.04 4. 0 .000 0.006 0.00 0.05 0.05 5. 0 .000 0.007 0.00 0.06 0.06 6. 0 .000 0.008 0.00 0.07 0.07 8. 0.000 0.009 0.00 0.08 0.08 9. 0.000 0.010 0.00 0.09 0.09 10. 0.000 0.011 0.00 0.19 0.19 20. 0.000 0.015 0.00 0.29 0.29 31. 0.001 0.019 0.00 0.39 0.39 42. 0.001 0 .022 0.00 0.49 0.49 52. 0.001 0 .024 0.00 0.59 0.59 63. 0 .001 0 .027 0.00 0.69 0.69 74. 0 .002 0 .029 0.00 0.79 0.79 84. 0 .002 0.031 0.00 0.89 0.89 95. 0 .002 0.033 0.00 0.99 0.99 106. 0 .002 0.034 0.00 1.09 1.09 116. 0 .003 0.036 0.00 1.19 1.19 127. 0 .003 0.038 0.00 1.29 1.29 137. 0.003 0.039 0.00 1.39 1.39 148. 0.003 0.041 0.00 1.49 1.49 159. 0.004 0.042 0.00 1.59 1.59 169. 0.004 0.044 0.00 1.69 1.69 180. 0.004 0 .045 0.00 1.79 1.79 191. 0 .004 0 .046 0.00 1.89 1.89 201. 0 .005 0 .047 0.00 1.99 1.99 212. 0 .005 0 .049 0.00 2.09 2.09 223. 0 .005 0.050 0.00 2.19 2.19 233. 0 .005 0.051 0.00 2 .29 2.29 244. 0 .006 0.052 0.00 2.39 2.39 255. 0.006 0 .053 0.00 2.49 2 .49 265. 0.006 0 .054 0.00 2.59 2.59 276. 0.006 0 .056 0.00 2.69 2.69 287. 0.007 0 .057 0.00 2.79 2.79 297. 0.007 0 .058 0.00 2.89 2.89 308. 0.007 0 .059 0.00 2.99 2.99 319. 0 .007 0 .060 0.00 3.00 3.00 320. 0 .007 0 .060 0.00 3.01 3.01 321. 0 .007 0.060 0.00 3.02 3.02 322. 0 .007 0 .061 0.00 3.04 3.04 324. 0 .007 0.063 0.00 3.05 3.05 325. 0 .007 0.065 0.00 3.06 3.06 326. 0 .007 0.067 0.00 3.07 3.07 327. 0 .008 0.071 0.00 3.09 3.09 329. 0 .008 0.071 0.00 3.10 3.10 330. 0 .008 0.072 0.00 3.20 3.20 341. 0 .008 0.078 0.00 3.30 3.30 352. 0 .008 0.083 0.00 3.40 3.40 362. 0 .008 0.087 0.00 3.50 3.50 373. 0 .009 0.091 0.00 3.60 3.60 384. 0 .009 0.094 0.00 3.70 3.70 394. 0 .009 0.097 0.00 3.80 3.80 405. 0 .009 0.100 0.00 3 .90 3.90 416. 0 .010 0 .103 0.00 4 .00 4.00 426. 0 .010 0 .106 0.00 4 .10 4.10 437. 0 .010 0.571 0.00 4 .20 4.20 448. 0 .010 1.420 0.00 4 .30 4.30 458. 0 .011 2 .510 0.00 4 .40 4.40 469. 0 .011 3.810 0.00 4 .50 4.50 479. 0 .011 5.280 0.00 4 .60 4.60 490. 0 .011 6.710 0.00 4 .70 4.70 501. 0 .011 7.240 0.00 4.80 4.80 511. 0.012 7.740 0.00 4.90 4.90 522. 0 .012 8 .200 0.00 5.00 5.00 533. 0.012 8.640 0.00 5.10 5.10 543. 0.012 9.060 0.00 5.20 5.20. 554. 0.013 9.460 0.00 5.30 5.30 565. 0.013 9.840 0.00 5.40 5.40 575. 0.013 10.210 0.00 5.50 5.50 586. 0.013 10 .560 0.00 5.60 5.60 597. 0.014 10.910 0.00 5.70 5.70 607. 0.014 11.240 0.00 5.80 5.80 618. 0.014 11.560 0.00 5.90 5.90 629. 0.014 11.880 0.00 6.00 6.00 639. 0 .015 12.180 0.00 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.12 0.11 0.11 4.00 4.00 426. 0 .010 2 0.06 ******* 0.06 2.55 2.55 271. 0 .006 3 0.07 0.06 0.05 2.45 2.45 261. 0 .006 4 0.08 ******* 0.05 2.33 2.33 248. 0 .006 5 0.07 ******* 0.05 2.14 2.14 228. 0.005 6 0.06 0.05 0 .05 2.01 2.01 214. 0 .005 7 0.06 ******* 0.04 1.22 1.22 130. 0 .003 8 0.05 ******* 0.04 1.14 1.14 121. 0 .003 Retention/Detention Facility - On-Site Type of Facility: Detention Vault Facility Length: 43.33 ft Facility Width: 43.33 ft Facility Area: 1877. sq. ft Effective Storage Depth: 4.00 ft Stage 0 Elevation: 0.00 ft Storage Volume: 7509. cu. ft Riser Head: 4.00 ft Riser Diameter: 18 .00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 1.14 0 .071 2 3.90 4.26 0. 155 8.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 0.00 0. 0.000 0 .000 0.00 0.01 0.01 19. 0.000 0 .004 0.00 0.02 0.02 38. 0.001 0 .005 0.00 0.04 0.04 75. 0.002 0 .007 0.00 0.05 0.05 94. 0.002 0 .008 0.00 0.06 0.06 113 . 0.003 0 .009 0.00 0.07 0.07 131. 0.003 0 .009 0.00 0.08 0.08 150. 0.003 0 .010 0.00 0.10 0.10 188. 0.004 0 .011 0.00 0.20 0.20 375. 0 .009 0 .016 0.00 0.30 0.30 563. 0 .013 0 .019 0.00 0.40 0.40 751. 0 .017 0 .022 0.00 0.50 0.50 939. 0 .022 0 .025 0.00 0.60 0.60 1126. 0 .026 0 .027 0.00 0.70 0.70 1314. 0 .030 0 .029 0.00 0.80 0.80 1502. 0 .034 0 .031 0.00 0.90 0.90 1690. 0 .039 0 .033 0.00 1.00 1.00 1877. 0 .043 0 .035 0.00 1.10 1.10 2065. 0.047 0 .037 0.00 1.20 1.20 2253. 0.052 0 .039 0.00 1.30 1.30 2440. 0.056 0 .040 0.00 1.40 1.40 2628. 0.060 0 .042 0.00 1.50 1.50 2816. 0.065 0 .043 0.00 1.60 1.60 3004. 0.069 0 .045 0.00 1.70 1.70 3191. 0.073 0 .046 0.00 1.80 1.80 3379. 0.078 0 .047 0.00 1.90 1.90 3567. 0.082 0 .049 0.00 2.00 2.00 3754. 0.086 0 .050 0.00 2.10 2.10 3942. 0.090 0 .051 0.00 2.20 2.20 4130. 0 .095 0 .052 0.00 2.30 2.30 4318. 0 .099 0 .053 0.00 2.40 2.40 4505. 0 .103 0 .055 0.00 2.50 2.50 4693 . 0 .108 0 .056 0.00 2.60 2.60 4881. 0 .112 0.057 0.00 2.70 2.70 5068. 0 .116 0.058 0.00 2.80 2.80 5256. 0 .121 0.059 0.00 2.90 2.90 5444. 0.125 0.060 0.00 3.00 3.00 5632. 0.129 0.061 0.00 3.10 3.10 5819. 0 .134 0.062 0.00 3.20 3.20 6007. 0 .138 0.063 0.00 3.30 3.30 6195. 0 .142 0 .064 0.00 3.40 3.40 6382 . 0 .147 0 .065 0.00 3.50 3.50 6570. 0 .151 0 .066 0.00 3.60 3.60 6758. 0 .155 0 .067 0.00 3.70 3.70 6946. 0 .159 0.068 0.00 3.80 3.80 7133. 0 .164 0 .069 0.00 3.90 3.90 7321. 0 .168 0.070 0.00 3.94 3.94 7396. 0 .170 0.075 0.00 3.99 3.99 7490. 0 .172 0.092 0.00 4 .00 4.00 7509. 0 .172 0.098 0.00 4 .10 4.10 7697. 0 .177 0.639 0.00 4 .20 4.20 7884. 0.181 1.610 0.00 4 .30 4.30 8072. 0.185 2.780 0.00 4 .40 4.40 8260. 0 .190 4 .120 0.00 4 .50 4.50 8447. 0.194 5.620 0.00 4 .60 4.60 8635. 0 .198 7.080 0.00 4 .70 4.70 8823. 0.203 7.640 0.00 4 .80 4.80 9011. 0.207 8.150 0.00 4 .90 4.90 9198. 0.211 8.640 0.00 5.00 5.00 9386. 0.215 9.100 0.00 5.10 5.10 9574. 0.220 9.540 0.00 5.20 5.20 9761. 0 .224 9.960 0.00 5.30 5.30 9949. 0 .228 10.370 0.00 5.40 5.40 10137. 0 .233 10 .750 0.00 5.50 5.50 10325. 0 .237 11.130 0.00 5.60 5.60 10512. 0.241 11.490 0.00 5.70 5.70 10700. 0 .246 11.840 0.00 5.80 5.80 10888 . 0 .250 12 .180 0.00 5.90 5.90 11075. 0.254 12 .510 0.00 6.00 6.00 11263. 0 .259 12 .830 0.00 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.41 0.23 0.23 4.02 4.02 7553. 0.173 2 0.20 ******* 0.07 3.92 3.92 7355. 0.169 3 0.20 0.10 0.07 3.43 3.43 6446. 0.148 4 0.21 ******* 0.06 3.24 3.24 6084. 0.140 5 0.24 ******* 0.06 2.71 2.71 5084. 0.117 6 0.13 0.05 0.05 1.91 1.91 3592. 0.082 7 0.16 ******* 0.04 1.11 1.11 2086. 0.048 8 0.18 ******* 0.04 1.06 1.06 1985. 