Loading...
HomeMy WebLinkAboutSW240024932NE 24TH STPAGEJOB NO.DESIGN12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877CIVIL ENGINEERINGLANDSCAPE ARCHITECTUREPLANNINGSURVEYING18265NE 24TH ST SHORT PLAT - LOT 2SITE PLANNEW SINGLE FAMILY RESIDENCE1 NOTES: 1.SEE STD. PLANS 220.00 AND 220.10 FOR PIPE MATERIALS AND MINIMUM COVER REQUIREMENTS. 2.THE ROOF AND FOOTING DRAIN SYSTEMS ARE PRIVATELY MAINTAINED. 3.FLOW PATTERN SHOULD BE TO THE NEAREST CB IF GRADE ALLOWS, OR TO THE NEXT DOWNSTREAM CB. 4.ROOF DRAIN COLLECTORS MUST BE ANALYZED FOR CAPACITY, SIZED FOR 25-YEAR PEAK FLOW. 5.PVC PIPE MUST BE SDR 35 OR THICKER AND MEET THE REQUIREMENTS OF ASTM D3034. 6.PVC PIPE USED IN PRIVATELY MAINTAINED DRAINAGE SYSTEMS MUST BE WHITE IN COLOR. 7.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. 8.AREA DRAIN WITHIN CRAWL SPACE IS ALLOWED TO CONNECT INTO THE STORM DRAINAGE SYSTEM WITH THE FOLLOWING CONDITIONS: A.THE CONNECTION IS TO BE TIGHT LINED A MINIMUM OF 10' OUTSIDE OF THE FOUNDATION, AND IN NO CASE CONNECTED UPSTREAM OF THE FOOTING DRAIN SYSTEM FOR THE HOUSE. B.THE AREA DRAIN MUST BE ROUTED THROUGH A SUMP PUMP SYSTEM PRIOR TO CONNECTION TO THE PUBLIC STORM DRAINAGE SYSTEM TO HELP PREVENT BACKUP DURING SURCHARGE CONDITIONS. SD SD SD SD 6" DIA MIN. ROOF DRAIN STUB WITH CLEANOUT (TYP.) LOT LINE, TYP. PRIVATE TYPE I CATCH BASIN CITY STORM DRAIN (SD) SYSTEM CLEANOUT, TYP AT EVERY 90°, OR 2ND 45° BEND, AND AT 100' MAX. SPACING ON STRAIGHT SECTIONS ROOF DRAIN TO CONNECT INTO CITY CATCH BASIN (CB), MIN. SIZE TYPE I PRIVATE ROOF DRAIN COLLECTOR PIPE; 6" DIA MIN., 0.5% MIN. SLOPE, 2 FT MIN. COVER CURB, SIDEWALK R.O.W. LINE 5' MIN. TYP.) HOUSE (TYP.) PRIVATE JOINT UTILITY EASEMENT 5' MIN. WIDTH PRIVATE STORM DRAIN (SD) SYSTEM, 8" MIN. DIA. PIPE, SEE NOTE 1 3' MIN. TYPICAL PRIVATE STORM DRAIN COLLECTION SYSTEM STD. PLAN - 225.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEMartinPastucha Public Works Administrator UNLESSOTHERWISE NOTED, DRAWINGISNOTTOSCALE (NTS) DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C108 8/13/2020 | 8:48 AM PDT OPTION 5 - IMPORTED TOPSOIL OPTIONS 2, 3, AND 4 - AMEND IN PLACE OR STOCKPILE AND AMEND 3"-4" ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER 12" BELOW SOIL SURFACE) GRASS: SEED OR SOD 1.75" OF COMPOST INCORPORATED INTO 6.25" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER 12" BELOW SOIL SURFACE) PLANTING BEDS TURF (LAWN) AREAS 0" 8" 12" 3"-4" ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 SUBSOIL IS SCARIFIED 6" BELOW IMPORTED TOPSOIL MIX GRASS: SEED OR SOD 6" IMPORTED TOPSOIL MIX COMPACTED DEPTH) SUBSOIL IS SCARIFIED 6" BELOW IMPORTED TOPSOIL MIX 0" 6" 12" PLANTING BEDS TURF (LAWN) AREAS 3" OF COMPOST INCORPORATED INTO 5" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") GRASS: SEED OR SOD PLANTING BEDS/UNDISTURBED VEGETATION, SEE NOTE 1 UNDISTURBED TURF (LAWN) AREAS, SEE NOTE 1 0" OPTION 1 - NO DISTURBANCE UNDISTURBED NATIVE SOIL UNDISTURBED NATIVE SOIL 6" IMPORTED TOPSOIL MIX COMPACTED DEPTH) GENERAL NOTES: 1.TO MEASURE SETTLED DEPTH, WATER SOIL SUFFICIENTLY TO FULLY SATURATE WITHOUT CAUSING EROSION 2.COMPOST TO MEET STD. PLAN 262.60. 3.COMPACTION OF TOPSOIL (WHERE REQUIRED) TO BE TO 85% OF STANDARD PROCTOR. 4.SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. UNDISTURBED NATIVE VEGETATION NOTES: 1.AREAS OF NO DISTURBANCE TO BE FENCED AND EXISTING VEGETATION AND SOIL TO BE PROTECTED FROM CONSTRUCTION IMPACTS. SOIL AMENDMENT SECTIONS STD. PLAN - 264.