HomeMy WebLinkAbout052024 Admin Report
Mayor’s Office
Memorandum
DATE: May 20, 2024
TO: Ed Prince, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, May 20 through Friday, May 24, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE 12th St and Jefferson Ave NE for utility
installation. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, May 20 through Friday, May 24, 8:00 a.m. to 3:00 p.m.
Intermittent eastbound lane closure on S Grady Way east of Talbot Rd S for
construction work. Questions may be directed to Tom Main, 206-999-1823.
Monday, May 20 through Friday, May 24, 8:00 a.m. to 3:00 p.m.
Road closure on Kirkland Ave NE between NE Sunset Blvd and NE 12th St for
utility installation. A detour route will be provided. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, May 20 through Friday, May 24, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE and
Kirkland Ave NE for construction work. Questions may be directed to Brad
Stocco, 425-282-2373.
Monday, May 20 through Friday, May 24, 8:00 a.m. to 3:00 p.m.
Shifting lane closures both east and west on NE Sunset Blvd between Redmond
Pl NE to Union Ave NE for utility installation and frontage improvements.
Questions may be directed to Brad Stocco, 425-282-2373.
Ongoing Street Closure (City of Renton Resolution No. 4446). FULL STREET
CLOSURE on Sunset Lane NE between NE 10th Street and Harrington Place NE in
support of the Solera Development Project (LUA20-000305). Questions may be
directed to Brad Stocco, 425-282-2373.