0.046 SUNSET TERRACE PIHA SITE EXISTING CONDITIONS - IMPERVIOUS SURFACE ON PARCEL PERVIOUS SURFACE ON PARCEL - IMPERVIOUS SURFACE IN ROW J PERVIOUS SURFACE IN ROW LL\ y I zl N I �I NTS �I rr \ Table 1- Piha Parcel Areas Surface Coverage Existing Area (acres) Existing Area (5F) Impervious Surface 0.00 0 Pervious Surface 1.07 46597 Total Area (SF) 1.07 46597 1.0 \ Table 2- Piha Right of Way(ROW) Areas DESIGN COMPANY I: 1205 SECOND AVE. SUITE 200 i SEATTLE, WA 98101 / Surface Coverage Existing Area (acres) Existing Area (SF) T 206.223.0326 \ ` 25 Impervious Surface 0.17 7621 F 206. desi I e www.svrvr esign.com \ \\ Pervious Surface 0.12 5331 PROJECT #13015 \ ---------- Total Area (SF) 0.30 12952 10/31/2013 SUNSET TERRACE PIHA SITE PROPOSED CONDITIONS - IMPERVIOUS SURFACE ON PARCEL PERVIOUS SURFACE ON PARCEL �J ® IMPERVIOUS SURFACE IN ROW I PERVIOUS SURFACE IN ROW I CD1 i i N i NTS I i ' Table 1- Piha Parcel Areas Surface Coverage Proposed Area {acres Proposed Area (SF) Impervious Surface 0.69 30252 Pervious Surface 0.38 16345 Total Area (SF) 1.07 46597 ► DESIGN COMPANY Table 2- Piha Right of Way (ROW) Areas 1205 SECOND AVE. SUITE 200 Surface Coverage Proposed Area (acres Proposed Area (SF� T 2071 3. WA 98701 T 206223.0325 i Impervious Surface 0.22 9491 F 206223. esi / p ti�ww.svrdesign.com Pervious Surface 0.08 3461 PROJECT #13015 Total Area (SF) 0.30 12952 10/31/2013 CONC DATE:_l�Wkp.- r3 NA E I UDATE November 13, 2013 Mr. Mark Gropper, Executive Director Renton Housing Authority PO Box 2316, 2900 NE 101h Street Renton, WA 98056-0316 RE: PROPOSED FINANCIAL AGREEMENT FOR THE USE OF THE SUNSET TERRACE REGIONAL STORMWATER FACILITY FOR ON-SITE MITIGATION OF THE PIH��Z Dear Mr. Gropper: Per the FY 2012 Statewide Stormwater Grant Agreement No. G1200544 between the City and the Department of Ecology, the City is required to design and construct a facility that will infiltrate three-acres of impervious surface. The cost of designing and constructing a facility to mitigate for any additional areas needs to be covered by the private property owner or entity of which areas are being mitigated for. The City of Renton Surface Water Utility has completed a preliminary cost analysis to estimate Renton Housing Authority's (RHA) share of the cost for use of the Sunset Terrace Regional Stormwater Facility for stormwater mitigation for the on-site improvements on the PIHA site. For this exercise, we decided to do a proportional cost (including design and construction) based ih tributary impervious area draining to the regional facility. Ofx Per the information provided by SvR Design Company on November 1, 2013, approximately 0.75 acres of impervious area are proposed to be constructed on the PIHA site. This will result in a 25% increase of tributary area to the Sunset Terrace Regional Stormwater Facility. The City is currently under contract with CH2MHILL (GAC-13-021) for the design of the facility. Total design cost for a regional facility that will provide mitigation for three- acres of impervious is $179,003. The estimated cost for additional engineering efforts to accommodate additional impervious areas from the PIHA site is $44,750 (25% of current design contract). The RHA will be responsible for the actual additional design cost to be determined as part of a contract addendum with CH2MHILL. We anticipate that the actual cost will be less than this estimated amount. Mr.Gropper November 13,2013 Page 2 of 2 A pre-design report with approximately 15% sizing of the Sunset Terrace Regional Stormwater Facility was completed in 2012. Appendix E of the report includes a cost estimate of the regional facility estimated at a range between $547,000 and $900,000 (for mitigation of three-acres of impervious). Construction cost for mitigation of additional mitigation of 0.75 acres of impervious is estimated at a range between $149,250 and $225,000 (25% of cost estimated in pre-design report for a facility mitigating for three-acres of impervious). The actual construction cost will be based on final construction contract amount at time ofdFrfi ' n. Based on the explanation above, RHA's share of the cost for the use of the Regional Stormwater Facility for mitigation of the improvements constructed in the PIHA site is estimated to be between $194,000 and $269,750. The Department of Ecology indicated that we will need to track the eligible and ineligible grant cost for design and construction separately. The Department of Ecology will eview and approve the cost share agreement between the City and the Renton Housikg Authority. To move forward with the design of the Sunset Terrace Regional Stormwater Facility, we will need a letter confirming RHA's intent to use the Sunset Terrace Regional Stormwater Facility for mitigation of the required on-site improvements of the PIHA site. If you have any questions, please contact Hebe Bernardo, Surface Water Utility Engineer, at 425-430-7264 or by email at hbernardo@rentonwa.gov or me at 425-430-7248 or by email at rstraka@rentonwa.gov. Thank you for your efforts in assisting the City in the design of the Sunset Terrace Regional Stormwater Facility. We look forward to working with you and RHA's staff in the coming months on this important project. Sincerely, Ronald J. Straka, PE Surface Water Utility Engineering Supervisor Enclosures i_y7 ��n'a5�r cc: Hebe Bernardo,Surface Water Utility Engineer H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-8889 Sunset Regional SW Facility\1004 RHA Corr\Co st_S h a re_I ette r_1_N o v 2013.d o c\H C Bt p ON tGt? '4(!Tf10Rf0 RENTON HOUSING S P0. Box 23 16 • Benton, WA 98056-0316 r 94x� w.wwrentonhousing.org Office 425/226-1850 • Eix 425/27`1-8319 7DD 1-800-833.6388 V• December 10, 2013 Mr. Ron Straka, P.E. Utility Engineering Supervisor City of Renton (.Public Works ( Surface Water Utility 1055 S. Grady Way 15th Floor I Renton, WA 98057 RE: PROPOSED FINANCIAL AGREEMENT FOR THE USE OF THE SUNSET TERRACE REGIONAL STORMWATER