Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutLUA84-090DEPARTMENT/DIVISION DATE PREP. TRANSMITTED BY:
RECORDS TRANSMITTAL
CITY CLERK'S OFFICE CITY CLERK 2/8/95 L. STEPHENS
CITY OF RENTON RECEIVED BY: DATE REC'D. APPROVAL:
LOCATION B DX NO. RECORD SERIES 7fTLE INCLUSIVE;; F1ET€NTION DESTRUCT
DATES PERIOD DATE
Special Permit files
SP-84-019 Permanent
SP-84-078
SP-84-090
SP-85-006
SP-85-025
SP-85-048
SP-85-055
SP-85-099
SP-86-023
SP-86-024
SP-86-071
SP-86-078
SP-86-080
BEGINNING
OF FILE
FILE TITLE MiCROFILMED
flip
44 / UPAndicZoo)
SRO9O84
OF J
4 THE CITY OF RENTON
tip - z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
BARBARA Y. SHINPOCH, MAYOR 0 LAND USE HEARING EXAMINER
9A FRED J. KAUFMAN. 235 -2593
0,
9gr
D SE
April 18, 1986
Barbara E . Moss
Director 3f Planning
First City/Schuman
800 Fifth Avenue, Suite 4170
Seattle, 1rJashington, 98104
Re: S'-090-84
Special Permit for Grading and Filling
Black River Technology Park
Dear Ms. Moss:
The above entitled matter is dismissed this date pursuant to our letter to you dated April
3, 1986.
If you wish to reinitiate your request, you may contact the Building and Zoning
Department for application details.
Sincerely,
FRED J. <AUFMAN
HEARING EXAMINER
FJK/dk -
cc: Building and Zoning Department
City Clerk
Del Bonds. Alterra Corporation
1 I
OF RA,A
4 THE CITY OF RENTON
MUNICIPAL BUtLDING 200 MILL AVE. SO. RENTON, WASH. 98055
o m BARBARA Y. SHINPOCH, MAYOR I LAND USE HEARING EXAMINER
9°
FRED J. KAUFMAN. 235-2593
091?
ED SEPTE '
April 3. 1986
Barbara E. Moss
Director of Planning
First City/Schuman
800 Fifth Avenue, Suite 4170
Seattle. Washington, 98104
Re: SP-090-84
Special Permit for Grading and Filling
Black River Technology Park
Dear Ms. Moss:
I have reviewed the file in this matter along with your correspondence regarding the
subject site. Since this item was not diligently pursued. it will be dismissed within 14 days
of this date.
If this office can be of further assistance. please give us a call.
Sincerely,
FRED J. KAUFMAN
HEARING EXAMINER
F JK/dk-
cc: City Clerk
Building and Zoning Department
Del Bonds. Alterra Corporation
Y i
11
J
FIRSTCITY jT
7
EQUITIES MAR LI)
I
41986
March 4, 1986 BUILDtn!
Design Review Officials
CITY OF RENTON
200 Mill Ave. S.
Renton, WA 98055
Hearing Examiner Fred Kaufman
Environmental Review Committee Larry Springer
Dick Houghton
Ron Nelson
Building & Zoning Dept. Roger Blaylock
Jerry Lind
Jim Hansen
Public Works/Engineering Bob Bergstrom
Fire Department Jim Gray
Re: Conceptual Master Plan/Total Development Picture
VALLEY 405 BUSINESS PARK
Gentlemen:
As most of you are aware, First City Equities has recently purchased the Black
River Technology Park property just north of and adjacent to our Valley 405
Business Park. We are also in the process of purchasing the Burlington Northern
parcel to the west and adjacent to Tract A of the Valley 405 Business Park.
We are incorporating these properties into the Valley 405 Business Park as one
complete development.
Our architect, (LPN/Royce A. Berg, AIA,) our landscape architect, (Mitchell Nelson
Group,) our engineers, (Bush, Roed & Hitchings,) and our graphics design firm,
The GNU Group,) have been working to create an overall design concept, the
master site plan, for the entire property. Up to this time we have been submitting
for site plan approval on a phase by phase basis. This has caused some areas
of concern in that the City of Renton has not had the advantage of seeing our
intended master site plan for the entire property. Now that it is complete, we
would like to present it to you.
800 Fifth Avenue Suite 4170•Seattle,Washington 98104•(206)624-9223
Real Estate Development and Investments
r Design Review Officials
CITY OF RENTON
March 4, 1986
Page Two
We would like to meet with all of you on March 12 at 1:30 in your offices to
present our design concepts for development of the entire property. Included
in detail will be the master site plan, conceptual building layouts, enhanced water
features including natural amenities as well as formal fountains, ways in which
people will take advantage of the natural amenities of the property, signage details,
jogging trails with exercise stations and par course events, median strips, bridge
treatments, street landscaping, bollards, special paving and site lighting.
We would like to take the time now to go over the entire development scheme
in order to give you all the vision of what the Valley 405 Business Park will be
once development is complete. We feel this will benefit you in your review process
of site plan approvals and building permit applications, which will continue to
be submitted on a phase by phase basis.
Since First City Equities' entire project team will include at least seven of us
and since there could be as many as nine or more attending from the City, I
would suggest we use a room large enough, such as the Council Chambers, to
make this presentation. We will come prepared with slides for easy viewing by
all participants. If you could please arrange to have a screen available for our
use, it would be greatly appreciated.
If one of you could contact me to confirm this meeting date and time as well
as room availability, I would appreciate it. And if there are others in the City
who would like to be part of the presentation, please feel free to include them.
We're very much looking forward to sharing with you our vision for Valley 405
Business Park.
Very truly yours,
FIRST CITY EQUITIES
ittA6a,a_mi.J
Barbara E. Moss
Director of Planning
BEM/dip
cc: Royce Berg
Dennis Schmidling
Ted Holden
John Nelson
Bob Roed
David Schuman
Greg Byler
OF R&.
THE CITY OF RENTON
c) to z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o BARBARA Y. SHINPOCH, MAYOR 0 LAND USE HEARING EXAMINER
co,
FRED J. KAUFMAN. 235-2593
9gT o SE P1`-
O
P
March 4, 1986
Barbara E . Moss
Director ,pf Planning
First Cite/Schuman
800 Fifth Avenue, Suite 4170
Seattle, Washington, 98104
Re: SR-090-84
Special Permit for Grading & Filling
Black River Technology Park
Dear Ms. Moss:
I have reviewed your letter of February 26, 1986 and my response follows.
This Office does not issue extensions of Special Permits, nor does it determine, outside of
an administrative appeal process, whether a permit is in fact valid, expired or otherwise
void. Tire determination you seek should be sought from the Building and Zoning
Departmont.
Without expressing any opinion on whether your permit has expired, I will inform you that
determin 3tions of this Office as well as Court decisions upholding similar such decisions
indicate that if a permit has in fact expired, it cannot be extended. It is only prior to
expiratiol that a permit can be lawfully extended.
If the th termination of the Building and Zoning Department does not meet with your
satisfaction, and you believe they have made an error which is appealable, you may file
such appoal with this Office. First though, the Building and Zoning Department must be
given an )pportunity to rule.
If this Office can be of further assistance, please feel free to call.
Sincerely,
FRED J. KAUFMAN
HEARING EXAMINER
FJK/dk
cc: fiuilding and Zoning Department
ity Clerk
r ,
ti
RECEIVED
FEB 2; 1986
FIRST cnvi CITY OF RENTONHEARINGEXAMINER
SCHUMAN
February 26, 1986
Mr. Fred J. Kaufman
Land Use Hearing Examiner
CITY OF RENTON
Municipal Bldg.
200 Mill Ave. S.
Renton, WA 98055
Re: SP-090-84
Special Permit for Grading & Filling
BLACK RIVER TECHNOLOGY PARK
Dear Mr. Kaufman:
First City/Schuman has recently acquired the Black River Technology property
from Alterra Corporation. At the time we purchased the property we were
under the mistaken impression that a grade and fill permit had been issued.
Over the past six weeks I've put together what I believe to be the pertinent
facts regarding the permit to grade and fill the property and am presenting
them to you in the hopes that you will render a positive decision instating the
viability of the Special Permit (SP-090-84) which would then lead to the Building
and Zoning Department issuing a license to accomplish the work.
The Alterra Corporation submitted to the City of Renton on 8-24-84 ten sets
of plans and three applications for a fill and grade permit along with a check
for $4,700 covering fees for a variance, a preliminary plat, a fill and grade
permit, and E.I.S. fees for fill only. This submittal included a request through
the Building Department for a license for the fill and grade permit.
On 12-4-84 the Land Use Hearing Examiner, yourself, issued an approval for
the Special Permit for fill and grade subject to certain conditions, including
the posting of a revolving cash bond for $5,000 to permit City crews to clear
the haul route of debris deposited by the applicant if the applicant failed to
do so, and the posting of a $25,000 bond to provide for repair of any street
damaged by the applicant during the hauling operation. This special permit
approval was issued along with approval of the preliminary plat (PP-089-84) and
approval of a variance (V-091-84) to construct a cul-de-sac on the property.
The preliminary plat was subject to the formal filing of the Conditions, Covenants
Restrictions submitted by the applicant.
800 Fifth Avenue•Suite 4170•Seattle,Washington 98104 (206)624-9223
4
r
Mr. Fred J. Kaufman
February 26, 1986
Page Two
In the ensuing months, the Alterra Corporation worked with the City of Renton
on acceptable terminology for the bond form, a condition of the special permit
approval. On 9-26-85, Michael Courtnage of the law offices of Alston, Courtnage
MacAulay sent Roger Blaylock a copy of the proposed bond terminology.
On 11-12-85, Roger Blaylock sent Michael Courtnage a letter accepting the
proposed bond form. Included in Mr. Blaylock's letter was a recommendation
to Alterra Corporation to be sure to check with the Army Corps of Engineers
as to the possibility of their taking jurisdiction on the Black River Technology
Park property. Should the Corps take jurisdiction, no fill and grade permit could
be activated without the Army Corps of Engineer's 404 permit being secured
first. Del Bonds of Alterra met with a representative of the Corps on 11-6-85.
On 11-7-85, Mr. Bonds delivered to the Corps a letter requesting their decision
as to jurisdiction. On 11-14-85, the Corps held an onsite inspection of the site
to determine jurisdiction. On 12-16-85 the Corps issued a letter denying their
jurisdiction for this property.
Additionally, on 11-5-85, Richard Carruthers Associates received from the Hearing
Examiner a request to finalize and record the CC&Rs by 5:00 p.m. on 11-15-85.
To comply with the condition of the preliminary plat). On 11-13-85, Alterra
Corporation submitted the CC&Rs as requested.
On 12-31-85, First City/Schuman purchased the property from the Alterra
Corporation and inherited a somewhat dubious preliminary plat approval, special
permit approval, and variance approval. The Alterra Corporation felt they had
complied with all of the conditions for the approval of these permits and if
they had not complied with the letter of the law in terms of the final bonds,
they had at least complied with the spirit of the law in arriving at an agreed
upon form acceptable to the City, one which they were prepared to submit in
order to secure their permits. It seemed inappropriate to Alterra to submit
bonds on the property in December of '85 when First City/Schuman was about
to purchase the property. It also seemed inappropriate to the Alterra Corporation
to submit bonds when the Army Corps of Engineers was indicating that their
special permit would be invalid if jurisdiction was accepted on their site until
a 404 permit was secured.
At this time, although First City/Schuman thought they had a valid filling and
grading permit for the property, we realize that the permit itself may be in
jeopardy. I am writing you to request that you make a determination as to
the viability of both the special permit and the license as submitted to the City
of Renton for a grade and fill permit on the property. First City/Schuman will
supply you with both the $5,000 cash bond and the $25,000 street damage bond
as a condition of issuance of the permit itself and we will do so immediately
upon your decision to validate the special permit and the license itself.
The code requires that the license must be applied for within six months of
approval of the special permit. Apparently that application was made prior
to the special permit approval itself and therefore I am in hopes that both the
license and the special permit will be considered valid at this time. I have
enclosed for your information copies of all letters referenced and I am available
to discuss the entire issue if you have questions and would like any additional
information. It is very important to us to secure this grade and fill permit
at this time. Your help in clarifying the viability of the special permit and
A
Mr. Fred J. Kaufman
February 26, 1986
Page Three
license is integral to that development and is appreciated.
Very truly yours,
FIRST CITY/SCHUMAN
014.14(44(.72141-4"--
ICJ`
Barbara E. Moss
Director of Planning
BEM/dlp
Enclosures
cc: Michael Courtnage
Del Bonds
Royce Berg
Bob Roed
David Schuman
Greg Byler
Elliott Severson
CITY OF RENTON
RECEIPT M 820
JILDZNG & ZONING DEPARTMENT
ZONING DIVISION
1
NAME T. E Orb t)Aj OGTF}FS DATE 4 9( . 3 0 19 C
PROJECT 1. lce`RT-vre r FC/IPICt3L PrneK
LOCATION
F-c) o("S f3-tvo J# /j.) 5c v E I-Iv rvO,PG2 DOLLARS
BASIC FEE ACREAGE FEE APPLICATION TYPE TOTAL FEE
000/341.82.03 Rezone
Conditional Use
5-Q Variance & Other 5 0 0 0
Administrative Appeal
Short Plat
t 7
0 O 2_45
P
Ti oV gief9-17c i 95"O
110/341.82.03 Final Plat
000/341.90.00 EIS Fees ( F,170 Q ) p p t c7
000/341.84.00 Sale of maps/pub.
r-" r00/369.90.18 Miscellaneous Copies
Total 7o0 oo
TaxCheck (/
Y
Total Y 7Do O
BY:b Cti
eT.11.G. RENTONASSOCIATES
P. O. BOX10450
2064
SEATTLE, WASHINGTON08100
19-10/002
v2 - 191250
AYPTOTHEI $ 47cc . a
r
CdtDDiLLARS
Peoplaank
hopk$Nationalwilco(washrytosooi•, t
FretAvenueOffice,723FirstAn.
Seattle,Washington11104
FOR
1110000•206411' u250001,0SI:002 ?111M, 569901000004 ?000010
t
s ,
a
r
GF I
iv
e ti 0OFFICE OF THE CITY ATTORNEY • RENTON, WASHINGTON
U %% © 7,
POST OFFICE BOX 626 100 S 2nd STREET • RENTON, WASHINGTON 98057 255-8678
p • P. LAWRENCE J. WARREN, CITY ATTORNEY DANIEL KELLOGG, ASSISTANT CITY ATTORNEY
94) O DAVID M. DEAN,ASSISTANT CITY ATTORNEY
o cx
94T
D SEPj,
t,t0 MARK E. BARBER, ASSISTANT CITY ATTORNEY
ZANETTA L. FONTES, ASSISTANT CITY ATTORNEY
October 7 , 1985 MARTHA A. FRENCH,ASSISTANT CITY ATTORNEY
TO: Roger Blaylock, Zoning Administrator Ili0CT 1985
FROM: Lawrence J. Warren, City Attorney UILDING/ 01\01G DE
RE: Modification to Performance Bond Form - Alterra Corporation
File No. PP-089-84
Dear Roger:
The proposed change to the performance bond is really no change
at all. I have no problem with the change although I believe
that we ought to change the word "reasonable" to "a thirty day"
of time.
I think the request is unusual since we have used this performance
bond for quite sometime and have never had a bonding company or
contractor object to the words . However, since the change does
not affect the City markedly, then I see no reason why we could
not agree to it.
Lawrenc J. Warren
LJW:nd
cc: Mayor
SP 90-84
pF I? v q '_a4.
y Q ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON — DIRECTOR
rTh
o
MEM rn
O MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
9,0
009gTcpSEPI`
4\
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
DATE: October 3, 1985
TO: Larry Warren, City Attorney
FROM: Roger Blaylock, Zoning Administrator
SUBJECT: MODIFICATION OF PROPOSED PERFORMANCE BOND FORM
ALTERRA CORPORATION/FILE NO. PP-089-84
Mr. Michael Courtnag has proposed modifying the bond form that the City presently uses
to allow their client a reasonable time period to cure the deficiency before action is taken
to forfeit the bond. Since bonding is closely reviewed by the City Attorney, I have
referred :he item to you. I would suggest that instead of a subjective term as
reasonable" that a specific time period such as 60 or 90 days be placed in that spot.
RJB:ss
1967Z
1
LAW OFFICES OF
ALSTON, COURTNAGE & MACAULAY
SUITE 3450 • FIRST INTERSTATE CENTER TELEPHONE
999 THIRD AVENUE 206)623.7600
SEATTLE.WASHINGTON 98104
ISTHADDASLA I UN 4740125125 SEA UI
MICHAEL S.COURTNAGE TELECOPIER
ROBERT C.MwcAULAY 206)622-2522
September 26, 1985
Mr. Roger Blaylock
Zoning Administrator
Building & Zoning Department
City of Renton
200 dill Avenue South
Renton, Washington 98055
Re: Alterra Corporation - File No. PP-089-84 ,
SP-090-84 and V-091-84
Dear Mr. Blaylock:
We have been requested by Alterra Corporation to
assiGt it in connection with a problem related to the form of
the $25, 000 Performance Bond which is required in connection
with the above-numbered files. A copy of the bond requested
by the City of Renton is enclosed for your reference.
Our problem with the bond is that it allows the City
of Renton to unilaterally forfeit the bond without first
advising our client or the surety of the problem and
permitting them to attempt to cure the problem. While we
presume that the City would follow such a procedure as a
matter of good municipal practice, surety companies insist
upon something more than an expectation when issuing a bond.
The problem could be resolved if the City were to
agree to insert the following language, or similar language,
into the last paragraph of the bond:
If the City of Renton believes that
the principal is deficient in its
performance of the above require-
ments, then the principal and surety
shall be notified thereof in writing
and permitted a reasonable period of
time to cure the deficiency before
any action is taken to forfeit the
bond. "
ALSTUiv, COURTNAGE & MACAULAY
Mr. Roger Blaylock
September 25, 1985
Page Two
Please call me so that we can discuss the matter.
Very truly yours,
ALSTON, COURTNAGE & MacAULAY
Michael S. Cou n e
Enclosure
cc: Mr. Del Bonds
bjf
OF R4-,
4
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
o
o
BARBARA Y. SHINPOCH, MAYOR ® LAND USE HEARING EXAMINER
FRED J. KAUFMAN. 235 - 2593
94TFD SEP --
c3
November 5, 1985
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, Washington, 98122
Re: Alterra Corporation
PP-089-84, SP-090-84 & V-091-84
Dear Mr. Carothers:
A public hearing on the above matter was held on November 20, 1984. The Report and
Decision vas rendered from this Office on December 4, 1984.
This Office wrote to you on August 21, 1985 requesting that the formal C.C.& R's for this
proposal be formally filed to enable the matter to be presented to the City Council for
their review. Due to the length of time this matter has been pending, with no contact
from your office, be advised that 1 will hold the matter open until 5:00 P.M., Friday,
November 15, 1985. If we have not received a response by your office by the above stated
time and date, the matter will be considered dismissed.
Sincerely,
FRED J. K UFMAN
HEARING EXAMINER
FJK/dk
cc: City Attorney
amity Clerk
Y Alterra Corporation
Building & Zoning Department
l
HLTERRA CORPORATION
REAL ESTATE -INVESTMENTS
710 CHERRY STREET
SEATTLE, WASHINGTON 98104
206) 382-0333
Operations Division
Department of the Army
Corps of Engineers
473G East Marginal Way So.
Seattle, Washington 98134
November 7, 198S Hand Delivered
Dear Mr. Pojtinger,
It was a pleasure meeting with You and Mr. Tom F.
Mueller yesterday, concerning our Project in Renton
The Black River Technology Park) .
As I mentioned, we are currently in the process of
implementing plans to develop the above project, and have
the required approvals from the City of Renton, and King
County concerning zoning, grade and fill permits, and
preliminary plat (including CC & R's and Landscape guide-
lines) . To keep your agency informed as to this development,
since we have been a contributor to the P-1 Channel Project,
with the donation of twenty acres as a preserve and for the
enlargement of the current King Co. Pump Plant) , I would
appreciate Your time to inspect the site with myself in the
near future, so that You may see first hand the scope of
this project, and have and opportunity to review the develop-
ment guidelines concerning the Preserve Area; which will be
maintained in its present state for the benefit of the
Public.
I will make myself available to inspect the site with
You, and look forward to hearing from You in the near future.
cer-1 Yours,
11111
Dolton J. Bonds
Alterra Corp.
President
41t.1
i
1
1
OF RF 11/
BUILDING & ZONING DEPARTMENT
Cap z
00 RONALD G. NELSON - DIRECTOR
z tL
p MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 o 235-2540
90 Co'
O9-
4ED SE PT,
pO
BARBARA Y. SHINPOCH
MAY DR
Af0 1/ 1 3 1985
Novembe- 12. 1985
Mr. Michael Courtnage
Alston, Courtnage & MacAulay
First Interstate Center, Suite 3450
999 Third Avenue
Seattle, Washington 98104
RE: ALTERRA CORPORATION, FILE NO. PP-089-84, SP-090-84, AND V-091-84
Dear Mr. Courtnage:
We have reviewed your request to change the language of the performance bond
associated with the above files. The City Attorney has no objection to the modification:
however, they would make a change in the language from the word "reasonably" to "a
thirty day" period of time.
The attorney states that since the change does not affect the City markedly he does not
see any ri:ason why we could not agree to it.
In additic n, you should be aware that the Army Corps of Engineers is requiring review of
any deve.opment on property that could be questionably wetland and may require a 404
permit from the Army Corps of Engineers. Therefore. we would recommend that you
contact tie Army Corps immediately.
Sincerely,
Roger J. Blaylock
Zoning A lministrator
RJB:ss
2048Z
4 i
o°.
DEPARTMENT OF THE ARMY
A. Z SEATTLE DISTRICT. CORPS OF ENGINEERS
Io, ' ti7I,f I, P.O. BOX C-3755
111 M'
kK.% SEATTLE. WASHINGTON 98 1 24-2 2 5 5
A[
FL TO DEC 16 1985r•T[51 ' AiT[TNTIOM pF
Regulatory Branch
Delton J. Bonds, President
Alterra Corporation
710 Cherry Street
Seattle, Washington 98104
Dear Mr. Bonds:
This is in reply to your letter of November 7, 1985, concerning
proposed fill in wetlands at Renton, Washington. You inquired
whether the site to be filled is considered a wetland under Corps
of Engineers regulatory authority.
A Department of the Army permit under Section 404 of the Clean
Water Act is required for the discharge of any dredged or fill
material into waters of the United States, including adjacent wet-
lands. The term "wetlands" means those areas that are inundated or
saturated by surface or ground water at a frequency and duration
sufficient to support , and that under normal circumstances do
support, a prevalence of vegetation typically adapted for life in
saturated soil conditions. The Corps of Engineers has the respon-
sibility for determining whether a specific wetland area is within
Section 404 jurisdiction.
We have reviewed the information you furnished as well as data
gathered during our onsite inspection on November 14, 1985. We
determined that wetlands are present on the project site. However,
these wetlands are not considered adjacent wetlands under our
regulatory authority. A Department of the Army permit will not be
required to place fill into this area.
If you have any questions regarding this matter, please contact
Mr. Rudolf Pojtinger, telephone (206) 764-3495.
Sincerely,
7/
arr E. Baxter / /
Chief, Regulatory Branch
ALTERRA CORPORATION
REAL ESTATE -INVESTMENTS
710 CHERRY STREET
SEATTLE, WASHINGTON 98104
206) 382-0333
Mr. Fred J. Kaufman
Hearing Examiner
The City of Renton
Municipal Building
200 Mill Ave. So.
Renton, Washington 98055
November 13, 1985 Re: Alterra Corporation
Submittal of Design
Guidelines, CC&R's,
Dear Mr. Kaufman, and Preliminary Plat
Pursuant to your letter, dated November 5, 1985, in
which you advised us that filing of the above matters
should be accomplished no later than 5:00 P.M. , Friday
November 15, 198S, please be advised that I have submit-
ted six copies of the following documents:
1) Completed Application Form,
2) Plot Plans,
3) Vacinity Maps,
4) Justification
These documents, together with the required filing fee,
have been submitted to the City of Renton. I will continue
to monitor the progress of these documents, and assist in
any manner possible to complete whatever requirements re-
main in a timely manner.
Sincerely,
Delton J. Bonds
Alterra Corporation
President
DJB;sb
cc: Richard Carothers RECEIVEMichaelCourtnage
Ronald Neubauer
NOV 14 1985
CITY OF RENTON
HEARING EXAMINER
OF I?
BUILDING & ZONING DEPARTMENTv
RONALD G. NELSON - DIRECTOR
Z ..L
09 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
Co
0it,
SEF S0
0
P
BARBARA Y. SHINPOCH
MAYCR
November 12, 1985
Mr. Michael Courtnage
Alston, Courtnage & MacAulay
First Interstate Center, Suite 3450
999 Third Avenue
Seattle, Vtiashington 98104
RE: AL TERRA CORPORATION, FILE NO. PP-089-84, SP-090-84, AND V-091-84
Dear Mr. Courtnage:
We have reviewed your request to change the language of the performance bond
associatec with the above files. The City Attorney has no objection to the modification;
however, they would make a change in the language from the word "reasonably" to "a
thirty day' period of time.
The attorney states that since the change does not affect the City markedly he does not
see any reason why we could not agree to it.
In addition, you should be aware that the Army Corps of Engineers is requiring review of
any development on property that could be questionably wetland and may require a 404
permit from the Army Corps of Engineers. Therefore, we would recommend that you
contact tt.e Army Corps immediately.
Sincerely,
Roger J. Blaylock
Zoning Administrator
RJB:ss
2048Z
OF RA,,
o THE CITY OF RENTON
Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
NAL a 4rn BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
D9A FRED J. KAUFMAN, 235 -2593
09gTFD SEP
November 5, 1985
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, V1 ashington, 98122
Re: Alterra Corporation
PP -089-84, SP-090-84 & V-091-84
Dear Mr. Carothers:
A public hearing on the above matter was held on November 20, 1984. The Report and
Decision was rendered from this Office on December 4, 1984.
This Office wrote to you on August 21, 1985 requesting that the formal C.C.& R's for this
proposal be formally filed to enable the matter to be presented to the City Council for
their review. Due to the length of time this matter has been pending, with no contact
from your office, be advised that I will hold the matter open until 5:00 P.M., Friday,
November 15, 1985. If we have not received a response by your office by the above stated
time and date, the matter will be considered dismissed.
Sincerely,
FRED J. I UFMAN
HEARING EXAMINER
FJK/dk
cc: Attorney
City Clerk
Alterra Corporation
Building & Zoning Department
LAW OFFICES OF
ALSTON, COURTNAGE & MACAULAY
SUITE 3450 • FIRST INTERSTATE CENTER TELEPHONE
999 THIRD AVENUE 206)623.7600
SEATTLE, WASHINGTON 98104
TELEX
THADDAS L.ALSTON 4740125 SEA UI
MICHAEL S.COIJRTNAGE TELECOPIER
ROBERT C.MACAULAY 206)622.2522
September 26, 1985 CITY OF i %;,ITC'
Mr. :Roger Blaylock SEP 2 085 -
Zoning Administrator
Building & Zoning De)artment LU!+ DJA1G/21.9NFNr DEPT.City of Renton
200 Mill Avenue Sout'a
Renton, Washington 93055
Re: Alterra Corporation - File No. PP-089-84,
SP-090-84 and V-091-84
Dear Mr. Blaylock:
We have been requested by Alterra Corporation to
assist it in connection with a problem related to the form of
the $25, 000 Performa.ice Bond which is required in connection
with the above-numbered files. A copy of the bond requested
by the City of Rento- is enclosed for your reference.
Our problen with the bond is that it allows the City
of Renton to unilate ally forfeit the bond without first
advising our client or the surety of the problem and
permitting them to attempt to cure the problem. While we
presame that the City would follow such a procedure as a
matter of good municipal practice, surety companies insist
upon something more :Ilan an expectation when issuing a bond.
The problem could be resolved if the City were to
agree to insert the following language, or similar language,
into the last paragraph of the bond:
If the City of Renton believes that
the principal is deficient in its
perfornance of the above require-
ments, then the principal and surety
shall ',.)e notified thereof in writing
and permitted a reasonable period of
time to cure the deficiency before
any action is taken to forfeit the
bond. "
t
ALSTON, COURTNAGE & MACAULAY
Mr. Roger Blaylock
September 25, 1985
Page Two
Please call me so that we can discuss the matter.
Very truly yours,
ALSTON, COURTNAGE & MacAULAY
Michael S. Cour,.n e
Enclosure
cc: Mr. Del Bonds
bjf
OF R4,
BUILDING & ZONING DEPARTMENT
Z RONALD G. NELSON - DIRECTOR
MEMO
9 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0g1'6.1)SEP- °
s1'
BARBARA Y. EHINPOCH
MAYOR
MEMORANDUM
DATE: August 29, 1985
TO: Fred J. Kaufman, Hearing Examiner
FROM: oger J. Blaylock, Zoning Adminstrator
SUBJEC1 : Dismissal of Short Plats and Subdivision Applications/Short Plat 035-84 and
PP-089--84
It is def nite that the Hearing Examiner has the authority to dismiss applications for
non-acthity. However, I am concerned in the case of subdivisions and short plats that the
tentative approval granted allows the applicant an unusual compliance time. The
three-year mandated preliminary approval limit would suggest that any time during that
three-year period, the applicant could comply and thus submit the final plat or the final
documentation for the short plat.
I am not !sure if you considered this technical problem at the time you issued your original
letters or August 21st to both Mr. Richard Carrothers and Mr. Harold Harrison. It should
be pointed out in the case of Mr. Harrison that he has been working extensively with our
Public Wcrks Department to try to resolve the storm water drainage issue, which was one
of the major concerns of the short plat application. In the case of the Alterra
Corporation, the proposed Black River Office Park, it is true that during the last six
months oLr office has not been involved with any work for the proponents.
RJB:1916;'--:wr
OFA.
J
4 o THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
oroLL 4.rn BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
FRED J. KAUFMAN. 235-2593
091?
SE PIE
P
August 21, 1985
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, 'Nashington, 98122
Re: A terra Corporation
PP-089-84, SP-090-84 & V-091-84
Dear Mr. Carothers:
The abo\ e requests were approved by this office on December 4, 1984, subject to the
formal filing of C.C.& R's for the proposal.
To date Ne have not received the formal C.C.& R's from your office. Due to the length
of time t his matter has been pending, we urge that you diligently pursue this matter to its
immedial.e completion so we may close our records. If you have further questions, please
contact this office.
Sincerely,
FRED J. K UFMAN
HEARING EXAMINER
FJK/dk
1071E
cc: VCity Clerk
City Attorney
Alterra Corporation
BLilding & Zoning Department
01' If
A j
41 ky o THE CITY O1 RENTONs1
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
9°
FRED J. KAUFMAN. 235 -2593O94
E D S E PS
P
December 19, 1984
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, Washington
RE: File No. PP-089-84
Al terra Corporation
Dear Mr. Carothers:
The Examiner's Report and Recommendation regarding the referenced request has not
been appealed within the time period established by ordinance. We would like to schedule
this matter for the January 7, 1985 Council Meeting, but before doing so we must have
the signed and notarized Restrictive Covenants as set out in the decision of December 4,
1984. We should have that document in our office no later than January 2, 1985.
You will receive notification of final approval, as well as a copy of the enacting
ordinance, from the City Clerk upon adoption by the City Council.
If further assistance or information is desired, please do not hesitate to contact this
office.
Sincerely,
Fred J. Kaufman
Land Use Hearing Ex miner
F JK:dk
0757
cc: City Clerk /
Building & Zoning Department
or
41 ,I" '•: BUILDING & ZONING DEPARTMENT
tipi 's ., RONALD G. NELSON - DIRECTORzo
O MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0
1'FD SEPI-
BARBARA Y. SHINPOCH
MAYOR
Decem)er 10, 1984
Barbara E. Moss
Directc r of Planning
First Cities Equities
800 5th Avenue, Suite 4040
Seattle WA 98104
Re: Development Conditions - Tract A and Tract B, Valley 405 Business Park
Washington Technical Center)
0.1 Dear Barbara:
The Environmental Review Committee considered your request of November 21, 1984,
during :heir December 6th meeting. As you are aware, the L.I.D. process is a lengthy
procedi.re that begins with: (1) preliminary evaluation and inquiry by interested property
owners; (2) actual formation of an L.I.D. and acceptance by formal City ordinance; and,
Fe. 3) the Factual construction of the off-site improvements.
Develol ment on either Tract A or 'B was limited by the Environmental Review
Committee's condition of approval for Washington Technical Center. Specifically, the
ERC takes the position, at this time, that a building permit can be issued to First Cities
Equity if the City Council has adopted a formal ordinance enacting the L.I.D. process. In
response to your question of occupancy of structures, construction of the off-site
improvements must be completed prior to the occupancy of any structures. The ERC
believes that the L.I.D. provides the financial methods to accomplish the improvements
and doe not transfer the responsibility from First Cities Equity.
The Cil y cannot assure First Cities Equity that the L.I.D. process will not impede
develop rent on either Tracts A or B.
For the Environmental Review Committee,
Roger J. Blaylock
Zoning Administrator
RJB:1211Z:c1
AFFIDAVIT OF SERVICE BY MAILING
STATE OF WASHINGTON
ss.
County of King
DOTTY KLINGMAN
being first duly sworn,
upon oath, deposes and states:
4th December
That on the day of 1984, affiant
deposited in the mails of the United States a sealed envelope containing a
decision or recommendation with postage prepaid, addressed to the parties of
record in the below entitled application or petition.
6"
SUBSCRIBED AND SWORN to before me this I/'41
day
of
s .
L,jQ c Qr 1984.
Z4_0")-h_.
No PublJ r in and for the State of Washington,
residing at iNp,, therein.
Application, Petition, or Case #: PP089-84, SP090-84 & U-091-84 - ALTERRA CORPORATION
The minutes contain a list of the parties of record.)
0735E December 4, 1984
OFFICE OF THE LAND USE HEARING EXAMINER
CITY OF RENT ON
REPORT AND DECISION.
APPLICANT: ALTERRA CORPORATION
F Il_E NO. PP-089-84, SP-090-84 and V-091-84
LOCATION: Vicinity of S.W. 4th Place and Naches Avenue S.W.
SUMMARY OF REQUEST: Approval of Preliminary Plat to subdivide 71.16 acres
into 46 lots for future office/warehouse use; approval
of Special Permit to fill and grade 425,500 cubic
yards of material; and Variance to allow cul-de-sac
length of 2500 feet.
SUMMAR/ OF ACTION: Building and Zoning Department Recommendation:
Approval.
Hearing Examiner Decision: Variance is approved.
Special Permit is approved subject to conditions and
Preliminary Plat is approved subject to filing of
C.C.& R.'s by the applicant.
BUILDING & ZONING The Building & Zoning Department Report was
DEPARTMENT REPORT: received by the Examiner on November 13, 1984.
PUBLIC HEARING: After reviewing the Building and Zoning Department
Report, examining available information on file with
the application, and field checking the property and
surrounding area, the Examiner conducted a public
hearing on the subject as follows:
l he hearing was opened on November 20, 1984, at 9:35 A.M. in the Council Chambers of
the Rentcn Municipal Building. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit #1 - Yellow file containing application, proof
of posting, and other documents pertinent to this
application.
Exhibit #2 - Preliminary Plat dated 11/5/84.
Exhibit #3 - Erosion Control Plan dated 6/29/84.
Exhibit #4 - Bound book of technical specifications
for proposed project.
The hear ng was opened and Roger Blaylock, Zoning Administrator, presented the report
from sta He began by describing the topography of the site and the request to fill
stating the applicant has been careful to provide a hydroseeding plan to assure the
maintenance of adjacent water quality in natural areas south and west. The Public Works
Department will review all erosion control measures. Deterioration of the roads was
discussed because of the heavy weight of the vehicles to be used for hauling the fill. The
possible use of railroad cars was suggested as the railroad tracks are adjacent to the site.
The Variance request is to allow a cul-de-sac length of 2500 ft.; the maximum length
normally permitted by ordinance is 500 feet. Mr. Blaylock stated the existing zoning of
the site is in compliance with the Comprehensive Plan, with part of the site placed into a
greenbelt preservation under the original rezone. Approximately 27% of the site has an
easement on it which precluded any development except for maintaining the greenbelt
around the P-1 Channel. The public road is approximately 5.3 acres, walkways are about
1/2 an acre, there is a total of 46 lots of approximately 3/4 to 1 acre size. The site will be
raised approximately 5 to 6 ft. with the fill, and it was pointed out in the design that
specific stands of trees, because of the size requirement to be preserved, have been tied
in with culverts so water will go into those areas. The applicant will also be using an
erosion control fence along the perimeter of the area to prevent sedimentation from
entering the natural area of the site.
A
Altera Corporation
PP-089-8L, SP-090-84 and v-091-84
December 4, 1984
Page 2
Continuing, it was pointed out that the site is accessed off of S.W. 7th Street by 2 streets,
Naches Ave. S.W. and Powell Ave. S.W.. The applicant has oversized the width of the
cul-de-sac: pavement to provide relief for access, and has provided a secondary
emergency access for fire and police protection into the site. This will not be a public
street. It will be a right-of-way constructed with 24 ft. of pavement, and the waterline
will be looped along the pavement for use by the fire department. It was suggested that
the Plat be designated to show no parking on the streets. The Public Works Department
will need an all-weather access road for maintenance of the utility, and if designed
correctly, that road could also be used as an emergency access road to the site. The
special permit is to bring in approximately 425,000 cubic yards of material. The issue
with the permit is the impact on the streets due to the weight of the trucks, and the
access to be used by the trucks. A maintenance bond should be obtained for clean-up of
the streets. Mr. Blaylock stated there has been no time length for the permit established
as yet by the applicant. To the north, the property has some topographical restraints and
there is no access to that area. He stated there are no other properties within the City
that are as uniquely limited for access, as the subject site. Mr. Blaylock stated because
of the uniqueness of the cul-de-sac and the access, it was felt the Variance request should
be approved, as well as the Special Permit and the Preliminary Plat.
The Hear ng Examiner called for testimony from the applicant or their representative.
Respondirg for Alterra Corporation was:
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, Washington
Mr. Carot hers stated the parcel in question is a difficult piece of property to develop as it
is a finger-shape protruding into a greenbelt area, relatively narrow, and the plan for a
cul-de-sat: seemed to be the obvious conclusion to the access problem. Mr. Carothers
stated they have been very sensitive to the vegetation on the property and the very large
cottonwood trees have been protected and landscaping provided around the trees for their
continued survival. The 3/4 acre lot size was established as a result of a marketing study
that was parried out in the area. The study showed there were no lots of this size being
provided by developers in the area. Mr. Carothers requested approval of the proposal.
A call for further testimony either supporting or in opposition to the proposal was made.
Responding was:
Oliver T. Harding
Washington State Department of Transportation
1361 30th Avenue South
Seattle, Washington
Mr. Harding said he is responsible for the Mt Baker Ridge Tunnel Project. He stated he is
not in opposition to the Alterra project except for the fact that his department has been
advised by the Federal Highway Administration (responsible for Federal funding on
Interstate projects), that this particular site is in a wetlands area. If fill material comes
off of an interstate project and is placed in a wetlands, the Federal government will not
participal.e in funding for that portion of the project. He requested that language be
incorporated into the conditions for this project that would prohibit materials coming
from the Mt. Baker Ridge Project to this particular site.
The Hearing Examiner clarified Mr. Harding's statement for the applicant. Materials
taken frcm the Mt. Baker Tunnel site can be placed anywhere except on wetlands, or the
State will lose the funding for that portion of the project. Mr. Carothers, the applicant's
representative, spoke again stating he had not been made aware of the concerns of the
Department of transportation and questioned once the P-1 Channel is developed, is this
still clan ified a wetlands and therefore an issue? He felt to solve this particular problem,
it may be easier to just not take any material from any project that may cause it to lose
funding. He acknowledged to the Hearing Examiner that this indeed was one of the
sources they had contemplated using for fill for their project, and could give no
assurances that he could speak for his client at this time stating they would definitely not
use any cf the fill from the tunnel project.
The Hearing Examiner advised Mr. Carothers that he was not sure if he could regulate
where tF e fill material came from as long as it meets the criteria of the City. Mr.
Harding spoke again advising the material coming from the tunnel is very fine material
and the requirement to keep the streets clean will be very important. Mr. Carothers
ended his comments questioning if perhaps the subject site has been eliminated from a
wetlands designation. He is not sure where the decision would be made, but feels it is of
importance.
The Examiner called For Further comments or concerns on this proposal. There was no one
else wisl-ing to speak, and the hearing was closed at 10:15 A.M.
Altera Corporation
PP-089-84, SP-090-84 ana v-091-84
December 4, 1984
Page 3
FINDINGS, CONCLUSIONS & DECISION:
Having reviewed the record in this matter, the Examiner now makes and enters the
following:
FINDINGS:
1. The applicant, Alterra Corporation, filed a request for approval of a 46 lot plat of
approximately 71.16 acres together with a special permit to fill and grade the site,
and a variance to allow a cul-de-sac of approximately 2,500 feet in length.
2.The application file containing the application, the State Environmental Policy Act
SEPA) documentation, the Building and Zoning Department Report, and other
pertinent documents was entered into the record as Exhibit #1.
3. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C,
1971, as amended), an Environmental Impact Statement has been prepared for the
subject proposal.
4. Plans for the proposal have been reviewed by all city departments affected by the
impact of this development.
5.The subject site is located in the vicinity of S.W. 4th Place and Naches Avenue
S.W. generally north of the Washington Technical Park (formerly the Earlington
Golf Course). The railroad right-of-way is located immediately north of the
subject site. The P-1 channel and forebay is located generally south of the subject
site.
6. The subject site was annexed into the City by Ordinance 1745 adopted in April of
1959, as amended by Ordinances 1756 and 1928, adopted in May of 1959 and
December of 1961 respectively. The subject site was reclassified from G (General)
to M-P in December, 1982 by Ordinance 3694.
7.The map element of the Comprehensive Plan designates the area in which the
subject site is located as suitable for the development of manufacturing park uses
but does not mandate such development without consideration of other policies of
the plan.
8.The subject site is generally level, although some fill material has been deposited
on the subject site along the railroad right-of-way. North of the railroad the
topography changes to the steeper slopes under Empire (Sunset) Way. The riparian
forest preserve area is located along the site's southern boundary.
9.A natural riparian forest is located in the western portions of the subject site, as
well as along the southern periphery of the subject site. Approximately 19.388
acres or about 27.2 percent of the subject site's riparian forest will be preserved as
either open space or greenbelt preserve. This land was preserved as a result of the
reclassification of the subject site. The predominant set aside is along the
southern half of the western half of the subject site. Other smaller areas
containing "significant" trees or stands of trees will also be preserved.
10. The applicant proposes dividing the subject site into 46 separate lots. Most of the
lots will average approximately .75 to 1 acre in size. The largest (Lot 46) will be
approximately 3.5 acres in size.
11. In order to utilize those portions of the subject site outside of the preserve areas,
the applicant proposes filling and grading the subject site. Approximately 335,000
cubic yards of material will be imported to the site. Approximately 90,000 cubic
yards of material on site will be relocated as necessary.
12. The filling of the site will raise the elevation of the subject site approximately 5 to
6 feet. The maximum increase will be approximately 12 feet to accommodate the
existing sanitary sewer line. Significant stands of trees outside of the main
preserve will be cribbed, that is a type of reverse planter box will maintain the
trees surface elevation level while the surrounding terrain is raised up. An
elaborate culvert system will tie these separate areas to the main riparian forest.
The flow through the culverts will maintain the ordinary water level, thereby
maintaining their respective riparian, fringe aquatic environment.
13. Fill slopes will be a maximum of 2 to 1 while cut slopes will not exceed slopes of 3
to 1 to assure stability of any modified slope areas.
Altera Corporation
PP-089-84, SP-090-84 anu v-091-84
December 4, 1984
Page 4
14. The importation of material will require approximately 15,000 vehicle trips. Staff
expressed concern regarding the impacts of this concentrated heavy traffic on the
road system and recommended that the applicant post a $25,000 bond to repair
roads damaged by the applicant's fill operation.
15. In order to clean debris from the roads, if materials should fall from the trucks or
be tracked off-site, staff recommended that the applicant post a revolving cash
bond of $5,000 which can be used as necessary by city crews to clean streets.
16. Peak hour traffic in the area occurs between approximately 7:00 to 8:00 am and
from 3:00 pm on. Staff recommended operations be limited to minimize
interference with rush hour traffic.
17. The Department of Transportation indicated that fill material from the Mount
Baker Tunnel operation could not be utilized at the subject site without
jeopardizing certain federal matching funds. The subject site appears to be a
defined "wetlands" area under a federal agency guideline and fill materials from
federally funded projects cannot be used to fill wetlands. The state failed to spell
this out in its contract with the hauling company. No evidence was presented
regarding the source of the materials for filling the subject site. City authority
would only extend to the "make-up" of the material and assuring that it satisfies
structural integrity and chemical composition standards of the City.
18. The subject site is served from the south by two streets, Powell Avenue S.W. on the
east and Naches Avenue S.W. on the west. The two streets both extend into the
site and form a loop circulation pattern although serving mainly the southeastern
portion of the subject site.
19. The applicant proposes an approximately 2,500 foot long east-west street
branching from the loop. This street while the only public access to the western 35
lots and essentially a cul-de-sac will be supplemented by a private drive along the
south side of the southern tier of lots just north of the greenbelt preserve. This
private drive will intersect the cul-de-sac/public street approximately 500 feet
from its end. Approximately 13 lots will be served by only the one roadway.
20. The east-west street will be oversized to 44 feet rather than the 36 feet required
to provide additional passing space for emergency access. The Fire Department
has approved both the widened road and the cul-de-sac/private drive concept for
safety.
21. The cul-de-sac will be approximately 2,000 feet longer than the 500 feet permitted
by Section 9-1108(24)(A)(6), therefore, the applicant has requested a variance from
that provision.
22. Detailed plans for development, landscaping, streetscape and preservation are
included with the application. These include design guidelines and proposed
conditions, covenants and restrictions covering all steps from the initial filling and
grading to the final appearance of the complex.
CONCLUSIONS
Preliminary Plat
1.The proposed preliminary plat appears to serve the public use and interest. The
complex will be landscaped and a common streetscape will tie the complex
together, as well as blend the complex with the large greenbelt preserve.
2.The smaller parcels will enable a number of organizations and businesses to develop
in a well designed complex. The lots have been scaled down to mainly three
quarters to one acre to cater to the needs of smaller organizations.
3. While the location or remoteness of the site could present access problems for
some occupants, the naturalness of the site should be an off-setting draw. Two
streets provide access to the proposed cul-de-sac. A private drive will also be
available for emergency situations. The street itself will be over-sized to provide
additional width for clearance. Additional information regarding the street can be
found below in the discussion of the variance for cul-de-sac length.
Altera Corporation
PP-089-84, SP-090-84 ana v-091-84
December 4, 1984
Page 5
Special Permit
4. In order to use the developable portions of the subject site to its fullest extent,
filling and grading of the site will be necessary. The site is subject to periodic
flooding at its current elevation and additional material to raise the site some 5 to
6 feet will be necessary to permit construction in conformance with the 100 year
flood zone standards.
5. Any grading and filling around the separate stands of significant trees shall be
governed by specific standards for the construction and culverting of the tree wells
or cribs to retain the natural grade and natural water level.
6. Hydroseeding of the site shall be coupled with grading, cutting and filling of the
site.
7.The subject site is located in a remote corner of the City with access through
commercial, retail and industrial areas with large traffic volumes, and as such
access should be limited to non-peak hours. The hauling will therefore, be limited
to the hours of 9am to 3 pm Monday through Friday.
8.These limitations will enable the City to inspect the site operations, to maintain
the haul route, and to check to see that streets remain free of debris.
9. In order to maintain streets along the route, a revolving bond in the amount of
5,000 cash shall be required. The city may draw on the bond to clean the streets
if the applicant or applicant's agents fail to do so.
10. The concentration of heavy trucks and the great number of trips necessary may
accelerate the wear and tear on the road system serving the subject site. A bond
of $25,000 should be posted to permit the City to repair damage inflicted by the
proposed operation. In all matters regarding the haul route, the City through its
designated officials may change the hours and operation as is reasonably necessary
to maintain safe routes and corridors.
11. The detailed standards contained in the applicant's application pertaining to grade,
fill, slopes, hydroseeding, etc. shall govern the project to the extent they are not
contrary to this decision or the ordinances and regulations of the City.
12. As indicated above, the City does not appear to have any inherent power to control
or regulate in the matter of where the fill material is derived from. The material
must meet certain requirements as to suitability in such matters as texture,
coarseness, erosive nature and chemical content and structural and bearing
components. Other than that, the applicant would appear to be free to chose the
source. Hopefully the matter can be suitably concluded so that the state and its
taxpayers will not suffer economic or environmental harm as determined by the
federal government.
Variance
13. The proposed cul-de-sac will be 8 feet wider than required by ordinance, 44 instead
of 36 feet. In addition the applicant has provided a secondary emergency drive or
road running along the southern boundary of the southerly tier of lots. While not a
public road, the private drive will effectively make only the westerly 500 feet of
the public road a true cul-de-sac.
14. The subject site is relatively isolated from other portions of the City. Steep slopes
and the railroad-separate the site from any access to the north and east. While the
P-1 channel and greenbelt preserve act to separate the subject site along its
westerly and a large portion of its southerly boundary. This unique location and the
unique environment, the last remnant of riparian forest, coupled together would
unduly restrict the applicant's ability to use the subject site if a variance were not
approved.
15. The location alone makes the subject site rather unique and therefore, approval of
the variance will not grant the applicant a special privilege not afforded others
similarly situated. The juxtaposition of the environmentally unique riparian forest
also sets the subject site apart from other properties.
Altera Corporation
PP-089-84, SP-090-84 and V-091-84
December 4, 1984
Page 6
16. While the applicant could obviously create a loop road, development to City
standards would result in further loss of delicate and unique environmental
qualities. The applicant has already agreed to preserve over 19 acres in natural
vegetation. The widening of the proposed public road and the creation of the
private emergency drive appear to be the minimum necessary to afford the
applicant relief. With the private drive, the cul-de-sac actually extends no more
than a permissible 500 feet as a true cul-de-sac.
17. The isolation of the subject site is such that approval of the variance will not
adversely affect other property and the extra width, approved by the Fire
Department, and the private drive appear to safeguard the public welfare.
RECOMMENDATION
The City Council should approve the Preliminary Plat subject to the formal filing of the
conditions, covenants and restrictions filed by the applicant.
DECISION
The Special Permit for fill and grade is approved subject to the following conditions:
1. Hauling to or from the subject site shall be limited to the hours between 9:00 am
and 3:00 pm, Monday through Friday.
2.The posting of a revolving cash bond in the initial amount of $5,000 to permit city
crews to clear the haul route of debris deposited by the applicant or agents, if the
applicant fails to do so.
3.The posting of $25,000 bond to provide for repairing any street damaged by the
applicant during the hauling operation.
4.All grade and fill and supplementary actions such as hydroseeding, tree
preservation and similar actions shall be accomplished as provided in the detailed
application Exhibit #4, as those requirements are compatible with City ordinances
and regulations.
The Variance is approved.
ORDERED THIS 4th day of December, 1984.
Fred J. Kaufm
Land Use Hear64 Examiner
TRANSMITTED THIS 4th day of December, 1984 to the parties of record:
Richard Carothers, President
Richard Carothers & Associates
814 East Pike Street
Seattle, Washington
Oliver T. Harding
Washington State Department of Transportation
1361 30th Avenue South
Seattle, Washington
TRANSMITTED THIS 4th day of December, 1984 to the following:
Mayor Barbara Y. Shinpoch
Councilman Richard M. Stredicke
Richard Houghton, Public Works Director
Larry M. Springer, Policy Development Director
Members, Renton Planning Commission
Ronald Nelson, Building & Zoning Director
Roger Blaylock, Zoning Administrator
Lawrence J. Warren, City Attorney
Renton Record-Chronicle
r •
Altera Corporation
PP-089-84, SP-090--84 anu v-091-84
December 4, 1984
Page 7
Pursuant I 1 itle IV, Section 3015 of the City's Code, request for reconsideration must be
filed in writing on or before December 18, 1984. Any aggrieved person feeling that the
decision cf the Examiner is based on erroneous procedure, errors of law or fact, error in
judgment, or the discovery of new evidence which could not be reasonably available at the
prior hearing may make a written request for review by the Examiner within fourteen (14)
days from the date of the Examiner's decision. This request shall set forth the specific
errors relied upon by such appellant, and the Examiner may, after review of the record,
take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting
other specified requirements. Copies of this ordinance are available for inspection or
purchase n the Finance Department, first floor of City Hall.
The App€:arance of Fairness Doctrine provides that no ex parte (private one-on-one)
communications may occur concerning land use decisions. This means that parties to a
land use decision may not communicate in private with any decision-maker concerning the
proposal. Decision-makers in the land use process include both the Hearing Examiner and
members of the City Council.
All communications concerning the proposal must be made in public. 1 his permits all
interested parties to know the contents of the communication and would allow them to
openly rebut the evidence. Any violation of this doctrine would result in the invalidation
of the recuest by the Court.
The Docl rine applies not only to the initial public hearing but to all Requests for
Reconsideration as well as Appeals to the City Council.
1162Z
CITY OF RENTON
LAND USE HEARING EXAMINER
PUBLIC HEARING
NOVEMBER 20, 1984
AGENDA
COMMENCING AT 9:00 A.M.:
COUNCI_ CHAMBERS, SECOND FLOOR, RENTON MUNICIPAL BUILDING
The applications listed are in order of application number only and not necessarily the
order in which they will be heard. Items will be called for hearing at the discretion of the
Hearing Examiner.
M:CHAEL T. DONNELLY
Application to rezone approximately 0.17 acre of property from R-4 to B-1
for future professional office, file R-098-84, located at 636 Shattuck
Avenue South.
ALTERRA CORPORATION
Application for preliminary plat approval to subdivide approximately 51
acres of a 71.16 acre tract into 46 lots for future office/warehouse use
B.ack River Technology Park), file PP-089-84, and special permit
application for fill and grading of 425,500 cubic yards, file SP-090-84, and
variance from Section 9-1108(7)(K) and Section 9-1108(24)(A)(6) to allow a
cul-de-sac length of 2,500 feet, file V-091-84; located in the vicinity of
S.W. 4th Place and Naches Avenue S.W.
OF R4,M
o THE CITY OF RENTON
r ® z
POLICY DEVELOPMENT DEPARTMENT ® 235-2552
IMMEM
0
rn MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
9A co
O94TFi) SEPj„
0-
BARBARi"\ Y. SHINPOCH MEMORANDUM
MAYOR
DATE: October 15, 1984
TO: Roger J. Blaylock, Zoning Administrator
FROM: Gene N. Williamt, Associate Planner
SUBJECT: Black River Technology Park -- Preliminary Plat, special Permit, Variance.
We have reviewed the above applications and offer the following comments.
Preliminary Plat
The proposed preliminary plat lays out a series of It acre lots. With the exception noted
below, I his appears to be consistent with the policies of the Comprehensive Plan -- and
specific ally the newly adopted Valley Plan. The Valley Plan calls for the "implementation
of of fic e and other similar service and light industrial activities in low rise building
structures" and "small to medium scale office and business park uses" in this area. The
size of the lots, the provisions for interior tree preservation, the landscaping guidelines
and the building covenants appear to promote development in accordance with these
policies and the conditions of the rezone. Our principal concern is the consolidation of a
number of lots, which could allow the construction of large scale warehousing or industry
in confl ct with the Valley Plan.
We recc mmend approval of the preliminary plat with the condition of site plan review to
assure that specific development will be consistent with these use and bulk policies, with
tree preservation areas and with landscaping guidelines.
Special ?ermit
Approval of the special permit for fill and grade will transform the riparian forest
environment. Therefore, to preserve the amenities of the site, the special permit should
be cone itioned to required no disturbance of the dedicated greenbelt or restricted
preserve areas and maintenance of the tree preservation pockets detailed on the plans.
Rehabilitation or replacement should be required for any significant vegetation harmed in
the preservation pockets. In addition, the hauling hours of operation should be limited to
avoid the afternoon peak traffic.
Varianc(:•
The var ance for cul-de-sac length is not addressed in the Comprehensive Plan policies.
However , safe and convenient access is encouraged. The shape of the property and
abutting features -- railroad track and P-1 channel system -- suggest a need for the
variance. However, as the applicant has shown in previous submittals, a loop street
system Nith small cul-de-sac or a westerly extension of the roadway are possible. The
westerly extension could be placed adjacent to the railroad tracks and not disturb the
greenbe:t area. It could also end in a bridge across the outlet channel to Monster Road --
if a full service street were built -- or it could cross the railroad tracks just north of the
outlet channel -- if only emergency access were provided. In either case, or through a
loop roadway, solutions to the problem of access can be accomplished. Therefore, the
requested variance is not a "minimum" relief necessary to prevent a hardship and should
be denied.
REVIE ING DEPARTMENT/DIVISION : P;:ilte7 4.4)-44 -4
APPROVED ROVED WITH CONDITIONS • [ NOT APPROVED
sad
See aZ 0.40 4r cv. 3
N c; DATE : 04.4f1 / /7'81
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
Form 182
OF R4,
t.y OZ THE CITY OF RENTON
co DEVELOPMENT DEPARTMENT • 235-2552
Z
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
O .
o co
09gr
0 SEP1E
O
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
DATE: November 9, 1984
T : Roger J. Blaylock, Zoning Administrator
F OM: Gene N. Williams, Associate Planner
SUBJECT: Black River Technology Park
Based on the revised plat map of November 5, 1984 showing the emergency access drive,
we would like to amend our comments on the Black River Tachnology Park application.
My memo of October 15, 1984, states our position with regard to the preliminary plat and
the special permit. These positions are unchanged.
However, the revisions to access proposed in the recent plat map address our concerns
about the variance for cul-de-sac length. The emergency access drive provides for
secondary access, and the primary roadway is intentionally oversized. Although the
cul-de-sac is still legally 2,500 feet long, the shape of the property is unique and the
variance appears justified. The overall impacts to the forest environment will be less
than a full street loop within the site. The emergency access drive appears to be located
outside the greenbelt area and to avoid major tree preservation pockets. These items
should be conditions of approval, however, to ensure the integrity of the greenbelt area.
ALTERRA CORPORATION
PRELIMINARY PLAT PP-089-84
SPECIAL PERMIT SP-090-84
VARIANCE V 091-84
IP 8
l' •, •
ram®-- t N
i off}\\+ J j
l/ _
t` 1
of
t
0 Typical Retaining Wall N.* '2
N.
V_-/
EMERGENCY ACCESS DRIVE T - . _
v
N'''- % r-- -'-'
7''
0
r_
r
ii. - /•- - --_--- a-- '.1 ' I' 1 -- --- -
II ; ill;
mimir,..../ >: .-.7... 0.--ic •111•4' ' '
be. . •••• ;:;., *..., '..:....:0..8..Ellinum 14 .,;.0,?,..g:ii. • , • • •
III
ra I:°o°o: 0°o°Oo•o:; .•. . . . . o•o •••:
e••
I '. .*:•:**..
o o 7 o 0°o°0°p' • • O • •
O ••lc ogogog
4
iNalt e • cRIOg •
iii 0 ° og000 ' •_• OQO•• O•O•••• ••• •• • ':
fr 0 . b • o • • • • • • •I -
rOgOoOO • , •
cr•OeO•O Oe• O • • • •60 0% ° 0 • • •
o • •• • Ia.
oo • • •boo, Amk
1111 7m7ua-
4•,.
0-
ts:
1,
1g
1:::
I1M18N11110.
1I..1I.I_
1I1
III1III
trI
r'
1?'`•
ALTERRA CORPORATION 1•• .'`
1,
0,P4i70i0iri/mVaisk mi, PRELIMINARY PLAT PP-089-84 1••
11 p1 lIl f#a
7 SPECIAL PERMIT SP-090-84 h` fNVARIANCEIr-091-84 r4 `/r rO, 14 L
al
000000
a Iiiiiillikkn`.'.•y i 1 j jy/ Ioannina'
r •1,1 ,,.., ,fit( 111142,
g
L Zlf7 l Jl :non••_- "J r,
Ar <
a
ti 0, nnl o o o o ' Iipni di16ri, ; +jio:,0000°0000000
iik'-!,• , :.//: r lle,...,.....‘i '..."4
9:(7, ;e°,..
N Cii i,f iiiilliijr .gyp
n< ° nth• {3n Iln 1•
aa.u 1•••00 • ".• /,('=i
t r• Alrf asti
iiiAiio.:.•iiniim.nnu.c r•llninali ir d •
ci;,, r. •d:fe
rE:ii - --
cL•:' 7 ;'`@ .ii\uiii n
iit
n, ".ifi':. '('ii.`•e!,p n.
im,
a pia ve-. eleiIv. Pi-
c...-..::::,,,,1
VW'1 - •"'`<+`
C`e =__- _----- 1.
r.
4Ingo gjfi`. 1` fir
ik
f •
1 C M1 _ 2+.'.Gi' 1 I 1 .
O°• yam/` 00000
Lt
O'00000000• -`-— -
4 I /1 n 1 O°
n nnniIPn --_-
000000000 - I 1•l•.• ea::ha
r000000000. MUM i aa ` 3.i71-•...!y
x..
c 0000000000 '' ---- 1 n- d/ tf o• -'n}?`(i-ieC <1 . e. 00000000000. .fi_- _---_ I.•_r I/
r C.- ;. c ,
t•. + o0000000000. .;. Iaannnno r.c ,_Et+':n ,
C• OOOo00000000 . r-- 1 a nn n a co:cp1`•''e' / 0000000000. :.1 n nana na o's+••`' -•` i t?'. .•f0000• 00000 '•: ---
0 Inaann • r'e;•c,•''', ..V' ^fibo0000007 'O'r- -QZ a\ fC<f'lr`:?'I%'``c:i
v, ;[y 47,'._<Sl..'• f..
into-- ste---kir* 40 - 'clk.
A
1
44.k.W.jr-.0.41OgiNWNW-Mallas "•••••"V-0 e•
k...:•:-..• • ::. 1. ,z..;.•ti,;:,:::0.";;,:. ' . .';•"ip, ,
i ------------- -- ------7----- ------------
it '•,t 111 4.: ''..:a Allir"Pwal .h,iir.1177' it .e., ,To, : .2--:-:.--:-:-_:_-_:-.=-:_-- =========.= ,.:-.
iff ‘ ' Pen - . -f-__-:-::::::: ::-_-_-- '.-,
7".
I • et‘,... ... r.
j
IL 6i>t._ 1,50 oo `\.•'• 1ar"
1..e,,..- FOifreie 1 i
C:;. f:tt,:•;s4,,cie,..,'
F,:_,..,:,....•,
e,
r fj <r?;• r lL`
J •.[1 o`Cr.MIir
oo°°Ooi •' oo°o°o°000• 1•,''.,/, •SAC' . 9 0000 , 000000. •
J. A• .,..".
a
t t .'.1?-0'
0 000• , 000000° 91,
c
Frrr' 000000°. n.
I
I 0.0.0.
p ,,....,. . * .. - .•,. :-L-1.:,:,,,,,,-::::::,-....
S--r--Iv:'4t .
IQ.
1.
LAND USE ELEMENT
i'— --___-__-- - 1 Single Family Commercial
111-11
wo Density
Office / Office ParkMulti-Family
t' Medium Density 000000,1 __
00000
000000o Public/Quasi-PubliciMulti-Family 00000°o°o°O•
e:m. ., ' High Density
Light IndustrialMulti-Family
t
f
M`
Recreation Heavy Industrial
f l
I i
oo
o
w G`:': Greenbelt Manufacturing Park
e°O ,O O
41111
PRELIMINARY REPORT TO THE HEARING EXAMINER
ALTERRA CORPORATION
NOVEMB=R 20, 1984
PAGE 2
C. PUBLIC SERVICES:
1.Utilities:
a. Water: A 12-inch water line is located along S.W. 7th Street and along
the proposed Naches Avenue S.W.
b. Sewer: A 12-inch sanitary sewer line is located along S.W. 7th STreet
and along the proposed street, Naches Avenue S.W.
c. Storm Water Drainage: Flows directly into P-1 Detention pond.
2. Fire Protection: Provided by the City of Renton as per ordinance
requirements.
3. Transit: Not applicable.
4. Schools:
e, Elementary Schools: Not applicable.
b. Middle Schools: Not applicable.
c. High Schools: Not applicable.
5. Recreation: Not applicable.
D. HPiTORY/BACKGROUND:
Action Date Ordinance
Annexation April 14, 1959 1745
Corrected May 19, 1959 1756
December 12, 1961 1928
Zo red G-1, General Use Upon Annexation
Rezone Request 1979 (R-432-79) EIS Required
Rezone (G to M-P) December 24, 1982 3694
Lo: Line Adjustment
I.LA-013-83) September 23, 1983 Condition of Rezone
E. APPLICABLE SECTIONS OF THE ZONING CODE:
1. Section 4-73-, Manufacturing Park (M-P).
2. Section 4-711(B), Special Permits.
3. Section 4-722(G), Variance.
4. Section 4-732, Mining, Excavation and Grading.
5. Section 4-734(F)(2), Landscaping Requirement - Green River.
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN OR OTHER
OFFICIAL CITY DOCUMENT:
1. Green River Valley Plan, City of Renton Comprehensive Plan Compendium,
1983, p. 31-35.
2. Industrial Goal and Policies, Policies Element, City of Renton Comprehensive
Plan Compendium, 1983, p. 18-19.
3. Chapter 23, Mining, Excavation and Grading Ordinance.
G. DEPARTMENT ANALYSIS:
Th3 following analysis focuses on the land use issues relevant to each of the three
applications requested. A general statement as to compliance with the intent of
the Comprehensive Plan and specific compliance with the City code begins the
an<lysis of each of the subsequent applications.
PRELIMINARY PLAT
Tha proposal complies with the design criteria enumerated under Section 9-1108 of
the Subdivision Code, except for the variance request reviewed below.
P ELIMINARY REPORT 01E HEARING EXAMINER
A TERRA CORPORATIO
N•VEMBER 20, 1984
P GE 3
ISSUE:
Emergency Access:
As a result of the unusual length of the proposed cul-de-sac, emergency access for
both the Fire and Police Department becomes an issue.
The applicants original proposal showed the cul-de-sac as access to the industrial
development. Revised plans dated November 5, 1984, show a secondary emergency
access route which is basically parallel to the principal cul-de-sac route
approximately 250 to 300 feet south of the main access. This provides a loop
system which is acceptable to the Fire and Police Departments to serve the area.
In addition, it should be pointed out that the primary access road has been
oversized to a street width of 44 feet instead of the required 36 feet because of its
unusual length.
The Fire Department has noted that with the emergency access, a water line
should be established for fire flow availability. This will also help in the
development because it will create a circular transmission system and assure fire
flows if the line is broken or taxed as result of a fire.
The Public Works Department notes that, in addition, an all weather access road
wilt have to he constructed out to Monster Road to the west for utility
maintenance. This can also serve as another emergency access road into the site.
The emergency access road has been designed per the review standards of the
Environmental Review Committee and minimizes impacts upon the greenbelt area.
One clump of cottonwood trees that was intended to be saved on Lot 35 can still be
saved with the applicant utilizing culverts under the roadway. This is similar to
the concept already proposed by the applicant to serve the natural areas designated
on lots 8, 38, 33, 28, and 26.
S'ECIAL PERMIT
The plans submitted for the special permit to fill the site with approximately
425,000 cubic yards of material, complies with the intent of Chapter 23 of Title IV
of the Renton Municipal Code IMining, Excavation and Grading Ordinance). The
applicant has provided a strong rehabilitation plan with hydroseeding to maintain
the adjacent water quality in the natural areas located south and west of the
subject site. Detailed temporary erosion control measures will be reviewed with
the annual license by the Public Works Department. All of the plans at this point
present a proposal that specifically meets our criteria and protects the
environment.
ISSUE:
Vehicular Access:
Importation of approximately 335,000 cubic yards of material will create major
impacts upon the adjacent public streets.
Access to the site will be through an industrial area either on Powell Avenue or
Naches Avenue. Truck traffic hours should be specifically limited because of
material is anticipated to come from the Mt. Baker tunnel area or from the I-90
project area to the subject site. In total, 335,000 cubic yards of material
represents approximately 15,000 vehicle trips with 25 yard dump trucks. A
substantial clean-up and maintenance bond should be required of the development
and inactment should be accomplished by either the Public Works Department or
the Police Department depending upon need.
The secondary issue, which is not often discussed along with a fill operation, is the
fact that because of the heavy weight of these vehicles, the filling of the site will
substantially deteriorate the adjacent public streets. The weight of a 25 yard dump
truck can be equivalent to thousands of standard automobile vehicle trips based
upon the roadway asphalt design. It might be wiser to fill the site by bringing the
material in in railroad cars since the railroad tracks are immediately adjacent to
the site.
A EXAMINERPRELIMINARYREPORHEHEARINGEXMIER
AL TERRA CORPORATION
NOVEMBER 20, 1984
PAGE 4
VARIANCE
The applicant is requesting a variance from both sections 9-1108(7)(K) and
9-] 108(24)(A)(6) because both sections deal directly with the maximum length of
cul-de-sac street. The justification presented by the applicant is adequate to meet
the burden of proof to show that the variance request is appropriate. The staff
believes that the criteria enumerated under Section 9-1109 of the Subdivision Code
are met by the applicant and the variance is appropriate.
1.That there are special physical circumstances or conditions affecting said
property such as the strict application of the provisions of this ordinance
would deprive the applicant of the reasonable use or development of his land.
The physical limitation of the property is a result of shape and location which
was specifically determined by the City in its requirement to dedicate the
natural riparian. The applicant had originally intended dedicating the
western 1/3 of the site, thus making the project area more compact and
developable from an industrial point of view. The City's action, based upon
the actual location of the riparian forest created the unusual shape. The
extreme cul-de-sac length is the only way to service the property.
Limitation of the strict standard of 500 feet for cul-de-sac would basically
eliminate both the market viability under todays economy and the function
development, because we would end up with one massive lot which would still
have emergency access and service problems from an industrial point of view.
2. That the variance is necessary to assure such property the rights and
privileges enjoyed by other property in the vicinity and under similar
circumstances.
In strict comparison, there are no other properties quite as uniquely limited
as the subject site. It is not anticipated that there will ever be another
cul-de-sac within the City of Renton of this length. Denial of the variance
request would functionally deprive the applicant of the ability to develop the
property into a pattern that is typical for the general industrial park area to
the south of the subject site and also designaged for the subject site.
3.f he granting of the variance will not be materially detrimental to the public
welfare or injurious to other property in the vicinity.
The subject property is at the north end of the developable industrial ground
in the Green River Valley Plan. It will not provide a link to more property
and thus will limit development around it. It will not impact the use of other
industrial property to the south or interfere with it. The compromise position
created with the creation of the emergency access drive will assure the
continued safe function of the facility and not be detrimental to itself.
SUMMAR/:
The proposal, as amended shown in the plans dated November 5, 1984, meet the
int:nt of the Comprehensive Plan and the specific limitation set for in both the
Subdivision Code and the Mining and Grading Ordinance. The detail plans and
narratives, accompanying the site plan, suggest a very se sitive approach to the
industrial development on this site. Heavy emphasis has been placed on the
prE servation of natural stands of trees, the safe functional access of vehicular
traffic to each and every lot, the creation of a pleasant and heavily landscaped
industrial area, and a continuation of the industrial pattern that has been
established to the south of the project.
P ELIMINARY REPORT OE HEARING EXAMINER op
LTERRA CORPORATION
OVEMBER 20, 1984
P GE 5
H. RECOMMENDATION:
Based upon the above analysis, it is recommended that the PRELIMINARY PLAT,
file PPUD-089-84,, be recommended for approval to the City Council.
The SPECIAL PERMIT request, file SP-090-84, should be approved subject to:
1) The posting of a road clean-up bond in the amount of $5,000. This amount
should be kept at an active level of $5,000 through the performace of the fill
operation which should be limited to a maximum of a two year period.
2) In addition, $25,000 in cash should be placed for the repair and maintenance
of the roadbeds of either Powell Avenue S.W., Naches Avenue S.W., or S.W.
7th Street as a result of damage created from the truck activity.
3) The filling operation should be specifically limited from 9:00 am to 3:00 p.m.
on weekdays, and 7:00 a.m. to 5:00 p.m. on weekends.
The VARIANCE request, file V-091-84, to allow cul-de-sac of approximately 2500
feet in length should be granted.
1165Z VDING AND ZONING DEPARTME
PRELIMINARY REPORT TO THE HEARING EXAMINER
PUBLIC HEARING
NOVEMBER 20, 1984
APPLICANT: ALTERRA CORPORATION
PROJEC-- NAME: BLACK RIVER TECHNICAL PARK
A. SL MMARY & PURPOSE OF REQUEST:
The applicant seeks approval of the following application(s):
1. PRELIMINARY PLAT (PP-089-84): To subdivide approximately 71.16 acres
of property into 46 lots for future office/warehouse use.
2. SPECIAL PERMIT (SP-090-84): To fill and grade 425,500 cubic yards of
material. 90,000 is presently on-site - 335,000 will have to be imported.
3. VARIANCE (V-091-84): From Section 9-1108(24)(A)(6) to allow a cul-de-sac
length of 2,500 feet.
B. GL=NERAL INFORMATION:
1. Owner of Record: J.A.G. - Renton Properties
Association.
2. Applicant: Alterra Corporation
3. Location:
Vicinity Map Attached) Vicinity of S.W. 4th Place and
Naches Avenue S.W.
4. Existing Zoning: M-P, Manufacturing Park
5. Existing Zoning in the Area: G-1, General Use; R-2, Residential
Two Family; R-3, Residential -
Multiple Family; and M-P,
Manufacturing Park.
6.Comprehensive Land Use Plan:Manufacturing Park
7.Total Size of Property: 71.16 acres
8. Project Area: 45.861 acres (64.4% of total)
9.Greenbelts/Open Space: 19.388 acres (27.2% of total)
10. Public Roads: 5.375 acres (7.6% of total)
11. Pedestrian & Utility: 536 acres (.08% of total)
12.Access: S.W. 7th Street
13. Number of Lots: 46
14.Average Size of Lots: 75 to 1.0 acre
15.Topography: Relatively level. Fill will raise
property approximately 5 to 6 feet.
16. Land Use: Undeveloped.
17. Neighborhood Characteristics:Undeveloped to north and west;
developing industrial park to south.
REVIEW-ING DEPARTMENT/DTVTSION ; b
APPROVED j APPROVED WITH CONDITIONS NOT APPROVED
7j66.. /x/6 7724/6-
7 /
i
lam
7-1
C DATE; ?-7 c74L--PV
SIGNATURE eRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
Form 182
c
REVIEWING DEPARTMENT/DIVISION : L______ E 2_Aari
EJAPPROVED gAPPROVED WITH CONDITIONS ONOT APPROVED
PrA/cIe acEd7 0*AA-/ 2c,e-jn es a s Mei/cal a'fru
pig
2, s.e,. add i hafted neWes Apt, A
L Ag.. , N....
t
oic,
4 DATE ; 9--18-84
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
MEMORANDUM
asTTMRTEO.
ZTO c 1.1 / 4 .k _ i IUr/7 d":2.(5'Nit', DATE ( 10- - 8y )
FROM _ 3e)1 / .fSV14M •
SUBJECT /4771C/rct - / /d /r Plitt,. (S- Pr/f
Yuv 66'CcSS rod/r^ro'r bovt, IcAs ak /o ;he.4i I
Co-{s
le 3 z -ti iv. y z
pic,, ,,,* f1 A hiceirk t.K!/ 40am -lb 4<1/ja,,_
Q/I ..-tvt 0Alt- 4.-c4Ac c. r-J d,,d., LA,jou $4 Q v, --
6 4 i 1s 7 Y-' /24 al - 4 (J,c' t II ,,e)-44 .Cr E., Ey(Sii;7
1/r(L rr / ) /, ,s of doe 4, (,,I;`c,/,t
4N atnlan,ee,
r
ram- T 1/z ( LLB 1 i C'l /i!
REVIEWING DEPARTMENT/DIVI_ _ _N ,
El APPROVED 0 APPROVED WITH CONDITIONS 4NOT APPROVED
e Pia 1- 7 / C i%o a fi,^17 /17 L_ u f e_ e.c_-c.-,e r- /S , Li-k( ( Lc. <c! /"c
2,,
1 c., f
AA4/Cak4 dE> lc-111/ileci d/i[I- / Yd !- G
1-Cd4.Si S
p) / C4f' C' // e.,l Y 2 /L L/ pi/ Sc' S
J
Y .i C1 P S vac_-l //J i c1< S ., 42
c'f ).-a c.,, `‘-1
T' C, /j 7ci2J -,S/a-ram- (15 ,
l- 8-el/ EI7 Prmvice P-,.ps,. C atu- Ek fva.4ce.
e DATE :cc' `
SIGNATURE OF DIRECTOR OR AUTHORIZE REPRESENTATIVE
REVISION 5/1982
Form 182
PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
o MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
94
P.
Dg6-O SEP-C
CITY OF RENTON
BARBARA Y. SHINPOCH
0 D WNr:"MAYOR
October 4, 1984 OCT 5 1984, L.
BUILDING/ZONING DEF.
TO : Jerry Lind, Building & Zoning Department
FROM : Gary Norris, Traffic Engineer
SUBJECT: Black River Technology Park
Al terra Corp.
For your records the above-referenced development will be required to
participate in a latecomer's agreement which shares the cost of the
traffic signal installations at the following two locations :
1 . Powell Ave. SW & SW Grady Way
2. SW 7th Street & Hardie Ave. SW
67
CEM:ad
REVIEWING DEPARTMENT/DIVISION : c , re_ / re-ve l oh
APPROVED PPROVED WITH CONDITIONS NOT APPROVED
4U-es s a 40 ay 5 4 not P A 51' 11
fro u t d ed as 7w-
elilti•op- /O Li, ny aDAS r,t c<.,9 -z -
c02 CA/"ptcrc ;Q/ ro e4s ,re t- u,rc 70 .4e- scrifia AI (" me ci
pR access l v1d 'tn all I cl 4cGe /a g eve 6 AcC c;r-e e k..7'opt •
4 , DATE : /" / "
SIGNATURE OF DIRECTOR D'R AUTHORIZED/REPRESENTATIVE
REVISION 6/1982
Form 182
OF R4,
o
BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0'
911TFD SEP1
P
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
J
DATE: NOVEMBER 8, 1984
TO: TiR. f tE' E011C)
NOVA 7 1984
FROM: BUILDING & ZONING DEPARTMENT
SUBJECT: BLACK RIVER TECHNOLOGY PARK
ALTERRA CORPORATION
FILE NO. PP-089-84, SP-090-84, V-091-84
Please find attached a revised site plan for the above referenced project.
In this new plan you will note that the plat is now served by an emergency
access drive to the south.
Please review this plan. Your comments are needed urgently by FRIDAY,
NOVEMBER 9th AT 12:00 P.M. For your reference is attached, your earlier
comments on the development application review sheets.
1-/
lbrf /r2lc tio7/e/
Liss 7ae . 1
c'-
e
0530N
FINAL DECLARATION OF NON-SIGNIFICANCE
Application No(§):PP-089-84, SP-090-84, V-091-84
Environmental Checklist No.: ECF-094-84
Description of Proposal: Application for preliminary plat approval to
subdivide approximately 71.16 acres of
property into 46 lots for future
office/warehouse use (Black River
Technology Park), and special permit
application for fill and grading of 425,500
cubic yards, and variance from Section
9-1108(7)(K) and Section 9-1108(24)(A)(6) to
allow a cul-de-sac length of 2,500 feet.
Proponent: Alterra Corporation
Location of Proposal: Located in the vicinity of S.W. 4th Place and
Naches Avenue S.W.
Lead Agency: City of Renton Building and Zoning
Department
This proposal was reviewed by the ERC on September 19, 1984 and September 27, 1984,
following a presentation by Jerry Lind of the Building and Zoning Department. Oral
comments were accepted from: Gene Williams, James Matthew, Richard Houghton,
Michael Parness, Ronald Nelson, and Jerry Lind.
Incorporated by reference in the record of the proceedings of the ERC on application
ECF-094-84 are the following:
1. Environmental Checklist Form, prepared by: Delton J. Bonds, dated August 30,
1984.
2.Applications: Preliminary Plat (PP-089-84), Special Permit (SP-090-84), and
Variance (V-091-84).
3. Recommendations for a declaration of non-significance: Building and Zoning
Department, Utilities Engineering Division, Policy Development Department, and
the Police Department.
4. Recommendations for a declaration of significance: Fire Prevention Bureau.
5. Recommendation for more information: Parks and Recreation Department, Traffic
Engineering Division, and Design Engineering Division.
Acting as the Responsible Official, the ERC has determined this development does not
have a significant adverse impact on the environment. An EIS is not required under RCW
43.21 C.030(2)(c). This decision was made after review by the lead agency of a complete
environmental checklist and other information on file with the lead agency.
Reasons for declaration of environmental non-significance:
This final declaration of non-significance shall be subject to the, following conditions
being complied with:
1.The cul-de-sac street proposed is not approved and must be redesigned to reflect
the layout shown on the conceptual land use/preservation plan dated May 21, 1982,
and used as Exhibit No. 12 per Rezone No. R-129-80.
FINAL DECLARATION O. JJN-SIGNIFICANCE
ALTERRA CORPORATION: PP-089-84, SP-090-84, V-091-84
OCTOBER 1, 1984
PAGE 2
2.All :ree preservation shown on the conceptual land use/preservation plan dated
May 21. 1982, and used as Exhibit No. 12 per Rezone No. R-129-80, shall be
reta.ned.
3.The designated greenbelts are not to be disturbed.
4. Participation in a latecomer's agreement shall be required for traffic signal
imps ovements for the intersections of S.W. 7th Street and Hardie Avenue S.W., and
S.W. Grady Way and Powell Avenue S.W. The amount due Will depend upon the
building type(s) and trips generated and shall be paid to the City at the time of
building permit issuance.
SIGNATURES:
2/ ')
Ronald G. Nelson Mi ael am
Building an i Zoning Director Administrative Assistant to the Mayor
R hard C. Houghton
Public Works Director
PUBLISHEI): October 1, 1984
APPEAL DATE: October 15, 1984
ENVIRONMENTAL, CHECKLIST REVIEW SHEET
ECF - 094 - 84
APPLICATION No(s ) : PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) , VARIAN
V-091
PROPONENT: ALTERRA CORPORATION
PROJECT TITLE: BLACK RIVER TECHNOLOGY PARK
PPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVI
Brief Description of Project : /1.16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE/WAREHOUSE USE, AND SPECIAL PERMIT APPLICATION FOR FILL & GRADING OF 425,500 CU.
AND VARIANCE FROM SECTION # 9-1108(7) (K) & 9-1108(24) (A6) TO ALLOW A CUL-DE-SAC STREET
LENGTH OF 2,500 FEET.
LOCATION: LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA: 71.16 ACRES BUILDING AREA (Gross) : N/A
DEVELOPMENT COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1) Topographic Changes : x
2) Direct/Indirect Air Quality: x
3 ) Water & Water Courses : x
4 ) Plant Life:x
5) Animal Life: x
6) Noise: x
7) Light & Glare: X
8 ) Land Use; North: BURLINGTON NORTHERN RR & UNDEVELOPED
East : SUNPOINTE At'ARTMENTS
South: WASHINGTON TECHNICAL CENTER
West : UNDEVELOPED
Land Use Conflicts : NONE ANTICIPATED
View Obstruction:NONE ANTICIPATED
9) Natural Resources : x
10) Risk of Upset : x
11) Population/Employment : x
12) Number of Dwellings :
x
13) Trip Ends ( ITE) : DEPENDENT UPON BUILDING TYPES
Traffic Impacts : ADDRESSED IN E.I.S.