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEGreggZimmerman Public Works Administrator UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 9/28/2018 | 9:45 AM PDT SURFACE WATER STANDARD PLAN NOTES (1 OF 2) STD. PLAN - 267.00 PUBLIC WORKS DEPARTMENT APPROVED: DATEMartinPastucha Public Works Administrator UNLESSOTHERWISE NOTED, DRAWINGISNOTTOSCALE (NTS) SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WATER STANDARD PLAN NOTES. 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2.THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3.ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4.APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5.A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS-BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS. 7.VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 8.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 9.OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11.ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND 220.20. 13.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 14.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT-LOCKING LIDS PER THE CITY STANDARD PLAN 204.10, 204.20, 204.30, 204.40, AND 204.50. STRUCTURES SHALL HAVE: RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE. ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. 15.BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM. 16.LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C108 8/13/2020 | 8:48 AM PDT SURFACE WATER STANDARD PLAN NOTES (2 OF 2) STD. PLAN - 267.10 PUBLIC WORKS DEPARTMENT APPROVED: DATEMartinPastucha Public Works Administrator UNLESSOTHERWISE NOTED, DRAWINGISNOTTOSCALE (NTS) THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WATER STANDARD PLAN NOTES. 18.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70% PASSING; 2 - 4 INCH ROCK / 30 - 40% PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 19.FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON-SITE BMPS. 20.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT-LOCKING LID MARKED "STORM” OR "DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00. 21.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22.ALL NEWLY-INSTALLED AND NEWLY-REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/OR PAVEMENT. 23.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24.FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00. 25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 27.PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS (RMC 4-3-050). 28.PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON-SLIP OR NON-SKID LID PER ADA REQUIREMENTS. 29.CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31.CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. SURFACE WATER STANDARD PLAN NOTES: DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C108 8/13/2020 | 8:48 AM PDT DocuSign Envelope ID:345B681 D-914F-4F2D-AB59-7C192D3B78A3 ALL 90' TURNS SHALL BE ACCOMPLISHED— BY MEANS OF A WYE WITH CLEANOUT AND 4" BEND AS REQUIRED (NO GREATER 45' BEND. TWO 45'BENDS SHALL NOT BE THAN 45'BEND). EVERY 2ND CHANGE 4" CLEANOUT WYE WITH ACCEPTABLE. (SEE NOTE 11) IN DIRECTION OR GRADE WILL REQUIRE 45' BEND AND PLUG. 1 A CLEANOUT WYE. (SEE NOTE 11) I (SEE NOTE 11) I I Q W La W 3 z. z• z' H N HOUSE I HOUSE al0 HOUSE ce0l HOUSE z z rig' za. a. a. i --3-0" MIN. IIII4" SEWER PIPE SURFACE CLEANOUT 4" SURFACE v (TYPICAL) 6"x 6"x6" WYE a CLEANOUT 4" SEWER PIPE, SEE NOTES 2 SEE STD PLAN - 407) WYE 4" TEST TEE WITH AND 3. MINIMUM UNE