FACILITY FOR ON-SITE MITIGATION OF THE PIRA SITE Dear Mr. Straka, Thank you,for the careful evaluation of the option for RHA to consider sharing in the cost and use of the Sunset Terrace Regional Stormwater Facility for the on-site mitigation of flow from the"Piha"site. - Your November 14,2013 analysis suggests that.RHA's share of the cost is between$194,000 and$269,750 for the expansion necessary to connect any future development of the Piha site to the regional facility. As discussed, there is yet to be a projected fully designed or funded on the Piha lot; for that reason RHA declines to participate financially in the subject stormwater facility. I hereby concur with your recommendation that the City proceed with the Sunset Terrace Regional Stormwater facility design to not provide flow control for runoff from the RHA PIRA site. The Sunset Terrace Regional Stormwater facility would therefore not be designed to provide flow control. for the runoff from the RHA PIHA site. Thank you, again,:for enabling your Renton Housing Authority to explore its options as together we aspire to meet the affordable housing needs of our great city. Sincerely, Mark oppe Executive Director mrgtez;tentonhousin .org cc: Grace.Kim,Schemata Workshop Owen Mayfield, RHA,Director of Finance Proposed Agreement for the Use of the Sunset Terrace Regional Stormwater Facility_City_RHA.doex 4Z �.� 91J7 Z7 zo 6,e d-.1- 6,5 llcd Z 7p 7i 27/5 Return Address: City Clerk's Office City of Renton 1055 South Grady Way Renton,WA 98055-3232 Title: Temporary Construction Property Tax Parcel Number: 7227801055 Agreement Project File#: SWP—27-3658 Project Name: Sunset Terrace Regional Stormwater Facility Grantor(s): Grantee(s): 1. Renton Housing Authority(RHA) 1. City of Renton, a Municipal Corporation The Grantor,for and in consideration of mutual benefits,does by these presents,grant,unto the City of Renton,a Municipal Corporation,Grantee herein,its successors and assigns,permission to use for public purposes with necessary appurtenances over,under,through,across and upon the following described real estate,for Right-of-Way purposes, situated in the County of King,State of Washington: LEGAL DESCRIPTION:See Exhibit A �70 Z� 7r Z /S� A' y� The work to be performed is demolition of building 2720,abandoning/removing existing underground City L,r� utilities, installation of conveyance system, construction of bioretention facilities and infiltration galleries,for the purpose of constructing the planned project improvements associated with the Sunset 6a Regional Stormwater Facility Project. icp xcd- The Grantee shall, upon completion of any work within the property covered by the agreement, restore the surface of the agreement,and any private improvements disturbed or destroyed during execution of the work, as nearly as practicable to the condition they were in immediately before commencement of the work or entry by the Grantee. This permit shall become effective upon execution by the Grantor from date hereof,and shall continue fo ones, year. IN WITNESS WHEREOF, said Grantor has caused this instrument to be executed this day of , 20 Exhibit A Temporary Construction Easement Legal Description That portion of Blocks 35 and 35A of the Corrected Plat of Renton Highlands No.2, as recorded in Volume 57 of Plats, pages 82-98, lying easterly of Harrington Ave NE, northwesterly of Sunset Ln NE, and southwesterly of NE 101h St, lying northerly of the following described line: Commencing at the point of intersection of the northwesterly right of way margin of said Sunset Ln NE and the southwesterly right of way margin of said NE 101h St; Thence S 35030'03"W a distance of 214.52 feet along said northwesterly margin of Sunset Ln NE,to the True Point of Beginning of the hereby described line; Thence N 35053'29"W a distance of 98.67 feet; Thence S 74006'11" W a distance of 80.21 feet to the easterly right of way margin of said Harrington Ave NE and the terminus of said described line; All situate in the Northwest quarter of Section 9,Township 23 North, Range 5 East, W.M., in the City of Renton, King County, Washington. CONSTRUCTION EASEMENT 1 j TEMPORARY CONSTPUCTION NE 10TH ST % D N�70, PROPOSED ROW 272.7901M 2727801655. EXISTING ROW 't Return Address: City Clerk's Office City of Renton 1055 South Grady Way Renton, WA 98055-3232 Title: Temporary Construction Property Tax Parcel Number: 7227801055 Agreement Project File#: SWP—27-3658 Project Name: Sunset Terrace Regional Stormwater Facility Grantor(s): Grantee(s): 1. Renton Housing Authority(RHA) 1. City of Renton, a Municipal Corporation The Grantor,for and in consideration of mutual benefits,does by these presents,grant,unto the City of Renton,a Municipal Corporation,Grantee herein,its successors and assigns, permission to use for public purposes with necessary appurtenances over,under,through,across and upon the following described real estate,for Right-of-Way purposes, situated in the County of King,State of Washington: LEGAL DESCRIPTION:See Exhibit A The work to be performed is demolition of building 2720, abandoning/removing existing underground City utilities, installation of conveyance system, construction of bioretention facilities and infiltration galleries,for the purpose of constructing the planned project improvements associated with the Sunset Area Regional Stormwater Facility Project. The Grantee shall, upon completion of any work within the property covered by the agreement, restore the surface of the agreement, and any private improvements disturbed or destroyed during execution of the work, as nearly as practicable to the condition they were in immediately before commencement of the work or entry by the Grantee. This permit shall become effective upon execution by the Grantor from date hereof, and shall continue for one year. IN WITNESS WHEREOF, said Grantor has caused this instrument to be executed this day of 1 20 Exhibit A Temporary Construction Easement