14 ) Public Services :
x
15) Energy:
x
16) Utilities :
x
17) Human Health: x
18) Aesthetics :
x
19 ) Recreation:
x
20) Archeology/History:
x
Signatures :
Ronald G. Nelson lichael Parness
Building & Zonin4 Director Administrative Assistant
to the Mayor
i'. PUBLISHED: OCTOBER 10, 1984
Richard C. Hour*` :on APPEAL DATE: OCTOBER 15. 1984
Public Works 'tor
MEMORANDUM
TO /l c pA t Gi[rn'1T —/.5 v, /Ji N,/'nl
DATE
FROM D b 13S'42,-
SUBJECT /4114//ct.. - 3l d /r" K/,yet. ST"l%. ,
OCCeSS nGe b,,C /04 S O ' /U v();1 14e1
Cod 3 Z Ala y z
J
jf o p(eo . N id A/ . t..// 4dve r4 d LI/Jcwti
01/ ` edict- 4-c,62S /'c.a to LAr tde,, wt 4;0- dlei-
1 o L n,0 - e-ese, e yAi or
du,it- row/ ) 06/die, 4.,";44, 61 a e eu7(4.4.ed,
11/
SUMMARY
OF THE PROPOSAL
III
III I . The Proposed Action
The project sponsor proposes to rezone a 71.16 acre site from General
Classification (G) to Manufacturing Park (MP) designation in order toIIIconstruct, in 2 phases, an office park and rail served warehousing.
Future environmental consequences of specific on-site development will
ilibe addressed in more detail in future environmental documents.
pOff-site improvements may be required to serve this proposal , or this
proposal in conjunction with other developments anticipated in the
IIfuture in this area. These include improvements to the P-1 drainage
channel (see other Governmental Services, p. 86 of the DEIS) , and con-
struction of the Valley Parkway.11
II . Impacts and Mitigating Measures
11 A. PHYSICAL ENVIRONMENT
1. Earth
II a. Geology and Soils
Impacts
IIImport of fill and reposition and cover of topsoils due to
excavation and filling activities.
IIMitigating Measures
Excavation and grading operations on the site will be performed inIIconformancewiththeCityofRentonMining, Excavation and Grading
Ordinance
I b. Topography
Impacts
Topography will be modified in order to create buildings and roadE
sites.
Mitigating Measures
Topographic changes could be restricted to limited areas of theisite.
E
x-
c. Unique Physical Features
Impacts
Development of the proposal will necessitate removal of 38.6 acres
of the 59.5 acre riparian forest located on the site.
Mitigating Measures
Existing vegetation will be preserved on significant portions
of the site.
A master landscape plan will be prepared to ensure good design
practice and preservation of as much of the riparian vegetation
as possible.
As many of the existing trees as possible should be retained
through maintenance of greenbelt areas in order that large
groups of trees and understory remain undisturbed.
The Black River Channel will be protected by a 50 to 100 foot
setback from the top of the bank.
2. Air
Impacts
There will be a short-term increase in dust and fumes during
construction. Over the long-term, automobile-related pollutants
will increase as local traffic levels increase.
Mitigating Measures
Low emission construction equipment will be used whenever
possible.
Measures to control construction dust , such as watering,
cleaning and sweeping of streets at the end of hauling
activities should be performed by the contractor.
3. Water
a. Surface Water Quantity/Quality
Impacts
Increased surface runoff from the site as well as increased levels
of polluted surface runoff would result from the proposed action.
Alteration of runoff characteristics will occur in that diversion
of stormflow into ditches and storm pipes will prevent water from
flowing to low lying areas and may cause some drying up of wetlands
that will be preserved on site, unless storm drainage measures are
undertaken to protect them.
xi-
Mitigating Measures
Temporary detention and settling ponds should be utilized
during construction of foundations to collect silt and minimize
turbidity.-
Stormwater runoff will be collected in a storm sewer system
approved by the Renton Public Works Department.
Oil/water separators should be utilized to remove petroleum
products from storm water.
Adequate street and parking area cleaning and maintenance of
the stormwater system should be provided.
Catch basins and screens should be included in the stormwater
system to collect litter and debris.
No development will occur within a 50 foot setback from the top
of the bank of the Black River Channel .
b. Floods
Impacts
Fill material will be utilized to bring building sites above the
100 year flood elevations.
Mitigating Measures
Fill material will be required to bring some building sites
above the 100 year flood plain which will prevent on-site
flooding.-
Some areas could be left unfilled which may reduce the amounts
of flood storage displacement that occurs on the site.
c. Groundwater Quantity/Movement Movement
Impacts
Project development would result in an increase of impervious
surface on the site, which would decrease the amount of
infiltration of precipitation.
Mitigating Measures
A reduction in building site coverage could require less filling.
xii-
4. Flora
Impacts
Approximately 84% of the site consists of a unique wetland
deciduous forest, a part of the largest forest of this type in the
Seattle area. As a result of the proposed action about 7870 of this
riparian forest would be removed and be replaced by building
foundations, roads and parking areas.
Mitigating Measures
As many of the existing trees as possible should be retained
through maintenance of green belt areas in order that large
groups of trees and understory remain undisturbed.
A master landscape plan will be prepared to assure good design
practice and preservation of as much of the riparian vegetation
as possible.
Placement of building sites, parking lots and roads should be
based on tree inventories provided by field surveys.
Vegetation along the Black River Channel should be preserved
and maintained by the proponent.
5. Fauna
Impacts
Removal of most wildlife habitat and reduction in most native
wildlife due to intrusion of human activity.
Mitigating Measures
Landscaping materials that provide food sources for birds and
small animals should be utilized.
As much natural vegetation should be retained as possible.
Surface water quality along Black Rives should be
preserved by planting natural riparian vegetation along the
drainage-way banks and maintaining wetlands wherever possible.
i
I
1
6. Noise
Impacts (Short-Term)
Noise levels will increase considerably during construction
activities with frequent noise peaks depending on the type of
equipment used. Traffic noise will increase on adjacent streets.
Mitigating Measures
Noisy operations should be scheduled so that they are not
rconcurrent.
Phased development should be planned which would reduce the
size of movements of construction noise.-
Construction equipment should be operated only between the
hours of 7:00a.m. and 7:00p.m. Monday through Friday.
Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be used.
Construction equipment should be placed as far away from
sensitive noise receptors as possible.
Construction activity should be scheduled so that all truck
traffic does not occur concurrently in order to avoid vehicle
congestion.
Impacts (Long-Term)
Increase in traffic and train movements will result in a
proportionate increase in noise levels. Increases in noise levels
due to human activity at the site will occur.
Mitigating Measures
Landscaping, careful site design and berming should be utilized
near main roads to deflect noise and reduce its impact.
See "Vehicular Transportation Generated - Mitigating Measures,"
p. 81 of the DEIS.
Installation of rubberized railroad crossings where the access
road would intersect the railroad spurs to the south of the
site would decrease noise generation.
xiv-
7. Light and Glare
Impacts
Addition of low level lighting on the site. The traffic generated
by the site will increase the incidence of headlight glare. Some
glare will be produced by reflections from windows and possibly the
buildings themselves.
Mitigating Measures
Building wash lighting should not be used.
Perimeter landscaping, fencing and berming, especially around
parking areas and road entrances could reduce light spillage.
Parking area lighting could be directed so that no direct light
spills off the site.
8. Land Use
Impacts
Change in the land use from old growth riparian forest and open space
to office park with warehousing.
Mitigating Measures
An alternative development design with limited building area could
retain significant areas of the site in open space.
9. Natural Resources
Impacts
Removal of most of the existing vegetation and open space on the
site. Consumption of some natural resources for construction and
maintenace of the project.
Mitigating Measures
Building elements could be analyzed for use of techniques, wherever
possible, permitting recovery of materials used in construction.
10. Risk of Explosion or Hazardous Emission
Impacts
There will be a slight risk of hazardous emission or explosion
during construction and potentially from future tenants.
xv-
1
I.
Mitigating Measures
1
None.
B. HUMAN ENVIRONMENT
1. Population and Housing
Impacts
A slight increase in local housing demand may result due to
employees desiring to relocate near their work. Also, day time
population levels at the site will increase to about approximately
4,100 permanent employees.
2. Employment
Impacts
Increased short-term employment during construction and long-term
employment once the development is complete.
Mitigating Measures
None.
3. Transportation/Circulation
Impacts
The proposed Black River Office Park is anticipated to generate be-
tween 9,070 and 34,030 vehicles per day and between 1,250 and 3,970
vehicles during the evening peak hour. This additional volume will
exacerbate the existing congestion at most of the intersections
along major arterials.
I
Mitigating Measures
a) To reduce potential safety hazard, Monster Road should be
upgraded to accommodate heavy tricks and increased traffic
volumes. This may involve rechanneli7ation and possible
signalization of the Sunset Boulevard/Monster Road inter-
section.
I
xvi-
b) To discourage the use of single occupant vehicles, the City
may consider 7 imi ting the number of required parking spaces
to less than is currently prescribed by the zoning code.
c) The road proposed to be constructed along the west edge of
Earlington Park, to the south of the site, could be extended
in such away to provide westerly at-"Pss from the Black River
Office Park, in order to reduce traffic volumes that flow
through Earlington Park.
d) Establish a new bus route or modify an existing bus route to
pass through the project.
e) If bus service is modified to be convenient, provide bus
passes as a company or office park benefit.
f) Office park management should advise tenants and their
employees of the advantages of fleet ride, vanpool and car-
pool programs through a package of information provided at
initial occupancy for each tenant and coordinated through the
Seattle-King County Commuter Pool agency. Office park manage-
ment should also schedule public information meetings for
employers and employees.
g) As much as practical, office park management should encourage
employers to initiate a flextime work schedule so peak period
traffic can be distributed more evenly over the 3:30 to 5:30
p.m. peak period.
h) Any roadwork on-site could be conditioned to allow open at all
tins a poi Lion of the road wide enough to permit emergency
vehicle access.
i) Grade an alignment from Thomas Avenue S.W. which would intersect
the road system on-site with a gravel sub-base wide enough to
allow emergency vehicle access.
j) Disruption of traffic flaw in the internal road system could be
minimized by installing utilities, within the right-of-way, but
outside the roadway proper.
M
4. Public Services
a. Fire Service
Impacts
Over the short-term, construction activity may increase the
hazards of fire fighting. Construction of the proposal would
significantly impact the fire protection responsibilities of
the Renton Fire Department. This development, coupled with
future development in the area, would necessitate improvements
to provide timely first response capabilities.
Mitigating Measures
Sprinkler systems installed in buildings per City Code and
Fire Marshall 's requirements, will reduce the amount of fire
flow required.
Non-combustible building materials would reduce risks of
fire.
Industrial tenants could be limited to uses that do not
utilize flammable materials.
1 b. Police Service
Impacts
Demand for police protection will increase.
Mitigating Measures
Tax revenues generated from the development will help offset
the cost of additional service.
I
I
xviii-
3
r
Internal security systems could be installed in the building.
1 Exterior lighting should be placed at strategic locations to
provide additional security measures.
i c. Hospital Facilities
Impacts
The proposed project is not expected to significantly affect
usage of the Valley General Hospital .
Mitigating Measures
On-site first aid facilities within major buildings should be
provided.
d. Parks and Recreation
Impacts
Development of the site will preclude any future development or
designation for park use.
Mitigating Measures
None.
e. Maintenance
Impacts
Increased demand for City maintenance of streets , water
sanitary sewer and stormwater drainage systems.
Mitigating Measures
None.
5. Energy
Impacts
Increase in demand for electrical power and natural gas ar
possible increase in demand for energy associated wit
transportation.
I
11
Mitigating Measures
Insulation in roof, walls, flooring and glass should be
utilized.
Energy analysis of building design should be performed.
6. Communication
Impacts
Increase in demand for telephone service.
Mitigating Measures
All telephone lines will be installed underground.
Installation of telephone lines will be coordinated with
installation of electrical lines.
7. Public Utilities
Impacts
Existing water supply and system would experience some
additional demand. Deterioration of water quality entering the
combined sewer and storm drainage system is possible during
construction activities. In the long-term, the quantity of
water entering the system will increase due to increased
impervious surfaces on the site. Also, project development
would generate increased solid waste and sewage flows from the
site.
I
Mitigating Measures
Site runoff will be directed to the old Black River Channel
where it will receive wetland treatment prior to its discharge
into Springbrook Creek.
8. Human Health
Impacts
Increased noise levels due to construction, traffic and other
human activities may affect the health of nearby residents.
I
xx-
Mitigating Measures
Noisy operations should be scheduled so that they are not
concurrent.
Phased development should be planned which would reduce the
size of movements of construction noise.
Construction equipment should be operated only between the
hours of 7:00 a.m. and 7:00 p.m. Monday through Friday.
Only construction equipment that does not exceed State of
Washington maximum environmental noise standards should be
used.
Construction equipment should be placed as far away from
sensitive noise receptors as possible.
Construction activity should be scheduled so that all truck
traffic does not occur concurr :tly in order to avoid
vehicle congestion.
9. Aesthetics
Impacts
Visual appearance of the site will be altered.
Mitigating Measures
Site design and retention of some existing vegetation will
soften the impacts of the bulk and mass of buildings.
10. Archaeological/Historical
Impacts
Project development may cover potentially archaeologically
significant portions of the site, specifically Duwamish Indian
sites . (Refer to the letter from the Office of Public
Archaeology in Appendix D of the DEIS.)
Mitigating Measures
The Office of Public Archaeology of the University of
Washington will conduct borings at 25 meter intervals in the
areas considered to have high archaeological potential and at
50 meter intervals at other undisturbed areas to confirm
specific locations prior to development of the site.
xxi-
R4,'l/
C ® z
THE CITY OF RENTON
POLICY DEVELOPMENT DEPARTMENT • 235-2552
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055
9,0
0,
9gT
D SEP1E
P
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
DATE: November 9, 1984
TO: Roger J. Blaylock,, Zoning Administrator
c
FROM: Gene N. Williams, Associate Planner
SUBJECT: Black River Technology Park
Based on the revised plat map of November 5, 1984 showing the emergency access drive,
we would like to amend our comments on the Black River Tachnology Park application.
My memo of October 15, 1984, states our position with regard to the preliminary plat and
the special permit. These positions are unchanged.
However, the revisions to access proposed in the recent plat map address our concerns
about the variance for cul-de-sac length. The emergency access drive provides for
secondary access, and the primary roadway is intentionally oversized. Although the
cul-de-sac is still legally 2,500 feet long, the shape of the property is unique and the
variance appears justified. The overall impacts to the forest environment will be less
than a full street loop within the site. The emergency access drive appears to be located
outside the greenbelt area and to avoid major tree preservation pockets. These items
should be conditions of approval, however, to ensure the integrity of the greenbelt area.
I
CITY 30FRENTON
M I =
NOV 61984
BUILDING/ZONING DEPT.
November 5, 1984 Richard Carothers Associates
Roger Blaylock
Zoning Acministrator
Building & Zoning Department
200 Mill Avenue South
Renton, lt,ashington 98055
RE: Preliminary Plat, Special Permit and Variance for Blackriver
Technology Park, Files PP-089-84, SP-090-84 and U-091-84; Property
Located in the Vicinity of S.W. 4th Place and Naches Avenue S.W.
Dear Mr. Blaylock:
Please irciude the attached sheet number 13 entitled Emergency Access Drive into
the above referenced applications.
Sheet number 13 clarifies the issue of public safety and emergency access to
properties located west of Naches Avenue S.W.
The cul-de-sac length is therefore reduced to 765 feet as indicated.
The 30 fcot wide easement includes a 24 foot wide aspahlt emergency access drive
that shall remain unobstructed by parked vehicles, bollards, fences, gates, etc.
truly yours,
RICH' 'D (;'RO RS ASSOCIATES
if A
i chard t '\.:,r o ' s, APA, ASLA, CSI
resid- t
t
RAC:tip
Seattle Office:
Eight Fourteen East Pike Street, Seattle, Washington 98122 Telephone (206) 324-5500
OF R .
BUILDING & ZONING DEPARTMENTC'r ® z
RONALD G. NELSON - DIRECTOR
pomm.MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
OQq
ED SEP', -
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
DATE: October 29, 1984
TO: Fred Kaufman, Hearing Examiner
FROM: Roger Blaylock, Zoning Administrator
SUBJECT: Alterra Corporation Public Hearing: PP-089-84, SP-090-84, and V-091-84
The applic ant's representatives have met with the Environmental Review Committee to
discuss tF a intent of the conditions imposed in the environmental documents. The
applicant, to specifically comply with that intent and provide the Hearing Examiner with
a new site plan, has requested that the public hearing be continued until Tuesday,
November 20th. This will enable the Building and Zoning Department who will receive the
revised in 'ormation by Friday, November 2nd, to circulate and obtain comments from the
various departments and provide a formal staff report to the Hearing Examiner on
Tuesday, November 13th in accordance with City ordinance.
The spec fic intent of the first condition imposed by the Environmental Review
Committee will be clarified by the Committee in a formal memo from the ERC to the
Land Use -tearing Examiner after their formal discussion on Wednesday, October 31st.
I°/- vgy- 8 /
INTER—OFFICE MEMO
TO: DON MONAGHAN DATE OCTOBER 25, 1984
FROM: JEANETTE
RE: LEGAL FOR UPCOMING PUBLIC HEARING --
OCTOBER 30, 1984
ENCLOSED IS THE LEGAL FOR THE ELISA THOMAS REZONE. PLEASE CHECK IT FOR ANY
ERRORS OR MISSING INFORMATION.
I HAVE ALSO INCLUDED ALTERRA' s LEGAL ALTHOUGH WE EXPECT THAT THE PUBLIC HEARING
WILL BE CONTINUED. a-=r' .-=-1 /?P
J
THANKS,i/ ?/ , /
OF RP
40 ' BUILDING & ZONING DEPARTMENTu4-
RONALD G. NELSON - DIRECTOR
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
09iteo SE P-C -
BARBARA Y. SHINPOCH
MAYJR
MEMORANDUM
October ?5, 1984
TO: Fred J. Kaufman, Land Use Hearing Examiner
FROM: Ronald G. Nelson, Building & Zoning Director
SUBJEC Alterra, Black River Technology Park_
PP-089-84, SP-090-84, V-091-84)
The Zoning Division staff found that the applicant had not complied with an
Environmental Review Committee condition. This condition requires the applicant to
redesign S.W. 4th Place, the major access for the proposed plat. The Zoning staff have
contacted the applicant concerning the issue and the department's position. The applicant
has indicated a willingness to work with staff on the redesign. Representatives will be
meeting ivith several of the staff to resolve the design problems.
We feel that the design issue affects the total proposal and, until it's resolved, we
recommend continuing the public hearing to a time presented at next Tuesday's meeting.
RGN:JS-v1:1 141 Z:wr
OF RFC
tiow t"r4,4 ° BUILDING & ZONING DEPARTMENT
RONALD G. NELSON — DIRECTOR
Z smiL
p9 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
co-
O P
t 0 sEPjc
BARBARA Y. SHINPOCH
MAYOR
October 9, 1984
Alterra Corporation
710 Cher-y Street
Seattle, IVA 98104
Re: Preliminary Plat, Special Permit, and Variance for Black River Technology Park,
Files PP-089-84, SP-090-84, and V-091-84; property located in the vicinity of S.W.
4th Place and Naches Avenue S.W.
Dear Sirs:
The Cite of Renton Building and Zoning Department formally accepted the above
mentioned application on August 30, 1984. A public hearing before the City of Renton
Land Use Hearing Examiner has been scheduled for October 30, 1984. The public hearing
commences at 9:00 a.m. in the Council Chambers on the second floor of City Hall.
The applicant or representative(s) of the applicant is required to be present at the public
hearing. A copy of the staff report will be mailed to you before the hearing. If you have
any questions, please call the Building and Zoning Department at 235-2550.
Sincerely,
Roger J. Blaylock
Zoning A iministrator
RJB:JMNI:cl
1132Z
OF R
i ;
w"? z BUILDING & ZONING DEPARTMENT
rat. RONALD G. NELSON - DIRECTOR
NAL 'R ,
0 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
co-
09gr
D SE PSc4(6
BARBARA Y. SHINPOCH
MAYOR
October 19, 1984
Steve Splidel
Richard Throthers Associates
814 East Pike Street
Seattle, 'NA 9812'2
Re: Preliminary Plat, Special Permit, and Variance for Black River Technology Park,
Files PP-089•-84, SP-090-84, and V-091-84; property located in the vicinity of S.W.
4th Place and Naches Avenue S.W.
Dear Mr. Speidel:
The City of Renton Building and Zoning Department formally accepted the above
mentioned application on August 30, 1984. A public hearing before the City of Renton
Land Use Hearing Examiner has been scheduled for October 30, 1984. The public hearing
commences at 9:00 a.m. in the Council Chambers on the second floor of City Hall.
The appl cant or representative(s) of the applicant is required to be present at the public
hearing. A copy of the staff report will be mailed to you before the hearing. If you have
any quest ions, please call the Building and Zoning Department at 235-2550.
Sincerely,
Roger 3. Blaylock
Zoning Administrator
RJB:JMM:c1
1132Z-3
OF RA,1
0 BUILDING & ZONING DEPARTMENTtz
i` . RONALD G. NELSON - DIRECTOR
Z
09 4
cp
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0941 rfD SE PIO°
BARBARA Y. SHINPOCH
MAY,)R
October 19, 1984
J.A.G.-Renton Properties Associates
710 Cher-y Street
Seattle, WA 98104
Re: Pr3liminary Plat, Special Permit, and Variance for Black River Technology Park,
F is es PP-089-84, SP-090-84, and V-091-84; property located in the vicinity of S.W.
4th Place and Naches Avenue S.W.
Dear Sirs
The City of Renton Building and Zoning Department formally accepted the above
mentioned application on August 30, 1984. A public hearing before the City of Renton
Land Use Hearing Examiner has been scheduled for October 30, 1984. The public hearing
commenc 3s at 9:00 a.m. in the Council Chambers on the second floor of City Hall.
The applicant or representative(s) of the applicant is required to be present at the public
hearing. A copy of the staff report will be mailed to you before the hearing. If you have
any quest ons, please call the Building and Zoning Department at 235-2550.
Sincerely,
Roger J. Edaylock
Zoning Administrator
RJB:JMM:cl
1132Z-2
1L
Affidavit of Publication
STATE OF WASHINGTON
COUNTY OF KING ss.
Cindy..Strupp being first duly sworn on
oath,deposes and says that.She.is the chief..clerk of
THE DAILY RECORD CHRONICLE,a newspaper published six(6)times a
week.That said newspaper is a legal newspaper and it is now and has been
for more than six months prior to the date of publication referred to,
printed and published in the English language continually as a newspaper
published four(4)times a week in Kent,King County,Washington,and it is
CITY Q ENTONnowandduringallofsaidtimewasprintedinanofficemaintainedatthe
aforesaid place of publication of said newspaper.That the Daily Record NRNIITIChroniclehasbeenapprovedasalegalnewspaperbyorderoftheSuperiorU
Court of the County in which it is published,to-wit,King County, D
NOV 15 1984
Washington.That the annexed is a Land Use MMXXV Hearing
BUILDING/ZONING DEPT.
as it was published in regular issues(and
not in supplement form of said newspaper)once each issue for a period
of One consecutive issues,commencing on the
19 th.day of QctQbe.r 19.... .!.,and ending the
day of 19 ,both dates
inclusive, and that such newspaper was regularly distributed to its sub-
scribers during all of said period. That the full amount of the fee
charged for the foregoing publication is the sum of s2.7 D.Q which
has been paid in full at the rate of per folio of one hundred words for the
first insertion and per folio of o hundred words for each subsequent
insertion.
Chie.f...C.ierk
Subscribed and sworn to before me this...19.th day of
October , 19..-.84_
Notary Public in and he State of Washington,
re ing at Jcc King County.
Federal Wav
Passed by the Legislature,1955,known as Senate Bill 281,effective June
9th, 1955.
Western Union Telegraph Co. rules for counting words and figures,
adopted by the newspapers of the State.
VN s87 Revised 582
n, _ .... .:-lr 0if'i KJL4 ..iCL':'.... fs1@iJ{/N+9Cr+14.4ll:L
r
1 Public Notice
al to subdivide approximately 51 acres
of a 71.16 acre tract into 46 lots for
future office/warehouse use(Black Riv-
er Technology Park), file PP-089-84,
and special permit application for fill
and grading of 425,500 cubic yards,file
SP-090-84, and variance from Section
9-1108(7)(K) and Section 9-
1108(24)(A)(6) to allow a cul-de-sac
length of 2,500 feet, file V-091-84;
located in the vicinity of S.W.4th Place
and Naches Avenue S.W.
Legal descriptions of the files noted
above are on file in the Renton Building and
Zoning Department.
ALL INTERESTED PERSONS TO SAID
PETITIONS ARE INVITED TO BE PRE-
SENT AT THE PUBLIC HEARING ON
OCTOBER 30, 1984, AT 9:00 A.M. TO
EXPRESS THEIR OPINIONS.
Ronald G. Nelson
Building and Zoning Director
Published in the Daily News Journal
NOTICE OF PUBLIC.HEARING
October 19, 1984 R<3•l70
RENTON LAND USE HEARING
EXAMINER
RENTON,WASHINGTON
A PUBLIC HEARING WILL BE HELD BY
THE RENTON LAND USE HEARING
EXAMINER AT HIS REGULAR MEETING
IN THE COUNCIL CHAMBERS ON THE
SECOND FLOOR OF CITY HALL, RE-
NTON,WASHINGTON ON OCTOBER 30,
1984, AT 9:00 A.M.TO CONSIDER THE
FOLLOWING PETITIONS:
ELISA THOMAS
Application to rezone approximately
0.134 acre of property from R-1 to L-1
for future office or office/warehouse
use,file R-094-84;located on the north
side of S.W. 13th Street and 65 feet
east of Maple Avenue S.W.
ALTERA CORPORATION
Application for preliminary plat approv-
OF R4
C•'; 6 Pz orricE
Og9TE0 SEP1
City of Renton Land Use Hearing Examiner
will hold a
PUBLIC HEARING
in
CITY COUNCIL CHAMBERS , CITY HALL
ON OCTOWR 3k 199.4 BEGINNING AT c1,00 A.M. P.M.
CONCERNING:PP-089-84, SP-090-84, V-091-84
REZONE From To
X SPECIAL / CONDITIONAL USE PERMIT
ro Fill AND GRADE 425,500 CU. YDS.
SITE APPROVAL
SHORT PLAT/SUBDIVISION of Lots
PLANNED UNIT' DEVELOPMENT
x VARIANCE FROM SECTIONS 9-1108(7)(K) & 9-1108(24) (A) (6)
I X PRELIMINARY PLAT
GENERAL LOCATION AND/OR ADDRESS:
LOCATED IN THE VICINITY OF S.W. 4TH PLACE AND NACRES AVENUE S.W.
LEGAL DESCRIPTION ON FILE IN THE RENTON BUILDING & ZONING DEPARTMENT.
ENVIRONMENTAL DECLARATION
SIGNIFICANT IA NON—SIGNIFICANT
FOP FURTHER INFORMATION CALL THE CITY OF RENTON
BUILDING & ZONING DEPARTMENT 235-2550
THIS NOTICE NOT TO BE REMOVED WITHOUT
PROPER AUTHORIZATION
s
F I?
v Ci Co z
THE CITY OF RENTON
POLICY DEVELOPMENT DEPARTMENT • 235-2552
0
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
9A co.
O91 t 0 SEPI°
1
BARBARA Y. SHINPOCH MEMORANDUM
MAYOR
DATE: October 15, 1984
TO: Roger J. Blaylock, Zoning Administrator
FROM: Gene N. William , Associate Planner
SUBJECT: Black River Technology Park -- Preliminary Plat, Special Permit, Variance.
We have reviewed the above applications and offer the following comments.
Preliminary Plat
The proposed preliminary plat lays out a series of 1± acre lots. With the exception noted
below, this appears to be consistent with the policies of the Comprehensive Plan -- and
specifically the newly adopted Valley Plan. The Valley Plan calls for the "implementation
of office ,and other similar service and light industrial activities in low rise building
structures" and "small to medium scale office and business park uses" in this area. The
size of the lots, the provisions for interior tree preservation, the landscaping guidelines
and the building covenants appear to promote development in accordance with these
policies and the conditions of the -ezone. Our principal concern is the consolidation of a
number of lots, which could allow the construction of large scale warehousing or industry
in conflict with the Valley Plan.
We recomn-end approval of the preliminary plat with the condition of site plan review to
assure that specific development will be consistent with these use and bulk policies, with
tree preservation areas and with landscaping guidelines.
Roger J. Blaylock
October 15, 1984
Page 2
Special Permit
Approval of the special permit for fill and grade will transform the riparian forest
environment. Therefore, to preserve the amenities of the site, the special permit should
be conditioned to required no disturbance of the dedicated greenbelt or restricted
preserve areas and maintenance of the tree preservation pockets detailed on the plans.
Rehabilitation or replacement should be required for any significant vegetation harmed in
the preservation pockets. In addition, the hauling hours of operation should be limited to
avoid the afternoon peak traffic.
Variance
The variance for cul-de-sac length is not addressed in the Comprehensive Plan policies.
However, safe and convenient access is encouraged. The shape of the property and
abutting .7eatures -- railroad track and P-1 channel system -- suggest a need for the
variance. However, as the applicant has shown in previous submittals, a loop street
system with small cul-de sac or a westerly extension of the roadway are possible. The
westerly extension could be placed adjacent to the railroad tracks and not disturb the
greenbelt area. It could also end in a bridge across the outlet channel to Monster Road --
if a full service street were built -- or it could cross the railroad tracks just north of the
outlet cht.nnel -- if only emergency access were provided. In either case, or through a
loop roadway, solutions to the problem of access can be accomplished. Therefore, the
requested variance is not a "minimum" relief necessary to prevent a hardship and should
be denied.
OF I
1i 40 ° PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
0 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH. 98055
9,0 co.
0 P
9
TF0 SEP'C&
O
CITY OF RENTomBARBARAY. SHINPOCH
MAYOR
October 4, 1984 OCT 5 1984 I--
BUILDING/ZONING DEP
TO : Jerry Lind, Building & Zoning Department
FROM : Gary Norris, Traffic Engineer
SUBJECT : Black River Technology Park
Al terra Corp.
For your records the above-referenced development will be required to
participate in a latecomer's agreement which shares the cost of the
traffic signal installations at the following two locations :
1 . Powell Ave. SW & SW Grady Way
2. SW 7th Street & Hardie Ave. SW
eae?,
CEM:ad
l . y
0530N
FINAL DECLARATION OF NON-SIGNIFICANCE
Application No(s):PP-089-84, SP-090-84, V-091-84
Environmental Checklist No.: ECF-094-84
Description of Proposal: Application for preliminary plat approval to
subdivide approximately 71.16 acres of
property into 46 lots for future
office/warehouse use (Black River
Technology Park), and special permit
application for fill and grading of 425,500
cubic yards, and variance from Section
9-1108(7)(K) and Section 9-1108(24)(A)(6) to
allow a cul-de-sac length of 2,500 feet.
Proponent: Alterra Corporation
Location of Proposal: Located in the vicinity of S.W. 4th Place and
Naches Avenue S.W.
Lead Agency: City of Renton Building and Zoning
Department
This proposal was reviewed by the ERC oil September 19, 1984 and September 27, 1984,
following a presentation by Jerry Lind of the Building and Zoning Department. Oral
comments were accepted from: Gene Williams, James Matthew, Richard Houghton,
Michael Farness, Ronald Nelson, and Jerry Lind.
Incorporated by reference in the record of the proceedings of the ERC on application
ECF-094 -84 are the following:
1 Environmental Checklist Form, prepared by: Delton J. Bonds, dated August 30,
1934.
2.Applications: Preliminary Plat (PP-089-84), Special Permit (SP-090-84), and
Variance (V-091-84).
3. Recommendations for a declaration of non-significance: Building and Zoning
Department, Utilities Engineering Division, Policy Development Department, and
the Police Department.
4. Re commendations for a declaration of significance: Fire Prevention Bureau.
5. Recommendation for more information: Parks and Recreation Department, Traffic
Engineering Division, and Design Engineering Division.
Acting a.; the Responsible Official, the ERC has determined this development does not
have a significant adverse impact on the environment. An EIS is not required under RCW
43.21 C.0'>0(2)(c). This decision was made after review by the lead agency of a complete
environmental checklist and other information on file with the lead agency.
Reasons for declaration of environmental non-significance:
This final declaration of non-significance shall be subject to the following conditions
being complied with:
1.The cul-de-sac street proposed is not approved and must be redesigned to reflect
the 1,'vnut shown on the conceptual land use/preservation plan dated May 21, 1982,
and Used as Exhibit No. 12 per Rezone No. R-129-80.
FINAL DECLARATION O...__..._N-SIGNIFICANCE
ALTERRA CORPORATION: PP-089-84, SP-090-84, V-091-84
OCTOBER 1, 1984
PAGE 2
2.All tree preservation shown on the conceptual land use/preservation plan dated
May 21, 1982, and used as Exhibit No. 12 per Rezone No. R-129-80, shall be
retained.
3.The designated greenbelts are not to be disturbed.
4. Participation in a latecomer's agreement shall be required for traffic signal
improvements for the intersections of S.W. 7th Street and Hardie Avenue S.W., and
S.W. Grady Way and Powell Avenue S.W. The amount due will depend upon the
building type(s) and trips generated and shall be paid to the City at the time of
building permit issuance.
SIGNATURES:
r
Ronald G. Nelson Mi ael am
Building and Zoning Director Administrative Assistant to the Mayor
R hard C. Houghton cz
Public Woks Director
PUBLISHED: October 1, 1984
APPEAL DATE: October 15, 1984
ITV O "ci
pD . ' 1a ! vr u: •
ti (IOV 15 1984
Affidavit of Publication
BUI(-DtNG/7_C;N!Nc Di:,,T•
STATE OF WASHINGTON
COUNTY OF KING ss.
Cindy Strupp
being first duly sworn on Public Notice
oath,deposes and says that
she
is the
chief clerk
of NOTICE OF
ENVIRCNMENTAL DETERMINATION
THE DAILY RECORD CHRONICLE,a newspaper published six(6)times a ENVIRONMENTAL REVIEW COM-
week.That said newspaper is a legal newspaper and it is now and has been MITTEE
for more than six months prior to the date of publication referred to, RENTON, WASHINGTON
printed and published in the English language continually as a newspaper The Environmental Review Committee
published feu:-(4)times a week in Kent,King County,Washington,and it is ERC) has issued a final declaration of
now and during all of said time was printed in an office maintained at the
non-significance for the following project:aforesaid plac e of publication of said newspaper. That the Daily Record
WiLLIAMS/BALES(ECF-095-84)Chronicle has been approved as a legal newspaper by order of the Superior
Application for building permit to con-Court of the County in which it is published, to-wit, King County,
slruct a 16 unit apartment complex,
consisting of two, 8-unit buildings (Fir
Washington.That the annexed is a ERC One Apartments), file B-331; located
along the east side of Monroe Avenue
N.E.between N.E.11th Place and N.E.
12th Street.
The Environmental Review Committee
ERC) has issued a final declaration of
as it was published in regular issues(and non-significance with conditions for the
not in supplerrent form of said newspaper) once each issue for a period following projects:
ALTERRA CORPORATION (ECF-
094-84)
one Application for preliminary plat approv-of consecutive issues,commencing on the al to subdivide approximately 51 acres
of a 71.16 acre tract into 46 lots for
1st October 84 future office/warehouse use(Black Riv-day of 19 and ending the er Technology Park), file PP-089-84,
and special permit application_for fill
and grading of 425,500 cubic yards,file
day of 19 both dates SP-090-84, and variance from Section
inclusive, and that such newspaper was regularly distributed to its sub- to9- allow
7)(K)and Section 9-1108(A)(6)
scribers duringall of said
feet,
allow a cul-de-sac length of 2,500period. That the full amount of the fee
feet,file V-091-84;located in the vicinity
of S.W.4th Place and Naches Avenue
charged for the foregoing publication is the sum of $3.2 40 which S.W.
has been paid in full at the rate of per folio of one hundred words for the AERODYNE CORPORATION (ECF-
first insertion and per folio of one hundred words for each subsequent 096-84)
insertion.
c- Application for conditional use permit to
js,
allow a 4-unit aircraft hanger to be
constructed ina P-1(Public Use)zonedadistrict, file CU-092-84; located at the
south end of the Renton Municipal
Chief Clerk Airport at 340 Airport Way South.
Further information regarding this action
is available in the Building and Zoning
Subscribed and sworn to before me this
a S t
day of Department, Municipal Building, Renton,
Washington, 235-2550. Any appeal of
ERC action must be filed with the HearingOctoberl984ExaminerbyOctober15, 1984.
Published in the Daily Record Chronicle
October 1, 1984. R9435
Notary Public inor the State of Washington,
residing at X , King County.
Federal Way _
Passed by the. egislature,1955,known as Senate Bill 281,effective June
9th, 1955.
Western Union Telegraph Co. rules for counting words and figures,
adopted by the newspapers of the State.
VN#87 devised 5;82
0525Nr
NOTICE OF ENVIRONMENTAL DETERMINATION
ENVIRONMENTAL REVIEW COMMITTEE
RENTON, WASHINGTON
The En iironmental Review Committee (ERC) has issued a final declaration of
non-significance for the following project:
WILLIAMS/BALES (ECF-095-84)
Application for building permit to construct a 16 unit apartment complex,
consisting of two, 8-unit buildings (Fir One Apartments), file B-331; located
along the east side of Monroe Avenue N.E. between N.E. 11 th Place and N.E.
1 th Street.
The Environmental Review Committee (ERC) has issued a final declaration of
non-significance with conditions for the following projects:
vALTERRA CORPORATION (ECF-094-84)
Application for preliminary plat approval to subdivide approximately 51 acres
of a 71.16 acre tract into 46 lots for future office/warehouse use (Black
River Technology Park), file PP-089-84, and special permit application for
fill and grading of 425,500 cubic yards, file SP-090-84, and variance from
Section 9-1108(7)(K) and Section 9-1108(24)(A)(6) to allow a cul-de-sac
length of 2,500 feet, file V-091-84; located in the vicinity of S.W. 4th Place
and Naches Avenue S.W.
AERODYNE CORPORATION (ECF-096-84)
Application for conditional use permit to allow a 4-unit aircraft hanger to be
co,istructed in a P-1 (Public Use) zoned district, file CU-092-84; located at
the south end of the Renton Municipal Airport at 340 Airport Way South.
Further .nformation regarding this action is available in the Building and Zoning
Department, Municipal Building, Renton, Washington, 235-2550. Any appeal of ERC
action mL.st be filed with the Hearing Examiner by October 15, 1984.
Published:October 1, 1984
NOTICE
ENVIRONMENTAL
DECLARATION
APPLICATION NO.PP-089-84, SP-090-84, V-091-84, ECF-094-84
PROPOSED ACTION APPLICATION FOR PRELIM, PLAT APPROVAL-0 SUBDIVIDE APPROX
51 ACRES OF A 71,16 ACRE TRACT INTO 46 LOTS FOR FUTURE OFFTCF/WARFHnhISF IISF (RI AcKJRJVER
TECHNOLOGY PK) SPECIAL PERMIT FOR FILL & GRADE, VARIANCE FROM SFCTJON 9-11n2(7) (K) R_ (24) 0
GENERAL LOCATION AND OR ADDRESS E
LOCATED IN THE VICINITY OF S,W, 4TH PLACE & NACHES AVENUE S.W.
POSTED TO NOTIFY INTERESTED
PERSONS OF AN ENVIRONMENTAL
ACTION.
THE CITY OF RENTON ENVIRONMENTAL REVIEW
COMMITTEE C E.R.C. ] HAS DETERMINED THAT THE
PROPOSED ACTION
CJDOES DOES NOT
HAVE A SIGNIFICANT ADVERSE IMPACT ON THE
ENVIRONMENT.
AN EINVIRONMENTAL IMPACT STATEMENT
DWILL Ki WILL NOT
BE REQUIRED.
AN APPEAL OF THE ABOVE DETERMINATION MAY
BE FILED WITH,, E_ RENTON HEARING EXAMINER
BY 5:C 0 P.M., U Ob 115 84
FOR FURTHER INFORMATION
CONTACT THE CITY OF RENTON
BUILDING & ZONING DEPARTMENT
235-2550
DO NOT REMOVE THIS NOTICE
WITHOUT PROPER AUTHORIZATION
ENVIRONMENTAL, CHECKLIST REVIEW SHEET
ECF - 094 - 84
APPLICATION No(s) : PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) , VARIAN
V-091
PROPONENT: ALTERRA CORPORATION
PROJECT TITLE: BLACK RIVER TECHNOLOGY PARK
PPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVI
Brief Description of Project : 71.16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE/WAREHOUSE USE, AND SPECIAL PERMIT APPLICATION FOR FILL & GRADING OF 425,500 CU.
AND VARIANCE FROM SECTION # 9-1108(7) (K) & 9-1108(24) (A6) TO ALLOW A CUL-DE-SAC STREET
LENGTH OF 2,500 FEET.
LOCATION: LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA: 71.16 ACRES BUILDING AREA (Gross ) : N/A
DEVELOPMENT COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1) Topographic Changes : x
2) Direct/Indirect Air Quality: x
3 ) Water & Water Courses : x
4 ) Plant Life:x
5) Animal Life: x
6) Noise: x
7) Light & Glare: x
8) Land Use; North: BURLINGTON NORTHERN RR & UNDEVELOPED
East : SUNPOINTE APARTMENTS
South: WASHINGTON TECHNICAL CENTER
West : UNDEVELOPED
Land Use Conflicts : NONE ANTICIPATED
View Obstruction: NONE ANTICIPATED
9) Natural Resources : x
10) Risk of Upset : x
11) Population/Employment : x
12) Number of Dwellings : x
13) Trip Ends ( ITE) : DEPENDENT UPON BUILDING TYPES
Traffic Impacts : ADDRESSED IN E.I.S.
14) Public Services : x
15) Energy: x
16) Utilities : x
17) Human Health: X
18) Aesthetics :X
19) Recreation: __
x
20) Archeology/History:x
Signatures :
Ronald G. Nelson Michael Parness
Building & Zoning Director Administrative Assistant
to the Mayor
Z-L-1 PUBLISHED: OCTOBER 10, 1984
Richard C. Houghton APPEAL DATE: oCTOBER 15. 1984
Public Works Director
23
a
FINAL DECLARATION C ON-SIGNIFICANCE
ALTERRA CORPORATION: PP-089-84, SP-090-84, V-091-84
OCTOBER 1, 1984
PAGE 2
2. Al] tree preservation shown on the conceptual land use/preservation plan dated
May 21, 1982, and used as Exhibit No. 12 per Rezone No. R-129-80, shall be
retained.
3.The designated greenbelts are not to be disturbed.
4. Participation in a latecomer's agreement shall be required for traffic signal
improvements for the intersections of S.W. 7th Street and Hardie Avenue S.W., and
S.W. Grady Way and Powell Avenue S.W. The amount due Will depend upon the
building type(s) and trips generated and shall be paid to the City at the time of
building permit issuance.
SIGNATURES:
r /. 1i. .._.
Ronald G. Nelson Mi ael am
Building aid Zoning Director Administrative Assistant to the Mayor
c-
Y-Zi,d
4e --74-` 1
R. hard C. Houghton
Public Works Director
PUBLISHED: October 1, 1984
APPEAL DATE: October 15, 1984
0530N
FINAL DECLARATION OF NON-SIGNIFICANCE
Application f5o(§):PP-089-84, SP-090-84, V-091-84
Environmental Checklist No.: ECF-094-84
Description of Proposal: Application for preliminary plat approval to
subdivide approximately 71.16 acres of
property into 46 lots for future
office/warehouse use (Black River
1 echnology Park), and special permit
application for fill and grading of 425,500
cubic yards, and variance from Section
9-1108(7)(K) and Section 9-1108(24)(A)(6) to
allow a cul-de-sac length of 2,500 feet.
Proponent: Alterra Corporation
Location cf Proposal: Located in the vicinity of S.W. 4th Place and
Naches Avenue S.W.
Lead Ager cy: City of Renton Building and Zoning
Department
This proposal was reviewed by the ERC on September 19, 1984 and September 27, 1984,
following a presentation by Jerry Lind of the Building and Zoning Department. Oral
comments were accepted from: Gene Williams, James Matthew, Richard Houghton,
Michael Parness, Ronala Nelson, and Jerry Lind.
Incorporated by reference in the record of the proceedings of the ERC on application
ECF-094-134 are the following:
1. Environmental Checklist Form, prepared by: Delton J. Bonds, dated August 30,
1984.
2.Applications: Preliminary Plat (PP-089-84), Special Permit (SP-090-84), and
Var,ance (V-091-84).
3. Recommendations for a declaration of non-significance: Building and Zoning
Department, Utilities Engineering Division, Policy Development Department, and
the Police Department.
4. Recommendations for a declaration of significance: Fire Prevention Bureau.
5. Recommendation for more information: Parks and Recreation Department, Traffic
Eng neering Division, and Design Engineering Division.
Acting as the Responsible Official, the ERC has determined this development does not
have a significant adverse impact on the environment. An EN is not required under RCW
43.21C.030(2)(c). This decision was made after review by the lead agency of a complete
environmental checklist and other information on file with the lead agency.
Reasons declaration of environmental nori-significance:
This final declaration of non-significance shall be subject to the, following conditions
being complied with:
1.1 he cul-de-sac street proposed is not approved and must be redesigned to reflect
the layout shown on the conceptual land use/preservation plan dated May 21, 1982,
and ised as Exhibit No. 12 per Rezone No. R-129-80.
REI BUILQINO & ZONING DE 1TMENT
DEVELOPMENT APPLICATION REVIEWIsrine'`fi N
SEP 6 1984
POLICE
ECF - 094 - 84 pFVG!7Fanc:r:'T 1cPT
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TIT _E : BLACK RIVER TECHNOLOGY PARK
APPL1LAU fUN FOR Yxu..orTNARY PLAT AI RUvAL TO SUBDIVIDE
BRIEF DESCRIPTION OF PROJECT : APPROXIMATELY 71. 16 ACRES OF PROPERTY INFO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND MADING OF 42b,3UU
CUBIC YARDS. AND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY IS LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
n ENGINEERING DIVISION
l 1TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
Ti FIRE PREVENTION BUREAU
n PARKS & RECREATION DEPARTMENT
E BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
C,RPOLICY DEVELOPMENT DEPARTMENT
l ! OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZQNING DEPARTMENT
BY 5 : 00 P .M, ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION : Po/c7 7-
APPROVED 154 APPROVED WITH CONDITIONS NOT APPROVED
PreI •k nar pef
s
azreidall vKa..1...c r cevi.kl,"2
n.DATE : 044 / l 78Y-
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
Form lc -)
REP N BUILDING & ZONING DEI TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLILAIION t-OK PRELTMINARY PLAT APPROVAL TO SUBDIVIDE
BRIEF DESCR: PTION OF PROJECT: APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 425,5UO
CUBIC YARDS, AND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY IS LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n P• UBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
I (
ENGINEERING DIVISION
n TFAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
F• IRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
El BUILDING & ZONING DEPARTMENT
n P• OLICE DEPARTMENT
1 POLICY DEVELOPMENT DEPARTMENT
I ( OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M, ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION :
APPROVED I (
APPROVED WITH CONDITIONS n NOT APPROVED
V/ZG /7/1/cam Jd/G ri 6 77z4/ -
71
DATE : 2 7SIGNATUREOFRECTORORAUTHORIZEDREPRESENTATIVE
REVISION 5/1982
Form 182
REN. BUILDING & ZONING DEPOMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLILA11UN FOR PRELIMIrrARY PLAT APPRuVAL TO SUBDIVIDE
BRIEF DESCR IPTION OF PROJECT : APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 425,5UO
CUBIC YARDS, AND VARIANCE FROM SECTION NUMBERS 9-1108 (7)(K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION ;
THE PROPERTY IS LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n
I (
P• UBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
0 ENGINEERING DIVISION
l 1TF;AFFIC ENG , DIVISION SCHEDULED HEARING DATE :
fU1ILITIES ENG , DIVISION
n F• IRE PREVENTION BUREAU
i (
PARKS & RECREATION DEPARTMENT
I ! BUILDING & ZONING DEPARTMENT
l ( P• OLICE DEPARTMENT
I POLICY DEVELOPMENT DEPARTMENT
ri
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M . ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION :T///T'i
C APPROVED APPROVED WITH CONDITIONS NOT APPROVED
UTILITY APPROVAL SUBIECI TO 4/8-4
UTE COMERS ASI EEMENT • WATER ND
LATE COMERS AGREEMENT SEWER y S S-223 04
SYSTEM DEVELOPMENT CHARGE WATER y 's i7D, F2,42./3 PEc/P/zAir /-7/4‹
SYSTEM DEVELOPMENT CHARGE SEWER v/,ES / g/2. /3
l____--A,
SPECIAL ASSESSMENT AREA CHARGE WATER ivo
SPECIAL ASSESSMENT AREA CHARGE SEWER ND
APPROVED WATER PLAN YES
APPROVED SEWER PLAN yg5
APPROVED FIRE HYDRANT LOCATIONS
OY FIRE DEPT
FIRE FLOW ANALYSIS ES _
WV DATE :
0 44.
SIGNAT RE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE F t/
REVISION 5/1982 /
Fn rm 1 R7
REND BUILDING & ZONING DEFOMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLILNIIUN FOK NRELIMINARY PEAT APPROVAL TO SUBDIVIDE
BRIEF DESCR PTION OF PROJECT : APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 425,500
CUBIC YARDS, AND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24)(A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY IS LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
n ENGINEERING DIVISION
n TFAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n U1ILITIES ENG , DIVISION
n FIRE PFEVENTION BUREAU
n PARKS E RECREATION DEPARTMENT
I ( BUILDING & ZONING DEPARTMENT
E POLICE DEPARTMENT
l POLICY DEVELOPMENT DEPARTMENT
l ( OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P . M, ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION :L/
i
pi n
ek
APPROVED APPROVED W TH CONDITIONS
I ( NOT APPROVED
DATE : (/ 9'e)7 1/
SIGNATUR OF DI TOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
REN 4 BUILDING & ZONING DEP TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLILA11UIN rOR FRELIMINARY PLAT APPROVAL TO SUBDIVIDE
BRIEF DESCRIPTION OF PROJECT : APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 4"L5,5U0
CUBIC YARDS. AND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY S LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
l (
ENGINEERING DIVISION
n TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
El FIRE PREVENTION BUREAU
n PARKS & RECREATION DEPARTMENT
n BUILDIFG & ZONING DEPARTMENT
n POLICE DEPARTMENT
n POLICY DEVELOPMENT DEPARTMENT
n OTHERS
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION : f `'_ tre_Vejdn
11APPROVED I ( APPROVED WITH CONDITIONS
i ( NOT APPROVED
4-esS ieo a Lia S a n d c,./, {' dra•1/s 54/ i/ A (—
s re u,,-e, r; - /o , a4.ELT
0-o,sX-14 c `v •zProclefa
Compterc4 ro e4- s 're c.rc h Se -v, u90 yxe rats
D Q access a h9 vielc Mtn eve` ®R -;rc ,/`11/e 4914K •
Pt
DATE : /" ! - flit/
SIGNATURE 0= DIRECTOR 07R AUTHORIZE REPRESENTATIVE
REVISION 5/1982
Pnrm 1R7
OF RA,A
A
6 © 0 BUILDING & ZONING DEPARTMENT
RONALD G. NELSON - DIRECTOR
Nall
009 co
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0 -
ep SEP1°°
BARBARA Y. SHINPOCH
MEMORANDUM
MAYOR
DATE: NOVEMBER 8, 1984
TO: TIRE 'TtEVEre I
NOVA 7 1984
FROM: BUILDING & ZONING DEPARTMENT
SUBJECT: BLACK RIVER TECHNOLOGY PARK
ALTERRA CORPORATION
FILE NO. PP-089-84, SP-090-84, V-091-84
Please find attached a revised site plan for the above referenced project.
In this new plan you will note that the plat is now served by an emergency
access drive to the south.
Please review this plan. Your comments are needed urgently by FRIDAY.
NOVEMBER 9th AT 12:00 P.M. For your reference is attached, your earlier
comments on the development application review sheets.
4"'714. ; >416' 7)17 ee/
v7c)/ CS>c_.9 77/4„2,&
o ti 6
REP N BUILDING & ZONING DEI ITMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION VO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLIL.AI1UN I-OK VKELIMINARY PLAT APPROVAL TO SUBDIVIDE
BRIEF DESCRI 'TION OF PROJECT: APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE/WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 425,5UU
CUBIC YARDS, IND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC `.TREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY : S LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
flENSINEERING DIVISION
n TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
n FIRE PREVENTION BUREAU
n PARKS 8 RECREATION DEPARTMENT
n BUILDING & ZONING DEPARTMENT
n POLICE DEPARTMENT
n POLICY DEVELOPMENT DEPARTMENT
n OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M, ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION :ENO,/EI22//67
n APPROVED APPROVED WITH CONDITIONS I INOT APPROVED
Prow de aCW4 % 2a/6 em eftis a-.5 inchCc
tar astt,Q,
2, tee, andd R L/tatted n ez,zi ,cam
4--t-- .7\zi_e4- r/2-,
0-12
R,e4 DATE : 9-/8-^(94"
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
1 rm 12'7
REP N BUILDING & ZONING DEI TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICHI ION I-OK PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
BRIEF DESCRIPTION OF PROJECT: APPROXIMATELY 71.16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE, WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRA6ING OF 4Z5,5U0
CUBIC YARDS, L',ND VARIANCE FROM SECTION NUMBERS 9-1108 (7) (K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC ' TREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY S LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n P• UBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
n ENGINEERING DIVISION
TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
n UTILITIES ENG , DIVISION
n F• IRE PREVENTION BUREAU
n PARKS & RECREATION DEPARTMENT
C B• UILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
I ( POLICY DEVELOPMENT DEPARTMENT
I ( OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M, ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION : I L,
1 /
L, e'), /ti
l (
APPROVED C APPROVED WITH CONDITIONS 4NOT APPROVED
Ci/ 1ai/tn/.
7 /
i
p
L o'z e c.,v 'S / 1f '- 1 e 40T gr.):
WLot4-ti:` cl(e T l Kr i h cc, d 1 T Ya m. a1-r s •
2, ce 2iyseS
cy, P v /ii /e .S7"y cl="c/ /J 1774
7 cue ey 91-1•-a, -s
741) C, ><; St a `s ,
7-8 el! c.
IQ-
PrmU/de -,.per G E fva.c «
1?7,_z
DATE :
SIGNATURE OF DIRECTOR OR AUTHORIZZE6REPRESENTATIVREPRESENTATIVE
REVISION 5/1982
Form 182
RENON BUILDING & ZONING DEFOTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - 094 - 84
APPLICATION NO(S) : PRELIMINARY PLAT (PP-089-84) ,SPECIAL PERMIT (SP-090-84) , VARIANCE
V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TIT_E : BLACK RIVER TECHNOLOGY PARK
APPLTLAIlUN FUK NRELTN1INARY PLAT TPPROVAL TO SUBDIVIDE
BRIEF DESCRIPTION OF PROJECT: APPROXIMATELY 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR
FUTURE OFFICE /WAREHOUSE USE, AND SPECIAL PERMITAPPLICATION FOR FILL AND GRADING OF 425,5UU
CUBIC YARDS, AND VARIANCE FROM SECTION NUMBERS 9-1108 (7)(K) AND 9-1108 (24) (A6) TO ALLOW
A CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION :
THE PROPERTY IS LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
TO :
n PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 9-19-84
ENGINEERING DIVISION
n TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
nu- ILITIES ENG , DIVISION
n FIRE PREVENTION BUREAU
51 PARKS RECREATION DEPARTMENT
n BUILDIFG & ZONING DEPARTMENT
n POLICE DEPARTMENT
n POLICY DEVELOPMENT DEPARTMENT
n OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 : 00 P .M. ON TUESDAY, SEPTEMBER 18, 1984
REVIEWING DEPARTMENT/DIVISION : P4-1 k
Iv APPROVED n APPROVED WITH CONDITIONS n NOT APPROVED
7-li/e- ietcm fl/AJ/,v 6-o /'' Nv 5/ CC / 1'
2 E"G A}- I v 6-L y' .s Ai 4i'G L. - 4 Epp/ 4fr
o w -rAtE Jo e /ecun/D /Nfr 4Rt 4 Fie- 6
f u . v/ v ft t: o r / 7`_.S' 6-to 4S -no o 01 ' 't 7 `6'
I m ,'4 7 o f 7friE F/L' 6 1/45 To ,B 7WE
s S v e
j
Ai o r- 7 e-' Coe__ ,o c sec, vs .6-
tee y "n/ L.E C v L. t
M k 6 4 G 4.e4 7'` O'Q4 6 s7--A/P,
DATE :
SIGNA URE OF DIRECTOR 0 AUTH IZED REPRESENTATIVE
REVISION 5/1982
F nrm 1 P?
f.
Date c: rculated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
EINVIROINHEINTAL CHECKLIST REVIEW SHEET
E C F - 094 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICATION No (s ) . VARIANCE (V-091-84)
PROPONI:NT : ALTERRA CORPORATION
PROJEC - TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
YOFFICEMAREHOUSE E AND SPECIAL PERMIT APPLICATION
ARnS, VC VARTANCEFROMSECTIONNUMBERS 9-1108(7) (K)
OR F ILL AND
1108(7) (K) AND9-1108(24) (A6)
OF 425,500 CUBIC
TOALLOWA
CUL-DE- 3AC STREET LENGTH OF 2,500 FEET.
L O CATI1 N : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AEA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELO 'MENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Typographic changes :
2 ) Direct/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life : 4---
6 ) Noise :
7 ) Light & glare :
8 ) Land Use ; north :
east :
south :
west :
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) : Defai( TV-Ic. Ana ((re-S NeA.
traffic impacts :IV/ !` vim 21^ le
14 ) Public services : I
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
C I'Part I c I e 0 k CO Lvt y- 15 /41Yee iv iif
2 U l 11'=ao RNlovkf cif(eitw1ikec( 2 fev riii .7N „3z_5
Q P-ro v -e Ufa.fa 7P740,L 4-u S
2) P-, v/d--e S,-veef /. f 4 z i 4/l9k raZtcJ'S Ci tZ)' s'tta,.iare,
Recommendation : DNSI DOS More Information_
Reviewed by :4.4.
ti tle : /, ., 4;421 s1L
Date : 57/ / 77`.E5/,
FORM: ERC-06
Date c. rculated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
EMIVIRONHE\ITAL CHECKLIST REVIEW SHEET
E C F - 094 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICiATION No (s ) . VARIANCE (V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71.16 ACRES OF PROPERTY INTO 46 LOT.) FOR FUTURE
OFFICEMARYARDS, NDEHOUSEVARTANCFEFROMDSECTIONL PERMIT APPLICATION
NUMBERS 9-1108(7) (K)
FOR
ANDh9-1108(24)(A6)
ILL b Or
TO ALLOW5A0 CUBI(
CUL-DE-;AC STREET LENGTH OF 2,500 FEET.
LOCATIi)N : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE 06) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) DLrect/Indirect air quality :
3 ) Writer & water courses :
4 ) P .ant life :
5 ) Animal life :
6 ) Noise :
7 ) L Lght & glare :
8 ) Lund Use ; north :
east :
south :
west :
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Homan health :
18 ) A3sthetics :
19 ) Recreation :
20 ) Archeology/history : V
COMMENTS : .`/ ) 4 r4ii U7l l e SZr,pti5 / u/v''
ale ,
2 ) rn u-t.e h• i,444074 w r u i
e&tam' /
Recommendation : DNSI DOS More Information-
10
Reviewed by : litle :
Date :
FORM: E] C-06
Date circulated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
ENVIIRONMENTAL CHEEIKLIST REVIIEW SHEET
ECF - I)94 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLIC \TION No (s ) . VARIANCE (V-091-84)
PROPON :NT : ALTERRA CORPORATION
PROJECI TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE/'JAREHOUSE USE, AND SPECIAL PERMIT APPLICATION FOR FILL ANU GRAVING OF 425,500 CUBIC
YARnS, XNn VARIANCE FROM SECTION NUMBERS 9-1108(7) (K) AND 9-1108(24)(A6) TO ALLOW A
CUL-DE-3AC STREET LENGTH OF 2,500 FEET.
L OCATII)N : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life :
6 ) Noise :
7 ) L .ght & glare :
8 ) Lond Use ; north :
east :
south :
west :
Land use conflicts :
V..ew obstruction :
9 ) Notural resources :
10 ) R .sk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) A] cheology/history :
COMMEN1 S : S/itd C Th,1L GPeie.r s A.4Gd /iv T/i'J
filee# Al. u 41. 4e-A '' f° f3 eeA, OPAfT'e 9i G V etV iee / i
4 v 7 Spa-- 7//o7 toec// /,/6/' e-AdeG-- , c 7we6r-w 4-
Cco1. iH 116. S/7 c .9wv/0, , 7i-iRvdow R414,9 (Ad AI AT iyyl'/fcl`
VA(de o& TN AVM 4 Pi r
Recommendation : DNSI DOS More Information 1.
Q -
Reviewod by : 1 7/
l litle :
Date :
FORM: EFC-06
Fib
Date circulated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
ENIVIRONMIENITAL CHECKLIST REVIEW SHEET
E C F - 094 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICATION No (s ) . VARIANCE (V-091-84)
PROPOI ENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71.16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE,'WAREHOUSE USE, AND SPECIAL PERMIT APPLICATION FUR FILL ANU GRAuiNu OF 425,500 CUBI(
YARnS, ANn VARIANCE FROM SECTION NUMBERS 9-1108(7) (K) AND 9-1108(24)(A6) TO ALLOW A
CUL-DE -SAC STREET LENGTH OF 2,500 FEET.
LOCAL ON : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
z.
2 ) Direct/Indirect air quality :
3 ) Dater & water courses :
4 ) Flant life :
5 ) Inimal life : L"
6 ) Noise :
7 ) Light & glare :
8 ) Land Use ; north :
east :
south :
west : Lv
Land use conflicts : l/
lieu obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) :
traffic impacts :
14 ) Fublic services :
15 ) Energy : L
16 ) Utilities :
17 ) Human health : v
18 ) Aesthetics :
19 ) Fecreation :
20 ) Archeology/history :
COMMENTS : _ --
IVO hfe zns D' acee-S Qre, ter ae,r 9Ar S-,1P e-
4c./'D -D beel (-A de Sam de Not G lAl !l
W i ll c;r e, J p N frot e S E P 6 1984
Recommendation : DNSI DOS More Information
R e v i e v e d by : I i t l e : J,15 f)eC—/a
Date : j. 1.
FORM: ERC-06
V1I —I-flES
Date circulated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
EM llIROMIff9EMITAL CHECKLIST REVIEW SHEET
E C F - 094 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICATION No (s ) . VARIANCE (V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE 'WAREHOUSE USE, AND SPECIAL PERMIT APPLICATION FOR FILL ANU URAU1NG ar 425,500 CUBIC
VARnc, ANn VARTANCF FROM SECTION NUMBERS 9-1108(7) (K) AND 9-1108(24)(A6) TO ALLOW A
CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOC AT:LON : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELHPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) ' opographic changes : y'
2 ) Direct/Indirect air quality :
3 ) IJater & water courses :
4 ) Plant life : V
5 ) Animal life :
6 ) Noise :
7 ) Light & glare : V
8 ) Land Use ; north :
east :
south :
west :
Land use conflicts :
liew obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment : b2
12 ) Number of Dwellings :
13 ) drip ends ( ITE ) : v/
raffic impacts :
14 ) Public services :
15 ) Lnergy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
Recommendation : DNSI DOS More Information
Revie,ued by : Title : l/T/l/l t0 4-i-/.E ,/A/
Date :
FORM: ER -0
7CYU CE
Date cirl:ulated ; SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
ENVIRONMENTAL CHEEIKLIST REVIEW SHEET
ECF - 09z - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICATION No (s ) . VARIANCE (V-091-84)
PROPONENT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief DE scription of Project : 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OFFICE/WIRYYARnS, At,fEHOUSEVARIANCEEFROMDSECTIONL PERMIT APPLICATION
NUMBERS 9-1108(7) (K)
FORANDFILL ANU
9-1108(24)(A6l)bTOrALLOW5A0 CUBIC
CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Tcpographic changes :
2 ) Direct/Indirect air quality : _
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life :
6 ) Noise :
7 ) Light & glare :
8 ) Land Use ; north :
east :
south :
west :
Land use conflicts :
view obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Humber of Dwellings :
13 ) {rip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
Reconmendation : DNSI V DOS More Information
Reviewed by : AA/c—_ title :
Date : e 91°/67-g /
FORM: ERC-06
I vuGL1 V.
Date c..rculated : SEPTEMBER 6, 1984 Comments due : SEPTEMBER 18, 1984
ENVIRONMENTAL CHECKLIST REVIEW SHEET
E C F - 1194 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLIC \TION No (s ) . VARIANCE (V-091-84) DIY OF RENTON
PROPON :NT : ALTERRA CORPORATION E P u 1984
POLICY
P R O J E C T TITLE : BLACK RIVER TECHNOLOGY PARK DEVEL OPmcNT rip p7
APPLICATION FOR PRELIMINARY PLAT APPROVAL 10 SUBDIVIDE
Brief description of Project : 7L,16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
V
E AND LL
ARn , Nfl VARIANCFFROMSEC
SPECIAL
SECTION 9-
PERMIT APPLICATION F OR F OF
1108(7) (K) AND9-1108(24) (A6) TOALLOW425,500 CUBIC
S
CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
L OCATIIN : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Direct/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life :
5 ) Animal life :
6 ) Noise :
7 ) Light & glare :
8 ) Land Use ; north : r-#w
east : i l or• l/l/ods U,_
south : (,(2,f
vest : CA°(2(0 1Qc)
Land use conflicts :
View obstruction :
9 ) Natural resources :
f
10 ) Risk of upset :
11 ) Population/Employment :
12 ) Number of Dwellings :
13 ) Trip ends ( ITE ) : Arefrj 5
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Ltilities :
17 ) Fuman health :
18 ) Aesthetics :
19 ) Fecreation : v `
20 ) Archeology/history :
COMMENTS :
1-1 -oao w- a 04 444„ ,
pD
rJa
Recommendation :` DN I // DOS More Information
Revieved by : 6/4(). un 1 itle : s5/5 71/3/pie/P
Date : COilgy
FORM: 1RC-06
B.i.$)qi-zoK)E.
Date circulated : SEPTEMBER 6, 1984 Comments due • SEPTEMBER 18, 1984
ENIVIRONMIENTAL CHECKLIST REVIEW SHEET
E C F - 194 - 84
PRELIMINARY PLAT (PP-089-84) , SPECIAL PERMIT (SP-090-84) ,
APPLICATION No (s ) . VARIANCE (V-091-84)
PROPON=NT : ALTERRA CORPORATION
PROJECT TITLE : BLACK RIVER TECHNOLOGY PARK
APPLICATION FOR PRELIMINARY PLAT APPROVAL TO SUBDIVIDE
Brief Description of Project : 71. 16 ACRES OF PROPERTY INTO 46 LOTS FOR FUTURE
OYARnS, ANRnEVARTANCEE FROM DSECTION LNUMBERS 9-1108(7) (K)
PERMIT APPLICATION L
AND
OR t9-1108(24) (A6ILLANUl)
TO ALLOW
OF 5A0 CUBE
CUL-DE-SAC STREET LENGTH OF 2,500 FEET.
LOCATION : LOCATED IN THE VICINITY OF S.W. 4th PLACE AND NACHES AVENUE S.W.
SITE AREA : 71. 16 ACRES BUILDING AREA (gross ) N/A
DEVELOPMENTAL COVERAGE (%) : N/A
IMPACT REVIEW NONE MINOR MAJOR MORE
INFO
1 ) Topographic changes :
2 ) Cirect/Indirect air quality :
3 ) Water & water courses :
4 ) Plant life : X
5 ) Animal life :
6 ) Noise :X
7 ) Light & glare :
8 ) Land Use ; north :
east :
south :
west :
Land use conflicts :
View obstruction :
9 ) Natural resources :
10 ) Risk of upset :
11 ) Population/Employment :
12 ) t',umber of Dwellings :
13 ) lrip ends ( ITE ) :
traffic impacts :
14 ) Public services :
15 ) Energy :
16 ) Utilities :
17 ) Human health :
18 ) Aesthetics :
19 ) Recreation :
20 ) Archeology/history :
COMMENTS :
1
Recommendation : DNSI Y DOS__ More Information
Revieed; by : j „ ( , Title :
Date : V .7 Z-(//'07
FORM: ::RC-06
0515N
ENVIRONMENTAL REVIEW COMMITTEE
AGENDA
SEPTEMBER 19, 1984
THIRD FLOOR CONFERENCE ROOM:
COMMENCING AT 10:00 A.M.
OLD BUSINESS:
ECF-014-84 HONEY CREEK ASSOCIATES
R-014-8/, Application to rezone 48.5 acres of property from G-1 to G-1,
PPUD-0]5-84 R-1, and R-2 and for approval of a preliminary PUD consisting of a
multi-family condominium development having 185 housing units.
This revised application is to be constructed in two phases. The
first phase will be 99 units to be located on the south side of Honey
Creek; property located in the vicinity of the 2200 block of
Jefferson Avenue N.E.
ECF-091-84 FETTERLY ANNEXATION
Reconsideration is being asked from Robert Fetterly of the final
declaration of significance issued by ERC, to annex 0.9 acre of
property into the City of Renton for future single family use;
located at the southeast corner of 140th Avenue S.E. and S.E.
116th Street (N.E. 10th Street).
NEW BU iINESS:
ELF-094-84 ALTERRA CORPORATION
PP-089-34 Application for preliminary plat approval to subdivide
SP-090-134 approximately 71.16 acres of property into 46 lots for future
V-091-84 office/warehouse use (Black River Technology Park), and special
permit application for fill and grading of 425,500 cubic yards, and
variance from Section 9-1108(7)(K) and Section 9-1108(24)(A)(6) to
allow a cul-de-sac length of 2,500 feet; located in the vicinity of
S.W. 4th Place and Naches Avenue S.W.
ECF-09`-84 WILLIAMS/BAI ES
B-331 Application for building permit to construct a 16 unit apartment
complex, consisting of two, 8-unit buildings (Fir One Apartments);
located along the east side of Monroe Avenue N.E. between N.E.
11 th Place and N.E. 12th Street.
ECF-09E -84 AERODYNE CORPORATION
CU-092- 84 Application for conditional use permit to allow a 4-unit aircraft
hanger to be constructed in a P-1 (Public Use) zoned district;
located at the south end of the Renton Municipal Airport at 340
Airport Way South.
INFORN ATION:
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
A proposed declaration of non-significance has been issued for the
construction of a 160 stall Park 'n Ride lot on property leased from
St. Matthews Lutheran Church. The lot will be maintained by
METRO Transit. The proposal also includes paving of the church's
existing gravel parking lot; located at the northeast corner of
Edmonds Avenue N.E. and N.E. 16th Street. Any comments are
due by September 28, 1984.
ITY OF RENTC T(
Ii5 BUILDING & ZONING DEPARTMENT 5 P -o? o-
4 0 - 8
NTS MASTER APPLICATION
NOTE TO APPLICANT: Since this is a comprehensive application form, only those
items related to your specific type of application(s) are to be completed.
Please print or type. Attach additional sheets if necessary.)
APPLICANT I TYPE OF APPLICATION
NAME FEES
Alterra Corporation a REZONE*(FROM TO
ADDRESS
710 Cherry Street 0 SPECIAL PERMIT*
CITY ZIP
r E] TEMPORARY PERMIT*
Seattle , W\ 98104 CD CONDITIONAL USE PERMIT*
D SITE PLAN APPROVAL
TELEPHONE
382-J333 C21 GRADING AND FILLING PERMIT 1595.00
206 ) No. of Cubic Yards: 4 2 5, 5 0 0
7 VARIANCE 9-1108(7) (K) $ 150.00
CONT ACT PERSON From Section: 9-1108(24) (A6)
Justification Required
NAME Steve Speidel
Richard Carothers Associates 2855.00
ADDRESS
SUBDIVISIONS:
814 East Pike Street D SHORT PLAT
CITY ZIP D TENTATIVE PLAT
1 °a t t 1 e WA 9 8 1 2 2 PRELIMINARY PLAT
EPHONE Q FINAL PLAT
206 ) 324-5500 D WAIVER
Justification Required)
OWNER NO. OF LOTS:
46
PLAT NAME: Blackriver Technology Park
NAME
J.A.G. - RENTON PROPERTIES ASSOC.
ADDRESS
PLANNED UNIT DEVELOPMENT:
710 Cherry Street D PRELIMINARY
CITY ZIP D FINAL
Seattle , VGA 98104
P.U.D. NAME:
TELEPHONE
206 ) 382-0333 D Residential D Industrial
DCommercicl ED Mixed
LOCATION
MOBILE HOME PARKS:
PROPERTY ADDRESS D TENTATIVE
Blackriver Technology Park D PRELIMINARY
EXISTING USE PRESENT ZONING
Reparian-Forest MP
FINAL
PROPOSED USE
PARK NAME:
fice/Warehouse NUMBER OF SPACES:
r
Total Acres to be developed 51 -
1.--®
ENVIRONMENTAL REVIEW COMMITTEE 100.
SQ. FT. ACRES
TOTAL FEES 4700.00
AREA: 7 0±
STAFF USE ONLY -- ADMINISTRATIVE PROCESSING
DATE STAMP I APPLICATION RECEIVED BY:
APPLICATION DETERMINED TO BE:
DAccepted
11ITY OF RF" %{ _, r Incomplete Notification Sent On By:
C
Initials)
44
DATE h'
r1 ADDITIONAL MATERIAL RECEIVED BY:l
6 3 0APPLICATION DETERMINED TO BE:
1°64541 . D Accepted
BUR G/ZC .•.0 11 } i D Incomplete Notification Sent On By:
Initials)
ROUTED TO:
MI Buildi:4;; Design Eng. Fire El Parks
Police
fit
Policy Dev. Cg Traffic Eng. 51,1 Utilities
REVISION 5/1982
Legal description of property (if more space is required, attach a separate sheet).
ATTACHED
AFFIDAVIT
I, being duly sworn, declare that I am
authorized representative to act for the property owner,L owner of the property involved
in this application and that the foregoing statements and answers herein contained and the
information herewith submitted are in all respects true and correct to the best of my knowledge
and belief.
SUBS73ED AND SWORN TO BEFORE ME THIS
6 . DAY OF
19L1Z
NOTARY PUFJL;C IN AND FOR THE STATE OF
WASHINGTON, IDING AT
s , ;, / 7?
5„..e...r/ / S •Q.,.6.;r
Name of Notary Public) Signature of Owner)
7/D c c,2'v C% S/.=/j/LE f U4 loti 710 Cherry Street
Address) . Address)
Q^1ni.Seattle , WA
City) State) (Zip)
1 s .o YT t.:;
2 0 6 ) 332-0333
Telephone)
Acceptance of this application and required filing ,ee does not constitute a complete
application. Plans and other materials required to constitute a complete application are listed in
the "Application Procedure."
Form 0174
7..
PROJECT DESCRIPTION
I. PROJECT TITLE
Blackriver Technical Park, Clearing and Grading, Renton, Washington
II. SCOFE OF WORK
Blackriver Technical Park is located on 71.16 acres of land to the south of
The Burlington Northern Railroad tracks and to the north of Washington Tech-
nicil Park and the renovated P-1 Channel .
The project includes clearing and grading approximately 51 acres of the north
eas1.erly portion of the site. There are preserve areas containing significant
trees within the clearing area that will be retained. (See attached, "Guide-
lines for the Preservation Outside the 'Preserve' Zone"). Over 19 of 71.16
acres shall be retained as natural preserve areas or are currently being
utilized for the renovation of the P-1 Channel .
The grading will include raising existing grades up to base grades for future
access drive, utilities and building development. The grades will increase a
maximum of 12 feet at the west end of the site in order to accommodate exist-
ing sanitary sewer pipe invert elevations offsite. Fills at the southeast
will also bring existing grades above the 100 year flood levels.
The transition fill slopes will be set at 2 to 1 maximum steepness and cut
slo)es set at 3 to 1 to assure stability of the railroad tracks.
III. Fill Material
A. Type - The material to be used for this project will be from various
sources. Approximately 30,000 cubic yards of material will be from
on-site excavated from the old railroad grade. Approximately 95 to
97,000 cubic yards of material is currently being deposited on-site from
the P-1 Channel project. Material from the I-90, Mercer Island and Mt.
Baker Ridge Tunnel may be deposited on-site. Portions of the soils
reports containing soil logs are attached herein.
Other sources of material shall be utilized as they become available.
There shall be a soils engineer on-site to grade and inspect all import-
ed materials. The entire filling will require approximately 425,500
cubic yards of material .
B. Construction Methods - The following are the approximate steps to be
followed during the placement of all fills:
1 ) Drain area within limit of work of standing water.
2) Clear vegetation, except significant trees to be preserved.
3) Place filter fabric on soft soils and on access drive.
4) Establish erosion controls at limit of work.
5) At Access Road place 18 inches of material on top of woven filter
fabric as a fill mat compacted to 95%.
6) Place and compact additional soils in 8 inch lifts throughout fill
areas.
7) Installation of the fill material shall be in accordance with
Standard Specification for Municipal Public Works Construction"
1981 Edition, Washington State Chapter APWA.
C. Truck Routing - Freeway: All loaded trucks shall approach the site from
I-5 North and/or Southbound, exit at Empire Way South, turn southeast and
continue to Rainier Avenue South, turn South to South 7th Street, head
west to Powell Ave S.W. and North to enter the site.
Load limits on I-405 may allow empty truck to use 1-405 as an alternate
route.
Arterials and City Streets: Access to the site may also utilize Monster
Road at the west end of the site. Truck traffic shall use Empire Way
South and exit at 68th Ave. S. , proceed to Monster Road S.W. and access
the site utilizing the existing 12 foot wide dirt road, currently being
used for the P-1 Channel Project.
IV. Otis : Control
Pri )r to hydro-seeding, dust control shall be accomplished by controlling
moi ;ture content of soil and sprinkling.
V. Hou^s of Operation
The hours of sitework shall be the general work hours of 7AM to 5PM, 5 days
a week. Truck hauling to the site may be reduced during AM/PM "Rush Hour" ,
traffic periods to reduce congestion of arterials and city streets.
VI. Rehjbilition and Seeding
See the attached - Erosion Control Specification, Section 02485.
VII. Project Timing
The clearing and grading shall start upon issuance of a permit from the
City of Renton (Est. September, 1984) , and continue until the proposed
grades are reached.
i.
JUSTIFICATION OF VARIANCE
FOR CUL-DE-SAC LENGTH
The Blackriver Technology Park is located on a distinctly shaped parcel of
land. The arc shaped northern boundary is formed by the Burlington Northern
Railroad r ght-of-way. More than half of the southern boundry is formed by the P-1
Channel , City of Renton buffer property, and preserve areas. Therefore, the only
unencumbered border of the site is the southerly portion that extends east-west
between Powell Avenue and Natches Avenue.
To aid circulation and promote efficient access, Blackriver Technology Park
proposes t) link Powell and Natches Avenues. However, in order to service lots in
the "bounc in" western portion of the site, it is necessary to provide a
cul-de-sac.
The cal-de-sac shall extend 2500' beyond the "T" intersection of Natches and
The applicant for Blackriver Technology Park (Alterra Corporation) , would
suffer undue hardship if a loop road were provided to the western portion of the
site. Currently over 11% of the developable land will be given over to roadway
right-of-way. If a loop road were provided approximately 20% of the developable
area would be roadway right-of-way.
The applicant also would suffer undue hardship as well as the City of Renton
if a 'confection' to Monster Road were proposed. The roadway would impact and
disturb City of Renton green-belt, buffer and preserve areas. The property is less
than 40' vide and could not support a 44' wide road with a 60' right-of-way
adjacent i,o Monster Road. Impacts would also be caused by the alignment of the
Burlingtor Northern track, signals and control boxes.
As ncted above, the variance is necessary because of the special circumstances
of developable land size, shape, the location of adjacent properties, i.e. P-1
Chanral and Burlington Northern Railroad. The high percentage of area necessary to
provide a connection deprives the applicant of development rights and privileges
enjoyed b.]' other property owner's in the vicinity.
The granting of a variance to allow a 2500' cul-de-sac will not be materially
detrimental to the public welfare, nor will it cause injury to property or
improvements in the vicinity. To the contrary, the applicant will provide
utilities in the developable area and beyond to provide service connections for
future use to the north and west. The applicant will also provide all the
cul-de-sa : improvements per city codes and regulations, at no cost or harm to the
public.
The applicant is not asking for a variance that would constitute a special
privilege that is inconsistent with other properties of similar size and/or shape
located within the vicinity.
The need for variance is directly related to the geographical constraints of
the Railroad, P-1 Channel and Greenbelt, Buffer and City of Renton properties. The
applicant is providing access to the developable parcels of the site, which does
not constitute a special privilege.
Due io the desire of the applicant to efficiently provide parcels of land of
approximately three-quarters of an acre in size and to be in compliance with the
cities sub division code, a cul-de-sac of 2500' in length is necessary. A
cul-de-sac of lesser length or a loop road would cause undue hardship on the
applicant by reducing the parcels to a size of undevelopable proportions.
The Parcel sizes currently proposed are developable within the current zoning
and proposed land usage.
The applicant feels the above statements provide ample background and
justification to warrant a variance of the cul-de-sac length to provide that
be extended to 2500' in length.
CITY OF RENTON, WASHINGTON
ENVIRONMENTAL CHECKLIST FORM
FOR OFFICE LSE ONLY
Application No. Z/"n=
C,q© / - ZS _s/"/- D90 -`7, V' U9 - /
Environmental Checklist No, E C-F
PROPOSED, date: FINAL , date:
Declaration of Significance 1:1Declaration of Significance
Declaration of Non-Significance
T
Declaration of Non-Significance
COMMENTS :
Introduction The State Environmental Policy Act of 1971, Chapter 43.21C, RCW, requires
all state and local governmental agencies to consider environmental values both for their
own actions and when licensing private proposals . The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment.
The purpose of this checklist is to help the agencies involved determine whether or not a
proposal is such a major action.
Please answer the following questions as completely as you can with the information
presently available to you. Where explanations of your answers are required , or where
you believe an explanation would be helpful to government decision makers , include your
explanation in the space provided, or use additional pages if necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant to the answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
The following questions apply to your total proposal , not just to the license for which
you are currently applying or the proposal for which approval is sought. Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
of the agencies which will be involved to complete their environmental review now, with-
out duplicating paperwork in the future.
NOTE: This is a standard form being used by all state and local agencies in the State
of Washington for various types of proposals. Many of the questions may not apply to
your proposal . If a question does not apply, just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
I . BACKGR( UND
1. Nime of Proponent ALTERRA CORPORATION
2. Address and phone number of Proponent:
710 CHERRY ST.
SEATTLE, WA 98104 (206) 382-0333
3. Dite Checklist submitted July, 1984
4. Acency requiring Checklist City of Renton Building & Zoning Dept.
5. N:me of proposal , if applicable:
Blackriver Technology Park
6. Nature and brief description of the proposal (including but not limited to its
size general design elements and outer factors that will give. an accurate
urderstanding of its scope and nature) :
The general site consists of over 70 acres. An area of over 51 acres
shall be filled with approximately 425,000 cubic yards of material .
