Loading...
HomeMy WebLinkAboutSWP273658(5) 11 11 B B LANDSCAPE ARCHITECTURE 19 January 2015 Dustin Atchison, P.E. Water Resources Engineer CH2M Hill 1100 112th Avenue NE, Suite 400 Bellevue, WA 98004-4504 RE: Sunset Park Stormwater Facility— Rain Gardens:Additional Irrigation Scope & Fee Landscape Architecture Renton, Washington Dear Dustin: Per our team and City of Renton conference call on 13 January 2015 and City of Renton direction in email dated 14 January 2015, Hough Beck & Baird Inc. (HBB) is providing the following scope and fee proposal for additional irrigation design services. We understand that only irrigation plan drawings, details, and cost estimate will be prepared for the 90% submittal date on 21 January 2015, and that irrigation special provisions will be submitted separately for 90% review by the City of Renton. TASK 1 PROJECT MANAGEMENT (additional irrigation scope) 1.1 Conduct one (1) quality control review for irrigation drawings and for special provisions. one for each submittal listed below. TASK 2 DESIGN & CONSTRUCTION DOCUMENTS (additional irrigation scope) 2.2.1 The 90% submittal will include: irrigation plan, irrigation schedule, irrigation details, and irrigation cost estimate. Special provisions to standard specifications will be provided. 2.2.2 100% submittal will be the final, bid-ready irrigation construction documents, incorporating city review comments from 90%. EXPENSES: Printing for quality control review and signing. _ In consideration of the above services, we are proposing the following estimated fee (see Exhibit A): TASK 1. Project Management $503.36 TASK 2. Design & Construction Documents $2,413.36 Expenses $30.00 Total HBB Cost of Services: $2,946.72 _ The above fee is an estimate of how we expect to allocate our time. We reserve the right to move time between tasks as needed to accomplish the overall goals of the project. Bid alternates, bid additives, or subsequent re- packaging of the project into separate phases is not included. _ If you have questions regarding this proposal, please feel free to call. Best regards, HOUGH BECK& BAIRD INC. v'60 01 Juliet Vong,ASLA, LEED AP President Attachments: Exhibit A. HBB Fee Spreadsheet Seattle I Boise EXHIBIT A SUNSET PARK STORMWATER FACILITY- RAIN GARDENS 1/19/2015 Page 1 of 1 HBB Fee Proposal: Additional Irrigation Scope Fee HOUGH BECK&BAIRD INC. PRINCIPAL LA/PRJ.VG DESIGN, CAD/TECH. ADMIN SCOPE OF WORK 180.37/hr 125.84/hr 75.50/hr 64.32/hr 57.33/hr I TOTAL TASK 1.PROJECT MANAGEMENT(additional irrigation scope) 1.1 lQuality Control Reviews 1 4 SUBTOTAL(HRS) 0 4 0 0 0 4 SUBTOTAL($) $ - $ 503.36 $ $ - $ $ 503.36 TASK 2.DESIGN&CONSTRUCTION DOCUMENTS(additional irrigation scope) 2.2.3 90%Submittal 4 10 2.2.4 100%Submittal Final Documents 7 6 SUBTOTAL(HRS) 0 11 0 16 0 27 SUBTOTAL($$) $ - $ 1,384.24 $ $ 1,029.12 $ $ 2,413.36 SUMMARY TASK 1.PROJECT MANAGEMENT additional irrigation scope $ 503.36 TASK 2.DESIGN&CONSTRUCTION DOCUMENTS additional irrigation scope $ 2,413.36 OUT-OF-POCKET EXPENSES Printing for quality control review and signing $ 30.00 TOTAL HBB SERVICES $ 2,946.72 P.12014 Prolects12014-14 Sunset Park Stormwater FaciliWdmin101-Contmctsllrrigatoin Additional Scope&FeelSunset Storm Facility_HBB IRR Fee V1 xlsx