Legal Description That portion of Blocks 35 and 35A of the Corrected Plat of Renton Highlands No.2, as recorded in Volume 57 of Plats, pages 82-98, lying easterly of Harrington Ave NE, northwesterly of Sunset Ln NE, and southwesterly of NE 10th St, lying northerly of the following described line: Commencing at the point of intersection of the northwesterly right of way margin of said Sunset Ln NE and the southwesterly right of way margin of said NE 10th St; Thence S 35030'03" W a distance of 214.52 feet along said northwesterly margin of Sunset Ln NE, to the True Point of Beginning of the hereby described line; Thence N 35053'29"W a distance of 98.67 feet; Thence S 74006'11" W a distance of 80.21 feet to the easterly right of way margin of said Harrington Ave NE and the terminus of said described line; All situate in the Northwest quarter of Section 9,Township 23 North, Range 5 East, W.M., in the City of Renton, King County,Washington. CONSTRUCTION EASEMENT EMPO?ARY CONSTRUCTION NE 10TH ST �F10Ty� PROPOS_D ROW 4.1 0 \ � < 27278POIGF5 ;\ m \ \ m 272.7801,055 0.2 i i Ii � ' 986 % JOB EXISTING ROW \ Return Address: City Clerk's Office City of Renton 1055 South Grady Way Renton, WA 98055-3232 Title: Temporary Construction Property Tax Parcel Number: 7227801055, Agreement 7227801085 Project File#: SWP—27-3658 Project Name: Sunset Terrace Regional Stormwater Facility Grantor(s): Grantee(s): 1. Renton Housing Authority(RHA) 1. City of Renton, a Municipal Corporation The Grantor,for and in consideration of mutual benefits,does by these presents,grant,unto the City of Renton,a Municipal Corporation,Grantee herein,its successors and assigns, permission to use for public purposes with necessary appurtenances over,under,through,across and upon the following described real estate,for Right-of-Way purposes, situated in the County of King,State of Washington: LEGAL DESCRIPTION:See Exhibit A The work to be performed is demolition of buildings No. 2720, No 2715, No 984, and No. 2707; abandoning/removing existing underground City utilities service lines, installation of conveyance system, construction of bioretention facilities and infiltration galleries,for the purpose of constructing the planned project improvements associated with the Sunset Terrace Regional Stormwater Facility Project. The Grantee shall, upon completion of any work within the property covered by the agreement, restore the surface of the agreement, and any private improvements disturbed or destroyed during execution of the work, as nearly as practicable to the condition they were in immediately before commencement of the work or entry by the Grantee. This permit shall become effective upon execution by the Grantor from date hereof,and shall continue for one year. IN WITNESS WHEREOF, said Grantor has caused this instrument to be executed this day of , 20 Exhibit A Temporary Construction Easement Legal Description That portion of Blocks 35 and 35A of the Corrected Plat of Renton Highlands No.2, as recorded in Volume 57 of Plats, pages 82-98, lying easterly of Harrington Ave NE, northwesterly of Sunset Ln NE, and southwesterly of NE 10th St, lying northerly of the following described line: Commencing at the point of intersection of the northwesterly right of way margin of said Sunset Ln NE and the southwesterly right of way margin of said NE loth St; Thence S 35030'03" W a distance of 214.52 feet along said northwesterly margin of Sunset Ln NE, to the True Point of Beginning of the hereby described line; Thence N 35053'29"W a distance of 98.67 feet; Thence S 74006'11" W a distance of 80.21 feet to the easterly right of way margin of said Harrington Ave NE and the terminus of said described line; All situate in the Northwest quarter of Section 9,Township 23 North, Range 5 East, W.M., in the City of Renton, King County,Washington. EXHIBIT B TEMPORARY CONSTRUCTION EASEMENT i NE 10TH ST D PROPOSED ROW �� O . r \' m �715 r / 727801055 \� V 0.2 ;�y 2720, r \ � \\ 970 ;986 EXISTING ROW ��/ TEMPORARY CONSTRUCTION EASEMENT Hebe Bernardo From: Mark R. Gropper <mrg@rentonhousing.org> Sent: Friday, November 09, 2012 9:13 AM To: Ronald Straka; tnw@sitesurveymapping.com Cc: Mark Santos-Johnson; Hebe Bernardo; Peter Renner; Leslie A Betlach;Terry Higashiyama; Dustin.Atchison@CH2M.com; Owen Mayfield Subject: RE: Survey_Sunset Terrace and related parcels By all means, Ron, RHA will share with the City the resulting Sunset survey. No doubt Thomas'firm can deliver the right of way dimensions you enumerate below. Site Survey& Mapping may have questions about utility location and easements. If so, please welcome their call. Thank you, stay tuned. - Mark- From: Ronald Straka jmailto:rstraka(cbRentonwa.govl Sent: Fri 11/9/2012 9:12 AM To: Mark R. Gropper Cc: Mark Santos-Johnson; Hebe Bernardo; Peter Renner; Leslie A Betlach; Terry Higashiyama; 'Dustin.Atchison@CH2M.com' Subject: RE: Survey_ Sunset Terrace and related parcels Mark, Thanks for sharing this information to ensure good coordination and avoid duplication of effort. Please confirm that the survey data and information collected by this surveying contract with Site Surveying and Mapping, would be made available to the City to use in the design of City project's in the same area (Sunset Park, Sunset Terrace Regional Stormwater Facility). The scope of work mentions that surveying of the "full width of adjacent right-of-ways". We are trying to determine which full width of right-of-ways will be included in the survey work . The scope of work lists the parcels, but we are interested in knowing the boundary (limits) of total area where the survey work will be conducted that includes the parcels and full right-of-way widths. Please provide us a map or show on the figure below the limits of the survey work to be conducted by this survey contract. We are especially interested in knowing if the survey work will include the following: • The full right-of-way width along NE 10th