Fill shall serve as base for future office/manufacture structure and
an access road. For detailed information about future development see
draft and final EIS "Blackriver Office Park" April 1981 & 82.
2-
7. Location of proposal (describe the physical setting of the proposal , as well
as the extent of the land area affected by any environmental impacts , including •
any other information needed to give an accurate understanding of the environ-
mental setting of the proposal ) :
The site is located south of the Burlington Northern Railroad right-of-way.
To the east is the Earlington Woods P.U.D. and to the south is the
Washington Technical Park.
8. Estimated date for completion of the proposal :
Filling shall be completed as suitable material becomes available.
9. List of all permits , licenses or government approvals required for the proposal
federal , state and local--including rezones) :
Grading and filling permit City of Renton
10. Do you have any plans for future additions , expansion, or further activity
related to or connected with this proposal? If yes , explain:
Yes: Water, sanitary sewer and storm drainage utilities shall be
installed as well as Blackriver Blvd. (access road) . Future structures
shall be constructed.
11. Do you know of any plans by others which may affect the property covered by
your proposal ? If yes , explain:
Yes: SCS is currently using the site as a excaved soils stockpile.
12. Attach any other application form that has been completed regarding the pro-
posal ; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
See Attached: Master Application Form
II . ENVIRONMENTAL IMPACTS
Explanations of all "yes" and "maybe" answers are required)
1) Earth. Will the proposal result in:
a) Unstable earth conditions or in changes in geologic
substructures? X
YES MAYBE NO
b) Disruptions, displacements , compaction or over-
covering of the soil?X
YES MAYBE NO
c) Change in topography or ground surface relief
features? X
111/1YESMAYBEWU—
d) The destruction, covering or modification of any
unique geologic or physical features?X
YES MAYBE NO
e) Any increase in wind or water erosion of soils,
Xeitheronoroffthesite?
YES MAYBE NO
f) Changes in deposition or erosion of beach sands, or
changes in siltation. deposition or erosion which
may modify the channel of a river or stream or the Xbedoftheoceanoranybay, inlet or lake?
Explanation: B: The proposal is to fill w/425,000 CY ovelsexiTYM No
elevations. C: See above. D: The clearing of trees and vegetation
which may be considered unique. E: Only the limited amount that may occur
during construction. F: The current SCS construction and work within the
P-1 channel and this proposal change the flood boundry on site.
3-
2) Air. Will the proposal result in:
a) Air emissions or deterioration of ambient air
quality?X
YES MAYBE NO
b) The creation of objectionable odors?
X
YES MAYBE ii0--
c) Alteration of air movement , moisture or temperature,
or any change in climate , either locally or
Xregionally?
YES MAYBE NO
Explanation : C: Due to the reduction of existing vegetation, there
may be very minor localized changes .
3) Water. Will the proposal result in:
a) Changes in currents , or the course of direction of
water movements , in either marine or fresh waters? X
YES MAYBE NO
b) Changes in absorption rates , drainage patterns , or Xtherateandamountofsurfacewaterrunoff?
YES MAYBE NO
c) Alterations to the course or flow of flood waters?
X
II/1° d) Change in the amount of surface water in any water
YES MAYBE NO
body? X
YES MAYBE NO
e) Discharge into surface waters, or in any alteration
surface water quality, including but not limited to
Xtemperature , dissolved oxygen or turbidity.
YES MAYBE WU—
if) Alteration of the direction or rate of flow of
Xgroundwaters?
YES MAYBE NO
g) Change in the quantity of ground waters , either
through direct additions or withdrawals , or through
Xinterceptionofanaquiferbycutsorexcavations?
YES MAYBE NO
n) Deterioration in ground water quality, either through
direct injection , or through the seepage of leachate ,
phosphates , detergents , waterborne virus or bacteria ,
Xorothersubstancesintothegroundwaters?
YES MAYBE NO
i ) Reduction in the amount of water otherwise available Xforpublicwatersupplies?
YES MAYBE
Explanation: B: Due to imported soil types and compaction, the ab-
sorption rates will change. Also the patterns will change due to
proposed contours and elevations.
11110 4) Flora. Will the proposal result in:
a ) Change in the diversity of species , or numbers of any
species of flora (including trees , shrubs , grass , crops ,
microflora and aquatic plants)?X
YES MAYBE NO
b) Reduction of the numbers of any unique , rare or
endangered species of flora? X
YES MAYBE NO
c) Introduction of new species of flora into an area, or
in a barrier to the normal replenishment of existing
species? X
YES MAYBE NO
d` Reduction in acreage of any agricultural crop? X
YES MAYBE NO
ExElanation: A: Clearing of trees and shrubs shall reduce numbers.
B: (See above) The area is a reparian forest which is unique in the area.
C: The introduction of errosion control grasses and the prevention of the
return of existing tree types in the areas of fill .
4-
5) Fauna. Will the proposal result in:
a) Changes in the diversity of species, or numbers of 111/1anyspeciesoffauna (birds, land animals including
reptiles, fish and shellfish, benthic organisms,
insects or microfauna)? X
YES MAYBE !ice
b) Reduction of the numbers of any unique, rare or X
endangered species of fauna?
YES MAYBE NO
c) Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement X
of fauna?
YES MAYBE NO
d) Deterioration to existing fish or wildlife habitat?
YES MAYBE NO
Explanation: A: Due to clearing and filling operations species may
relocate to preserve areas. C: New species may use the area after
the grasses take hold.
6) Noise. Will the proposal increase existing noise levels? X
YES MAYBE NO
Explanation: Construction noises and truck noise may increase but
shall be short term.
11110
7) Light and Glare. Will the proposal produce new light or
glare? X
YES MMYBE tV
Explanation:
8) Land Use. Will the proposal result in the alteration of the
present or planned land use of an area? X
YES MB NO
Explanation: The present land use is reparian forest. However, the zoning
is MP and the proposal is to clear and fill part of the site.
9) Natural Resources. Will the proposal result in:
a) Increase in the rate of use of any natural resources? X
YES MAYBE NO
b) Depletion of any nonrenewable natural resource?
X
YES MAYBE NO
Explanation: A: The proposal will use soil and rock suitable for such
filling operations.
1111/
10) Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous substances (including,
but not limited to, oil , pesticides, chemicals or radiation)
in the event of an accident or upset conditions? X
YES M-B W
Explanation: Only which is typical in the construction processes
11) Population. Will the proposal alter the location, distri-
bution, density, or growth rate of the human population
of an area? x
YY u- MAYBE
Explanation:
5-
12) Housing. Will the proposal affect existing housing, or X
create a demand for additional housing?
YES MAYBE NO
Explanation:
13 Transportation/Circulation. Will the proposal result in :
a) Generation of additional vehicular movement?
X
YES MAYBE NO
b) Effects on existing parking facilities , or demand X
for new parking?
YES MAYBE NO
c) Impact upon existing transportation systems?
X
YES MAYBE NO
d) Alterations to present patterns of circulation or X
movement of people and/or goods?
YES MAYBE NO
e) Alterations to waterborne, rail or air traffic? X
YES MAYBE NO
f) Increase in traffic hazards to motor vehicles , X
bicyclists or pedestrians?
YES MAYBE NO
Explanation:C & F: The use of large trucks to bring soils to the
site via freeways and city streets .
14) Public Services. Will the proposal have an effect upon, or
result in a need for new or altered governmental services
in any of the following areas :
a) Fire protection? X
YES MAYBE NO
b) Police protection? X
YES MAYBE NO
c) Schools?
X
YES MAYBE NO
X
d) Parks or other recreational facilities?
YES MAYBE NO
e) Maintenance of public facilities , including roads? X _
YES MAYBE NO
f) Other governmental services?
X
YES MAYBE NO
Explanation: E: May be some dirt and dust caused by trucks on
public roads.
15) Energy. Will the proposal result in:
a) Use of substantial amounts of fuel or energy?
YES MAYBE NO
b) Demand upon existing sources of energy, or require
the development of new sources o4 energy? X
YES MAYBE WO--
Explanation:
16) Utilities. Will the proposal result in a need for new
systems , or alterations to the following utilities :
a) Power or natural gas? X
YES MAYBE NO
b) Communications systems?
X
YES MAYBE NO
c) Water? X
YES MAYBE NO
6-
d) Sewer or septic tanks? X
YET— MAYBE rr
e) Storm water drainage?
X
YES FIXTrir FO—
X
f) Solid waste and disposal?
YES MAYBE N0
Explanation: . E: Storm drainage and erosion control system on site
will be required.
17) Human Health. Will the proposal result in the creation of
any health hazard or potential health hazard (excluding
mental health)?
V— MAYBE WO--
Explanation:
18) Aesthetics. Will the proposal result in the obstruction of
any scenic vista or view open to the public, or will the
proposal result in the creation of an aesthetically offensive X
site open to public view?
YES MAYBE NO
Explanation: The replacement of a forest by grass lands may be
offensive to some aspects of the public
19) Recr*,tipri, Wit: [:i,:a pro .o3a1 rea:ilt in ,:i inyact upon the
qualit or qu ntlty ,'t r.xisting rccr'ry'+ i4r, st opportunities? X
YES MAYBE NO
Explanation:
20) ArcheologicalLllistorical . Will the proposal result in an
alteration of a significant archeological or historical
site, structure, object or building? X
YES Mai YBE k0
Explanation:
III. SIGNATURE
I , the undersigned, state that to the best of my knowledge the above information
is true and complete. It is understood that the lead agency may withdraw any decla-
ration of non-significance that it might sue 'n reliance upon this checklist should
there be any willful misrepresentation o willfu lack of full is osure my part.
Proponent:
signed)
De)----44b 3D lU 4 S
name printed)
City of Renton
Building & Zoning Department
May, 1983
Form 1 176
c
BATC`4. NUMBER :CK COMMENTS
CUSTOMER NAME RICHARu CAROTHER '
4 *#*#********#*###*###*****, ****##*##*****####*#**##*###
t##**###*###
2 143 70-1 980-C 1 2143 70-2 000-05
F/CHG ASSOCIATES E0980 CF/CHG ASSOCIATES E0980
200 S 333RC ST 230 S 333RD ST
FEDERAL WA) WA 98003 FEDERAL WAY WA 98003
214370-2280-06 377920-0005-04
CF/CHG ASSOCIATES E0980 NEWBURN LLCYAL L C0379
200 S 333RD ST 2230 151ST PL SE
FEDERAL WAY WA 98003 BELLEVUE WA 98007
377920-0010-07 377920-0053-05
SANFORD H S 441938 SANFORD H S 441938
4520 55TH AVE NE 4520 55TH AVE NE
SEATTLE WA 98105 SEATTLE WA 98105
377920-0056- 02 377920-0120-04
SANFORD H S 441938 SANFORD H S 441938
4520 55TH AVE NE 4520 55TH AVE NE
SEATTLE Wig 98105 SEATTLE WA 98105
377920-0150 -07 377920-0170-03
BLACK RIVER QUARRY BLACK RIVER QUARRY
6808 S 14)TH 6808 S 140TH ST
SEATTLE WA 98178 SEATTLE WA 98178
722950-0320-02 918800-0010-03
BLACK RI1+ER QUARRY INC FIRST CITY QUI TI ES 329999
6808 S 140TH 800 5TH AVE SUITE 4040
SEATTLE 4 A 98178 SEATTLE WA 98101
918800-0020-01 9188 00-0030—09
HOLVICK DEREGT KOERING 319800 HOLVICK DEREGT KOERING 319800
1230 GAKIIEAD PWY SUITE 210 1230 OAKMEAD PWY SUITE 210
SUNNYVAL = CALIF 94086 SUNNYVALE CALIF 94086
918800-0043-07 918800-0050-04
HOLVICK DEREGT KOERING 319800 HOLVICK DEREGT KOERING 319800
1230 OAKMEAD PWY SUITE 210 1230 OAKMEAD PWY SUITE 210
SUNNYVALE CALIF 94086 SUNNYVALE CALIF 94086
918800-0060-02 918800-0130-08
HOLVICK DEREGT KOERING 319800 FIRST CITY EQUITIES 391023
1230 GALMEAD PWY SUITE 210 800 5TH AVE SUITE 4040
SUNNYVALE CALIF 94086 SEATTLE WA 98104
918800-01 .0-06 918800-0150-03
FIRST CITY EQUITIES 391023 KING COUNTY 359800
800 5TH AVE SUITE 4040 530 KC ADMIN BLDG
SEATTLE WA 98104 SEATTLE WA 98104
j
4*************************************4 :**************************************4
BATCH NUMBER:CS COMMENTS J21JD. l-A-N D
CUSTOMER NAME RICHARD CAROTHER ou,NF_/2.Z
4***************************i c**************************************g
722950-03I0-04 242304-9008-04
STATE OF WN CONTAINER CORP OF AMERICA C0481
MC A 4 D 2FSS of r2t--coa..t)
1 1ST NATL PLAZA
CHICAGO IL 60670
182305-92`00-06 182305-9250-06
PACIFIC COAST RR CO
301 GRE/aT NORTHERN BLDG
N/ .SEATTLE WA 98101
132 304-9005-09 1323 04-9007-08
SANFORD -1 S 441938 BURLINGTON NORTHERN INC 1279
4520 55TH AVE NE I
SEATTLE WA 98105 810 3RD AVE TX DPT 208 CTRL
SEATTLE WA 98104
1323 04-9 009-06 1323 04-9010-03
BURLINGTON NORTHERN INC A0181 SANFORD H S 441938
810 3RD AVE 4520 55TH AVE NE
208 CENTRAL BLDG - TAX DEPT SEATTLE WA 98105
SEATTLE WA 98104
132304-9020-01 132304-9025-06
C & P S RY CO CF CHG ASSOCIATES E0980NoAD9IU=SS of f2j Cat2-A 200 S 333RD ST
FEDERAL WAY WA 98003
132304-9 018-0 2 1323 04-9080-08
KING COUNTY 0740 0577 KING COUNTY 0740 0577
Soo K A DH1 tJ I,1._PGi 500 KC- 40N,N) P,L-D6,
si_Air c.r WA
913101 SF-A,fiLF_ wi4
y 8i0 9
132304-90FA-04 132304-9084-04
BURLING' ON NORTHERN INC 209800
810 3RD AVE
208 CEN"RAL BLDG-TAX DEPT c v /
SEATTLE WA 98104
LEGAL DESCRIPTION
PARS:EL.. A
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M. ,
in Kirg County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat .recorded in
Volume 12 of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Erownell 's Donation Claim No. 41 , described as follows:
Beginring at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet;
thence N80'04 '48"E 232.00 feet; thence S42.06'08"E 87. 16 feet to the TRUE POINT OF
BEGINfING; thence N42'06'08"W 87. 16 feet; thence S80'04'48"W 232 .00 feet; thence
N12'01 'OO"W 40.75 feet; thence Sj 59 '00"W 133.01 feet to a point of curve; thence
along a curve to the right having a radius of 230.00 feet , through a central angle
of 27'47'31" an arc distance of 111 .56 feet to a point of compound curvature; the
center of said curve bears N15°46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48 ' 19" an arc distance of 197.73 feet; thence
582'15 '00"W 67.68 feet; thence S31'32 '22'%1 71 .06 feet; thence N81'11 '35"W 193.00
feet; thence 582' 15'00"W 92.99 feet; thence 535'29'30"W 143. 18 feet; thence
N74'44 '00"W 84.85 feet; thence S60' 16'00"W 67.00 feet; thence S12'16'00"E 97.35
feet to the north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence 568'06'46"W along said
northerly line 375.53 feet to the northerly line of a tract of land described in
EXHIBIT 8 in said Agreement; thence northwesterly along said northerly line on a
curve to the left, the center which bears west 195.01 feet, thru a central angle
of 78'41 '24", an arc distance of 267.83 feet; thence N78'41 '241V along said
northerly line 180.00 feet to an angle point in said northerly line; thence
N33'0( '54"W along said northerly line 109.47 feet to the south line of the
Burlirgton Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears S39'23'00"E 1853.00 feet; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01 '59", an arc
distarce of 65.75 feet to a point of compound cure; thence continuing along
said !outh line on a curve to the right the center of which bears S37'21 '01"E
havinc a radius of 10543.00 feet, an arc distance of 186.51 feet through a central
angle of 01'00'49" to a point of compound curve; thence continuing along said south
line on a curve to the right, the center of which bears S36'20' 12"E having a radius
of 1657.00 feet an arc distance of 193.93 feet through a central angle of 06'42 '20"
to a point of compound curve; thence continuing along said south line on a curve to
the right, the center of which bears S29'37'52"E having a radius of 6738.00 feet ,
an arc distance of 197.76 feet through a central angle of 01°40'54" to a point of
compound curve; thence continuing along said south line on a curve to the right,
the tinter of which bears S27'56'58"E having a radius of 1768.00 feet , an arc
distance of 194.45 feet through a central angle of 06' 18'06" to a point of compound
curve thence continuing along said south line on a curve to the right, the center
of wh ch bears S21'38'52"E having a radius of 8603.00 feet , an arc distance of
204.51 feet through a central angle of 01'21 '44" to a point of compound curve;
thencn continuing along said south line on a curve to the right , the center of
which bears S20' 17'08"E having a radius of 1922. 10 feet, an arc distance of 178.79
feet :hrough a central angle of 05'19'46" to a point of compound curve on the east
line 1)f said Charles Brownell Donation land Claim No. 41 ; thence continuing along
said south line on a curve to the right, the center of which bears 514'S7'22"E
havini a radius of 2814.93 feet, an arc distance of 659.42 feet through a central
angle of 13'25' 19" to a point of compound curve; thence continuing along said
south line on a curve to the right, the center of which bears 501'32 '03"E having
a radius of 1165.09 feet, thru a central angle of 37'39' 19", an arc distance of
765.71 feet to a point which bears N41'28' 10"E from the TRUE POINT OF BEGINNING;
thenc! 536'19'35"W 188.63 feet to a point on a curve, the center which bears
536'13'35"W 967.46 feet; thence northwesterly along said curve to the left , thru
a central angle of 4'39'32", an arc distance of 78.67 feet ; thence S38'54 '221W
451 .74 feet to a point on a curve, the center which bears 543'36'23"W 170.00 feet ;
thence southeasterly along said curve to the right, thru a central angle of
3°08'37", an arc distance of 9.33 feet; thence S43'15'00"E 20.74 feet; thence •
527'21 '32"W 44.74 feet to the TRUE POINT OF BEGINNING.
PAHt :L li-1
That portion of the south half of Section 13, Township z3 North, Range 4 East, V.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginnin; at the south quarter corner of said Section 13; thence NO0'58'28"E along
the nortl-south centerline thereof 1092.82 feet; thence S68'03'54"W 351 . 11 feet to
the TRUE POINT OF BEGINNING; thence N68'03'54"E 575.56 feet; thence N12'01 '00"W
40. 75 fe t; thence S77'59'OO"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27'47'31" an arc distance of'111.56 feet to a point of compound curvature; the
center o` said curve bears N15'46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48' 19" an arc distance of 197.73 feet; thence
S82'15'0+1"1/ 67.68 feet; thence S31'32'22"W 71 .06 feet; thence N81'11 '35"W 193.00
feet; thence 582'15'00W 92.99 feet; thence S35'29'30"W 143. 18 feet; thence
N74'44'0U"W 84.85 feet; thence S60'16'00"W 67.00 feet; thence S12'16'00'1 97. 35
feet; thence N68'06'46"E 53.79 feet to a point which bears N72'04'34"W from the
TRUE POIIIT OF BEGINNING; thence 572'04'34"E 389.92 feet to the TRUE POINT OF
BEGINNING.
PARCEL. B-2
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
in King county, Washington and of Junction Addition to the City of Seattle, according
to .plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell 's Donation Claim No. 41 described as follows:
Beginnin5 at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence 568'03'54"w 575.56 feet; thence N72'04'34'W
389.92 feet; thence S68°06'46"W 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet, thru a central
angle of 126'52' 10", an arc distance of 132.86 feet; thence N53'07 '50"E 199.18 feet
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53'55'30", an arc distance of 188.47 feet; thence 572'52'40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08'51", an arc distance of 134.60 feet; thence
N67'58'2!"E 380.92 feet; thence N31'27 '12"E 204.86 feet to the TRUE POINT OF BEGINNING.
PARCEL B-3
That potion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
togethe . with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26,
Renton More Lands 2nd Supplemental Maps 1958, described as follows:
Beginniirg at the south quarter corner of said Section 13; thence NO0°58'28"E along the
north-south centerline, thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to a poinq
hereinafter called "Point A"; thence 568'03'54"W 575.56 feet; thence N72'04'34"V
389.92 1eet; thence 568'06'46"W 429.32 feet to the TRUE POINT OF BEGINNING; thence
south 8!.47 feet to a point of curve; thence on a curve to the left, having a radius
of 60.00 feet, thru a central angle of 126'52' 10", an arc distance of 132.86 feet;
thence I153'07'50"E 199. 18 feet to a point of curve; thence on a curve to the right,
having 41 radius of 200.00 feet thru a central angle of 53'59'30", an arc distance of
188.47 feet; thence S72'52'40"E 290.00 feet to a point of curve; thence on a curve to
the left: having a radius of ,197.00 feet, thru a central angle of 39'08' 51", an arc
distance of 134.60 feet; thence N67'58'29"E 380.92 feet; thence N31'27' 12"E 204.86
feet to aforementioned "Point A"; thence N80°O4'48"E 232.00 feet; thence 542'06'08"E
215.00 lot; thence S31° 14'05"W 358.99 feet; thence 547'10'O1"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88'15'00"W 180.65 feet; 1433'07'25' d 154.51 feet; N27'21 '32"E 387 .32
feet; N83'17'25"W 171 . 17 feet; S46'22'22"W 324.66 feet; 572'37'52"W 458.93 feet;
N70'54'02"W 354.53 feet; 573°56'01"W 130.08 feet; and S41' 16'07"W 316. 18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Deceiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears S39'41 '39"W 627.46 feet thru a central angle of
39'41 '3!f', an arc distance of 434.70 feet; thence north along said north boundary
25.00 foot; thence west along said north boundary 245.69 feet; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence S78'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle ot`' 78'41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
PARCEL 8-4
That portion of the south__ quarter of Section 13, Town...., 23 North, Range 4 East ,
W.M. in Kirr; County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. erownell 's Donation Claim No. 41 , described
as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1958; thence 572.37'52'V 382.60 feet to
an angle point in the south line of said Tract 26; thence N70'5-4'02"W 354.53 feet to
an angle point in the south line of said Tract 26; thence S73.656'01'%l 130.08 feet to
an angle point in the south line of said Tract 26; thence S41'16'07"W along the south
line of sail Tract 26 a distance of 316. 18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears 539'41 '39"V 627.46 feet, thru a central angle of 39'41 '39"; an arc distance of
434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGit4NING; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence N33°00'54"W 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of-Way, said point being a point on
a curve, the center which bears 539'23'00"E 1853.00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3'59' 19", en arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
S43'22' 19"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32", an arc distance of 197.57 feet to a point
of tangency; thence S431149'O9"V along said south margin 271 .00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571 .00 feet, thru a central angle of 7'32'02", an arc distance of 206.57 feet to
a point of compound curve, the center which bears N38'38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16'55'35", an arc distance of 214.77 feet to a point of compound curve, the center
which bears ful'43' 14"W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11'24'08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10' 19'06"W 696.00 feet;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence 534'18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74'13r19"E along said north boundary 443.31 feet; thence
N59'53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35 .00 feet to the TRUE POINT OF BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the southeast quarter of Section 13, Township 23 North, Range 4 East , V.M. ,
and that portion of the southwest quarter of Section 18, Township 23 North , Range
4 East, W.M. , all in King County, Washington described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet;
thence N80'D4'48"E 232.00 feet; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence S42°06'08"E 127.84 feet; thence S31'14'05'%1 358.99 feet; thence
547°10'O1"E 71 .34 feet; thence east 114.27 feet; thence south 68.91 feet to the
south line of said Tract 25; thence S88'15'O0"E along said south line and the
north line 5f the south 650.00 feet of the southeast quarter of said Section 13, a
distance of 2080.76 feet to the east line of said Section 13; thence 589'10'25"E
along the north line of the south 650.00 feet of the southwest quarter of said
Section 18, a distance of 81 .57 feet to the south line of the Burlington Northern
Railroad Right-of-Way; thence N71'29'03"W along said south line 85.52 feet to the
east line of said Section 13; thence N71'29'03"W along said south line 826.56
feet to a point of curve; thence on a curve to the right along said south line,
the center which bears N18°30'57"E 1005.37 feet, thru a central angle of 33'54'00",
an arc distance of 594.84 feet; thence N37'35'03"W along said south line 308.70
feet to a point of curve; thence on a curve to the left, along said south line,
the center wrhich bears S52'24157"W 1165.09 feet, thru a central angle of 16'17'41",
an arc distance of 331.35 feet to a point which bears N41'28'l0"E from the TRUE
POINT OF BEGINNING; thence S36'19'35"W 188.63 feet to a point on a curve, the
center which bears S36'19'35"W 967.46 feet; thence northwesterly along said curve
to the left, thru a central angle of 4'39'32", an arc distance of 78.67 feet;
thence 538'54'22'%1 451 .74 feet to a point on a curve, the center which bears R
Sii3'36'23"V 170.00 feet; thence southeasterly along said curve to the right, thru
a central angle of 3'08'37", an arc distance of 9.33 feet; thence S43'15'00"1
20.74 feet; thence 527'21 '32"V 44.74 feet to the TRUE POINT OF BEGINNING.
N/
nil A
L, JLJ
A
rcaPROJECT8L.A-e-lick U y Pk6.}
name, address): ?M) , wA •
richard Carothers associates
PROJECT NO:941 Z
f w- 1
Reply to:
TO: S(• `T7 v s 814 East Pike Street
Gtry o% .rJ>0•r )Seattle.Washington98122
ll 408 S.W.2nd Ave.#402
ZOO fit C.C_ 4 v , 5 . Portland,Oregon 97204
wa ZoCc C235-2 5.4o)
El
WE ARE FORWARDING THE FOLLOWING: ATTACHED UNDER SEPARATE COVER VIA
Originals Shop Drawings
Specifications Request for Proposal
Prints Photographs/Slides
Contract Documents Equipment Submittals
DRAWING NO. COPIES TITLE OR DESCRIPTION DATE SIZE
g C. e.cr(041 IJifr.e y 10 L,AT SF 7 a z. 31)
CA-7°1- FfNAL)
ICI i' RE14 T€N
lj r
JUL 19 1984
71144
p rEA S r& "1oT/_ cu.9/...5 ("F.-
al-A c K e.L 13 Lu0. J) /vim i-s p
tit pcya W't GOl A S Tc> TH s r -r -r A u-c rec 5
f;€ GCTY RA-62
Richard Carothers Associates
BY: DATE: 77z-o
5TE'1 SpeloEL• #45 COPIES TO: lu
ENDING
OF FILE
FILE TITLE
DESIGN GUIDELINES & CC&R's
BLACK AVER
TECHNOLOGY PARK
Renton, Washington
MICROFILMED
6 celcs
5)*x\
d‘
44*
JAG. / Renton Properties Associates, Developer
Richard Carothers Alistodotea ,, [Planning Consultant
July, 1984
S
Purpose
The development of each site within Blackriver Technology Park is controlled and
restricted by the Declaration of Covenants, Conditions and Restrictions for
Blackriver Technology Park (hereinafter referred to as the "CC&R' s") , as well as
applicable governmental codes and regulations. The CC&R's are directed toward
achieving the desired character and quality level of site development that will
set Blackriver Technology Park apart from other business developments. The
purpose of these Development Guidelines is to further define the requirements
which are specifically and generally stated in the CC&R's. These Guidelines are
intended in supplemented to the CC&R's as an aid in the submittal of plans for
approval by providing more detailed information on which to base a revie . Any
specific conflicts between shall be brought to the immediate attention of
J.A.G./Renton Properties Associates. In general , however the priority of com-
pliance is first; with governmental codes and regulations , second; with the CC&R's
and third; with the Design Guidelines.
The Owners/Occupants of each site within Blackriver Technology Park sh.cJld
familiarize themselves with the intent and requirements of the CC&R's these
Guidelines and all applicable governmental codes and regulations, and through
their consultant(s), implement all those provisions applicable to their specific
site developments. All development plans, landscaping plans and graphic designs,
shall be submitted to a Design Review Committee as described in the CC&R's.
Contents
Purpose
1.0 Introduction to Blackriver Technology Park
1. 1 Location
1.2 Immediate Setting
1.3 Master Plan and Streetscape
1.4 Planning and Zoning
1.5 Flood Plain Restrictions
1.6 Engineering and Utilities
1.7 Permitted and Prohibited Uses
2.0 Approvals and Submittals
2.1 Master Plan Design Submittal
2.2 Preliminary Plan Submittal
2.3 Revision, Alteration, Addition or Change
of Use Preliminary Plan Submittal
2.4 Institutional Review Process
3.0 Site Planning Guidelines
3.1 Building Site Coverage
3.2 Landscape Coverage
3.3 Building Heights
3.4 Stre_: Setback
3.5 Interior Property Line Setback
3.6 Parking Requirements
3.7 Access and Drive Location
3.8 Sidewalks
3.9 Stc'._e , Service, and Loading Areas
3. 10 Refuse Collection Areas
3. 11 Screening of Exterior Mechanical Equipment
3.12 Screening of Exterior Electrical Equipment
3.13 Fences and Walls
3.14 Utilities
3.15 Grading
3.16 Nuisances
4.0 Architectural Guidelines
5.0 Landscape Guidelines
5.1 Introduction to the Blackriver Technology Park
Landscape Concept
5.1.1 Streetscape Zone
5.1.2 Streetscape Zone Design Concept
T
5. 1 .3 Interior Zone
5. 1 .4 Interior Zone Design Concept
5. 1.5 Grantor Provided Amenities
5.1.5a Exceptions
5. 1.5b Entry Feature
5.1.5c The Commons
5. 1 .6 Other Requirements
5.2 Landscape Design Guidelines
5.2. 1 Assessment District Installation and Maintenance Agreement
5.2.2 Maintenance of Unimproved Sites
5.2.3 Landscape Coverage
5.2.4 Street Frontage Zone Design Guidelines
5.2.4a Specific Design Limitation within
the Street Frontage Zone
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
5.2.5b Parking and Pedestrian Circulation
5.2.5c Parking Lot Plant Material List
5.2.6 Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
5.2.6b Limited Use Area at Primary and
Secondary Access Drive
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side and Rear Yard Requirements
5.2.7b Side and Rear Yard Landscape Requirements
5.2.7c Plant Material List-Interior Property Lines
5.2.7d Planting and Irrigation Details & Specifications
Guidelines for Exterior Property Lines
5.2.9 Guidelines for Tree Preservation Outside the ' Preserve ' Zones
6.0 Signing Guidelines
6. 1 OL = ctives
6.2 Sicr. Submittals
6.3 Detached Business Identification Stamps
6.4 Building Mounted Business or Building Identification Signs
6.5 Information and Vehicular Control Signs
6.6 Temporary Signs
7.0 Lighting Guidelines
7. 1 Objectives
7.2 Lighting Quality
7.3 Parking, Access and Circulation Areas
7.4 Service Areas
7.5 Building Illuminations
7.6 Pedestrian Areas
8.0 Appendix
Contact and Reference List
Planninc and Design References
Declaration of Covenants, Conditions and Restrictions
1 .0 Introduction to
Blackriver Technology Park
Blackriver Technology Park is to become a unique business community distinguished
from other Sea::le Area business parks. The distinction of Blackriver Technology
Park begins its concept as a series of small business sites situated in a
controlled, uried landscape setting. This conception will be furthered through
an emphasis on quality contemporary site, architectural and landscape design.
1. 1 LOCATION
Blackriver Technology Park is centrally situated southeast of downtown Renton and
due north of I-405, contiguous to and immediately north of Washington Technical
Center. Access via I-405 and arterials now serving Earlington Park Industrial
Area.
1.2 IMMEDIATE SETTING
Blackriver Tec-nology Park is bordered on the north by the Burlington Northern
Railroad right-of-way, on the south by Washington Technical Center and P-I Channel
detention basi' . Preserve areas and City of Renton buffer zones provide a wooded
backdrop conducive to the development of a pleasant business environment.
1.3 MASTER PLAN AND STREETSCAPE
The Blackriver Technology Park Plan is organized around a broad, two lane, central
cul -de-sac serving most of the sites within Blackriver Technology Park. This
central collector is Southwest 4th Place. Southwest 4th Place, will have a
controlled lar:scaped easement along both sides which will establish a unified,
park-like env; -:nment, distinctive among business parks in the Pacific Northwest.
Intersections Thading into the Park will be highlighted by landscape and graphic
design features to establish these locations as gateways to the Park. Recreational
opportunites will be available in the form of walking and jogging paths integrated
with landscape parkways and providing access into undeveloped buffer and preserve
areas.
1.4 PLANNING AND ZONING
Blackriver Technology Park is located within the jurisdiction of the City of
Renton Department of Planning, Public Works, Engineering and Parks.
1.5 FLOOD PLAIN RESTRICTIONS
Blackriver Technology Park lies within the 100 year floodplain of the Black River.
Site planning, grading and drainage design constraints, will be placed upon all
developments. All development within Blackriver Technology Park must conform to
grading and drainage restrictions contained in the Blackriver Technology Park
Design Guidelires as well as on-site planning, grading and drainage guidelines
administered b, the City of Renton.
1 .6 ENGINEERING AND UTILITIES
Assessment district landscaping, street improvements, and underground utilities
including domestic water, fire service systems, storm drainage, sanitary sewer,
and street lighting, telephone, electrial and natural gas mains have been install-
ed by J.A.G./Renton Properties Associates. The improvement designs were prepared
by Richard Carothers Associates, Seattle.
1.7 PERMITTED AND PROHIBITED USES
In order to achieve the objective of Blackriver Technology Park as a high quality
business environment the CC&R's identify uses that are permitted and prohibited
within City of Renton. The following, outlines the objectives related to permit-
ted and prohibited uses within Blackriver Technology Park and restates those
uses contained in the CC&R's.
Objectives
1. to permit business uses whose facility developments and maintenance will
contribute to the perception of Blackriver Technology Park as a series of
high qua"ty business sites.
2. to permit business uses which do not, through their operation, produce
objectional visual , sound, smell , or vibrational outputs
3. to permit business uses which are compatible with one another and compatible
with exis`_ino or planned uses surrounding Blackriver Technology Part,
4. to permit business uses which will not create excessive burdens upon Black-
river Technology Park transportation and utility systems
Guidelines
1. Prohibited Uses - The following operations and uses shall not be permitted on
any parce; within Blackriver Technology Park:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling and removing oil , gas or other hydrocarbon substances , or drilling
for or removing such hydrocarbons;
e) Refining of petroleum or of its products;
f) Petroleum storage yards ;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary
in the course of approved construction pursuant to Article III of CC&R' s;
h) Distillat'cn of bones;
i ) Dumping, cisposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j ) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries ;
n) Jail or h:nor farms;
o) Labor or rigrant worker camps;
p) Truck terminals;
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race track;
2. Permittec Jses - Any use or business operation permitted by the current City
of Renton Zoning Ordinance that is not specifically prohibited above, provided
such use is specifically approved in writing by J.A.G./Renton Properties Associ-
ates. J.A.G/Penton Properties Associates , however, reserves the right tc refuse
any use which conclude may adversely affect Blackriver Technology Pa-, . An
approved use s'all be performed or carried out entirely within a building that is
so designed anc constructed that the enclosed operations and uses do not cause or
produce a nuisance to adjacent lots or streets such as, but not limited to,
vibration, sound, electromechanical disturbances, radiation, air or water pol-
lution, dust, or emission of odorous, toxic or non-toxic matter including steam.
Certain activities which cannot be carried on within building may be permitted,
provided such activities are specifically approved in writing by J.A.G./Renton
Properties Associates and further provided such activities are screened in an
acceptable manner so as not to be visible from neighboring lots and streets.
2.0 Approvals and Submittals
In order to insure that the design standards for Blackriver Technology Park
contained in these guidelines are achieved, a series of plan submissions will be
required at different stages of the design process. The number of plan submis-
sions will vary depending upon the complexity and timing of a proposed develop-
ment. Plan su:-issions will also be required for significant revisions , altera-
tions, additions , or change of use for approved or existing developments within
Blackriver Technology Park.
Required plan submissions shall be submitted to the Blackriver Technology Park
Design Review Committee, J.A.G./Renton Properties Associates care of Alterra
Corporation, General Partner. Each stage of plan submission will require four (4)
sets of plans containing the specific information described below.
A Design Review Committee will be established by J.A.G./Renton Properties Associ-
ates to review all required plan submissions. All submitted plans will be reviewed
by the Blackriver Technology Park Design Review Committee for acceptability of
design in compliance with the CC&R's and these Design Guidelines. Upon completion
of review by the Design Review Committee, one set of submitted plans will be
returned to the applicant along with a letter summarizing comments , recommenda-
tions, require-ents and findings. The length of review by the Blackriver Techno-
logy Park Desic-: Review Committee for all stages of plan submissions shall be
governed by Section 5 of the Blackriver Technology Park CC&R's. The returned
plans will be marked "Approved" or "Approved Subject to Conditions" or "Not
Approved" with the following intended meanings:
1. "Approvec - approved documents permit the applicant to proceed to the next
stage of the approval process.
2. "Approved Subject to Conditions" - documents so marked permit the applicant
to proceed to the next stage of the approval process provided the applicant
complies .,:th the conditions specified by the Design Review Committer.. If
the applicant takes exception to the specified conditions, the applicant must
do so in writing by certified mail addressed to J.A.G./Renton Properties
Associates within ten (10) days from the date of the applicant's receipt of
returned documents. Unless such action is taken, J.A.G./Renton Properties
Associates will assume that all conditions are acceptable to and approved by
the applicant.
3. "Not Approved" - documents will be returned to the applicant with comments
describing the basis for disapproval . Revised documents must be resubmitted
if approval is sought.
4. J.A.G./Renton Properties Associates' approval of the applicant's plans,
specifications, calculations, or work shall not constitute an implication,
representation, or certification by J.A.G./Renton Properties Associates that
the above items are in compliance with applicable Statues, Codes, Ordinances
or other regulations.
The Blackriver Technology Park Design Guidelines are in no way intended to super-
sede any applicable Statutes , Codes , Ordinances or regulations of controlling
governmental jurisdictions. Should any portions of the Blackriver Technology Park
CC&R's or Design Guidelines be discovered to encourage violation of applicable
Statutes, Codes, Ordinances or other governmental regulations, those discrepancies
should be brought to the immediate attention of J.A.G./Renton Properties Associ-
ates.
The applicant shall have the sole responsibility for compliance with all appli-
cable Statutes, Codes, Ordinances or other regulations for all work performed on
the premises by or on behalf of the applicant.
2. 1 BLACKRIVER TECHNOLOGY PARK MASTER PLAN DESIGN SUBMITTAL
Submission of a site Master Plan will be required only when the ultimate site
development is planned to be constructed in separate phases over a period of time.
The site Master Plan is to be submitted and approved before Preliminary Plans are
submitted.
Master Plan submissions shall show an indication of:
1. Al major buildings and structures including:
a. building footprints
b. overhangs
c. net floor area
d. site coveraae - building-ground contact area/net lot area
e. building coverage - area of all floors/net lot area
f. a brief description of the use of each building or structure including
an estimate of the number of employees
2. Parking Area
a. configuration of parking and vehicular circulation including employee
and guest parking
b. dimensions of typical parking stalls and parking aisles
c. total parking provided
d. calculation demonstrating total parking required
3. Loading and Service Areas
a. truck service and loading dock areas
b. truck and service vehicle circulation areas
c. trash enclosure areas
d. location of screening devices for truck and service areas
4. Landscape and Pedestrian circulation concept including any major
site design features
5. Interfaces with off-site circulation including the location and
design of all access drive curb cuts
6. Interfaces with adjacent properties
7. Conceptual grading, drainage and utilities
8. Descriptions or sketches of the architectural design concept including
intended character and materials
9. Phasing Plans - plans indicating the phasing of the ultimate Master Plan
development illustrating the extent of development at the completion of each
phase
While the above information is required for all Master Plan submissions, it would
be desirable for applicants to utilize all available presentation materials and
media in order to fully communicate the intent and design character to the Design
Review Committee.
2.2 BLACKRIVER TECHNOLOGY PARK PRELIMINARY PLAN SUBMITTAL
The Preliminary Plan submission is required to convey specific information about
the site planr=ng and architecture of the proposed development. The Preliminary
Plan package sFould be submitted to the Design Review Committee prior to or
concurrent witr submission of plans to the City of Renton for Site Development
Review, Preliminary Plans are to be submitted and approved before construction
documents are submitted.
The Preliminary Plan submission requires each of the following exhibits:
1. Site Plar indicating the following:
a. builcing footprints and dimensions to property lines
b. building roof overhangs
c. configuration of parking and vehicular circulation areas
d. location of parking lot electrollers
e. true• service, loading area , trash enclosures
f. lines of setback and easements
g. locations of on-site transformers, electrical switch gear, and gas
meters
h. adjacent roadways including curblines, medians and median openings
i. tabulation of:
I. Parcel Area
II. Total Building Floor Area
III. Site Coverage
IV. Building Coverage
V. Total Parking Provided
VI. Total Parking Required
VII. Estimated total employees on site at any peak time
VIII The anticipated number of shifts and the hours and days
of their operation
2. Conceptual Grading and Drainage Plan indicating:
a. proposed finish grades, slopes and building pad elevations
b. site drainage structures and systems
c. grades of existing streets and curbs
d. locations of street lighting and utility structures within landscape
easement
3. Conceptual Landscape Plan indicating:
a. plant materials , sizes , and spacings
b. walkways and paved areas
c. other landscape design features
4. Building Elevations of all sides of all proposed buildings indicating:
a. wall and roof materials, textures, and colors
b. locations of wall mounted signing and lighting
c. roof and parapet heights above ground floor line
d. the profile of any roof mounted mechanical equipment which extends above
the roof parapet
5. Building Floor Plans
6. Building Roof Plans indicating:
a. roof elevations above finish floor
b. heights and locations of roof mounted mechanical equipment where
available
7. Outline Specifications of all building materials
8. Conceptual Graphics and Wall Mounted Signs
a. ground signs and wall mounted signs
I. locations
II . designs , materials , textures , colors , heights , areas
III . Illumination
IV. typography
b. directional and information signs
I. locations
II. designs, materials, textures, colors, heights, areas
III. illumination
IV. typography
2.3 BLACKRIVER TECHNOLOGY PARK REVISION, ALTERATION, ADDITION OR CHANGE OF USE
PRELIMINARY PLAN SUBMITTAL
Preliminary plans are required to be submitted for any significant revisions,
alterations, additions or change of use to approved or existing developments
within Blackriver Technology Park. Preliminary plans for this purpose must be
submitted and approved before construction documents are submitted and before the
commencement of construction.
Revision, Alterations , Additions or Change of Use require the submission of four
4) sets of documents including:
1. A written description of the nature and extent of the proposed revision,
alteration, addition or change of use to be undertaken.
2. Indications of proposed revisions, alterations , additions or changes to:
a. the site plan
b. the trading and drainage plan
c. the landscape plan
d. the building elevations including
I. wall and roof materials, textures and colors
II . locations of wall mounted signing and lighting
III . roof and parapet heights above the ground floor line
IV. the profile of any roof mounted mechanical equipment which extends
above the roof parapet
e. the building floor plans
3. Tabulations of:
a. the rew total building floor area
b. the rew site coverage
c. the rew building coverage
d. the rew parking provided
e. calcwiations demonstrating the new required parking
f. the new estimated peak employee count
4. Outline specifications of construction materials.
2.4 INSTITUTIC',AL REVIEW PROCESS
In the course of designing proposed developments for lots within Blackriver
Technology Park: additional reviews and approvals will be required beyond the
Blackriver Tecr~ology Park Design Review Process. The following summary cf
Blackriver Tecrnology Park and other review and approval processes is included to
assist individual applicants in understanding the approximate nature and sequence
of those reviews. An understanding of the total review process from the outset,
it is hoped, will contribute to smoother and more efficient processing of each
proposed development.
1. The design process should begin with a review of the Blackriver Technology
Park, CC&R' s and Design Guidelines, the City of Renton Guidelines, and the
applicable sections of the current City of Renton Zoning Ordinance. Copies
of the City of Renton applications and submission requirements should also be
obtained at this time.
2. Prior to commencement of design, a licensed civil engineer should be consult-
ed as to grading and drainage restrictions in the City of Renton.
3. Master plan should be submitted to and approved by the Blackriver Technology
Park Design Review Committee.
4. Applicants should review master plans with the City of Renton Planning
Department and staff, for comments. This is not a required review but it may
help to avoid problems and duplication of work.
5. Master plans should be reviewed by a licensed civil engineer for compliance
with City of Renton grading and drainage restrictions.
6. Preliminar_, plan should be submitted to and approved by the Blackriver
Technology Park Design Review Committee.
7. Preliminary plans should be reviewed by a licensed civil engineer for
compliance with City of Renton grading and drainage restrictions.
8. Preliminary plans should be reviewed with the City of Renton planning and
public works staff several weeks prior to the intended submission for Site
Development Review.
9. Submit plans to the City of Renton for Site Plan Approval .
10. Submit pla-s for building department plan check.
3.0 Site Planning Guidelines
3. 1 BUILDING SITE COVERAGE
Objectives
1. to insure :nat the intensity of site development is not excessive or detri-
mental to the perception of Blackriver Technology Park as a unified series of
high quality business sites
2. to insure that the intensity of site development does not over-tax utility or
transportation systems
Guidelines
1. Site coverage (defined as the building-ground contact area divided by the
total net lot area) shall not exceed 50% or the amount specified in the
current City of Renton Zoning Ordinance (whichever is the more restrictive.
2. Building coverage (defined as the total area of all floors divided by the
total net lot area) shall not exceed 60% unless otherwise approved in writing
by J.A.G./Renton Properties Associates.
3.2 LANDSCAPE COVERAGE
Objectives
1 . to insure that at least a minimum portion of a development site is devoted to
landscape -aterials in order to maintain a sense of continuity with adjacent
sites and to contribute to the perception of Blackriver Technology Park as a
park-like" environment.
2. to insure that at least a minimum of landscape materials are available on a
development site in order to contribute to the environmental well being of
potential .;sers of each site.
Guidelines
1. A minimum of at least 15% of the area within the property lines of a develop-
ment site (exclusive of the Landscape Easement Transition Zone) shall be
devoted to landscape materials unless otherwise approved in writing by
J.A.G./Renton Properties Associates (for additional landscape requirements
see Landscape Guidelines Section 5.0)
3.3 BUILDING HEIGHTS
Objectives
1. to maintain a reasonably consistent and compatible height profile throughout
Blackriver Technology Park
Guidelines
1. Building heights shall conform to City of Renton Building Regulations
4-730.060.
3.4 STREET SETBACK
Objectives
1. to achieve a feeling of openness along the streets that reinforces the
perception of Blackriver Technology Park as a series of high quality business
sites
2. to encourage some regularity of space formed by buildings on either side of a
street
3. to achieve a landscaped setting between the street and buildings
4. to provide for a street-side edge which will have a landscape character that
will unify the total development and be sufficiently distinctive in design to
differentiate Blackriver Technology Park from other business developments
5. to provide vehicular sight lines which allow discrimination of one company
from another
6. to provide vehicular sight lines which allow safe ingress and egress to
properties and safe movements along roadways
7. to accommodate major Blackriver Technology Park identity statements at street
intersections leading into, and within the Park
Guidelines
1 . No building or parking shall be permitted to be constructed closer than
thirty-five (35) feet from the property line along Southwest 4th Street.
Planters, walls, sign elements not exceeding 3'-0" in height may be permitted
in street-side setback areas with written approval of J.A.G./Renton Propert-
ies Associates. Roof overhanes may extend a maximum of 6'-0" into setback
areas.
2. The first 8 to 19 feet of street-side landscaping (from back of curb)
including sidewalk,will be installed by J.A.G./Renton Properties Assoicates
as a landscape easement, and shall remain unaltered, except for access
drives , unless alterations are approved in writing by J.A.G./Renton Proper-
ties Assoicates.
3. The remaining setback area shall be fully landscaped by the Owner/Occupant in
a manner both compatible with and complimentary to the landscape easements,
refer to Landscape Guidelines).
3.5 INTERIOR PROPERTY LINE SETBACK
Objectives
1. to provide a definite physical separation between buildings on adjoining lots
suitable for distinguishing separation of responsibilities
2. to allow companies on adjoining lots to be individually identifiable
Guidelines
1. No building shall be permitted to be constructed closer than ten (10) feet
from an interior property line.
2. No parking , other than automobile overhangs, shall be permitted to be con-
structed closer than five (5) feet from an interior property line, unless
otherwise approved in writing by J.A.G./Renton Properties Associates.
3. All setback areas shall be fully landscaped in a manner both compatible with
and complimentary to the on-site architecture and landscape design concepts.
3.6 PARKING REQUIREMENTS
Objectives
1. to provide sufficient on-site parking to accommodate all vehicles associated
with the use of each lot at any one time, and therefore not require vehicles
to be parked on public roadways or on lots of other companies
2. to configure parking areas such that they contribute to an increase of the
ratio of on-site persons to on-site vehicles
Guidelines
1. On-site parking shall be provided in a ratio of one space per 250 square feet
or less of net building area unless otherwise approved by J.A.G./Renton
Properties Associates.
2. Standard parking stalls shall be a minimum of 9 feet by 19 feet with a 22
foot reduction permitted for vehicle front overhangs.
3. Compact parking stalls shall not exceed forty (40) percent of the tc:al
parking and shall be a minimum of 8i feet by 17 feet with a 2 foot reduction
permitted for vehicle front overhangs.
4. In addition to the parking required above, one designated parking space shall
be provide: for each company vehicle to be parked on-site during
working hours. Parking spaces for company vehicles shall be of a size, area
and configuration that the company vehicles can be parked such that they are
fully contained within their designated spaces.
5. Designated "Handicap Parking" spaces, 12 feet in width, shall be provided at
a ratio c= one stall per 50 parking stalls. Such parking spaces se. ' be
give preferential locations near building entrances which provide fu' i and
convenient handicap access.
6. Should businesses locating on a Blackriver Technology Park development site
wish to encourage the formation of car pools by their employees, considera-
tion should be given to designating reserved "Car Pool" parking spaces.
Designated "Car Pool" spaces should be given preferential locations in
relatively close proximity to primary employee building entrances.
7. Designated "Cycle Parking" areas should be considered for the convenience of
employees using bicycles or motorcycles. In order to avoid the clutter of
cycles parked in unplanned locations, it is recommended that planned "Cycle
Parking" areas be conveniently located to employee entrances and be provided
with racks having security locking capabilities.
3.7 ACCESS AND DRIVE LOCATION
Objectives
1 . to have access drives located such that vehicular traffic arriving at and
leaving from lots, as well as traffic passing continuously in streets , flow
at an optimum level of efficiency
2. that the continuity of street-side landscaping is minimally disrupted by the
construction of access drives
3. that utilities located in the landscape easement are not or are minimally
disrupted by the construction of access drives
Guidelines
1. Access drives on Southwest 4th Place should be aligned with regularly spaced
median breaks and low points in Landscape Easement earth mounding. Curb
openings aligned with regularly spaced median breaks will be permitted only
if the opposite side of the street has no planned curb openings. All curb
openings not aligned with regularly spaced median breaks shall be designed
for "right-turn-only" ingress and egress.
2. Access drives on Southwest 4th Place should be coordinated with
planned and existing median openings and where median openings are not
available, designed for efficient "right-turn-only" ingress and egress.
3. Access drives should be coordinated with adjacent lots so as not to impede
the efficient flow of peak period traffic. Consideration should be given to
adequate separation of adjacent access drives or the development of common
access drives.
4. Access drive designs should incorporate provisions for efficient vehicle
stacking during peak periods of use.
5. Access drives should be located such that their construction results in a
minimal disruption of the street side landscaping and utilities located
within the designated landscape easement.
6. No access drives will be permitted directly off of at any point east of its
intersection with
3.8 SIDEWALKS
Objectives
1. to provice a safe (separated from vehicles all weather efficient and aesthet-
ically pleasing means of pedestrian circulation connecting lots along the
streetside perimeter
2. to provide a safe (separated from vehicles), all weather efficient and
aesthetically pleasing means of pedestrian circulation serving each site,
including connecting parking areas with building entries, connecting build-
ings to one another, and connecting building entries with on-site amenities
Guidelines
1. Streetside sidewalks will be installed by the developer within perimeter
landscape easements.
2. On-site pedestrian circulation systems shall be provided to meet the circul-
ation needs of on-site users. Such systems should provide safe, all weather
efficient, and aesthetically pleasing means of on-site movement and should be
an integrated part of the overall architectural and site design concept.
3. Where usage dictates, connections should be made between on-site and perime-
ter pedestrian circulation systems.
3.9 STORAGE, SERVICE, AND LOADING AREAS
Objectives
1. to insure that storage, service and loading areas are not visible from
primary visual exposure areas (streets , primary image entry drives , floors of
image buildings, common visual and recreational amenity areas , etc. )
2. to insure that storage, service and loading areas are located upon a site so
as to minimize the visibility of loading and service vehicles from primary
visual exposure areas
3. to insure that the storage, service and loading areas are designed and
located on the site so that service vehicle activities and movements do not
disrupt the efficient flowof on-site and off-site traffic
Guidelines
1. Storage, service; maintenance and loading areas must be constructed, main-
tained and used in accordance with the following conditions:
a. Unless approved in writing by J.A.G./Renton Properties Associates , no
materials, supplies , or equipment, including trucks or other motor
vehicles, shall be stored upon a site except inside a closed building or
behind a visual barrier screening such materials, supplies or vehicles
from adjacent sites so as not to be visible from neighboring properties
and streets. Any storage areas screened by visual barriers shall be
located upon the rear portions of a site, unless otherwise approved
in writing by J.A.G./Renton Properties Associates. No storage areas may
extend into a setback area except with the written approval of
J.A.G./Renton Properties Associates.
b. Provisions shall be made on each site for any necessary vehicle loading
and ro: on-street vehicle loading shall be permitted.
c. Load--g dock areas shall be set back, recessed or screened so as not to
be visible from adjacent lots, or sites, neighboring properties , or
streets, and in no event shall a loading dock be closer than seventy-
five (75) feet from a property line fronting upon a street unless
otherwise approved in writing from J.A.G./Renton Properties Associates.
3.10 REFUSE COLLECTION AREAS
Objectives
1. to insure that refuse and refuse containers are not visible from primary
visual exposure areas (streets, primary image entry drives, floors of image
buildings, common visual and recreational amenity areas, etc. )
2. to insure that refuse enclosures are effectively designed to receive and
contain generated refuse until collected, and enclose refuse containers after
refuse is collected
3. to insure that refuse collection vehicles have clear and convenient access to
refuse collection areas and thereby not contribute to excessive wear-and-tear
to on-site and off-site developments
Guidelines
1. All outdoor refuse containers shall be visually screened within a durable
6'-o" or higher non-combustible enclosure, so as not to be visible from
adjacent lots or sites, neighboring properties or streets. No refuse collec-
tion areas shall be permitted between a street and the front of a
building.
2. Refuse collection areas should be effectively designed to contain all refuse
generated on-site and deposited between collections. Deposited refuse should
not be visible from outside the refuse enclosure.
3. Refuse collection enclosures should be designed of durable materials with
finishes and colors which are unified and harmonious with the overall archi-
tectural theme.
4. Refuse collection areas should be so located upon the lot as to provide clear
and convenient access to refuse collection vehicles and thereby minimize
wear-and-tear to on-site and off-site developments.
5. Refuse collection areas should be designed and located on the lot so as to be
convenient for the deposition of refuse generated on-site.
3. 11 SCREENING OF EXTERIOR MECHANICAL EQUIPMENT
Objectives
1. to have all exterior components of plumbing, processing, heating, cooling and
ventilating systems not be directly visible from within the lot or from
ad cininc streets . lots or buildings.
Guidelines
1. Exterior components of plumbing, processing, heating, cooling, and ventila-
ting systems (including but not limited to piping, tanks , stacks , collectors ,
heating, cooling , and ventilating equipment fans , blowers , ductwork: , vents ,
louvers , meters, compressors, motors, incinerators , ovens, etc. ) , shall not
be directly visible from a height of 5 '-0" above any ground or ground floor
elevation at a distance closer than 200 feet from the closest building wall
on any lot, unless such components are an integral part of the building
exterior design concept and approved in writing by J.A.G./Renton Properties
Associates.
2. It is recommended that in the case of roof mounted mechanical equipment, that
building parapets be of such a height that roof mounted screening devices not
be required. If building parapets do not provide the required screening,
mechanical equipment shall be screened by an unobtrusive screening device
that will appear as an integrated part of the overall architectural design.
3. Any devices employed to screen exterior components of plumbing, processing,
heating, cooling, and ventilating systems from direct view shall appear as an
integrated park of the architectural design, and as such, be constructed of
complimentary and durable materials and finished in a complimentary texture
and color scheme to the overall architectural design.
4. Any exterior components of plumbing, processing, heating, cooling and
ventilating systems and their screening devices , that will be visible from
upper floors of adjacent buildings shall be kept to a visible minimum, shall
be installed in a neat and compact fashion, and shall be painted such a color
as to allow their blending with their visual background.
5. No exterior components of plumbing, processing, heating, cooling, and ventil-
ating systems shall be mounted on any building hall unless they are an
integrated architectural design feature, and in any case shall be permitted
only with the written approval of J.A.G./Renton Properties Associates.
3.12 SCREENING OF EXTERIOR ELECTRICAL EQUIPMENT AND TRANSFORMERS
Objectives
1. to minimize the visibility of exterior electrical equipment and transformers
from primary visual exposure areas (streets, primary image entry drives,
floors of image buildings, and common visual and recreational amenity areas,
etc. )
Guidelines
1 . Transformers that may be visible from any primary visual exposure area shall
be screened with either planting or a durable non-combustible enclosure (of a
design configuration acceptable to Puget Sound Power and Light). Where
possible, it is recommended that refuse containers and transformers be
integrated into the same enclosure.
2. Transformer enclosures should be designed of durable materials with finishes
and co. 3rs which are unified and harmonious with the overall architectural
theme.
3. Exterior mounted electrical equipment shall be mounted on the interior of a
buildir_ wherever possible. When interior mounting is not practical , elect-
rical ecuipment shall be mounted in a location where it is substantially
screerc_ from public view. In no case shall exterior electrical equipment be
mountec on the street-side or primary exposure side of any building.
4. Exterior mounted electrical equipment and conduits shall be kept to a visible
minimum, where visible shall be installed in a neat and orderly fashion, and
shall be painted to blend with its mounting background.
3.13 FENCES AND WALLS
Objectives
1. to permit the installation of fences and walls within a lot for the purpose
of site security, sound attenuation, separation of functional activities, and
screening of unsightly functions and activities
2. to have fences and walls installed such that they are as inconspicuous as
possible or designed as an integrated and complimentary architectural design
element adding interest to the overall architectural design concept
3. to have no walls or fences reduce the intended quality of development or
reduce the perception of Blackriver Technology Park as a series of high
quality business sites
4. to discourage the construction of walls and fences except as necessary to
screen outside storage, loading and service areas
5. to insure that fences and walls do not, because of their height, location, or
design, contribute to a decrease in the safety or efficiency of traffic flows
on-site or in fronting streets
Guidelires
1 . No fence or wall shall be constructed closer than thirty (30) feet from the
curbline of a fronting street unless it is of a height not to exceed 3'-0".
2. No fence or wall shall exceed a height of 8'-0" unless otherwise approved in
writing by J.A.G./Renton Properties Associates.
3. Walls and fences between buildings and fronting streets are discouraged, but
when necessary shall require written approval by J.A.G./Renton Properties
Associates.
4. All fences and walls shall be designed as an integrated part of the overall
architectural and site design. All materials shall be durable and finished
in textures and colors complimentary of the overall architectural design.
5. Where chain link fencing is to be employed, it shall be of a dark color and
be largely hidden behind plant materials and or earth mounding.
3.14 UTILITIES AND COMMUNICATION DEVICES
Objectives
1. to have the entire Blackriver Technology Park visually free of unsightly
overhead power and telephone lines, utility poles , and other utility and
communication equipment and components
2. to protect off-site utility systems from becoming over-burdened by individual
lot utility systems
3. to achieve minimum disruption of off-site utilities , paving and landscape
during construction and maintenance of on-site utility systems
Guidelines
1. All exterior on-site utilities including, but not limited to, drainage
systems, sewers, gas lines, water lines, and electrical , telephone, and
communications wires and equipment shall be installed and maintained under-
ground.
2. On-site underground utilities shall be designed and installed to minimize the
disruption of off-site utilities, paving and landscape during construction
and maintenance and shall be of such a design so as not to place excessive
burdens upon off-site utility systems during the course of use.
3. No antenna or device for transmission or reception of any signals, including,
but not limited to, telephone, television, and radio, shall be placed on any
lot so that it is visible from 5'-0" above the ground or ground floor level
at a distance of 500 feet in any direction, unless specific written approval
is granted by J.A.G./Renton Properties Associates.
4. Temporary overhead power and telephone facilities are permitted during
construction.
3. 15 GRADING
Objectives
1. to encourage site design which protects buildings and business activities
from damage or disruption that might otherwise occur during extreme storm
conditions .
2. to encourage site design which protects buildings and business activities
from damage or disruption during extreme storm conditions
3. to allow precipitation falling on site and surface water flowing from ad-
jacent sites to be effectively absorbed or to drain off the site without
causing excessive water concentrations on adjacent sites or streets
4. to have site grading compliment and reinforce the overall architectural and
landscape design character
Guidelines
1. All building first floor elevations shall be approximately one and one-half
feet (1i) to two and one-half (21) feet above the flow line of adjacent
streets (specific pad elevations and on-site drainage plans should be estab-
lished by the project consultant) .
2. Site grading design should compliment and reinforce the architectural and
landscape design character by helping to screen parking, loading and service
areas, by helping to reduce the perception of height and mass on larger
buildings, by providing reasonable transitions between on-site uses, by
providing elevation transitions contributing to the efficiency of on-site
and off-site movement systems , and by providing reasonable transitions
between lots.
3. 16 NUISANCES
Objectives
1. to insure that no portion of Blackriver Technology Park is used in such a
manner as to create a nuisance to adjacent sites or streets such as, but not
limited to, vibration, sound, electro-mechanical disturbance and radiation,
electro-magnetic disturbance, radiation, air or water pollution, dust,
emission of odorous, toxic or noxious matter
Guidelines
1. No nuisance shall be permitted to exist or operate upon any lot or site so as
to be offensive or detrimental to any adjacent lot or site or neighboring
property or to its occupants. A "nuisance" shall include, but not be limited
to, any of the following conditions:
a) Any use of the lot or site which emits dust, sweepings, dirt or cinders
into the atmosphere, or discharges liquid runoff and discharge into
river, which in the opinion of J.A.G./Renton Properties Associates , may
adversely affect the health, safety, or comfort of persons within the
area or the intended use of their property. No waste nor any substance
or materials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any
regulation of any public body having jurisdiction over such public
sewer;
b) The escape or discharge of any fumes , odors , gases , vapors, steam,
acias or other substance into the atmosphere which discharge, in the
opinion of J.A.G./Renton Property Associates, may be detrimental to the
health, safety or welfare of any person or may interfere with the
comfort of persons within the area or which may be harmful to property
or vegetation;
c) The radiation or discharge of intense glare or heat or atomic,
electro-magnetic, microwave, ultrasonic, laser or other radiation. Any
operation producing intense glare or heat or such other radiation shall
be performed only within an enclosed or screened area and then only in
such manner that the glare, or heat or radiation emitted will
not be discernible from any point exterior to the site or lot upon which
the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from
individual plant or operation, exceed the decibel levels in the
designated preferred octave bands as follows:
Octave Band Maximum Sound Pressure Levels
renter Freauency db' at Boundary Plane of _ot
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60db(A). The
maximum permissible noise levels for the octave bands shown above are
equal to an NC-50 Boise Criterion curve when plotted on the preferred
frequency scale.
Reasonable noise from motor vehicles and other transportation facilities
are exempted, so long as the vehicles or other transportation facilities
are not continuously on the subject property.
The operation of signaling devices and other equipment having impulsive
or non-continuous sound characteristics shall have the following correc-
tions applied:
Corrections
Pure Tone Content 5db
Impulsive Character 5db
Duration for Non-Continuous
Sounds in Daytime Only:
1 min/hr 5db
10 sec/10 min 10db
2 sec/10 min 15 db
The reference level for the db values listed above is the pressure of
0.00002 microbar or 0.0002 dyne/cm2
e) Excessive emissions of smoke, steam or particulate matter. Visible
emissions of smoke or steam will not be permitted (outside any building)
which exceed Ringlemann No. 1 on The Ringlemann Chart of the United
States Bureau of Mines. This requirement shall also be applied to the
disposal of trash and waste materials. Wind-borne dust, sprays
ana mists originating in plants are not permitted.
f) Grc,Ad vibration. Buildings and other structures shall be constructed,
and machinery and equipment installed, and insulated on each lot or site
so that the ground vibration inherently and recurrently generated is not
perceptible without instruments at any point exterior to any lot or
site.
4.0 Architectural Guidelines
Objectives
1. to encourage high quality, contemporary architectural design of all facil-
ities to be constructed within Blackriver Technology Park, thus allowing
Blackriver Technology Park to be positively differentiated from other bus-
iness parks
2. to encourage businesses located within Blackriver Technology Park to express
themselves individually through the architectural design of their facilities
Guidelines
1. All design shall appear as an integrated part of an overall site design.
2. No "Period Buildings" shall be permitted. Contemporary building forms and
materials will be encouraged.
3. Pre-engineered metal buildings will not be permitted. Metal -clad buildings
will be permitted only if designed by an architect and only if specifically
approved in writing by J.A.G./Renton Properties Associates.
4. Design corsideration should be given to:
a. views and vistas
b. solar orientation and climate
c. orientation toward major streets and thoroughfares
d. vehicular and pedestrian flows
e. the character of surrounding developments
f. expressions of a facility's functional organization
g. expressions of the individual character of each business
h. the satisfaction of physical , psychological , social and
functional needs of facility users
i . energy conservation through facility design
j . potential environmental hazards
k. enhancement of the overall landscape
5. Consideration should be given to the incorporation of design features such as:
a. highlighted visitor entrance and entry plazas
b. focal theme towers
c. enriched employee lunch areas
d. employee recreational facilities
e. accent lighting
f. atriums and interior courts
g. dynamic building and roof forms
h. striking window patterns
i . light and shadow patterns
j. color accents
Refer to Site Planning Guidelines and Landscape Guidelines for other design
features.
5.0 Landscape Guidelines
The landscape consists of elements that give form to exterior spaces. Thus, the
character of the landscape is created by major functional elements such as project
entrances, parking lots, buildings, service areas, signing, site lighting,
walkways, and the arrangement of plant materials.
Given that prc_ect architecture and building sites within Blackriver Technology
Park will most likely be of varying types and sizes , landscaping as a design
element will play the key role in creating and conveying the overall character of
Blackriver Tec-nology Park as a "park-like" working environment. The purpose,
then, of these Landscape Guidelines, is to provide design criteria which will help
to insure that Blackriver Technology Park achieves an image that is distinctive,
clearly understandable and unified.
5. 1 INTRODUCTION TO THE BLACKRIVER TECHNOLOGY PARK LANDSCAPE CONCEPT
As a part of Elackriver Technology Park Master Plan, hereinafter referred to as
Blackriver Technology Park, a Concept Master Plan has been conceived to organize,
unify and crew:e a distinctive character for the whole of the development. The
Concept Master Plan recognizes that Blackriver Technology Park consists of two
prominent zones , namely, the 'Streetscape Zone' and the ' Interior Zone ' . An
understanding :f the nature of these two zones is important to understanding the
landscape guicelines and their intent.
5.1.1 Streetscape Zone
The streetsca:= zone is the primary image setting zone on either side of
Southwest 4th :lace. All improvements within this corridor will have the greatest
degree of control . Attributes within this zone include:
1 . The Lands:ape Easement - This easement begins at the back of the
curb anc extends inward for a distance of 30 feet along the entire street.
The firs: 13 feet minimum (including walk) to 24 feet maximum are designated
as a "Pub: ic Parkway". The parkway includes a 5 foot walkway (see Figure C)
The remaining 6 feet minimum to 17 feet maximum shall be the "Transistion
Zone" , to be contoured and planted by the Owner or Occupant. Common elements
within the Landscape Easement include a walkway, planting, irrigation, street
lighting, project signing and project entries.
5.1.2 The Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified single
image, namely: a single row of street trees planted approximately 5 feet from the
curb line on a landscaped berm, on both sides of the main roadway. Lawn shall
occur from the curb to the walkway. Informal tree, shrub and groundcover
plantings shall occur between the walkway and the landscape easement.
Individual project entries will punctuate these plantings providing highlighted
corporate idertification.
A walkway wil; meander through the public parkway providing an added dimension to
the overall Blackriver streetscape scene.
5.1.3 Interior Zone
The Interior Zone encompasses all exterior elements not covered by the
requirements of Section 5.1.1 and 5.1.2. This zone is subject to the needs of
each Owner or Occupant and, thus, is meant to have a greater degree of flexibility
than the streetscape zones. Common concerns within this zone include: parking
lot arrangements and landscaping, site lighting, regulatory and directional
signing, and service area screening.
5.1.4 Interior Zone Design Concept
It is intended that the Interior Zone of Blackriver Technology Park, consisting
primarily of parking lot landscaping, be planted in geometric patterns. (Refer to
Section 2.2.5c for plant types). Subtle light levels, restrained graphics and
screening of service areas will all contribute to reinforcing the Blackriver
Technology Park landscape design concept.
The Streetscape within Blackriver Technology Park will consist of a unified single
image, namely: a single row of street trees planted on both sides of the
Southwest 4th dace approximately 5 feet from the curbline on a landscaped berm
Lawn will occur from the curbline to the walkway. Informal tree, shrub and
groundcover plantings shall occur between the walkway and the property line of
individual properties of Owners or Occupants. This is the "Transition Zone" .
Individual project entries will punctuate these plantings providing highlighted
corporate identification.
Two major Blackriver entry monuments will be provided, namely: entrances to
Blackriver Technology Park.
5. 1 .5 Grantor Provided Amenities
5.1.5a Exceptions
Exceptions to 5.1.4a above, shall occur at the west entry to Blackriver Technology
Park where a special entry landscape feature shall be provided by the Grantor
refer to the Concept Master Plan).
5.1.5b Entry Feature
The Grantor shall be responsible to provide a special landscaped feature at the
entrances to Powell Avenue S.W. and Naches Avenue S.W. (Refer to the Master Plan,
Exhibit A) . This area shall include a special landscaping and a Blackriver
identification monument (sign).
5.1.5c Pedestrian Easements
The Grantor shall be responsible to provide three(3) ten foot wide landscaped
pedestrian easements (refer to the Concept Master Plan Exhibit A). Landscaping in
this area shah include a five (5) foot wide walkway leading from the public
sidewalk within the landscape easement to preserve and/or buffer areas.
Landscaping or either side of the walkway shall be native groundcover vegetation.
5. 1.6 Other Requirements
5.1.6a
All planting areas shall have a fully automatic irrigation system.
5. 1.6b
All planting and irrigation details and technical specifications shall conform to
the highest standards of the American Association of Nurseryman , the American
Landscape Contractors Association, and the irrigation industry.
5. 1.6c
It shall be the Owner or Occupant's responsibility to provide a one year guarantee
against all defects of materials and workmanship for all planting and irrigation.
The Owner or Occupant shall replace plants not in normal , healthy growing
condition at the end of the guarantee period with same species and size. The
guarantee period shall begin when the Owner or Occupant, and Grantor or their
representative have accepted the work as 100 percent complete.
5.2 LANDSCAPE DESIGN GUIDELINES
5.2.1 Assessment District Installation and Maintenance Agreement
1. All landscape improvements within the Public Parkway (S.W. 4th Place Land-
scape Easement Section 5. 1 . 1-1 ) will ble installed by the Grantor.
2. The Grantor has entered into a five year maintenance agreement to maintain
the Public Parkway. Landscape maintenance will be paid for through
Assessment District revenues. Following the expiration of the five year
maintenance period, all maintenance will be assumed by the Owner or Occupant
of individual development parcels and will be assumed by the Owner cr Occu-
pant of individual development parcels and will be paid for through the
continuation of an Assessment District.
3. The 30 foot Landscape Easement (Public Parkway and Transistion
Zone) landscaping and irrigation will be installed as a continuouss linear
system. Demolition of this system at vehicular access points will be
necessary during the process of the access drive installation. It is a
responsibility of the Owner or Occupant to maintain the flow of the
irrigation system during construction, and to re-establish the planting,
grading and final irrigation layout that has been altered.
5.2.2 Maintenance of Unimproved Sites
1. Sites that are not improved or built upon shall be maintained in a clean
and neat appearance by the Owner or Occupant. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or more
often as required to maintain a high quality appearance. The Grantor and
their representative have the right to perform the necessary maintenance
and charge the individual Owner or Occupant as necessary.
5.2.3 Landscape Coverage
1. A minimum of fifteen (15) percent of the gross site area within the property
lines of a development site (exclusive of the Landscape Easement
Transition Zone) shall be devoted to landscape materials unless otherwise
approved in writing by the Grantor.
5.2.4 Street Frontage Zone Design Guidelines
The street frontage zone is defined as that portion of the site which is adjacent
to the Southwest 4th Place Landscape Easement.
5.2.4a Specific Design Limitation within the Street Frontage Zone
1. Grading: Finish grading for each site shall provide for a smooth transition
with the walkway in the Public Parkway. Transition slope in this zone shall
not exceed 4:1.
2. Service Areas: Service areas within this zone are to be enclosed with solid
walls anc screened with the appropriate landscape material . (Refer to
5.2.4.b-4 for plant types).
3. Parking: Berming shall be provided within the Transition Zone of the
Landscape Easement.
4. Screening Shrubs: The following shrubs, in combination with walls or fences,
have beer selected to aid in eye level screening of service areas . wanting
areas sra 1 be a minimum width of 4 feet. All planting areas exceeding 4
feet shall also conform to these landscape guidelines. The shrubs should
be planted at a size to achieve a minimum height of 5 feet within a 3 year
period from the date of planting.
Plant Na--2 Maximus Spacing Comments
Chaenomeies lagenaria 4' on center Full
Euonymous alatus 4' on center Full
Forsythia sp. 4' on center Full
Juniper chinesis var.4' on center Full
Juniper squamata var.4' on center Full
Ligustrum vulgare 4' on center Full
Philadelphus virginalis 4' on center Full
Spiraea prunifolia 4' on center Full
Spiraea vanhouttei 4' on center Full
Thuja occidentalis pyramidalis 3' on center Full
Thuja orientalis 4' on center Full
Viburnum opulus 4' on center Full
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
1. Two (2) types of trees are identified for the parking lot planting.
Refer to Section 5.2.5c for plant types)
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
Type A: These trees shall be planted at the ends of parking columns (see Figures
J , K, anc L) and at intermediate planting islands Figure J. A single tree
species, with a minimum height of 12 feet shall be planted throughout the
Owner or Occupant's entire parking lot compound.
Type B: These trees shall be planted in the parking lot interior (see Figures K
and L). A single tree species, with a minimum height of 8 feet shall be
used. The tree species may be different in separated parking lots within
the compcund. Credit will not be given for perimeter edge tree planting. A
minimum c= one (1) tree shall be planted for every six (6) car stalls.
2. Tree wells and planter areas within paved parking areas shall provide a
minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
4. All parr, -g lot planting beds in addition to Type A and Type B trees shall
be plantez with shrubs and/or groundcover. The size and spacing to conform
to Section 5.2.4.b.4.
5. Planting beds shall be a minimum of 25 square feet.
5.2.5.b Parking and Pedestrian Circulation
1. Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a minimum
width of 4 feet between stalls should be provided at key locations.
3. If parking lots exceed two rows in depth, the alignment of the aisles should
be in the direction of the pedestrian movement.
5.2.5c Parking Lot Plant Materials List
1. Tree species are to be selected from the following lists. If special soil or
site conditions prevent the use of the recommended trees, the Owner or Occu-
pant should recommend an alternative to the Design Review Committee.
Tree Lists for Parking Compounds
Type A Trees: (Refer to Section 5.2.5.a-1A)
Plant Name Minimum Size Comments
Acer platanoides, sp. var. 12' Well branched
Acer saccharur 12' Well branched
Aesculus hippocastanum 12' Well branched
Fraxinus americana (seedless) 12' Well branched
Gleditsia tr' anthos inermis 12' Well branched
Tilia cordata 12' Well branched
All Type A Trees to be limbed up to six (6) feet from the ground.
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Crataegous lavallei 8' Well branched
Crataegus phaenopyrum 8' Well branched
Malus, var. 8' Well branched
Prunus cerasifera 8' Well branched
Sorbus aucupar=a 8' Well branched
All Type B Trees to be limbed up to four (4) feet from the ground.
5.2.6 Vehicu-a r Access Drive Design Guidelines
5.2.6a Location Criteria
1 . The loco: on of major access drives shale be approved by the Grantor.
2. Access drives for "right turn only" ingress and egress should be located by
the Owner or Occupant according to City of Renton Standards.
5.2.6b LiF":E = Use Area of Primary and Secondary Access Drives
1. The "limited use area" is defined as the area extending 10 feet on either
side of an access drive and in that area of the first 10 feet extending
from the curbline of the public street.
2. All objects higher than 30 inches above the top of the curb at the access
drive curb opening, including but not limited to, shrubs, signs and earth
berms shall be located outside of the limited use area. Trees without limbs
to a height of six (6) feet may be planted in this area.
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side/Rear Yard Requirements
1. A 5 foot minimum planting strip is to be provided continuously along all
interior property lines not adjacent to landscape easements, except where a
shared access drive has been mutually agreed upon by adjoining property
owners.
2. All site drainage shall be coordinated with the overall project Site Drainage
Master Plan and shall comply with the City of Renton Storm Drainage
Ordinance.
3. A maximum slope of 2:1 is allowed within the 5 foot planting zone. A 1 foot
minimum flat transition shall be provided at the top and bottom of all slopes
within tr :s zone.
4. Where the two properties adjoin, there shall be a 10 foot minimum zone
created by the two 5 foot landscape planting strips on each side of a
property line. All planting areas exceeding the 5 foot minimum shall also
conform to these landscape guidelines.
5. No walls or fences shall be permitted within the required 5 foot minimum
planting zone. However, walls or fences separating adjoining parcels may be
permitted when located at the property line. Walls or fences which
contribute to a specific landscape design may be submitted to the Design
Review Committee for consideration.
5.2.7b Side/ ear Yard Landscape Requirements
1. General - Either shrub or tree planting shall be required in the 5 foot side
and rear yard zone. Where two properties adjoin, shrub plantings with
groundcover is required on one side of the property line and tree plantings
with groundcover is required on the other. The first Owner or Occupant to
receive plan approval shall be required to plant the required trees with
groundcover. The second Owner or Occupant must then plant the required
shrubs h- Ih grounocover.
5.2.7c Plant Material Requirements - Interior Property Lines
1 . Trees: Shall be located 4 feet from curbs or 1 foot from the property
line. _ trees selected for interior property lines must be species
selectec from the Tree List. (Refer to Section 5.2.5c)
2. Shrubs: Shall be located 3 feet from the property line or 2 feet from the
curb, and planted with a maximum spacing of 5 feet on center.
3. Groundcover: Shall be placed 24 inches on center maximum spacing, covering
all ground surfaces.
4. Sod lawn may be used in lieu of groundcover.
5.2.8 Guidelines for Exterior Property Lines
1. Side/Rear Yard Requirements Adjacent to Landscape Easements
a. Parking lots require no setback from the Landscape Easement. Parking
lotsshall be back five (5) feet from side on river property lines.
b. A trinimum 60 foot front yard setback is required. Landscaping within
this zone shall conform to praking lot landscaping and transition zone
landscaping.
5.2.9 Guidelines for Free Preservation Outside the "Preserve" Zone
Trees selecte: for preservation shall have a "tree well " (fill retaininc wall )
constructed tc maintain an undisturbed existing ground area around the tree.
Provide approximately 5 sq. ft. for each caliper inch of trunk measured at 48"
above existing grade. The tree well shall be constructed in a manner to protect
all roots. ?c root cutting allowed. Special care shall be taken to maintain
ground water level and quality as nearly as possible to pre-development
conditions. This may include special irrigation and drainage systems or culvert
systems connecting the tree wells to nearby wetlands so that the rise and fall of
ground water will be similar to pre-development conditions. Storm water may be
retained on-site as necessary or desirable to assist in maintaining ground water
levels.
Tree wells may be constructed of railroad ties, treated timbers or poured-in-place
concrete, wit,- an 8 inch high curb of timber, concrete or asphalt on all sides.
Provide hand rails where resultant depressions are more than 30 inches deep.
Conditions ma ,' vary at each tree location. Analyze each tree to ascertain the
best solution or combination of solutions to minimize adverse environmental
impacts.
Consult an Aborist regarding selection of trees to be preserved and preservation
procedures tc De used. Selected trees are subject to review and approva by the
City of Renton.
6.0 Signing Guidelines
6. 1 OBJECTIVES The objectives of Signing Guidelines for Blackriver Technology
Park are:
1. to allow sufficient, though not excessive, business identification devises so
that the name of each business locating in Blackriver Technology Park is
clearly and individually associated with the facilities it occupies, when
viewed by motorists passing by on fronting streets
2. to prohibit signs and business identification devices from being used for
advertising of any kind including, but not limited to, advertising of pro-
ducts , services, or job openings
3. to allow on each lot sufficient, though not excessive, informational , direc-
tional , and traffic control signing for convenient and efficient operation
4. to have all informational , vehicular control , and temporary signing be
uniform in design, size, height, color, material , and topography
5. to permit sufficient, though not excessive, temporary signing including those
identifying the future occupant, the design consultants, the general con-
tractor, lending institutions, sale or leasing agents, and the building
product to be offered
6. tc insure that signing and identification devices do not, because of their
height, location or design, contribute to a decrease in the safety and
efficiency of traffic flows in fronting streets
6.2 SIGN SUBMITTALS:
1 . An overall sign program including any (1) detached business identifica-
tion sicrs , (2) building mounted business or builaing identification signs
and (3) informational and vehicular control signs shall be submitted as part
of the preliminary plan submittal to the Blackriver Technology Park Design
Review Committee.
6.3 DETACHED BUSINESS IDENTIFICATION SIGNS:
1. Detached business identification signs shall be limited to the display of the
name and/or symbol of the business or businesses occupying the site. No
messages or advertising of any kind including, but not limited to, adver-
tising of products, services, or job openings shall be permitted.
2. No more than one detached business identification sign shall be permitted on
each street frontage of a development parcel .
3. No detached business identification sign shall exceed a sign area which is
the lesser of 50 square feet per side or the maximum sign area permitted by
the local governing authority. The sign area is defined as the area of the
surface or surfaces which displays letters or symbols identifying the bus-
iness or businesses occupying the site, or when the sign is of free-
standing letters, the single rectangular area which fully encloses all
letters or symbols identifying the business or businesses occupying the site.
The sign area shall not include the base or pedestal to which the sign is
mounted.
4. All detached business identification signs shall be permanent "ground hugger"
type signs and shall not exceed a height of five feet above the underlying
finish grade unless otherwise approved in writing by J.A.G./Renton Properties
Associates.