SIZE FOR 4" WYE WITH II PLUG FACE UP II OTHER THAN SINGLE FAMILY IS 6" II R.O.W. LINE CLEANOUT _La I ; R.O.W. UNE 3' MIN. to lO ioTYPICAL) o 06"x 4" REDUCER 0 F1 fFrl H TYPICAL) F WR cn MAIN SEWER LINE w 0 w w NOTES: z IF THE BUILDING SEWER SERVES ANY FIXTURE HAVING a FLOOD LEVEL RIMS LOCATED BELOW THE ELEVATION 1. PRIOR TO INSTALLATION OF A SANITARY SEWER CONNECTION, A OF THE NEXT UPSTREAM MANHOLE COVER OF THE SIDE-SEWER PERMIT MUST BE PURCHASED FROM THE CITY OF o PUBLIC SEWER SYSTEM, A BACKFLOW PREVENTION RENTON PUBLIC WORKS DEPARTMENT, b z DEVICE SUCH AS CLEAN CHECK EXTENDABLE I a BACKWATER VALVE OR APPROVED EQUAL SHALL BE111INSTALLED. 2. FOR INSPECTION OF SIDE SEWER, CALL 24 HOURS IN ADVANCE. m THE INSPECTION PHONE NUMBER IS ON THE SIDE SEWER PERMIT. 4" FLEXIBLE COUPLING (FERNCO OR EQUAL) SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE z z ON SITE WHEN INSPECTOR ARRIVES AT APPOINTED TIME. DO NOT o ' BACKFILL THE DITCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR. LLJ SURFACE CLEANOUT m 4"x 4"x4" WYE 3. SIDE SEWER PIPE AND FITTINGS SHALL BE PVC SDR 35 WITH RUBBER 4" PIPING GASKET JOINTS UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT.PLAN BUILDING DRAIN FOR 4. A MINIMUM GRADE OF 2% (1/4" PER FOOT) MUST BE MAINTAINEDLOWELEVATIONHOUSE WITH A 4" PIPE. IN THE EVENT A 2% GRADE CANNOT BE MAINTAINED. WITH THE APPROVAL OF THE PUBLIC WORKS INSPECTOR, THE MAIN TO 5 FEET CONTRACTOR MAY INSTALL A 6' DIAMETER SIDE SEWER AT NO LESS R.O.W. LINE R.O.W. LINE TO CLEANOUT MAX THAN 1x SIDE SEWER BUILDING SEWER BUILDING 5. INSTALL SIDE SEWER WIN 2' MINIMUM COVER. 18" COVER IS ALLOWEDSTUB 3 FEET MIN. -- DRAIN AT THE HOUSE IF OUTLET IS SHALLOW. I/-. 110_3 6. ALL BUILDING SEWER AND SIDE SEWERS SHALL HAVE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405. VI0 co m aof ((( o) O4` A NA A• AL-J m ' rNmi< ' c x >x • 0)x,o m 7. WHENEVER FEASIBLE, THERE SHALL BE A MINIMUM 5 FOOT zom o v y n ? mi At v F x> o m O HORIZONTAL SEPARATION BETWEEN SANITARY SIDE SEWERS AND ALL MO 0 o mm o •A- c-x z o •.- pm OTHER UTILITIES. rn2 „O_, rn UIn Z p m >> G) Z 0 0m 'aznmm 8. SIDE SEWER TESTING SHALL CONSIST OF PLACING A PLUG IN THEgzw8am0 > > Q el TEST TEE AND INSTALLING A 4-FOOT RISER PIPE ON THE CLEANOUT I Io z m- c > AT THE BUILDING. THE SIDE SEWER PIPE SHALL BE FILLED TO WITH m 1 m - '-g y C m i ,,Z WATER TO THE TOP OF THE RISER PIPE. NO LOSS OF WATER SHALL rnm I a, m mm 0 OCCUR FOR A PERIOD OF 10 MINUTES. THE SIDE SEWER MAY BE x' zz c CONNECTED TO THE BUILDING FOLLOWING THE SUCCESSFULo rn m COMPLETION OF THE LEAK TEST. O1 o 9. THE CLEANOUT AT THE RIGHT-OF-WAY SHALL BE INSTALLED PER mPLAN STANDARD PLAN 406.1. THE CLEANOUT AT THE BUILDING SHALL BE BUILDING SEWER INSTALLED TO SURFACE GRADE. ALL OTHER CLEANOUTS SHALL BE INSTALLATION INSTALLED TO WITHIN 12" OF THE SURFACE. 10. IF SIDE SEWER STUB IS NOT AVAILABLE. THE OWNER SHALL BE RESPONSIBLE FOR ITS INSTALLATION PER STANDARD PLAN 406.1. ALL WORK WITHIN STREET RIGHT-OF-WAY SHALL BE DONE BY A LICENSED AND BONDED CONTRACTOR. CALL 811 BEFORE YOU DIG 11. ALL TRENCH RESTORATION FOR SIDE SEWERS IN THE PUBLIC or go to RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110.2. www.callbeforeyoudig.org 12. ALL WORK SHALL BE ACCOMPUSHED IN ACCORDANCE WITH THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT (WISHA). TYPICAL BUILDING SEWER STaD:PLAN-406.2 PUBLIC WORKS FROM PROPERTY LINE TO 26/2020 I 12:1 DEPARTMENT Martin PastucliW F-R't U" BUILDING CONNECTION eB049 1FD98B449D... Public Work"kdmlohtntor DATE