Street from Harrington Ave Ne to Sunset Boulevard • The full right-of-way width of Harrington Ave NE from NE 10th Street to Sunset Blvd. It would also be good to know the other right-of-way areas that are included in the survey contract scope of work for future reference. Please contact me if you have any questions. Thanks Ron Straka, P.E. Utility Engineering Supervisor City of Renton I Public Works I Surface Water Utility i Hebe Bernardo From: Ronald Straka Sent: Friday, November 09, 2012 9:12 AM To: 'Mark R. Gropper' Cc: Mark Santos-Johnson; Hebe Bernardo; Peter Renner; Leslie A Betlach;Terry Higashiyama; 'Dustin.Atchison@CH2M.com' Subject: RE: Survey_Sunset Terrace and related parcels Attachments: Survey Proposal accepted_Sunset Terrace and related parcels.pdf Mark, Thanks for sharing this information to ensure good coordination and avoid duplication of effort. Please confirm that the survey data and information collected by this surveying contract with Site Surveying and Mapping, would be made available to the City to use in the design of City project's in the same area (Sunset Park, Sunset Terrace Regional Stormwater Facility). The scope of work mentions that surveying of the "full width of adjacent right-of-ways". We are trying to determine which full width of right-of-ways will be included in the survey work . The scope of work lists the parcels, but we are interested in knowing the boundary (limits) of total area where the survey work will be conducted that includes the parcels and full right-of-way widths. Please provide us a map or show on the figure below the limits of the survey work to be conducted by this survey contract. We are especially interested in knowing if the survey work will include the following: • The full right-of-way width along NE 10th Street from Harrington Ave Ne to Sunset Boulevard • The full right-of-way width of Harrington Ave NE from NE 10th Street to Sunset Blvd. It would also be good to know the other right-of-way areas that are included in the survey contract scope of work for future reference. Please contact me if you have any questions. Thanks Ron Straka, P.E. Utility Engineering Supervisor City of Renton I Public Works I Surface Water Utility 1055 S. Grady Way 15th Floor I Renton, WA 98057 Direct: 425.430.7248 Cell: 206.919.4281 Email: rstraka(a rentonwa.gov From: Mark R. Gropper [mailto:mrg@rentonhousing.orgl Sent: Wednesday, November 07, 2012 4:08 PM To: Leslie A Betlach; Terry Higashiyama; Ronald Straka Cc: Mark Santos-Johnson Subject: FW: Survey_ Sunset Terrace and related parcels FYI 1 Address Search ircels link Help a °• ,l' 422 Mt.;Y J'tr'� � LI +r Tij k t - Mark- From: Mark R. Gropper Sent: Wednesday, November 07, 2012 7:39 AM To: tnw(cbsitesurveymappin_.com Cc: Colpitts Development Company (coldevcoCcDgmail.com); Mark Santos-Johnson; Peter Renner (PRennerCcJ)Rentonwa.gov); Owen Mayfield Subject: Survey_ Sunset Terrace and related parcels Good morning, Thomas. The signed proposal is attached. A check for$8,945 was placed in the mail yesterday afternoon. Please proceed. Thank you. —Mark— Mark Gropper Executive Director (W PO Box 2316, 2900 NE 10th St. Renton WA 98056-0316, Phone 425-226-1850 x. 223 2 DISCLAIMER: This message is confidential,intended only for the named recipient(s)and may contain information that is privileged or exempt from disclosure under applicable law.If you are not the intended reciyient(s) you are notified that the dissemination distribution or copying of this information is strictly prohibited.If you received this message in error,please notifv the sender then delete this message. 3 10116-2141h Avenue NE Redmond,WA 98063 SSite Tel:(425)298-4412 Fax:(425)298-4414 Survey&Mapping tnw0sitesurveymapaina.com CITY OF RENTON Boundary and Topographic Survey Proposal for: Mark Gropper Renton Housing Authority PO Box 2316 Renton,WA 98056 Tel:425,226.1850 x 223 E-mail: mrgGrentonhousing.org Project: Sunset Development Phase II Tax Parcel No: 722780-1055; -1400; -1295; -1300; -1305: -131 b and-1085 Site Survey &Mapping Project No: 12-376 INTRODUCTION Thank you for the opportunity to provide this proposal for surveying services for the above-referenced project. Based on preliminary research of recorded documents,we have identified a scope of work and a lump sum fee for your project.Our surveying services will be provided based upon the following: S The client is the property owner or an authorized agent of the property owner. 5 The client will provide right of entry onto the property. S In some cases,the cutting of brush or small trees is necessary to complete the field survey. S Utilities above and below ground will be shown on the survey to the extent that they can be identified by normal field observation. Invert elevations to existing underground storm and sanitary sewer structures will be provided. SCOPE OF WORK _.. ...... _.......... This scope of work is based on the typical requirements for a boundary and topographic survey in the City of Renton based on our experience with similar projects. The cost of the standard boundary and topographic survey is delineated in the fee section of this proposal. The Boundary Survey includes: S Research including a review of available Records of Survey for the area. S Collection of field evidence required for an adequate resolution of the boundaries. This typically includes street centerline monuments, existing survey monuments on the subject or nearby parcels,and evidence of occupation such as fences and other improvements. S Setting of%" steel rods with 2" plastic raps or brass disks with masonry nails in concrete and asphalt at all corners except where existing monuments are found. S Plotting of easements based on a title report and supporting copies of recorded easements provided by the owner. S Show all horizontal control on the face of the survey with coordinate data in table format. S Prepare Revised Legal Descriptions for transactions vacating streets