5. All detached business identification signs shall be of such materials and
design to be compatible with and complimentary to the on-site design concept
as well as landscape and physical design features.
6. Illumination - Detached business identification signs may be illuminated by
continuous and uniform internal illumination, backlighting, or ground light-
ing. No flashing or moving lights will be permitted. No unprotected lamp
providing sign illumination shall be directly visible when viewed at
any angle from a distance of twenty feet or more. No sign illumination shall
cast a glare which will be visible from any street or access drive.
7. Location - Detached business identification signs must be located within 20
feet of a fronting street and the access drive but shall not exceed 30 inches
in height when located in the first 10 feet adjacent to access drive closest
to the street.
6.4 BUILDING MOUNTED BUSINESS OR BUILDING IDENTIFICATION SIGNS:
1. Building r;,unted business or building identification signs shall be limited
to the display of the building name or the name and/or symbol of the business
occupying the site. No message or advertising of any kind including, but not
limited t: the advertising of products, services or job openings
shall be permitted.
2. No more than one building mounted sign shall be permitted for each street
frontage of a development parcel .
Eusiness building identification signs may be mounted to any vertical
surface c= a building or building associated wall provided such signs appear
as an integral part of the overall architectural and site design concept.
4. The sign area of building mounted business or building identification signs
may not exceed the lesser of 50 square feet or the maximum building mounted
sign area permitted by the local governing authority. The building mounted
sign area is defined as the area of the surface or surfaces which displays
letters or symbols identifying the business or businesses occupying the
site or when the sign is of freestanding letters, the single rectangular area
which fully encloses all letters or symbols identifying the business or
businesses occupying the site.
5. Building mounted business or building signs shall not extend beyond a height
above the ground floor which is the lesser of 32 feet or the maximum height
permitted by the local governing authority.
6. Building mounted business or building identification signs may be illuminated
by internal illumination or backlighting provided that the color and inten-
sity of such lighting appears as an integral part of the overall architec-
tural and site design concept. No sign illumination shall cast a glare which
will be visible from any street or access drive.
6.5 INFORMATIONAL AND VEHICULAR CONTROL SIGNS:
1. All informational and vehicular control signs shall be of uniform design
using ASI `=iberglass Post & Panel System or a sign system of equal design
which is specifically approved in writing by J.A.G./Renton Properties Assoc-
iates. All lettering shall be Helvetica Medium, white in color. Red and
yellow may be used for stop and yield signs respectively.
2. No informational or vehicular control sign shall have a panel face which
exceeds 5 square feet in area per side.
3. No business name, symbol or advertising of any sort shall be permitted on any
informaticnal or vehicular control sign.
4. No informational or vehicular control sign shall exceed a height of 4 feet
above the underlying grade.
5. No informational or vehicular control sign shall be located so as to reduce
the safe flow of vehicles or pedestrians.
6. No informational or vehicular control sign shall be internally illuminated or
illuminated from the ground.
6.6 TEMPORARY SIGNS.
Only one temporary sign plus one financing sign shall be permitted per
development parcel . No additional individual signs shall be permitted.
J.A.G./Renton Properties Associates or its representatives have the right to
remove unpermitted signs and charge the individual tenant or property owner
for the test of such removal .
2. Temporary development signs shall be of a uniform size, area, height, color,
and desicr as illustrated here and shall , at a minimum, identify Blackriver
Technoloc. Park and the business or company developing the parcel . The
remaining sign area shall be limited to identification of the following
and no other information:
a. a concise identification of the nature of the development
b. the : -ojected date of completion
c. the construction lender
d. the real estate brokerage firm
e. the General contractor
f. the architect
g. the ' andscape architect
h. the =tructural engineer
i . the civil engineer
j. the mechanical engineer
k. the electrical engineer
3. No temporary development sign shall be located so as to reduce the safe flow
of vehicles and pedestrians
4. All temporary development signs shall be removed prior to occupancy.
7 .0 Lighting Guidelines
7. 1 OBJECTIVES
1. to have on-site lighting contribute to the safe and efficient use of a
development site
2. to have on-site lighting contribute to site security
3. to have cr-site lighting compliment and reinforce the architecture and site
design character
4. to have on-site parking lot lighting fixtures and illumination levels be
consistent throughout Blackriver Technology Park
5. to prevent on-site lighting from casting glare onto adjacent lots
6. to prevent on-site lighting from casting glare onto adjacent streets in such
a manner as to decrease the safety of vehicular movement
7. to encourage lighting design that is in conformance with energy saving
guidelines
7.2 LIGHTING QUALITY
All lighting potentially visible from an adjacent street except bollard
lighting less than 42 inches high, shall be indirect or shall incorporate a
full cut off shield type fixture.
7.3 PARKING, ACCESS AND CIRCULATION AREAS
Parking areas, access drives, and internal vehicular circulation areas - All
parking lot lighting fixtures shall be a zero
series cr a fixture of similar "shoe box" type design mounted at 181 -0" atop
a square metal pole. Both the fixture and pole are to have a durable black
finish. The light source shall be 150 watt color corrected high pressure
sodium. The parking lot illumination level shall achieve a uniformity ratio
of 3 to 1 (average to minimum) with a maintained average of 1 foot
candle e' a minimum of .3 foot candle.
7.4 SERVICE AREAS
Service area lighting shall be contained within the service yard boundaries
and enclosure walls. No light spillover should occur outside the service
area. The light source should not be visible from the street.
7.5 BUILDING ILLUMINATION
Building illumination and architectural lighting shall be indirect in charac-
ter. (No light source visible). Indirect wall lighting or "wall washing"
overhead down lighting, or interior illumination which spills outside is
encouraged. Architectural lighting should articulate and animate the
particular building design as well as provide the required functional light-
ing for safety and clarity of pedestrian movement.
7.6 PEDESTRIAN AREAS
Pedestrian walk and area lighting is segmented into 2 zones.
1. The first zone is pedestrian area lighting. This is for outdoor pedes-
trian use areas such as courtyard, entry way, etc. Pedestrian area
lightinc should achieve a uniformity ratio of 3.5 to 1 average to
minimum, with an average illumination of .60 foot candles and a minimum
of .18 fcot candles.
2. The second zone is pedestrian walk lighting where point to point
lightinc is acceptable with no specific illumination levels required.
The main emphasis in this zone should be to clearly identify the pedes-
trian walkway and direction of travel .
8.0 Appendix
CONTACT AND REFERENCE LIST
DEVELOPER (Grantor)
J.A.G./Renton Properties Associates
Alterra Corp. , General Partner
710 Cherry Street
Seattle, WA 9E104
Phone: (206) 382-0333
Contact: Delton Bonds
PROJECT CONSULTANT (Planning, Site, Civil & Utilities Design, Landscape
Architecture)
Richard Carothers Associates
814 E. Pike Street
Seattle, WA 9E122
Phone: (206) 324-5500
Contact: Richard A. Carothers
GOVERNMENTAL ;SENCIES
City of Renton
Municipal Building
200 Mill Aver-_-E South
Renton, WA 9cJE5
o Planning 5epartment
Ronald G. Nelson, Director
PFone (2=: ` 235-2540
Contact: Roger J. Blalock, Zoning Administrator
Jerry Lind, Land Use Inspector
o Public Works
Richard Houghton, Director
Phone (206) 235-2569
Contact: Richard Houghton
o Engineering Department
Robert Bergstrom, P.E. , Director
Phone (206) 231-2631
Contact: Robert Bergstrom, P.E.
o Fire Department
James Matthew, Fire Marshall
Phone (206) 235-2642
Contact: James Matthew
PLANNING & DESSN REFERENCES
Renton Zoning Ordinance
Building Regulations, Title 4, Chapter 23 (Grading & Filling)
Subdivision Ordinance, Chapter 11 (Preliminary Plat)
Controlling Building Code: Uniform Building Code with City enacted amendments.
Maps and plans , Contact J.A.G./Renton Properties Associates
Covenants, Conditions and Restrictions
Contents
DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS
FOR BLACKRIVER TECHNOLOGY PARK
Page No.
RECITALS 1
1.0 DEFINITIONS 2
1.1 Architect, Landscape Architect, Civil Engineer
1.2 Beneficiary
1.3 Declarant
1.4 Declaration
1.5 Deed of Trust
1.6 Improvement - Improvements
1.7 Lot
1.8 Mortgage
1.9 Mortgagee
1.10 Occu:ant
1.11 Owner
1. 12 Record - Recorded - Recordation
1.13 Sign
1.14 Street or Streets
1.15 Subject Property
1.16 Viso ,e from Neighboring Property
2.0 SUBJECT PROPERTY 4
2.1 General Declaration
2.2 Addition of Other Realty
2.3 Notice of Addition of Land
3.0 CONSTRUCTION OF IMPROVEMENTS 6
3.1 Approval of Plans Required
3.2 Basis for Approval
3.3 Review Fee
3.4 Result of Inaction
3.5 Approval
3.6 Proceeding with Work
3.7 Completion of Work
3.8 Declarant Not Liable
3.9 Construction Without Approval
4.0 DEVELOPMENT STANDARDS 10
4.1 Minimum Setback
4.2 Exceptions to Setback Requirements
4.3 Lancscaping
Page No.
4.0 DEVELOPMENT STANDARDS (Continued)
4.4 Signs
4.5 Parking Areas
4.6 Storage and Loading Areas
5.0 REGULATIC'; OF OPERATIONS AND USES 14
5.1 Permitted Uses
5.2 Prohibited Uses
5.3 Nuisances
5.4 Condition of Property
5.5 Maintenance of Grounds
5.6 Remedies for Failure to Maintain & Repair
a) Remedies
b) Foreclosure of Lien
c) Cure
d) Nonexclusive Remedy
5.7 Taxes and Assessments
5.8 Refuse Collection Areas
5.9 Repair of Buildings
5.10 Public Utilities
5.11 Utility Lines and Antennas
5. 12 Mechanical Equipment
5.13 Mireral Exploration
5. 14 Other Operations and Uses
6.0 MODIFICATION AND REPEAL 23
E . 1 Prccedure
6.2 Modification by Declarant
6.3 Governmental Regulation
7.0 ENFORCEMENT 25
7.1 Abatement and Suit
7.2 Right of Entry
7.3 Deemed to Constitute a Nuisance
7.4 Attorney's Fee
7.5 Failure to Enforce is No Waiver
8.0 ASSIGNMENT 27
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE 27
10.0 WAIVER 28
Page No.
11.0 RUNS WITH LAND 28
12.0 RIGHTS OF MORTGAGEES 28
13.0 CAPTIONS 29
14.0 EFFECT OF INVALIDATION Z9
DECLARATION OF COVENANTS
CONDITIONS AND RESTRICTIONS
FOR
BLACKRIVER TECHNOLOGY PARK
This Declaration, made this day of 1984, by J.A.G./
Renton Properties Associates, a Washington Partnership, is made with reference to
the following facts:
RECITALS
A. Blackriver Technology Park is the owner of that certain real property in the
City of Renton, County of King, State of Washington described in Exhibit A attached
hereto and by this reference incorporated herein, and known as Blackriver Technology
Park.
B. Blackriver Technology Park is being developed as a planned industrial park.
It is J.A.G./Ps-ton Properties Associates desire and intention to subject the real
property in said industrial park to certain covenants , conditions and restrictions
for the benefit of the property, J.A.G./Renton Properties Associates, and the
purchasers of lots in Blackriver Technology Park. It is intended that said
covenants, conditions and restrictions bind and benefit not only said purchasers
and J.A.G./Renton Properties Associates, but also their respective successors,
heirs and assigns and that all lots in Blackriver Technology Park should be held,
used, leased, sold and conveyed subject to the covenants, conditions and
restrictions set forth in this Declaration.
1-
C. It is the intention of J.A.G./Renton Properties Associates to further a plan
of subdivision by means of the covenants, conditions and restrictions set forth in
this Declaration. Said covenants, conditions and restrictions are intended to be
common to all cr the lots in Blackriver Technology Park and to enhance and protect
the value, desirability and attractiveness of all such lots to their mutual
benefit.
1.0 DEFINITIO":S
Unless the context otherwise specifies or requires, the terms defined in this (1.0
Definitions) , shall as used in this Declaration, have the meanings herein set
forth:
1. 1 Architect. Landscape Architect, Civil Engineer. The term "architect,
landscape architect and civil engineer" , shall mean a person holding a certificate
to practice architecture, landscape architecture or civil engineering, in the State
of Washington.
1.2 Beneficiary. The term "beneficiary" shall mean a mortgagee under a mortgage
as well as a beneficiary under a deed of trust.
1 .3 Declarant . The term "Declarant" shall mean J.A.G./Renton Properties
Associates and, to the extent provided in Article VIII of this Declaration, its
successors and assigns.
1.4 Declaration. The term "Declaration" shall mean this Declaration of Covenants,
Conditions and Restrictions for Blackriver Technology Park, as it may from time to
time be amended or supplemented.
1.5 Deed of Trust. The term "deed of trust" shall mean a mortgage as well as a
deed of trust.
1.6 Blackriver Technology Park. The term "Blackriver Technology Park" shall be
synonymous with the term "subject property" and shall mean all of the real property
2-
now or hereafter made subject to this Declaration. 1.7 Improvement - Improvements.
The term "improvement" or "improvements" shall include buildings, outbuildings,
roads, driveways, parking areas, fences, screening walls and barriers, retaining
walls, stairs , decks , water lines , sewers , electrical and gas distribution
facilities , hedges, windbreaks, plantings, planted trees and shrubs, poles, signs ,
loading areas and all other structures, installations and landscaping of every type
and kind, whether above or below the land surface.
1.8 Lot. The term "lot" shall mean a fractional part of the subject property as
subdivided on subdivision or parcel maps recorded from time to time in the Office
of the Recorder of the County of King, State of Washington.
1.9 Mortgage. The term "mortgage" shall mean a deed of trust as well as a
mortgage.
1.10 Mortgagee. The term "mortgagee shall mean a beneficiary under, or holder of,
a deed of trust as well as a mortgagee under a mortgage.
1. 11 Occupant. The term "Occupant" shall mean a lessee or licensee of an Owner, or
any other person or entity other than an Owner in lawful possession of a lot with
the permission _t the Owner.
1. 12 Owner. The term "Owner" shall mean and refer to any person or entity which is
the record Owner of fee simple title to any lot, excluding any entity or person who
holds such interest as security for the payment of an obligation, but including
contract sellers and any mortgagee or other security holder in actual possession of
a lot.
1.13 Record - Recorded - Recordation. The terms "record," "recorded," or
recordation" shall mean, with respect to any document, the recordation of said
document in the Office of the Recorder of the County of King, State of Washington.
3-
1 . 14 Sign. The term "sign" shall mean any structure, device or contrivance,
electric or non-electric, upon or within which any poster, bulletin, printing,
lettering, painting, device or other advertising of any kind whatsoever used,
placed, posted , tacked, nailed, pasted, or otherwise fastened or affixed.
1. 15 Street of Streets. The term "street" or "streets" shall mean any street,
highway, road, or thoroughfare within or adjacent to the subject property and shown
on any recorded subdivision or parcel map, or record or survey, whether designated
thereon as street, boulevard, place, drive, road, court, terrace, way, lane, circle
or otherwise.
1. 16 Subject Property. The term "subject property shall be synonymous with the
term "Blackriver Technology Park" and shall mean all of the real property now or
hereinafter made subject to this Declaration.
1.17 Visible from Neighboring Property. The term "visible from neighboring
property" shall mean, with respect to any given object on a lot, that such object
is or would be visible to a person six (6) feet tall , standing on any part of any
adjacent lot or other property at an elevation no greater than the elevation of the
base of the object being viewed.
2.0 SUBJECT PROPERTY
2.1 General Declaration. Declarant hereby declares that all of that real property
located in the City of Renton, County of King, State of Washington, and more
particularly described in Exhibit "A" is , and shall be, conveyed, hypothecated,
encumbered, leased, occupied, built upon or otherwise used, improved or transferred
in whole or in part, subject to this Declaration. All of the covenants, conditions
and restrictions set forth herein are declared and agreed to be in furtherance of a
general plan for the subdivision, improvement and sale of said real property and
are established for the purpose of enhancing and protecting the value, desirability
4-
and attractiveness of the subject property and every part thereof. All of said
covenants , conditions and restrictions shall run with all of the subject property
for all purposes and shall be binding upon and inure to the benefit of Declarant
and all Owners , Occupants , and their successors in interest as set forth in this
Declaration.
2.2 Addition of Other Realty. Declarant may at any time during the pendency of
this Declaration add all or a portion of any real property now or hereinafter owned
by Declarant to the subject property, and upon recording of a notice of addition of
real property containing at least the provisions set forth in Section 2.3, the
provisions of this Declaration specified in said notice shall apply to such added
real propert_ in the same manner as if it were originally covered by this
Declaration. Thereafter, to the extent that this Declaration is made applicable
thereto, the rights, powers and responsibilities of Declarant and the Owners and
Occupants of lots within such added real property shall be the same as in the case
of the real property described in Exhibit "A".
2.3 Notice of Addition of Land. The notice of addition of real property referred
to in Sectic- 2.2 shall contain at least the following provisions :
a) A reference to this Declaration stating the date of recording and the book or
books of the records of King County, Washington, and the page numbers where this
Declaration is recorded;
b) A statement that the provisions of this Declaration, or some specified part
thereof, shall apply to such added real property;
c) A legal description of such added real property; and
d) Such other or different covenants, conditions and restrictions as Declarant
shall , in its discretion, specify to regulate and control the use, occupancy and
improvements of such added real property.
5-
3.0 CONSTRUCTION OF IMPROVEMENTS
3. 1 Approval of Plans Required. No improvements shall be erected, placed,
altered, maintained or permitted to remain on any lot by any Owner or Occupant
until final pens and specifications shall have been submitted to and approved in
writing by Declarant. Such final plans and specifications shall be submitted in
duplicate over the authorized signature of the Owner or Occupant or both of the lot
or the authorized agent thereof. Such plans and specifications shall be in such
form and shall contain such information as may be required by the Declarant, but
shall in any event include the following:
a) A site development plan of the lot showing the nature, grading scheme, kind,
shape, composition, and location of all structures with respect to the particular
lot (includinc proposed front, rear and side setback lines) , and with respect to
structures on adjoining lots, and the number and location of all parking spaces and
driveways on the lot;
b) A landscaping plan for the particular lot;
c) A plan for the location of signs and lighting; and
d) A buildir_ elevation plan showing dimensions , materials and extericr color
scheme in no less detail than required by the appropriate governmental authority
for the issuance of a building permit. Material changes in approved plans must be
similarly submitted to and approved by Declarant.
3.2 Basis for Approval . Approval shall be based, among other things, upon
adequacy of site dimensions, adequacy of structural design, conformity and harmony
of external design with neighboring structures, effect of location and use of
proposed improvements upon neighboring lots, proper facing of main elevation with
respect to nearby streets, adequacy of screening of mechanical , air conditioning or
other roof top installations, and conformity of the plans and specifications to the
purpose and general plan and intent of this Declaration. No plans will be approved
6-
which do not provide for the underground installation of power, electrical ,
telephone and other utility lines from the property line to buildings. Plans which
provide for metal-clad buildings will be approved only on the condition that such
buildings are constructed so as not to have the appearance of a metal building and
any metal-clad building must be specifically approved in writing. Declarant shall
not arbitrarily or unreasonably withhold its approval of any plans and
specifications. Except as otherwise provided in this Declaration, Declarant shall
have the right to disapprove any plans and specifications submitted hereunder on
any reasonable grounds including, but not limited to, the following:
a) Failure to comply with any of the restrictions set forth in this Declaration;
b) Failure to include information in such plans and specifications as may have
been reasonably requested by Declarant;
c) Objection to the exterior design, the appearance of materials or materials
employed in any proposed structure;
d) Objection on the ground of incompatibility of any proposed structure or use
with existing structures or uses upon other lots, or other property in the vicinity
of the subject property;
e) Objection to the location of any proposed structure with reference to other
lots, or other property in the vicinity;
f) Objection to the grading or landscaping plan for any lot;
g) Objection to the color scheme, finish, proportions, style or architecture,
height, bulk or appropriateness of any structure;
h) Objection to the number or size of parking spaces, or to the design of the
parking area;
i ) Any other matter which, in the judgment of the Declarant, would render the
proposed improvements or use inharmonious with the general plan for improvement of
7-
the subject property or with improvements located upon other lots or other property
in the vicinity.
3.3 Review Fee. An architectural review fee shall be paid to Declarant at such
time as plans and specifications are submitted to it based upon the following
schedule:
a) When the plans submitted are prepared by a licensed architect, engineer or
landscape architect, the architectural review fee shall be the sum of One Hundred
and no/100ths Dollars ($100.00);
b) In all other cases, the architectural review fee shall be the sum or Two
Hundred Fifty and no/100ths Dollars ($250.00) .
3.4 Result of Inaction. If Declarant fails either to approve or disapprove plans
and specifications submitted to it for approval within forty-five (45) days after
the same have been submitted, it shall be conclusively presumed that Declarant has
disapproved said plans and specifications; provided, however, that if within the
forty-five (45) day period Declarant gives written notice of the fact that more
time is required for the review of such plans and specifications , there shall be no
presumption that the same are disapproved until the expiration of such reasonable
period of time as is set forth in the notice.
3.5 Approval . Declarant may approve plans and specifications as submitted, or as
altered or amended, or it may grant its approval to the same subject to specific
conditions. Upon approval or conditional approval by Declarant of any plans and
specifications submitted, a copy of such plans and specifications, together with
any conditions, shall be deposited for permanent record with Declarant, and a copy
of such plans and specifications, bearing such approval together with any
conditions, shall be returned to the applicant submitting the same.
8-
3.6 Proceedinc with Work. Upon receipt of approval from Declarant pursuant to
Section 3.5, the Owner, or Occupant, or both, to whom the same is given, shall , as
soon as practicable, satisfy any and all conditions of such approval and shall
diligently proceed with the commencement and completion of all approved excavation,
construction, refinishing, and alterations. In all cases, work shall commence
within one (1) year from the date of approval , and if work is not so commenced
approval shall be deemed revoked unless Declarant, pursuant to written request made
and received prior to the expiration of said one (1) year period, extends the
period of time within which work must be commenced.
3.7 Completion of Work. Any improvement commenced pursuant hereto shall be
completed within two (2) years from the date of Declarant's approval of the plans
and specifications therefor, except for so long as such completion is rendered
impossible, or unless work upon the proposed improvements would impose a great
hardship upon the Owner or Occupant, to whom Declarant's approval is given, due to
strike, fire, national emergency, natural disaster or other supervening force
beyond the control of Owner or Occupant. Declarant may, upon written request made
and received rrior to the expiration of the two (2) year period, extend the period
of time within which work must be completed. Failure to comply with this Section
3.7 shall constitute a breach of this Declaration and subject the party in breach
to the enforcement procedures set forth in 7.0.
3.8 Declarant Not Liable. Declarant shall not be liable for any damage, loss or
prejudice suffered or claimed by any person on account of:
a) The approval or disapproval of any plans, drawings and specifications, whether
or not in any way defective;
b) The construction of any improvement, or performance of any work, whether or
not pursuant to approved plans , drawings and specifications; or
9-
c) The development of any lot within Blackriver Technology Park.
3.9 Construction Without Approval . If any improvement shall be erected, placed or
maintained upon any lot, or the exterior design thereof, or any new use commenced
upon any lot, other than in accordance with the approval by the Declarant pursuant
to the provisions of this 3.0 (Construction of Improvements) , such alteration,
erection, placement, maintenance or use shall be deemed to have been undertaken in
violation of this Declaration, and upon written notice from Declarant, any such
improvement so altered, erected, placed, maintained or used upon any lot in
violation of this Declaration shall be removed or altered so as to conform to this
Declaration, and any such use shall cease or be amended so as to conform to this
Declaration. Should such removal or alteration, or cessation or amendment of use
not be accomplished within thirty (30) days after receipt of such notice, then the
party in breach of this Declaration shall be subject to the enforcement procedures
set forth in 7.0.
4.0 DEVELOPMENT STANDARDS
4. 1 Minimum Setback. No improvements of any kind, and no part thereof, shall be
placed closer :nan permitted by Declarant to an interior property line , except as
otherwise provided in Section 4.2. "Interior property line" shall mean the
boundary between any lot within the subject property and all other lots bordering
upon said lot. No improvements of any kind, and no part thereof, shall be placed
closer than twenty-five (25) feet from a property line fronting the following
streets: (1) Southwest Fourth Place and (2) Naches Avenue S.W. "Property line"
shall mean the boundary of every lot.
4.2 Exceptions to Setback Requirements. The following improvements, or parts of
improvements, are specifically excluded from the setback requirements set forth in
Section 4. 1:
10-
a) Roof overhang, subject to approval in writing from Declarant, provided said
overhang does not extend more than six (6) feet into the setback area;
b) Steps and walkways;
c) Paving arc' associated curbing;
d) Fences , except that no fence shall be placed closer than twenty-five (25) feet
from a property line fronting upon any public street without the prior written
approval of Declarant;
e) Landscaping and irrigation systems;
f) Planters, not to exceed three (3) feet in height, except that planters of
greater height may be built within the setback area with the prior written approval
of Declarant;
g) Industrial park identification signs , directional and parking signs and signs
identifying the Owner or Occupant of a lot, subject to the prior written approval
of Declarant;
h) Lighting facilities, subject to the prior written approval of Declarant; and
i ) Underground utility facilities and sewers.
4.3 La1dscaE'^a. Within ninety (90) days following completion of construction , or
by the date each improvement is occupied, whichever shall occur first, each lot
shall be landscaped in accordance with the plans and specifications. The area of
each lot between any street and any minimum setback line as set forth in Section
4. 1 shall be landscaped with an attractive combination of trees, shrubs and other
ground cover. All other areas fronting on a street and not utilized for parking,
driveways, or walkways shall be landscaped in a complementary and similar manner.
All portions of a lot not fronting a street and not used for parking, storage or
buildings shall be landscaped utilizing ground cover and shrub or tree materials.
The Owner or Occupant shall be responsible for landscaping and maintaining the area
11-
known as the ' transition zone' ; refer to Landscape Design Guidelines. An
underground landscape irrigation system shall be provided and maintained by the
Owner or Occupant for all landscaped areas. Areas used for parking shall be
landscaped, bermed or attractively fenced in such a manner as to screen said areas
from view from adjacent streets and freeways. Such screening shall extend at least
forty-two (42) inches above the high point of the finished pavement in said parking
area. Plant materials used for this purpose shall consist of lineal or grouped
masses of shrubs and trees.
After completion, such landscaping as is herein required shall be maintained in a
sightly and well-kept condition. If, in Declarant's reasonable opinion, the
required landscaping is not maintained in a sightly and well -kept condition,
Declarant shall be entitled to the remedies set forth in 7.0.
4.4 Signs. No sign shall be permitted on any lot unless approved by Declarant in
writino, No Sian shall be approved other than industrial park identification
signs , directional and parking signs, signs identifying the name, business and
products of the Owner or Occupant of a lot, and signs offering the lot for sale or
lease.
4.5 Parking Areas. Off-street parking adequate to accommodate the parking needs
of the Owner or Occupant, the employees and visitors thereof shall be provided by
the Owner or Occupant of each lot. The intent of this provision is to eliminate
the need for any on-street parking; provided, however, that nothing herein shall be
deemed to prohibit on-street parking of public transportation vehicles. If parking
requirements increase as a result of a change in the use of a lot or in the number
of persons employed by the Owner or Occupant, additional off-street parking shall
be provided so as to satisfy the intent of this section. All parking areas shall
conform to the following standards:
12-
a) Required off-street parking shall be provided on the lot, on a contiguous lot,
or within such distance from the lot as Declarant deems reasonable. Where parking
is provided other than upon the lot concerned, Declarant shall be given a certified
copy of a recorded instrument, duly executed and acknowledged by the person or
persons holding title to the lot or other property upon which the parking area is
located, stipulating to the permanent reservation of the use of the lot or other
property for such parking area.
b) Parking areas shall be paved so as to provide dust-free, all-weather surfaces.
Each parking space provided shall be designated by lines painted upon the paved
surface and shall be adequate in area. All parking areas shall provide, in
addition to parking spaces , adequate driveways and space for the movement of
vehicles.
c) In determining the adequacy of the number of parking spaces to be provided by
an Owner or Occupant, Declarant shall consider the nature of the proposed use of
the lot, the amount of vehicular traffic generated by said use, the anticipated
number of, and manner of employment of, persons to be employed upon the lot; the
nature and location of proposed structures upon the lot; and such other matters as
Declarant shall reasonably deem relevant.
d) No parking spaces shall be located on or permitted within setback areas
adjacent to a street as set forth in Section 4.1, except that parking spaces may be
located on or parking permitted within such area if Declarant's written permission
is first obtained. Permission will not be given in any event unless parking areas
within such setback areas are screened from view of the street by shrubs and trees,
by a screen wall or by berms, and any such screening must extend at least forty-two
42) inches above the high point of the finished pavement in said parking area.
13-
4.6 Storage and Loading Areas. Storage, maintenance and loading areas must be
constructed, maintained and used in accordance with the following conditions:
a) Unless approved in writing by Declarant, no materials, supplies or equipment,
including trucks or other motor vehicles , shall be stored upon a lot except inside
a closed building or behind a visual barrier screening such materials, supplies or
vehicles so as not to be visible from neighboring property and streets. Any
storage areas screened by visual barriers shall be located upon the rear portions
of a lot, unless otherwise approved in writing by Declarant. No storage area may
extend into a setback area as defined in Section 4. 1 except with the written
approval of Declarant.
b) Provisior shall be made on each site for any necessary vehicle loading and no
on-street vehicle loading shall be permitted.
c) Loading dock areas shall be set back, recessed or screened so as not to be
visible from neighboring property or streets and in no event shall a loading dock
be closer than seventy-five (75) feet from a property line fronting upon a street
unless otherwise approved in writing by Declarant.
5.0 FEGULATIC, OF OPERATIONS AND USES
5. 1 Permitted Uses. Except as otherwise specifically prohibited herein, any
industrial operation and use will be permitted upon a lot, provided that Declarant
specifically consents to such use in writing. Such approved use shall be performed
or carried out entirely within a building that is so designed and constructed that
the enclosed operations and uses do not cause or produce a nuisance to other lots
or property, such as, but not limited to, vibration, sound, electro-mechanical
disturbances, electro-magnetic disturbances, radiation, air or water pollution,
dust, or emission of odorous, toxic or non-toxic matter (including steam). Certain
activities which cannot be carried on within a building may be permitted, provided
14-
Declarant specifically consents to such activity in writing and further provided
such activity is screened so as not to be visible from neighboring property and
streets. All lighting is to be shielded so as not to be visible from neighboring
property.
5.2 Prohibited Uses. The following operations and uses shall not be permitted on
any property subject to this Declaration:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling for and removing oil , gas or other hydrocarbon substances;
e) Refining cf petroleum or of its products;
f) Commercial petroleum storage yards;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary in the
course of approved construction pursuant to 3.0, Construction of Improvements;
h) Distillation of bones;
i ) Dumping, cisposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
15-
q) Automobile , go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race tracks;
r) Retail stores or shopping centers;
s) Commercia' service stations or gasoline stations;
t) Commercial restaurants or snack bars; or
u) Banks or savings and loans institutions.
5.3 Nuisances. No nuisance shall be permitted to exist or operate upon any lot so
as to be offensive or detrimental to any adjacent lot, or property or to its
occupants. A "nuisance" shall include, but not be limited to, any of the following
conditions:
a) Any use, excluding reasonable construction activity, of the lot which emits
dust, sweepincs , dirt of cinders into the atmosphere, or discharges liquid, solid
wastes or other matter into any stream, river, or other waterway which, in the
opinion of Declarant, may adversely affect the health, safety, comfort of, or
intended use of their property by persons within the area. No waste nor any
substance or materials of any kind shall be discharged into any public sewer
serving the s,..:ject property or any part thereof in violation of any regulation of
any public body having jurisdiction over such public sewer;
b) The escape or discharge of any fumes, odors, gases, vapors, steam, acids or
other substance into the atmosphere which discharge, in the opinion of Declarant,
may be detrimental to the health, safety or welfare of any person or may interfere
with the comfort of persons within the area or which may be harmful to property or
vegetation;
c) The radiation or discharge of intense glare or heat, or atomic, electro-
magnetic, microwave, ultrasonic, laser or other radiation. Any operation producing
intense glare or heat or such other radiation shall be performed only within an
16-
enclosed or screened area and then only in such manner that the glare, heat or
radiation emitted will not be discernible from any point exterior to the site or
lot upon which the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from any
individual plant or operation, exceed the decibel levels in the designated
preferred octave bands as follows:
Octave Bank Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
Hz
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60 db(A) . cxirur,
permissible noise levels for the octave bands shown above are equal to an NC-50
Noise Criterion curve when plotted on the preferred frequency scale.
Reasonable noise from motor vehicles and other transportation facilities are
exempted, so long as the vehicles or other transportation facilities are not
continuously on the subject property. The operation of signalling devices and other
equipment having impulsive or non-continuous sound characteristics shall have the
following corrections applied:
Corrections
Pure Tone Content 5dB
Impulsive Character 5dB
Duration for Non-
Continuous Sounds
in Daytime Only,
1 min/hr 5dB
10 sec/10 min 10dB
17-
2 sec/10 min 15dB
The reference level for the dB values listed above is the pressure of 0.0002
microbar or 0.0002 dyne/cm2.
e) Excessive e-jssions of smoke, steam or particulate matter. Visible emissions
of smoke or steam will not be permitted (outside any building) which exceed
Ringlemann No. I on the Ringlemann Chart of the United States Bureau of Mines.
This requiremert shall also be applied to the disposal of trash and waste
materials. Wind-borne dust, sprays and mists originating in plants are not
permitted.
f) Ground vibration. Buildings and other structures shall be constructed, and
machinery and equipment installed, and insulated on each lot so that the ground
vibration inherently and recurrently generated is not perceptible without
instruments at any point exterior to any lot.
5.4 Condition of Property. The Owner or Occupant of any lot shall , at all times,
keep it and the buildings , improvements and appurtenances thereon in a safe, clean
and wholesome condition and comply, at its own expense, in all respects with all
applicable ec._rnmental , health, fire and safety ordinances , regulations ,
requirements ar.d directives and the Owner or Occupant shall at regular and frequent
intervals remove at its own expense any rubbish of any character whatsoever which
may accumulate upon such lot.
5.5 Maintenance of Grounds. Each Owner shall be responsible for the maintenance
and repair of all parking areas, driveways, walkways and landscaping on his lot.
Such maintenance and repair shall include, without limitation:
a) Maintenance of all parking areas, driveways and walkways in a clean and safe
condition, including the paving and repairing or resurfacing of such areas when
necessary with the type of material originally installed therein or such substitute
18-
therefor as shall , in all respects , be equal thereto in quality, appearance and
durability; the removal of debris and waste material and the washing and sweeping
of paved areas as required; painting and repainting of striping markers and
directional sic-als as required;
b) Cleaning, maintenance and relamping of any external lighting fixtures except
such fixtures and may be the property of any public utility or government body; and
c) Performance of all necessary maintenance of all landscaping including the
trimming, watering and fertilization of all grass, ground cover, shrubs or trees,
removal of dead or waste materials, replacement of any dead or diseased grass,
ground cover, shrubs, or trees.
Nothing contaired herein shall preclude an Owner from recovering from any person
liable therefor, damages to which such Owner might be entitled for any act or
omission to act requiring an expenditure by the Owner for the maintenance and
repair of the parking area, driveway, walkway and/or landscaping on his lot.
5.6 Remedies for Failure to Maintain and Repair.
a) Remedies. If any Owner shall fail to perform the maintenance and repair
required by Se::ion 5.5, then Declarant, after fifteen days ' prior written notice
to such delinquent Owner, shall have the right, but not the obligation, to perform
such maintenance and repair and to charge the delinquent Owner with the cost of
such work together with interest thereon at the rate of twelve percent (12%) per
annum from the date of Declarant' s advancement of funds for such work to the date
of reimbursement of Declarant by Owner. If the delinquent Owner shall fail to
reimburse Declarant for such costs within ten days after demand therefor, Declarant
may, at any time within two years after such advance, file for record in the Office
of County Recorder of King County, Washington a claim of lien signed by Declarant
for the amount of such charge together with interest thereon, which claim shall
19-
contain: (1) a statement of the amount unpaid and the interest accrued thereon;
2) a legal description of the lot owned by the delinquent Owner; and (3) the name
of the delinquent Owner. Such claim of lien shall be effective to establish a lien
against the interest of the delinquent Owner in his lot together with interest at
twelve percent (12%) per annum on the amount of such advance from the date thereof,
recording fees, cost of tile search obtained in connection with such lien or the
foreclosure thereof and court costs and reasonable attorneys ' fees which may be
incurred in the enforcement of such a lien.
b) Foreclosure of Lien. Subject to the provisions of 12.0 Rights of Mortgagees ,
such a lien, when so established against the lot described in said claim, shall be
prior or super' :r to any right, title, interest, lien or claim which may be or may
have been acquired in or attached to the real property interests subject to the
lien subsequent to the time of filing such claim for record. Such lien shall be
for the benefit of Declarant and may be enforced and foreclosed in a suit or action
brought by Declarant in any court of competent jurisdiction, if brought within one
year of the filing of such claim. Any such sale provided for herein is to be
conducted in a: :ordance with the provisions of the Civil Code of the State of
Washington applicable to the exercise of powers of sale in mortgages and deeds of
trust, or in any other manner permitted or provided by law. Declarant, through its
duly authorized agents, shall have the power to bid on the liened property at any
foreclosure sale and to acquire, lease, mortgage and convey the same.
c) Cure. IF a default for which a notice of claim of lien was filed is cured,
Declarant shall file or record a recision of such notice, upon payment by the
defaulting Owner of the costs of preparing and filing or recording such recision,
and other reasonable costs, interest or fees which have been incurred.
20-
d) Nonexclusive Remedy. The foregoing lien and the rights to foreclose
thereunder shall be in addition to, and not in substitution for, all other rights
and remedies which any party may have hereunder and by law, including any suit to
recover a more_ judgment for unpaid assessments. If any Owner shall fail to
perform such maintenance and repair and, notwithstanding such failure, Declarant
should fail to exercise its rights and remedies hereunder, then, any other Owner,
after fifteen (15) days' prior written notice to Declarant and such delinquent
Owner, shall have the right, but not the obligation, to perform such maintenance
and repair and shall have the same rights and remedies with respect thereto as are
provided herein to Declarant.
5.7 Taxes and Assessments. If an Owner fails to pay taxes or assessments on its
lot which beco7e a lien on any portion of subject property utilized for parking,
service or loading areas, then any other Owner may pay such taxes or assessments,
together with any interest, penalties and costs arising out of or related thereto,
except while the validity thereof is being contested by judicial or administrative
proceedings , and in such event the defaulting Owner obligated to pay such taxes or
assessments shall promptly reimburse the other Owner for all such taxes or
assessments , interest, penalties and costs paid or incurred by such other Owner and
until such reimbursement has been made the amount of the payment by such other
Owner shall constitute a lien on and charge against the lot of the defaulting
Owner subject and subordinate, however, to any deed of trust then outstanding
affecting said lot.
5.8 Refuse Collection Areas. All outdoor refuse collection areas shall be
visually screened so as not to be visible from neighboring property or streets. No
refuse collection areas shall be permitted between a street and the front of a
building.
21-
5.9 Repair of Buildings. No building or structure upon any lot shall be permitted
to fall into disrepair, and each such building and structure shall at all times be
kept in good condition and repair and adequately painted or otherwise finished.
5. 10 Public L': lities. Declarant reserves the sole right to grant consents for the
construction and operation of public utilities including, but not limited to,
street railways, interurban or rapid transit, freight railways , poles or lines for
electricity, telephone or telegraph, above or below ground conduits, and gas pipes
in and upon any and all streets now existing or hereafter established upon which
any portion of the subject property may now or hereafter front or abut. Declarant
reserves the exclusive right to grant consents and to petition the proper
authorities f: any and all street improvements such as grading, seeding, tree
planting, side alks, paving, sewer and water installation, whether it be on the
surface or subsurface, which in the opinion of Declarant are necessary on or to the
subject property. Notwithstanding the provisions of Section 3.2, Declarant
reserves the exclusive right to approve above ground utility lines across the
subject property or any portion thereof on a temporary basis for the purpose of
construction , and such lines shall be permitted when required by a government
agency. 5.11 Utility Lines and Antennas. No sewer, drainage or utility lines or
wires or other devices for the communication or transmission of electric current,
power, or signals including telephone, television, microwave or radio signals ,
shall be constructed, placed or maintained anywhere in or upon any portion of the
subject property other than within buildings or structures unless the same shall be
contained in conduits or cables constructed, placed or maintained underground or
concealed in or under buildings or other structures. No antenna for the
transmission or reception of telephone, television, microwave or radio signals
shall be placed on any building or other improvement within the subject property
22-
unless (a) such antenna shall be so located that it cannot be seen from any point
at the ground level of the subject property or (b) the consent of Declarant shall
first be obtained. Nothing contained herein shall be deemed to forbid the erection
or use of ter::rary power or telephone facilities incidental to the construction or
repair of buildings on the subject property.
5.12 Mechanical Equipment. All mechanical equipment, utility meters , storage
tanks, air conditioning equipment and similar items shall be located in such a
manner so not to be visible from neighboring property.
5.13 Mineral Exploration. No portion of the subject property shall be used in any
manner to explore for or to remove any steam, heat, oil or other hydro-carbons ,
gravel , earth or any earth substances or other minerals of any kind, provided,
however, that this shall not prevent the excavation of earth in connection with the
grading or construction of improvements within the subject property. Water may be
extracted to the extent permitted by the appropriate governmental agency.
5. 14 Other Operations and Uses. Operations and uses which are neither specifically
prohibited nor specifically authorized by this Declaration may be permitted in a
specific case if operational plans and specifications are submitted to and approved
in writing by Declarant in accordance with the procedures set forth in 3.0, of this
Declaration. Approval or disapproval of such operational plans and specifications
shall be based upon the effect of such operations or uses on other property subject
to this Declaration or upon the occupants thereof, but shall be in the sole
discretion of Declarant.
6.0 MODIFICATION AND REPEAL
6.1 Procedure. Except as otherwise provided in Section 6.2, this Declaration or
any provision hereof, or any covenant, condition or restriction contained herein,
may be terminated, extended, modified or otherwise amended, as to the whole of the
23-
subject property or any portion thereof, with the written consent of the Owners of
eight percent (80%) of the subject property, based upon the number of square feet
owned as compared to the total number of square feet subject to these conditions,
covenants anc restrictions (excluding dedicated streets) ; provide, however, that so
long as Declarant owns at least twenty percent (20%) of the property subject to
these conditions , covenants and restrictions, or for a period of fifteen (15) years
from the effective date hereof, whichever period is shorter, no such termination,
extension, modification or other amendment shall be effective until a proper
instrument in writing has been executed, acknowledged and recorded.
6.2 Modification by Declarant. For so long as Declarant owns any interest
excepting a - easehold interest) in the subject property, or any part thereof, or
for a period cf fifteen (15) years from the effective date hereof, whichever period
is shorter, Declarant acting alone may modify or amend the provisions of 3.0, 4.0
and 5.0; provided, however, that (a) any such modification or amendment must be
within the spirit and overall intention of the development as set forth herein; (b)
prior to any such modification or amendment Declarant shall obtain the approval of
any governmental agency to such modification or amendment where such
approval is necessary; and (c) any modification or amendment shall not provide for
any type of improvements or use not presently permitted by this Declaration. No
such modification or amendment shall be effective until the Owners have been given
thirty (30) days' prior written notice of the proposed change, and a proper
instrument in writing has been executed, acknowledged and recorded.
6.3 Governmental Regulation. All valid governmental enactments, ordinances and
regulations are deemed to be a part of this Declaration and to the extent that they
conflict with any provision, covenant, condition or restriction hereof, said
conflicting covernmental enactment, ordinance and regulation shall control and the
24-
provision, covenant, condition and restriction hereof in conflict therewith shall
be deemed (a) amended to the extent necessary to bring it into conformity with said
enactment, ordinance or regulation while still preserving the intent and spirit of
the provision, :ovenant, condition or restriction; or (b) stricken here from should
no amendment conforming to the governmental enactment, ordinance or regulation be
capable of preserving the intent and spirit of said provision, covenant, condition
or restriction .
7.0 ENFORCEME'J
7. 1 Abatement and Suit. The Owner of each lot shall be primarily liable, and the
Occupant, if any, secondarily liable for the violation or breach of any condition,
covenant or restriction herein contained. Violation or breach of any condition,
covenant or restriction herein contained shall give to Declarant, following thirty
30) days' written notice to the Owner or Occupant in question except in exigent
circumstances . the right, privilege and license to enter upon the lot where said
violation or teach exists and to summarily abate and remove, or abate or remove,
at the expense of the Owner or Occupant thereof, any improvement, structure, thing
or condition --E.t may be or exist thereon contrary to the intent and meanir,g of the
provisions hereof, or to prosecute a proceeding at law or in equity against the
person or persons who have violated or are attempting to violate any of these
covenants, conditions or restrictions to enjoin or prevent them from doing so, to
cause said violation to be remedied, or to recover damages for said violation. No
such entry by Declarant or its agents shall be deemed a trespass, and neither
Declarant nor its agents shall be subject to liability to the Owner or Occupant of
said lot for such entry and any action taken to remedy or remove a violation. The
cost of any abatement, remedy or removal hereunder shall be a binding personal
obligation or any Owner or Occupant in violation of any provision of this
25-
Declaration, as well as a lien (enforceable in the same manner as a mortgage) upon
the lot in question. The lien provided for in this section shall not be valid as
against a bona fide purchaser or mortgagee for value of the lot in question unless
a suit to enfcrce said lien shall have been filed in a court of record in King
County, Washington, prior to the recordation of the deed or mortgage conveying or
encumbering the lot in question to such purchaser or mortgagee, respectively.
7.2 Right of Entry. During reasonable hours and upon reasonable notice, and
subject to reasonable security requirements, Declarant, or its agents, shall have
the right to enter upon and inspect any lot and the improvements thereon covered by
this Declaration for the purpose of ascertaining whether or not the provisions of
this Declaraticn have been or are being complied with, and neither Declarant nor
its agents shall be deemed to have committed a trespass or other wrongful act by
reason of such entry or inspection.
7.3 Deemed to Constitute A Nuisance. The result of every act or omission whereby
any condition, covenant or restriction herein contained is violated in whole or in
part is hereby declared to be and to constitute a nuisance, and every remedy
allowed by lay. Dr in equity against an Owner or Occupant either public or private ,
shall be applicable against every such result and maybe exercised by Declarant.
7.4 Attorney's Fees. In any legal or equitable proceeding for the enforcement of
this Declaration or any provision hereof, whether it be an action for damages,
declaratory relief or injunctive relief, or any other action, the losing party or
parties shall pay the attorney fees of the prevailing party or parties, in such
reasonable amount as shall be fixed by the court in such proceedings or in a
separate action brought for that purpose. The prevailing party shall be entitled
to said attorney's fees even though said proceeding is settled prior to judgment.
26-
All remedies provided herein or at law or in equity shall be cumulative and not
exclusive.
7.5 Failure to Enforce is No Waiver. The failure of Declarant to enforce any
requirement, restriction or standard herein contained shall in no event be deemed
to be a waiver of the right to do so thereafter or in other cases, nor of the right
to enforce any other restriction.
8.0 ASSIGNME',-
Any and all of the rights, powers and reservations of Declarant herein contained
may be assigned to any person, corporation or association which will assume the
duties of Declarant pertaining to the particular rights, powers and reservations
assigned, and upon any such person, corporation or association evidencing its
consent in wr —..ing to accept such assignment and assume such duties, he or it
shall , to the extent of such assignment, have the same rights and powers and be
subject to the same obligations and duties as are given to and assumed by Declarant
herein. If a_ any time Declarant ceases to exist and has not made such an
assignment, a successor to Declarant may be appointed in the same manner as this
Declaration c_ . be modified or amended under Section 6. 1 . Any assignment or
appointment mace under this article shall be in recordable form and shall be
recorded.
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE
Every person or entity who now or hereafter owns, occupies or acquires any right,
title or interest in or to any portion of the subject property is and shall be
conclusively deemed to have consented and agreed to every covenant, condition and
restriction contained herein, whether or not any reference to this Declaration is
contained in the instrument by which such person acquired an interest in the
subject property.
27-
10.0 WAIVER
Neither Declarant nor its successors or assigns shall be liable to any Owner or
Occupant of the subject property by reason of any mistake in judgment, negligence,
nonfeasance, action or inaction or for the enforcement or failure to enforce any
provision of this Declaration. Every Owner or Occupant of any of said property by
acquiring its interest therein agrees that it will not bring any action or suit
against Declarant to recover any such damages or to seek equitable relief because
of same.
11.0 RUNS WITH LAND
All covenants , conditions, restrictions and agreements herein contained are made
for the direct , mutual and reciprocal benefit of each and every lot of the subject
property; sha- 1 create mutual equitable servitudes upon each lot in favor of every
other lot; shall create reciprocal rights and obligations between respective Owners
and Occupants of all lots and privity of contract and estate between all grantees
of saic lots . their heirs, successors and assigns; anc shall , as to the Owner and
Occupant of each lot, his heirs, successors and assigns, operate as covenants
running with the land, for the benefit of all other lots, except as provided
otherwise herein.
12.0 RIGHTS OF MORTGAGEES
No breach of any covenant, condition or restriction herein contained, or any
enforcement thereof, shall defeat or render invalid the lien of any mortgage or
deed of trust now or hereafter executed upon the subject property or a portion
thereof, provided, however, that if any portion of said property is sold under a
foreclosure c` any mortgage or under the provisions of any deed of trust, any
28-
purchaser at such sale and its successors and assigns shall hold any and all
property so purchased subject to all of the covenants, conditions and restrictions
contained in this Declaration.
13.0 CAPTIONS
The captions o` articles and sections herein are used for convenience only and are
not intended to be a part of this Declaration or in any way to define, limit or
describe the scope and intent of the particular article or section to which they
refer.
14.0 EFFECT OF VALIDATION
If any provision of this Declaration is held to be invalid by any court, the
invalidity of such provision shall not effect the validity of the remaining
provisions hereof.
DECLARANT
J.A.G./Renton Properties Associates
A Washington Partnership
By: Alterra Corporation, a Washington
Corporation, General Partner
By:
By:
BY:
29-
1.` f • 1- 1 .. .....11 ,-- W.-7 t
ii
4 - - ---:'7..._ •-',..-z-s. 71,.14/002iiirAOr ''
4 e,1-:CKR1VER f
AAIL NOL ?O f,:C;
sEss=lq '
j
4* c
I
t
1
4-
s s'‘.`"
77141L--:---'"-:- :\\ %::41,‘ 0 _.
to
n'71....r.';
1 .;,.%
4.:1!:::
1* . . 11 -ri7/.. .
t 7/:
LEGAL DESCRIPTIONS
PARCEL_ A
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M. ,
in King County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat recorded in
Volume 1: of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginninc at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092 .82 feet; thence N68'03 ' 54"E 224 .45 feet ;
thence N!'i0'04 '48"E 232.00 feet; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING,; thence N42'06'08"W 87. 16 feet; thence S80'04' 48"W 232 .00 feet; thence
M12'O1 '01)' 4 40.75 feet ; thence S2'59 '00"W 133.01 feet to a point of curve; thence
along a Gurve tc the right having a radius of 230.00 feet , through a central angle
of 27'47 31" an arc distance of 111 .56 feet to a point of compound curvature; the
center o ` said curve bears N15'46' 31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48 ' 19" an arc distance of 197 .73 feet; thence
S82' 15'00"W 67.68 feet; thence S31'32 '22'W 71 .06 feet; thence N81'11 '35"w 193.00
feet; thi:nce 582'15'00'V 92.99 feet; thence S35'29'30"W 143. 18 feet; thence
N74'44 '00"W 84.85 feet; thence S60'16'00"W 67.00 feet; thence 512'16'00"E 97.35
feet to :he north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence S68'06'46"W along said
northerly line 375.53 feet to the northerly line of a tract of land described In
EXHIBIT 13 in said Agreement; thence northwesterly along said northerly line on a
curve to the left, the center which bears west 195.01 feet, thru a central angle
of 78'41 '24", an arc distance of 267.83 feet; thence 1178'41 '24'W along said
northerly line 180.00 feet to an angle point in said northerly line; thence
H33'00'S4"W along said northerly line 109.47 feet to the south line of the
Burlingt3n Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears S39'23'00"E 1853.00 feat; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01 '59". an arc
distance of 65.75 feet to a point of compound cure; thence continuing along
EXHIBIT A: 1 of 5
said south line on a curve to the right the center of which bears S37'21 '01"E .
having a radius of 10543.00 feet, an arc distance of 186.51 feet through a central
angle of Ol'00' 49" to a point of compound curve; thence continuing along said south
line on n curve to the right, the center of which bears 536'20 ' 12"E having a radius
of 1657.00 feet an arc distance of 193.93 feet through a central angle of 06'42 '20"
to a point of compound curve; thence continuing along said south line on a curve to
the right., the center of which bears S29'37'52"E having a radius of 6738.00 feet ,
an arc d stance of 197.76 feet through a central angle of OI'40'54" to a point of
compound curve; thence continuing along said south line on a curve to the right ,
the centrar of which bears S27'56' 58"E having a radius of 1768 .00 feet , an arc
distance of 194. 45 feet through a central angle of 06' 18 '06" to a point of compound
curve; Bence continuing along said south line on a curve to the right, the center
of which bears 521'38'52"E having a radius of 8603.00 feet , an arc distance of
204.54 f .et through a central angle of 01 '21 ' 44" to a point of compound curve;
thence continuing along said south line on a curve to the right , the center of
which bears 520' 17'08"E having a radius of 1922. 10 feet, an arc distance of 178.79
feet through a central angle of 05' 19'46" to a point of compound curve on the east
line of said Charles Brownell Donation Land Claim No. 41 ; thence continuing along
said south line on a curve to the right , the center of which bears 514'57'22"E
having a radius of 2814.93 feet , an arc distance of 659.42 feet through a central
angle of 13'25' 19" to a point of compound curve; thence continuing along said
south line on a curve to the right , the center of which bears SO1'32 '03"E having
a radius of 1165 .09 feet , thru a central angle of 37'39' 19", an arc distance of
765. 71 feet to a point which bears N41 '28' 10"E from the TRUE POINT OF BEGINNING;
thence S36' 19 ' 35"W 188.63 feet to a point on a curve , the center which bears
S36' 19 ' 35"W 967. 46 feet ; thence northwesterly along said curve to the left , thru
a central angle of 4'39'32", an arc distance of 78.67 feet ; thence 538'94 '22"w
451 .74 feet to a point on a curve, the center which bears S43'36'23"W 170.00 feet ;
thence southeasterly along said curve to the right, thru a central angle of
3' 08 ' 37", an arc distance of 9. 33 feet ; thence 543' 15 ' 00"E 20 .74 feet ; thence
527.21 ' 32"V 44 .74 feet to the TRUE POINT OF BEGINNING.
PARCEL B-1
That portion of the south half of Section 13, Township 23 Borth, Range 4 East, Y.K.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the Flat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C .E. $ro+wnell 's Donation Claim No. 41 , described as follows: •
Beginnirg at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence 568'03'54"W 351. 11 feet to
the TRUE POINT OF BEGINNING; thence N68'03'54"E 575.56 feat; thence N12'Ol '00"V
40. 75 fret; thence 577'59'00"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27'47' 31" an arc distance of' 111.56 feet to a point of compound curvature; the
center of said curve bears N15'46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48' 19" an arc distance of 197.73 feet; thence
012'15'00"V 67.68 feet; thence S31'32 '22"W 71 .06 feet; thence N81'll ' 39"W 193.00
feet; thence S82'15'00"W 92.99 feat; thence S35'29'30"W 143. 18 feet; thence
N74'44'00"1V 84. 85 feet; thence 560'16'00"W 67:00 feet; thence $12'16'00E 97. 35
feet; ti.ence N68'06'46"E 53.79 feet to a point which bears N72'04'34"W from the
TRUE POINT OF BEGINNING; thence 572'04 '34"E 389.92 feet to the TRUE POINT OF
BEGINNING.
EXHIBIT A: 2 of 5
PARCEL B-2
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
in King County, Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E . 5ro4nell 's Donation Claim No. 41 described as follows:
degInnin; at the south quarter corner of said Section 13; thence NOO'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224 .45 feet to
the TRUE POINT OF BEGINNING; thence S68'03'54'V 575.56 feet ; thence N72'04'34V
389.92 feet; thence 568'06'46"V 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left , having a radius of 60.00 feet , thru a central
angle of 126'52 ' 10". an arc distance of 132.86 feet; thence N53'07 '50"E 199.18 feet
to a point of curve; thence on a curve to the right , having a radius of 200.00 feet
thru a central angle of 53'59'30", an arc distance of 188.47 feet ; thence S72'52 '40"E
290. 00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08' 51", an arc distance of 134 .60 feet; thence
N67'58'15"E 380.92 feet; thence N31'27 ' 12"E 204.86 feet to the TRUE POINT OF BEGINNING .
PARCEL B-3
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
In King County, Washington; and of Junction Addition to the City of Seattle, according
to the rlat recorded in Volume 12 of Plats, page 75, records of said King County,
togethei with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26 ,
Renton ';bore Lands 2nd Supplemental Maps 1958 , described as follows:
beginning at the south quarter corner of said Section .13; thence NOO'S8'28"E along the
north-south centerline, thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to a point
hereinafter called "Point A"; thence S66' 03 ' 54' u' 575.56 feet; thence X72'01 '3k'V
389.92 feet; thence 568'06'46"W 429.32 feet to the TRUE POINT OF BEGINNING ; thence
south 85.47 feet to a point of curve; thence on a curve to the left, having a radius
of 6-0. 00 feet, thru a central angle of 126'52 ' 10", an arc distance of 132 .86 feet;
thence MS3'07 '5C 'E 199. 18 feet to a point of curve; thence on a curve to the right ,
having a radius of 200.00 feet thru a central angle of 53'59 ' 30", an arc distance of
188. 47 feat; thence S72'52' 40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39'08' S1", an arc
distance of 134.60 feet; thence N67'58'29"E 380.92 feet; thence N31'27 ' 12"E 204.86
feet tc afore "entioned "Point A"; thence N80'04'48"E 232.00 feet; thence S42'06'08"E
215.00 feet; thence S31'14'05"V 358.99 feet; thence S47'10'01"E 71 .3h feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distantes: N88'15'OO"V 180.65 feet; 103'07 '25"W 154.51 feet; N27'21 '32"E 387 .32
feet; 1183'17'25"V 171 .17 feet; S46'22 '22"V 324.66 feet; 572'37'52'V 458.93 feet;
N70'54 02"V 354.53 feet; 573'56'01' W 130.08 feet; and S41' 16'07"W 316. 18 feet to the
north ',oundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears S39'41 '39"V 627.46 feet thru a central angle of
39•41 ' 39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence 578'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet , thru a central
angle of 78'41 '24", an arc distance of 267.83 feat to the TRUE POINT OF BEGINNING .
EXHIBIT A: 3 of 5
PARCEL B-4
That portion of the southwest quarter of Section 13, Township 23 North, Range 4 East ,
V.M. in King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. Brownell 's Donation Claim No. 41 , described
as follows:
Beginning at the south quarter corner of sal4 Section 13 ; them 1400'56'28"1 along
the north-south centerline thereof 684.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1958; thence S72'37 '52"y 382.60 feat to
an angle point in the south line of said Tract 26; thence N70'5r102'%l 354.53 feet to
an angle point In the south line of said Tract 26; thence S73'56'Oi"W 130.08 feet to
an angle point in the south line of said Tract 26; thence S41.16'07"W along the south
line of said Tract 26 a distance of 316. 18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording N&xaber 6607786;
thence .esterly along said north boundary on a curve to the left , the center which
bears 529'41 '39"W 627.46 feet, thru a central angle of 39'41 '39"; an arc distance of
434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence N33'00'54"V 109.47 feet to the southerly
margin of the burlington Northern Railroad Right-of-Way , said point being a point on
a curve, the center which bears S39'23 '00"E 1853 .00 feet ; thence westerly along said
southerly margin and curve to the left , thru a central angle of 3'59' 19", an arc
distance of 129.00 feet to a pointof compound curve, the center of said curve bears
S43'22' ii9"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32", an arc distance of 197.57 feet to a point
of tangtncy; :Hence S43' 49 ' 09'`e' along said south margin 271 .40 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571 . 00 feet, thru a central angle of 7'32'02", an arc distance of 206.57 feet to
a point of compound curve, the center which bears N38'38'491%1 727.00 feet ; thence
westerly along said southerly margin and curve to the right , thru a central angle of
16' 55 '35", an arc distance of 214.77 feat to a point of compound curve , the center
which br..ars )421 '43 ' 14"v 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11'2 '08", an arc distance of 209 .95
feet to a point of compound curve; the center which bears N10' 19'06"w 696.00 feet ;
thence iesterly along said southerly margin and curve to the right thru a central of
3'44125", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34. 18'31"E along said easterly margin 3.46 feet to the north
boundary, of said tract deeded to King County and described under King County Record-
ing Numl,er 6607786; thence N74'13r19"E along said north boundary 443 .31 feet; thence
N59.53' i7"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT Of BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the southeast quarter of Section 13, Township 23 North, Range 4 East, W.M. ,
and that portion of the southwest quarter of Section 18, Township 23 North , Range
4 East, V.M. , all in King County, Washington described as follows :
EXHIBIT A: 4 of 5
i . 1
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E I24.45 feet;
thence 1480'04'4S"E 232 .00 feet; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence 542'06'08"E 127.84 feet; thence S31' 14 '05'% 358.99 feet ; thence
547' 10'11"E 71 . 34 feet ; thence east 114.27 feet; thence south 68.91 feet to the
south I 'ne of said Tract 25; thence S88'15'00"E along said south line and the
north line of the south 650.00 feet of the southeast quarter of said Section 13, a
distances of 2080.76 feet to the east line of said Section 13; thence S89'10'25"E
along tie north line of the south 650.00 feet of the southwest quarter of said
Section 18, a distance of 81 .57 feet to the south line of the Burlington Northern
R.allroai Right-of-Way; thence 1471'29 '03"V along said south line 85.52 feet to the
east 11 a of said Section 13; thence 1171'29'03"W along said south line 826.56
feet to a point of curve; thence on a curve to the right along said south line ,
the center which bears N18'30'57"E 1005.37 feet, thru a central angle of 33'S4'00",
an arc distance of 594.84 feet; thence N37'35'03"W along said south line 308.70
feet to a point of curve; thence on a curve to the left, along said south line ,
the center which bears S52'24 '57'%l 1165.09 feet, thru a central angle of 16' 17'41",
an arc distance of 331 .35 feet to a point which bears N41'28' 10"E fro. the TRUE
POINT OF BEGiNNI11G; thence S36'19'35"V 188.63 feet to a point on a curve, the
center ,'hich bears S36'19'35"V 967.46 feet; thence northwesterly along said curve
to the left, thru a central angle of 4'39'32", an arc distance of 78.67 feet ;
thence S38'54'22'%1 451 .7h feet to a point on a curve, the canter which bears
S43'36'23"W 170.00 feet; thence southeasterly along said curve to the right , thru
a central angle of 3'08'37", an arc distance of 9.33 feet ; thence S43' 15 '00"t
20.74 feet ; thence S27'21 '32"111 44.74 feet to the TRUE POiNT OF BEGINNING.
EXHIBIT A: 5 of 5
DESIGN GUIDELINES & CC&R's
BLACKRIVER
TECHNOLOGY PARK
Renton, Washington
Gt. 2‘
ci
P
J
J.A.G.
0
Renton Properties Associates, Developer
Richard Carothers Associates , Planning Consultant
July, 1984
4 4V
Purpose
The development of each site within Blackriver Technology Park is controlled and
restricted by the Declaration of Covenants, Conditions and Restrictions for
Blackriver Technology Park (hereinafter referred to as the "CC&R's") , as well as
applicable governmental codes and regulations. The CC&R's are directed toward
achieving the desired character and quality level of site development that will
set Blackriver Technology Park apart from other business developments. The
purpose of these Development Guidelines is to further define the requirements
which are specifically and generally stated in the CC&R's. These Guidelines are
intended in supplemented to the CC&R's as an aid in the submittal of plans for
approval by providing more detailed information on which to base a review. Any
specific conflicts between shall be brought to the immediate attention of
J.A.G./Renton Properties Associates. In general , however the priority of com-
pliance is first; with governmental codes and regulations , second; with the CC&R's
and third; with the Design Guidelines.
The Owners/Occupants of each site within Blackriver Technology Park should
familiarize themselves with the intent and requirements of the CC&R's these
Guidelines and all applicable governmental codes and regulations, and through
their consultant(s), implement all those provisions applicable to their specific
site developments. All development plans, landscaping plans and graphic designs,
shall be submitted to a Design Review Committee as described in the CC&R's.
Contents
Purpose
1.0 Introduction to Blackriver Technology Park
1.1 Location
1.2 Immediate Setting
1.3 Master Plan and Streetscape
1.4 Planning and Zoning
1.5 Flood Plain Restrictions
1.6 Engineering and Utilities
1.7 Permitted and Prohibited Uses
2.0 Approvals and Submittals
2.1 Master Plan Design Submittal
2.2 Preliminary Plan Submittal
2.3 Revision, Alteration, Addition or Change
of Use Preliminary Plan Submittal
2.4 Institutional Review Process
3.0 Site Planning Guidelines
3.1 Building Site Coverage
3.2 Landscape Coverage
3.3 Building Heights
3.4 Street Setback
3.5 Interior Property Line Setback
3.6 Parking Requirements
3.7 Access and Drive Location
3.8 Sidewalks
3.9 Storage, Service, and Loading Areas
3. 10 Refuse Collection Areas
3.11 Screening of Exterior Mechanical Equipment
3. 12 Screening of Exterior Electrical Equipment
3.13 Fences and Walls
3.14 Utilities
3.15 Grading
3.16 Nuisances
4.0 Architectural Guidelines
5.0 Landscape Guidelines
5.1 Introduction to the Blackriver Technology Park
Landscape Concept
5.1.1 Streetscape Zone
5.1.2 Streetscape Zone Design Concept
1 '
5.1.3 Interior Zone
5. 1.4 Interior Zone Design Concept
5. 1.5 Grantor Provided Amenities
5. 1.5a Exceptions
5.1.5b Entry Feature
5.1.5c The Commons
5. 1 .6 Other Requirements
5.2 Landscape Design Guidelines
5.2. 1 Assessment District Installation and Maintenance Agreement
5.2.2 Maintenance of Unimproved Sites
5.2.3 Landscape Coverage
5.2.4 Street Frontage Zone Design Guidelines
5.2.4a Specific Design Limitation within
the Street Frontage Zone
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
5.2.5b Parking and Pedestrian Circulation
5.2.5c Parking Lot Plant Material List
5.2.6 Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
5.2.6b Limited Use Area at Primary and
Secondary Access Drive
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side and Rear Yard Requirements
5.2.7b Side and Rear Yard Landscape Requirements
5.2.7c Plant Material List-Interior Property Lines
5.2.7d Planting and Irrigation Details & Specifications
5.2.E Guidelines for Exterior Property Lines
5.2.9 Guidelines for Tree Preservation Outside the ' Preserve' Zones
6.0 Signing Guidelines
6. 1 Objectives
6.2 Sign Submittals
6.3 Detached Business Identification Stamps
6.4 Building Mounted Business or Building Identification Signs
6.5 Information and Vehicular Control Signs
6.6 Temporary Signs
7.0 Lighting Guidelines
7.1 Objectives
7.2 Lighting Quality
7.3 Parking, Access and Circulation Areas
7.4 Service Areas
7.5 Building Illuminations
7.6 Pedestrian Areas
8.0 Appendix
Contact and Reference List
Planning and Design References
Declaration of Covenants, Conditions and Restrictions
1 .0 Introduction to
Blackriver Technology Park
Blackriver Technology Park is to become a unique business community distinguished
from other Sea-..le Area business parks. The distinction of Blackriver Technology
Park begins wi n its concept as a series of small business sites situated in a
controlled, ur.' cied landscape setting. This conception will be furthered through
an emphasis on quality contemporary site, architectural and landscape design.
1. 1 LOCATION
Blackriver Technology Park is centrally situated southeast of downtown Renton and
due north of I-405, contiguous to and immediately north of Washington Technical
Center. Access via I-405 and arterials now serving Earlington Park Industrial
Area.
1.2 IMMEDIATE SETTING
Blackriver Technology Park is bordered on the north by the Burlington Northern
Railroad right-of-way, on the south by Washington Technical Center and P-I Channel
detention basin. Preserve areas and City of Renton buffer zones provide a wooded
backdrop conducive to the development of a pleasant business environment.
1.3 MASTER PLAN AND STREETSCAPE
The Blackriver Technology Park Plan is organized around a broad, two lane, central
cul-de-sac serving most of the sites within Blackriver Technology Park. This
central collector is Southwest 4th Place. Southwest 4th Place, will have a
controlled lancscaped easement along both sides which will establish a unified,
park-like environment, distinctive among business parks in the Pacific Northwest.
Intersections reading into the Park will be highlighted by landscape and graphic
design features to establish these locations as gateways to the Park. Recreational
opportunites will be available in the form of walking and jogging paths integrated
with landscape parkways and providing access into undeveloped buffer and preserve
areas.
1.4 PLANNING AND ZONING
Blackriver Technology Park is located within the jurisdiction of the City of
Renton Department of Planning, Public Works, Engineering and Parks.
1.5 FLOOD PLAIN RESTRICTIONS
Blackriver Technology Park lies within the 100 year floodplain of the Black River.
Site planning, grading and drainage design constraints, will be placed upon all
developments. All development within Blackriver Technology Park must conform to
grading and drainage restrictions contained in the Blackriver Technology Park
Design Guidelires as well as on-site planning, grading and drainage guidelines
administered by the City of Renton.
1
1.6 ENGINEERING AND UTILITIES
Assessment district landscaping, street improvements, and underground utilities
including domestic water, fire service systems, storm drainage, sanitary sewer,
and street lighting, telephone, electrial and natural gas mains have been install-
ed by J.A.G./Renton Properties Associates. The improvement designs were prepared
by Richard Carothers Associates, Seattle.
1.7 PERMITTED AND PROHIBITED USES
In order to achieve the objective of Blackriver Technology Park as a high quality
business environment the CC&R's identify uses that are permitted and prohibited
within City of Renton. The following, outlines the objectives related to permit-
ted and prohibited uses within Blackriver Technology Park and restates those
uses contained in the CC&R's.
Objectives
1. to permit business uses whose facility developments and maintenance will
contribute to the perception of Blackriver Technology Park as a series of
high quality business sites.
2. tc permit business uses which do not, through their operation, produce
objectional visual , sound, smell , or vibrational outputs
3. to permit business uses which are compatible with one another and compatible
with existing or planned uses surrounding Blackriver Technology Park
4. to permit business uses which will not create excessive burdens upon Black-
river Technology Park transportation and utility systems
Guidelines
1. Prohibited Uses - The following operations and uses shall not be permitted on
any parcel within Blackriver Technology Park:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling and removing oil , gas or other hydrocarbon substances, or drilling
for or removing such hydrocarbons;
e) Refining of petroleum or of its products;
i
f) Petroleum storage yards ;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary
in the course of approved construction pursuant to Article III of CC&R' s;
h) Distillation of bones;
i ) Dumping, disposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j ) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries ;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race track;
2. Permitted Uses - Any use or business operation permitted by the current City
of Renton Zoning Ordinance that is not specifically prohibited above, provided
such use is specifically approved in writing by J.A.G./Renton Properties Associ-
ates. J.A.G/Renton Properties Associates , however, reserves the right to refuse
any use which they conclude may adversely affect Blackriver Technology Park. An
approved use shall be performed or carried out entirely within a building that is
so designed and constructed that the enclosed operations and uses do not cause or
produce a nuisance to adjacent lots or streets such as, but not limited to,
vibration, sound, electromechanical disturbances, radiation, air or water pol-
lution, dust, or emission of odorous, toxic or non-toxic matter including steam.
Certain activities which cannot be carried on within building may be permitted,
provided such activities are specifically approved in writing by J.A.G./Renton
Properties Associates and further provided such activities are screened in an
acceptable manner so as not to be visible from neighboring lots and streets.
2.0 Approvals and Submittals
In order to insure that the design standards for Blackriver Technology Park
contained in these guidelines are achieved, a series of plan submissions will be
required at different stages of the design process. The number of plan submis-
sions will vary depending upon the complexity and timing of a proposed develop-
ment. Plan submissions will also be required for significant revisions , altera-
tions, additions, or change of use for approved or existing developments within
Blackriver Technology Park.
Required plan submissions shall be submitted to the Blackriver Technology Park
Design Review Committee, J.A.G./Renton Properties Associates care of Alterra
Corporation, General Partner. Each stage of plan submission will require four (4)
sets of plans containing the specific information described below.
A Design Review Committee will be established by J.A.G./Renton Properties Associ-
ates to review all required plan submissions. All submitted plans will be reviewed
by the Blackriver Technology Park Design Review Committee for acceptability of
design in compliance with the CC&R's and these Design Guidelines. Upon completion
of review by the Design Review Committee, one set of submitted plans will be
returned to the applicant along with a letter summarizing comments , recommenda-
tions, requirements and findings. The length of review by the Blackriver Techno-
logy Park Design Review Committee for all stages of plan submissions shall be
governed by Section 5 of the Blackriver Technology Park CC&R' s. The returned
plans will be marked "Approved" or "Approved Subject to Conditions" or "Not
Approved" with the following intended meanings:
1. "Approved" - approved documents permit the applicant to proceed to the next
stage of the approval process.
2. "Approved Subject to Conditions" - documents so marked permit the applicant
to proceed to the next stage of the approval process provided the applicant
complies with the conditions specified by the Design Review Committee. If
the applicant takes exception to the specified conditions, the applicant must
do so in writing by certified mail addressed to J.A.G./Renton Properties
Associates within ten (10) days from the date of the applicant's receipt of
returned documents. Unless such action is taken, J.A.G./Renton Properties
Associates will assume that all conditions are acceptable to and approved by
the applicant.
3. "Not Approved" - documents will be returned to the applicant with comments
describing the basis for disapproval . Revised documents must be resubmitted
if approval is sought.
4. J.A.G./Renton Properties Associates' approval of the applicant's plans,
specifications, calculations, or work shall not constitute an implication,
representation, or certification by J.A.G./Renton Properties Associates that
the above items are in compliance with applicable Statues, Codes, Ordinances
or other regulations.
The Blackriver Technology Park Design Guidelines are in no way intended to super-
sede any applicable Statutes , Codes , Ordinances or regulations of controlling
governmental jurisdictions. Should any portions of the Blackriver Technology Park
CC&R's or Design Guidelines be discovered to encourage violation of applicable
Statutes, Codes, Ordinances or other governmental regulations, those discrepancies
should be brought to the immediate attention of J.A.G./Renton Properties Associ-
ates.
The applicant shall have the sole responsibility for compliance with all appli-
cable Statutes, Codes , Ordinances or other regulations for all work performed on
the premises by or on behalf of the applicant.
2. 1 BLACKRIVER TECHNOLOGY PARK MASTER PLAN DESIGN SUBMITTAL
Submission of a site Master Plan will be required only when the ultimate site
development is planned to be constructed in separate phases over a period of time.
The site Master Plan is to be submitted and approved before Preliminary Plans are
submitted.
Master Plan submissions shall show an indication of:
1. All major buildings and structures including:
a. building footprints
b. overhangs
c. net floor area
d. site coverage - building-ground contact area/net lot area
e. building coverage - area of all floors/net lot area
f. a brief description of the use of each building or structure including
an estimate of the number of employees
2. Parking Area
a. configuration of parking and vehicular circulation including employee
and guest parking
b. dimensions of typical parking stalls and parking aisles
c. total parking provided
d. calculation demonstrating total parking required
3. Loading and Service Areas
a. truck service and loading dock areas
b. truck and service vehicle circulation areas
c. trash enclosure areas
d. location of screening devices for truck and service areas
4. Landscape and Pedestrian circulation concept including any major
site design features
5. Interfaces with off-site circulation including the location and
design of all access drive curb cuts
6. Interfaces with adjacent properties
7. Conceptual grading, drainage and utilities
8. Descriptions or sketches of the architectural design concept including
intended character and materials
9. Phasing Plans - plans indicating the phasing of the ultimate Master Plan
development illustrating the extent of development at the completion of each
phase
While the above information is required for all Master Plan submissions, it would
be desirable for applicants to utilize all available presentation materials and
media in order to fully communicate the intent and design character to the Design
Review Committee.
2.2 BLACKRIVER TECHNOLOGY PARK PRELIMINARY PLAN SUBMITTAL
The Preliminary Plan submission is required to convey specific information about
the site planning and architecture of the proposed development. The Preliminary
Plan package should be submitted to the Design Review Committee prior to or
concurrent with submission of plans to the City of Renton for Site Development
Review, Preliminary Plans are to be submitted and approved before construction
documents are submitted.
The Preliminary Plan submission requires each of the following exhibits:
1. Site Plan indicating the following:
a. building footprints and dimensions to property lines
b. building roof overhangs
c. configuration of parking and vehicular circulation areas
d. location of parking lot electrollers
e. truck service, loading area, trash enclosures
f. lines of setback and easements
g. locations of on-site transformers, electrical switch gear, and gas
meters
h. adjacent roadways including curblines, medians and median openings
i. tabulation of:
I. Parcel Area
II. Total Building Floor Area
III. Site Coverage
IV. Building Coverage
V. Total Parking Provided
VI. Total Parking Required
VII. Estimated total employees on site at any peak time
VIII The anticipated number of shifts and the hours and days
of their operation
2. Conceptual Grading and Drainage Plan indicating:
a. proposed finish grades, slopes and building pad elevations
b. site drainage structures and systems
c. grades of existing streets and curbs
d. locations of street lighting and utility structures within landscape
easement
3. Conceptual Landscape Plan indicating:
a. plant materials , sizes, and spacings
b. walkways and paved areas
c. other landscape design features
4. Building Elevations of all sides of all proposed buildings indicating:
a. wall and roof materials, textures, and colors
b. locations of wall mounted signing and lighting
c. roof and parapet heights above ground floor line
d. the profile of any roof mounted mechanical equipment which extends above
the roof parapet
5. Building Floor Plans
6. Building Roof Plans indicating:
a. roof elevations above finish floor
b. heights and locations of roof mounted mechanical equipment where
available
7. Outline Specifications of all building materials
8. Conceptual Graphics and Wall Mounted Signs
a. ground signs and wall mounted signs
I. locations
II . designs , materials , textures , colors, heights , areas
III . Illumination
IV. typography
b. directional and information signs
I. locations
II. designs, materials, textures, colors, heights, areas
III. illumination
IV. typography
2.3 BLACKRIVER TECHNOLOGY PARK REVISION, ALTERATION, ADDITION OR CHANGE OF USE
PRELIMINARY PLAN SUBMITTAL
Preliminary plans are required to be submitted for any significant revisions,
alterations, additions or change of use to approved or existing developments
within Blackriver Technology Park. Preliminary plans for this purpose must be
submitted and approved before construction documents are submitted and before the
commencement of construction.
Revision, Alterations , Additions or Change of Use require the submission of four
4) sets of documents including:
1. A written description of the nature and extent of the proposed revision,
alteration, addition or change of use to be undertaken.
2. Indications of proposed revisions , alterations , additions or changes to:
a. the site plan
b. the grading and drainage plan
c. the landscape plan
d. the building elevations including
I. wall and roof materials, textures and colors
II. locations of wall mounted signing and lighting
III . roof and parapet heights above the ground floor line
IV. the profile of any roof mounted mechanical equipment which extends
above the roof parapet
e. the building floor plans
3. Tabulations of:
a. the new total building floor area
b. the new site coverage
c. the new building coverage
d. the new parking provided
e. calculations demonstrating the new required parking
f. the new estimated peak employee count
4. Outline specifications of construction materials.
2.4 INSTITUTIONAL REVIEW PROCESS
In the course of designing proposed developments for lots within Blackriver
Technology Park additional reviews and approvals will be required beyond the
Blackriver Technology Park Design Review Process. The following summary of
Blackriver Technology Park and other review and approval processes is included to
assist individual applicants in understanding the approximate nature and sequence
of those reviews. An understanding of the total review process from the outset,
it is hoped, will contribute to smoother and more efficient processing of each
proposed development.
1. The design process should begin with a review of the Blackriver Technology
Park, CC&R' s and Design Guidelines, the City of Renton Guidelines, and the
applicable sections of the current City of Renton Zoning Ordinance. Copies
of the City of Renton applications and submission requirements should also be
obtained at this time.
2. Prior to commencement of design, a licensed civil engineer should be consult-
ed as to grading and drainage restrictions in the City of Renton.
3. Master plan should be submitted to and approved by the Blackriver Technology
Park Design Review Committee.
4. Applicants should review master plans with the City of Renton Planning
Department and staff, for comments. This is not a required review but it may
help to avoid problems and duplication of work.
5. Master plans should be reviewed by a licensed civil engineer for compliance
with City of Renton grading and drainage restrictions.
6. Preliminary plan should be submitted to and approved by the Blackriver
Technology Park Design Review Committee.
7. Preliminary plans should be reviewed by a licensed civil engineer for
compliance with City of Renton grading and drainage restrictions.
8. Preliminary plans should be reviewed with the City of Renton planning and
public works staff several weeks prior to the intended submission for Site
Development Review.
9. Submit plans to the City of Renton for Site Plan Approval .
10. Submit plans for building department plan check.
c '
3.0 Site Planning Guidelines
3. 1 BUILDING SITE COVERAGE
Objectives
1. to insure that the intensity of site development is not excessive or detri-
mental to the perception of Blackriver Technology Park as a unified series of
high quality business sites
2. to insure that the intensity of site development does not over-tax utility or
transportation systems
Guidelines
1. Site coverage (defined as the building-ground contact area divided by the
total net lot area) shall not exceed 50% or the amount specified in the
current City of Renton Zoning Ordinance (whichever is the more restrictive.
2. Building coverage (defined as the total area of all floors divided by the
total net lot area) shall not exceed 60% unless otherwise approved in writing
by J.A.G./Renton Properties Associates.
3.2 LANDSCAPE COVERAGE
Objectives
1 . to insure that at least a minimum portion of a development site is devoted to
landscape materials in order to maintain a sense of continuity with adjacent
sites and to contribute to the perception of Blackriver Technology Park as a
park-like" environment.
2. to insure that at least a minimum of landscape materials are available on a
development site in order to contribute to the environmental well being of
potential users of each site.
Guidelines
1. A minimum of at least 15% of the area within the property lines of a develop-
ment site (exclusive of the Landscape Easement Transition Zone) shall be
devoted to landscape materials unless otherwise approved in writing by
J.A.G./Renton Properties Associates (for additional landscape requirements
see Landscape Guidelines Section 5.0)
3.3 BUILDING HEIGHTS
Objectives
1. to maintain a reasonably consistent and compatible height profile throughout
Blackriver Technology Park
Guidelines
1. Building heights shall conform to City of Renton Building Regulations
4-730.060.
t
3.4 STREET SETBACK
Objectives
1. to achieve a feeling of openness along the streets that reinforces the
perception of Blackriver Technology Park as a series of high quality business
sites
2. to encourage some regularity of space formed by buildings on either side of a
street
3. to achieve a landscaped setting between the street and buildings
4. to provide for a street-side edge which will have a landscape character that
will unify the total development and be sufficiently distinctive in design to
differentiate Blackriver Technology Park from other business developments
5. to provide vehicular sight lines which allow discrimination of one company
from another
6. to provide vehicular sight lines which allow safe ingress and egress to
properties and safe movements along roadways
7. to accommodate major Blackriver Technology Park identity statements at street
intersections leading into, and within the Park
Guidelines
1. No building or parking shall be permitted to be constructed closer than
thirty-five (35) feet from the property line along Southwest 4th Street.