and/or lot realignments The Topographic Survey includes: 5 Location of street edge,back of curb and sidewalk,show Right-of Way widths S Location of all site improvements including houses, decks, sheds, roof overhangs, sidewalks, steps, rockeries,retaining walls,fences,eaves etc. S Location of surface evidence of utilities including overhead power, cable and telephone, storm and sanitary sewer manholes with inverts, catch basins with inverts, water and gas meters, etc based on a utility locate performed through Onecall S Existing topography at 1-foot contour intervals on an accepted vertical datum. S Location, size and species of trees with caliper greater than 6 inches with elevations at their bases S Location of adjacent houses S Location of buildings on adjacent properties S Tie into City of Renton vertical control.Provide two benchmarks on site. S The survey will extend 5 feet beyond the property lines and for the full width of adjacent rights of way. Renton Housing Authority Boundary F Topographic Survey proposal Page 1 of 4 11/1/2012 SCHEDULE OF WORK COMPLETION Normal Schedule: Once we have received the signed contract and retainer, the survey will be completed within 28 business days. FEES We propose to provide these services on a lump sum basis. Standard Boundary&Topographic Survey: . . s Research Principal Surveyor $140.00 1 $140.00 PLS Boundary Resolution Principal Surveyor $140.00 3 $420.00 Field Survey 2-Person Survey Crew $150.00 80 $12000.00 Data Reduction Principal Surveyor $140.00 1 $140.00 PLS Field Check Principal Surveyor $140.00 0.5 $70.00 Drafting CAD Drafter $80.00 64 $6120.00 Sub Totals 149.6 $17890.00 Fee Summary Table& Total Fee Calculation: 1. Standard Boundary&Topographic $17890.00 T—Total Project Fee $17890.00 PAYMENT SCHEDULE AND OPTIONS " The calculated total project fee above is to be paid in two payments as follows. S 50% of the fee is to be paid upon acceptance. Note: Your project start date is the date on which we receive the retainer payment and signed contract. S The remaining 50%of the fee is to be paid before or at the time of delivery. ;I"AWA V-1.SA� k " For your convenience, we do accept Visa, MasterCard and American Express credit cards by phone for payments. DELIVERABLES Upon completion of your survey,we will provide you with the following: S► Two hard copies of your survey(additional copies will be available for the cost of reproduction); S Drawings will be 22"x 34" S Electronic files—Autocad 2009,Microsurvey and PDF;and 5 Provide ASCII file of all survey points S Digital pictures of the property. INSURANCE COVERAGE Site Survey & Mapping, Inc. will provide and maintain the following minimum insurance coverage for this project: 5 Errors and Omissions Insurance(Lloyds of London):$1,000,000 S General Liability Insurance(Travelers):$2,000,000 Renton Housing Authority Boundary&Topographic Survey proposal Page 2 of 4 1 1/112 0 1 2 TERMS AND CONDITIONS Successor and Assigns The Client and Consultant each binds himself,his partners,successors,assigns and legal representative to the other party to this LETTER OF AGREEMENT and to the partners,successors,assigns and legal representatives of such other party with respect to all covenants of this LETTER OF AGREEMENT. Neither the Client nor the consultant shall assign his interest in this LETTER OF AGREEMENT without written consent of the other. Time of Essence Time is of the essence in this Agreement; therefore, the terms specified in this contract shall be subject to re-negotiation if not executed within 30 days from the date of the LETTER OF AGREEMENT. Further,if this project extends beyond six(6)months from commencement because of delays by the Client or such other reasons beyond the control of the consultant, the fees in this agreement shall be adjusted to reflect current fee schedules. Government Approvals It:s understood that the consulting services to be rendered by the Consultant do not in any way guarantee approval of governmental permits,approvals,licenses,or other necessary actions. Additional Work and Changes in Scope of Work Additional work requested by the Client or arising from inaccurate or incomplete information furnished by the Client is not included in this fee. it is further understood that if there are client-initiated changes and/or additional governmental requirements that are not covered in the Scope of Work,these changes shall be billed on a time and materials basis according to the current rate schedule. Other Services Other services of other professionals,such as traffic consultant,architect,soils,or environmental consultants shall be enlisted as necessary with the Client's approval. Their fees shall be resolved at that time and billed directly to the Client. Stop Work Order Consultant agrees to stop work on this project at the written request of the Client The Consultant further reserves the right to stop work on this project for cause. "Cause"is defined to ine:iude,but without limitation,failure of the client to comply with the provisions of'.his agreement; failure of the Client to provide necessary information and/or documentation necessary to complete the project; deterioration of working relationship of the parties to '.tie extent it impedes project effectiveness; inability of the parties to re- negotiate the terms of this Agreement according to the provisions contained herein;and failure of Client to bring current accounts 60 days in arrears.Client agrees to pay for all work.according to the records of the Consultant,which are kept on an hourly basis,up to the time Stop Work Order is executed. By slcning this contract, the Client understands that property may be liened by the Consultant if payment is not received in full within the timeframe outlined herein Attorney's Fees In the event that any party of this LETTER OF AGREEMEN f seeks the assistance of legal counsel to enforce this LETTER OF AGREEMENT, or to maintain or defend any cause of action