Planters, walls, sign elements not exceeding 3'-0" in height may be permitted
in street-side setback areas with written approval of J.A.G./Renton Propert-
ies Associates. Roof overhangs may extend a maximum of 6'-0" into setback
areas.
2. The first 8 to 19 feet of street-side landscaping (from back of curb)
including sidewalk,will be installed by J.A.G./Renton Properties Assoicates
as a landscape easement, and shall remain unaltered, except for access
drives , unless alterations are approved in writing by J.A.G./Renton Proper-
ties Associates.
3. The remaining setback area shall be fully landscaped by the Owner/Occupant in
a manner both compatible with and complimentary to the landscape easements,
refer to Landscape Guidelines).
3.5 INTERIOR PROPERTY LINE SETBACK
Objectives
1. to provide a definite physical separation between buildings on adjoining lots
suitable for distinguishing separation of responsibilities
2. to allow companies on adjoining lots to be individually identifiable
Guidelines
1. No building shall be permitted to be constructed closer than ten (10) feet
from an interior property line.
2. No parking, other than automobile overhangs, shall be permitted to be con-
structed closer than five (5) feet from an interior property line, unless
otherwise approved in writing by J.A.G./Renton Properties Associates.
3. All setback areas shall be fully landscaped in a manner both compatible with
and complimentary to the on-site architecture and landscape design concepts.
3.6 PARKING REQUIREMENTS
Objectives
1. to provide sufficient on-site parking to accommodate all vehicles associated
with the use of each lot at any one time, and therefore not require vehicles
to be parked on public roadways or on lots of other companies
2. to configure parking areas such that they contribute to an increase of the
ratio of on-site persons to on-site vehicles
Guidelines
1. On-site parking shall be provided in a ratio of one space per 250 square feet
or less of net building area unless otherwise approved by J.A.G./Renton
Properties Associates.
2. Standard parking stalls shall be a minimum of 9 feet by 19 feet with a 22
foot reduction permitted for vehicle front overhangs.
3. Compact parking stalls shall not exceed forty (40) percent of the total
parking and shall be a minimum of 81 feet by 17 feet with a 2 foot reduction
permitted for vehicle front overhangs.
4. In addition to the parking required above, one designated parking space shall
be provided for each company vehicle to be parked on-site during no,-al
working hours. Parking spaces for company vehicles shall be of a size, area
and configuration that the company vehicles can be parked such that they are
fully contained within their designated spaces.
5. Designated "Handicap Parking" spaces, 12 feet in width, shall be provided at
a ratio of one stall per 50 parking stalls. Such parking spaces sha: 1 be
give preferential locations near building entrances which provide full and
convenient handicap access.
6. Should businesses locating on a Blackriver Technology Park development site
wish to encourage the formation of car pools by their employees, considera-
tion should be given to designating reserved "Car Pool" parking spaces.
Designated "Car Pool" spaces should be given preferential locations in
relatively close proximity to primary employee building entrances.
7. Designated "Cycle Parking" areas should be considered for the convenience of
employees using bicycles or motorcycles. In order to avoid the clutter of
cycles parked in unplanned locations, it is recommended that planned "Cycle
Parking" areas be conveniently located to employee entrances and be provided
with racks having security locking capabilities.
3.7 ACCESS AND DRIVE LOCATION
Objectives
1. to have access drives located such that vehicular traffic arriving at and
leaving from lots, as well as traffic passing continuously in streets, flow
at an optimum level of efficiency
5 •
2. that the continuity of street-side landscaping is minimally disrupted by the
construction of access drives
3. that utilities located in the landscape easement are not or are minimally
disrupted by the construction of access drives
Guidelines
1. Access drives on Southwest 4th Place should be aligned with regularly spaced
median breaks and low points in Landscape Easement earth mounding. Curb
openings aligned with regularly spaced median breaks will be permitted only
if the opposite side of the street has no planned curb openings. All curb
openings not aligned with regularly spaced median breaks shall be designed
for "right-turn-only" ingress and egress.
2. Access drives on Southwest 4th Place should be coordinated with
planned and existing median openings and where median openings are not
available, designed for efficient "right-turn-only" ingress and egress.
3. Access drives should be coordinated with adjacent lots so as not to impede
the efficient flow of peak period traffic. Consideration should be given to
adequate separation of adjacent access drives or the development of common
access drives.
4. Access drive designs should incorporate provisions for efficient vehicle
stacking during peak periods of use.
5. Access drives should be located such that their construction results in a
minimal disruption of the street side landscaping and utilities located
within the designated landscape easement.
6. No access drives will be permitted directly off of at any point east of its
intersection with
3.8 SIDEWALKS
Objectives
1. to provide a safe (separated from vehicles all weather efficient and aesthet-
ically pleasing means of pedestrian circulation connecting lots along the
streetside perimeter
2. to provide a safe (separated from vehicles), all weather efficient and
aesthetically pleasing means of pedestrian circulation serving each site,
including connecting parking areas with building entries, connecting build-
ings to one another, and connecting building entries with on-site amenities
Guidelines
1. Streetside sidewalks will be installed by the developer within perimeter
landscape easements.
2. On-site pedestrian circulation systems shall be provided to meet the circul-
ation needs of on-site users. Such systems should provide safe, all weather
efficient, and aesthetically pleasing means of on-site movement and should be
an integrated part of the overall architectural and site design concept.
3. Where usage dictates, connections should be made between on-site and perime-
ter pedestrian circulation systems.
4 • •
3.9 STORAGE, SERVICE, AND LOADING AREAS
Objectives
1. to insure that storage, service and loading areas are not visible from
primary visual exposure areas (streets , primary image entry drives, floors of
image buildings, common visual and recreational amenity areas, etc. )
2. to insure that storage, service and loading areas are located upon a site so
as to minimize the visibility of loading and service vehicles from primary
visual exposure areas
3. to insure that the storage, service and loading areas are designed and
located on the site so that service vehicle activities and movements do not
disrupt the efficient flowof on-site and off-site traffic
Guidelines
1. Storage, service; maintenance and loading areas must be constructed, main-
tained and used in accordance with the following conditions:
a. Unless approved in writing by J.A.G./Renton Properties Associates , no
materials, supplies , or equipment, including trucks or other motor
vehicles, shall be stored upon a site except inside a closed building or
behind a visual barrier screening such materials, supplies or vehicles
from adjacent sites so as not to be visible from neighboring properties
and streets. Any storage areas screened by visual barriers shall be
located upon the rear portions of a site, unless otherwise approved
in writing by J.A.G./Renton Properties Associates. No storage areas may
extend into a setback area except with the written approval of
J.A.G./Renton Properties Associates.
b. Provisions shall be made on each site for any necessary vehicle loading
and no on-street vehicle loading shall be permitted.
c. Loading dock areas shall be set back, recessed or screened so as not to
be visible from adjacent lots, or sites, neighboring properties , or
streets, and in no event shall a loading dock be closer than seventy-
five (75) feet from a property line fronting upon a street unless
otherwise approved in writing from J.A.G./Renton Properties Associates.
3.10 REFUSE COLLECTION AREAS
Objectives
1. to insure that refuse and refuse containers are not visible from primary
visual exposure areas (streets, primary image entry drives, floors of image
buildings, common visual and recreational amenity areas, etc. )
2. to insure that refuse enclosures are effectively designed to receive and
contain generated refuse until collected, and enclose refuse containers after
refuse is collected
3. to insure that refuse collection vehicles have clear and convenient access to
refuse collection areas and thereby not contribute to excessive wear-and-tear
to on-site and off-site developments
Guidelines
1. All outdoor refuse containers shall be visually screened within a durable
6' -o" or higher non-combustible enclosure, so as not to be visible from
adjacent lots or sites, neighboring properties or streets. No refuse collec-
tion areas shall be permitted between a street and the front of a
building.
2. Refuse collection areas should be effectively designed to contain all refuse
generated on-site and deposited between collections. Deposited refuse should
not be visible from outside the refuse enclosure.
3. Refuse collection enclosures should be designed of durable materials with
finishes and colors which are unified and harmonious with the overall archi-
tectural theme.
4. Refuse collection areas should be so located upon the lot as to provide clear
and convenient access to refuse collection vehicles and thereby minimize
wear-and-tear to on-site and off-site developments.
5. Refuse collection areas should be designed and located on the lot so as to be
convenient for the deposition of refuse generated on-site.
3.11 SCREENING OF EXTERIOR MECHANICAL EQUIPMENT
Objectives
1. to have all exterior components of plumbing, processing, heating, cooling and
ventilating systems not be directly visible from within the lot or from
adjoining streets , lots or buildings.
Guidelines
1. Exterior components of plumbing, processing, heating, cooling, and ventila-
ting systems (including but not limited to piping, tanks, stacks , collectors ,
heating, cooling, and ventilating equipment fans , blowers , ductwork, vents,
louvers, meters, compressors, motors, incinerators , ovens, etc. ) , shall not
be directly visible from a height of 5'-0" above any ground or ground floor
elevation at a distance closer than 200 feet from the closest building wall
on any lot, unless such components are an integral part of the building
exterior design concept and approved in writing by J.A.G./Renton Properties
Associates.
2. It is recommended that in the case of roof mounted mechanical equipment, that
building parapets be of such a height that roof mounted screening devices not
be required. If building parapets do not provide the required screening,
mechanical equipment shall be screened by an unobtrusive screening device
that will appear as an integrated part of the overall architectural design.
3. Any devices employed to screen exterior components of plumbing, processing,
heating, cooling, and ventilating systems from direct view shall appear as an
integrated park of the architectural design, and as such, be constructed of
complimentary and durable materials and finished in a complimentary texture
and color scheme to the overall architectural design.
4. Any exterior components of plumbing, processing, heating, cooling and
ventilating systems and their screening devices, that will be visible from
upper floors of adjacent buildings shall be kept to a visible minimum, shall
be installed in a neat and compact fashion, and shall be painted such a color
as to allow their blending with their visual background.
5. No exterior components of plumbing, processing, heating, cooling, and ventil-
ating systems shall be mounted on any building wall unless they are an
integrated architectural design feature, and in any case shall be permitted
only with the written approval of J.A.G./Renton Properties Associates.
3.12 SCREENING OF EXTERIOR ELECTRICAL EQUIPMENT AND TRANSFORMERS
Objectives
1. to minimize the visibility of exterior electrical equipment and transformers
from primary visual exposure areas (streets, primary image entry drives ,
floors of image buildings, and common visual and recreational amenity areas,
etc. )
Guidelines
1. Transformers that may be visible from any primary visual exposure area shall
be screened with either planting or a durable non-combustible enclosure (of a
design configuration acceptable to Puget Sound Power and Light). Where
possible, it is recommended that refuse containers and transformers be
integrated into the same enclosure.
2. Transformer enclosures should be designed of durable materials with finishes
and colors which are unified and harmonious with the overall architectural
theme.
3. Exterior mounted electrical equipment shall be mounted on the interior of a
building wherever possible. When interior mounting is not practical , elect-
rical equipment shall be mounted in a location where it is substantially
screened from public view. In no case shall exterior electrical equipment be
mounted on the street-side or primary exposure side of any building.
4. Exterior mounted electrical equipment and conduits shall be kept to a visible
minimum, where visible shall be installed in a neat and orderly fashion, and
shall be painted to blend with its mounting background.
3.13 FENCES AND WALLS
Objectives
1. to permit the installation of fences and walls within a lot for the purpose
of site security, sound attenuation, separation of functional activities, and
screening of unsightly functions and activities
2. to have fences and walls installed such that they are as inconspicuous as
possible or designed as an integrated and complimentary architectural design
element adding interest to the overall architectural design concept
3. to have no walls or fences reduce the intended quality of development or
reduce the perception of Blackriver Technology Park as a series of high
quality business sites
4. to discourage the construction of walls and fences except as necessary to
screen outside storage, loading and service areas
5. to insure that fences and walls do not, because of their height, location, or
design, contribute to a decrease in the safety or efficiency of traffic flows
on-site or in fronting streets
Guidelines
1. No fence or wall shall be constructed closer than thirty (30) feet from the
curbline of a fronting street unless it is of a height not to exceed 3'-0".
2. No fence or wall shall exceed a height of 8'-0" unless otherwise approved in
writing by J.A.G./Renton Properties Associates.
3. Walls and fences between buildings and fronting streets are discouraged, but
when necessary shall require written approval by J.A.G./Renton Properties
Associates.
4. All fences and walls shall be designed as an integrated part of the overall
architectural and site design. All materials shall be durable and finished
in textures and colors complimentary of the overall architectural design.
5. Where chain link fencing is to be employed, it shall be of a dark color and
be largely hidden behind plant materials and or earth mounding.
3. 14 UTILITIES AND COMMUNICATION DEVICES
Objectives
1. to have the entire Blackriver Technology Park visually free of unsightly
overhead power and telephone lines, utility poles , and other utility and
communication equipment and components
2. to protect off-site utility systems from becoming over-burdened by individual
lot utility systems
3. to achieve minimum disruption of off-site utilities, paving and landscape
during construction and maintenance of on-site utility systems
Guidelines
1. All exterior on-site utilities including, but not limited to, drainage
systems, sewers, gas lines, water lines, and electrical , telephone, and
communications wires and equipment shall be installed and maintained under-
ground.
2. On-site underground utilities shall be designed and installed to minimize the
disruption of off-site utilities, paving and landscape during construction
and maintenance and shall be of such a design so as not to place excessive
burdens upon off-site utility systems during the course of use.
3. No antenna or device for transmission or reception of any signals, including,
but not limited to, telephone, television, and radio, shall be placed on any
lot so that it is visible from 5'-0" above the ground or ground floor level
at a distance of 500 feet in any direction, unless specific written approval
is granted by J.A.G./Renton Properties Associates.
4. Temporary overhead power and telephone facilities are permitted during
construction.
3.15 GRADING
Objectives
1. to encourage site design which protects buildings and business activities
from damage or disruption that might otherwise occur during extreme storm
conditions.
2. to encourage site design which protects buildings and business activities
from damage or disruption during extreme storm conditions
3. to allow precipitation falling on site and surface water flowing from ad-
jacent sites to be effectively absorbed or to drain off the site without
causing excessive water concentrations on adjacent sites or streets
4. to have site grading compliment and reinforce the overall architectural and
landscape design character
Guidelines
1. All building first floor elevations shall be approximately one and one-half
feet (11) to two and one-half (23) feet above the flow line of adjacent
streets (specific pad elevations and on-site drainage plans should be estab-
lished by the project consultant) .
2. Site grading design should compliment and reinforce the architectural and
landscape design character by helping to screen parking, loading and service
areas, by helping to reduce the perception of height and mass on larger
buildings, by providing reasonable transitions between on-site uses, by
providing elevation transitions contributing to the efficiency of on-site
and off-site movement systems, and by providing reasonable transitions
between lots.
3.16 NUISANCES
Objectives
1. to insure that no portion of Blackriver Technology Park is used in such a
manner as to create a nuisance to adjacent sites or streets such as, but not
limited to, vibration, sound, electro-mechanical disturbance and radiation,
electro-magnetic disturbance, radiation, air or water pollution, dust,
emission of odorous, toxic or noxious matter
Guidelines
1. No nuisance shall be permitted to exist or operate upon any lot or site so as
to be offensive or detrimental to any adjacent lot or site or neighboring
property or to its occupants. A "nuisance" shall include, but not be limited
to, any of the following conditions:
a) Any use of the lot or site which emits dust, sweepings, dirt or cinders
into the atmosphere, or discharges liquid runoff and discharge into
river, which in the opinion of J.A.G./Renton Properties Associates, may
adversely affect the health, safety, or comfort of persons within the
area or the intended use of their property. No waste nor any substance
or materials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any
regulation of any public body having jurisdiction over such public
sewer;
b) The escape or discharge of any fumes, odors, gases , vapors, steam,
acids or other substance into the atmosphere which discharge, in the
opinion of J.A.G./Renton Property Associates, may be detrimental to the
health, safety or welfare of any person or may interfere with the
comfort of persons within the area or which may be harmful to property
or vegetation;
c) The radiation or discharge of intense glare or heat or atomic,
electro-magnetic, microwave, ultrasonic, laser or other radiation. Any
operation producing intense glare or heat or such other radiation shall
be performed only within an enclosed or screened area and then only in
such manner that the glare, or heat or radiation emitted will
not be discernible from any point exterior to the site or lot upon which
the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from
any individual plant or operation, exceed the decibel levels in the
designated preferred octave bands as follows:
Octave Band Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60db(A). The
maximum permissible noise levels for the octave bands shown above are
equal to an NC-50 Boise Criterion curve when plotted on the preferred
frequency scale.
Reasonable noise from motor vehicles and other transportation facilities
are exempted, so long as the vehicles or other transportation facilities
are not continuously on the subject property.
The operation of signaling devices and other equipment having impulsive
or non-continuous sound characteristics shall have the following correc-
tions applied:
Corrections
Pure Tone Content 5db
Impulsive Character 5db
Duration for Non-Continuous
Sounds in Daytime Only:
1 min/hr 5db
10 sec/10 min 10db
2 sec/10 min 15 db
The reference level for the db values listed above is the pressure of
0.00002 microbar or 0.0002 dyne/cm2
e) Excessive emissions of smoke, steam or particulate matter. Visible
emissions of smoke or steam will not be permitted (outside any building)
which exceed Ringlemann No. 1 on The Ringlemann Chart of the United
States Bureau of Mines. This requirement shall also be applied to the
disposal of trash and waste materials. Wind-borne dust, sprays
and mists originating in plants are not permitted.
f) Ground vibration. Buildings and other structures shall be constructed,
and machinery and equipment installed, and insulated on each lot or site
so that the ground vibration inherently and recurrently generated is not
perceptible without instruments at any point exterior to any lot or
site.
4.0 Architectural Guidelines
Objectives
1. to encourage high quality, contemporary architectural design of all facil-
ities to be constructed within Blackriver Technology Park, thus allowing
Blackriver Technology Park to be positively differentiated from other bus-
iness parks
2. to encourage businesses located within Blackriver Technology Park to express
themselves individually through the architectural design of their facilities
Guidelines
1. All design shall appear as an integrated part of an overall site design.
2. No "Period Buildings" shall be permitted. Contemporary building forms and
materials will be encouraged.
3. Pre-engineered metal buildings will not be permitted. Metal -clad buildings
will be permitted only if designed by an architect and only if specifically
approved in writing by J.A.G./Renton Properties Associates.
4. Design consideration should be given to:
a. views and vistas
b. solar orientation and climate
c. orientation toward major streets and thoroughfares
d. vehicular and pedestrian flows
e. the character of surrounding developments
f. expressions of a facility's functional organization
g. expressions of the individual character of each business
h. the satisfaction of physical , psychological , social and
functional needs of facility users
i . energy conservation through facility design
j . potential environmental hazards
k. enhancement of the overall landscape
5. Consideration should be given to the incorporation of design features such as:
a. highlighted visitor entrance and entry plazas
b. focal theme towers
c. enriched employee lunch areas
d. employee recreational facilities
e. accent lighting
f. atriums and interior courts
g. dynamic building and roof forms
h. striking window patterns
i . light and shadow patterns
j. color accents
Refer to Site Planning Guidelines and Landscape Guidelines for other design
features.
5.0 Landscape Guidelines
The landscape consists of elements that give form to exterior spaces. Thus, the
character of the landscape is created by major functional elements such as project
entrances, parking lots, buildings, service areas, signing, site lighting,
walkways, and the arrangement of plant materials.
Given that project architecture and building sites within Blackriver Technology
Park will most likely be of varying types and sizes , landscaping as a design
element will play the key role in creating and conveying the overall character of
Blackriver Technology Park as a "park-like" working environment. The purpose,
then, of these Landscape Guidelines, is to provide design criteria which will help
to insure that Blackriver Technology Park achieves an image that is distinctive,
clearly understandable and unified.
5. 1 INTRODUCTION TO THE BLACKRIVER TECHNOLOGY PARK LANDSCAPE CONCEPT
As a part of Blackriver Technology Park Master Plan, hereinafter referred to as
Blackriver Technology Park, a Concept Master Plan has been conceived to organize,
unify and create a distinctive character for the whole of the development. The
Concept Master Plan recognizes that Blackriver Technology Park consists of two
prominent zones , namely, the 'Streetscape Zone' and the ' Interior Zone' . An
understanding of the nature of these two zones is important to understanding the
landscape guidelines and their intent.
5.1.1 Streetscape Zone
The streetscape zone is the primary image setting zone on either side of
Southwest 4th Place. All improvements within this corridor will have the greatest
degree of control . Attributes within this zone include:
1 . The Landscape Easement - This easement begins at the back of the
curb and extends inward for a distance of 30 feet along the entire street.
The first 13 feet minimum (including walk) to 24 feet maximum are designated
as a "Public Parkway". The parkway includes a 5 foot walkway (see Figure C)
The remaining 6 feet minimum to 17 feet maximum shall be the "Transistion
Zone", to be contoured and planted by the Owner or Occupant. Common elements
within the Landscape Easement include a walkway, planting, irrigation, street
lighting, project signing and project entries.
5.1.2 The Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified single
image, namely: a single row of street trees planted approximately 5 feet from the
curb line on a landscaped berm, on both sides of the main roadway. Lawn shall
occur from the curb to the walkway. Informal tree, shrub and groundcover
plantings shall occur between the walkway and the landscape easement.
Individual project entries will punctuate these plantings providing highlighted
corporate identification.
A walkway will meander through the public parkway providing an added dimension to
the overall Blackriver streetscape scene.
L +
5.1.3 Interior Zone
The Interior Zone encompasses all exterior elements not covered by the
requirements of Section 5.1.1 and 5.1.2. This zone is subject to the needs of
each Owner or Occupant and, thus, is meant to have a greater degree of flexibility
than the streetscape zones. Common concerns within this zone include: parking
lot arrangements and landscaping, site lighting, regulatory and directional
signing, and service area screening.
5.1.4 Interior Zone Design Concept
It is intended that the Interior Zone of Blackriver Technology Park, consisting
primarily of parking lot landscaping, be planted in geometric patterns. (Refer to
Section 2.2.5c for plant types). Subtle light levels, restrained graphics and
screening of service areas will all contribute to reinforcing the Blackriver
Technology Park landscape design concept.
The Streetscape within Blackriver Technology Park will consist of a unified single
image, namely: a single row of street trees planted on both sides of the
Southwest 4th Place approximately 5 feet from the curbline on a landscaped berm
Lawn will occur from the curbline to the walkway. Informal tree, shrub and
groundcover plantings shall occur between the walkway and the property line of
individual properties of Owners or Occupants. This is the "Transition Zone".
Individual project entries will punctuate these plantings providing highlighted
corporate identification.
Two major Blackriver entry monuments will be provided, namely: entrances to
Blackriver Technology Park.
5.1.5 Grantor Provided Amenities
5.1.5a Exceptions
Exceptions to 5.1.4a above, shall occur at the west entry to Blackriver Technology
Park where a special entry landscape feature shall be provided by the Grantor
refer to the Concept Master Plan).
5.1.5b Entry Feature
The Grantor shall be responsible to provide a special landscaped feature at the
entrances to Powell Avenue S.W. and Naches Avenue S.W. (Refer to the Master Plan,
Exhibit A) . This area shall include a special landscaping and a Blackriver
identification monument (sign).
5.1.5c Pedestrian Easements
The Grantor shall be responsible to provide three(3) ten foot wide landscaped
pedestrian easements (refer to the Concept Master Plan Exhibit A). Landscaping in
this area shall include a five (5) foot wide walkway leading from the public
sidewalk within the landscape easement to preserve and/or buffer areas.
Landscaping on either side of the walkway shall be native groundcover vegetation.
5. 1.6 Other Requirements
5. 1.6a
All planting areas shall have a fully automatic irrigation system.
5. 1.6b
All planting and irrigation details and technical specifications shall conform to
the highest standards of the American Association of Nurseryman , the American
Landscape Contractors Association, and the irrigation industry.
5.1.6c
It shall be the Owner or Occupant's responsibility to provide a one year guarantee
against all defects of materials and workmanship for all planting and irrigation.
The Owner or Occupant shall replace plants not in normal , healthy growing
condition at the end of the guarantee period with same species and size. The
guarantee period shall begin when the Owner or Occupant, and Grantor or their
representative have accepted the work as 100 percent complete.
5.2 LANDSCAPE DESIGN GUIDELINES
5.2.1 Assessment District Installation and Maintenance Agreement
1. All landscape improvements within the Public Parkway (S.W. 4th Place Land-
scape Easement Section 5. 1. 1-1) will ble installed by the Grantor.
2. The Grantor has entered into a five year maintenance agreement to maintain
the Public Parkway. Landscape maintenance will be paid for through
Assessment District revenues. Following the expiration of the five year
maintenance period, all maintenance will be assumed by the Owner or Occupant
of individual development parcels and will be assumed by the Owner or Occu-
pant of individual development parcels and will be paid for through the
continuation of an Assessment District.
3. The 30 foot Landscape Easement (Public Parkway and Transistion
Zone) landscaping and irrigation will be installed as a continuouss linear
system. Demolition of this system at vehicular access points will be
necessary during the process of the access drive installation. It is a
responsibility of the Owner or Occupant to maintain the flow of the
irrigation system during construction, and to re-establish the planting,
grading and final irrigation layout that has been altered.
5.2.2 Maintenance of Unimproved Sites
1. Sites that are not improved or built upon shall be maintained in a clean
and neat appearance by the Owner or Occupant. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or more
often as required to maintain a high quality appearance. The Grantor and
their representative have the right to perform the necessary maintenance
and charge the individual Owner or Occupant as necessary.
5.2.3 Landscape Coverage
1. A minimum of fifteen (15) percent of the gross site area within the property
lines of a development site (exclusive of the Landscape Easement
Transition Zone) shall be devoted to landscape materials unless otherwise
approved in writing by the Grantor.
5.2.4 Street Frontage Zone Design Guidelines
The street frontage zone is defined as that portion of the site which is adjacent
to the Southwest 4th Place Landscape Easement.
5.2.4a Specific Design Limitation within the Street Frontage Zone
1. Grading: Finish grading for each site shall provide for a smooth transition
with the walkway in the Public Parkway. Transition slope in this zone shall
not exceed 4:1.
2. Service Areas: Service areas within this zone are to be enclosed with solid
walls and screened with the appropriate landscape material . (Refer to
5.2.4.b-4 for plant types).
3. Parking: Berming shall be provided within the Transition Zone of the
Landscape Easement.
4. Screening Shrubs: The following shrubs, in combination with walls or fences,
have been selected to aid in eye level screening of service areas. Planting
areas shall be a minimum width of 4 feet. All planting areas exceeding 4
feet shall also conform to these landscape guidelines. The shrubs should
be planted at a size to achieve a minimum height of 5 feet within a 3 year
period from the date of planting.
Plant Nare Maximum Spacing Comments
Chaenomeles lagenaria 4' on center Full
Euonymous alatus 4' on center Full
Forsythia sp. 4' on center Full
Juniper chinesis var.4' on center Full
Juniper squamata var.4' on center Full
Ligustrum vulgare 4' on center Full
Philadelphus virginalis 4' on center Full
Spiraea prunifolia 4' on center Full
Spiraea vanhouttei 4' on center Full
Thuja occidentalis pyramidalis 3' on center Full
Thuja orientalis 4' on center Full
Viburnum opulus 4' on center Full
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
1. Two (2) types of trees are identified for the parking lot planting.
Refer to Section 5.2.5c for plant types)
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
Type A: These trees shall be planted at the ends of parking columns (see Figures
J, K, and L) and at intermediate planting islands Figure J. A single tree
species, with a minimum height of 12 feet shall be planted throughout the
Owner or Occupant's entire parking lot compound.
Type B: These trees shall be planted in the parking lot interior (see Figures K
and L). A single tree species, with a minimum height of 8 feet shall be
used. The tree species may be different in separated parking lots within
the compound. Credit will not be given for perimeter edge tree planting. A
minimum of one (1) tree shall be planted for every six (6) car stalls.
2. Tree wells and planter areas within paved parking areas shall provide a
minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
4. All parking lot planting beds in addition to Type A and Type B trees shall
be planted with shrubs and/or groundcover. The size and spacing to conform
to Section 5.2.4.b.4.
5. Planting beds shall be a minimum of 25 square feet.
5.2.5.b Parking and Pedestrian Circulation
1. Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a minimum
width of 4 feet between stalls should be provided at key locations.
3. If parking lots exceed two rows in depth, the alignment of the aisles should
be in the direction of the pedestrian movement.
5.2.5c Parking Lot Plant Materials List
1. Tree species are to be selected from the following lists. If special soil or
site conditions prevent the use of the recommended trees, the Owner or Occu-
pant should recommend an alternative to the Design Review Committee.
Tree Lists for Parking Compounds
Type A Trees: (Refer to Section 5.2.5.a-1A)
Plant Name Minimum Size Comments
Acer platanoides, sp. var. 12' Well branched
Acer saccharum 12' Well branched
Aesculus hippocastanum 12' Well branched
Fraxinus americana (seedless) 12' Well branched
Gleditsia triacanthos inermis 12' Well branched
Tilia cordata 12' Well branched
All Type A Trees to be limbed up to six (6) feet from the ground.
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Crataegous lavallei 8' Well branched
Crataegus phaenopyrum 8' Well branched
Malus, var. 8' Well branched
Prunus cerasifera 8' Well branched
Sorbus aucuparia 8' Well branched
All Type B Trees to be limbed up to four (4) feet from the ground.
5.2.6 Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
1 . The location of major access drives shall be approved by the Grantor.
2. Access drives for "right turn only" ingress and egress should be located by
the Owner or Occupant according to City of Renton Standards.
5.2.6b Limiter Use Area of Primary and Secondary Access Drives
1. The "limited use area" is defined as the area extending 10 feet on either
side of an access drive and in that area of the first 10 feet extending
from the curbline of the public street.
2. All objects higher than 30 inches above the top of the curb at the access
drive curb opening, including but not limited to, shrubs, signs and earth
berms shall be located outside of the limited use area. Trees without limbs
to a height of six (6) feet may be planted in this area.
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side/Rear Yard Requirements
1. A 5 foot minimum planting strip is to be provided continuously along all
interior property lines not adjacent to landscape easements, except where a
shared access drive has been mutually agreed upon by adjoining property
owners.
2. All site drainage shall be coordinated with the overall project Site Drainage
Master Plan and shall comply with the City of Renton Storm Drainage
Ordinance.
3. A maximum slope of 2:1 is allowed within the 5 foot planting zone. A 1 foot
minimum flat transition shall be provided at the top and bottom of all slopes
within this zone.
4. Where the two properties adjoin, there shall be a 10 foot minimum zone
created by the two 5 foot landscape planting strips on each side of a
property line. All planting areas exceeding the 5 foot minimum shall also
conform to these landscape guidelines.
5. No walls or fences shall be permitted within the required 5 foot minimum
planting zone. However, walls or fences separating adjoining parcels may be
permitted when located at the property line. Walls or fences which
contribute to a specific landscape design may be submitted to the Design
Review Committee for consideration.
5.2.7b Side/Rear Yard Landscape Requirements
1. General - Either shrub or tree planting shall be required in the 5 foot side
and rear yard zone. Where two properties adjoin, shrub plantings with
groundcover is required on one side of the property line and tree plantings
with groundcover is required on the other. The first Owner or Occupant to
receive plan approval shall be required to plant the required trees with
groundcover. The second Owner or Occupant must then plant the required
shrubs with groundcover.
5.2.7c Plant Material Requirements - Interior Property Lines
1. Trees: Shall be located 4 feet from curbs or 1 foot from the property
line. The trees selected for interior property lines must be species
selected from the Tree List. (Refer to Section 5.2.5c)
2. Shrubs: Shall be located 3 feet from the property line or 2 feet from the
curb, and planted with a maximum spacing of 5 feet on center.
3. Groundcover: Shall be placed 24 inches on center maximum spacing, covering
all ground surfaces.
4. Sod lawn may be used in lieu of groundcover.
5.2.8 Guidelines for Exterior Property Lines
1. Side/Rear Yard Requirements Adjacent to Landscape Easements
a. Parking lots require no setback from the Landscape Easement. Parking
lotsshall be back five (5) feet from side on river property lines.
b. A minimum 60 foot front yard setback is required. Landscaping within
this zone shall conform to praking lot landscaping and transition zone
landscaping.
5.2.9 Guidelines for Free Preservation Outside the "Preserve" Zone
Trees selected for preservation shall have a "tree well " (fill retaining wall )
constructed to maintain an undisturbed existing ground area around the tree.
Provide approximately 5 sq. ft. for each caliper inch of trunk measured at 48"
above existing grade. The tree well shall be constructed in a manner to protect
all roots. No root cutting allowed. Special care shall be taken to maintain
ground water level and quality as nearly as possible to pre-development
conditions. This may include special irrigation and drainage systems or culvert
systems connecting the tree wells to nearby wetlands so that the rise and fall of
ground water will be similar to pre-development conditions. Storm water may be
retained on-site as necessary or desirable to assist in maintaining ground water
levels.
Tree wells may be constructed of railroad ties, treated timbers or poured-in-place
concrete, with an 8 inch high curb of timber, concrete or asphalt on all sides.
Provide hand rails where resultant depressions are more than 30 inches deep.
Conditions may vary at each tree location. Analyze each tree to ascertain the
best solution or combination of solutions to minimize adverse environmental
impacts.
Consult an Aborist regarding selection of trees to be preserved and preservation
procedures to be used. Selected trees are subject to review and approval by the
City of Renton.
6.0 Signing Guidelines
6. 1 OBJECTIVES The objectives of Signing Guidelines for Blackriver Technology
Park are:
1. to allow sufficient, though not excessive, business identification devises so
that the name of each business locating in Blackriver Technology Park is
clearly and individually associated with the facilities it occupies, when
viewed by motorists passing by on fronting streets
2. to prohibit signs and business identification devices from being used for
advertising of any kind including, but not limited to, advertising of pro-
ducts, services, or job openings
3. to allow on each lot sufficient, though not excessive, informational , direc-
tional , and traffic control signing for convenient and efficient operation
4. to have all informational , vehicular control , and temporary signing be
uniform in design, size, height, color, material , and topography
5. to permit sufficient, though not excessive, temporary signing including those
identifying the future occupant, the design consultants, the general con-
tractor, lending institutions, sale or leasing agents, and the building
product to be offered
6. to insure that signing and identification devices do not, because of their
height, location or design, contribute to a decrease in the safety and
efficiency of traffic flows in fronting streets
6.2 SIGN SUBMITTALS:
1 . An overall sign program including any (1) detached business identifica-
tion signs , (2) building mounted business or building identification signs
and (3) informational and vehicular control signs shall be submitted as part
of the preliminary plan submittal to the Blackriver Technology Park Design
Review Committee.
6.3 DETACHED BUSINESS IDENTIFICATION SIGNS:
1. Detached business identification signs shall be limited to the display of the
name and/or symbol of the business or businesses occupying the site. No
messages or advertising of any kind including, but not limited to, adver-
tising of products, services, or job openings shall be permitted.
2. No more than one detached business identification sign shall be permitted on
each street frontage of a development parcel .
3. No detached business identification sign shall exceed a sign area which is
the lesser of 50 square feet per side or the maximum sign area permitted by
the local governing authority. The sign area is defined as the area of the
surface or surfaces which displays letters or symbols identifying the bus-
iness or businesses occupying the site, or when the sign is of free-
standing letters, the single rectangular area which fully encloses all
letters or symbols identifying the business or businesses occupying the site.
The sign area shall not include the base or pedestal to which the sign is
mounted.
4. All detached business identification signs shall be permanent "ground hugger"
type signs and shall not exceed a height of five feet above the underlying
finish grade unless otherwise approved in writing by J.A.G./Renton Properties
Associates.
5. All detached business identification signs shall be of such materials and
design to be compatible with and complimentary to the on-site design concept
as well as landscape and physical design features.
6. Illumination - Detached business identification signs may be illuminated by
continuous and uniform internal illumination, backlighting, or ground light-
ing. No flashing or moving lights will be permitted. No unprotected lamp
providing sign illumination shall be directly visible when viewed at
any angle from a distance of twenty feet or more. No sign illumination shall
cast a glare which will be visible from any street or access drive.
7. Location - Detached business identification signs must be located within 20
feet of a fronting street and the access drive but shall not exceed 30 inches
in height when located in the first 10 feet adjacent to access drive closest
to the street.
6.4 BUILDING MOUNTED BUSINESS OR BUILDING IDENTIFICATION SIGNS:
1. Building mounted business or building identification signs shall be limited
to the display of the building name or the name and/or symbol of the business
occupying the site. No message or advertising of any kind including, but not
limited to the advertising of products, services or job openings
shall be permitted.
2. No more than one building mounted sign shall be permitted for each street
frontage of a development parcel .
3. Business or building identification signs may be mounted to any vertical
surface of a building or building associated wall provided such signs appear
as an integral part of the overall architectural and site design concept.
4. The sign area of building mounted business or building identification signs
may not exceed the lesser of 50 square feet or the maximum building mounted
sign area permitted by the local governing authority. The building mounted
sign area is defined as the area of the surface or surfaces which displays
letters or symbols identifying the business or businesses occupying the
site or when the sign is of freestanding letters, the single rectangular area
which fully encloses all letters or symbols identifying the business or
businesses occupying the site.
5. Building mounted business or building signs shall not extend beyond a height
above the ground floor which is the lesser of 32 feet or the maximum height
permitted by the local governing authority.
6. Building mounted business or building identification signs may be illuminated
by internal illumination or backlighting provided that the color and inten-
sity of such lighting appears as an integral part of the overall architec-
tural and site design concept. No sign illumination shall cast a glare which
will be visible from any street or access drive.
6.5 INFORMATIONAL AND VEHICULAR CONTROL SIGNS:
1. All informational and vehicular control signs shall be of uniform design
using ASI/Fiberglass Post & Panel System or a sign system of equal design
which is specifically approved in writing by J.A.G./Renton Properties Assoc-
iates. All lettering shall be Helvetica Medium, white in color. Red and
yellow may be used for stop and yield signs respectively.
2. No informational or vehicular control sign shall have a panel face which
exceeds 5 square feet in area per side.
3. No business name, symbol or advertising of any sort shall be permitted on any
informational or vehicular control sign.
4. No informational or vehicular control sign shall exceed a height of 4 feet
above the underlying grade.
5. No informational or vehicular control sign shall be located so as to reduce
the safe flow of vehicles or pedestrians.
6. No informational or vehicular control sign shall be internally illuminated or
illuminated from the ground.
6.6 TEMPORARY SIGNS.
Only one temporary sign plus one financing sign shall be permitted per
development parcel . No additional individual signs shall be permitted.
J.A.G./Renton Properties Associates or its representatives have the right to
remove unpermitted signs and charge the individual tenant or property owner
for the cost of such removal .
2. Temporary development signs shall be of a uniform size, area, height, color,
and design as illustrated here and shall , at a minimum, identify Blackriver
Technology Park and the business or company developing the parcel . The
remaining sign area shall be limited to identification of the following
and no other information:
a. a concise identification of the nature of the development
b. the projected date of completion
c. the construction lender
d. the real estate brokerage firm
e. the general contractor
f. the architect
g. the landscape architect
h. the structural engineer
i . the civil engineer
j. the mechanical engineer
k. the electrical engineer
3. No temporary development sign shall be located so as to reduce the safe flow
of vehicles and pedestrians
4. All temporary development signs shall be removed prior to occupancy.
7.0 Lighting Guidelines
7.1 OBJECTIVES
1. to have on-site lighting contribute to the safe and efficient use of a
development site
2. to have on-site lighting contribute to site security
3. to have or-site lighting compliment and reinforce the architecture and site
design character
4. to have on-site parking lot lighting fixtures and illumination levels be
consistent throughout Blackriver Technology Park
5. to prevent on-site lighting from casting glare onto adjacent lots
6. to prevent on-site lighting from casting glare onto adjacent streets in such
a manner as to decrease the safety of vehicular movement
7. to encourage lighting design that is in conformance with energy saving
guidelines
7.2 LIGHTING QUALITY
All lighting potentially visible from an adjacent street except bollard
lighting less than 42 inches high, shall be indirect or shall incorporate a
full cut off shield type fixture.
7.3 PARKING, ACCESS AND CIRCULATION AREAS
Parking areas, access drives, and internal vehicular circulation areas - All
parking lot lighting fixtures shall be a zero
series or a fixture of similar "shoe box" type design mounted at 18' -0" atop
a square metal pole. Both the fixture and pole are to have a durable black
finish. The light source shall be 150 watt color corrected high pressure
sodium. The parking lot illumination level shall achieve a uniformity ratio
of 3 to 1 (average to minimum) with a maintained average of 1 foot
candle and a minimum of .3 foot candle.
7.4 SERVICE AREAS
Service area lighting shall be contained within the service yard boundaries
and enclosure walls. No light spillover should occur outside the service
area. The light source should not be visible from the street.
7.5 BUILDING ILLUMINATION
Building illumination and architectural lighting shall be indirect in charac-
ter. (No light source visible). Indirect wall lighting or "wall washing"
overhead down lighting, or interior illumination which spills outside is
encouraged. Architectural lighting should articulate and animate the
particular building design as well as provide the required functional light-
ing for safety and clarity of pedestrian movement.
7.6 PEDESTRIANS AREAS
Pedestrian walk and area lighting is segmented into 2 zones.
1. The first zone is pedestrian area lighting. This is for outdoor pedes-
trian use areas such as courtyard, entry way, etc. Pedestrian area
lighting should achieve a uniformity ratio of 3.5 to 1 average to
minimum, with an average illumination of .60 foot candles and a minimum
of .18 foot candles.
2. The second zone is pedestrian walk lighting where point to point
lighting is acceptable with no specific illumination levels required.
The main emphasis in this zone should be to clearly identify the pedes-
trian walkway and direction of travel .
8.0 Appendix
CONTACT AND REFERENCE LIST
DEVELOPER (Grantor)
J.A.G./Renton Properties Associates
Alterra Corp. , General Partner
710 Cherry Street
Seattle, WA 98104
Phone: (206) 382-0333
Contact: Delton Bonds
PROJECT CONSULTANT (Planning, Site, Civil & Utilities Design, Landscape
Architecture)
Richard Carothers Associates
814 E. Pike Street
Seattle, WA 98122
Phone: (206) 324-5500
Contact: Richard A. Carothers
GOVERNMENTAL AGENCIES
City of Renton
Municipal Building
200 Mill Avenue South
Renton, WA 98055
o Planning Department
Ronald G. Nelson, Director
Phone (20E) 235-2540
Contact: Roger J. Blalock, Zoning Administrator
Jerry Lind, Land Use Inspector
o Public Works
Richard Houghton, Director
Phone (206) 235-2569
Contact: Richard Houghton
o Engineering Department
Robert Bergstrom, P.E. , Director
Phone (206) 231-2631
Contact: Robert Bergstrom, P.E.
o Fire Department
James Matthew, Fire Marshall
Phone (206) 235-2642
Contact: James Matthew
PLANNING & DESIGN REFERENCES
Renton Zoning Ordinance
Building Regulations, Title 4, Chapter 23 (Grading & Filling)
Subdivision Ordinance, Chapter 11 (Preliminary Plat)
Controlling Building Code: Uniform Building Code with City enacted amendments.
Maps and plans , Contact J.A.G./Renton Properties Associates
Covenants, Conditions and Restrictions
Contents
DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS
FOR BLACKRIVER TECHNOLOGY PARK
Page No.
RECITALS 1
1.0 DEFINITIONS 2
1.1 Architect, Landscape Architect, Civil Engineer
1.2 Beneficiary
1.3 Declarant
1.4 Declaration
1.5 Deed of Trust
1.6 Improvement - Improvements
1.7 Lot
1.8 Mortgage
1.9 Mortgagee
1.10 Occupant
1.11 Owner
1. 12 Record - Recorded - Recordation
1.13 Sign
1.14 Street or Streets
1.15 Subject Property
1.16 Visible from Neighboring Property
2.0 SUBJECT PROPERTY 4
2.1 General Declaration
2.2 Addition of Other Realty
2.3 Notice of Addition of Land
3.0 CONSTRUCTION OF IMPROVEMENTS 6
3.1 Approval of Plans Required
3.2 Basis for Approval
3.3 Review Fee
3.4 Result of Inaction
3.5 Approval
3.6 Proceeding with Work
3.7 Completion of Work
3.8 Declarant Not Liable
3.9 Construction Without Approval
4.0 DEVELOPMENT STANDARDS 10
4.1 Minimum Setback
4.2 Exceptions to Setback Requirements
4.3 Landscaping
Page No.
4.0 DEVELOPMENT STANDARDS (Continued)
4.4 Signs
4.5 Parking Areas
4.6 Storage and Loading Areas
5.0 REGULATION OF OPERATIONS AND USES 14
5.1 Permitted Uses
5.2 Prohibited Uses
5.3 Nuisances
5.4 Condition of Property
5.5 Maintenance of Grounds
5.6 Remedies for Failure to Maintain & Repair
a) Remedies
b) Foreclosure of Lien
c) Cure
d) Nonexclusive Remedy
5.7 Taxes and Assessments
5.8 Refuse Collection Areas
5.9 Repair of Buildings
5.10 Public Utilities
5.11 Utility Lines and Antennas
5.12 Mechanical Equipment
5.13 Mineral Exploration
5. 14 Other Operations and Uses
6.0 MODIFICATION AND REPEAL 23
6. 1 Procedure
6.2 Modification by Declarant
6.3 Governmental Regulation
7.0 ENFORCEMENT 25
7. 1 Abatement and Suit
7.2 Right of Entry
7.3 Deemed to Constitute a Nuisance
7.4 Attorney's Fee
7.5 Failure to Enforce is No Waiver
8.0 ASSIGNMENT 27
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE 27
10.0 WAIVER 28
Page No.
11.0 RUNS WITH LAND 28
12.0 RIGHTS OF MORTGAGEES 28
13.0 CAPTIONS 29
14.0 EFFECT OF INVALIDATION 29
DECLARATION OF COVENANTS
CONDITIONS AND RESTRICTIONS
FOR
BLACKRIVER TECHNOLOGY PARK
This Declaration, made this day of 1984, by J.A.G./
Renton Properties Associates, a Washington Partnership, is made with reference to
the following facts:
RECITALS
A. Blackriver Technology Park is the owner of that certain real property in the
City of Renton , County of King, State of Washington described in Exhibit A attached
hereto and by this reference incorporated herein, and known as Blackriver Technology
Park.
B. Blackriver Technology Park is being developed as a planned industrial park.
It is J.A.G./Renton Properties Associates desire and intention to subject the real
property in said industrial park to certain covenants, conditions and restrictions
for the benefit of the property, J.A.G./Renton Properties Associates, and the
purchasers of lots in Blackriver Technology Park. It is intended that said
covenants, conditions and restrictions bind and benefit not only said purchasers
and J.A.G./Renton Properties Associates, but also their respective successors,
heirs and assigns and that all lots in Blackriver Technology Park should be held,
used, leased, sold and conveyed subject to the covenants, conditions and
restrictions set forth in this Declaration.
1-
C. It is the intention of J.A.G./Renton Properties Associates to further a plan
of subdivision by means of the covenants, conditions and restrictions set forth in
this Declaration. Said covenants, conditions and restrictions are intended to be
common to all of the lots in Blackriver Technology Park and to enhance and protect
the value, desirability and attractiveness of all such lots to their mutual
benefit.
1.0 DEFINITIONS
Unless the context otherwise specifies or requires, the terms defined in this (1.0
Definitions) , shall as used in this Declaration, have the meanings herein set
forth:
1. 1 Architect, Landscape Architect, Civil Engineer. The term "architect,
landscape architect and civil engineer", shall mean a person holding a certificate
to practice architecture, landscape architecture or civil engineering, in the State
of Washington.
1.2 Beneficiary. The term "beneficiary" shall mean a mortgagee under a mortgage
as well as a beneficiary under a deed of trust.
1.3 Declarant. The term "Declarant" shall mean J.A.G./Renton Properties
Associates and, to the extent provided in Article VIII of this Declaration, its
successors and assigns.
1.4 Declaration. The term "Declaration" shall mean this Declaration of Covenants,
Conditions and Restrictions for Blackriver Technology Park, as it may from time to
time be amended or supplemented.
1.5 Deed of Trust. The term "deed of trust" shall mean a mortgage as well as a
deed of trust.
1.6 Blackriver Technology Park. The term "Blackriver Technology Park" shall be
synonymous with the term "subject property" and shall mean all of the real property
2-
now or hereafter made subject to this Declaration. 1.7 Improvement - Improvements.
The term "improvement" or "improvements" shall include buildings, outbuildings,
roads, driveways, parking areas, fences, screening walls and barriers, retaining
walls , stairs, decks , water lines, sewers, electrical and gas distribution
facilities, hedges, windbreaks, plantings , planted trees and shrubs, poles, signs ,
loading areas and all other structures, installations and landscaping of every type
and kind, whether above or below the land surface.
1.8 Lot. The term "lot" shall mean a fractional part of the subject property as
subdivided on subdivision or parcel maps recorded from time to time in the Office
of the Recorder of the County of King, State of Washington.
1.9 Mortgage. The term "mortgage" shall mean a deed of trust as well as a
mortgage.
1.10 Mortgagee. The term "mortgagee shall mean a beneficiary under, or holder of,
a deed of trust as well as a mortgagee under a mortgage.
1. 11 Occupant. The term "Occupant" shall mean a lessee or licensee of an Owner, or
any other person or entity other than an Owner in lawful possession of a lot with
the permission of the Owner.
1. 12 Owner. The term "Owner" shall mean and refer to any person or entity which is
the record Owner of fee simple title to any lot, excluding any entity or person who
holds such interest as security for the payment of an obligation, but including
contract sellers and any mortgagee or other security holder in actual possession of
a lot.
1.13 Record - Recorded - Recordation. The terms "record," "recorded," or
recordation" shall mean, with respect to any document, the recordation of said
document in the Office of the Recorder of the County of King, State of Washington.
3-
I-
1. 14 Sign. The term "sign" shall mean any structure, device or contrivance,
electric or non-electric, upon or within which any poster, bulletin, printing,
lettering, painting, device or other advertising of any kind whatsoever used,
placed, posted, tacked, nailed, pasted, or otherwise fastened or affixed.
1.15 Street of Streets. The term "street" or "streets" shall mean any street,
highway, road, or thoroughfare within or adjacent to the subject property and shown
on any recorded subdivision or parcel map, or record or survey, whether designated
thereon as street, boulevard, place, drive, road, court, terrace, way, lane, circle
or otherwise.
1.16 Subject Property. The term "subject property shall be synonymous with the
term "Blackriver Technology Park" and shall mean all of the real property now or
hereinafter made subject to this Declaration.
1.17 Visible from Neighboring Property. The term "visible from neighboring
property" shall mean, with respect to any given object on a lot, that such object
is or would be visible to a person six (6) feet tall , standing on any part of any
adjacent lot or other property at an elevation no greater than the elevation of the
base of the object being viewed.
2.0 SUBJECT PROPERTY
2.1 General Declaration. Declarant hereby declares that all of that real property
located in the City of Renton, County of King, State of Washington, and more
particularly described in Exhibit "A" is, and shall be, conveyed, hypothecated,
encumbered, leased, occupied, built upon or otherwise used, improved or transferred
in whole or in part, subject to this Declaration. All of the covenants, conditions
and restrictions set forth herein are declared and agreed to be in furtherance of a
general plan for the subdivision, improvement and sale of said real property and
are established for the purpose of enhancing and protecting the value, desirability
4-
and attractiveness of the subject property and every part thereof. All of said
covenants, conditions and restrictions shall run with all of the subject property
for all purposes and shall be binding upon and inure to the benefit of Declarant
and all Owners, Occupants , and their successors in interest as set forth in this
Declaration.
2.2 Addition of Other Realty. Declarant may at any time during the pendency of
this Declaration add all or a portion of any real property now or hereinafter owned
by Declarant to the subject property, and upon recording of a notice of addition of
real property containing at least the provisions set forth in Section 2.3, the
provisions of this Declaration specified in said notice shall apply to such added
real property in the same manner as if it were originally covered by this
Declaration. Thereafter, to the extent that this Declaration is made applicable
thereto, the rights, powers and responsibilities of Declarant and the Owners and
Occupants of lots within such added real property shall be the same as in the case
of the real property described in Exhibit "A".
2.3 Notice of Addition of Land. The notice of addition of real property referred
to in Section 2.2 shall contain at least the following provisions :
a) A reference to this Declaration stating the date of recording and the book or
books of the records of King County, Washington, and the page numbers where this
Declaration is recorded;
b) A statement that the provisions of this Declaration, or some specified part
thereof, shall apply to such added real property;
c) A legal description of such added real property; and
d) Such other or different covenants, conditions and restrictions as Declarant
shall , in its discretion, specify to regulate and control the use, occupancy and
improvements of such added real property.
5-
3.0 CONSTRUCTION OF IMPROVEMENTS
3.1 Approval of Plans Required. No improvements shall be erected, placed,
altered, maintained or permitted to remain on any lot by any Owner or Occupant
until final plans and specifications shall have been submitted to and approved in
writing by Declarant. Such final plans and specifications shall be submitted in
duplicate over the authorized signature of the Owner or Occupant or both of the lot
or the authorized agent thereof. Such plans and specifications shall be in such
form and shall contain such information as may be required by the Declarant, but
shall in any event include the following:
a) A site development plan of the lot showing the nature, grading scheme, kind,
shape, composition, and location of all structures with respect to the particular
lot (including proposed front, rear and side setback lines) , and with respect to
structures on adjoining lots, and the number and location of all parking spaces and
driveways on the lot;
b) A landscaping plan for the particular lot;
c) A plan for the location of signs and lighting; and
d) A buildina elevation plan showing dimensions , materials and exterior color
scheme in no less detail than required by the appropriate governmental authority
for the issuance of a building permit. Material changes in approved plans must be
similarly submitted to and approved by Declarant.
3.2 Basis for Approval . Approval shall be based, among other things, upon
adequacy of site dimensions, adequacy of structural design, conformity and harmony
of external design with neighboring structures, effect of location and use of
proposed improvements upon neighboring lots, proper facing of main elevation with
respect to nearby streets, adequacy of screening of mechanical , air conditioning or
other roof top installations, and conformity of the plans and specifications to the
purpose and general plan and intent of this Declaration. No plans will be approved
6-
which do not provide for the underground installation of power, electrical ,
telephone and other utility lines from the property line to buildings. Plans which
provide for metal-clad buildings will be approved only on the condition that such
buildings are constructed so as not to have the appearance of a metal building and
any metal-clad building must be specifically approved in writing. Declarant shall
not arbitrarily or unreasonably withhold its approval of any plans and
specifications. Except as otherwise provided in this Declaration, Declarant shall
have the right to disapprove any plans and specifications submitted hereunder on
any reasonable grounds including, but not limited to, the following:
a) Failure to comply with any of the restrictions set forth in this Declaration;
b) Failure to include information in such plans and specifications as may have
been reasonably requested by Declarant;
c) Objection to the exterior design, the appearance of materials or materials
employed in any proposed structure;
d) Objection on the ground of incompatibility of any proposed structure or use
with existing structures or uses upon other lots, or other property in the vicinity
of the subject property;
e) Objection to the location of any proposed structure with reference to other
lots, or other property in the vicinity;
f) Objection to the grading or landscaping plan for any lot;
g) Objection to the color scheme, finish, proportions, style or architecture,
height, bulk or appropriateness of any structure;
h) Objection to the number or size of parking spaces, or to the design of the
parking area;
i ) Any other matter which, in the judgment of the Declarant, would render the
proposed improvements or use inharmonious with the general plan for improvement of
7-
the subject property or with improvements located upon other lots or other property
in the vicinity.
3.3 Review Fee. An architectural review fee shall be paid to Declarant at such
time as plans and specifications are submitted to it based upon the following
schedule:
a) When the plans submitted are prepared by a licensed architect, engineer or
landscape architect, the architectural review fee shall be the sum of One Hundred
and no/100ths Dollars ($100.00);
b) In all other cases, the architectural review fee shall be the sum or Two
Hundred Fifty and no/100ths Dollars ($250.00).
3.4 Result of Inaction. If Declarant fails either to approve or disapprove plans
and specifications submitted to it for approval within forty-five (45) days after
the same have been submitted, it shall be conclusively presumed that Declarant has
disapproved said plans and specifications; provided, however, that if within the
forty-five (45) day period Declarant gives written notice of the fact that more
time is required for the review of such plans and specifications , there shall be no
presumption that the same are disapproved until the expiration of such reasonable
period of time as is set forth in the notice.
3.5 Approval . Declarant may approve plans and specifications as submitted, or as
altered or amended, or it may grant its approval to the same subject to specific
conditions. Upon approval or conditional approval by Declarant of any plans and
specifications submitted, a copy of such plans and specifications, together with
any conditions, shall be deposited for permanent record with Declarant, and a copy
of such plans and specifications, bearing such approval together with any
conditions, shall be returned to the applicant submitting the same.
8-
3.6 Proceeding with Work. Upon receipt of approval from Declarant pursuant to
Section 3.5, the Owner, or Occupant, or both, to whom the same is given, shall , as
soon as practicable, satisfy any and all conditions of such approval and shall
diligently proceed with the commencement and completion of all approved excavation,
construction, refinishing, and alterations. In all cases, work shall commence
within one (1) year from the date of approval , and if work is not so commenced
approval shall be deemed revoked unless Declarant, pursuant to written request made
and received prior to the expiration of said one (1) year period, extends the
period of time within which work must be commenced.
3.7 Completion of Work. Any improvement commenced pursuant hereto shall be
completed within two (2) years from the date of Declarant's approval of the plans
and specifications therefor, except for so long as such completion is rendered
impossible, or unless work upon the proposed improvements would impose a great
hardship upon the Owner or Occupant, to whom Declarant's approval is given, due to
strike, fire, national emergency, natural disaster or other supervening force
beyond the control of Owner or Occupant. Declarant may, upon written request made
and received prior to the expiration of the two (2) year period, extend the period
of time within which work must be completed. Failure to comply with this Section
3.7 shall constitute a breach of this Declaration and subject the party in breach
to the enforcement procedures set forth in 7.0.
3.8 Declarant Not Liable. Declarant shall not be liable for any damage, loss or
prejudice suffered or claimed by any person on account of:
a) The approval or disapproval of any plans, drawings and specifications, whether
or not in any way defective;
b) The construction of any improvement, or performance of any work, whether or
not pursuant to approved plans, drawings and specifications; or
9-
c) The development of any lot within Blackriver Technology Park.
3.9 Construction Without Approval . If any improvement shall be erected, placed or
maintained upon any lot, or the exterior design thereof, or any new use commenced
upon any lot, other than in accordance with the approval by the Declarant pursuant
to the provisions of this 3.0 (Construction of Improvements) , such alteration,
erection, placement, maintenance or use shall be deemed to have been undertaken in
violation of this Declaration, and upon written notice from Declarant, any such
improvement so altered, erected, placed, maintained or used upon any lot in
violation of this Declaration shall be removed or altered so as to conform to this
Declaration, and any such use shall cease or be amended so as to conform to this
Declaration. Should such removal or alteration, or cessation or amendment of use
not be accomplished within thirty (30) days after receipt of such notice, then the
party in breach of this Declaration shall be subject to the enforcement procedures
set forth in 7.0.
4.0 DEVELOPMENT STANDARDS
4. 1 Minimum Setback. No improvements of any kind, and no part thereof, shall be
placed closer than permitted by Declarant to an interior property line, except as
otherwise provided in Section 4.2. "Interior property line" shall mean the
boundary between any lot within the subject property and all other lots bordering
upon said lot. No improvements of any kind, and no part thereof, shall be placed
closer than twenty-five (25) feet from a property line fronting the following
streets: (1) Southwest Fourth Place and (2) Naches Avenue S.W. "Property line"
shall mean the boundary of every lot.
4.2 Exceptions to Setback Requirements. The following improvements, or parts of
improvements, are specifically excluded from the setback requirements set forth in
Section 4. 1:
10-
a) Roof overhang, subject to approval in writing from Declarant, provided said
overhang does not extend more than six (6) feet into the setback area;
b) Steps and walkways;
c) Paving and associated curbing;
d) Fences, except that no fence shall be placed closer than twenty-five (25) feet
from a property line fronting upon any public street without the prior written
approval of Declarant;
e) Landscaping and irrigation systems;
f) Planters, not to exceed three (3) feet in height, except that planters of
greater height may be built within the setback area with the prior written approval
of Declarant;
g) Industrial park identification signs, directional and parking signs and signs
identifying the Owner or Occupant of a lot, subject to the prior written approval
of Declarant;
h) Lighting facilities, subject to the prior written approval of Declarant; and
i ) Underground utility facilities and sewers.
4.3 Landscaping. Within ninety (90) days following completion of construction, or
by the date each improvement is occupied, whichever shall occur first, each lot
shall be landscaped in accordance with the plans and specifications. The area of
each lot between any street and any minimum setback line as set forth in Section
4.1 shall be landscaped with an attractive combination of trees, shrubs and other
ground cover. All other areas fronting on a street and not utilized for parking,
driveways, or walkways shall be landscaped in a complementary and similar manner.
All portions of a lot not fronting a street and not used for parking, storage or
buildings shall be landscaped utilizing ground cover and shrub or tree materials.
The Owner or Occupant shall be responsible for landscaping and maintaining the area
11-
known as the 'transition zone' ; refer to Landscape Design Guidelines. An
underground landscape irrigation system shall be provided and maintained by the
Owner or Occupant for all landscaped areas. Areas used for parking shall be
landscaped, bermed or attractively fenced in such a manner as to screen said areas
from view from adjacent streets and freeways. Such screening shall extend at least
forty-two (42) inches above the high point of the finished pavement in said parking
area. Plant materials used for this purpose shall consist of lineal or grouped
masses of shrubs and trees.
After completion, such landscaping as is herein required shall be maintained in a
sightly and well-kept condition. If, in Declarant's reasonable opinion, the
required landscaping is not maintained in a sightly and well -kept condition,
Declarant shall be entitled to the remedies set forth in 7.0.
4.4 Signs. No sign shall be permitted on any lot unless approved by Declarant in
writing. No sign shall be approved other than industrial park identification
signs , directional and parking signs, signs identifying the name, business and
products of the Owner or Occupant of a lot, and signs offering the lot for sale or
lease.
4.5 Parking Areas. Off-street parking adequate to accommodate the parking needs
of the Owner or Occupant, the employees and visitors thereof shall be provided by
the Owner or Occupant of each lot. The intent of this provision is to eliminate
the need for any on-street parking; provided, however, that nothing herein shall be
deemed to prohibit on-street parking of public transportation vehicles. If parking
requirements increase as a result of a change in the use of a lot or in the number
of persons employed by the Owner or Occupant, additional off-street parking shall
be provided so as to satisfy the intent of this section. All parking areas shall
conform to the following standards:
12-
a) Required off-street parking shall be provided on the lot, on a contiguous lot,
or within such distance from the lot as Declarant deems reasonable. Where parking
is provided other than upon the lot concerned, Declarant shall be given a certified
copy of a recorded instrument, duly executed and acknowledged by the person or
persons holding title to the lot or other property upon which the parking area is
located, stipulating to the permanent reservation of the use of the lot or other
property for such parking area.
b) Parking areas shall be paved so as to provide dust-free, all-weather surfaces.
Each parking space provided shall be designated by lines painted upon the paved
surface and shall be adequate in area. All parking areas shall provide, in
addition to parking spaces , adequate driveways and space for the movement of
vehicles.
c) In determining the adequacy of the number of parking spaces to be provided by
an Owner or Occupant, Declarant shall consider the nature of the proposed use of
the lot, the amount of vehicular traffic generated by said use, the anticipated
number of, and manner of employment of, persons to be employed upon the lot; the
nature and location of proposed structures upon the lot; and such other matters as
Declarant shall reasonably deem relevant.
d) No parking spaces shall be located on or permitted within setback areas
adjacent to a street as set forth in Section 4.1, except that parking spaces may be
located on or parking permitted within such area if Declarant's written permission
is first obtained. Permission will not be given in any event unless parking areas
within such setback areas are screened from view of the street by shrubs and trees,
by a screen wall or by berms, and any such screening must extend at least forty-two
42) inches above the high point of the finished pavement in said parking area.
13-
4.6 Storage and Loading Areas. Storage, maintenance and loading areas must be
constructed, maintained and used in accordance with the following conditions:
a) Unless approved in writing by Declarant, no materials, supplies or equipment,
including trucks or other motor vehicles, shall be stored upon a lot except inside
a closed building or behind a visual barrier screening such materials, supplies or
vehicles so as not to be visible from neighboring property and streets. Any
storage areas screened by visual barriers shall be located upon the rear portions
of a lot, unless otherwise approved in writing by Declarant. No storage area may
extend into a setback area as defined in Section 4.1 except with the written
approval of Declarant.
b) Provision shall be made on each site for any necessary vehicle loading and no
on-street vehicle loading shall be permitted.
c) Loading dock areas shall be set back, recessed or screened so as not to be
visible from neighboring property or streets and in no event shall a loading dock
be closer than seventy-five (75) feet from a property line fronting upon a street
unless otherwise approved in writing by Declarant.
5.0 REGULATION OF OPERATIONS AND USES
5. 1 Permitted Uses. Except as otherwise specifically prohibited herein, any
industrial operation and use will be permitted upon a lot, provided that Declarant
specifically consents to such use in writing. Such approved use shall be performed
or carried out entirely within a building that is so designed and constructed that
the enclosed operations and uses do not cause or produce a nuisance to other lots
or property, such as, but not limited to, vibration, sound, electro-mechanical
disturbances, electro-magnetic disturbances, radiation, air or water pollution,
dust, or emission of odorous, toxic or non-toxic matter (including steam). Certain
activities which cannot be carried on within a building may be permitted, provided
14-
Declarant specifically consents to such activity in writing and further provided
such activity is screened so as not to be visible from neighboring property and
streets. All lighting is to be shielded so as not to be visible from neighboring
property.
5.2 Prohibited Uses. The following operations and uses shall not be permitted on
any property subject to this Declaration:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling for and removing oil , gas or other hydrocarbon substances;
e) Refining of petroleum or of its products;
f) Commercial petroleum storage yards;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary in the
course of approved construction pursuant to 3.0, Construction of Improvements;
h) Distillation of bones;
i ) Dumping, disposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
15-
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race tracks;
r) Retail stores or shopping centers;
s) Commercial service stations or gasoline stations;
t) Commercial restaurants or snack bars; or
u) Banks or savings and loans institutions.
5.3 Nuisances. No nuisance shall be permitted to exist or operate upon any lot so
as to be offensive or detrimental to any adjacent lot, or property or to its
occupants. A "nuisance" shall include, but not be limited to, any of the following
conditions:
a) Any use, excluding reasonable construction activity, of the lot which emits
dust, sweepings , dirt of cinders into the atmosphere, or discharges liquid, solid
wastes or other matter into any stream, river, or other waterway which, in the
opinion of Declarant, may adversely affect the health, safety, comfort of, or
intended use of their property by persons within the area. No waste nor any
substance or materials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any regulation of
any public body having jurisdiction over such public sewer;
b) The escape or discharge of any fumes, odors, gases, vapors, steam, acids or
other substance into the atmosphere which discharge, in the opinion of Declarant,
may be detrimental to the health, safety or welfare of any person or may interfere
with the comfort of persons within the area or which may be harmful to property or
vegetation;
c) The radiation or discharge of intense glare or heat, or atomic, electro-
magnetic, microwave, ultrasonic, laser or other radiation. Any operation producing
intense glare or heat or such other radiation shall be performed only within an
16-
enclosed or screened area and then only in such manner that the glare, heat or
radiation emitted will not be discernible from any point exterior to the site or
lot upon which the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from any
individual plant or operation, exceed the decibel levels in the designated
preferred octave bands as follows:
Octave Bank Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
Hz
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60 dB(A). The maximum
permissible noise levels for the octave bands shown above are equal to an NC-50
Noise Criterion curve when plotted on the preferred frequency scale.
Reasonable noise from motor vehicles and other transportation facilities are
exempted, so long as the vehicles or other transportation facilities are not
continuously on the subject property. The operation of signalling devices and other
equipment having impulsive or non-continuous sound characteristics shall have the
following corrections applied:
Corrections
Pure Tone Content 5dB
Impulsive Character 5dB
Duration for Non-
Continuous Sounds
in Daytime Only,
1 min/hr 5dB
10 sec/10 min 10dB
17-
2 sec/10 min 15dB
The reference level for the dB values listed above is the pressure of 0.0002
microbar or 0.0002 dyne/cm2.
e) Excessive emissions of smoke, steam or particulate matter. Visible emissions
of smoke or steam will not be permitted (outside any building) which exceed
Ringlemann No. 1 on the Ringlemann Chart of the United States Bureau of Hines.
This requirement shall also be applied to the disposal of trash and waste
materials. Wind-borne dust, sprays and mists originating in plants are not
permitted.
f) Ground vibration. Buildings and other structures shall be constructed, and
machinery and equipment installed, and insulated on each lot so that the ground
vibration inherently and recurrently generated is not perceptible without
instruments at any point exterior to any lot.
5.4 Condition of Property. The Owner or Occupant of any lot shall , at all times,
keep it and the buildings , improvements and appurtenances thereon in a safe, clean
and wholesome condition and comply, at its own expense, in all respects with all
applicable governmental , health, fire and safety ordinances , regulations,
requirements and directives and the Owner or Occupant shall at regular and frequent
intervals remove at its own expense any rubbish of any character whatsoever which
may accumulate upon such lot.
5.5 Maintenance of Grounds. Each Owner shall be responsible for the maintenance
and repair of all parking areas, driveways, walkways and landscaping on his lot.
Such maintenance and repair shall include, without limitation:
a) Maintenance of all parking areas, driveways and walkways in a clean and safe
condition, including the paving and repairing or resurfacing of such areas when
necessary with the type of material originally installed therein or such substitute
18-
therefor as shall , in all respects, be equal thereto in quality, appearance and
durability; the removal of debris and waste material and the washing and sweeping
of paved areas as required; painting and repainting of striping markers and
directional signals as required;
b) Cleaning, maintenance and relamping of any external lighting fixtures except
such fixtures and may be the property of any public utility or government body; and
c) Performance of all necessary maintenance of all landscaping including the
trimming, watering and fertilization of all grass, ground cover, shrubs or trees ,
removal of dead or waste materials, replacement of any dead or diseased grass,
ground cover, shrubs, or trees.
Nothing contained herein shall preclude an Owner from recovering from any person
liable therefor, damages to which such Owner might be entitled for any act or
omission to act requiring an expenditure by the Owner for the maintenance and
repair of the parking area, driveway, walkway and/or landscaping on his lot.
5.6 Remedies for Failure to Maintain and Repair.
a) Remedies. If any Owner shall fail to perform the maintenance and repair
required by Section 5.5, then Declarant, after fifteen days ' prior written notice
to such delinquent Owner, shall have the right, but not the obligation, to perform
such maintenance and repair and to charge the delinquent Owner with the cost of
such work together with interest thereon at the rate of twelve percent (12%) per
annum from the date of Declarant's advancement of funds for such work to the date
of reimbursement of Declarant by Owner. If the delinquent Owner shall fail to
reimburse Declarant for such costs within ten days after demand therefor, Declarant
may, at any time within two years after such advance, file for record in the Office
of County Recorder of King County, Washington a claim of lien signed by Declarant
for the amount of such charge together with interest thereon, which claim shall
19-
contain: (1) a statement of the amount unpaid and the interest accrued thereon;
2) a legal description of the lot owned by the delinquent Owner; and (3) the name
of the delinquent Owner. Such claim of lien shall be effective to establish a lien
against the interest of the delinquent Owner in his lot together with interest at
twelve percent (12%) per annum on the amount of such advance from the date thereof,
recording fees, cost of tile search obtained in connection with such lien or the
foreclosure thereof and court costs and reasonable attorneys ' fees which may be
incurred in the enforcement of such a lien.
b) Foreclosure of Lien. Subject to the provisions of 12.0 Rights of Mortgagees,
such a lien, when so established against the lot described in said claim, shall be
prior or superior to any right, title, interest, lien or claim which may be or may
have been acquired in or attached to the real property interests subject to the
lien subsequent to the time of filing such claim for record. Such lien shall be
for the benefit of Declarant and may be enforced and foreclosed in a suit or action
brought by Declarant in any court of competent jurisdiction, if brought within one
year of the filing of such claim. Any such sale provided for herein is to be
conducted in accordance with the provisions of the Civil Code of the State of
Washington applicable to the exercise of powers of sale in mortgages and deeds of
trust, or in any other manner permitted or provided by law. Declarant, through its
duly authorized agents, shall have the power to bid on the liened property at any
foreclosure sale and to acquire, lease, mortgage and convey the same.
c) Cure. IF a default for which a notice of claim of lien was filed is cured,
Declarant shall file or record a recision of such notice, upon payment by the
defaulting Owner of the costs of preparing and filing or recording such recision,
and other reasonable costs, interest or fees which have been incurred.
20-
d) Nonexclusive Remedy. The foregoing lien and the rights to foreclose
thereunder shall be in addition to, and not in substitution for, all other rights
and remedies which any party may have hereunder and by law, including any suit to
recover a money judgment for unpaid assessments. If any Owner shall fail to
perform such maintenance and repair and, notwithstanding such failure, Declarant
should fail to exercise its rights and remedies hereunder, then, any other Owner,
after fifteen (15) days' prior written notice to Declarant and such delinquent
Owner, shall have the right, but not the obligation, to perform such maintenance
and repair and shall have the same rights and remedies with respect thereto as are
provided herein to Declarant.
5.7 Taxes and Assessments. If an Owner fails to pay taxes or assessments on its
lot which become a lien on any portion of subject property utilized for parking,
service or loading areas, then any other Owner may pay such taxes or assessments,
together with any interest, penalties and costs arising out of or related thereto,
except while the validity thereof is being contested by judicial or administrative
proceedings , and in such event the defaulting Owner obligated to pay such taxes or
assessments shall promptly reimburse the other Owner for all such taxes or
assessments, interest, penalties and costs paid or incurred by such other Owner and
until such reimbursement has been made the amount of the payment by such other
Owner shall constitute a lien on and charge against the lot of the defaulting
Owner subject and subordinate, however, to any deed of trust then outstanding
affecting said lot.
5.8 Refuse Collection Areas. All outdoor refuse collection areas shall be
visually screened so as not to be visible from neighboring property or streets. No
refuse collection areas shall be permitted between a street and the front of a
building.
21-
5.9 Repair of Buildings. No building or structure upon any lot shall be permitted
to fall into disrepair, and each such building and structure shall at all times be
kept in good condition and repair and adequately painted or otherwise finished.
5.10 Public Utilities. Declarant reserves the sole right to grant consents for the
construction and operation of public utilities including, but not limited to,
street railways, interurban or rapid transit, freight railways, poles or lines for
electricity, telephone or telegraph, above or below ground conduits, and gas pipes
in and upon any and all streets now existing or hereafter established upon which
any portion of the subject property may now or hereafter front or abut. Declarant
reserves the exclusive right to grant consents and to petition the proper
authorities for any and all street improvements such as grading, seeding, tree
planting, sidewalks, paving, sewer and water installation, whether it be on the
surface or subsurface, which in the opinion of Declarant are necessary on or to the
subject property. Notwithstanding the provisions of Section 3.2, Declarant
reserves the exclusive right to approve above ground utility lines across the
subject property or any portion thereof on a temporary basis for the purpose of
construction, and such lines shall be permitted when required by a government
agency. 5.11 Utility Lines and Antennas. No sewer, drainage or utility lines or
wires or other devices for the communication or transmission of electric current,
power, or signals including telephone, television, microwave or radio signals,
shall be constructed, placed or maintained anywhere in or upon any portion of the
subject property other than within buildings or structures unless the same shall be
contained in conduits or cables constructed, placed or maintained underground or
concealed in or under buildings or other structures. No antenna for the
transmission or reception of telephone, television, microwave or radio signals
shall be placed on any building or other improvement within the subject property
22-
unless (a) such antenna shall be so located that it cannot be seen from any point
at the ground level of the subject property or (b) the consent of Declarant shall
first be obtained. Nothing contained herein shall be deemed to forbid the erection
or use of temporary power or telephone facilities incidental to the construction or
repair of buildings on the subject property.
5.12 Mechanical Equipment. All mechanical equipment, utility meters, storage
tanks, air conditioning equipment and similar items shall be located in such a
manner so not to be visible from neighboring property.
5.13 Mineral Exploration. No portion of the subject property shall be used in any
manner to explore for or to remove any steam, heat, oil or other hydro-carbons,
gravel , earth or any earth substances or other minerals of any kind, provided,
however, that this shall not prevent the excavation of earth in connection with the
grading or construction of improvements within the subject property. Water may be
extracted to the extent permitted by the appropriate governmental agency.
5. 14 Other Operations and Uses. Operations and uses which are neither specifically
prohibited nor specifically authorized by this Declaration may be permitted in a
specific case if operational plans and specifications are submitted to and approved
in writing by Declarant in accordance with the procedures set forth in 3.0, of this
Declaration. Approval or disapproval of such operational plans and specifications
shall be based upon the effect of such operations or uses on other property subject
to this Declaration or upon the occupants thereof, but shall be in the sole
discretion of Declarant.
6.0 MODIFICATION AND REPEAL
6.1 Procedure. Except as otherwise provided in Section 6.2, this Declaration or
any provision hereof, or any covenant, condition or restriction contained herein,
may be terminated, extended, modified or otherwise amended, as to the whole of the
23-
subject property or any portion thereof, with the written consent of the Owners of
eight percent (80%) of the subject property, based upon the number of square feet
owned as compared to the total number of square feet subject to these conditions,
covenants and restrictions (excluding dedicated streets); provide, however, that so
long as Declarant owns at least twenty percent (20%) of the property subject to
these conditions, covenants and restrictions, or for a period of fifteen (15) years
from the effective date hereof, whichever period is shorter, no such termination,
extension, modification or other amendment shall be effective until a proper
instrument in writing has been executed, acknowledged and recorded.
6.2 Modification by Declarant. For so long as Declarant owns any interest
excepting a leasehold interest) in the subject property, or any part thereof, or
for a period of fifteen (15) years from the effective date hereof, whichever period
is shorter, Declarant acting alone may modify or amend the provisions of 3.0, 4.0
and 5.0; provided, however, that (a) any such modification or amendment must be
within the spirit and overall intention of the development as set forth herein; (b)
prior to any such modification or amendment Declarant shall obtain the approval of
any governmental agency to such modification or amendment where such
approval is necessary; and (c) any modification or amendment shall not provide for
any type of improvements or use not presently permitted by this Declaration. No
such modification or amendment shall be effective until the Owners have been given
thirty (30) days' prior written notice of the proposed change, and a proper
instrument in writing has been executed, acknowledged and recorded.
6.3 Governmental Regulation. All valid governmental enactments, ordinances and
regulations are deemed to be a part of this Declaration and to the extent that they
conflict with any provision, covenant, condition or restriction hereof, said
conflicting governmental enactment, ordinance and regulation shall control and the
24-
provision, covenant, condition and restriction hereof in conflict therewith shall
be deemed (a) amended to the extent necessary to bring it into conformity with said
enactment, ordinance or regulation while still preserving the intent and spirit of
the provision, covenant, condition or restriction; or (b) stricken here from should
no amendment conforming to the governmental enactment, ordinance or regulation be
capable of preserving the intent and spirit of said provision, covenant, condition
or restriction.
7.0 ENFORCEMENT
7.1 Abatement and Suit. The Owner of each lot shall be primarily liable, and the
Occupant, if any, secondarily liable for the violation or breach of any condition,
covenant or restriction herein contained. Violation or breach of any condition,
covenant or restriction herein contained shall give to Declarant, following thirty
30) days' written notice to the Owner or Occupant in question except in exigent
circumstances, the right, privilege and license to enter upon the lot where said
violation or breach exists and to summarily abate and remove, or abate or remove,
at the expense of the Owner or Occupant thereof, any improvement, structure, thing
or condition that may be or exist thereon contrary to the intent and meaning of the
provisions hereof, or to prosecute a proceeding at law or in equity against the
person or persons who have violated or are attempting to violate any of these
covenants, conditions or restrictions to enjoin or prevent them from doing so, to
cause said violation to be remedied, or to recover damages for said violation. No
such entry by Declarant or its agents shall be deemed a trespass, and neither
Declarant nor its agents shall be subject to liability to the Owner or Occupant of
said lot for such entry and any action taken to remedy or remove a violation. The
cost of any abatement, remedy or removal hereunder shall be a binding personal
obligation on any Owner or Occupant in violation of any provision of this
25-
Declaration, as well as a lien (enforceable in the same manner as a mortgage) upon
the lot in question. The lien provided for in this section shall not be valid as
against a bona fide purchaser or mortgagee for value of the lot in question unless
a suit to enforce said lien shall have been filed in a court of record in King
County, Washington, prior to the recordation of the deed or mortgage conveying or
encumbering the lot in question to such purchaser or mortgagee, respectively.
7.2 Right of Entry. During reasonable hours and upon reasonable notice, and
subject to reasonable security requirements, Declarant, or its agents, shall have
the right to enter upon and inspect any lot and the improvements thereon covered by
this Declaration for the purpose of ascertaining whether or not the provisions of
this Declaration have been or are being complied with, and neither Declarant nor
its agents shall be deemed to have committed a trespass or other wrongful act by
reason of such entry or inspection.
7.3 Deemed to Constitute A Nuisance. The result of every act or omission whereby
any condition, covenant or restriction herein contained is violated in whole or in
part is hereby declared to be and to constitute a nuisance, and every remedy
allowed by law or in equity against an Owner or Occupant either public or private,
shall be applicable against every such result and may be exercised by Declarant.
7.4 Attorney's Fees. In any legal or equitable proceeding for the enforcement of
this Declaration or any provision hereof, whether it be an action for damages,
declaratory relief or injunctive relief, or any other action, the losing party or
parties shall pay the attorney fees of the prevailing party or parties, in such
reasonable amount as shall be fixed by the court in such proceedings or in a
separate action brought for that purpose. The prevailing party shall be entitled
to said attorney's fees even though said proceeding is settled prior to judgment.
26-
All remedies provided herein or at law or in equity shall be cumulative and not
exclusive.
7.5 Failure to Enforce is No Waiver. The failure of Declarant to enforce any
requirement, restriction or standard herein contained shall in no event be deemed
to be a waiver of the right to do so thereafter or in other cases, nor of the right
to enforce any other restriction.
8.0 ASSIGNMEN-
Any and all of the rights, powers and reservations of Declarant herein contained
may be assigned to any person, corporation or association which will assume the
duties of Declarant pertaining to the particular rights, powers and reservations
assigned, and upon any such person, corporation or association evidencing its
consent in writing to accept such assignment and assume such duties, he or it
shall , to the extent of such assignment, have the same rights and powers and be
subject to the same obligations and duties as are given to and assumed by Declarant
herein. If at any time Declarant ceases to exist and has not made such an
assignment, a successor to Declarant may be appointed in the same manner as this
Declaration ma: be modified or amended under Section 6. 1. Any assignment or
appointment made under this article shall be in recordable form and shall be
recorded.
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE
Every person or entity who now or hereafter owns, occupies or acquires any right,
title or interest in or to any portion of the subject property is and shall be
conclusively deemed to have consented and agreed to every covenant, condition and
restriction contained herein, whether or not any reference to this Declaration is
contained in the instrument by which such person acquired an interest in the
subject property.
27-
10.0 WAIVER
Neither Declarant nor its successors or assigns shall be liable to any Owner or
Occupant of the subject property by reason of any mistake in judgment, negligence,
nonfeasance, action or inaction or for the enforcement or failure to enforce any
provision of this Declaration. Every Owner or Occupant of any of said property by
acquiring its interest therein agrees that it will not bring any action or suit
against Declarant to recover any such damages or to seek equitable relief because
of same.
11.0 RUNS WITH LAND
All covenants, conditions, restrictions and agreements herein contained are made
for the direct, mutual and reciprocal benefit of each and every lot of the subject
property; shall create mutual equitable servitudes upon each lot in favor of every
other lot; shall create reciprocal rights and obligations between respective Owners
and Occupants of all lots and privity of contract and estate between all grantees
of said lots , their heirs, successors and assigns; and shall , as to the Owner and
Occupant of each lot, his heirs, successors and assigns, operate as covenants
running with the land, for the benefit of all other lots, except as provided
otherwise herein.
12.0 RIGHTS OF MORTGAGEES
No breach of any covenant, condition or restriction herein contained, or any
enforcement thereof, shall defeat or render invalid the lien of any mortgage or
deed of trust now or hereafter executed upon the subject property or a portion
thereof, provided, however, that if any portion of said property is sold under a
foreclosure of any mortgage or under the provisions of any deed of trust, any
28-
purchaser at such sale and its successors and assigns shall hold any and all
property so purchased subject to all of the covenants, conditions and restrictions
contained in this Declaration.
13.0 CAPTIONS
The captions of articles and sections herein are used for convenience only and are
not intended to be a part of this Declaration or in any way to define, limit or
describe the scope and intent of the particular article or section to which they
refer.
14.0 EFFECT OF VALIDATION
If any provision of this Declaration is held to be invalid by any court, the
invalidity of such provision shall not effect the validity of the remaining
provisions hereof.
DECLARANT
J.A.G./Renton Properties Associates
A Washington Partnership
By: Alterra Corporation, a Washington
Corporation, General Partner
By:
By:
By:
29-
II -__. .'
4': StN,. ,.. . ,...f".......,.... ::::!
lot
i Ns • . - , 1) 4, • iet,---7. 70
1,
1, ... , /Aim _
41,
r
am. - w `,.-'.\I 1' I . . 1 I ,
i
LEGAL DESCRIPTIONS
PARCEL A
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M. ,
in King County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat recorded in
Volume 12 of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Brownell ' s Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence NO0'58'28"E along
the north-south centerline thereof 1092 .82 feet; thence N68'03'54"E 224.45 feet;
thence N80604 '48"E 232.00 feet ; thence 542'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence N42'06'08"W 87. 16 feet; thence S80'04' 48"V 232 .00 feet; thence
N12'01 '00"W 40.15 feet; thence S7L'59 '00"W 133.01 feet to a point of curve; thence
along a curve to the right having a radius of 230.00 feet , through a central angle
of 27'47' 31" an arc distance of 111 .56 feet to a point of compound curvature; the
center of said curve bears N15'46' 31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48 ' 19" an arc distance of 197.73 feet; thence
582' 15'0C"W 67.68 feet; thence 531'32'22'V 71 .06 feet; thence N81'11 '35"W 193.00
feet; thence 582'15'00"W 92.99 feet; thence S35'29'30"14 143. 18 feet; thence
N7464Is10C'v 84.85 feet; thence S60' 16'00"W 67.00 feet; thence 512'16'00"E 97.35
feet to the north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence 568'06'46"W along said
northerly line 375.53 feet to the northerly line of a tract of land described In
EXHIBIT a in said Agreement; thence northwesterly along said _northerly line on a
curve to the left, the center which bears west 195.01 feet , thru a central angle
of 78'41 '24", an arc distance of 267.83 feet; thence N78'41 '24'V along said
northerly line 180.00 feet to an angle point In said northerly line; thence
N33'00'54"W along said northerly line 109.47 feet to the south line of the
Burlington Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears 539'23'00"E 1853.00 feet; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01 '59", an arc
distance of 65.75 feet to a point of compound cure; thence continuing along
EXHIBIT A: 1 of 5
said south line on a curve to the right the center of which bears 537'21 '01"E
having a radius of 10543.00 feet, an arc distance of 186.51 feet through a central
angle of 01'00' 49" to a point of compound curve; thence continuing along said south
line on a curve to the right, the center of which bears 536'20' 12"E having a radius
of 1657. 30 feet an arc distance of 193.93 feet through a central angle of 06'42 '20"
to a port of compound curve; thence continuing along said south line on a curve to
the right, the center of which bears S29'37'52"E having a radius of 6738.00 feet ,
an arc distance of 197.76 feet through a central angle of 01'40'54" to a point of
compound curve; thence continuing along said south line on a curve to the right ,
the center of which bears S27'56' 58"E having a radius of 1768.00 feet , an arc
distance of 194.45 feet through a central angle of 06' 18 '06" to a point of compound
curve; thence continuing along said south line on a curve to the right, the center
of which bears S21'38'S2"E having a radius of 8603.00 feet , an arc distance of
204.54 feet through a central angle of 01 '21 ' 44" to a point of compound curve;
thence continuing along said south line on a curve to the right , the center of
which bears S20' 17'08"E having a radius of 1922. 10 feet, an arc distance of 178.79
feet through a central angle of 05' 19'46" to a point of compound curve on the east
line of said Charles Brownell Donation Land Claim No. 41 ; thence continuing along
said south line on a curve to the right , the center of which bears 514'57'22"E
having a radius of 2814.93 feet , an arc distance of 659.42 feet through a central
angle of 13'25' 19" to a point of compound curve; thence continuing along said
south line on a curve to the right , the center of wfiich bears SO1'32 '03"E having
a radius of 1165.09 feet , thru a central angle of 37'39' 19", an arc distance of
765.71 feet to a point which bears N41'28 ' 10"E from the TRUE POINT OF BEGINNING;
thence 536' 19 ' 35"W 188.63 feet to a point on a curve, the center which bears
S36' 19 ' 35"u 967. 46 feet ; thence northwesterly along said curve to the left , thru
a central angle of 4'39'32", an arc distance of 78.67 feet ; thence 538'54 '22''W
451 .74 feet to a point on a curve, the center which bears 543'36'23"W 170.00 feet ;
thence southeasterly along said curve to the right, thru a central angle of
3'08 ' 37", an arc distance of 9.33 feet; thence 543' 15 '00"E 20 .74 feet; thence
527'21 ' 32"V 44.74 feet to the TRUE POINT OF BEGINNING.
PARCEL B-1
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Browneli 's Donation Claim No. 41 , described as follows: •
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence S68'03'54"W 351 . 11 feet to
the TRUE POINT OF BEGINNING; thence 0168'03'54"E 575.56 feet; thence N12'Ol '00"W
40. 75 feet; thenci S77'59'00"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27'47' 31 ' an arc distance of' 111.56 feet to a point of compound curvature; the
center of said curve bears N15'46'31"E 160.00 fest; thence along said curve to the
right, through a central angle of 70'48' 19" an arc distance of 197.73 feet; thence
S82'15'0O"1i 67.68 feet; thence S31'32 '22"1' 71 .06 feet; thence N81.11 ' 35"W 193.00
feet; thence S82'15'00"W 92. 99 feet; thence S35'29'30"W 143. 18 feet; thence
N74'44'00"V 84.85 feet; thence 560'16'00"W 67.00 feet; thence S12' 16'00"E 97. 35
feet; thence N68'06'46"E 53. 79 feet to a point which bears N72'04'34"W from the
TRUE POINT OF BEGINNING; thence 572'04'34"E 389. 92 feet to the TRUE POINT OF
BEGINNIN,;.
EXHIBIT A: 2 of 5
PARCEL B-2
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
In King County, Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brcwnell 's Donation Claim No. 4i described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence S68'03'51i"w 575.56 feet ; thence N72'04'34"V
389.92 feet; thence 568'06'46'V 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet , .thru a central
angle of 126'52 ' 10", an arc distance of 132.86 feet; thence N53'07 '50"E 199. 18 feet
to a point of curve; thence on a curve to the right , having a adius of 200.00 feet
thru a (.antral angle of 53'59'30", an arc distance of 188.47 feet ; thence 572'52 '40"E
290. 00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08' 51", an arc distance of 134.60 feet; thence
167'58'19"E 380.92 feet; thence N31'27 ' 12"E 204.86 feet to the TRUE POINT OF BEGINNING .
PARCEL B-3
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
In King County, Washington; and of Junction Addition to the City of Seattle, according
to the Flat recorded in Volume 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim Mo. hi , and of Tracts 25 and 26,
Renton 'shore lands 2nd Supplemental Maps 1958, described as follows:
Beginnlig at the south quarter corner of said Section 13; thence N00'58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to a point
herelna'' ter called "Point A"; thence 568.03 '54"W 575.56 feet; thence N72'04 '34"J
389.92 !eat; thence S68'06'46"W 429.32 feet to the TRUE POINT OF BEGINNING; thence
south 8;. 47 feet to a point of curve; thence on a curve to the left, having a radius
of 60. 01 feet, thru a central angle of 126'52 ' 10", an arc distance of 132 .86 feet;
thence 153'07 '50"E 199. 18 feet to a point of curve; thence on a curve to the right ,
having .e radius of 200.00 feet thru a central angle of 53'59 '30", an arc distance of
188.47 'set; thence S72'52' 4O"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of ;97.00 feet, thru a central angle of 39'08' 51", an arc
distance of 134.60 feet; thence N67'58 '29"E 380.92 feet; thence N31'27 ' 12"E 204.86
feet to aforementioned "Point A"; thence N80'04'48"E 232.00 feet; thence S42'06'08"E
215. 00 feet; thence 531'14'05"V 358.99 feet; thence S47'10'01"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88'15'00"V 180.65 feet; N33'07 '25"W 154.51 feet; N27'21 '32"E 387 .32
feet; N83'17'25"V 171 . 17 feet; S46'22 '22"V 324.66 feet; S72'37'52"W 458.93 feet;
N70'54' O2"V 35h.53 feet; S73.56'01"V 130.08 feet; and Shl' 16'07"V 316. 18 feet to the
north boundary of a tract of lend deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left. the center which bears S391141 '391V 627.h6 feet thru a central angle of
39141 '39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 2h5.69 feet; thence north 156. 13
feet; thence N50'39' 19'1 330.21 feet; thence 578'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet , thru a central
angle of 78'41 ' 24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING .
EXHIBIT A: 3 of 5
PARCEL B-4
That por : lon of the southwest quarter of Section 13, Township 23 North, Range 4 East ,
W.M. in 'King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. Srownell ' s Donation Clai No. 41 , described
as follows:
Beginning; at the south quarter corner of said Section 13 ; thence N00'58'28"E along
the nortl-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
Renton Sforelands Second Supplemental Maps 1958; thence S72'37 '52' W 382.60 feat to
an angle point in the south line of said Tract 26; thence 1170651002"V 35t.53 feet to
an angle point in the south line of said Tract 26; thence 573'56'01'V 130.08 feet to
an angle point In the south line of said Tract 26; thence S41'16'07"1d along the south
line of said Tract 26 a distance of 316. 18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears 539'41 '39"W 627.46 feet, thru a central angle of 39.41 '39"; an arc distance of
434. 70 feet; t henc a north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence N33'00'54"W 109.47 feet to the southerly
margin on the Burlington Northern Railroed Right-of-Way, said point being a point on
a curve, the center which bears S39'23100"E 1853 .00 feet ; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3'59' 19", an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
S43'22' 19"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32", an arc distance of 197.57 feet to a point
of tangeicy; thence S43'49' 09"V along said south margin 271 .00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571 . 00 feet, thru a central angle of 7'32 '02", an arc distance of 206. 57 feet to
a point pf compound curve, the center which bears N38'38'49"1 727.00 feet ; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16' 55'35 ', an arc distance of 214.77 feet to a point of compound curve, the center
which bears N21 '43 ' 14"V 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11'24 '08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10' 19'06"W 696.00 feet ;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence S34' 18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74.13r19"E along said north boundary 443 .31 feet ; thence
N59'53 ' 47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the southeast quarter of Section 13, Township 23 North, Range 4 East , W.M. ,
and that portion of the southwest quarter of Section 18 , Township 23 North , Range
4 East, W.M. , all in King County, Washington described as follows :
EXHIBIT A: 4 of 5
DESIGN GUIDELINES & CC&R's
BLACKRIVER
TECHNOLOGY PARS
Renton, Washington
S\C"
0
4°
J.A.G. / Renton Properties Associates, Developer
Richard Carothers Associates , Planning Consultant
July, 1984
Purpose
The development of each site within Blackriver Technology Park is controlled and
restricted by the Declaration of Covenants, Conditions and Restrictions for
Blackriver Technology Park (hereinafter referred to as the "CC&R' s" ) , as v,ell as
applicable governmental codes and regulations. The CC&R's are directed toward
achieving the desired character and quality level of site development that will
set Blackriver Technology Park apart from other business developments. The
purpose of these Development Guidelines is to further define the requirements
which are specifically and generally stated in the CC&R's. These Guidelines are
intended in supplemented to the CC&R' s as an aid in the submittal of plans for
approval by providing more detailed information on which to base a revie . Any
specific conflicts between shall be brought to the immediate attention of
J.A.G./Renton Properties Associates. In general , however the priority of com-
pliance is first; with governmental codes and regulations , second; with the ('C&R's
and thi -d; with the Design Guidelines .
The Owrers/Occupants of ea& site within Blackriver lechncloey Par s -: .,ld
familiarize themselves with the intent and requirements of the CC&R's these
Guidelines and all applicable governmental codes and regulations, and through
their consultant(s), implement all those provisions applicable to their specific
site developments. All development plans, landscaping plans and graphic designs,
shall be submitted to a Design Review Committee as described in the CC&R's.
Contents
Purpose
1 .0 Introduction to Blackriver Technology Park
1. 1 Location
1.2 Immediate Setting
1.3 Master Plan and Streetscape
1.4 Planning and Zoning
1.5 Flood Plain Restrictions
1.6 Enc=neering and Utilities
1.7 Perritted and Prohibited Uses
2.0 Approvals and Submittals
2. 1 Master Plan Design Submittal
2.2 Preliminary Plan Submittal
2.3 Revision, Alteration, Addition or Change
c= Use Preliminary Plan Submittal
2.4 Ins`'tutional Review Process
3.0 Site Pla--ing Guidelines
3. 1 Building Site Coverage
3.2 Landscape Coverage
3.3 Building Heights
Setback
3. 5 In.erior Property Line Setback
3.6 Parking Requirements
3. 7 Access and Drive Location
3.8 Sidewalks
3.9 Ste -age, Service, and Loading Areas
3. 10 Ret.se Collection Areas
3.11 Screening of Exterior Mechanical Equipment
3.12 Screening of Exterior Electrical Equipment
3.13 Fences and Walls
3.14 Utilities
3.15 Grading
3. 16 Nuisances
4.0 Architectural Guidelines
5.0 Landscape Guidelines
5.1 Introduction to the Blackriver Technology Park
Landscape Concept
5.1.1 Streetscape Zone
5.1.2 Streetscape Zone Design Concept
a,
5. 1 .: Interior Zone
5. 1 .4 Interior Zone Design Concept
5. 1.5 Grantor Provided Amenities
5. 1.5a Exceptions
5. 1.5b Entry Feature
5. 1.5c The Commons
5. 1 . _ Other Requirements
5.2 Larcscape Design Guidelines
5.2. : Assessment District Installation and Maintenance Agreenert
5.2.2 Maintenance of Unimproved Sites
5.2.3 Landscape Coverage
5.2.4 Street Frontage Zone Design Guidelines
5.2.4a Specific Design Limitation within
the Street Frontage Zone
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
5.2.5b Parking and Pedestrian Circulation
5.2.5c Parking Lot Plant Material List
5.2.E Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
5.2.6b Limited Use Area at Primary and
Secondary Access Drive
5.2. - Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side and Rear Yard Requirements
5.2.7b Side and Rear Yard Landscape Requirements
5.2.7c Plant Material List-Interior Property Lines
5.2.7d Planting and Irrigation Details & Snecifications
6uioelines for Exterior- Property Lines
5.2. = Guidelines for Tree Preservation Outside the ' Preserve ' Zones
6.0 Signing Guidelines
6. : Ot _'ives
6.L SIC- :ubm ttals
6.3 Deta:ned Business Identification Stamps
6.4 Builcing Mounted Business or Building Identification Signs
6.5 Information and Vehicular Control Signs
6.6 Temporary Signs
7.0 Lighting Guidelines
7.1 Objectives
7.2 Lighting Quality
7.3 Parking, Access and Circulation Areas
7.4 Service Areas
7.5 Building Illuminations
7.6 Pedestrian Areas
8.0 Appendix
Contact and Reference List
Planning and Design References
Declaration of Covenants, Conditions and Restrictions
1 .0 Introduction to
Blackriver Technology Park
Blackriver Tecrnology Park is to become a unique business community distinguished
from other Sea ::ie Area business parks. The distinction of Elackriver Technology
Park begins w,:- its concept as a series of small business sites situated in a
controlled, ur= =ied landscape setting. This conception will be furthered through
an emphasis or quality contemporary site, architectural and landscape design.
1 . 1 LOCATION
Blackriver Technology Park is centrally situated southeast of downtown Renton and
due north of I-405, contiguous to and immediately north of Washington Technical
Center. Access via I-405 and arterials now serving Earlington Park Industrial
Area.
1.2 IMMEDIATE SETTING
Elackriver Te:--,ology Park is bordered on the north by the Burlington Northern
Railroad right-Df-way, on the south by Washington Technical Center and P-I Channel
detention basi - . Preserve areas and City of Renton buffer zones provide a wooded
backdrop conducive to the development of a pleasant business environment.
1.3 MASTER PLAN AND STREETSCAPE
The Elackriver -echnology Park Plan is organized around a broad, two lane, central
cul -de-sac ser. ing most of the sites within Blackriver Technology Park. This
central collector is Southwest 4th Place. Southwest 4th Place, will have a
controlled lar:scaped easement along both sides which will establish a unified,
park-like env' -:nment, distinctive among business parks in the Pacific Northwest.
Intersections - eading into the Park will be highlighted by landscape and graphic
design features to establish these locations as gateways to the Park. Recreational
opportunites will be available in the form of walking and jogging paths integrated
with landscape parkways and providing access into undeveloped buffer and preserve
areas.
1.4 PLANNING AND ZONING
Blackriver Technology Park is located within the jurisdiction of the City of
Renton Department of Planning, Public Works , Engineering and Parks.
1.5 FLOOD PLAIN RESTRICTIONS
Blackriver Technology Park lies within the 100 year floodplain of the Black River.
Site planning, grading and drainage design constraints, will be placed upon all
developments. All development within Blackriver Technology Park must conform to
grading and drainage restrictions contained in the Blackriver Technology Park
Design GuidelY as as well as on-site planning, grading and drainage guidelines
administered b_ the City of Renton.
i a
1 .6 ENGINEERI',G AND UTILITIES
Assessment district landscaping, street improvements , and underground utilities
including domestic water, fire service systems, storm drainage, sanitary sewer,
and street lighting, telephone, electrial and natural gas mains have been install -
ed by J.A.G./Renton Properties Associates. The improvement designs were prepared
by Richard Ca -_thers Associates , Seattle.
1.7 PERMITTED AND PROHIBITED USES
In order to achieve the objective of Blackriver Technology Park as a high quality
business environment the CC&R's identify uses that are permitted and prohibited
within City of Renton. The following, outlines the objectives related to permit-
ted and prohibited uses within Blackriver Technology Park and restates those
uses contained in the CC&R's.
Objectives
1. to permit business uses whose facility developments and maintenance will
contribute to the perception of Blackriver Technology Park as a series of
high qua' rty business sites.
2. to permit business uses which do not, through their operation , produce
objectional visual , sound, smell , or vibrational outputs
3. to permit business uses which are compatible with one another and compatible
with existino or planned uses surrnundino Blackriver Technn1oov ParIz
4. to permit business uses which will not create excessive burdens upon Black-
river Technology Park transportation and utility systems
Guidelines
1 . Prohibited Uses - The following operations and uses shall not be permitted on
any parcel within Blackriver Technology Park:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling and removing oil , gas or other hydrocarbon substances, or drilling
for or removing such hydrocarbons;
e) Refining of petroleum or of its products;
f) Petroleum storage yards ;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary
in the course of approved construction pursuant to Article III of CC&R' s;
h) Distillation of bones;
i ) Dumping , disposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j ) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries ;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race track;
2. Permittec Jses - Any use or business operation permitted by the current City
of Renton Zoning Ordinance that is not specifically prohibited above, provided
such use is specifically approved in writing by J.A.G./Renton Properties Associ-
ates. J.A.G/Renton Properties Associates , however, reserves the right to refuse
any use which 'nnev conclude may adversely affect Blackriver Technolocy An
approved use shall be performed or carried out entirely within a building that is
so designed anc constructed that the enclosed operations and uses do not cause or
produce a nuisance to adjacent lots or streets such as, but not limited to,
vibration, sound, electromechanical disturbances, radiation, air or water pol-
lution, dust, or emission of odorous, toxic or non-toxic matter including steam.
Certain activities which cannot be carried on within building may be permitted,
provided such activities are specifically approved in writing by J.A.G./Renton
Properties Associates and further provided such activities are screened in an
acceptable manner so as not to be visible from neighboring lots and streets.
2.0 Approvals and Submittals
In order to insure that the design standards for Blackriver Technology Park
contained in these guidelines are achieved, a series of plan submissions will be
required at different stages of the design process. The number of plan submis-
sions will vary depending upon the complexity and timing of a proposed develop-
ment. Pan sic-fissions will also be required for significant revisions , altera-
tions , additic-s , or change of use for approved or existing developments within
Blackriver Technology Park.
Required plan submissions shall be submitted to the Blackriver Technology Park
Design Review Committee, J.A.G./Renton Properties Associates care of Alterra
Corporation, General Partner. Each stage of plan submission will require four (4)
sets of plans containing the specific information described below.
A Design Review Committee will be established by J.A.G./Renton Properties Associ-
ates to review all required plan submissions. All submitted plans will be reviewed
by the Blackriver Technology Park Design Review Committee for acceptability of
design in compliance with the CC&R's and these Design Guidelines. Upon completion
of review by the Design Review Committee, one set of submitted plans will be
returned to the applicant along with a letter summarizing comments , recommenda-
tions, require-tints and findings. The length of review by the Blackriver Techno-
logy Park Desic- Review Committee for all stages of plan submissions shall be
governed by Section 5 of the Blackriver Technology Park CC&R's. The returned
plans will be marked "Approved" or "Approved Subject to Conditions" or "Not
Approved" with the following intended meanings:
1 . "Approves - approved documents permit the applicant to proceed to the next
stage of the approval process.
2. "Approved Subject to Conditions" - documents so marked permit the applicant
to procee: to the next stage of the approval process provided the a. licart
complies th the conditions specified tj. the Design Revie;; Committee. f
the applicant takes exception to the specified conditions , the applicant must
do so in writing by certified mail addressed to J.A.G./Renton Properties
Associates within ten (10) days from the date of the applicant's receipt of
returned documents. Unless such action is taken, J.A.G./Renton Properties
Associates will assume that all conditions are acceptable to and approved by
the applicant.
3. "Not Approved" - documents will be returned to the applicant with comments
describing the basis for disapproval . Revised documents must be resubmitted
if approval is sought.
4. J.A.G./Renton Properties Associates' approval of the applicant's plans,
specifications, calculations, or work shall not constitute an implication,
representation, or certification by J.A.G./Renton Properties Associates that
the above items are in compliance with applicable Statues, Codes, Ordinances
or other regulations.
The Blackriver Technology Park Design Guidelines are in no way intended to super-
sede any applicable Statutes , Codes , Ordinances or regulations of controlling
governmental jurisdictions. Should any portions of the Blackriver Technology Park
CC&R's or Design Guidelines be discovered to encourage violation of applicable
Statutes, Codes, Ordinances or other governmental regulations, those discrepancies
should be brought to the immediate attention of J.A.G./Renton Properties Associ-
ates.
The applicant shall have the sole responsibility for compliance with all appli-
cable Statutes, Codes , Ordinances or other regulations for all work performed on
the premises by or on behalf of the applicant.
2. 1 BLACKRIVER -ECHNOLOGY PARK MASTER PLAN DESIGN SUBMITTAL
Submission of a site Master Plan will be required only when the ultimate site
development is planned to be constructed in separate phases over a period of time.
The site Master Plan is to be submitted and approved before Preliminary Plans are
submitted.
Master Plan sut-fissions shall show an indication of:
1. All major buildings and structures including:
a. builoing footprints
b. overhangs
c. net floor area
d. site coverage - building-around contact area/net lot area
e. builc- ng coverage - area of all floors/net lot area
f. a brief description of the use of each building or structure including
an estimate of the number of employees
2. Parking Area
a. configuration of parking and vehicular circulation including erployee
and guest parking
b. dimensions of typical parking stalls and parking aisles
c. total parking provided
d. calculation demonstrating total parking required
3. Loading and Service Areas
a. truck service and loading dock areas
b. truck and service vehicle circulation areas
c. trash enclosure areas
d. location of screening devices for truck and service areas
4. Landscape and Pedestrian circulation concept including any major
site design features
5. Interfaces with off-site circulation including the location and
design of all access drive curb cuts
6. Interfaces with adjacent properties
7. Conceptual grading, drainage and utilities
8. Descriptions or sketches of the architectural design concept including
intended character and materials
9. Phasing P' ans - plans indicating the phasing of the ultimate Master Plan
developmert illustrating the extent of development at the completion of each
phase
While the above information is required for all Master Plan submissions, it would
be desirable for applicants to utilize all available presentation materials and
media in order to fully communicate the intent and design character to the Design
Review Committee.
2.2 BLACKRIVEF TECHNOLOGY PARK PRELIMINARY PLAN SUBMITTAL
The Preliminary Plan submission is required to convey specific information about
the site planr=ng and architecture of the proposed development. The Preliminary
Plan package s-ould be submitted to the Design Review Committee prior to or
concurrent wit, submission of plans to the City of Renton for Site Development
Review, Preliminary Plans are to be submitted and approved before construction
documents are submitted.
The Preliminary Plan submission requires each of the following exhibits:
i. Site Plar indicating the following:
a. building footprints and dimensions to property lines
b. building roof overhangs
c. configuration of parking and vehicular circulation areas
d. location of parking lot electrollers
e. tru:• service , loading area , trash enclosures
f. lines of setback and easements
g. locations of on-site transformers, electrical switch gear, and gas
meters
h. adjacent roadways including curblines, medians and median openings
i. tabulation of:
I. Parcel Area
II. Total Building Floor Area
III . Site Coverage
IV. Building Coverage
V. Total Parking Provided
VI. Total Parking Required
VII. Estimated total employees on site at any peak time
VIII The anticipated number of shifts and the hours and days
of their operation
2. Conceptual Grading and Drainage Plan indicating:
a. proposed finish grades , slopes and building pad elevations
b. site drainage structures and systems
c. grades of existing streets and curbs
d. locations of street lighting and utility structures within landscape
easement
3. Conceptual Landscape Plan indicating:
a. pier: materials , sizes , and spacings
b. walkways and paved areas
c. other landscape design features
4. Building Elevations of all sides of all proposed buildings indicating:
a. wall and roof materials , textures, and colors
b. locations of wall mounted signing and lighting
c. roof and parapet heights above ground floor line
d. the profile of any roof mounted mechanical equipment which extends above
the roof parapet
5. Building Floor Plans
6. Building z':of Plans indicating:
a. roof elevations above finish floor
b. heigrIs and locations of roof mounted mechanical equipment where
available
7. Outline Specifications of all building materials
8. Conceptua... Graphics and Wall Mounted Signs
a. grourd signs and wall mounted signs
I . locations
II . designs , materials , textures , colors , heights , areEE
II: . Illumination
IV. typography
b. directional and information signs
I. locations
II. designs, materials, textures, colors, heights, areas
III. illumination
IV. typography
2.3 BLACKRIVER TECHNOLOGY PARK REVISION, ALTERATION, ADDITION OR CHANGE OF USE
PRELIMINARY PLAN SUBMITTAL
Preliminary plans are required to be submitted for any significant revisions,
alterations, additions or change of use to approved or existing developments
within Blackriver Technology Park. Preliminary plans for this purpose must be
submitted and approved before construction documents are submitted and before the
commencement of construction.
Revision, Alterations , Additions or Change of Use require the submission of four
4) sets of documents including:
1. A written description of the nature and extent of the proposed revision,
alteration , addition or change of use to be undertaken.
2. Indicatic-_ of proposed revisions , alterations , additions or changes to:
a. the ste plan
b. the c-ading and drainage plan
c. the landscape plan
d. the building elevations including
I. wall and roof materials , textures and colors
II . locations of wall mounted signing and lighting
III . roof and parapet heights above the ground floor line
IV. the profile of any roof mounted mechanical equipment which extends
above the roof parapet
e. the building floor plans
3. Tabulations of:
a. the rew total building floor area
b. the rew site coverage
c. the rew building coverage
d. the rew parking provided
e. calc;ations demonstrating the new required parking
f. the new estimated peak employee count
4. Outline svecifications of construction materials.
2.4 INSTITUTI;.',AL REVIEW PROCESS
In the course c= designing proposed developments for lots within Blackriver
Technology Par. additional reviews and approvals will be required beyond the
Blackriver Tec--oloay Park Design Review Process. The follorc sumTE-r, c=
Blackriver Technology Park and other review and approval processes is included to
assist individual applicants in understanding the approximate nature and sequence
of those reviews. An understanding of the total review process from the outset,
it is hoped, will contribute to smoother and more efficient processing of each
proposed development.
1. The design process should begin with a review of the Blackriver Technology
Park , CC&R' s and Design Guidelines, the City of Renton Guidelines , and the
applicable sections of the current City of Renton Zoning Ordinance. Copies
of the City of Renton applications and submission requirements should also be
obtained at this time.
2. Prior to commencement of design, a licensed civil engineer should be consult-
ed as to grading and drainage restrictions in the City of Renton.
3. Master plan should be submitted to and approved by the Blackriver Technology
Park Desicr, Review Committee.
t .
4. Applicants should review master plans with the City of Renton Planning
Department and staff, for comments. This is not a required review but it may
help to avoid problems and duplication of work.
5. Master plans should be reviewed by a licensed civil engineer for compliance
with City cf Renton grading and drainage restrictions.
6. Preliminar: plan should be submitted to and approved by the Blackriver
Technology Park Design Review Committee.
7. Preliminar; plans should be reviewed by a licensed civil engineer for
compliance with City of Renton grading and drainage restrictions.
8. Preliminary plans should be reviewed with the City of Renton planning and
public works staff several weeks prior to the intended submission for Site
Development Review.
9. Submit pla-s to the City of Renton for Site Plan Approval .
10. Submit pla-s for building department plan check.
3.0 Site Planning Guidelines
3. 1 BUILDING SITE COVERAGE
Objectives
1 . to insure that the intensity of site development is not excessive or detri-
mental to the perception of Blackriver Technology Park as a unified series of
high quality business sites
2. to insure that the intensity of site development does not over-tax utility or
transportation systems
Guidelines
1. Site coverage (defined as the building-ground contact area divided by the
total net lot area) shall not exceed 50% or the amount specified in the
current City of Renton Zoning Ordinance (whichever is the more restrictive.
2. Building coverage (defined as the total area of all floors divided by the
total net lot area) shall not exceed 60% unless otherwise approved in writing
by J.A.G./Renton Properties Associates.
3.2 LAN)SCAPE COVERAGE
Objectives
1 . to insure that at least a minimum portion of a development site is devoted to
landscape raterials in order to maintain a sense of continuity with adjacent
sites and to contribute to the perception of Blackriver Technology Park as a
park-like" environment.
2. to insure that at least a minimum of landscape materials are available on a
development site in order to contribute to the environmental well being of
potential users of each site.
Guidelines
1. A minimum of at least 15% of the area within the property lines of a develop-
ment site (exclusive of the Landscape Easement Transition Zone) shall be
devoted to landscape materials unless otherwise approved in writing by
J.A.G./Renton Properties Associates (for additional landscape requirements
see Landscape Guidelines Section 5.0)
3.3 BUILDING HEIGHTS
Objectives
1. to maintain a reasonably consistent and compatible height profile throughout
Blackriver Technology Park
Guidelines
1 . Building heights shall conform to City of Renton Building Regulations
4-730.060.
3.4 STREET SETBACK
Objectives
1. to achieve a feeling of openness along the streets that reinforces the
perception of Blackriver Technology Park as a series of high quality business
sites
2. to encourage some regularity of space formed by buildings on either side of a
street
3. to achieve a landscaped setting between the street and buildings
4. to provide for a street-side edge which will have a landscape character that
will unify the total development and be sufficiently distinctive in design to
differentiate Blackriver Technology Park from other business developments
5. to provide vehicular sight lines which allow discrimination of one company
from another
6. to provide vehicular sight lines which allow safe ingress and egress to
properties and safe movements along roadways
7. to accommodate major Blackriver Technology Park identity statements at street
intersections leading into, and within the Park
Guidelines
1 . No building or parking shall be permitted to be constructed closer than
thirty-five (35) feet from the property line along Southwest 4th Street.
Planters, walls, sign elements not exceeding 3'-0" in height may be permitted
in street-side setback areas with written approval of J.A.G./Renton Propert-
1ec, pccn'; tp , Roof overhanoc may extend a maximum of 6'-O" into setback
areas.
2. The first 8 to 19 feet of street-side landscaping (from back of curb)
including sidewalk,will be installed by J.A.G./Renton Properties Assoicates
as a landscape easement, and shall remain unaltered, except for access
drives , unless alterations are approved in writino by J.A.G./Renton Proper-
ties Ass: : ates.
3. The remairing setback area shall be fully landscaped by the Owner/Occupant in
a manner both compatible with and complimentary to the landscape easements,
refer to Landscape Guidelines).
3.5 INTERIOR PROPERTY LINE SETBACK
Objectives
1. to provide a definite physical separation between buildings on adjoining lots
suitable for distinguishing separation of responsibilities
2. to allow companies on adjoining lots to be individually identifiable
Guidelines
1. No building shall be permitted to be constructed closer than ten (10) feet
from an interior property line.
2. No parkins , other than automobile overhangs, shall be permitted to be con-
structed closer than five (5) feet from an interior property line, unless
otherwise approved in writing by J.A.G./Renton Properties Associates.
3. All setback areas shall be fully landscaped in a manner both compatible with
and complimentary to the on-site architecture and landscape design concepts.
3.6 PARKING RETJIREMENTS
Objectives
1. to provide sufficient on-site parking to accommodate all vehicles associated
with the use of each lot at any one time, and therefore not require vehicles
to be parked on public roadways or on lots of other companies
2. to configure parking areas such that they contribute to an increase of the
ratio of on-site persons to on-site vehicles
Guidelines
1. On-site parking shall be provided in a ratio of one space per 250 square feet
or less of net building area unless otherwise approved by J.A.G./Renton
Properties Associates.
2. Standard parking stalls shall be a minimum of 9 feet by 19 feet with a 2i
foot reduction permitted for vehicle front overhangs.
3. Compact parking stalls shall not exceed forty (40) percent of the tc.al
parking and shall be a minimum of 8# feet by 17 feet with a 2 foot reduction
permitted for vehicle front overhangs.
4. In addition to the parking required above, one designated parking space shall
L_ - each cerany vehic'c. tc be pa: d cr-. i e.
wortiing hc..rs. Parking spaces for company vehicles shall be of a s-ce, area
and configuration that the company vehicles can be parked such that they are
fully contained within their designated spaces.
5. Designates "Handicap Parking" spaces , 12 feet in width, shall be provided at
a retie c= one stall per 50 parking stalls. Such parking spaces be
give preferential locations near building entrances which provide fu . ii ono
convenient handicap access.
6. Should businesses locating on a Blackriver Technology Park development site
wish to encourage the formation of car pools by their employees, considera-
tion should be given to designating reserved "Car Pool" parking spaces.
Designated "Car Pool" spaces should be given preferential locations in
relatively close proximity to primary employee building entrances.
7. Designated "Cycle Parking" areas should be considered for the convenience of
employees using bicycles or motorcycles. In order to avoid the clutter of
cycles parked in unplanned locations, it is recommended that planned "Cycle
Parking" areas be conveniently located to employee entrances and be provided
with racks having security locking capabilities.
3.7 ACCESS AND DRIVE LOCATION
Objectives
1 . to have access drives located such that vehicular traffic arriving at and
leaving from lots , as well as traffic passing continuously in streets, flow
at an optinum level of efficiency
2. that the continuity of street-side landscaping is minimally disrupted by the
construction of access drives
3. that utilities located in the landscape easement are not or are minimally
disrupted by the construction of access drives
Guidelines
1. Access drives on Southwest 4th Place should be aligned with regularly spaced
median breaks and low points in Landscape Easement earth mounding. Curb
openings aligned with regularly spaced median breaks will be permitted only
if the oc:,osite side of the street has no planned curb openings. All curb
openings not aligned with regularly spaced median breaks shall be designed
for "right-turn-only" ingress and egress.
2. Access drives on Southwest 4th Place should be coordinated with
planned and existing median openings and where median openings are not
available , designed for efficient "right-turn-only" ingress and egress.
3. Access drives should be coordinated with adjacent lots so as not to impede
the efficient flow of peak period traffic. Consideration should be given to
adequate separation of adjacent access drives or the development of common
access d-ives.
4. Access drive designs should incorporate provisions for efficient vehicle
stacking :wring peak periods of use.
5. Access drives should be located such that their construction results in a
minimal disruption of the street side landscaping and utilities located
within the designated landscape easement.
6. No access drives will be permitted directly off of at any point east of its
intersec_- on with
3.8 SIDEWALKS
Ohiectives
1 . to provide a safe (separated from vehicles all weather efficient and aesthet-
ically pleasing means of pedestrian circulation connecting lots along the
streetside perimeter
2. to provide a safe (separated from vehicles), all weather efficient and
aesthetically pleasing means of pedestrian circulation serving each site,
including connecting parking areas with building entries, connecting build-
ings to cne another, and connecting building entries with on-site amenities
Guidelines
1. Streetside sidewalks will be installed by the developer within perimeter
landscape easements.
2. On-site pedestrian circulation systems shall be provided to meet the circul-
ation needs of on-site users. Such systems should provide safe, all weather
efficient, and aesthetically pleasing means of on-site movement and should be
an integrated part of the overall architectural and site design concept.
3. Where usace dictates, connections should be made between on-site and perime-
ter pedestrian circulation systems.
3.9 STORAGE, SERVICE, AND LOADING AREAS
Objectives
1. to insure that storage, service and loading areas are not visible from
primary v': _ ,al exposure areas (streets , primary image entry drives , floors of
image buildings, common visual and recreational amenity areas , etc. )
2. to insure that storage, service and loading areas are located upon a site so
as to minimize the visibility of loading and service vehicles from primary
visual exposure areas
3. to insure that the storage, service and loading areas are designed and
located or the site so that service vehicle activities and movements do not
disrupt the efficient flowof on-site and off-site traffic
Guidelines
1. Storage, service; maintenance and loading areas must be constructed, main-
tained and used in accordance with the following conditions:
a . Unless approved in writing by J.A.G./Renton Properties Associates , no
materials, supplies , or equipment, including trucks or other motor
vehicles, shall be stored upon a site except inside a closed buildino or
behinc a visual barrier screening such materials, supplies or vehicles
from adjacent sites so as not to be visible from neighboring properties
and streets. Any storage areas screened by visual barriers shall be
located upon the rear portions of a site, unless otherwise approved
in wr-: ting by J.A.G./Renton Properties Associates. No storage areas may
extent into a setback area except with the written approval of
J.A.G./Renton Properties Associates.
b. Provisions shall be made on each site for any necessary vehicle loading
and r: on-street vehicle loading shall be permitted.
c. Loac- -2 dock areas shall be set back , recessed or screened so as rot to
be visible from adjacent lots, or sites, neighboring properties , or
streets , and in no event shall a loading dock be closer than seventy-
five (75) feet from a property line fronting upon a street unless
otherwise approved in writing from J.A.G./Renton Properties Associates.
3.10 REFUSE COLLECTION AREAS
Objectives
1. to insure that refuse and refuse containers are not visible from primary
visual exposure areas (streets, primary image entry drives, floors of image
buildings, common visual and recreational amenity areas, etc. )
2. to insure that refuse enclosures are effectively designed to receive and
contain generated refuse until collected, and enclose refuse containers after
refuse is collected
3. to insure that refuse collection vehicles have clear and convenient access to
refuse collection areas and thereby not contribute to excessive wear-and-tear
to on-site and off-site developments
Guidelines
1. All outdoor refuse containers shall be visually screened within a durable
6'-o" or higher non-combustible enclosure, so as not to be visible from
adjacent lots or sites, neighboring properties or streets. No refuse collec-
tion areas shall be permitted between a street and the front of a
building.
2. Refuse collection areas should be effectively designed to contain all refuse
generated on-site and deposited between collections. Deposited refuse should
not be visible from outside the refuse enclosure.
3. Refuse collection enclosures should be designed of durable materials with
finishes and colors which are unified and harmonious with the overall archi-
tectural theme.
4. Refuse collection areas should be so located upon the lot as to provide clear
and convenient access to refuse collection vehicles and thereby minimize
wear-and-tear to on-site and off-site developments.
5. Refuse collection areas should be designed and located on the lot so as to be
convenient for the deposition of refuse generated on-site.
3. 11 SCREENING OF EXTERIOR MECHANICAL EQUIPMENT
Objectives
1. to have all exterior components of plumbing, processing, heating, cooling and
ventilating systems not be directly visible from within the lot or from
iininln^ ctreetc . lots or huildinos .
Guidelines
1. Exterior components of plumbing, processing, heating, cooling , and ventila-
ting syste-.s (including but not limited to piping, tanks , stacks , collectors ,
heating , _soling , and ventilating equipment fans , flowers , ductwcr,. , vents ,
louvers , meters, compressors, motors , incinerators , ovens, etc. ) , shall not
be directly visible from a height of 5 '-0" above any ground or ground floor
elevation at a distance closer than 200 feet from the closest building wall
on any lot, unless such components are an integral part of the building
exterior design concept and approved in writing by J.A.G./Renton Properties
Associates.
2. It is recommended that in the case of roof mounted mechanical equipment, that
building parapets be of such a height that roof mounted screening devices not
be required. If building parapets do not provide the required screening,
mechanical equipment shall be screened by an unobtrusive screening device
that will appear as an integrated part of the overall architectural design.
3. Any devices employed to screen exterior components of plumbing, processing,
heating, cooling, and ventilating systems from direct view shall appear as an
integrated park of the architectural design, and as such, be constructed of
complimentary and durable materials and finished in a complimentary texture
and color scheme to the overall architectural design.
4 . Any exterior components of plumbing, processing, heating , cooling and
ventilating systems and their screening devices , that will be visible from
upper floors of adjacent buildings shall be kept to a visible minimum, shall
be installed in a neat and compact fashion, and shall be painted such a color
as to allow their blending with their visual background.
5. No exterior components of plumbing, processing, heating, cooling, and ventil-
ating s stems shall be mounted on any building r,all unless they are an
integrated architectural design feature, and in any case shall be permitted
only with the written approval of J.A.G./Renton Properties Associates.
3. 12 SCREENING OF EXTERIOR ELECTRICAL EQUIPMENT AND TRANSFORMERS
Objectives
1. to minimize the visibility of exterior electrical equipment and transformers
from primary visual exposure areas (streets, primary image entry drives ,
floors of image buildings, and common visual and recreational amenity areas,
etc. )
Guidelines
1. Transfcrmers that may be visible from any primary visual exposure area shall
be screened with either planting or a durable non-combustible enclosure (of a
design configuration acceptable to Puget Sound Power and Light) . Where
possible, it is recommended that refuse containers and transformers be
integrated into the same enclosure.
2. Transformer enclosures should be designed of durable materials with finishes
and cc. : rs which are unified and harmonious with the overall arcnitecturai
theme.
3. Exterior mounted electrical equipment shall be mounted on the interior of a
buildir= wherever possible. When interior mounting is not practical , elect-
rical e_uipment shall be mounted in a location where it is substantially
scree-_: from public view. In no case shall extericr electrical equipment be
mounter on the street-side or primary exposure side of any building.
4. Exterior mounted electrical equipment and conduits shall be kept to a visible
minimum, where visible shall be installed in a neat and orderly fashion, and
shall be painted to blend with its mounting background.
3.13 FENCES AND WALLS
Objectives
1. to permit the installation of fences and walls within a lot for the purpose
of site security, sound attenuation, separation of functional activities, and
screening of unsightly functions and activities
2. to have fences and walls installed such that they are as inconspicuous as
possible or designed as an integrated and complimentary architectural design
element adding interest to the overall architectural design concept
3. to have no walls or fences reduce the intended quality of development or
reduce the perception of Blackriver Technology Park as a series of high
qualit; business sites
4. to discourage the construction of walls and fences except as necessary to
screen outside storage, loading and service areas
5. to insure that fences and walls do not, because of their height, location, or
design, contribute to a decrease in the safety or efficiency of traffic flows
on-site or in fronting streets
Guidelines
1 . No fence or wall shall be constructed closer than thirty (30) feet from the
curbline of a fronting street unless it is of a height not to exceed 3'-O".
2. No fence or wall shall exceed a height of 8'-0" unless otherwise approved in
writing by J.A.G./Renton Properties Associates.
3. Walls and =ences between buildings and fronting streets are discouraged, but
when necessary shall require written approval by J.A.G./Renton Properties
Associates.
4. All fences and walls shall be designed as an integrated part of the overall
architectural and site design. All materials shall be durable and finished
in textures and colors complimentary of the overall architectural design.
5. Where chain link fencing is to be employed, it shall be of a dark color and
be largely hidden behind plant materials and or earth mounding.
3. 14 UTILITIES AND COMMUNICATION DEVICES
Objectives
1. to have the entire Blackriver Technology Park visually free of unsightly
overhead power and telephone lines, utility poles , and other utility and
connmuni ca on equ-i pi rat arid cor,ponents
2. to protect off-site utility systems from becoming over-burdened by individual
lot utility systems
3. to achieve minimum disruption of off-site utilities , paving and landscape
during corstruction and maintenance of on-site utility systems
Guidelines
1. All exterior on-site utilities including, but not limited to, drainage
systems, sewers, gas lines, water lines, and electrical , telephone, and
communications wires and equipment shall be installed and maintained under-
ground.
2. On-site underground utilities shall be designed and installed to minimize the
disruption of off-site utilities, paving and landscape during construction
and maintenance and shall be of such a design so as not to place excessive
burdens upon off-site utility systems during the course of use.
3. No antenna or device for transmission or reception of any signals , including,
but not limited to, telephone, television, and radio, shall be placed on any
lot so that it is visible from 5'-0" above the ground or ground floor level
at a distance of 500 feet in any direction, unless specific written approval
is granted by J.A.G./Renton Properties Associates.
4. Temporary overhead power and telephone facilities are permitted during
construction.
3. 15 GRADING
Objectives
1. to encourage site design which protects buildings and business activities
from damage or disruption that might otherwise occur during extreme storm
cor,ditiors.
2. to encourage site design which protects buildings and business activities
from damage or disruption during extreme storm conditions
3. to allow precipitation falling on site and surface water flowing from ad-
jacent sites to be effectively absorbed or to drain off the site without
causing excessive water concentrations on adjacent sites or streets
4. to have site grading compliment and reinforce the overall architectural and
landscape design character
Guidelines
1. Al". building first floor elevations shall be approximately one and one-half
feet (1i) to two and one-half (2i) feet above the flow line of adjacent
streets (specific pad elevations and on-site drainage plans should be estab-
lished by the project consultant) .
2. Site grading design should compliment and reinforce the architectural and
landscape design character by helping to screen parking, loading and service
areas, by helping to reduce the perception of height and mass on larger
buildings, by providing reasonable transitions between on-site uses, by
providing elevation transitions contributing to the efficiency of on-site
and off-site movement systems , and by providing reasonable transitions
be:weer lots.
3. 16 NUISANCES
Objectives
1. to insure that no portion of Blackriver Technology Park is used in such a
manner as to create a nuisance to adjacent sites or streets such as , but not
limited to, vibration, sound, electro-mechanical disturbance and radiation,
electro-magnetic disturbance, radiation, air or water pollution, dust,
emission of odorous, toxic or noxious matter
Guidelines
1. No nuisance shall be permitted to exist or operate upon any lot or site so as
to be offensive or detrimental to any adjacent lot or site or neighboring
property or to its occupants. A "nuisance" shall include, but not be limited
to, any of the following conditions:
a) Any use of the lot or site which emits dust, sweepings, dirt or cinders
into the atmosphere, or discharges liquid runoff and discharge into
river, which in the opinion of J.A.G./Renton Properties Associates , may
adversely affect the health , safety, or comfort of persons within the
area or the intended use of their property. No waste nor any substance
or raterials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any
regulation of any public body having jurisdiction over such public
sewer;
b) The escape or discharge of any fumes , odors , gases , vapors , steam,
ac-; :s or other substance into the atmosphere which discharge, in the
opi'ion of J.A.G./Renton Property Associates , may be detrimental to the
hea- th, safety or welfare of any person or may interfere with the
com`ort of persons within the area or which may be harmful to property
or vegetation;
c) The radiation or discharge of intense glare or heat or atomic,
electro-magnetic, microwave, ultrasonic, laser or other radiation. Any
operation producing intense glare or heat or such other radiation shall
be performed only within an enclosed or screened area and then only in
suck manner that the glare, or heat or radiation emitted will
not be discernible from any point exterior to the site or lot upon which
the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from
an_ individual plant or operation, exceed the decibel levels in the
designated preferred octave bands as follows:
Octave Band Maximum Sound Pressure Levels
renter Freouencv dh) at Boundary P1Pne of 10+
31 .5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60db(A). The
maximum permissible noise levels for the octave bands shown above are
equal to an NC-50 Boise Criterion curve when plotted on the preferred
frequency scale.
Reasonable noise from motor vehicles and other transportation facilities
are exempted, so long as the vehicles or other transportation facilities
are not continuously on the subject property.
The operation of signaling devices and other equipment having impulsive
or non-continuous sound characteristics shall have the following correc-
tions applied:
Corrections
Pure Tone Content 5db
Imp;,lsive Character 5db
Duration for Non-Continuous
Sounds in Daytime Only:
1 rin/hr 5db
1C _ec/10 min 10db
2 sec/10 min 15 db
The reference level for the db values listed above is the pressure of
0.C2002 microbar or 0.0002 dyne/cm2
e) Excessive emissions of smoke, steam or particulate matter. Visible
emissions of smoke or steam will not be permitted (outside any building)
which exceed Ringlemann No. 1 on The Ringlemann Chart of the United
States Bureau of Mines. This requirement shall also be applied to the
dis:osal of trash and waste materials. Wind-borne dust, sprays
anc mists originating in plants are not permitted.
Grc_nd vibration. Buildings and other structures shall be constructed,
arc machinery and equipment installed, and insulated on each lot or site
so that the ground vibration inherently and recurrently generated is not
perceptible without instruments at any point exterior to any lot or
site.
4.0 Architectural Guidelines
Objectives
1. to encourage high quality, contemporary architectural design of all facil-
ities to `e constructed within Blackriver Technology Park , thus allowing
Blackriver Technology Park to be positively differentiated from other bus-
iness parks
2. to encourage businesses located within Blackriver Technology Park to express
themselves individually through the architectural design of their facilities
Guidelines
1. All design shall appear as an integrated part of an overall site design.
2. No "Period Buildings" shall be permitted. Contemporary building forms and
materials will be encouraged.
3. Pre-engireered metal buildings will not be permitted. Metal -clad buildings
will be permitted only if designed by an architect and only if specifically
approved n writing by J.A.G./Renton Properties Associates.
4. Design cc-sideration should be given to:
a. vies and vistas
b. solar orientation and climate
c. orientation toward major streets and thoroughfares
d. vehicular and pedestrian flows
e. the character of surrounding developments
f. expressions of a facility's functional organization
g. er,r. 'essions of the individual character of each Lusiness
h. the satisfaction of physical , psychological , social and
functional needs of facility users
i . enemy conservation through facility design
j . potential environmental hazards
k. enra-:ement of the overall landscape
5. Consideration should be given to the incorporation of design features such as:
a. highlighted visitor entrance and entry plazas
b. focal theme towers
c. enriched employee lunch areas
d. employee recreational facilities
e. accent lighting
f. atriums and interior courts
g. dynamic building and roof forms
h. striking window patterns
i . light and shadow patterns
j. color accents
Refer to Site Planning Guidelines and Landscape Guidelines for other design
features.
5.0 Landscape Guidelines
The landscape consists of elements that give form to exterior spaces. Thus , the
character of the landscape is created by major functional elements such as project
entrances, parking lots, buildings, service areas, signing, site lighting,
walkways, and the arrangement of plant materials.
Given that pr::ect architecture and building sites within Blackriver Technology
Park will most likely be of varying types and sizes , landscaping as a design
element will play the key role in creating and conveying the overall character of
Blackriver Technology Park as a "park-like" working environment. The purpose,
then , of these Landscape Guidelines , is to provide design criteria which will help
to insure that Blackriver Technology Park achieves an image that is distinctive,
clearly understandable and unified.
5. 1 INTRODUCTION TO THE BLACKRIVER TECHNOLOGY PARK LANDSCAPE CONCEPT
As a part of E ackriver Technology Park Master Plan, hereinafter referred to as
Blackriver Technology Park, a Concept Master Plan has been conceived to organize,
unify and crea:e a distinctive character for the whole of the development. The
Concept Maste- Plan recognizes that Blackriver Technology Park consists of two
prominent zones , namely, the 'Streetscape Zone' and the ' Interior Zone ' . An
understanding :f the nature of these two zones is important to understanding the
landscape guidelines and their intent.
5.1.1 Streetscape Zone
the streetsca: zone is the primary image setting zone or; eitner sioe o=
Southwest 4th =lace. All improvements within this corridor will have the greatest
degree of control . Attributes within this zone include:
1 . The Lands :ape Easement - This easement begins at the back of the
curb arc -:Ytends inward for a distance of 30 feet along the entire street.
The firs: 13 feet minimum ( including walk) to 24 feet maximum are designated
as a "Pu:- ic Parkway". The parkway includes a 5 foot walkway (see Figure C)
The remaining 6 feet minimum to 17 feet maximum shall be the "Transistion
Zone" , to be contoured and planted by the Owner or Occupant. Common elements
within the Landscape Easement include a walkway, planting, irrigation, street
lighting, project signing and project entries.
5. 1.2 The Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified single
image, namely: a single row of street trees planted approximately 5 feet from the
curb line on a landscaped berm, on both sides of the main roadway. Lawn shall
occur from the curb to the walkway. Informal tree, shrub and groundcover
plantings shall occur between the walkway and the landscape easement.
Individual project entries will punctuate these plantings providing highlighted
corporate ide':ification.
A walkway wit - meander through the public parkway providing an added dimension to
the overall Blackriver streetscape scene.
5. 1.3 Interior Zone
The Interior Zone encompasses all exterior elements not covered by the
requirements of Section 5.1.1 and 5. 1.2. This zone is subject to the needs of
each Owner or Occupant and, thus, is meant to have a greater degree of flexibility
than the streetscape zones. Common concerns within this zone include: parking
lot arrangemer.s and landscaping, site lighting, regulatory and directional
signing, and service area screening.
5.1.4 Interior Zone Design Concept
It is intended that the Interior Zone of Blackriver Technology Park, consisting
primarily of parking lot landscaping, be planted in geometric patterns. (Refer to
Section 2.2.5c for plant types). Subtle light levels, restrained graphics and
screening of service areas will all contribute to reinforcing the Blackriver
Technology Park landscape design concept.
The Streetscape within Blackriver Technology Park will consist of a unified single
image, namely: a single row of street trees planted on both sides of the
Southwest 4th :lace approximately 5 feet from the curbline on a landscaped berm
Lawn will occur from the curbline to the walkway. Informal tree, shrub and
groundcover plantings shall occur between the walkway and the property line of
individual properties of Owners or Occupants. This is the "Transition Zone" .
Individual project entries will punctuate these plantings providing highlighted
cnrnnr?+p idpr firtion .
Two major Blackriver entry monuments will be provided, namely: entrances to
Blackriver Technology Park.
5. 1 . 5 Granter provided Amenities
5.1 .5a Exceptions
Exceptions to 5.1.4a above, shall occur at the west entry to Blackriver Technology
Park where a special entry landscape feature shall be provided by the Grantor
refer to the Concept Master Plan).
5.1.5b Entry Feature
The Grantor shall be responsible to provide a special landscaped feature at the
entrances to Powell Avenue S.W. and Naches Avenue S.W. (Refer to the Master Plan,
Exhibit A) . This area shall include a special landscaping and a Blackriver
identification monument (sign).
5.1.5c Pedestrian Easements
The Grantor shall be responsible to provide three(3) ten foot wide landscaped
pedestrian easements (refer to the Concept Master Plan Exhibit A) . Landscaping in
this area shal - include a five (5) foot wide walkway leading from the public
sidewalk within the landscape easement to preserve and/or buffer areas.
Landscaping or either side of the walkway shall be native groundcover vegetation.
5. 1.6 Other Requirements
5. 1.6a
All planting areas shall have a fully automatic irrigation system.
5. 1.6b
All planting and irrigation details and technical specifications shall conform to
the highest standards of the American Association of Nurseryman , the American
Landscape Contractors Association, and the irrigation industry.
5. 1.6c
It shall be the Owner or Occupant' s responsibility to provide a one year guarantee
against all defects of materials and workmanship for all planting and irrigation.
The Owner or Occupant shall replace plants not in normal , healthy growing
condition at the end of the guarantee period with same species and size. The
guarantee period shall begin when the Owner or Occupant, and Grantor or their
representati .e have accepted the work as 100 percent complete.
5.2 LANDSCAPE DESIGN GUIDELINES
5.2.1 Assessment District Installation and Maintenance Agreement
1. All landscape improvements within the Public Parkway (S.W. 4th Place Land-
s'ane Easement Section 5. 1 . 1-1 ) will ble installed by the Grantor.
2. The Grantor has entered into a five year maintenance agreement to maintain
the Public Parkway. Landscape maintenance will be paid for through
Assessment District revenues . Following the expiration of the five year
mainterarce period, all maintenance will be assumed by the Owner or Occupant
of ird' . ' dual develop-ert parcels and w;i i be assur-ed by the Owner : Occu-
pant of '. ndividual development parcels and will be paid for througr the
continuation of an Assessment District.
3. The 30 foot Landscape Easement (Public Parkway and Transistion
Zone) landscaping and irrigation will be installed as a continuouss linear
system. Demolition of this system at vehicular access points will be
necessary during the process of the access drive installation. It is a
responsibility of the Owner or Occupant to maintain the flow of the
irrigation system during construction, and to re-establish the planting,
grading and final irrigation layout that has been altered.
5.2.2 Maintenance of Unimproved Sites
1. Sites that are not improved or built upon shall be maintained in a clean
and neat appearance by the Owner or Occupant. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or more
often as required to maintain a high quality appearance. The Grantor and
their re:resentative have the right to perform the necessary maintenance
and charge the individual Owner or Occupant as necessary.
5.2.3 Landscape Coverage
1. A minimur, of fifteen (15) percent of the gross site area within the property
lines of a development site (exclusive of the Landscape Easement
Transition Zone) shall be devoted to landscape materials unless otherwise
approved in writing by the Grantor.
5.2.4 Street =rontage Zone Design Guidelines
The street frortage zone is defined as that portion of the site which is adjacent
to the Southwest 4th Place Landscape Easement.
5.2.4a Specif= c Design Limitation within the Street Frontage Zone
1. Grading: Finish grading for each site shall provide for a smooth transition
with the walkway in the Public Parkway. Transition slope in this zone shall
not exceec 4: 1.
2. Service Areas: Service areas within this zone are to be enclosed with solid
walls anc screened with the appropriate landscape material . (Refer to
5.2.4.b-z. for plant types) .
3. Parking: Berming shall be provided within the Transition Zone of the
Landscape Easement.
4. Screening Shrubs: The following shrubs, in combination with walls or fences,
have beer selected to aid in eye level screening of service areas. plantino
areas sr_- i be a minimum width of 4 feet. H.: 1 planting areas exceecino 4
feet sha: T also conform to these landscape guidelines. The shrubs should
be plantec at a size to achieve a minimum height of 5 feet within a 3 year
period fr the date of planting.
Plant ',a--77 cinc
Chaenomeies lagenaria 4' on center Full
Euonymous alatus 4' on center Full
Forsythia sp. 4' on center Full
Juniper chinesis var.4' on center Full
Juniper squamata var.4' on center Full
Ligustrur vulgare 4' on center Full
Philadelphus virginalis 4' on center Full
Spiraea prunifolia 4' on center Full
Spiraea vanhouttei 4' on center Full
Thuja occidentalis pyramidalis 3' on center Full
Thuja orientalis 4' on center Full
Viburnum opulus 4' on center Full
5.2.5 Parkin_ Lot Landscape Requirements
5.2.5a Tree Planting Requirements
1. Two (2) types of trees are identified for the parking lot planting.
Refer tc Section 5.2.5c for plant types)
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
Type A: These trees shall be planted at the ends of parking columns (see Figures
J, K, arc L) and at intermediate planting islands Figure J. A single tree
species , with a minimum height of 12 feet shall be planted throughout the
Owner or Occupant's entire parking lot compound.
Type B: These trees shall be planted in the parking lot interior (see Figures K
and L) . A single tree species, with a minimum height of 8 feet shall be
used. The tree species may be different in separated parking lots within
the comp:..nd. Credit will not be given for perimeter edge tree planting. A
minimum c= one (1) tree shall be planted for every six (6) car stalls .
2. Tree wells and planter areas within paved parking areas shall provide a
minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
4, riI Vic' ,lot planting beds in addition to Hype A and Type c trees snail
be planter with shrubs and/or groundcover. The size and spacing to conform
to Secticr 5.2.4.b.4.
5. Plantinc :eds shall be a minimum of 25 square feet.
5.2.5.t Par. - - g and Pedestrian Circulation
1. Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a minimum
width of 4 feet between stalls should be provided at key locations.
3. If parking lots exceed two rows in depth, the alignment of the aisles should
be in the direction of the pedestrian movement.
5.2.5c Parking Lot Plant Materials List
1. Tree species are to be selected from the following lists. If special soil or
site conditions prevent the use of the recommended trees, the Owner or Occu-
pant should recommend an alternative to the Design Review Committee.
Tree Lists for Parking Compounds
Type A Trees: (Refer to Section 5.2.5.a-1A)
Plant Name Minimum Size Comments
Acer platanoides, sp. var. 12' Well branched
Acer saccharur 12' Well branched
Aesculus hippocastanum 12' Well branched
Fraxinus americana (seedless) 12' Well branched
Gleditsia tria _anthos inermis 12 ' Well branched
Tilia cordate 12' Well branched
All Type A Trees to be limbed up to six (6) feet from the ground.
Type B Trees: ( Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Crataegous lavallei 8' Well branched
Crataegus phaenopyrum 8' Well branched
Malus , var. 8' Well branched
Prunus cerasifera 8' Well branched
Sorbus aucupar'a 8' Well branched
All Type B Trees to be limbed up to four (4) feet from the ground.
5.2.6 Vehicu , Er Access Drive Design Guidelines
5.2.6a Location Criteria
1 . the iota=' on of major access drives sha i 1 be approveo by Elie ur aril'.
2. Access drives for "right turn only" ingress and egress should be located by
the Owner or Occupant according to City of Renton Standards.
5. .E Lire '= _ Use Area of Primary and Secondary Access Drives
1. The "lir":ed use area" is defined as the area extending 10 feet on either
side of an access drive and in that area of the first 10 feet extending
from the curbline of the public street.
2. All objects higher than 30 inches above the top of the curb at the access
drive curb opening, including but not limited to, shrubs, signs and earth
berms shall be located outside of the limited use area. Trees without limbs
to a height of six (6) feet may be planted in this area.
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side/Rear Yard Requirements
1. A 5 foot minimum planting strip is to be provided continuously along all
interior property lines not adjacent to landscape easements, except where a
shared access drive has been mutually agreed upon by adjoining property
owners.
2. All site drainage shall be coordinated with the overall project Site Drainage
Master Plan and shall comply with the City of Renton Storm Drainage
Ordinance.
3. A maximumr slope of 2:1 is allowed within the 5 foot planting zone. A 1 foot
minimum flat transition shall be provided at the top and bottom of all slopes
within t" s zone.
4. Where the two properties adjoin, there shall be a 10 foot minimum zone
created by the two 5 foot landscape planting strips on each side of a
property line. All planting areas exceeding the 5 foot minimum shall also
conform to these landscape guidelines.
5. No walls or fences shall be permitted within the required 5 foot minimum
planting zone. However, walls or fences separating adjoining parcels may be
permitted when located at the property line. Walls or fences which
contribute to a specific landscape design may be submitted to the Design
Review Committee for consideration.
5.2.7b Side/:ear Yard Landscape Requirements
1 . General - Either shrub or tree planting shall be required in the 5 foot side
and rear yard zone. Where two properties adjoin , shrub plantings with
groundcover is required on one side of the property line and tree plantings
with groundcover is required on the other. The first Owner or Occupant to
receive plan approval shall be required to plant the required trees with
groundcover. The second Owner or Occupant must then plant the reouired
srruos groundcover.
5.2.7c Plant Material Requirements - Interior Property Lines
1 . Trees : _hall be located 4 feet from curbs cr 1 foot from the property
line. - = trees selected for interior property ' =res must be species
selectec from the Tree List. (Refer to Section E.2.5c)
2. Shrubs: Shall be located 3 feet from the property line or 2 feet from the
curb, and planted with a maximum spacing of 5 feet on center.
3. Groundcover: Shall be placed 24 inches on center maximum spacing, covering
a' l ground surfaces.
4. Sod lawn may be used in lieu of groundcover.
5.2.8 Guidelines for Exterior Property Lines
1. Side/Rear Yard Requirements Adjacent to Landscape Easements
a. Parking lots require no setback from the Landscape Easement. Parking
lotsshall be back five (5) feet from side on river property lines.
b. A r' nimum 60 foot front yard setback is required. Landscaping within
this zone shall conform to praking lot landscaping and transition zone
landscaping.
5.2.9 Guidelines for Free Preservation Outside the "Preserve" Zone
Trees selecte: for preservation shall have a "tree well " (fill retaininc wall )
constructed t: maintain an undisturbed existing ground area around the tree.
Provide apprczimately 5 sq. ft. for each caliper inch of trunk measured at 48"
above existing grade. The tree well shall be constructed in a manner to protect
all roots. trc root cutting allowed. Special care shall be taken to maintain
ground water level and quality as nearly as possible to pre-development
conditions. -This may include special irrigation and drainage systems or culvert
systems connecting the tree wells to nearby wetlands so that the rise and fall of
ground water will be similar to pre-development conditions. Storm water may be
retained on-site as necessary or desirable to assist in maintaining ground water
levels .
Tree wells may be constructed of railroad ties, treated timbers or poured-in-place
concrete, wit- an 8 inch high curb of timber, concrete or asphalt on all sides.
Provide hang ails where resultant depressions are more than 30 inches deep.
Conditions ma . vary at each tree location. Analyze each tree to ascertain the
best solution or combination of solutions to minimize adverse environmental
impacts.
Consult an Ah^rist reaardino selection of trees to be preserved and preservation
procedures t: ee used. Se'iecteo trees are sueject to review and approval, oy the
City of Rentc-..
6.0 Signing Guidelines
6. 1 OBJECTIVES The objectives of Signing Guidelines for Blackriver Technology
Park are:
1 . to allow sufficient, though not excessive, business identification devises so
that the name of each business locating in Blackriver Technology Park is
clearly and individually associated with the facilities it occupies , when
viewed by motorists passing by on fronting streets
2. to prohibit signs and business identification devices from being used for
advertising of any kind including, but not limited to, advertising of pro-
ducts , services , or job openings
3. to allow cn each lot sufficient, though not excessive, informational , direc-
tional , and traffic control signing for convenient and efficient operation
4. to have all informational , vehicular control , and temporary signing be
uniform in design, size, height, color, material , and topography
5. to permit sufficient, though not excessive, temporary signing including those
identifying the future occupant, the design consultants , the general con-
tractor, lending institutions , sale or leasing agents, and the building
product t: be offered
6. to insure that signing and identification devices do not, because of their
height, location or design, contribute to a decrease in the safety and
efficient: of traffic flows in fronting streets
6.2 SIGN SUBMITTALS:
1 . An overall sign program including any (1) detached business identifica-
tion sic' . , (2) building mounter business or building identification signs
and (3) 1 :-formational and vehicular control signs shall be submitted as part
of the preliminary plan submittal to the Blackriver Technology Park Design
Review Cc-niittee.
E. 3 DETACHEfl E _SINESS IDENTIFICATION SIGNS :
1. Detached business identification signs shall be limited to the display of the
name and/or symbol of the business or businesses occupying the site. No
messages or advertising of any kind including, but not limited to, adver-
tising of products, services, or job openings shall be permitted.
2. No more than one detached business identification sign shall be permitted on
each street frontage of a development parcel .
3. No detached business identification sign shall exceed a sign area which is
the lesser of 50 square feet per side or the maximum sign area permitted by
the local governing authority. The sign area is defined as the area of the
surface or surfaces which displays letters or symbols identifying the bus-
iness or businesses occupying the site, or when the sign is of free-
standing letters, the single rectangular area which fully encloses all
letters or symbols identifying the business or businesses occupying the site.
The sign area shall not include the base or pedestal to which the sign is
mounted.
4. All detached business identification signs shall be permanent "ground hugger"
type signs and shall not exceed a height of five feet above the underlying
finish grade unless otherwise approved in writing by J.A.G./Renton Properties
Associates.
5. All detached business identification signs shall be of such materials and
design to be compatible with and complimentary to the on-site design concept
as well as landscape and physical design features .
6. Illumination - Detached business identification signs may be illuminated by
continuous and uniform internal illumination, backlighting, or ground light-
ing. No flashing or moving lights will be permitted. No unprotected lamp
providing sign illumination shall be directly visible when viewed at
any angle from a distance of twenty feet or more. No sign illumination shall
cast a glare which will be visible from any street or access drive.
7. Location - Detached business identification signs must be located within 20
feet of a fronting street and the access drive but shall not exceed 30 inches
in height when located in the first 10 feet adjacent to access drive closest
to the street.
6.4 BUILDING MOUNTED BUSINESS OR BUILDING IDENTIFICATION SIGNS:
1 . Building rounted business or building identification signs shall be limited
to the display of the building name or the name and/or symbol of the business
occupying the site. No message or advertising of any kind including, but not
limited t: the advertising of products , services or job openings
shall be permitted.
2. No more than one building mounted sign shall be permitted for each street
frontage of a development parcel .
L'U 1riEs_ buiiGi 'iy 1Gel"itlr:iC "vl"i 5S LE n,.;UntEu LU ally 4E1 ;,'.Cal
surface c= a building or building associated wall provided such signs appear
as an integral part of the overall architectural and site design concept.
4. The sign area of building mounted business or building identification signs
may not e> ceed the lesser of 50 square feet or the maximum building mounted
sign area oerritted by the local governing authority. The building rounted
sign area is defined as the area of the surface or surfaces which displays
letters or symbols identifying the business or businesses occupying the
site or when the sign is of freestanding letters, the single rectangular area
which fully encloses all letters or symbols identifying the business or
businesses occupying the site.
5. Building mounted business or building signs shall not extend beyond a height
above the ground floor which is the lesser of 32 feet or the maximum height
permitted by the local governing authority.
6. Building mounted business or building identification signs may be illuminated
by internal illumination or backlighting provided that the color and inten-
sity of such lighting appears as an integral part of the overall architec-
tural and site design concept. No sign illumination shall cast a glare which
will be visible from any street or access drive.
6.5 INFORMATIONAL AND VEHICULAR CONTROL SIGNS:
1. All informational and vehicular control signs shall be of uniform design
using ASI 'Fiberglass Post & Panel System or a sign system of equal design
which is specifically approved in writing by J.A.G./Renton Properties Assoc-
iates. All lettering shall be Helvetica Medium, white in color. Red and
yellow may be used for stop and yield signs respectively.
2. No informational or vehicular control sign shall have a panel face which
exceeds 5 square feet in area per side.
3. No business name, symbol or advertising of any sort shall be permitted on any
informat ;: al or vehicular control sign.
4. No informational or vehicular control sign shall exceed a height of 4 feet
above the underlying grade.
5. No informational or vehicular control sign shall be located so as to reduce
the safe flow of vehicles or pedestrians.
6. No informational or vehicular control sign shall be internally illuminated or
illuminated from the ground.
6.6 TEMPORARY SIGNS.
Only one temporary sign plus one financing sign shall be permitted per
development parcel . No additional individual signs shall be permitted.
J.A.G./Renton Properties Associates or its representatives have the right to
remove unpermitted signs and charge the individual tenant or property owner
for the cost of such removal .
2. Temporar development signs shall be of a uniform size, area , height, color,
and desic- as illustrated here and shall , at a minimum, identify Blackriver
Technoloc. Park and the business or company developing the parcel . The
remaining sign area shall be limited to identification of the following
and no other information:
a. a concise identification of the nature of the development
h, the 7ro;ected date of cmmnletion
c. the construction lender
d. the real estate brokerage firm
e. the veneral contractor
f. the architect
g. the - andscape architect
h. the : -ructural engineer
i . the civil engineer
j . the mechanical engineer
k. the electrical engineer
3. No temporary development sign shall be located so as to reduce the safe flow
of vehicles and pedestrians
4. All temporary development signs shall be removed prior to occupancy.
7 .0 Lighting Guidelines
7.1 OB3ECTIVES
1. to have on-site lighting contribute to the safe and efficient use of a
development site
2, to have c- -site lighting contribute to site security
3. to have c--site lighting compliment and reinforce the architecture and site
design character
4. to have cr-site parking lot lighting fixtures and illumination levels be
consistent throughout Blackriver Technology Park
5. to preve" on-site lighting from casting glare onto adjacent lots
6. to prevent on-site lighting from casting glare onto adjacent streets in such
a manner as to decrease the safety of vehicular movement
7. to encourage lighting design that is in conformance with energy saving
guidelines
7.2 LIGHTING QUALITY
All ligh-- ng potentially visible from an adjacent street except bollard
lighting - ess than 42 inches high, shall be indirect or shall incorporate a
full cut off shield type fixture.
7.3 PARKING, ACCESS AND CIRCULATION AREAS
Parking areas, access drives, and internal vehicular circulation areas - All
narkinc liohtinc fixtures shall be a zero
series c - a fixture of similar "shoe box" type design mounted at 1E ' -0" atop
a square -petal pole. Both the fixture and pole are to have a durable black
finish. The light source shall be 150 watt color corrected high pressure
sodium. The parking lot illumination level shall achieve a uniformity ratio
of 3 to 1 (average to minimum) with a maintained average of 1 foot
canCE = a minimum of .3 foct candle.
7.4 SERVICE AREAS
Service area lighting shall be contained within the service yard boundaries
and enclosure walls. No light spillover should occur outside the service
area. The light source should not be visible from the street.
7.5 BUILDING ILLUMINATION
Building illumination and architectural lighting shall be indirect in charac-
ter. (No light source visible). Indirect wall lighting or "wall washing"
overhead down lighting, or interior illumination which spills outside is
encouraged. Architectural lighting should articulate and animate the
particular building design as well as provide the required functional light-
ing for safety and clarity of pedestrian movement.
7.6 PEDESTRIP AREAS
Pedestrian walk and area lighting is segmented into 2 zones.
1. The first zone is pedestrian area lighting. This is for outdoor pedes-
trian use areas such as courtyard, entry way, etc. Pedestrian area
lighting _Would achieve a uniformity ratio of 3.5 to 1 average to
minimum, with an average illumination of .60 foot candles and a minimum
of .18 fcct candles.
2. The second zone is pedestrian walk lighting where point to point
lighting is acceptable with no specific illumination levels required.
The main emphasis in this zone should be to clearly identify the pedes-
trian walkway and direction of travel .
8.0 Appendix
CONTACT AND REFERENCE LIST
DEVELOPER (Grantor)
J.A.G./Renton Properties Associates
Alterra Corp. , General Partner
710 Cherry Street
Seattle, WA 9E04
Phone: (206) 382-0333
Contact: Deltc- Bonds
PROJECT CONSULTANT (Planning, Site, Civil & Utilities Design, Landscape
Architecture)
Richard Carothers Associates
814 E. Pike Street
Seattle, WA 9E122
Phone: (206) H4-5500
Contact: Richard A. Carothers
GOVERNMENTAL =NCIES
City of Renton
Municipal Building
LOG r i i Aver..._ South
Renton, WA 9S: 5
o Planning :epartment
Ronald G. Nelson, Director
Phone (2_i ' 235-2540
Contact: =.oger J. Blalock, Zoning Administrator
Jerry Lind, Land Use Inspector
o Public Works
Richard Houghton, Director
Phone (206) 235-2569
Contact: Richard Houghton
o Engineering Department
Robert Bergstrom, P.E. , Director
Phone (206) 231-2631
Contact: Robert Bergstrom, P.E.
o Fire Department
James Matthew, Fire Marshall
Phone (206) 235-2642
Contact: James Matthew
PLANNING & DESIGN REFERENCES
Renton Zoning Ordinance
Building Regulations, Title 4, Chapter 23 (Grading & Filling)
Subdivision Ordnance, Chapter 11 (Preliminary Plat)
Controlling Building Code: Uniform Building Code with City enacted amendments.
Maps and plans , Contact J.A.G./Renton Properties Associates
Covenants, Conditions and Restrictions
Contents
DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS
FOR BLACKRIVER TECHNOLOGY PARK
Page No.
RECITALS 1
1.0 DEFINITIONS 2
1 .1 Architect, Landscape Architect, Civil Engineer
1.2 Beneficiary
1.3 Declarant
1.4 Declaration
1.5 Deed of Trust
1.6 Improvement - Improvements
1.7 Lot
1.8 Mortgage
1.9 Mortgagee
1.10 Occupant
1.11 Owner
1 . 12 Record - Recorded - Recordation
1.13 Sign
1.14 Street or Streets
1.15 Subject Property
1 , 1E Visit'e from Neighboring Property
2.0 SUBJECT PROPERTY 4
2.1 General Declaration
2.2 Addit-on of Other Realty
2. Notice of Addition of Land
3.0 CONSTRUCTION OF IMPROVEMENTS 6
3.1 Approval of Plans Required
3.2 Basis for Approval
3.3 Review Fee
3.4 Result of Inaction
3.5 Approval
3.6 Proceeding with Work
3.7 Completion of Work
3.8 Declarant Not Liable
3.9 Construction Without Approval
4.0 DEVELOPMENT STANDARDS 10
4.1 Minimum Setback
4.2 Exceptions to Setback Requirements
4.3 Landscaping
i
Page No.
4.0 DEVELOPMENT STANDARDS (Continued)
4.4 Signs
4.5 Parking Areas
4.6 Storage and Loading Areas
5.0 REGULATIC'; OF OPERATIONS AND USES 14
5.1 Permitted Uses
5.2 Prohibited Uses
5.3 Nuisances
5.4 Condition of Property
5.5 Maintenance of Grounds
5.6 Remedies for Failure to Maintain & Repair
a) Remedies
b) Foreclosure of Lien
c) Cure
d) Nonexclusive Remedy
5.7 Taxes and Assessments
5.8 Refuse Collection Areas
5.9 Repair of Buildings
5.10 Public Utilities
5.11 Utility Lines and Antennas
5. 12 Mech=nical Eouinment
5. 13 Mire al Exploration
5. 14 Other Operations and Uses
6.0 MODIFICATION AND REPEAL 23
6. 1 Prc:_dure
6.2 Modification by Declarant
6.3 Governmental Regulation
7.0 ENFORCEMENT 25
7. 1 Abatement and Suit
7.2 Right of Entry
7.3 Deemed to Constitute a Nuisance
7.4 Attorney's Fee
7.5 Failure to Enforce is No Waiver
8.0 ASSIGNMENT 27
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE 27
10.0 WAIVER 28
Page No.
11.0 RUNS WITn LAND 28
12.0 RIGHTS 07 MORTGAGEES 28
13.0 CAPTIC',= 29
14.0 EFFECT C= INVALIDATION 29
DECLARATION OF COVENANTS
CONDITIONS AND RESTRICTIONS
FOR
BLACKRIVER TECHNOLOGY PARK
This Declaration, made this day of 1984, by J.A.G./
Renton Properties Associates, a Washington Partnership, is made with reference to
the following =acts :
RECITALS
A. Blackrive- Technology Park is the owner of that certain real property in the
City of Renton , County of King , State of Washington described in Exhibit A attached
hereto and by this reference incorporated herein, and known as Blackriver Technology
Park.
B. Blackrive- Technology Park is being developed as a planned industrial park.
It is J.A. G./'a-ton Properties Associates desire and intention tc subject the real
propert\' in sad industrial park to certain covenants , conditions and restrictions
for the benefit of the property, J.A.G./Renton Properties Associates, and the
purchasers of lots in Blackriver Technology Park. It is intended that said
covenants, conditions and restrictions bind and benefit not only said purchasers
and J.A.G./Renton Properties Associates , but also their respective successors,
heirs and assigns and that all lots in Blackriver Technology Park should be held,
used, leased, sold and conveyed subject to the covenants, conditions and
restrictions set forth in this Declaration.
1-
C. It is the intention of J.A.G./Renton Properties Associates to further a plan
of subdivision by means of the covenants, conditions and restrictions set forth in
this Declaration. Said covenants, conditions and restrictions are intended to be
common tc all the lots in Blackriver Technology Park and to enhance and protect
the value, desirability and attractiveness of all such lots to their mutual
benefit.
1.0 DEFINITIO'.S
Unless the context otherwise specifies or requires, the terms defined in this (1.0
Definitions) , shall as used in this Declaration, have the meanings herein set
forth:
1 . 1 Architect , Landscape Architect, Civil Engineer. The term "architect,
landscape arch' :ect and civil engineer" , shall mean a person holding a certificate
to practice architecture, landscape architecture or civil engineering, in the State
of Washington.
1.2 Beneficiar;. The term "beneficiary" shall mean a mortgagee under a mortgage
as well as a be7eficiary under a deed of trust.
1 . 3 Declarar.t . The term "Declarant" shall mean J.A.G./Renton Properties
Associates and, to the extent provided in Article VIII of this Declaration, its
successors and assigns.
1.4 Declaration. The term "Declaration" shall mean this Declaration of Covenants,
Conditions and Restrictions for Blackriver Technology Park, as it may from time to
time be amender or supplemented.
1.5 Deed of Trust. The term "deed of trust" shall mean a mortgage as well as a
deed of trust.
1.6 Blackriver Technology Park. The term "Blackriver Technology Park" shall be
synonymous witr the term "subject property" and shall mean all of the real property
2-
now or hereafter made subject to this Declaration. 1.7 Improvement - Improvements.
The term "improvement" or "improvements" shall include buildings, outbuildings,
roads, driveways, parking areas, fences, screening walls and barriers , retaining
walls , stairs , decks , water lines , sewers , electrical and gas distribution
facilities , hedges, windbreaks, plantings , planted trees and shrubs, poles, signs ,
loading areas and all other structures, installations and landscaping of every type
and kind, whether above or below the land surface.
1.8 Lot. The term "lot" shall mean a fractional part of the subject property as
subdivided on subdivision or parcel maps recorded from time to time in the Office
of the Recorder of the County of King, State of Washington.