arising out of or related to this LETTER OF AGREEMENT,then the prevA:,-.g party in such action, demand. arbitration or defense shall be entitled to recover from the other said prevailing party's reasonab!e attorney's fees incurred,together with costs and expenses. Retainer A retainer shall be collected as identified in the proposal letter. Said retainer shall be paid prior to commencement of work and will be applied to the final invoice for services. Costs associated with collection efforts or services will be charged and added to past due accounts on a time and material basis. Miscellaneous Fees The Client shalt pay all permit fees,application fees,or any other fee required to obtain the necessary permits. Instruments of Service Drawings, specifications and other documents.including those in electronic form,prepared by the Consultant are Instruments of Service for use solely with respect to this Project. Consultant shall be deemed the author and owner of all Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. Upon execution of the LETTER OF AGREEMENT. the Consultant grants to the Client a nonexclusive license to reproduce the Consultant's Instruments of Service solely for purposes of constructing, using and rnaint;rining the Project, provided that the Client shall comply with all obligations, including prompt payment of all sums when due, under this LETTER OF AGREEMENT. Any termination of this LETTER OF AGREEMENT prior to completion of the Project shall terminate this license. The Client shall not assign, sublicense, pledge or otherwise transfer any license granted herein to another party without prior written agreement of the Consultant. However, the Client shall be permitted to authorize the Contractor, and Its subcontractors, materialmen and suppliers to reproduce applicable portions of the Instruments of Service appropriate to and for use in their execution of the work. Interest on overdue accounts Consultant will bill for services rendered on a monthly basis or upon the completion of identified tasks. Client shall pay all fees and costs invoiced by the Consultant within 15 days of the date of billing or the account shall be considered overdue. Interest at the annual rate of 18%will be added to subsequent invoicing for all overdue accrued unpaid amounts. Disclosures It is hereby disclosed that the Consultant may have completed work on neighboring properties,may own or be a partner in the development of neighboring properties and may accept employment in the future from neighboring or competing properties or developers. Further,the consultant may develop and sell properties [fiat will be on the market at the same time as the Client's property. The Consultant may have relationships with various individuals,firms and organizations that have a financial interest in the Client's project or a competing project.Should the Client have any questions about these disclosures or any concerns at all about the Consultant's current or future relationships they should be brought to the attention of the Consultant, Renton Housing Authority Boundary&Topographic Survey proposal Page 3 of 4 11/112012 ACCEPTANCE This represents the entire agreement between the Parties with respect to the subject matter hereof and supersedes any previous or contemporaneous oral or written agreements regarding such subject matter. This Agreement may be amended or modified only by a written instrument signed by a duly authorized representative of each Party. By signing this contract,the Client understands that property may be liened by the Consultant if payment is not received in full within the timeframe outlined herein. IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their duly authorized representatives as of the date set forth below. Site Survey & Mapping, Inc. Accepted by: Thomas N.Woldendarp, PLS Name: Mark Gropper �virBy: Signature: 7 Date: . t ' (Please complete form below,sign and return with 50% retainer check to schedule your job. M Client Name ..._....... ._ Company Billing --� Address City State ....... - zip _ _Code Phone Fax Cell Email Fee Summary Table&Total fee Calculation: ME E 1.Standard Boundary&Topographic $17890.00 Total Project Fee $17890.00 Benton Housing Authority Boundary&'topographic Survey proposal Pane 4 of 4 11/1/2012 City of Renton PETITION FOR VACATION OF RIGHT-OF-WAY WIWI 11-11-WIV To the Honorable Mayor and (3 D I Members of the City Council V�C- APR 19 2013 City of Renton 1055 S.Grady Way RECEIVED Renton,WA 98055 CITY CLERK'S OFFICE Dear Mayor and Council Members: We,the undersigned property owners abutting a certain portion of public right-of-way,respectfully request the vacation of the right-of-way as described on the attached"Exhibit A"and commonly known as: Sunset Lane NE from NE 10th Street to Harrington Avenue NE (Insert closest cross streets and reference the street name,i.e.NE Bog Street from Bicycle Alley to Slalom Avenue NE.) We request a time and place be fixed when this petition will be heard by the City Council. Of the property owners abutting the area of this petition 100 % 1 2/3 or more required] of the lineal frontage have agreed and indicated their joining this petition with their signatures below: PROPERTY OWNER(S) Property Identification Number. 7 2 2 7 8 0 - 1 0 5 5 (first 10 digits of your 12-digit property tax account number Signature: NAME: Mark Gropper Ex Galt! � � � HOUSING AUT�1Gr�IT'� �E+'� Lz ,LI ADDRESS: P.O. Box 2316, 2900 NE 10th Street R. CITY: Renton ZIP: 98056 TELEPHONE NUMBER: (425)226 1850 PROPERTY OWNER(S) Property Identification Number: 7 2 2 7 8 0 - 1 0 8 5 first 10 digits of your 12-di it property tax account number Signature: NAME: Mark Gropper it : edoi` HOUSING AUTHORITY My OF RENION ADDRESS: P.O. Box 2316, 2900 NE 10th Street R. 0, BOX 2316 CITY: Renton ZIP: 98056 RENTON, WA 98056-0316 TELEPHONE NUMBER: (425)226 1850 1 . vc.�lt-t,o� �z�--�1-t�t►. Petition for Vacation of Right-of-way 1 05.01.2007 (White) �S w�% �✓p y.e�zM1- �i�` PETITIONER NAME: Mark Gropper _. ON 111-10 c MARK R. GROPPER COMPANY(if applicable): `f _ Executive Director Renton Housing Authority R� ADDRESS: P.O, BOX 2316, 2900 NE 10th Street gUrHOR► Office 425/226-1850 Ext. 223 RENTON Fax 425/271-8319 HOUSING TTY 1-800-833-6388 CITY: Renton zIP: 98056 Email mrg@rentonhousing.org AUTHORITY www.rentonhousing.org TELEPHONE NUMBER (425)2261850 2900 N.E. 10th St. • P.O. Box 2316 • Renton,WA 98056-0316 AFFIDAVIT OF AUTHORIZATION I, (Print Name/s) Mark Gropper ,declare that I am(please check one)X the current owner of the property involved in this petition or an authorized representative for the petitioners and that the foregoing statements and signatures herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief. I certify that I know or have satisfactory evidence that r✓ romp of / signed this instrument and acknowledged it to be his/her/their free and v Itintary act for the uses and purposes mentioned in the instrument. t (Signature of Owner/ resen ive) xctittt�e lEOf E% Notary Public idand for the State of Washington (Signature of Owner/Representative) I Notary(Print)ffit�t.Sr�t5 tcl S��bi�ti q i �I My appointment expires: '0PIjB��' i Dated:.00 Illal •.�SlU�i �b y� s "SUBMIT PETITION and FILING FEE TO THE CITY CLERK, 7th FLOOR, RENTON CITY HALL" For City Use: ❑ Legal Description []Vacation Area Map ❑Vicinity Map ❑Public Benefit Explanation Petition for Vacation of Right-of-way 3 05.01.2007 (White) --------------- EDMONDS AVENUE NEcn � A' o CD I= } r k z N n�i o � _FERNDALE CIRCLE NEB rn CD z cn � f > m �. r GIENWOOD AVENUE � z iGLENW00D AVENUE NE' j y i ,00 r z CD _HARRINGTON AVENUE NUl EVI ul f G` O 7 C oy� Gj�� o ti / z / - I PARCEL# z 7227801085 / rPARCEL# I I 1722780105/ PARCEL# I \�� 722780108 � \ PARCEL# PARCEL# � , 72Z7801055 7227801055 _ — _............... PARCEL# , AREA OF RIGHT-OF-WAY 7227801055 / TO BE VACATED 1 VACATION AREA MAP EXHIBIT 1 — 100'-0" 0' 25' 50' 100' RHA- STREET VACATION Project Number 1317 schemata RENTON,WA 04/15/2013 workshop VACATION AREA MAP EXHIBIT EXHIBIT B EXHIBIT A SITE SURVEY AND MAPPING, INC 10115 214Ty AVENUE NE REDMOND, WA 98053 SITE SURVEY PROJECT#: 11-097 LEGAL DESCRIPTION-RIGHT-OF-WAY VACATION THAT PORTION OF THE CORRECTED PLAT OF RENTON HIGHLANDS NO.2, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 57 OF PLATS, PAGES 92 TO 98, IN KING COUNTY, WASHINGTON, MORE FULLY DESCRIBED AS FOLLOWS: THE SOUTHEAST 19.00 FEET OF SUNSET LANE LYING BETWEEN THE SOUTHWEST MARGIN OF NE 1 OTH STREET AND A LINE 32.00 NORTHEAST OF THE CENTERLINE OF HARRINGTON AVENUE NE; ALL SITUATE IN THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN THE CITY OF RENTON, KING COUNTY, WASHINGTON; CONTAINING 6,170 SQUARE FEET. W4(p WAvo 4 Q~ cl O r 0 389 4 �� Fir 9FGl 5 T ioNR! IAN� S (6�(3 schemata workshop Explanation of Public Benefit The Street Vacation Petition for a part of Sunset Lane NE is central to help achieve the Community Vision goals for the Sunset Terrace Revitalization as identified in their program.The requested Street Vacation is nineteen feet(19')wide along Sunset Lane NE and 6,170 square feet in area. The properties to the south of the vacated portion of the street will be developed as a public library operated by the King County Library System and a market-rate,mixed-use,residential building developed by a for-profit developer which will provide the seed funding for the development of future public housing projects by the Renton Housing Authority.The development of the new public library will be a great amenity for the use of current and future residents of the Sunset Terrace redevelopment and the Sunset area. This street vacation and property development will help realize some of the goals set forth by the community as a part of its Revitalization project such as supporting existing communities,providing equitable housing and providing additional retail in the area. schemata workshop inc 1172012th avenue#3,seattle wa 98122 www.schemataworkshop.com v 206.285.1589 f 206.285.2701 it 4 iop m 3' ilia All Ag M F Z Pal ppy a p Yz MR 99 o m � � 3yY�•A� I I M p \ \ -1 k !eN r � ` qP F O �.rys°� I w q`_ _ _� Inn/ '•�.p .+' o g pig m I My I \ 1" q y 2 `,I I r s 7pR D P I ` I 9' 7N48TORY wOOD 1`� \ s All I A _ A A F � m \ �rx 1 I�I ���� �� I -- -------- 1 j IA � 1 1� F az w II gyp w 5 r � � ' d" --------------------- co I Fn �` m Ce re WOL 2 fiX 9 1'M-IHDF�30aM �i ' '•,`I m p '-( � � ? � ,p � � ,� � �x �. D'l➢t-LIg3H 3AV3 , � ..�'p aG ODOM ALOIBOML w I all 8 I I I I ' cf) � 4 it I I I I I Ikk . ` G I � ON s a _ e18 - - - - _ --- __ " D -- — - _ - __- -, �'" I• F ' Q „ BB Oyp—�0• 1S H1Uiy3 I11 wa� op _WOYL — F M M —r—M ��•N i .r � � d �..y'' •1y1r�y0Y/ i g 5 a s .ww-f I 1P igiy � � 00*`+ m NW 1/4, NW 1/4, SEC 9,TWP 23N, RNG 5E,W.M. DATI COON M m o TOPOGRAPHIC SURVEY o S ED 1 RENTON HOUSING AUTHORITY TNj F. y� S i0 te a 970 HARRINGTON AVE NE RENTON,WA 98056 Survey & Mapping, Inc. EYWRES "10-2011 2011SITE SURVEY MAPPING INC. ALL RIGHTS RESERVED I _.K....Yrnppkv. 10115214th An NE Redmond,We 9eM Phone:4252DB.U12 Page 4 of 4 Management Acceptance and Commitment for: Sunset Terrace Regional Stormwater Facility, SWP-27-3658 ❑ We concur with the project scope and schedule as outlined in this project proposal. We are assigning (Ext. ) as our representative on the design team. We concur with the project scope and schedule as outlined in this project proposal. We are not assigning a representative to participate on the design team, but reserve our right to participate in the standard review processes. ❑ We feel that the following item(s) are of concern or interest in relationship to this project and would like to bring them to you attention: /i.9 nature) (Da e) (Name, Section and/or Divisio ) \\RVFPS-02\Depts\PW\File Sys\SWP - Surface Water Projects\SWP-27-Surface Water Projects (CIP)\27-3658 Sunset Regional SW Facility\1003 Project Proposal\2014-0614 Project-Proposal-Sunset Terra ce.doc\H CBtp