1.9 Mortgage. The term "mortgage" shall mean a deed of trust as well as a
mortgage.
1.10 Mortgagee. The term "mortgagee shall mean a beneficiary under, or holder of,
a deed of trust as well as a mortgagee under a mortgage.
1. 11 Occupant. The term "Occupant" shall mean a lessee or licensee of an Owner, or
any other person or entity other than an Owner in lawful possession of a lot with
the perr- ssior c` the Owner.
1. 12 Owner. The term "Owner" shall mean and refer to any person or entity which is
the record Owner of fee simple title to any lot, excluding any entity or person who
holds such interest as security for the payment of an obligation, but including
contract sellers and any mortgagee or other security holder in actual possession of
a lot.
1.13 Record - Recorded - Recordation. The terms "record," "recorded," or
recordation" shall mean, with respect to any document, the recordation of said
document in the Office of the Recorder of the County of King, State of Washington.
3-
1. 14 Sign. The term "sign" shall mean any structure, device or contrivance,
electric or non-electric, upon or within which any poster, bulletin, printing,
lettering, painting, device or other advertising of any kind whatsoever used,
placed, posted , tacked, nailed, pasted, or otherwise fastened or affixed.
1. 15 Street of Streets. The term "street" or "streets" shall mean any street,
highway, road, or thoroughfare within or adjacent to the subject property and shown
on any recorded subdivision or parcel map, or record or survey, whether designated
thereon as street, boulevard, place, drive, road, court, terrace, way, lane, circle
or otherwise.
1. 16 Subject Property. The term "subject property shall be synonymous with the
term "Blackriver Technology Park" and shall mean all of the real property now or
hereinafter made subject to this Declaration.
1.17 Visible from Neighboring Property. The term "visible from neighboring
property" shall mean, with respect to any given object on a lot, that such object
is or would be visible to a person six (6) feet tall , standing on any part of any
adjacent lot or other property at an elevation no greater than the elevaticn of the
base of the object being viewed.
2.0 SUBJECT PROPERTY
2.1 General Declaration. Declarant hereby declares that all of that real property
located in the City of Renton, County of King, State of Washington, and more
particularly described in Exhibit "A" is, and shall be, conveyed, hypothecated,
encumbered, leased, occupied, built upon or otherwise used, improved or transferred
in whole or in part, subject to this Declaration. All of the covenants, conditions
and restrictions set forth herein are declared and agreed to be in furtherance of a
general plan for the subdivision, improvement and sale of said real property and
are established for the purpose of enhancing and protecting the value, desirability
4-
and attractiveness of the subject property and every part thereof. All of said
covenants, conditions and restrictions shall run with all of the subject property
for all purposes and shall be binding upon and inure to the benefit of Declarant
and all Owners , Occupants , and their successors in interest as set forth in this
Declaration.
2.2 Addition of Other Realty. Declarant may at any time during the pendency of
this Declaration add all or a portion of any real property now or hereinafter owned
by Declarant to the subject property, and upon recording of a notice of addition of
real property containing at least the provisions set forth in Section 2.3, the
provisions of this Declaration specified in said notice shall apply to such added
real aropert_ in the same manner as if it were originally covered by this
Declaration. Thereafter, to the extent that this Declaration is made applicable
thereto, the rights, powers and responsibilities of Declarant and the Owners and
Occupants of lots within such added real property shall he the same as in the case
of the real property described in Exhibit "A".
2.3 Notice c= Addition of Land. The notice of addition of real property referred
to in Sectic. = .2 shall contain at least the following provisions :
a) A reference to this Declaration stating the date of recording and the book or
books of the records of King County, Washington, and the page numbers where this
Declaration is recorded;
b) A statement that the provisions of this Declaration, or some specified part
thereof, shall apply to such added real property;
c) A legal description of such added real property; and
d) Such other or different covenants, conditions and restrictions as Declarant
shall , in its discretion, specify to regulate and control the use, occupancy and
improvements cf such added real property.
5-
3.0 CONSTRUCTION OF IMPROVEMENTS
3. 1 Approval of Plans Required. No improvements shall be erected, placed,
altered, maintained or permitted to remain on any lot by any Owner or Occupant
until final pens and specifications shall have been submitted to and approved in
writing by Declarant. Such final plans and specifications shall be submitted in
duplicate over the authorized signature of the Owner or Occupant or both of the lot
or the authorized agent thereof. Such plans and specifications shall be in such
form and shall contain such information as may be required by the Declarant, but
shall in any event include the following:
a) A site development plan of the lot showing the nature, grading scheme, kind,
shape, compos- :ion, and location of all structures with respect to the particular
lot (includir: proposed front, rear and side setback lines ) , and with respect to
structures on adjoining lots, and the number and location of all parking spaces and
driveways on the lot;
b) A landscaping plan for the particular lot;
c) A plan fcv the location of signs and lighting; and
d) A build=: elevation plan showing dimensions , materials and e>.te,=_r color
scheme in no less detail than required by the appropriate governmental authority
for the issuance of a building permit. Material changes in approved plans must be
similarly submitted to and approved by Declarant.
3.2 Basis for Approval . Approval shall be based, among other things, upon
adequacy of site dimensions, adequacy of structural design, conformity and harmony
of external design with neighboring structures, effect of location and use of
proposed improvements upon neighboring lots, proper facing of main elevation with
respect to nearby streets, adequacy of screening of mechanical , air conditioning or
other roof top installations, and conformity of the plans and specifications to the
purpose and ge-.eral plan and intent of this Declaration. No plans will be approved
6-
which do not Provide for the underground installation of power, electrical ,
telephone and other utility lines from the property line to buildings. Plans which
provide for metal-clad buildings will be approved only on the condition that such
buildings are ::nstructed so as not to have the appearance of a metal building and
any metal-clad building must be specifically approved in writing. Declarant shall
not arbitrarily or unreasonably withhold its approval of any plans and
specifications . Except as otherwise provided in this Declaration, Declarant shall
have the right to disapprove any plans and specifications submitted hereunder on
any reasonable grounds including, but not limited to, the following:
a) Failure tc comply with any of the restrictions set forth in this Declaration;
b) Failure tc include information in such plans and specifications as may have
been reasonabl: requested by Declarant;
c) Objection to the exterior design, the appearance of materials or materials
empinved in ar'v proposed structure:
d) Objection on the ground of incompatibility of any proposed structure or use
with existing structures or uses upon other lots, or other property in the vicinity
of the subjec: :roperty;
e) Objection to the location of any proposed structure with reference to other
lots, or other property in the vicinity;
f) Objection to the grading or landscaping plan for any lot;
g) Objection to the color scheme, finish, proportions, style or architecture,
height, bulk or appropriateness of any structure;
h) Objection to the number or size of parking spaces, or to the design of the
parking area;
i ) Any other matter which, in the judgment of the Declarant, would render the
proposed imprc .ements or use inharmonious with the general plan for improvement of
7-
the subject property or with improvements located upon other lots or other property
in the vicinity.
3.3 Review Fee. An architectural review fee shall be paid to Declarant at such
time as plans and specifications are submitted to it based upon the following
schedule:
a) When the plans submitted are prepared by a licensed architect, engineer or
landscape architect, the architectural review fee shall be the sum of One Hundred
and no/100ths Dollars ($100.00);
b) In all other cases, the architectural review fee shall be the sum or Two
Hundred Fifty and no/100ths Dollars ($250.00) .
3.4 Result of inaction. If Declarant fails either to approve or disapprove plans
and specifications submitted to it for approval within forty-five (45) days after
the same have been submitted, it shall be conclusively presumed that Declarant has
disapproved said plans and specifications; provided, however, that if within the
forty-five (4E , day period Declarant gives written notice of the fact that more
time is required for the review of such plans and specifications , there shall be no
presumption tra: the same are disapproved until the expiration of such reasonable
period of time as is set forth in the notice.
3.5 Approval . Declarant may approve plans and specifications as submitted, or as
altered or amended, or it may grant its approval to the same subject to specific
conditions. Upon approval or conditional approval by Declarant of any plans and
specifications submitted, a copy of such plans and specifications, together with
any conditions, shall be deposited for permanent record with Declarant, and a copy
of such plans and specifications, bearing such approval together with any
conditions, shall be returned to the applicant submitting the same.
8-
3.6 Proceedinc with Work. Upon receipt of approval from Declarant pursuant to
Section 3.5, the Owner, or Occupant, or both, to whom the same is given, shall , as
soon as practicable, satisfy any and all conditions of such approval and shall
diligently proceed with the commencement and completion of all approved excavation,
construction, refinishing, and alterations. In all cases, work shall commence
within one (1: year from the date of approval , and if work is not so commenced
approval shall be deemed revoked unless Declarant, pursuant to written request made
and received prior to the expiration of said one (1) year period, extends the
period of time within which work must be commenced.
3.7 Completion: of Work. Any improvement commenced pursuant hereto shall be
completed witr = n two (2) years from the date of Declarant's approval of the plans
and specifications therefor, except for so long as such completion is rendered
impossible, or unless work upon the proposed improvements would impose a great
hardship upon the Owner or Occupant, to whom Declarant's approval is given, due to
strike, fire , -ational emergency, natural disaster or other supervening force
beyond the ccr'rol of Owner or Occupant. Declarant may, upon written request made
and received :-ior to the expiration of the twc (2) year period, extend the period
of time within which work must be completed. Failure to comply with this Section
3.7 shall constitute a breach of this Declaration and subject the party in breach
to the enforcement procedures set forth in 7.0.
3.8 Declarant Not Liable. Declarant shall not be liable for any damage, loss or
prejudice suffered or claimed by any person on account of:
a) The approval or disapproval of any plans, drawings and specifications, whether
or not in any way defective;
b) The construction of any improvement, or performance of any work, whether or
not pursuant tc approved plans , drawings and specifications; or
9-
r
c) The development of any lot within Blackriver Technology Park.
3.9 Construction Without Approval . If any improvement shall be erected, placed or
maintained upon any lot, or the exterior design thereof, or any new use commenced
upon any lot, ether than in accordance with the approval by the Declarant pursuant
to the provisions of this 3.0 (Construction of Improvements) , such alteration ,
erection, placement, maintenance or use shall be deemed to have been undertaken in
violation of this Declaration, and upon written notice from Declarant, any such
improvement so altered, erected, placed, maintained or used upon any lot in
violation of this Declaration shall be removed or altered so as to conform to this
Declaration, and any such use shall cease or be amended so as to conform to this
Declaration. Should such removal or alteration, or cessation or amendment of use
not be accomplished within thirty (30) days after receipt of such notice, then the
party in breach of this Declaration shall be subject to the enforcement procedures
cet forth in 7f,
4.0 DEVEL0PME',T STANDARDS
4. 1 Minimum Setback. No improvements of any kind, and no part thereof, shall be
placed closer --an permitted by Declarant to an interior property line, e>cept as
otherwise provided in Section 4.2. "Interior property line" shall mean the
boundary between any lot within the subject property and all other lots bordering
upon said lot. No improvements of any kind, and no part thereof, shall be placed
closer than twenty-five (25) feet from a property line fronting the following
streets: (1) Southwest Fourth Place and (2) Naches Avenue S.W. "Property line"
shall mean the boundary of every lot.
4.2 Exceptions to Setback Requirements. The following improvements, or parts of
improvements, are specifically excluded from the setback requirements set forth in
Section 4. 1:
10-
a) Roof overhang, subject to approval in writing from Declarant, provided said
overhang does not extend more than six (6) feet into the setback area;
b) Steps and walkways;
c) Paving ar: associated curbing;
d) Fences , except that no fence shall be placed closer than twenty-five (25) feet
from a property line fronting upon any public street without the prior written
approval of Declarant;
e) Landscaping and irrigation systems;
f) Planters , not to exceed three (3) feet in height, except that planters of
greater height may be built within the setback area with the prior written approval
of Declarant;
g) Industrial park identification signs , directional and parking signs and signs
identifying the Owner or Occupant of a lot, subject to the prior written approval
of Declarant;
h) Lighting facilities , subject to the prior written approval of Declarant; and
i ) Underground utility facilities and sewers.
4.3 Landscao . Within ninety (9Ci) days following completion cf constr.: on , or
by the date each improvement is occupied, whichever shall occur first, each lot
shall be landscaped in accordance with the plans and specifications. The area of
each lot between any street and any minimum setback line as set forth in Section
4. 1 shall be landscaped with an attractive combination of trees , shrubs and other
ground cover. All other areas fronting on a street and not utilized for parking,
driveways, or walkways shall be landscaped in a complementary and similar manner.
All portions of a lot not fronting a street and not used for parking, storage or
buildings shall be landscaped utilizing ground cover and shrub or tree materials.
The Owner or Occupant shall be responsible for landscaping and maintaining the area
11-
known as the ' transition zone' ; refer to Landscape Design Guidelines. An
underground landscape irrigation system shall be provided and maintained by the
Owner or Occupant for all landscaped areas. Areas used for parking shall be
landscaped , bee-ed or attractively fenced in such a manner as to screen said areas
from view from adjacent streets and freeways. Such screening shall extend at least
forty-two (42) inches above the high point of the finished pavement in said parking
area. Plant materials used for this purpose shall consist of lineal or grouped
masses of shrubs and trees.
After completion, such landscaping as is herein required shall be maintained in a
sightly and well-kept condition. If, in Declarant's reasonable opinion, the
required landscaping is not maintained in a sightly and well -kept condition,
Declarant shall be entitled to the remedies set forth in 7.0.
4.4 Signs. No sign shall be permitted on any lot unless approved by Declarant in
writing. No sian shall be approved other than industrial park identification
signs, directional and parking signs , signs identifying the name, business and
products of the Owner or Occupant of a lot, and signs offering the lot for sale or
lease.
4.5 Parking Areas. Off-street parking adequate to accommodate the parking needs
of the Owner or Occupant, the employees and visitors thereof shall be provided by
the Owner or Occupant of each lot. The intent of this provision is to eliminate
the need for any on-street parking; provided, however, that nothing herein shall be
deemed to prohibit on-street parking of public transportation vehicles. If parking
requirements increase as a result of a change in the use of a lot or in the number
of persons employed by the Owner or Occupant, additional off-street parking shall
be provided so as to satisfy the intent of this section. All parking areas shall
conform to the following standards:
12-
a) Required off-street parking shall be provided on the lot, on a contiguous lot,
or within such distance from the lot as Declarant deems reasonable. Where parking
is provided other than upon the lot concerned, Declarant shall be given a certified
copy of a rec_ ' red instrument, duly executed and acknowledged by the person or
persons holding title to the lot or other property upon which the parking area is
located, stipulating to the permanent reservation of the use of the lot or other
property for s,,ch parking area.
b) Parking areas shall be paved so as to provide dust-free, all-weather surfaces.
Each parking s:Dace provided shall be designated by lines painted upon the paved
surface and shall be adequate in area. All parking areas shall provide, in
addition to ;_ eking spaces , adequate driveways and space for the movement of
vehicles.
c) In determining the adequacy of the number of parking spaces to be provided by
an Owner or Occupant, Declarant shall consider the nature of the proposed use of
the lot, the anount of vehicular traffic generate° by said use, the anticipated
number of, anc manner of employment of, persons to be employed upon the lot; the
nature End ic __tion of proposed structures upon the lot; and such oter- ratters as
Declarant shall reasonably deem relevant.
d) No parking spaces shall be located on or permitted within setback areas
adjacent to a street as set forth in Section 4.1, except that parking spaces may be
located on or parking permitted within such area if Declarant's written permission
is first obtained. Permission will not be given in any event unless parking areas
within such setback areas are screened from view of the street by shrubs and trees,
by a screen wall or by berms, and any such screening must extend at least forty-two
42) inches above the high point of the finished pavement in said parking area.
13-
4.6 Storage a-f Loading Areas. Storage, maintenance and loading areas must be
constructed, maintained and used in accordance with the following conditions:
a) Unless approved in writing by Declarant, no materials, supplies or equipment,
including true _ or other motor vehicles , shall be stored upon a lot except inside
a closed building or behind a visual barrier screening such materials , supplies or
vehicles so as not to be visible from neighboring property and streets. Any
storage areas screened by visual barriers shall be located upon the rear portions
of a lot, unless otherwise approved in writing by Declarant. No storage area may
extend into a setback area as defined in Section 4. 1 except with the written
approval of Declarant.
b) Provisior shall be made on each site for any necessary vehicle loading and no
on-street vehic- e loading shall be permitted.
c) Loading dock areas shall be set back, recessed or screened so as not to be
visible from neighboring property or streets and in no event shall a loading dock
be closer thar seventy-five (75) feet from a property line fronting upon a street
unless otherwise approved in writing by Declarant.
5.0 REGULATIC OF OPERATIONS AND USES
5. 1 Permitted Uses. Except as otherwise specifically prohibited herein, any
industrial operation and use will be permitted upon a lot, provided that Declarant
specifically consents to such use in writing. Such approved use shall be performed
or carried out entirely within a building that is so designed and constructed that
the enclosed operations and uses do not cause or produce a nuisance to other lots
or property, such as, but not limited to, vibration, sound, electro-mechanical
disturbances, electro-magnetic disturbances, radiation, air or water pollution,
dust, or emission of odorous, toxic or non-toxic matter (including steam). Certain
activities whi :• cannot be carried on within a building may be permitted, provided
14-
Declarant specifically consents to such activity in writing and further provided
such activity is screened so as not to be visible from neighboring property and
streets. All lighting is to be shielded so as not to be visible from neighboring
property.
5.2 Prohibitec Uses. The following operations and uses shall not be permitted on
any property subject to this Declaration:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling for and removing oil , gas or other hydrocarbon substances;
e) Refining c= petroleum or of its products;
f) Commercia-: petroleum storage yards;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary in the
course of appro .ed construction pursuant to 3.0, Construction of Improvements;
h) Distillation of bones;
11 Dunping , _- sposal , incineration or reduction of garbage, sewage , offal , dead
animals or other refuse;
j) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
15-
q) Automobile , go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race tracks;
r) Retail stores or shopping centers;
s ) Commercia. service stations or gasoline stations;
t) Commercial restaurants or snack bars; or
u) Banks or savings and loans institutions.
5.3 Nuisances . No nuisance shall be permitted to exist or operate upon any lot so
as to be offensive or detrimental to any adjacent lot, or property or to its
occupants. A "nuisance" shall include, but not be limited to, any of the following
conditions:
a) Any use , excluding reasonable construction activity, of the lot which emits
dust, sweepings , dirt of cinders into the atmosphere, or discharges liquid, solid
wastes or other matter into any stream, river, or other waterway which, in the
opinion of Declarant, may adversely affect the health, safety, comfort of, or
intended use their property by persons within the area. No waste nor any
substance or -aterials of any kind shall be discharged into any public sewer
serving the s_.: iect property or any part thereof in violation of any regulation or
any public bog: having jurisdiction over such public sewer;
b) The escape or discharge of any fumes, odors, gases, vapors, steam, acids or
other substance into the atmosphere which discharge, in the opinion of Declarant,
may be detrimental to the health, safety or welfare of any person or may interfere
with the comfort of persons within the area or which may be harmful to property or
vegetation;
c) The radiation or discharge of intense glare or heat, or atomic, electro-
magnetic, microwave, ultrasonic, laser or other radiation. Any operation producing
intense glare car heat or such other radiation shall be performed only within an
16-
enclosed or screened area and then only in such manner that the glare, heat or
radiation emitted will not be discernible from any point exterior to the site or
lot upon which the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from any
individual plant or operation, exceed the decibel levels in the designated
preferred octave bands as follows:
Octave Bank Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
Hz
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-SCaiE purpcs s or-E cy,.. clef,; 13 60
permissible noise levels for the octave bands shown above are equal to an NC-50
Noise Criterion curve when plotted on the preferred frequency scale.
Reasonable noise from motor vehicles and other transportation facilities are
exempted, so long as the vehicles or other transportation facilities are not
continuously on the subject property. The operation of signalling devices and other
equipment having impulsive or non-continuous sound characteristics shall have the
following corrections applied:
Corrections
Pure Tone Content 5dB
Impulsive Character 5dB
Duration for Non-
Continuous Sounds
in Daytime Only,
1 min/hr 5dB
10 sec/10 min 10d6
17-
2 sec/10 min 15dB
The reference level for the dB values listed above is the pressure of 0.0002
microbar or 0.0002 dyne/cm2.
e) Excessive issions of smoke, steam or particulate matter. Visible e-issions
of smoke or steam will not be permitted (outside any building) which exceed
Ringlemann No. 1 on the Ringlemann Chart of the United States Bureau of (lines.
This requirement shall also be applied to the disposal of trash and waste
materials. Wind-borne dust, sprays and mists originating in plants are not
permitted.
f) Ground vibration. Buildings and other structures shall be constructed, and
machinery and e:uipment installed, and insulated on each lot so that the ground
vibration inherently and recurrently generated is not perceptible without
instruments at any point exterior to any lot.
5.4 Condition of Property. The Owner or Occupant of any lot shall , at all times,
keep it and the buildings , improvements and appurtenances thereon in a sa=e, clean
and wholesome condition and comply, at its own expense, in all respects with all
applicable eo\. _-nmental , health , fire and safety ordinances , reeula:- _ns ,
requirements and directives and the Owner or Occupant shall at regular and frequent
intervals remove at its own expense any rubbish of any character whatsoever which
may accumulate upon such lot.
5.5 Maintenance of Grounds. Each Owner shall be responsible for the maintenance
and repair of all parking areas , driveways, walkways and landscaping on his lot.
Such maintenance and repair shall include, without limitation:
a) Maintenance of all parking areas, driveways and walkways in a clean and safe
condition, including the paving and repairing or resurfacing of such areas when
necessary with the type of material originally installed therein or such substitute
18-
therefor as shall , in all respects, be equal thereto in quality, appearance and
durability; the removal of debris and waste material and the washing and sweeping
of paved areas as required; painting and repainting of striping markers and
directional si.- 3ls as required;
b) Cleaning, raintenance and relamping of any external lighting fixtures except
such fixtures ar.d may be the property of any public utility or government body; and
c) Performance of all necessary maintenance of all landscaping including the
trimming, watering and fertilization of all grass, ground cover, shrubs or trees,
removal of dead or waste materials, replacement of any dead or diseased grass,
ground cover, shrubs, or trees.
Nothing contained herein shall preclude an Owner from recovering from any person
liable therefor, damages to which such Owner might be entitled for any act or
omission to act requiring an expenditure by the Owner for the maintenance and
repair of the parking area , driveway, walkway and/or landscaping on his lot.
5.6 Remedies ':r Failure to Maintain and Repair.
a) Remedies. If any Owner shall fail to perform the maintenance and repair
required by Se::ion 5. 5, then Declarant, after fifteen Gays ' prior written notice
to such delinq„=nt Owner, shall have the right, but not the obligation, to perform
such maintenance and repair and to charge the delinquent Owner with the cost of
such work together with interest thereon at the rate of twelve percent (12%) per
annum from the date of Declarant's advancement of funds for such work to the date
of reimbursemer.t of Declarant by Owner. If the delinquent Owner shall fail to
reimburse Declarant for such costs within ten days after demand therefor, Declarant
may, at any time within two years after such advance, file for record in the Office
of County Recorder of King County, Washington a claim of lien signed by Declarant
for the amount of such charge together with interest thereon, which claim shall
19-
contain: (1) E statement of the amount unpaid and the interest accrued thereon;
2) a legal description of the lot owned by the delinquent Owner; and (3) the name
of the delinquent Owner. Such claim of lien shall be effective to establish a lien
against the ir__rest of the delinquent Owner in his lot together with interest at
twelve percent ; 12%) per annum on the amount of such advance from the date thereof,
recording fees, cost of tile search obtained in connection with such lien or the
foreclosure thereof and court costs and reasonable attorneys ' fees which may be
incurred in the enforcement of such a lien.
b) Foreclosure of Lien. Subject to the provisions of 12.0 Rights of Mortgagees ,
such a lien, wh-en so established against the lot described in said claim, shall be
prior or super= :r to any right, title, interest, lien or claim which may be or may
have been acqu- -ed in or attached to the real property interests subject to the
lien subsequent to the time of filing such claim for record. Such lien shall be
for the benefit of Declarant and m?v he enforced and foreclosed in a suit or action
brought by Dec; =rant in any court of competent jurisdiction, if brought within one
year of the f=' °ng of such claim. Any such sale provided for herein is to be
cor,ducte in -crdance with the previsions of the Civit Code of the State of
Washington app' - cable to the exercise of powers of sale in mortgages and deeds of
trust, or in any other manner permitted or provided by law. Declarant, through its
duly authorized agents, shall have the power to bid on the liened property at any
foreclosure sale and to acquire, lease, mortgage and convey the same.
c) Cure. IF a default for which a notice of claim of lien was filed is cured,
Declarant shall file or record a recision of such notice, upon payment by the
defaulting Owner of the costs of preparing and filing or recording such recision,
and other reasonable costs, interest or fees which have been incurred.
20-
d) Nonexclusive Remedy. The foregoing lien and the rights to foreclose
thereunder shall be in addition to, and not in substitution for, all other rights
and remedies which any party may have hereunder and by law, including any suit to
recover a MC'_.. judgment for unpaid assessments . If any Owner shall fail to
perform such raintenance and repair and, notwithstanding such failure, Declarant
should fail tc exercise its rights and remedies hereunder, then, any other Owner,
after fifteen 15) days ' prior written notice to Declarant and such delinquent
Owner, shall have the right, but not the obligation, to perform such maintenance
and repair and shall have the same rights and remedies with respect thereto as are
provided herein, to Declarant.
5.7 Taxes anc Assessments. If an Owner fails to pay taxes or assessments on its
lot which bete--e a lien on any portion of subject property utilized for parking,
service or loading areas, then any other Owner may pay such taxes or assessments,
together with any interest, penalties and costs arising out of or related thereto,
except while z e validity thereof is being contested by judicial or administrative
proceedings , and in such event the defaulting Owner obligated to pay such taxes or
assessments s' i l promptly reimburse the other Owner or all such taxes or
assessments, interest, penalties and costs paid or incurred by such other Owner and
until such reimbursement has been made the amount of the payment by such other
Owner shall constitute a lien on and charge against the lot of the defaulting
Owner subject and subordinate, however, to any deed of trust then outstanding
affecting said lot.
5.8 Refuse Collection Areas. All outdoor refuse collection areas shall be
visually screened so as not to be visible from neighboring property or streets. No
refuse collection areas shall be permitted between a street and the front of a
building.
21-
5.9 Repair of Buildings. No building or structure upon any lot shall be permitted
to fall into disrepair, and each such building and structure shall at all times be
kept in good condition and repair and adequately painted or otherwise finished.
5. 10 Putlic 1 : ; ities . Declarant reserves the sole right to grant consents for the
construction and operation of public utilities including, but not limited to,
street railways , interurban or rapid transit, freight railways, poles or lines for
electricity, telephone or telegraph, above or below ground conduits, and gas pipes
in and upon any and all streets now existing or hereafter established upon which
any portion of the subject property may now or hereafter front or abut. Declarant
reserves the exclusive right to grant consents and to petition the proper
authorities fc. - any and all street improvements such as grading, seeding, tree
planting, sider,alks, paving, sewer and water installation, whether it be on the
surface or subsurface, which in the opinion of Declarant are necessary on or to the
subject property. Notwithstanding the provisions of Section 3. 2, Declarant
reserves the exclusive right to approve above ground utility lines across the
subject property or any portion thereof on a temporary basis for the purpose of
construction , _
n,d such lines shall be permitted when required by a government
agency. 5. 11 Utility Lines and Antennas. No sewer, drainage or utility lines or
wires or other devices for the communication or transmission of electric current,
power, or signals including telephone, television, microwave or radio signals,
shall be constructed, placed or maintained anywhere in or upon any portion of the
subject property other than within buildings or structures unless the same shall be
contained in conduits or cables constructed, placed or maintained underground or
concealed in or under buildings or other structures. No antenna for the
transmission or reception of telephone, television, microwave or radio signals
shall be place: on any building or other improvement within the subject property
22-
unless (a) such antenna shall be so located that it cannot be seen from any point
at the ground level of the subject property or (b) the consent of Declarant shall
first be obtained. Nothing contained herein shall be deemed to forbid the erection
or use of terr:rary power or telephone facilities incidental to the construction or
repair of buildings on the subject property.
5. 12 Mechanical Equipment. All mechanical equipment, utility meters , storage
tanks, air conditioning equipment and similar items shall be located in such a
manner so not to be visible from neighboring property.
5. 13 Mineral Exploration. No portion of the subject property shall be used in any
manner to explore for or to remove any steam, heat, oil or other hydro-carbons ,
gravel , earth or any earth substances or other minerals of any kind, provided,
however, that this shall not prevent the excavation of earth in connection with the
grading or construction of improvements within the subject property. Water may be
extracted to the extent permitted by the appropriate governmental agency.
5. 14 Otner Operations and Uses. Operations and uses which are neither specifically
prohibited nor specifically authorized by this Declaration may be permitted in a
specific case if operational plans and specifications are submitted to and approved
in writing by Declarant in accordance with the procedures set forth in 3.0, of this
Declaration. Approval or disapproval of such operational plans and specifications
shall be based upon the effect of such operations or uses on other property subject
to this Declaration or upon the occupants thereof, but shall be in the sole
discretion of Declarant.
6.0 MODIFICATION AND REPEAL
6.1 Procedure. Except as otherwise provided in Section 6.2, this Declaration or
any provision hereof, or any covenant, condition or restriction contained herein,
may be terminated, extended, modified or otherwise amended, as to the whole of the
23-
subject property or any portion thereof, with the written consent of the Owners of
eight percent (80%) of the subject property, based upon the number of square feet
owned as compared to the total number of square feet subject to these conditions,
covenants anc restrictions (excluding dedicated streets) ; provide , however, that so
long as Declarant owns at least twenty percent (20%) of the property subject to
these conditions, covenants and restrictions, or for a period of fifteen (15) years
from the effective date hereof, whichever period is shorter, no such termination,
extension, modification or other amendment shall be effective until a proper
instrument in writing has been executed, acknowledged and recorded.
6.2 Modification by Declarant. For so long as Declarant owns any interest
excepting a 'easehold interest) in the subject property, or any part thereof, or
for a period cf fifteen (15) years from the effective date hereof, whichever period
is shorter, Declarant acting alone may modify or amend the provisions of 3.0, 4.0
and 5.0; provided, however, that (a) any such modification or amendment must be
within the spirit and overall intention of the development as set forth herein; (b)
prior to any such modification or amendment Declarant shall obtain the approval of
any governm,er:al agency to such modification or amendment where such
approval is necessary; and (c) any modification or amendment shall not provide for
any type of improvements or use not presently permitted by this Declaration. No
such modification or amendment shall be effective until the Owners have been given
thirty (30) days' prior written notice of the proposed change, and a proper
instrument in writing has been executed, acknowledged and recorded.
6.3 Governmental Regulation. All valid governmental enactments, ordinances and
regulations are deemed to be a part of this Declaration and to the extent that they
conflict with any provision, covenant, condition or restriction hereof, said
conflicting ccvernmental enactment, ordinance and regulation shall control and the
24-
provision, covenant, condition and restriction hereof in conflict therewith shall
be deemed (a) amended to the extent necessary to bring it into conformity with said
enactment, ordinance or regulation while still preserving the intent and spirit of
the prcvisior , :ovenant, condition or restriction; or (b) stricken here frc^ should
no amendment ccnforming to the governmental enactment, ordinance or regulation be
capable of preserving the intent and spirit of said provision, covenant, condition
or restriction.
7.0 ENFORCEME',
7.1 Abatement and Suit. The Owner of each lot shall be primarily liable, and the
Occupant, if ary, secondarily liable for the violation or breach of any condition,
covenant or restriction herein contained. Violation or breach of any condition,
covenant or re=:riction herein contained shall give to Declarant, following thirty
30) days' written notice to the Owner or Occupant in question except in exigent
circumstances , the right, privilege and license to enter upon the lot where said
violation or teach exists and to summarily abate and remove, or abate or remove,
at the expense of the Owner or Occupant thereof, any improvement, structure, thing
or condition t'Et may be or exist thereon contrary to the intent and mear-rg of the
provisions hereof, or to prosecute a proceeding at law or in equity against the
person or persons who have violated or are attempting to violate any of these
covenants, conditions or restrictions to enjoin or prevent them from doing so, to
cause said violation to be remedied, or to recover damages for said violation. No
such entry by Declarant or its agents shall be deemed a trespass, and neither
Declarant nor its agents shall be subject to liability to the Owner or Occupant of
said lot for such entry and any action taken to remedy or remove a violation. The
cost of any abatement, remedy or removal hereunder shall be a binding personal
obligation on =_ny Owner or Occupant in violation of any provision of this
25-
Declaration, as well as a lien (enforceable in the same manner as a mortgage) upon
the lot in question. The lien provided for in this section shall not be valid as
against a bona fide purchaser or mortgagee for value of the lot in question unless
a suit to en': -ce said lien shall have been filed in a court of record in King
County, Washircton, prior to the recordation of the deed or mortgage conveying or
encumbering the lot in question to such purchaser or mortgagee, respectively.
7.2 Right of Entry. During reasonable hours and upon reasonable notice, and
subject to reasonable security requirements , Declarant, or its agents, shall have
the right to enter upon and inspect any lot and the improvements thereon covered by
this Declaration for the purpose of ascertaining whether or not the provisions of
this Declarani have been or are being complied with , and neither Declarant nor
its agents sha- 1 be deemed to have committed a trespass or other wrongful act by
reason of such entry or inspection.
7.3 Deemed to Constitute A Nuisance. The result of every act or omission whereby
any condition , covenant or restriction herein contained is violated in whole or in
part is hereb, declared to be and to constitute a nuisance, and every remedy
allowed by la: _r in equity against an Owner or Occupant either public cr private ,
shall be applicable against every such result and may be exercised by Declarant.
7.4 Attorney's Fees. In any legal or equitable proceeding for the enforcement of
this Declaration or any provision hereof, whether it be an action for damages ,
declaratory relief or injunctive relief, or any other action, the losing party or
parties shall pay the attorney fees of the prevailing party or parties , in such
reasonable amount as shall be fixed by the court in such proceedings or in a
separate action brought for that purpose. The prevailing party shall be entitled
to said attorney's fees even though said proceeding is settled prior to judgment.
26-
All remedies provided herein or at law or in equity shall be cumulative and not
exclusive.
7.5 Failure to Enforce is No Waiver. The failure of Declarant to enforce any
requirerrent, restriction or standard herein contained shall in no event be deemed
to be a waiver of the right to do so thereafter or in other cases, nor of the right
to enforce any other restriction.
8.0 ASSIGNME%-
Any and all of the rights, powers and reservations of Declarant herein contained
may be assignee to any person, corporation or association which will assume the
duties of Declarant pertaining to the particular rights, powers and reservations
assigned, and upon any such person, corporation or association evidencing its
consent in wr= .ing to accept such assignment and assume such duties , he or it
shall , to the extent of such assignment, have the same rights and powers and be
subject to the same obligations and duties as are given to and assumed by Declarant
herein. If a: any time Declarant ceases to exist and has not made such an
assignment, a successor to Declarant may be appointed in the same manner as this
Declaration r be modified or amended under Section E. 1 . Any assignment or
appointment ma:e under this article shall be in recordable form and shall be
recorded.
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE
Every person or entity who now or hereafter owns, occupies or acquires any right,
title or interest in or to any portion of the subject property is and shall be
conclusively deemed to have consented and agreed to every covenant, condition and
restriction contained herein, whether or not any reference to this Declaration is
contained in the instrument by which such person acquired an interest in the
subject proper: '.
27-
10.0 WAIVER
Neither Declarant nor its successors or assigns shall be liable to any Owner or
Occupant of the subject property by reason of any mistake in judgment, negligence,
nonfeasance , action or inaction or for the enforcement or failure to enforce any
provision of this Declaration. Every Owner or Occupant of any of said property by
acquiring its interest therein agrees that it will not bring any action or suit
against Declarant to recover any such damages or to seek equitable relief because
of same.
11.0 RUNS WITH LAND
All covenants , conditions, restrictions and agreements herein contained are made
for the direct , mutual and reciprocal benefit of each and every lot of the subject
property; sha' i create mutual equitable servitudes upon each lot in favor of every
other lot; shall create reciprocal rights and obligations between respective Owners
and Occupants of all lots and privity of contract and estate between all grantees
of said lots , their heirs , successors and assigns ; arc shall , as to the Owner and
Occupant of each lot, his heirs, successors and assigns , operate as covenants
running with the land, for the benefit of all other lots, except as provided
otherwise herein.
12.0 RIGHTS OF MORTGAGEES
No breach of any covenant, condition or restriction herein contained, or any
enforcement thereof, shall defeat or render invalid the lien of any mortgage or
deed of trust now or hereafter executed upon the subject property or a portion
thereof, provided, however, that if any portion of said property is sold under a
foreclosure c= any mortgage or under the provisions of any deed of trust, any
28-
purchaser at such sale and its successors and assigns shall hold any and all
property so purchased subject to all of the covenants, conditions and restrictions
contained in this Declaration.
13.0 CAPTIONS
The captions of articles and sections herein are used for convenience only and are
not intended to be a part of this Declaration or in any way to define, limit or
describe the scope and intent of the particular article or section to which they
refer.
14.0 EFFECT OF 1VALIDATION
If any provision of this Declaration is held to be invalid by any court, the
invalidity of such provision shall not effect the validity of the remaining
provisions hereof.
DECLARANT
J.A.G./Renton Properties Associates
A Washington Partnership
By: Alterra Corporation, a Washington
Corporation, General Partner
By:
By:
By:
29-
NimftmCel..0....0r...- 2. s m.••L:+.:'•.'!,,
1Ih1'h/ui
PI
tiipyr
1*
1.&.:::"
Ir'44,4f4e: iel-
t .;;.1 •VgWV:-.7,7-. -- ..-. :, if//I" At .
f %r. .. r C .,,RIVER t
Ma tee'. r0'
i• • 1" /
G N s s OGY- .,.ARK' -r --... .I —-
e jlA-
dik'
t - 44 .14‘
4Z-:Z
lii • rr4-'
r Y _410 N I ///
lye""".-- 1 4 ft
41
LEGAL DESCRIPTIONS
PARCEL A
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M. ,
in King County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat recorded in
Volume 12 of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Brownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092 .82 feet; thence N68'03 ' 54"E 224 .45 feet;
thence N8C'04 '48"E 232.00 feet ; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence N42'06'08"W 87. 16 feet; thence S80'04' 48"W 232 .00 feet ; thence
N12'O1 '00"W 40.75 feet; thence S.72:59 '00"W 133.01 feet to a point of curve; thence
along a curve to the right having a radius of 230.00 feet , through a central angle
of 27'47' 31" an arc distance of 111 .56 feet to a point of compound curvature; the
center of said curve bears N15'46' 31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48 ' 19" an arc distance of 197.73 feet; thence
582415'00'V 67.68 feet; thence S31'32'22' W 71 .06 feet; thence N81'11 '35"W 193.00
feet; thence S82'15'00'V 92.99 feet; thence S35'29'30"W 143.18 feet; thence
N74'44 '00"W 84.85 feet; thence S60'16'00"W 67.00 feet; thence S12'16'00"E 97.3S
feet to the north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence 568'06'46"w along said
northerly line 375.53 feet to the northerly line of a tract of land described in
EXHIBIT 8 in said Agreement; thence northwesterly along said •northerly line on a
curve to the left, the center which bears west 195.01 feet, thru a central angle
of 78'41 '24", an arc distance of 267.83 feet; thence N78'41 '24"W along said
northerly line 180.00 feet to an angle point in said northerly line; thence
N33'00'54'V along said northerly line 109.47 feet to the south line of the
Burlington Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears S39'23'00"E 1853.00 feet; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01 '59", an arc
distance of 65.75 feet to a point of compound curv,e; thence continuing along
EXHIBIT A: 1 of 5
said south line on a curve to the right the center of which bears S37'21 '01"E
having a radius of 10543.00 feet, an arc distance of 186. 51 feet through a central
angle of 01'00' 49" to a point of compound curve; thence continuing along said south
line on a curve to the right , the center of which bears 536'20 ' 12"E having a radius
of 1657.1)0 feet an arc distance of 193.93 feet through a central angle of 06'42 '20"
to a point of compound curve; thence continuing along said south line on a curve to
the right:, the center of which bears S29'37'52"E having a radius of 6738.00 feet ,
an arc d stance of 197.76 feet through a central angle of 01'40' 54" to a point of
compound curve; thence continuing along said south line on a curve to the right ,
the center of which bears S27'56 ' 58"E having a radius of 1768 .00 feet , an arc
distance of 194. 45 feet through a central angle of 06' 18 '06" to a point of compound
curve; thence continuing along said south line on a curve to the right , the center
of which bears S21'38 '52"E having a radius of 8603 . 00 feet , an arc distance of
204.54 feet through a central angle of 01 '21 ' 44" to a point of compound curve;
thence continuing along said south line on a curve to the right , the center of
which bears S20' 17 '08"E having a radius of 1922. 10 feet, an arc distance of 178. 79
feet through a central angle of 05' 19 ' 46" to a point of compound curve on the east
line of said Charles Brownell Donation Land Claim No. 41 ; thence continuing along
said south line on a curve to the right , the center of which bears 514'57'22"E
having a radius of 2814 .93 feet , an arc distance of 659 .42 feet through a central
angle of 13'25' 19" to a point of compound curve; thence continuing along said
south line on a curve to the right , the center of which bears 501'32 '03"E having
a radius of 1165 .09 feet , thru a central angle of 37' 39 ' 19", an arc distance of
765. 71 feet to a point which bears N41 '28 ' 10"E from the TRUE POINT OF BEGINNING;
thence 536' 19 '35"Y 188.63 feet to a point on a curve , the center which bears
S36' 13 ' 35'111' 967. 46 feet ; thence northwesterly along said curve to the left , thru
a central angle of 4'39'32", an arc distance of 78.67 feet ; thence S38'54 '22"W
451 .74 feet to a point on a curve, the center which bears 543'36'23"V 170.00 feet ;
thence southeasterly along said curve to the right , thru a central angle of
3. 08 ' 37", an arc distance of 9 .33 feet ; thence S43' 15 ' 00"E 20 . 74 feet ; tnence
521'21 ' 3; " i 44 .74 feet to the TRUE POINT OF BEGINNING .
PARCEL B- 1
That portion of the south half of Section 13, Township 23 North, Range 4 East, Y.K.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Irownell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence S68'03'54"W 351 . 11 feet to
the TRU'f POINT OF BEGINNING; thence N68'03'54"E 575.56 feet; thence N12'O1 '00"V
40. 75 feet; thence 577'59'00Y 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27'47' 31" an arc distance of' 111. 56 feet to a point of compound curvature; the
center of said curve bears 1115'46'31"E 160.00 feet; thence along said curve to the
right , through a central angle of 70'48' 19" an arc distance of 197.73 feet; thence
S82'15'00 'V 67.68 feet; thence 531'32 '22"W 71 .06 feet; thence N81'll ' 35"1r 193.00
feet; thence 02'15'00W 92.99 feet; thence S35'29'30"V 143. 18 feet; thence
0474'44'040 'V 84. 85 feet; thence S60'16'00'11 67. 00 feet; thence $12' 16'00"E 97. 35
feet; thence N68'06'46"E 53. 79 feet to a point which boars N72'04 '34"W from the
TRUE POINT OF BEGINNING; thence S72'04 '34"E 389. 92 feet to the TRUE POINT OF
BFG I NNI NG.
EXHIBIT A: 2 of 5
ARCE:L B-2
That portion of the south half of Section 13, Township 23 Korth, Range 4 East , V.M.
In King County, Washington and of Junction Addition to the City of Seattle, according
to plat recorded in Volume 12 of Plats, page 75, records of said King County, and cf
C . E . Brcinel1 's Donation Claim No. 41 described as follows :
Beginnirg at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224 .45 feet to
the TRUE POINT OF BEGINNING; thence S68'03'54"W 575.56 feet ; thence 1472'04 '34'V
389.52 feet; thence 568'06'46'V 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left , having a radius of 60.00 feet , thru a central
angle of 126' 52 ' 10", an arc distance of 132. 86 feet; thence N53'07 '50"E 199. 18 feet
to a point of curve; thence on a curve to the right , having a adius of 200.00 feet
thru a central angle of 53'55'30", an arc distance of 188.47 feet ; thence 572'52 '40"E
290. 00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08' 51", an arc distance of 134.60 feet ; thence
1467'58'25"E 380.92 feet; thence N31 '27 ' 12"E 204.86 feet to the TRUE POINT OF BEGINNING .
PARCEL B-3
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
in King county, Washington; and of Junction Addition to the City of Seattle , according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County ,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C .E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26,
Renton Snore Lands 2nd Supplemental Maps 1958 , described as follows :
6eginninl at the south quarter corner of said Section .13; thence N00'58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to a point
hereinafter called "Point A"; thence S68'03 ' 54'ti' 575.56 feet; thence N72'0k '301/
389. 92 feet; thence S68'06''6"W 429.32 feet to the TRUE POINT OF BEGINNING ; thence
south 85. 47 feet to a point of curve; thence on a curve to the left , having a radius
of 60. 00 feet, thru a central angle of 126'52 ' 10", an arc distance of 132 .86 feet ;
thence N53'07 '50'1 199. 18 feet to a point of curve; thence on a curve to the right ,
having a radius of 200. 00 feet thru a central angle of 53'59 '30", en arc distance cf
188.47 feat; thence S72'52' 40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197 .00 feet , thru a central angle of 39'08' 51", an arc
distance of 134.60 feet ; thence N67'58'29"E 380.92 feet; thence N31'27 ' 12"E 204 .86
feet to aforementioned "Point A"; thence N80'01i'48"E 232.00 feet; thence S42'06'08"E
215. 00 feet; thence 531'14'05"W 358.99 feet; thence Sh7.10'0ll"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88'15'00"V 180. 65 feet; K33'07 '25"W 154.51 feet; N27'21 '32"E 387 .32
feet; N83' 17'25"W 171 . 17 feet; S46'22 '22"V 324.66 feet; S72'37'52'V 458.93 feet;
N7 O'S4'02"V 354.53 feet; 573'56'01'v 130.08 feet; and S41' 16'07"W 316. 18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears S39'41 '35"W 627.46 feet thru a central angle of
39'1'1 '35 ', an arc distance of 434.70 feet; thence north along said north boundary
25.00 fest; thenci west along said north boundary 245.69 feet; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence S78'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right , having a radius of 195.01 feet , thru a central
angle of 78'41 '24", an arc distance of 267.83 feat to the TRUE POINT OF BEGINNING .
EXHIBIT A: 3 of 5
PARCEL B-4
That portion of the southwest quarter of Section 13, Township 23 North, Range 4 East ,
V.M. in King County, tashington and that portion of Junction Addition to City of
Seattle, according to plat recorded In Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. erownell ' s Donation Claim No. 41 , described
as follows:
Deglnnin; at the south quarter corner of salt, Section 13 ; thence N00'58 '28"1 along
the north-south ce.nteriine thereof 884.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1958; thence 572'37 '52"V 382.60 feet to
an angle point in the south line of said Tract 26; thence K7045-F1021'V 354.53 feet to
an angle point in the south line of said Tract 26; thence S73'56'01'V 130.08 feet to
an angle point in the south line of said Tract 26; thence 541' 16'07'V along the south
line of said Tract 26 a distance of 316. 18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears S39'41 '39'V 627.46 feet, thru a central angle of 39'41 '33"; an arc distance of
14 3/4. 7 0 feet; t henc a north along said nor t h boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156. 13
feet ; thence N50'39' 19"E 330.21 feet; thence N33'00'54"1/ 109.47 feet to the southerly
margin or the Burlington Northern Railroe4 Right-of-Way, said point being a point on
a curve, the center which bears 539'23 '00"E 1853 .00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3'59' 19", an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
S43'22' I3"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32". an arc distance of 197.57 feet to a point
of tangelcy; t`.ence S3'49' 0911i' along said south margin 271 .00 feet to a point of
curve; tience on a curve to the right along said southerly margin, having a radius
of 1571 . )0 feet , thru a central angle of 7'32 '02", an arc distance of 206. 57 feet to
a point of compound curve , the center which bears N38'38'49"W 727.00 feet ; thence
westerly along said southerly margin and curve to the right , thru a central angle of
16' 55 '35", an arc distance of 214.77 feet to a point of compound curve , the center
which bears N21 ' 43 ' 14"Y 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11'24 '08", an arc distance of 209.95
feet to A point of compound curve; the center which bears 1410' 19'06"W 696.00 feet ;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25" an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Rued; thence 534' 18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Numbrrr 6607786; thence N74'13Y19"E along said north boundary '443 .31 feet ; thence
N59'53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT Of BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the s'wtheast quarter of Section 13, Township 23 North, Range 4 East , W.M. ,
and that portion of the southwest quarter of Section 18, Township 23 North , Range
4 East, '4.M. , all in King County, Washington described as follows :
EXHIBIT A: 4 of 5
beginning at the south quarter cornr;r oT said Section tj; N00'58 '28"E along
the north-south centerline Thereof 1t92.82 feet; thence N48'U3'54"E 224.45 feet ;
thence N80'04 ' 48"E 232 .00 feet; thence 542'06'08"E t7. 16 feat to the TRUE POINT OF
BEGINNING; thence 542'06'08"E 127.84 feet ; thence 531' 14 '05'V 358.99 feet ; thence
S47' 10'01"E 71 . 34 feet ; thence east 114.27 feet ; thence south 68.91 feet to the
south line of said Tract 25; thence S88' 15'00"E along said south lire and the
north line of the south 650.00 feet of the southeast quarter of said Section 13. a
distance: of 2080.76 feet to the east line of said Section 13; thence S89' 10'25"E
along tie north line of the south 650.00 feet of the southwest quarter of said
Section 18, a distance of 81 . 57 feet to the south line of the Burlington Northern
Railroad Right-of-Way; thence N71'29 '03"V along said south line 85. 52 feet to the
east line of said Section 13; thence 1(71'29'03"W along said south line 826.56
feet to a point of curve; thence on a curve to the right along said south line ,
the center which bears N18'30'57"E 1005.37 feet , thru a central angle of 33'54 '00",
an arc distance of 594.84 feet; thence N37'35 '03"W along said south lime 308.70
feet to a point of curve; thence on a curve to the left, along said south line ,
the center which bears S52'24 '57"I 1165.09 feet , thru a central angle of 16' 17 '41",
an ar: distance of 331 .35 feet to a point which bears 041'28' 10"E frail the TRUE
POINT OF BEGiMtMIiMG; thence 536'19 '35N 188.63 feet to a point on a curve , the
center whic.h bears S36'19 '35"W 967.46 feet ; thence northwesterly along said curve
to tPe left, thru a central angle of 4'39' 32", an arc distance of 78.67 feet ;
thence S38'54'221%1 451 .74 feet to a point on a curve, the canter which bears
S143' 36'23"W 170 .00 feet; thence southeasterly along said curve to the right , thru
a central angle of 3'08'37", an arc distance of 9. 33 feet ; thence S43' 15 '00"t
20.74 feet ; thence 527'21 ' 32"W 44 .74 feat to the TRUE POINT OF BECIN INtG.
EXHIBIT A: 5 of 5
Ir, CITY OF RENTON
AUG 3..•'0 1984,
BUILDING/ZONING DEPT.
41311ANk''
1 1_MICROFILMED
VARIANCE APPLICATION PROCEDURE
TO LAND USE HEARING EXAMINER
FILING DEADLING
HEARING DATE
REQUIREMENTS FOR FILING VARIANCE APPLICATION:
a) Six(6) copies of completed Application Form.
b) Six(6)copies Plot Plan, Scale 1"=10'.
c) Six(6) copies Vacinity Maps, Scale 1"=200'.
d) Six(6)copies of Justification.
e) Photographs(optional).
f) Filing Fee of$ 150.00 .
II. PREPARATION OF APPLICATION: Print legibly or type answer to each question. If the
question does not apply, please so state. THIS IS AN OFFICIAL DOCUMENT. PLEASE
KEEP IN GOOD ORDER. The affidavits must be signed before a Notary Public by the
OWNER or OWNERS or the CONTACT PURCHASER of the property. If signatures of
persons other than the owners of property making the application are offered in support
of or in opposition to the application, they may be received as evidence of their opinion
on the pending issue, but they shall in no case infringe upon the free exercise of the
powers vested in the City of Renton.
III. PLOT PLANS: Show the exact dimensions of the property at an approximate engineer's
scale (1'=10'), indicating all existing and proposed buildings, access points, off-street
parking areas with each individual stall shown, fencing and any other information that
will illustrate your proposal. The plot plans must be in ink or blue line prints on a good
grade of paper.
IV. VICINITY MAPS: Show your property in relation to other property and streets in the area
to a scale of l'=200'.
V. PHOTOGRAPHS OF THE PROPERTY: Photographs may be submitted to illustrate the
subjects under discussion and are suggested as exhibits with the application.
VI. LEGAL DESCRIPTION OF THE PROPERTY: A correct legal description shall be the
responsibility of the applicant. The Building & Zoning Department will not be held
accountable for any errors in the legal description submitted.
VII. JUSTIFICATION: The Hearing Examiner and/or Board of Adjustment must find after
conducting the public hearing that the following conditions specified below have been
found to exist:
a) That the applicant suffers undue hardship and the variance is necessary because
of special circumstances applicable to subject property, including size, shape,
topography, location or surroundings of the subject property, and the strict
application of the Building & Zoning Code is found to deprive subject property
owner of rights and privileges enjoyed by other property owners in the vicinity
and under identical classification.
b) That the granting of the variance will not be materially detrimental to the public
welfare or injurious to the property or improvements in the vicinity and zone in
which subject property is situated.
c) That approval shall not constitute a grant of special privilege inconsistent with
the limitation upon uses of other properties in the vicinity and zone in which the
subject property is situated.
d) That the approval as determined by the Hearing Examiner or Board of
Adjustment is a minimum variance that will accomplish the desired purpose.
The applicant must submit a written statement addressing and justifying the above
mentioned four conditions.
City of Renton
Building & Zoning Department
March, 1983
0105Z
Die to the desire of the applicant to efficiently provide parcels of land of
approximately three-quarters of an acre in size and to be in compliance with the
cities sub division code, a cul-de-sac of 2500' in length is necessary. A
cul-de-sac of lesser length or a loop road would cause undue hardship on the
applicant by reducing the parcels to a size of undevelopable proportions.
TFe parcel sizes currently proposed are developable within the current zoning
and prcposed land usage.
1-Fe applicant feels the above statements provide ample background and
justification to warrant a variance of the cul-de-sac length to provide that
be extended to 2500' in length.
LEGAL DESCRIPTION
LEGAL DESCRIPTIONS
PARCEL. A
That portion of the south half of Section 13, Township 23 North, Range 4 East, Y.M. ,
in King County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat .recorded in
Volume 12 of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Brownell 's Donation Claim No. 41, described as follows:
Beginning at the south quarter corner of said Section 13; thence 1400'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet;
thence N80'04'48"E 232.00 feet; thence S42'06'08"E 87.16 feet to the TRUE POINT OF
BEGINNING; thence N42'06'08"W 87.16 feet; thence S80'04'48"W 232.00 feet; thence
N12'01 '00"5.! 40.75 feet; thence SE 59'00"W 133.01 feet to a point of curve; thence
along a curve to the right having a radius of 230.00 feet, through a central angle
of 27'47'31" an arc distance of 111 .56 feet to a point of compound curvature; the
center of said curve bears N15'46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48'19" an arc distance of 197.73 feet; thence
S82'15'00"14 67.68 feet; thence S31'32'22'14 71.06 feet; thence N81'11 '35"W 193.00
feet; thence S82'15'00'V 92.99 feet; thence S35'29'30"W 143.18 feet; thence
N74'44'00"W 84.85 feet; thence S60'16'00"W 67.00 feet; thence Sl2'16'00"E 97.35
feet to the north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence 568'06'46"W along said
northerly line 375.53 feet to the northerly line of a tract of land described In
EXHIBIT 8 in said Agreement; thence northwesterly along said northerly line on a
curve to the left, the center which bears west 195.01 feet, thru a central angle
of 78'41 '24", an arc distance of 267.83 feet; thence N78'41 '24"W along said
northerly line 180.00 feet to an angle point In said northerly line; thence
N33'00'54"W along said northerly line 109.47 feet to the south line of the
Burlington Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears S39'23'00"E 1853.00 feet; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01'59", an arc
distance of 65.75 feet to a point of compound cure; thence continuing along
said south line on a curve to the right the center of which bears S37'21 '01"E
having a radius of 10543.00 feet, an arc distance of 186.51 feet through a central
angle of 01'00'49" to a point of compound curve; thence continuing along said south
line on a curve to the right, the center of which bears S36'20'12"E having a radius
of 1657.00 feet an arc distance of 193.93 feet through a central angle of 06'42'20"
to a point of compound curve; thence continuing along said south line on a curve to
the right, the center of which bears S29'37'52"E having a radius of 6738.00 feet,
an arc distance of 197.76 feet through a central angle of 01'40'54" to a point of
compound curve; thence continuing along said south line on a curve to the right,
the center of which bears S27'56'58"E having a radius of 1768.00 feet, an arc
distance of 194.45 feet through a central angle of 06'18'06" to a point of compound
curve; thence continuing along said south line on a curve to the right, the center
of which bears S21'38'52"E having a radius of 8603.00 feet, an arc distance of
204.54 feet through a central angle of 01'21'44" to a point of compound curve;
thence continuing along said south line on a curve to the right, the center of
which bears S20'17'08"E having a radius of 1922. 10 feet, an arc distance of 178.79
feet through a central angle of 05'19'46" to a point of compound curve on the east
line of said Charles Brownell Donation Land Claim No. 41 ; thence continuing along
said south line on a curve to the right, the center of which bears S14'57'22"E
having a radius of 2814.93 feet, an arc distance of 659.42 feet through a central
angle of 13'25'19" to a point of compound curve; thence continuing along said
south line on a curve to the right, the center of which bears 501'32'03"E having
a radius of 1165.09 feet, thru a central angle of 37'39' 19", an arc distance of
765.71 feet to a point which bears N4l'28' 10"E from the TRUE POINT OF BEGINNING;
thence S36'19'35"W 188.63 feet to a point on a curve, the center which bears
S36'l9'35"id 967.46 feet; thence northwesterly along said curve to the left, thru
a central angle of 4'39'32", en arc distance of 78.67 feet; thence 53B'54'22'W
451 .74 feet to a point on a curve, the center which bears 543'36'23"W 170.00 feet;
thence southeasterly along said curve to the right, thru a central angle of
3'08'37", an arc distance of 9.33 feet; thence S43'15'00"E 20.74 feet; thence
S27'21 '32"W 44.74 feet to the TRUE POINT OF BEGINNING.
F'Allt:tL C- 1
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded In Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell's Donation Claim No. 41, described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence S68'03'54"W 351.11 feet to
the TRUE POINT OF BEGINNING; thence N68603'S4"E 575.56 feet; thence N12'01 '00"W
40.75 feet; thence S77'59'00"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27.47'31" an arc distance of'111.56 feet to a point of compound curvature; the
center of said curve bears N15'46'31"E 160.00 feet; thence along said curve to the
right, through a central angle of 70'48'19" an arc distance of 197.73 feet; thence
S82'15'0O"V 67.68 feet; thence S31'32'22"W 71.06 feet; thence N81'11'35"W 193.00
feet; thence 582'15'00"W 92.99 feet; thence S35'29'30"W 143.18 feet; thence
N74.44'0(PW 84.85 feet; thence 560'16'00"W 67.00 feat; thence 512'16'00"E 97.35
feet; thence N68'06'46"E 53.79 feet to a point which bears N72'04'34"W from the
TRUE POINT OF BEGINNING; thence S72'04'34"E 389.92 feet to the TRUE POINT OF
BEGINNING.
PARCEL B-2
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington and of Junction Addition to the City of Seattle, according
to -plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brownell's Donation Claim No. 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence NOO'58'28"E along "
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence 568'03'51,"W 575.56 feet; thence N721'04'34"W
389.92 feet; thence 568'06'46"V 429.32 feet; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet, thru a central
angle of 126'52'10", an arc distance of 132.86 feet; thence N53607'50'1 199.18 feet
to a point of curve; thence on a curve to the right, having a radius of 200.00 feet
thru a central angle of 53'59'30", an arc distance of 188.47 feet; thence 572'52'40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08'51", an arc distance of 134.60 feet; thence
N67'58'29"E 380.92 feet; thence N31'27'12"E 204.86 feet to the TRUE POINT OF BEGINNING.
PARCEL 8-3
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim Mo. 41 , and of Tracts 25 and 26,
Renton Shore lands 2nd Supplemental Maps 1958, described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet to a point
hereinafter called "Point A"; thence S68'03'54"W 575.56 feet; thence N72'04'34'54
389.92 feet; thence 568'06.46"V 429.32 feet to the TRUE POINT OF BEGINNING; thence
south 85.47 feet to a point of curve; thence on a curve to the left, having • radius
of 60.00 feet, thru a central angle of 126'52'10", an arc distance of 132.86 feet;
thence N53'07'50"E 199.18 feet to a point of curve; thence on a curve to the right,
having a radius of 200.00 feet thru a central angle of 53'59'30", an arc distance of
188.47 feet; thence S72'52'40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of )97.00 feet, thru a central angle of 39'08'51", an arc
distance of 134.60 feet; thence N67.58'29"E 380.92 feet; thence N31'27'12"E 204.86
feet to aforementioned "Point A"; thence N80'04'48"E 232.00 feet; thence 542'06'08"E
215.00 feet; thence 531'14'05"W 358.99 feet; thence 541'10'01"E 71.34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88'15'00"V 180.65 feet; I133'07'25"W 154.51 feet; N27'21'32"E 387.32
feet; N83'l7'25"W 171 .17 feet; 546'22'22"W 324.66 feet; 572'37'52"W 458.93 feet;
N70'54'02"W 354.53 feet; 873'96'01'W 130.08 feet; and S41'16'07"V 316.18 feet to the
north boundary of • tract of land deeded to King County and described under King
County Receiving Number 6607786; thence westerly along said north boundary on • curve
to the left, the center which bears 539'41 '39V 627.46 feet thru a central angle of
39'41'39", an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156.13
feet; thence N50'39'19"E 330.21 feet; thence S78'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet, thru a central
angle of 78'41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
r r rct_.t t_ d-'+
That portion of the southwest quarter of Section 13, Township 23 North, Range 4 East,
V.M. in King County, Washington and that portion of Junction Addition to City of
Seattle, according to plat recorded in Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. Erownell's Donation Claim No. 41, described
as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1958; thence 572'37'52"W 382.60 feet to
an angle point in the south line of said Tract 26; thence K70'0'02"11 354.53 feet to
an angle point in the south line of said Tract 26; thence S73'56'0l"sI 130.08 feet to
an angle point in the south line of said Tract 26; thence 541'16'07"W along the south
line of said Tract 26 a distance of 316.18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence westerly along said north boundary on a curve to the left, the center which
bears 539'41'39"W 627.46 feet, thru a central angle of 39'41'39"; an arc distance of
434.70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156.13
feet; thence N50'39'19"E 330.21 feet; thence 1433'00'54"W 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of-Way, said point being a point on
a curve, the center which bears 539'23'00"E 1853.00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3'59'19", an arc
distance of 129.00 feet to a polntof compound curve, the center of said curve bears
543'22'19"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32", an arc distance of 197.57 feet to a point
of tangency; thence 543'49'09"W along said south margin 271.00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571.00 feet, thru a central angle of 7'32'02", an arc distance of 206.57 feet to
a point of compound curve, the center which bears N38'38'49"W 727.00 feet; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16'55'35", an arc distance of 214.77 feet to a point of caepound curve, the center
which bears N21.43'140W 1055.00 feet; thence westerly along said southerly margin
and curve to the right, thru a central angle of 11'24'08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10'19'06'51 696.00 feet;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence 534'18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Number 6607786; thence N74'13r19"E along said north boundary 443.31 feet; thence
N59'53'47"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the southeast quarter of Section 13, Township 23 North, Range 4 East, W.M.,
and that portion of the southwest quarter of Section 18, Township 23 North, Range
4 East, W.M., all in King County, Washington described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet;
thence N80'04'48"E 232.00 feet; thence S42'06'08"E 87.16 feet to the TRUE POINT OF
BEGINNING; thence 542'06'08"E 127.84 feet; thence 531'14'05'V 358.99 feet; thence
S47'10'01"E 71 .34 feet; thence east 114.27 feet; thence south 68.91 feet to the
south line of said Tract 25; thence S88'15'00"E along said south line and the
north line of the south 650.00 feet of the southeast quarter of said Section 13, a
distance of 2080.76 feet to the east line of said Section 13; thence S89'10'25"E
along the north line of the south 650.00 feet of the southwest quarter of said
Section 18, a distance of 81.57 feet to the south line of the Burlington Northern
Railroad Right-of-Way; thence N71'29'031 1 along said south line 85.52 feet to the
east line of said Section 13; thence N71'29'03"W along said south line 826.56
feet to a point of curve; thence on a curve to the right along said south line,
the center which bears N18'30'57"E 1005.37 feet, thru a central angle of 33'54'00",
an arc distance of 594.84 feet; thence N37'35'03"W along said south line 308.70
feet to a point of curve; thence on a curve to the left, along said south line,
the center which bears S52'24'57"W 1165.09 feet, thru a central angle of 16'17'41",
an arc distance of 331.35 feet to a point which bears N41'28'10"E from the TRUE
POINT OF BEGINNING; thence 536'19'35"W 188.63 feet to a point on • curve, the
center which bears S36'19'35"W 967.46 feet; thence northwesterly along said curve
to the left, thru a central angle of 4'39'32", an arc distance of 78.67 feet;
thence S38'54'22"W 451.74 feet to a point on • curve, the canter which bears R V.S1.3'36'23"W 170.00 feet; thence southeasterly along said curve to the right, ihru ,..;.. N
a central angle of 3.08'37", an arc distance of 9.33 feet; thence S43'15'00"E t_'
20.74 feet; thence S27'21 '32"W 44.74 feet to the TRUE POINT OF BEGINNING.
144
EIS CHECKLIST
CITY OF RENTON, WASHINGTON
ENVIRONMENTAL CHECKLIST FORM
FOR OFFICE USE ONLY
Application No.
Environmental Checklist No.
PROPOSED, date: FINAL, date:
Declaration of Significance Declaration of Significance
Declaration of Non-Significance Declaration of Non-Significance
COMMENTS:
Introduction The State Environmental Policy Act of 1971, Chapter 43.21C, RCW, requires
all state and local governmental agencies to consider environmental values both for their
own actions and when licensing private proposals. The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment.
The purpose of this checklist is to help the agencies involved determine whether or not a
proposal is such a major action.
Please answer the following questions as completely as you can with the information
presently available to you. Where explanations of your answers are required, or where
you believe an explanation would be helpful to government decision makers, include your
explanation in the space provided, or use additional pages if necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant to the answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
The following questions apply to your total proposal, not just to the license for which
you are currently applying or the proposal for which approval is sought. Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
of the agencies which will be involved to complete their environmental review now, with-
out duplicating paperwork in the future.
NOTE: This is a standard form being used by all state and local agencies in the State
of Washington for various types of proposals. Many of the questions may not apply to
your proposal. If a question does not apply, just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
I. BACKGROUND
1. Name of Proponent ALTERRA CORPORATION
2. Address and phone number of Proponent:
710 CHERRY ST.
SEATTLE, WA 98104 (206) 382-0333
3. Date Checklist submitted July, 1984
4. Agency requiring Checklist City of Renton Building & Zoning Dept.
5. Name of proposal, If applicable:
Blackriver Technology Park
6. Nature and brief description of the proposal (including but not limited to its
size, general design elements, and other factors that will give an accurate
understanding of its scope and nature):
The general site consists of over 70 acres. An area of over 51 acres
shall be filled with approximately 425,000 cubic yards of material.
Fill shall serve as base for future office/manufacture structure and
an access road. For detailed information about future development see
draft and final EIS "Blackriver Office Park" April 1981 & 82.
2-
7. Location of proposal (describe the physical setting of the proposal, as well
as the extent of the land area affected by any environmental impacts, including
any other information needed to give an accurate understanding of the environ-
mental setting of the proposal):
The site is located south of the Burlington Northern Railroad right-of-way.
To the east is the Earlington Woods P.U.D. and to the south is the
Washington Technical Park.
8. Estimated date for completion of the proposal:
Filling shall be completed as suitable material becomes available.
9. List of all permits, licenses or government approvals required for the proposalfederal, state and local--including rezones):
Grading and filling permit City of Renton
10. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain:
Yes: Water, sanitary sewer and storm drainage utilities shall be
installed as well as Blackriver Blvd. (access road). Future structures
shall be constructed.
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
Yes: SCS is currently using the site as a excaved soils stockpile.
12. Attach any other application form that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
See Attached: Master Application Form
II. ENVIRONMENTAL IMPACTS
Explanations of all "yes" and "maybe" answers are required)
1) Earth. Will the proposal result in:
a) Unstable earth conditions or in changes in geologic
substructures? X
Yam- TANa w
b) Disruptions, displacements, compaction or over-
covering of the soil? X
YES MAYBE NO
c) Changeein topography or ground surface relief
X0
YT MAYBE Fb—
d) The destruction, covering or modification of any
unique geologic or physical features? X
Yrr- RUEB N-
e) Any increase in wind or water erosion of soils,
either on or off the site? X
YES MAYS NO
f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the Xbedoftheoceanoranybay, inlet or lake?
WU—
Explanation: B: The proposal is to fill w/425,000 CY overEsexiRA—
elevations. C: See above. D: the clearing of trees and vegetation
which may be considered unique. E: Only the limited amount that may occur
during construction. F: The current SCS construction and work within the
P-1 channel and this proposal change the flood boundry on site.
3-
2) Air. Will the proposal result in:
a) Air emissions or deterioration of ambient air
quality? X
b) The creation of objectionable odors?
X
yrs- MAYBE NCI—
c) Alteration of air movement, moisture or temperature.
or any change in climate, either locally or
regionally? X
YES MAYBE N-
Explanation: C: Due to the reduction of existing vegetation, there
may be very minor localized changes.
3) Water. Will the proposal result in:
a) Changes in currents, or the course of direction of
Xwatermovements, in either marine or fresh waters?
YET- M-AYEE No
b) Changes in absorption rates, drainage patterns, or Xtherateandamountofsurfacewaterrunoff?
YET- M Y B au-
c) Alterations to the course or flow of flood waters?
X
YES MTIYBE N-
d) Change in the amount of surface water in any water
body?X
VET- MAYBE NO
e) Discharge into surface waters, or in any alteration
surface water quality, including but not limited to
temperature, dissolved oxygen or turbidity?X
V!T MAYBE Nl
f) Alteration of the direction or rate of flow of
ground waters? X
E MITE N -
g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
Xinterceptionofanaquiferbycutsorexcavations?
YES MAYBE NO
h) Deterioration in ground water quality, either through
direct injection, or through the seepage of leachate,
phosphates, detergents, waterborne virus or bacteria,
Xorothersubstancesintothegroundwaters?
Y E T-- guar Nl-
i) Reduction in the amount of water otherwise available
for public water supplies? X
YE3- MAYBE AU
Explanation: B: Due to imported soil types and compaction, the ab-
sorption rates will change. Also the patterns will change due to
proposed contours and elevations.
4) Flora. Will the proposal result in:
a) Change in the diversity of species, or numbers of any
species of flora (including trees, shrubs, grass, crops,
microflora and aquatic plants)? X
Ys MAYBE FU—
b) Reduction of the numbers of any unique, rare or
endangered species of flora? X
vur WIFEE F(f
c) Introduction of new species of flora into an area, or
in a barrier to the normal replenishment of existing Xspecies?
YES 'lava au-
d) Reduction in acreage of any agricultural crop? X
YET— M YB Nlf
Explanation: A: Clearing of trees and shrubs shall reduce numbers.
B: (See above) The area is a reparian forest which is unique in the area.
C: The introduction of errosion control grasses and the prevention of the
return of existing tree types in the areas of fill.
4-
5) Fauna. Will the proposal result in:
a) Changes in the diversity of species, or numbers of
any species of fauna (birds, land animals including
reptiles, fish and shellfish, benthic organisms,
insects or microfauna)? X
YES MATT
b) Reduction of the numbers of any unique, rare or X
endangered species of fauna?
YES MAYBE NO
c) Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement X
of fauna?
YES MAYBE NO
d) Deterioration to existing fish or wildlife habitat?
YES MAYBE NO
Explanation: A: Due to clearing and filling operations species may
relocate to preserve areas. C: New species may use the area after
the grasses take hold.
6) Noise. Will the proposal increase existing noise levels? X
YES MAYBE NO
Explanation: Construction noises and truck noise may increase but
shall be short term.
7) Light and Glare. Will the proposal produce new light or
glare? X
YES MAYBE ND
Explanation:
8) Land Use. Will the proposal result in the alteration of the
present or planned land use of an area? X
MTaYBE NO
Explanation: The present land use is reparian forest. However, the zoning
is MP and the proposal is to clear and fill part of the site.
9) Natural Resources. Will the proposal result in:
a) Increase in the rate of use of any natural resources? X
YES MAYBE NO
b) Depletion of any nonrenewable natural resource?
X
YES MAYBE W51—
Explanation: A: The proposal will use soil and rock suitable for such
filling operations.
10) Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous substances (including,
but not limited to, oil, pesticides, chemicals or radiation)
in the event of an accident or upset conditions? X
YES— MAYBE
Explanation: Only which is typical in the construction processes
11) Population. Will the proposal alter the location, distri-
bution, density, or growth rate of the human population
of an area? X
DES— MAYBE p?f
Explanation:
5_
12) Housing. Will the proposal affect existing housing, or X
create a demand for additional housing?
YES MAYBE NO
Explanation:
13) Transportation/Circulation. Will the proposal result in:
a) Generation of additional vehicular movement?
X
YES MAYBE NO
b) Effects on existing parking facilities, or demand X
for new parking?
YES MAYBE NO
c) Impact upon existing transportation systems?
X
YES MAYBE N(T
d) Alterations to present patterns of circulation or X
movement of people and/or goods?
YES MAYBE NO
e) Alterations to waterborne, rail or air traffic? X
YES MAYBE NO
f) Increase in traffic hazards to motor vehicles, X
bicyclists or pedestrians?
YES MAYBE N()
Explanation: C & F: The use of large trucks to bring soils to the
site via freeways and city streets.
14) Public Services. Will the proposal have an effect upon, or
result in a need for new or altered governmental services
in any of the following areas:
a) Fire protection?
YES MAYBE NO
b) Police protection? X
YES MAYBE NO
c) Schools?
X
YES MAYBE NO
X
d) Parks or other recreational facilities?
YES MAYBE NO
e) Maintenance of public facilities, including roads? X
YES MAYBE NO
f) Other governmental services?
X
YES MAYbE NO
Explanation: E: May be some dirt and dust caused by trucks on
public roads.
15) Energy. Will the proposal result in:
a) Use of substantial amounts of fuel or energy?
YES MAYBE NO
b) Demand upon existing sources of energy, or require
the development of new sources od energy? X
YE` MAYBE
Explanation:
16) Utilities. Will the proposal result in a need for new
systems, or alterations to the following utilities:
a) Power or natural gas? X
YES MAYBE NO
b) Communications systems?
X
YES MAYBE NO
c) Water? X
YES MAYBE NO
6-
d) Sewer or septic tanks? X
yr MAYBE 0—
e) Storm water drainage?
X
YET— MRl` Iva-
f)Solid waste and disposal?
YES MAYBE N0
Explanation: , E: Storm drainage and erosion control system on site
will be required.
17) Human Health. Will the proposal result in the creation of
any health hazard or potential health hazard (excluding Xmentalhealth)?
YT MAYBE N•
Explanation:
18) Aesthetics. Will the proposal result in the obstruction of
any scenic vista or view open to the public, or will the
proposal result in the creation of an aesthetically offensive X
site open to public view?
VET— MAYBE NU—
Explanation: The replacement of a forest by grass lands may be
offensive to some aspects of the public
19) Recr^:lion, Wit: a.:; propo>al reac:lt in 41 im,.act upon the
quality or qu .btlty ;? ;;xisting opportunities? X
YET— M—FYBr NU—
Explanation:
20) nrcheological 'Ni_storical. Will the proposal result in an
alteraCion o a signT4icant archeological or historical
Xsite, structure, object or building?
yr Y ' Ni
Explanation:
III. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information
is true and complete. It is understood that the lead agency may withdraw any decla-
ration of non-significance that it might u n reliance upon this checklist should
there be any willful misrepresentation o willfu lack of full is osure my part.
Proponent:
signed
DeLhk) ..J a0N4S
name printed)
City of Renton
Building c Zoning Department
May, 1983
Fora • 176
ADJACENT LANDOWNERS
BATCH NUMBER:CK C'JMMENTS
CUSTOMER NAME RICHARD CAROTHER
yy yy yyy yyyy ,yy yy yyy yy yyy yyy y yyyy y y yyy yy y yy yy yyyy yyy
T**********************
T**1,'T***********T***************************
7 1 43 70-1980-01 2143 70-2 000-05
F/CHG ASSOCIATES E0980 CF/CHG ASSOCIATES E0980
00 S 333RD ST 200 S 333RD ST
FEDERAL WAY WA 98003 FEDERAL WAY WA 98003
214370-2280-06 377920-0005-04
CF/CHG ASSOCIATES E0980 NEWBURN LLCYAL L C0379
200 S 333RD ST 2230 151ST PL SE
FEDERAL WAY WA 98003 BELLEVUE WA 98007
377920-0010-07 377920-0053-05
SANFORD H S 441938 SANFORD H S 441938
4520 55TH AVE NE 4520 55TH AVE NE
SEATTLE WA 98105 SEATTLE WA 98105
377920-0056-02 377920-0120-04
SANFORD H S 441938 SANFORD H S 441938
4520 55TH AVE NE 4520 55TH AVE NE
SEATTLE WA 98105 SEATTLE WA 98105
377920-0150-07 377920-0170-03
BLACK RIVER QUARRY BLACK RIVER QUARRY
6808 S 140TH 6808 S 140TH ST
SEATTLE WA 98178 SEATTLE WA 98178
722950-0320-02 918800-0010-03
BLACK RIVER QUARRY INC FIRST CITY QUITIES 329999
6808 S 140TH 800 5TH AVE SUITE 4040
SEATTLE WA 98178 ' : SEATTLE WA 98101
918800-0020-01 918800-0030-09
HOLVICK DEREGT KOERING 319800 HOLVICK DEREGT KOERING 319800
1230 OAKMEAD PWY SUITE 210 1230 OAKMEAD PWY SUITE 210
SUNNYVALE CALIF 94086 SUNNYVALE CALIF 94086
918800-0040-07 918800-0050-04
HOLVICK DEREGT KOERING 319800 HOLVICK DEREGT KOERING 319800
1230 OAKMEAD PWY SUITE 210 1230 OAKMEAD PWY SUITE 210
SUNNYVALE CALIF 94086 SUNNYVALE CALIF 94086
918800-0060-02 918800-0130-08
HOLVICK DEREGT KOERING 319800 FIRST CITY EQUITIES 391023
1230 OAKMEAD PM' SUITE 210 800 5TH AVE SUITE 4040
SUNNYVALE CALIF 94086 SEATTLE WA 98104
918800-0140-06 918800-0150-03
FIRST CITY EQUITIES 391023 KING COUNTY 359800
800 5TH AVE SUITE 4040 500 KC ADMIN BLDG
SEATTLE WA 98104 SEATTLE WA 98104
k****************************4 c**************************************
BATCH UMBER:CS COMMENTS 121ND. L-A iD
CUSTOM _R NAME RICHARD CAROTHER owiuF_Q,Z
c************************************
i&*
722950-0 310-04 242304-9008-04
STATE JF WN CONTAINER CORP OF AMERICA C0481
No A c•n2.F_Ss or 62r-_caR.0 1 1ST NATL PLAZA
CHICAGO IL 60670
182305-9250-06 182305-9250-06
PAC IF II: COAST RR CO
301 GR EAT NORTHERN BLDG
A //
SEATTLE WA 98101 v
132304-9C06-09 132304-9007-08
SANFORD H S 441938BURLINGTUN NORTHERN INC 1279
4520 55TH AVE NE I
SEATTLE WA 98105 810 3RD AVE TX DPT 208 CTRL
SE ATTLE WA 98104
132304-9009-06 132304-9010-03
BURLINGTON NORTHERN INC A0181 SANFORD H S 441938
810 3RD AVE 4520 55TH AVE NE
208 CENTRAL BLDG - TAX DEPT SEATTLE WA 98105
SEATTLE WA 98104
132304-9020-01 132304-9025-06
C & P S RY CO CF CHG ASSOCIATES E0980NoACT+2.E_SS aF f ECOtJ)
200 S 333RD ST
FEDERAL WAY WA 98003
1323 04-9 078-0 2 1323 04-908 0-08
KING COUNTY 0740 0577 KING COUNTY 0740 0577SoofcC. ADMIIJ gLpG 5-00 KG ADMM0 F5L_D61
Sl_ATr _r WA SEA-TrLE_ wA98104 98104
132304-9034-04 132304-9084-04
BURLINGTON NORTHERN INC 2D9800
810 3RD AVE WA208CENTRALBLDG-TAX DEPT
SEATTLE WA 98104
PROJECT DESCRIPTION
PROJECT DESCRIPTION
I . PR(JECT TITLE
BlEckriver Technical Park, Clearing and Grading, Renton, Washington
II . SCOPE OF WORK
BlEckriver Technical Park is located on 71.16 acres of land to the south of
The Burlington Northern Railroad tracks and to the north of Washington Tech-
nical Park and the renovated P-1 Channel .
ThE project includes clearing and grading approximately 51 acres of the north
easterly portion of the site. There are preserve areas containing significant
trees within the clearing area that will be retained. (See attached, "Guide-
lires for the Preservation Outside the ' Preserve' Zone") . Over 19 of 71. 16
acres shall be retained as natural preserve areas or are currently being
utilized for the renovation of the P-1 Channel .
ThE grading will include raising existing grades up to base grades for future
access drive, utilities and building development. The grades will increase a
ma> imum of 12 feet at the west end of the site in order to accommodate exist-
inc sanitary sewer pipe invert elevations offsite. Fills at the southeast
will also bring existing grades above the 100 year flood levels.
ThE transition fill slopes will be set at 2 to 1 maximum steepness and cut
slcpes set at 3 to 1 to assure stability of the railroad tracks.
III. Fill Material
A. Type - The material to be used for this project will be from various
sources. Approximately 30,000 cubic yards of material will be from
on-site excavated from the old railroad grade. Approximately 95 to
97,000 cubic yards of material is currently being deposited on-site from
the P-1 Channel project. Material from the I-90, Mercer Island and Mt.
Baker Ridge Tunnel may be deposited on-site. Portions of the soils
reports containing soil logs are attached herein.
Other sources of material shall be utilized as they become available.
There shall be a soils engineer on-site to grade and inspect all import-
ed materials. The entire filling will require approximately 425,500
cubic yards of material .
B. Construction Methods - The following are the approximate steps to be
followed during the placement of all fills:
1 ) Drain area within limit of work of standing water.
2) Clear vegetation, except significant trees to be preserved.
3) Place filter fabric on soft soils and on access drive.
4) Establish erosion controls at limit of work.
5) At Access Road place 18 inches of material on top of woven filter
fabric as a fill mat compacted to 95%.
6) Place and compact additional soils in 8 inch lifts throughout fill
areas.
7) Installation of the fill material shall be in accordance with
Standard Specification for Municipal Public Works Construction"
1981 Edition, Washington State Chapter APWA.
C. Truck Routing - Freeway: All loaded trucks shall approach the site from
I-5 North and/or Southbound, exit at Empire Way South, turn southeast and
continue to Rainier Avenue South, turn South to South 7th Street, head
west to Powell Ave S.W. and North to enter the site.
Load limits on I-405 may allow empty truck to use I-405 as an alternate
route.
Arterials and City Streets: Access to the site may also utilize Monster
Road at the west end of the site. Truck traffic shall use Empire Way
South and exit at 68th Ave. S. , proceed to Monster Road S.W. and access
the site utilizing the existing 12 foot wide dirt road, currently being
used for the P-1 Channel Project.
IV. Dust Control
Prior to hydro-seeding, dust control shall be accomplished by controlling
moisture content of soil and sprinkling.
V. Hours of Operation
The hours of sitework shall be the general work hours of 7AM to 5PM, 5 days
a Heek. Truck hauling to the site may be reduced during AM/PM "Rush Hour" ,
traffic periods to reduce congestion of arterials and city streets.
VI. ReFabilition and Seeding
SeE the attached - Erosion Control Specification, Section 02485.
VII. Project Timing
ThE clearing and grading shall start upon issuance of a permit from the
City of Renton (Est. September, 1984) , and continue until the proposed
grades are reached.
ut Quantities
Planimeter Readings Cubic
1st end 3rd average Yards
123.5185
3 29 28 29
216.0494
29 29 3 . 2933333
228. 3951
34 32 31 . 3233333
328.3951
56 58 55 .5633333
318.5185
29 29 31 . 2966667
354.3210
67 64 67 66
492. 5926
69 65 67 67
619. 75.31
1 . 02 1 99 1 . 003333
498. 7654
33 35 35 .3433333
274. 0741
4 39 4 .3966667
314.8148
45 46 45 . 4533333
501 . 2346
9 9 9 9
695.0617
95 97 1.01 . 9766667
654. 3210
8 79 78 79
566. 6667
71 77 74 74
786. 4198
1.4 1.37 1.38 1.383333
1079.012
1 .52 1.53 1.54 1 .53
1390. 123
2.22 2.24 2.21 2. 223333
1596. 296
2. 1 2.08 2.08 2.086667
1553.086
2. 1 2. 1 2. 12 2. 106667
1600.000
2.22 2. 2 2.22 2. 213.333
1916.049
2. 98 2.94 2.96 2.96
2625.926
4. 15 4. 1 4. 14 4: 1.3
3272.840 •
4. 73 4. 7 4.69 4. 706667
3295.062
4. 22 4. 17 4. 10 4. 19
2566. 667
77 2. 73 2. 72 2. 74
Cut Quantities
Planimeter Readings Cubic
1st 2nd 3rd average Yards
2.77 2.73 2.72 2.74
1596.296
1.56 1 .57 1 .58 1 .57
824. 6914
65 66 66 . 6566667
243. 2099
0
TOTAL 30532. 16
bl acc f
Bl. i;ck Ed ver MLO 6/15/84
Station Fill Quantities
Flanimeter Readings Cubic
1st 2nd 3rd Average Yards
985 0
423. 0864
1100 1 99 99 . 9933333
2765. 43'2
1200 6.45 6. 49 6. 48 6. 473333
6061 . 728
1300 9.91 9.89 9.88 9.893333
8958.025
1400 14.28 14.28 14.32 14. 29333
13783.95
1 500 72. 85 22.96 22.96 72. 9273
16956.79
1600 22.89 22.84 22.85 22. 86
18465. 43
1700 26. 97 27.04 26.98 26.99667
17450. 62
1 800 20.04 20. 14 20. 18 20. 12
15903. 70
1900 22.83 22.82 22.81 22. 82
16464. 20
i00 21 . 69 21 . 59 21 .62 21 .63333
15813. 58
2100 21 .04 21 . 1 21 .05 21 .06333
14640. 74
2201J 18.51 18. 46 18.43 18. 46667
13692.59
2300 18.53 18.51 18. 47 18.50333
12551 .05
2400 15. 41 15. 4 15. 35 15.38667
13503.70
2500 21.09 21.08 21 .05 21 .07333
15591 .36
2600 21.02 21.06 20.99 21.02333
14850. 62
2700 19. 12 19.08 19.02 19.07333
14392.59
2800 19.82 19. 77 19.77 19. 78667
ti. 14725. 93
2900 19.9B 19.94 20 19.97333
14364. 20
3600 18.81 18.78 18. 84 ,18. B 1
14237.04
3100 19. 65 19.65 19. 59 19. 63
15918.52
3.200 23.37 23.31 23.37 23.35
18432. 10 .
300 26. 46 26.41 26. 38 26. 41667
18675. 31.
3400 24.09 23.93 24 24.00667
18088.89
3500 24. 86 24.85 24. 79 24. 03333
10739. 51.
25. 79 25. 71 25. 79 25. 76.33_
bl accf
Black River MLO 6/15/84
Station Fill Quantities
PlaniRueter Readings: Cubic
1st 2nd 3rd Average Yards
3600 25. 79 25.71 25. 79 25. 76333
17496.30 •
3 700 21 . 5 21 .53 21 . 4 21 . 47667
14386. 42
7.800 17. 41 17. 33 17. 36 17. 36667
12 106. 17
3900 15.3 15. 39 15. 27 15. 32
9945. 679
4000 11 .52 11 . 48 11 . 6 11 .53333
7438. 272
4100 8.5 8.56 8.59 8.55
5724.691
4200 6.91 6.89 6.92 6.906667
4808. 642
4300 6. 1 6.06 6.07 6.076667
4250. 617
4400 5.39 5. 41 5. 4 5. 4
3551 .852
4500 4. 21 4.24. 16 4. 19
2760. 494
4600 3.27 3.27 3.25 3. 263333
2316.049
4700 2. 99 2.99 2.99 2.99
2002. 469
4800 2. 42 2. 41 2.42 2. 416667
1434.568
49041 1 . 45 1 . 47 1 . 45 1 .456667
887. 654 3
5000 96 93 93 94
569. 1358
5100 6 59 6 .5966667
587.6543
52i i 98 1 99 99
297
5281
0
TOTAL 456015. 1 _
EROSION CONTROL
02485 PAGE 1
PART 1 GENERAL
1.01 GENERAL
k. Erosion control shall consist of seeding, fertilization, tacki-
fier and mulching the areas shown on the plans , all in accordance
with these special provisions , the standard specifications , and
the details shown on the drawings.
PARE 2 PRODUCTS
2.01 SEED
1. Grass seed of the type specified and shall conform to the
standards for "certified" grade seed or better as outlined by the
State of Washington Department of Agriculture's "Rules for Seed
Certification," latest edition. Seed shall be furnished in
standard containers on which shall be shown the following
information:
1. Seed name
2. Lot number
3. Net weight
4. Percentage of purity
5. Percentage of germination
6. Percentage of weed seed content and inert material clearly
marked for each kind of seed in accordance with applicable
state and federal laws
B. Upon request, the Contractor shall furnish the Owner' s Represen-
tative with duplicate copies of a statement signed by the vendor
certifying that each lot of seed has been tested by a recognized
seed testing laboratory within six (6) months of the date of
delivery on the project. Seed which has become wet, moldy, or
otherwise damaged in transit or storage will not be accepted.
C. The seed mixture and rate of application shall be as follows:
Perennial Rye 40 pounds per acre
Creeping Red Fescue 26 pounds per acre
White Dutch Clover 15 pounds per acre
Shasta Daisy 8 pounds per acre
Alaska Strain)
Total 90 pounds per acre
Apply at the rate of 90 pounds per acre.
2.( 2 FERTILIZER
A. Fertilizer shall be standard commercial grade of organic or
inorganic fertilizer of the kind and quality as specified. It
may be separate or in a mixture containing the percentage of
total nitrogen, available phosphoric acid, and water-soluble
EROSION CONTROL
02485 PAGE 2
potash in the amounts specified. All fertilizers shall be
furnished in standard unopened containers with weight, name of
plant nutrients, and marked, all in accordance with state and
federal laws.
B. Acceptable commercial fertilizer may be supplied in one of the
following forms:
1. A dry free-flowing granular fertilizer suitable for applica-
tion by agricultural fertilizer spreader commonly available.
2. A soluble fertilizer ground to a fineness that will permit
complete suspension of insoluble particles in water, suit-
able for application by a power sprayer.
3. A granular or pelleted fertilizer suitable for application
by blower equipment.
4. A nonvolatile liquid fertilizer.
C. Commercial fertilizer in the following formulation shall be
furnished as specified. Fertilizer shall be slow release type:
Total nitrogen 10% N)
Available phosphoric acid 20% P)
Water-soluble potash 20% K)
D. The rate of fertilizer application shall be three hundred (300)
pounds per acre. Fertilizer other than commercial grade shall be
furnished only when specified or when shown on the plans.
2.1)3 MULCH - WOOD CELLULOSE MULCH
A. All mulch material shall be in an air-dried condition, free from
noxious weeds, weed seeds, and other materials detrimental to
plant life. "Silva-Fiber" or approved equal .
B. Mulch shall be applied at the rate of 1 ,500 pounds per acre.
C. Wood fiber mulch shall be adequately and uniformly agitated and
mixed in uniform distribution until pumped from tank. Mulch
shall be dyed green.
2.1)4 TACKIFIER
A. Tackifier shall be 100 percent organic material of a combination
of hydrocolloids selected to form a protective film. J-Tac or
approved equal .
PART 3 EXECUTION
3.01 Before proceeding with this portion of the work, the Contractor
shall be required to provide the Owner's Representative with
EROSION CONTROL
02485 PAGE 3
sufficient evidence of his past successful experience in this
type of work.
3.02 SEEDING OPERATION
A. Seeding shall begin immediately following the bringing to speci-
fied finished grade an area of sufficient size that will ensure
an efficient and economical operation, unless otherwise directed.
Seeding shall be done within the proper seeding dates in the
prevailing area or as directed by the Owner's Representative.
B. Seeding shall not be done during windy weather or when the ground
is frozen. Seed and fertilizer shall be placed at the rate and
mix specified or as directed by the Owner's Representative.
Where seed is sown with water by the use of hydraulic seeder,
inoculant may be added to the solution at the rate recommended by
the manufacturer. Seed and fertilizer may be sown by the fol-
lowing methods:
1. An approved type hydraulic seeder which utilizes water as
the carrying agent, and maintains a continuous agitator
action which will keep the seed and fertilizer mixed in
uniform distribution until pumped from the tank. The pump
pressure shall be such as to maintain a continuous,
no-fluctuating stream of solution.
2. Areas inaccessible to the above methods of application shall
be seeded and fertilized by approved hand methods. Distri-
bution of the material shall be uniform and at the rate
specified.
It shall be the Contractor's responsibility to provide qualified
equipment and methods to perform the work as specified.
3.03 SPREADING MULCH
P. Mulch material of the type specified shall be furnished, hauled
and evenly applied at the rates indicated, where shown on the
plans, or where directed by the Owner's Representative. Mulch
shall be spread on seeded areas within forty-eight (48) hours
after seeding unless otherwise specified. Distribution of mulch
material shall be by means of a mulch spreader which utilizes
forced air to blow mulch material on the seeded areas. The
spreader shall produce a uniform distribution of mulch. When
specified, mulch material shall be anchored in place with a
tackifier of the type specified. Mixed with the mulch at the
rates recommended by manufacturer or as specified. Areas beyond
the range of the mulch spreader shall be mulched by hand methods.
Distribution of the materials shall be uniform and at the rate
specified.
EROSION CONTROL
02485 PAGE 4
3.04 CONTRACTOR'S RESPONSIBILITY FOR WORK
A. The Contractor shall be responsible for all work herein described
in accordance with the following requirements and/or as directed
by the Owner's Representative:
1. Protect all areas involved against vehicle and pedestrian
traffic by warning signs and barricades.
2. Reseed by specified means all areas failing to show a
uniform stand of grass after the germination of seed, or
damaged through any cause before the final inspection.
END OF SECTION
Guidelines for Tree Preservation Outside the "Preserve" Zone
Trees selected for preservation shall have a "tree well " (fill retainingwall ) constructed to maintain an undisturbed existing ground area around
the tree. Provide approximately 5 sq. ft. for each caliper inch of trunk
measured at 48" above existing grade. The tree well shall be constructed
in a manner to protect all roots. No root cutting allowed. Special care
shall be taken to maintain ground water level and quality as nearly as
possible to pre-development conditions. This may include special irriga-
tion and drainage systems or culvert systems connecting the tree wells to
nearby wetlands so that the rise and fall of ground water will be similar
to pre-development conditions. Storm water may be retained on-site as
necessary or desirable to assist in maintaining ground water levels.
Tree wells shall be constructed of railroad ties (or treated timbers) with
an 8 inch high curb of timber, concrete or asphalt on all sides. Provide
hand rails where resultant depressions are more than 30 inches deep.
Conditions may vary at each tree location. Analyze each tree to ascertain
the best solution or combination of solutions to minimize adverse environ-
mental impacts.
Consult an Aborist regarding selection of trees to be preserved and preserva-
tion procedures to be used. Selected trees are subject to review and
approval by the City of Renton.
HAl4 FLAIL
Kg.AUIR.Kt=0
PAN1II 445 w/ . —
G. PLANTI -4
eb" LURt3
1;14v. 7 —RET I I-t icxrrs: c E
E7CIST Ids lt'
3 w' t` u+ "`,fir .' la izAP aWETLANDS4c-
P sEtzvE)
ut-471 -11.4izBmr> AREA
hlarr a: -ULVE KT AT EL EVATI al-4 .RM I t-4 o4J
IT E , Tb A L Lc)t.‘l c. tZo L t-.4 c> W P-T I . F RAM
Ap—IAGF-JT (,J>rTLA-JD Tc> FL4:4k1 IN- AMID OUT
of VLF - AkS FL L1 - T>='s.
LANDSCAPE GUIDELINES
Landscape Guidelines
r.
m;
yy
ut
4
for t
4
fin810 r ,J
0
Wo
Alterrat Corporation
r„ dT•"r-• 4 C t ' r
f
C r3... ,
k
a. is
y
r
1
t`r. ,PR 'n
y4
f' .+ .
s7'':`itr tFffi .'r i. r*,.. T vLi
26
d ,0`.It
it ir
byl 4
t
y
ke FilX l-ii s (r rr+thars As &cia 2
W .
itee
I
1 .01 INTRODUCTION
LANDSCAPE GUIDELINES
The landscape consists of elements that give form to exterior spaces. Thus,
the character of the landscape is created by elements such as streets and
building setbacks, the variety and placement of elements such as signing, site
lightiig, walkways, and plant materials, and the arrangement of major func-
tional elements such as project entrances, parking lots, buildings, service
areas etc.
Given :hat project architecture and building sites within Black River Office
Park will most likely be of varying types and sizes, landscaping as a design
element will play the key role in creating and conveying the overall character
of Bla:k River as a "park-like" working environment. The purpose, then, of
these _andscape Guidelines, is to provide design criteria which will help to
insure that Black River Office Park achieves an image that is distinctive,
clearl, understandable and unified.
The Landscape Guidelines recognizes that the Black River Office Park consists
of thrae prominent zones, namely, the streetscape zone, the interior zone, and
the "p^eserve" zone. While the "preserve" zone is precisely as it suggests,
areas )f no disturbance, an understanding of the nature of the other two zones
is imp)rtant to understanding the landscape guidelines and their intent.
NAu-I=S A". 6.y/.1
Ft:"W.LL Ate.S.kL115
1
4A4-+E3 Avm S t
Fb LL Ate. S.6 4.
t r R.I oR ZONE
r
101 f C14ES AVE- S.l4l
PZE E.RN/E2' Z
1 .1 Streetscape Zone
the streetscape zone is the primary image setting zone. All improvements
vithin this zone will have the greatest degree of control . Attributes
within this zone include:
1 . The Landscape Easement - This easement begins at the back of the
curb of the main roadway and extends inward for a distance of 30
feet along the entire length of the main roadway. The first 13 feet
minimum (including a 5 foot walk) to 24 feet maximum are designated
as a Public Parkway and shall be installed by the Developer. The
remaining 6 feet minimum to 17 feet maximum shall be a Transition
Zone to be improved by the adjacent user. Common elements within
the Landscape Easement include walkways, planting, irrigation,
street lighting, project signing and project entries.
4 -Avg. ',.1.1/41.-1
v- AVK. . .W.1 /5
51K - .T. APB ZOINE
n 4 .,.K1NU A.d LAND'.- Fi c TIS
SIDE of WAL WA`f SN LL
I ç ' 11%1, lice FIzz,VIGg•ID BY uER
I II -• ,--*-.-divA41144-) . 5,
1
k0.1-4(v• - tir cialfilliriati. fl '
tgras ,7,Fvi 1o' :`eras .. --Alek FzZiPa.gr r
imile
II
LIIJ
may WA. W 1' ' of .t
e.' Mti 1.
LAIN ki FoRMAL S7 R. . .T
E E Pt-AhtTI NG
LA_ LANDSc+APIN& THIS
SIPS of I,,,ALK -t-
I kIc 1_uD!hlca WAL- t )
Sh•LL_ ge PR vI af.l I Hp A' = 'SE M t IT
BY 1?FvF-s,_ PAR.
1 .1 .1 Streetscape Zone Design Concept
the streetscape within Black River Office Park will consist of a unified
jingle image, namely: a single row of street trees planted approximately
5 feet from the curb line on a landscaped berm, on both sides of the main
roadway. Lawn shall occur from the curb to the walkway. Informal tree,
shrub and ground cover plantings shall occur between the walkway and the
landscape easement.
4 1?-w. _ .
vul,- I," IllPiti' <h:.Il 4110
tf)# 11001111.1111111 It 5"RZ..-r TREE-
1)i--- ...... ....... a.. AM. AMMO. ,...... ...., .m... AM;.
r Aftv...1 41411. I NFOKMt L_ PLANrf Ne :
Vlb-vagvk nill 1?...)Lak.D.‹....4>v .g.
IA
Individual project entries will punctuate these plantings providing
iighlighted corporate identification.
walkway will meander through the public parkway providing an added
iimension to the overall Black River streetscape scene.
r
Ni
IDA 4
LAH•I P 6& FM MENT
1 .1 .2 Interior Zone
he interior zone encompasses all exterior elements from the 30 foot
landscape Easement to the building setbacks. This zone is subject to the
reeds of each User and, thus, is meant to have a greater degree of flexi-
lility than the streetscape zone. Common concerns within this zone in-
clude: parking lot arrangements and landscaping, site lighting, regula-
iory and directional signing, and service area screening.
441*°%
1
c = NAcNES AVE. S.W_
oWEt.t_ AvE3.1 1.
I NTH.F- .
1 .1 .3 Interior Zone Design Concept
It is intended that the interior zone of Black River Office Park, consist-
ing primarily of parking lot landscaping, be planted in geometric patterns.
Refer to Section 1 .2.4.b-4 for plant types. ) Subtle light levels, re-
strained graphics and screening of service areas will all contribute to
reinforcing the Black River landscape design concept.
1 .2. LANDSCAPE DESIGN GUIDELINES
1 .2.1 Assessment District Installation and Maintenance Agreement
All landscape improvements within the Public Parkway (Section
1 .1 .1-1 ) will be installed by the Developer or successor.
The 30 foot Landscape Easement (Public Parkway and Transition Zone)
landscaping and irrigation will be installed as a continuous linear
system the entire length of the streetscape zone. Occasional
demolition and interruption of this system will be necessary during
the process of access drive installations. It is a responsibility
of the User to maintain the flow of the irrigation system during
construction, and to re-establish the planting, grading and final
irrigation layout that has been interrupted.
PR V k Y
I RY
1
D
I I
L_ INPEs
1 .2.2 Maintenance of Unimproved Sites
Sites that are not improved or built upon shall be maintained in a
clean and neat appearance by the User. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or
more often as required to maintain a high quality appearance. The
Developer and their representative have the right to perform the
necessary maintenance and charge the individual User as neces-
sary.
1 .2.3 Landscape Coverage
A minimum of five (5) percent of the area within the property lines
of a development site shall be devoted to landscape materials unless
otherwise approved in writing by the Grantor or successors.
1 .2.4 Street Frontage Zone Design Guidelines
1 .2.4 a Definition of Street Frontage Zone
The street frontage zone is defined as that portion of the site
which is adjacent to the Landscape Easement and/or is visible from
the street.
10_
AcS M ANT
glEAg
Y.Rzas
1 .2.4.b Specific Design Limitation within the Street Frontage Zone
1 . Grading: Finish grading for each site shall meet the existing grade
of the Public Parkway boundary. Transition slope in this zone shall
not exceed 4:1 .
2 . Service Areas: Service areas within this zone are to be enclosed with
solid walls and screened with the appropriate landscape material .
Refer to 1 .2.4.b-4 for plant types. )
Parking: All berms within the Landscape Easement zone shall be 3 feet
minimum above the surface parking elevation within the street frontage
zone.
tilp#A
4:1MAX. 41.01,E i T ui
CAA 7
Ne-I6f`1ce 1S i-Czl-4iR Q e
ill
PAKKiN(A. 12-LAPI4AY
z Mal-t-t-
4 . Screening Shrubs: The following shrubs, in combination with walls
and/or fences , have been selected to aid in eye level screening of
service areas. Planting areas shall be a minimum width of 4 feet.
Planting areas exceeding 4 feet shall also conform to these landscape
guidelines. The shrubs should be planted at a size to achieve a
minimum height of 5 feet within a 3 year period from the date of
planting.
Plant Name Maximum Spacing Comments
Photinia fraseri 5 ' on center
Cotoneaster franchetii 4' " II
Cotoneaster lactea 4' " "
Viburnum tinus 4' " "
Viburnum rhytidophyllum 4' " II
Mahonia aquifolium 3' " "
Vaccinium ovatum 3' " "
Prunus lusitanica 5' " IImust be clipped
Arbuteus unedo 4' " "
Pieris japonica 3' " "
Ligustrum japonicum 3' " "
Texanum'
Thuja occidentalis 22' " "
Buxus sempervirens 3' " must be clipped
Rhododendron varieties 4' " "
1 .2.,' Parking Lot Landscape Requirements
1 .2.E .a Tree Planting Requirements
1 . Two (2) types of trees are identified for the parking lot planting.
Refer to Section 1 .2.5.c for plant types. )
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
5' 9'
G 7Lt 4M N HP.
1
TYP'g. 'A' AI , .
40'
11.11'. '
i-g- E'.--S r.II° Odith,,4ti!, Oa,
6'-nZEE4
iv
tpik ilt4.
s •trr.).4..4.06,14, ,3, 4,,,,..........,, ,I, ,•,,...,.
4„k;
R
Ifit...., .... . .....Irp, ..... __,,...... ,iii.
4I1I61P 4L)19A4174I01
4.
PE1zlMTK Pt E Fl-, -n F- a
ul,L MN ENP of 1
I It - 'A'
Tls 1
M ,
Ail,. tetir
Alb. - 41 ,..Ilia 1119i.
i
w
8' Tiffs
s .• • . n
v
ytim....„,
isii. ,
Iriiir. Ailips,,
g."'441}4.
lb
FizIr'e-re..1~ EGCE pi llN4A
Type A: Type A trees shall be planted at the ends of parking columns.
A single tree specie, with a minimum height of 12 feet shall
be planted throughout the User' s entire parking lot compound.
Type B: Type B trees shall be planted in the parking lot interior. A
single tree specie, with a minimum height of 8 feet shall be
planted every third stall . This tree specie may be different
in separated parking lots within the compound. Credit will
not be given for perimeter edge tree planting.
i-- E} DF Gol'u Mt-4 RAiNTI N I
rti E ',1=.: :(I ) ' Lid USED
l f+Rot-No G 'HP2uk .
l U
00I
U 2 u
U
I
O Li PAiz K l N<a 1-6
GoMPot-I,1D
I 1-4?Mi?Io2 171,a.14TI NCB.
0-3 -9 I T`T-I PFGIE
MAY VARY FILM
I Y I _H_l-crr4 *0 I 2 0 3.
t,INE
Tree wells and planter areas within paved parking areas shall provide
a minimum 4 foot clear planting space.
Planting areas shall have a 6 inch curb on all sides.
1.61 ,
yea
ink ,7(
p" UfZ6 A•fzcLHD
FL-44 TI NU ARC
1 .2.E .b Parking and Pedestrian Circulation
1 . Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a
minimum width of 4 feet between stalls should be provided at key
locations.
4'- v. Ai-rep.
O o
ILKW.Y
1
P i\--"4::
2 AisL s ce. t si-
3. If parking lots exceed two rows in depth, the alignment of the aisles
should be in the direction of the pedestrian movement.
i)
L--
C
r -Or,,, O Sl-1= I
i
V 1;
T-' PEPEGT-17-144-4 1
T, ezzw_117,4z4
4
A., , , ,ma ors:
i, dtrrj-- ltd.
t /6,I s L - 2
2I1.ISLg4 orz
1 .2.5 c Parking Lot Plant Materials List
Tree species are to be selected from the following lists , unless
special soil or site conditions prevent the use of the recommended
trees.
Tree Lists for Parking Compounds
The following lists of trees have been selected to create a park-like
appearance in the parking compound.
Type A Trees: (End of Parking Column Planting)
Plant Name Minimum Size Comments
Acer platanoides 12' ht Limb to 6' minimum
Acer rubrum 12' ht Limb to 6' minimum
Acer pseudoplatanus 12' ht Limb to 6' minimum
Liquidambar styraciflua 12' ht Limb to 6' minimum
Tilia cordata 12' ht Limb to 6' minimum
Liriodendron tulipifera 12' ht Limb, to 6' minimum
Quercus coccinia 12' ht Limb to 6' minimum
Quercus borealis 12' ht Limb to 6' minimum
Fraxinus pennsylvanica 12' ht Limb to 6' minimum
lanceolata
Gleditsia triacanthos 12' ht Thornless varieties only,
Skyline' , 'Shademaster'
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Magnolia grandiflora 8' ht Limb to 42' minimum
Styrax japonica 8' ht Limb to 42' minimum
Pyrus calleryana 8' ht Limb to 41/2' minimum
Crataegus lavallei 8' ht Limb to 42' minimum
Crataegus phaenopyrum 8' ht Limb to 42' minimum
Mallus floribunda 8' ht Limb to 41/2' minimum
Cercidiphyllum japonicum 8' ht Limb to 41/2' minimum
Prunus sargentii 8' ht Limb to 42' minimum
Prunus serrulata 8' ht Limb to 42' minimum
Kwanzan'
Prunus subhirtella 8' ht Limb to 42' minimum
Autumnalis'
1 .2. 6 Vehicular Access Drive Design Guidelines
1 .2.5.a Location Criteria
1 . Access drives for ingress and egress shall be located by the Developer
and/or User according to City of Renton standards.
cgEp:
A,Irz.. t gF-1'I. -
5F-g-H 1.1)4'.I N1..)<-. 1-2
1
local22 := :, i_)\'1 ,,, IN c
1 .2.6.b Limited Use Area at Access Drives
1 . The "limited use area" is defined as the area extending 10 feet on
either side of an access drive and in that area of the first 10 feet
extending from the curb line of the main roadway.
1617'1411t;(711" !:"
I
l` u
I
leit
jr-a
IMI L
cs-rtz---nci
1 . MD..... , —
j
P MIT -
2. All objects higher than 30 inches above the top of the curb at the
access drive curb opening, including but not limited to, shrubs,
trees, signs and earth berms shall be located outside of the limited
use area.
1 .2.7 Guidelines for Interior Property Lines and Landscape Areas
1 .2.7. i Side and Rear Yard Requirements
1 , A 5 foot wide minimum planting zone is to be provided continuously
along and adjacent to all interior property lines.
2. All site drainage shall be directed away from the 5 foot zone.
Drainage within the 5 foot zone may flow to an adjacent area.
3. A maximum slope of 2:1 is allowed within the 5 foot planting zone. A
1 foot minimum flat transition shall be provided at the top and bottom
of all slopes within this zone.
1 .2.7.b Plant Material Requirements - Interior Property Lines
1 . Trees : Shall be located 4 feet from curbs or 1 foot from the property
line. The trees selected for interior property lines must be species
that have been used somewhere else on the User' s property. (Refer to
Section 1 .2.5.c for plant types. )
i . Shrubs : Shall be located 3 feet from the property line or 2 feet from
curbs, and planted with a maximum spacing of 5 feet on center.
Groundcover: Shall be placed 24 inches on center maximum spacing,
covering all ground surfaces. If the User selects lawn as a ground-
cover, sod must be installed.
1 .2.7 c Planting and Irrigation Details and Specifications
All planting and irrigation details and technical specifications shall
conform to City of Renton, Washington Design Standards and the highest
standards of the American Association of Nurserymen, the American
Landscape Contractors Association, and the irrigation industry.
A one year guarantee against all defects of materials and workmanship
for all planting and irrigation shall be provided for all landscape
improvements identified herein. The guarantee shall include replace-
ment of plants not in normal , healthy growing condition at the end of
the guarantee period with same species and size. The guarantee period
shall begin when the Developer and/or User, or their representatives
have accepted the work as 100 percent complete.
The Developer may by deed or lease, transfer this responsibility to a
User.
1 .2.8 Guidelines for Tree Preservation Outside the "Preserve" Zone
rees selected for preservation shall have a "tree well " (fill retaining
wall ) constructed to maintain an undisturbed existing ground area around
1,he tree. Provide approximately 5 sq. ft. for each caliper inch of trunk
rleasured at 48" above existing grade. The tree well shall be constructed
in a manner to protect all roots. No root cutting allowed. Special care
hall be taken to maintain ground water level and quality as nearly as
rossible to pre-development conditions. This may include special irriga-
tion and drainage systems or culvert systems connecting the tree wells to
nearby wetlands so that the rise and fall of ground water will be similar
to pre-development conditions. Storm water may be retained on-site as
necessary or desirable to assist in maintaining ground water levels.
tree wells shall be constructed of railroad ties (or treated timbers) with
n 8 inch high curb of timber, concrete or asphalt on all sides. Provide
Fand rails where resultant depressions are more than 30 inches deep.
Conditions may vary at each tree location. Analyze each tree to ascertain
the best solution or combination of solutions to minimize adverse environ-
mental impacts.
Consult an Aborist regarding selection of trees to be preserved and preserva-
tion procedures to be used. Selected trees are subject to review and
approval by the City of Renton.
HANG FLAIL
Ph }Z .QuI Rf=p>
FA\'1Nd3 ("1/ Iz13 -
R PLANTING
S" GURt3
RETAI I-4
lAlA Lt..
E:CIST'cs
WETLANt,S <---
C PIzE - F2 v )
G U LVERT L;NPli lLi zBEC) AREA
P4 rE: GULVEiZT 1 AT ELEVATION V R1"11N6D J
SITE , To ALLokL UtZoutJO I,4?.-1 }Z f M
AP.-1 AG F-I T (,J 1=TL4•ND TC) F Lo la1 I N. ,4 hl D P U T
of P' I,IATE i= LEu FLy -L4A"T'>=5.
DESIGN GUIDELINES & CC&R's
DESIGN GUIDELINES & CC&R's
BLACKRIVER
TECHNOLOGY PARK
Renton, Washington
9
Q
Q.P
J.A.G. / Renton Properties Associates, Developer
Richard Carothers Associates , Planning Consultant
July, 1984
Purpose
The development of each site within Blackriver Technology Park is controlled and
restricted by the Declaration of Covenants, Conditions and Restrictions for
Blackriier Technology Park (hereinafter referred to as the "CC&R' s") , as well as
applicable governmental codes and regulations. The CC&R's are directed toward
achieviig the desired character and quality level of site development that will
set Blackriver Technology Park apart from other business developments. The
purpose of these Development Guidelines is to further define the requirements
which a^e specifically and generally stated in the CC&R' s. These Guidelines are
intendei in supplemented to the CC&R' s as an aid in the submittal of plans for
approval by providing more detailed information on which to base a review. Any
specifi : conflicts between shall be brought to the immediate attention of
J.A.G.Renton Properties Associates. In general , however the priority of com-
pliance is first; with governmental codes and regulations, second; with the CC&R's
and thi ^d; with the Design Guidelines.
The Owners/Occupants of each site within Blackriver Technology Park should
familia^ize themselves with the intent and requirements of the CC&R's these
Guidelines and all applicable governmental codes and regulations , and through
their c)nsultant(s) , implement all those provisions applicable to their specific
site developments. All development plans, landscaping plans and graphic designs,
shall submitted to a Design Review Committee as described in the CC&R's.
Contents
Purpose
1.0 Introduction to Blackriver Technology Park
1.1 Location
1.2 Immediate Setting
1.3 Master Plan and Streetscape
1.4 Planning and Zoning
1.5 Flood Plain Restrictions
1.6 Engineering and Utilities
1.7 Permitted and Prohibited Uses
2.0 Approvals and Submittals
2.1 Master Plan Design Submittal
2.2 Preliminary Plan Submittal
2.3 Revision, Alteration, Addition or Change
of Use Preliminary Plan Submittal
2.4 Institutional Review Process
3.0 Site Planning Guidelines
3.1 Building Site Coverage
3.2 Landscape Coverage
3.3 Building Heights
3.4 Street Setback
3.5 Interior Property Line Setback
3.6 Parking Requirements
3.7 Access and Drive Location
3.8 Sidewalks
3.9 Storage, Service, and Loading Areas
3.10 Refuse Collection Areas
3.11 Screening of Exterior Mechanical Equipment
3.12 Screening of Exterior Electrical Equipment
3.13 Fences and Walls
3.14 Utilities
3.15 Grading
3.16 Nuisances
4.0 Architectural Guidelines
5.0 Landscape Guidelines
5.1 Introduction to the Blackriver Technology Park
Landscape Concept
5.1.1 Streetscape Zone
5.1.2 Streetscape Zone Design Concept
5.1.3 Interior Zone
5. 1.4 Interior Zone Design Concept
5. 1.5 Grantor Provided Amenities
5. 1.5a Exceptions
5. 1.5b Entry Feature
5. 1.5c The Commons
5. 1.6 Other Requirements
5.2 Landscape Design Guidelines
5.2. 1 Assessment District Installation and Maintenance Agreement
5.2.2 Maintenance of Unimproved Sites
5.2.3 Landscape Coverage
5.2.4 Street Frontage Zone Design Guidelines
5.2.4a Specific Design Limitation within
the Street Frontage Zone
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
5.2.5b Parking and Pedestrian Circulation
5.2.5c Parking Lot Plant Material List
5.2.6 Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
5.2.6b Limited Use Area at Primary and
Secondary Access Drive
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side and Rear Yard Requirements
5.2.7b Side and Rear Yard Landscape Requirements
5.2.7c Plant Material List-Interior Property Lines
5.2.7d Planting and Irrigation Details & Specifications
5.2.8 Guidelines for Exterior Property Lines
5.2.9 Guidelines for Tree Preservation Outside the ' Preserve' Zones
6.0 Signing Guidelines
6. 1 Objectives
6.2 Sign Submittals
6.3 Detached Business Identification Stamps
6.4 Building Mounted Business or Building Identification Signs
6.5 Information and Vehicular Control Signs
6.5 Temporary Signs
7.0 Lighting Guidelines
7. 1 Objectives
7.2 Lighting Quality
7.3 Parking, Access and Circulation Areas
7.4 Service Areas
7.5 Building Illuminations
7.5 Pedestrian Areas
8.0 Ap )endix
Contact and Reference List
Plyinning and Design References
De,:laration of Covenants, Conditions and Restrictions
1 .0 Introduction to
Blackriver Technology Park
Blackriver Technology Park is to become a unique business community distinguished
from other Seattle Area business parks. The distinction of Blackriver Technology
Park begins with its concept as a series of small business sites situated in a
controlled, unified landscape setting. This conception will be furthered through
an emphasis on quality contemporary site, architectural and landscape design.
1.1 LOCATION
Blackriver Technology Park is centrally situated southeast of downtown Renton and
due north of I-405, contiguous to and immediately north of Washington Technical
Center. Access via I-405 and arterials now serving Earlington Park Industrial
Area.
1.2 IMMEDIATE SETTING
Blackriver Technology Park is bordered on the north by the Burlington Northern
Railroad right-of-way, on the south by Washington Technical Center and P-I Channel
detention basin. Preserve areas and City of Renton buffer zones provide a wooded
backdrop conducive to the development of a pleasant business environment.
1.3 MASTER PLAN AND STREETSCAPE
The Blackriver Technology Park Plan is organized around a broad, two lane, central
cul-de-sac serving most of the sites within Blackriver Technology Park. This
central collector is Southwest 4th Place. Southwest 4th Place, will have a
controlled landscaped easement along both sides which will establish a unified,
park-like environment, distinctive among business parks in the Pacific Northwest.
Intersections leading into the Park will be highlighted by landscape and graphic
design features to establish these locations as gateways to the Park. Recreational
opportunites will be available in the form of walking and jogging paths integrated
with landscape parkways and providing access into undeveloped buffer and preserve
areas.
1.4 PLANNING AND ZONING
Blackriver Technology Park is located within the jurisdiction of the City of
Renton Department of Planning, Public Works, Engineering and Parks.
1.5 FLOOD PLAIN RESTRICTIONS
Blackriver Technology Park lies within the 100 year floodplain of the Black River.
Site planning, grading and drainage design constraints, will be placed upon all
developments. All development within Blackriver Technology Park must conform to
grading and drainage restrictions contained in the Blackriver Technology Park
Design Guidelines as well as on-site planning, grading and drainage guidelines
administered by the City of Renton.
1.6 ENGINEERING AND UTILITIES
Assessment district landscaping, street improvements, and underground utilities
including domestic water, fire service systems, storm drainage, sanitary sewer,
and street lighting, telephone, electrial and natural gas mains have been install-
ed by J.A.G./Renton Properties Associates. The improvement designs were prepared
by Richard Carothers Associates, Seattle.
1.7 PERMITTED AND PROHIBITED USES
In order to achieve the objective of Blackriver Technology Park as a high quality
business environment the CC&R's identify uses that are permitted and prohibited
within City of Renton. The following, outlines the objectives related to permit-
ted and prohibited uses within Blackriver Technology Park and restates those
uses contained in the CC&R's.
Objectives
1. to permit business uses whose facility developments and maintenance will
contribute to the perception of Blackriver Technology Park as a series of
high quality business sites.
2. to permit business uses which do not, through their operation, produce
objectional visual , sound, smell , or vibrational outputs
3. to permit business uses which are compatible with one another and compatible
with existing or planned uses surrounding Blackriver Technology Park
4. to permit business uses which will not create excessive burdens upon Black-
river Technology Park transportation and utility systems
Guidelines
1. Prohibited Uses - The following operations and uses shall not be permitted on
any parcel within Blackriver Technology Park:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling and removing oil , gas or other hydrocarbon substances, or drilling
for or removing such hydrocarbons;
e) Refining of petroleum or of its products;
1
f) Petroleum storage yards;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary
in the course of approved construction pursuant to Article III of CC&R' s;
h) Distillation of bones;
i ) Dumping, disposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race track;
2. Permitted Uses - Any use or business operation permitted by the current City
of Renton Zoning Ordinance that is not specifically prohibited above, provided
such use is specifically approved in writing by J.A.G./Renton Properties Associ-
ates. J.A.G/Renton Properties Associates, however, reserves the right to refuse
any use which they conclude may adversely affect Blackriver Technology Park. An
approved use shall be performed or carried out entirely within a building that is
so designed and constructed that the enclosed operations and uses do not cause or
produce a nuisance to adjacent lots or streets such as, but not limited to,
vibration, sound, electromechanical disturbances, radiation, air or water pol-
lution, dust, or emission of odorous, toxic or non-toxic matter including steam.
Certain activities which cannot be carried on within building may be permitted,
provided such activities are specifically approved in writing by J.A.G./Renton
Properties Associates and further provided such activities are screened in an
acceptable manner so as not to be visible from neighboring lots and streets.
2.0 Approvals and Submittals
In order to insure that the design standards for Blackriver Technology Park
contained in these guidelines are achieved, a series of plan submissions will be
required at different stages of the design process. The number of plan submis-
sions will vary depending upon the complexity and timing of a proposed develop-
ment. Plan submissions will also be required for significant revisions, altera-
tions, additions, or change of use for approved or existing developments within
Blackriver Technology Park.
Required plan submissions shall be submitted to the Blackriver Technology Park
Design Review Committee, J.A.G./Renton Properties Associates care of Alterra
Corporation, General Partner. Each stage of plan submission will require four (4)
sets of plans containing the specific information described below.
A Design Review Committee will be established by J.A.G./Renton Properties Associ-
ates to review all required plan submissions. All submitted plans will be reviewed
by the Blackriver Technology Park Design Review Committee for acceptability of
design in compliance with the CC&R's and these Design Guidelines. Upon completion
of review by the Design Review Committee, one set of submitted plans will be
returned to the applicant along with a letter summarizing comments, recommenda-
tions, requirements and findings. The length of review by the Blackriver Techno-
logy Park Design Review Committee for all stages of plan submissions shall be
governed by Section 5 of the Blackriver Technology Park CC&R's. The returned
plans will be marked "Approved" or "Approved Subject to Conditions" or "Not
Approved" with the following intended meanings:
1. "Approved" - approved documents permit the applicant to proceed to the next
stage of the approval process.
2. "Approved Subject to Conditions" - documents so marked permit the applicant
to proceed to the next stage of the approval process provided the applicant
complies with the conditions specified by the Design Review Committee. If
the applicant takes exception to the specified conditions, the applicant must
do so in writing by certified mail addressed to J.A.G./Renton Properties
Associates within ten (10) days from the date of the applicant's receipt of
returned documents. Unless such action is taken, J.A.G./Renton Properties
Associates will assume that all conditions are acceptable to and approved by
the applicant.
3. "Not Approved" - documents will be returned to the applicant with comments
describing the basis for disapproval . Revised documents must be resubmitted
if approval is sought.
4. J.A.G./Renton Properties Associates ' approval of the applicant's plans,
specifications, calculations, or work shall not constitute an implication,
representation, or certification by J.A.G./Renton Properties Associates that
the above items are in compliance with applicable Statues, Codes, Ordinances
or other regulations.
The Blackriver Technology Park Design Guidelines are in no way intended to super-
sede any applicable Statutes , Codes , Ordinances or regulations of controlling
governmental jurisdictions. Should any portions of the Blackriver Technology Park
CC&R' s or Design Guidelines be discovered to encourage violation of applicable
Statutes, Codes , Ordinances or other governmental regulations, those discrepancies
should be brought to the immediate attention of J.A.G./Renton Properties Associ-
ates.
The applicant shall have the sole responsibility for compliance with all appli-
cable Statutes, Codes , Ordinances or other regulations for all work performed on
the premises by or on behalf of the applicant.
2.1 BLACKRIVER TECHNOLOGY PARK MASTER PLAN DESIGN SUBMITTAL
Submission of a site Master Plan will be required only when the ultimate site
development is planned to be constructed in separate phases over a period of time.
The site Master Plan is to be submitted and approved before Preliminary Plans are
submitted.
Master plan submissions shall show an indication of:
1. All major buildings and structures including:
a. building footprints
b. overhangs
c. net floor area
d. site coverage - building-ground contact area/net lot area
e. building coverage - area of all floors/net lot area
f. a brief description of the use of each building or structure including
an estimate of the number of employees
2. Pa^king Area
a. configuration of parking and vehicular circulation including employee
and guest parking
b. dimensions of typical parking stalls and parking aisles
c. total parking provided
d. calculation demonstrating total parking required
3. Loading and Service Areas
a. truck service and loading dock areas
b. truck and service vehicle circulation areas
c. trash enclosure areas
d. location of screening devices for truck and service areas
4. Laidscape and Pedestrian circulation concept including any major
site design features
5. Interfaces with off-site circulation including the location and
de;ign of all access drive curb cuts
6. Irterfaces with adjacent properties
7. Ccnceptual grading, drainage and utilities
8. Descriptions or sketches of the architectural design concept including
irtended character and materials
9. Phasing Plans - plans indicating the phasing of the ultimate Master Plan
development illustrating the extent of development at the completion of each
phase
While the above information is required for all Master Plan submissions, it would
be desirable for applicants to utilize all available presentation materials and
media in order to fully communicate the intent and design character to the Design
Review Committee.
2.2 BLACKRIVER TECHNOLOGY PARK PRELIMINARY PLAN SUBMITTAL
The Preliminary Plan submission is required to convey specific information about
the site planning and architecture of the proposed development. The Preliminary
Plan package should be submitted to the Design Review Committee prior to or
concurrent with submission of plans to the City of Renton for Site Development
Review, Preliminary Plans are to be submitted and approved before construction
documerts are submitted.
The Preliminary Plan submission requires each of the following exhibits:
1. Site Plan indicating the following:
a. building footprints and dimensions to property lines
b. building roof overhangs
c. configuration of parking and vehicular circulation areas
d. location of parking lot electrollers
e. truck service, loading area, trash enclosures
f. lines of setback and easements
g. locations of on-site transformers , electrical switch gear, and gas
meters
h. adjacent roadways including curblines, medians and median openings
i. tabulation of:
I. Parcel Area
II. Total Building Floor Area
III. Site Coverage
IV. Building Coverage
V. Total Parking Provided
VI. Total Parking Required
VII . Estimated total employees on site at any peak time
VIII The anticipated number of shifts and the hours and days
of their operation
2. Ccnceptual Grading and Drainage Plan indicating:
a. proposed finish grades , slopes and building pad elevations
b. site drainage structures and systems
c. grades of existing streets and curbs
d. locations of street lighting and utility structures within landscape
easement
3. Conceptual Landscape Plan indicating:
a. plant materials, sizes, and spacings
b. walkways and paved areas
c. other landscape design features
4. Building Elevations of all sides of all proposed buildings indicating:
a. wall and roof materials, textures, and colors
b. locations of wall mounted signing and lighting
c. roof and parapet heights above ground floor line
d. the profile of any roof mounted mechanical equipment which extends above
the roof parapet
5. Building Floor Plans
6. Building Roof Plans indicating:
a. roof elevations above finish floor
b. heights and locations of roof mounted mechanical equipment where
available
7. Outline Specifications of all building materials
8. Conceptual Graphics and Wall Mounted Signs
a. ground signs and wall mounted signs
I. locations
II. designs, materials, textures, colors, heights, areas
III. Illumination
IV. typography
b. directional and information signs
I. locations
II. designs, materials, textures, colors, heights, areas
III. illumination
IV. typography
2.3 BLACKRIVER TECHNOLOGY PARK REVISION, ALTERATION, ADDITION OR CHANGE OF USE
PRELIMINARY PLAN SUBMITTAL
Preliminary plans are required to be submitted for any significant revisions,
alterations, additions or change of use to approved or existing developments
within Blackriver Technology Park. Preliminary plans for this purpose must be
submitted and approved before construction documents are submitted and before the
commencement of construction.
Revisior , Alterations , Additions or Change of Use require the submission of four
4) sets of documents including:
1. A vritten description of the nature and extent of the proposed revision,
alteration, addition or change of use to be undertaken.
2. Incications of proposed revisions, alterations , additions or changes to:
a. the site plan
b. the grading and drainage plan
c. the landscape plan
d. the building elevations including
I. wall and roof materials, textures and colors
II. locations of wall mounted signing and lighting
III . roof and parapet heights above the ground floor line
IV. the profile of any roof mounted mechanical equipment which extends
above the roof parapet
e. the building floor plans
3. Tabulations of:
a. the new total building floor area
b. the new site coverage
c. the new building coverage
d. the new parking provided
e. calculations demonstrating the new required parking
f. the new estimated peak employee count
4. Outline specifications of construction materials.
2.4 INSTITUTIONAL REVIEW PROCESS
In the course of designing proposed developments for lots within Blackriver
Technology Park additional reviews and approvals will be required beyond the
Blackriver Technology Park Design Review Process. The following summary of
Blackriver Technology Park and other review and approval processes is included to
assist individual applicants in understanding the approximate nature and sequence
of those reviews. An understanding of the total review process from the outset,
it is hoped, will contribute to smoother and more efficient processing of each
proposed development.
1. The design process should begin with a review of the Blackriver Technology
Park, CC&R' s and Design Guidelines, the City of Renton Guidelines , and the
applicable sections of the current City of Renton Zoning Ordinance. Copies
of the City of Renton applications and submission requirements should also be
obtained at this time.
2. Prior to commencement of design, a licensed civil engineer should be consult-
ed as to grading and drainage restrictions in the City of Renton.
3. Master plan should be submitted to and approved by the Blackriver Technology
Park Design Review Committee.
4. Aprlicants should review master plans with the City of Renton Planning
Detartment and staff, for comments. This is not a required review but it may
help to avoid problems and duplication of work.
5. Master plans should be reviewed by a licensed civil engineer for compliance
with City of Renton grading and drainage restrictions.
6. PrEliminary plan should be submitted to and approved by the Blackriver
Technology Park Design Review Committee.
7. PrEliminary plans should be reviewed by a licensed civil engineer for
compliance with City of Renton grading and drainage restrictions.
8. Preliminary plans should be reviewed with the City of Renton planning and
public works staff several weeks prior to the intended submission for Site
De\elopment Review.
9. Sutmit plans to the City of Renton for Site Plan Approval .
10. Sutmit plans for building department plan check.
3.0 Site Planning Guidelines
3. 1 BUILDING SITE COVERAGE
Objectives
1. to insure that the intensity of site development is not excessive or detri-
mental to the perception of Blackriver Technology Park as a unified series of
high quality business sites
2. to insure that the intensity of site development does not over-tax utility or
transportation systems
Guidelines
1. Site coverage (defined as the building-ground contact area divided by the
total net lot area) shall not exceed 50% or the amount specified in the
current City of Renton Zoning Ordinance (whichever is the more restrictive.
2. Building coverage (defined as the total area of all floors divided by the
total net lot area) shall not exceed 60% unless otherwise approved in writing
by J.A.G./Renton Properties Associates.
3.2 LANDSCAPE COVERAGE
Objectives
1. to insure that at least a minimum portion of a development site is devoted to
landscape materials in order to maintain a sense of continuity with adjacent
sites and to contribute to the perception of Blackriver Technology Park as a
park-like" environment.
2. to insure that at least a minimum of landscape materials are available on a
development site in order to contribute to the environmental well being of
potential users of each site.
Guidelines
1. A minimum of at least 15% of the area within the property lines of a develop-
ment site (exclusive of the Landscape Easement Transition Zone) shall be
devoted to landscape materials unless otherwise approved in writing by
J.A.G./Renton Properties Associates (for additional landscape requirements
see Landscape Guidelines Section 5.0)
3.3 BUILDING HEIGHTS
Objectives
1. to maintain a reasonably consistent and compatible height profile throughout
Blackriver Technology Park
Guidelines
1. Building heights shall conform to City of Renton Building Regulations
4-730.060.
3.4 STREET SETBACK
Objectives
1. to achieve a feeling of openness along the streets that reinforces the
perception of Blackriver Technology Park as a series of high quality business
sites
2. to encourage some regularity of space formed by buildings on either side of a
street
3. to achieve a landscaped setting between the street and buildings
4. to provide for a street-side edge which will have a landscape character that
will unify the total development and be sufficiently distinctive in design to
differentiate Blackriver Technology Park from other business developments
5. to provide vehicular sight lines which allow discrimination of one company
from another
6. to provide vehicular sight lines which allow safe ingress and egress to
properties and safe movements along roadways
7. to accommodate major Blackriver Technology Park identity statements at street
intersections leading into, and within the Park
Guidelines
1. No building or parking shall be permitted to be constructed closer than
thirty-five (35) feet from the property line along Southwest 4th Street.
Planters, walls, sign elements not exceeding 3'-0" in height may be permitted
in street-side setback areas with written approval of J.A.G./Renton Propert-
ies Associates. Roof overhangs may extend a maximum of 6'-0" into setback
areas.
2. The first 8 to 19 feet of street-side landscaping (from back of curb)
including sidewalk,will be installed by J.A.G./Renton Properties Assoicates
as a landscape easement, and shall remain unaltered, except for access
drives, unless alterations are approved in writing by J.A.G./Renton Proper-
ties Associates.
3. The remaining setback area shall be fully landscaped by the Owner/Occupant in
a manner both compatible with and complimentary to the landscape easements,
refer to Landscape Guidelines).
3.5 INTERIOR PROPERTY LINE SETBACK
Objectives
1. to provide a definite physical separation between buildings on adjoining lots
suitable for distinguishing separation of responsibilities
2. to allow companies on adjoining lots to be individually identifiable
Guidelines
1. No building shall be permitted to be constructed closer than ten (10) feet
from an interior property line.
2. No parking, other than automobile overhangs, shall be permitted to be con-
structed closer than five (5) feet from an interior property line, unless
otherwise approved in writing by J.A.G./Renton Properties Associates.
3. All setback areas shall be fully landscaped in a manner both compatible with
and complimentary to the on-site architecture and landscape design concepts.
3.6 PARKING REQUIREMENTS
Objectives
1. to provide sufficient on-site parking to accommodate all vehicles associated
with the use of each lot at any one time, and therefore not require vehicles
to be parked on public roadways or on lots of other companies
2. to configure parking areas such that they contribute to an increase of the
ratio of on-site persons to on-site vehicles
Guidelines
1. On-site parking shall be provided in a ratio of one space per 250 square feet
or less of net building area unless otherwise approved by J.A.G./Renton
Properties Associates.
2. Standard parking stalls shall be a minimum of 9 feet by 19 feet with a 21
foot reduction permitted for vehicle front overhangs.
3. Compact parking stalls shall not exceed forty (40) percent of the total
parking and shall be a minimum of 81 feet by 17 feet with a 2 foot reduction
permitted for vehicle front overhangs.
4. In addition to the parking required above, one designated parking space shall
be provided for each company vehicle to be parked on-site during normal
working hours. Parking spaces for company vehicles shall be of a size, area
and configuration that the company vehicles can be parked such that they are
fully contained within their designated spaces.
5. Designated "Handicap Parking" spaces, 12 feet in width, shall be provided at
a ratio of one stall per 50 parking stalls. Such parking spaces shall be
give preferential locations near building entrances which provide full and
convenient handicap access.
6. Should businesses locating on a Blackriver Technology Park development site
wish to encourage the formation of car pools by their employees, considera-
tion should be given to designating reserved "Car Pool" parking spaces.
Designated "Car Pool" spaces should be given preferential locations in
relatively close proximity to primary employee building entrances.
7. Designated "Cycle Parking" areas should be considered for the convenience of
employees using bicycles or motorcycles. In order to avoid the clutter of
cycles parked in unplanned locations, it is recommended that planned "Cycle
Parking" areas be conveniently located to employee entrances and be provided
with racks having security locking capabilities.
3.7 ACCESS AND DRIVE LOCATION
Objectives
1. to have access drives located such that vehicular traffic arriving at and
leaving from lots, as well as traffic passing continuously in streets, flow
at an optimum level of efficiency
2. that the continuity of street-side landscaping is minimally disrupted by the
construction of access drives
3. that utilities located in the landscape easement are not or are minimally
disrupted by the construction of access drives
Guidelines
1. Access drives on Southwest 4th Place should be aligned with regularly spaced
median breaks and low points in Landscape Easement earth mounding. Curb
openings aligned with regularly spaced median breaks will be permitted only
if the opposite side of the street has no planned curb openings. All curb
openings not aligned with regularly spaced median breaks shall be designed
for "right-turn-only" ingress and egress.
2. Access drives on Southwest 4th Place should be coordinated with
planned and existing median openings and where median openings are not
available, designed for efficient "right-turn-only" ingress and egress.
3. Access drives should be coordinated with adjacent lots so as not to impede
the efficient flow of peak period traffic. Consideration should be given to
adequate separation of adjacent access drives or the development of common
access drives.
4. Access drive designs should incorporate provisions for efficient vehicle
stacking during peak periods of use.
5. Access drives should be located such that their construction results in a
minimal disruption of the street side landscaping and utilities located
within the designated landscape easement.
6. No access drives will be permitted directly off of at any point east of its
intersection with
3.8 SIDEWALKS
Objectives
1. to provide a safe (separated from vehicles all weather efficient and aesthet-
ically pleasing means of pedestrian circulation connecting lots along the
streetside perimeter
2. to provide a safe (separated from vehicles) , all weather efficient and
aesthetically pleasing means of pedestrian circulation serving each site,
including connecting parking areas with building entries, connecting build-
ings to one another, and connecting building entries with on-site amenities
Guidelines
1. Streetside sidewalks will be installed by the developer within perimeter
landscape easements.
2. On-site pedestrian circulation systems shall be provided to meet the circul-
ation needs of on-site users. Such systems should provide safe, all weather
efficient, and aesthetically pleasing means of on-site movement and should be
an integrated part of the overall architectural and site design concept.
3. Where usage dictates, connections should be made between on-site and perime-
ter pedestrian circulation systems.
3.9 STORAGE, SERVICE, AND LOADING AREAS
Objectives
1. to insure that storage, service and loading areas are not visible from
primary visual exposure areas (streets, primary image entry drives, floors of
image buildings, common visual and recreational amenity areas, etc. )
2. to insure that storage, service and loading areas are located upon a site so
as to minimize the visibility of loading and service vehicles from primary
visual exposure areas
3. to insure that the storage, service and loading areas are designed and
located on the site so that service vehicle activities and movements do not
disrupt the efficient flowof on-site and off-site traffic
Guidelines
1. Storage, service; maintenance and loading areas must be constructed, main-
tained and used in accordance with the following conditions:
a. Unless approved in writing by J.A.G./Renton Properties Associates, no
materials, supplies, or equipment, including trucks or other motor
vehicles, shall be stored upon a site except inside a closed building or
behind a visual barrier screening such materials, supplies or vehicles
from adjacent sites so as not to be visible from neighboring properties
and streets. Any storage areas screened by visual barriers shall be
located upon the rear portions of a site, unless otherwise approved
in writing by J.A.G./Renton Properties Associates. No storage areas may
extend into a setback area except with the written approval of
J.A.G./Renton Properties Associates.
b. Provisions shall be made on each site for any necessary vehicle loading
and no on-street vehicle loading shall be permitted.
c. Loading dock areas shall be set back, recessed or screened so as not to
be visible from adjacent lots, or sites, neighboring properties , or
streets, and in no event shall a loading dock be closer than seventy-
five (75) feet from a property line fronting upon a street unless
otherwise approved in writing from J.A.G./Renton Properties Associates.
3.10 REFUSE COLLECTION AREAS
Objectives
1. to insure that refuse and refuse containers are not visible from primary
visual exposure areas (streets, primary image entry drives, floors of image
buildings, common visual and recreational amenity areas, etc. )
2. to insure that refuse enclosures are effectively designed to receive and
contain generated refuse until collected, and enclose refuse containers after
refuse is collected
3. to insure that refuse collection vehicles have clear and convenient access to
refuse collection areas and thereby not contribute to excessive wear-and-tear
to on-site and off-site developments
Guidelines
1. All outdoor refuse containers shall be visually screened within a durable
6'-o" or higher non-combustible enclosure, so as not to be visible from
adjacent lots or sites, neighboring properties or streets. No refuse collec-
tion areas shall be permitted between a street and the front of a
building.
2. Refuse collection areas should be effectively designed to contain all refuse
generated on-site and deposited between collections. Deposited refuse should
not be visible from outside the refuse enclosure.
3. Refuse collection enclosures should be designed of durable materials with
finishes and colors which are unified and harmonious with the overall archi-
tectural theme.
4. Refuse collection areas should be so located upon the lot as to provide clear
and convenient access to refuse collection vehicles and thereby minimize
wear-and-tear to on-site and off-site developments.
5. Refuse collection areas should be designed and located on the lot so as to be
convenient for the deposition of refuse generated on-site.
3.11 SCREENING OF EXTERIOR MECHANICAL EQUIPMENT
Objectives
1. to have all exterior components of plumbing, processing, heating, cooling and
ventilating systems not be directly visible from within the lot or from
adjoining streets, lots or buildings.
Guidelines
1. Exterior components of plumbing, processing, heating, cooling, and ventila-
ting systems (including but not limited to piping, tanks, stacks, collectors,
heating, cooling, and ventilating equipment fans, blowers, ductwork, vents,
louvers, meters, compressors, motors, incinerators , ovens, etc. ) , shall not
be directly visible from a height of 5'-0" above any ground or ground floor
elevation at a distance closer than 200 feet from the closest building wall
on any lot, unless such components are an integral part of the building
exterior design concept and approved in writing by J.A.G./Renton Properties
Associates.
2. It is recommended that in the case of roof mounted mechanical equipment, that
building parapets be of such a height that roof mounted screening devices not
be required. If building parapets do not provide the required screening,
mechanical equipment shall be screened by an unobtrusive screening device
that will appear as an integrated part of the overall architectural design.
3. Any devices employed to screen exterior components of plumbing, processing,
heating, cooling, and ventilating systems from direct view shall appear as an
integrated park of the architectural design, and as such, be constructed of
complimentary and durable materials and finished in a complimentary texture
and color scheme to the overall architectural design.
4. Any exterior components of plumbing, processing, heating, cooling and
ventilating systems and their screening devices, that will be visible from
upper floors of adjacent buildings shall be kept to a visible minimum, shall
be installed in a neat and compact fashion, and shall be painted such a color
as to allow their blending with their visual background.
5. No exterior components of plumbing, processing, heating, cooling, and ventil-
ating systems shall be mounted on any building wall unless they are an
integrated architectural design feature, and in any case shall be permitted
only with the written approval of J.A.G./Renton Properties Associates.
3.12 SCREENING OF EXTERIOR ELECTRICAL EQUIPMENT AND TRANSFORMERS
Objectives
1. to minimize the visibility of exterior electrical equipment and transformers
from primary visual exposure areas (streets, primary image entry drives,
floors of image buildings, and common visual and recreational amenity areas,
etc. )
Guidelines
1. Transformers that may be visible from any primary visual exposure area shall
be screened with either planting or a durable non-combustible enclosure (of a
design configuration acceptable to Puget Sound Power and Light). Where
possible, it is recommended that refuse containers and transformers be
integrated into the same enclosure.
2. Transformer enclosures should be designed of durable materials with finishes
and colors which are unified and harmonious with the overall architectural
theme.
3. Exterior mounted electrical equipment shall be mounted on the interior of a
building wherever possible. When interior mounting is not practical , elect-
rical equipment shall be mounted in a location where it is substantially
screened from public view. In no case shall exterior electrical equipment be
mounted on the street-side or primary exposure side of any building.
4. Exterior mounted electrical equipment and conduits shall be kept to a visible
minimum, where visible shall be installed in a neat and orderly fashion, and
shall be painted to blend with its mounting background.
3.13 FENCES AND WALLS
Objectives
1. to permit the installation of fences and walls within a lot for the purpose
of site security, sound attenuation, separation of functional activities, and
screening of unsightly functions and activities
2. to have fences and walls installed such that they are as inconspicuous as
possible or designed as an integrated and complimentary architectural design
element adding interest to the overall architectural design concept
3. to have no walls or fences reduce the intended quality of development or
reduce the perception of Blackriver Technology Park as a series of high
quality business sites
4. to discourage the construction of walls and fences except as necessary to
screen outside storage, loading and service areas
5. to insure that fences and walls do not, because of their height, location, or
design, contribute to a decrease in the safety or efficiency of traffic flows
on-site or in fronting streets
Guidelines
1. No fence or wall shall be constructed closer than thirty (30) feet from the
curbline of a fronting street unless it is of a height not to exceed 3'-0".
2. No fence or wall shall exceed a height of 8'-0" unless otherwise approved in
writing by J.A.G./Renton Properties Associates.
3. Walls and fences between buildings and fronting streets are discouraged, but
when necessary shall require written approval by J.A.G./Renton Properties
Associates.
4. All fences and walls shall be designed as an integrated part of the overall
architectural and site design. All materials shall be durable and finished
in textures and colors complimentary of the overall architectural design.
5. Where chain link fencing is to be employed, it shall be of a dark color and
be largely hidden behind plant materials and or earth mounding.
3.14 UTILITIES AND COMMUNICATION DEVICES
Objectives
1. to have the entire Blackriver Technology Park visually free of unsightly
overhead power and telephone lines, utility poles , and other utility and
communication equipment and components
2. to protect off-site utility systems from becoming over-burdened by individual
lot utility systems
3. to achieve minimum disruption of off-site utilities, paving and landscape
during construction and maintenance of on-site utility systems
Guidelines
1. All exterior on-site utilities including, but not limited to, drainage
systems, sewers, gas lines, water lines, and electrical , telephone, and
communications wires and equipment shall be installed and maintained under-
ground.
2. On-site underground utilities shall be designed and installed to minimize the
disruption of off-site utilities, paving and landscape during construction
and maintenance and shall be of such a design so as not to place excessive
burdens upon off-site utility systems during the course of use.
3. No antenna or device for transmission or reception of any signals, including,
but not limited to, telephone, television, and radio, shall be placed on any
lot so that it is visible from 5'-0" above the ground or ground floor level
at a distance of 500 feet in any direction, unless specific written approval
is granted by J.A.G./Renton Properties Associates.
4. Temporary overhead power and telephone facilities are permitted during
construction.
3.15 GRADING
Objectives
1. to encourage site design which protects buildings and business activities
from damage or disruption that might otherwise occur during extreme storm
conditions.
2. to encourage site design which protects buildings and business activities
from damage or disruption during extreme storm conditions
3. to allow precipitation falling on site and surface water flowing from ad-
jacent sites to be effectively absorbed or to drain off the site without
causing excessive water concentrations on adjacent sites or streets
4. to have site grading compliment and reinforce the overall architectural and
landscape design character
Guidelines
1. All building first floor elevations shall be approximately one and one-half
feet (1i) to two and one-half (2i) feet above the flow line of adjacent
streets (speci.fic pad elevations and on-site drainage plans should be estab-
lished by the project consultant).
2. Site grading design should compliment and reinforce the architectural and
landscape design character by helping to screen parking, loading and service
areas, by helping to reduce the perception of height and mass on larger
buildings, by providing reasonable transitions between on-site uses, by
providing elevation transitions contributing to the efficiency of on-site
and off-site movement systems, and by providing reasonable transitions
between lots.
3.16 NUISANCES
Objectives
1. to insure that no portion of Blackriver Technology Park is used in such a
manner as to create a nuisance to adjacent sites or streets such as, but not
limited to, vibration, sound, electro-mechanical disturbance and radiation,
electro-magnetic disturbance, radiation, air or water pollution, dust,
emission of odorous, toxic or noxious matter
Guidelines
1. No nuisance shall be permitted to exist or operate upon any lot or site so as
to be offensive or detrimental to any adjacent lot or site or neighboring
property or to its occupants. A "nuisance" shall include, but not be limited
to, any of the following conditions:
a) Any use of the lot or site which emits dust, sweepings, dirt or cinders
into the atmosphere, or discharges liquid runoff and discharge into
river, which in the opinion of J.A.G./Renton Properties Associates, may
adversely affect the health, safety, or comfort of persons within the
area or the intended use of their property. No waste nor any substance
or materials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any
regulation of any public body having jurisdiction over such public
sewer;
The escape or discharge of any fumes , odors , gases , vapors, steam,
acids or other substance into the atmosphere which discharge, in the
opinion of J.A.G./Renton Property Associates , may be detrimental to the
health, safety or welfare of any person or may interfere with the
comfort of persons within the area or which may be harmful to property
or vegetation;
c) The radiation or discharge of intense glare or heat or atomic,
electro-magnetic, microwave, ultrasonic, laser or other radiation. Any
operation producing intense glare or heat or such other radiation shall
be performed only within an enclosed or screened area and then only in
such manner that the glare, or heat or radiation emitted will
not be discernible from any point exterior to the site or lot upon which
the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from
any individual plant or operation, exceed the decibel levels in the
designated preferred octave bands as follows:
Octave Band Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60db(A) . The
maximum permissible noise levels for the octave bands shown above are
equal to an NC-50 Boise Criterion curve when plotted on the preferred
frequency scale.
Reasonable noise from motor vehicles and other transportation facilities
are exempted, so long as the vehicles or other transportation facilities
are not continuously on the subject property.
The operation of signaling devices and other equipment having impulsive
or non-continuous sound characteristics shall have the following correc-
tions applied:
Corrections
Pure Tone Content 5db
Impulsive Character 5db
Duration for Non-Continuous
Sounds in Daytime Only:
1 min/hr 5db
10 sec/10 min 10db
2 sec/10 min 15 db
The reference level for the db values listed above is the pressure of
0.00002 microbar or 0.0002 dyne/cm2
e) Excessive emissions of smoke, steam or particulate matter. Visible
emissions of smoke or steam will not be permitted (outside any building)
which exceed Ringlemann No. 1 on The Ringlemann Chart of the United
States Bureau of Mines. This requirement shall also be applied to the
disposal of trash and waste materials. Wind-borne dust, sprays
and mists originating in plants are not permitted.
f) Ground vibration. Buildings and other structures shall be constructed,
and machinery and equipment installed, and insulated on each lot or site
so that the ground vibration inherently and recurrently generated is not
perceptible without instruments at any point exterior to any lot or
site.
4.0 Architectural Guidelines
Objectives
1. to encourage high quality, contemporary architectural design of all facil-
ities to be constructed within Blackriver Technology Park, thus allowing
Blackriver Technology Park to be positively differentiated from other bus-
iness parks
2. to encourage businesses located within Blackriver Technology Park to express
themselves individually through the architectural design of their facilities
Guidelines
1. All design shall appear as an integrated part of an overall site design.
2. No "Period Buildings" shall be permitted. Contemporary building forms and
materials will be encouraged.
3. Pre-engineered metal buildings will not be permitted. Metal-clad buildings
will be permitted only if designed by an architect and only if specifically
approved in writing by J.A.G./Renton Properties Associates.
4. Design consideration should be given to:
a. views and vistas
b. solar orientation and climate
c. orientation toward major streets and thoroughfares
d. vehicular and pedestrian flows
e. the character of surrounding developments
f. expressions of a facility's functional organization
g. expressions of the individual character of each business
h. the satisfaction of physical , psychological , social and
functional needs of facility users
i . energy conservation through facility design
j. potential environmental hazards
k. enhancement of the overall landscape
5. Consideration should be given to the incorporation of design features such as:
a. highlighted visitor entrance and entry plazas
b. focal theme towers
c. enriched employee lunch areas
d. employee recreational facilities
e. accent lighting
f. atriums and interior courts
g. dynamic building and roof forms
h. striking window patterns
i . light and shadow patterns
j. color accents
Refer to Site Planning Guidelines and Landscape Guidelines for other design
features.
5.0 Landscape Guidelines
The landscape consists of elements that give form to exterior spaces. Thus, the
character of the landscape is created by major functional elements such as project
entrances, parking lots, buildings, service areas, signing, site lighting,
walkways, and the arrangement of plant materials.
Given that project architecture and building sites within Blackriver Technology
Park will most likely be of varying types and sizes, landscaping as a design
element will play the key role in creating and conveying the overall character of
Blackriver Technology Park as a "park-like" working environment. The purpose,
then, of these Landscape Guidelines, is to provide design criteria which will help
to insure that Blackriver Technology Park achieves an image that is distinctive,
clearly understandable and unified.
5.1 INTRODUCTION TO THE BLACKRIVER TECHNOLOGY PARK LANDSCAPE CONCEPT
As a part of Blackriver Technology Park Master Plan, hereinafter referred to as
Blackriver Technology Park, a Concept Master Plan has been conceived to organize,
unify and create a distinctive character for the whole of the development. The
Concept Master Plan recognizes that Blackriver Technology Park consists of two
prominent zones, namely, the 'Streetscape Zone' and the ' Interior Zone' . An
understanding of the nature of these two zones is important to understanding the
landscape guidelines and their intent.
5.1.1 Streetscape Zone
The streetscape zone is the primary image setting zone on either side of
Southwest 4th Place. All improvements within this corridor will have the greatest
degree of control . Attributes within this zone include:
1 . The Landscape Easement - This easement begins at the back of the
curb and extends inward for a distance of 30 feet along the entire street.
The first 13 feet minimum (including walk) to 24 feet maximum are designated
as a "Public Parkway". The parkway includes a 5 foot walkway (see Figure C)
The remaining 6 feet minimum to 17 feet maximum shall be the "Transistion
Zone" , to be contoured and planted by the Owner or Occupant. Common elements
within the Landscape Easement include a walkway, planting, irrigation, street
lighting, project signing and project entries.
5.1.2 The Streetscape Zone Design Concept
The streetscape within Black River Office Park will consist of a unified single
image, namely: a single row of street trees planted approximately 5 feet from the
curb line on a landscaped berm, on both sides of the main roadway. Lawn shall
occur from the curb to the walkway. Informal tree, shrub and groundcover
plantings shall occur between the walkway and the landscape easement.
Individual project entries will punctuate these plantings providing highlighted
corporate identification.
A walkway will meander through the public parkway providing an added dimension to
the overall Blackriver streetscape scene.
5. 1.3 Interior Zone
The Interior Zone encompasses all exterior elements not covered by the
requirements of Section 5. 1.1 and 5. 1.2. This zone is subject to the needs of
each Ovner or Occupant and, thus, is meant to have a greater degree of flexibility
than the streetscape zones. Common concerns within this zone include: parking
lot arrangements and landscaping, site lighting, regulatory and directional
signinc , and service area screening.
5. 1.4 Interior Zone Design Concept
It is intended that the Interior Zone of Blackriver Technology Park, consisting
primarily of parking lot landscaping, be planted in geometric patterns. (Refer to
Sectior 2.2.5c for plant types). Subtle light levels , restrained graphics and
screening of service areas will all contribute to reinforcing the Blackriver
Technology Park landscape design concept.
The Streetscape within Blackriver Technology Park will consist of a unified single
image, namely: a single row of street trees planted on both sides of the
Southwest 4th Place approximately 5 feet from the curbline on a landscaped berm
Lawn will occur from the curbline to the walkway. Informal tree, shrub and
groundcover plantings shall occur between the walkway and the property line of
indivicual properties of Owners or Occupants. This is the "Transition Zone" .
Indivicual project entries will punctuate these plantings providing highlighted
corporate identification.
Two major Blackriver entry monuments will be provided, namely: entrances to
Blackriver Technology Park.
5. 1.5 Grantor Provided Amenities
5. 1.5a Exceptions
Exceptions to 5. 1.4a above, shall occur at the west entry to Blackriver Technology
Park where a special entry landscape feature shall be provided by the Grantor
refer to the Concept Master Plan) .
5.1.5b Entry Feature
The Grantor shall be responsible to provide a special landscaped feature at the
entrances to Powell Avenue S.W. and Naches Avenue S.W. (Refer to the Master Plan,
Exhibit A) . This area shall include a special landscaping and a Blackriver
identification monument (sign) .
5. 1.5c Pedestrian Easements
The Grantor shall be responsible to provide three(3) ten foot wide landscaped
pedestrian easements (refer to the Concept Master Plan Exhibit A) . Landscaping in
this area shall include a five (5) foot wide walkway leading from the public
sidewalk within the landscape easement to preserve and/or buffer areas.
Landscaping on either side of the walkway shall be native groundcover vegetation.
5.1.6 Other Requirements
5.1.6a
All planting areas shall have a fully automatic irrigation system.
5.1.6b
All planting and irrigation details and technical specifications shall conform to
the highest standards of the American Association of Nurseryman, the American
Landscape Contractors Association, and the irrigation industry.
5.1.6c
It shall be the Owner or Occupant's responsibility to provide a one year guarantee
against all defects of materials and workmanship for all planting and irrigation.
The Owner or Occupant shall replace plants not in normal , healthy growing
condition at the end of the guarantee period with same species and size. The
guarantee period shall begin when the Owner or Occupant, and Grantor or their
representative have accepted the work as 100 percent complete.
5.2 LANDSCAPE DESIGN GUIDELINES
5.2.1 Assessment District Installation and Maintenance Agreement
1. All landscape improvements within the Public Parkway (S.W. 4th Place Land-
scape Easement Section 5.1.1-1) will ble installed by the Grantor.
2. The Grantor has entered into a five year maintenance agreement to maintain
the Public Parkway. Landscape maintenance will be paid for through
Assessment District revenues. Following the expiration of the five year
maintenance period, all maintenance will be assumed by the Owner or Occupant
of individual development parcels and will be assumed by the Owner or Occu-
pant of individual development parcels and will be paid for through the
continuation of an Assessment District.
3. The 30 foot Landscape Easement (Public Parkway and Transistion
Zone) landscaping and irrigation will be installed as a continuouss linear
system. Demolition of this system at vehicular access points will be
necessary during the process of the access drive installation. It is a
responsibility of the Owner or Occupant to maintain the flow of the
irrigation system during construction, and to re-establish the planting,
grading and final irrigation layout that has been altered.
5.2.2 Maintenance of Unimproved Sites
1. Sites that are not improved or built upon shall be maintained in a clean
and neat appearance by the Owner or Occupant. Weeds, brush and trash will
be removed twice a year, once in the spring and once in the fall , or more
often as required to maintain a high quality appearance. The Grantor and
their representative have the right to perform the necessary maintenance
and charge the individual Owner or Occupant as necessary.
5.2.3 Landscape Coverage
1. A minimum of fifteen (15) percent of the gross site area within the property
lines of a development site (exclusive of the Landscape Easement
Transition Zone) shall be devoted to landscape materials unless otherwise
approved in writing by the Grantor.
5.2.4 Street Frontage Zone Design Guidelines
The street frontage zone is defined as that portion of the site which is adjacent
to the Southwest 4th Place Landscape Easement.
5.2.4a Specific Design Limitation within the Street Frontage Zone
1. Grading: Finish grading for each site shall provide for a smooth transition
with the walkway in the Public Parkway. Transition slope in this zone shall
nct exceed 4: 1.
2. Service Areas: Service areas within this zone are to be enclosed with solid
wElls and screened with the appropriate landscape material . (Refer to
5.2.4.b-4 for plant types).
3. Parking: Berming shall be provided within the Transition Zone of the
Landscape Easement.
4. Screening Shrubs: The following shrubs , in combination with walls or fences ,
hEve been selected to aid in eye level screening of service areas. Planting
areas shall be a minimum width of 4 feet. All planting areas exceeding 4
fEet shall also conform to these landscape guidelines. The shrubs should
bE planted at a size to achieve a minimum height of 5 feet within a 3 year
pEriod from the date of planting.
Plant Name Maximum Spacing Comments
Chaenomeles lagenaria 4' on center Full
Euonymous alatus 4' on center Full
Forsythia sp. 4' on center Full
Juniper chinesis var.4' on center Full
Juniper squamata var.4' on center Full
Ligustrum vulgare 4' on center Full
Priladelphus virginalis 4' on center Full
Spiraea prunifolia 4' on center Full
Spiraea vanhouttei 4' on center Full
Thuja occidentalis pyramidalis 3' on center Full
Thuja orientalis 4' on center Full
Viburnum opulus 4' on center Full
5.2.5 Parking Lot Landscape Requirements
5.2.5a Tree Planting Requirements
1. Two (2) types of trees are identified for the parking lot planting.
Refer to Section 5.2.5c for plant types)
Type A: End of Parking Column Planting
Type B: Interior Parking Lot Planting
Type A: These trees shall be planted at the ends of parking columns (see Figures
J , K, and L) and at intermediate planting islands Figure J. A single tree
species, with a minimum height of 12 feet shall be planted throughout the
Owner or Occupant's entire parking lot compound.
Type B: These trees shall be planted in the parking lot interior (see Figures K
and L) . A single tree species, with a minimum height of 8 feet shall be
used. The tree species may be different in separated parking lots within
tre compound. Credit will not be given for perimeter edge tree planting. A
minimum of one (1) tree shall be planted for every six (6) car stalls.
2. Tree wells and planter areas within paved parking areas shall provide a
minimum 4 foot clear planting space.
3. Planting areas shall have a 6 inch curb on all sides.
4. All parking lot planting beds in addition to Type A and Type B trees shall
bE planted with shrubs and/or groundcover. The size and spacing to conform
tc Section 5.2.4.b.4.
5. Planting beds shall be a minimum of 25 square feet.
5.2.5.b Parking and Pedestrian Circulation
1. Parking location and layout should facilitate easy and safe pedestrian
circulation.
2. If the parking layout is more than one row deep, walking space with a minimum
width of 4 feet between stalls should be provided at key locations.
3. If parking lots exceed two rows in depth, the alignment of the aisles should
bE in the direction of the pedestrian movement.
5.2.5c Parking Lot Plant Materials List
1. Tree species are to be selected from the following lists. If special soil or
site conditions prevent the use of the recommended trees , the Owner or Occu-
pant should recommend an alternative to the Design Review Committee.
Tree Lists for Parking Compounds
Type A Trees : (Refer to Section 5.2.5.a-1A)
Plant Name Minimum Size Comments
Acer platanoides, sp. var.12' Well branched
Acer saccharum 12' Well branched
Aesculus hippocastanum 12' Well branched
Fraxinus americana (seedless) 12' Well branched
Gleditsia triacanthos inermis 12' Well branched
Tilia cordata 12' Well branched
All Type A Trees to be limbed up to six (6) feet from the ground.
Type B Trees: (Interior Parking Lot Planting)
Plant Name Minimum Size Comments
Crataegous lavallei 8' Well branched
Crataegus phaenopyrum 8' Well branched
Malus, var. 8' Well branched
Prunus cerasifera 8' Well branched
Sorbus aucuparia 8' Well branched
All Type B Trees to be limbed up to four (4) feet from the ground.
5.2.6 Vehicular Access Drive Design Guidelines
5.2.6a Location Criteria
1. The location of major access drives shall be approved by the Grantor.
2. Access drives for "right turn only" ingress and egress should be located by
the Owner or Occupant according to City of Renton Standards.
5.2.6b Limited Use Area of Primary and Secondary Access Drives
1. The "limited use area" is defined as the area extending 10 feet on either
side of an access drive and in that area of the first 10 feet extending
from the curbline of the public street.
2. All objects higher than 30 inches above the top of the curb at the access
drive curb opening, including but not limited to, shrubs, signs and earth
berms shall be located outside of the limited use area. Trees without limbs
to a height of six (6) feet may be planted in this area.
5.2.7 Guidelines for Interior Property Lines and Landscape Areas
5.2.7a Side/Rear Yard Requirements
1. A 5 foot minimum planting strip is to be provided continuously along all
interior property lines not adjacent to landscape easements , except where a
shared access drive has been mutually agreed upon by adjoining property
owners.
2. All site drainage shall be coordinated with the overall project Site Drainage
Master Plan and shall comply with the City of Renton Storm Drainage
Ordinance.
3. A maximum slope of 2: 1 is allowed within the 5 foot planting zone. A 1 foot
irinimum flat transition shall be provided at the top and bottom of all slopes
within this zone.
4. Where the two properties adjoin, there shall be a 10 foot minimum zone
created by the two 5 foot landscape planting strips on each side of a
property line. All planting areas exceeding the 5 foot minimum shall also
conform to these landscape guidelines.
5. No walls or fences shall be permitted within the required 5 foot minimum
planting zone. However, walls or fences separating adjoining parcels may be
permitted when located at the property line. Walls or fences which
contribute to a specific landscape design may be submitted to the Design
Review Committee for consideration.
5.2.7b Side/Rear Yard Landscape Requirements
1. General - Either shrub or tree planting shall be required in the 5 foot side
and rear yard zone. Where two properties adjoin, shrub plantings with
groundcover is required on one side of the property line and tree plantings
with groundcover is required on the other. The first Owner or Occupant to
receive plan approval shall be required to plant the required trees with
groundcover. The second Owner or Occupant must then plant the required
scrubs with groundcover.
5.2.7c Plant Material Requirements - Interior Property Lines
1. Trees: Shall be located 4 feet from curbs or 1 foot from the property
line. The trees selected for interior property lines must be species
selected from the Tree List. (Refer to Section 5.2.5c)
2. Snrubs: Shall be located 3 feet from the property line or 2 feet from the
carb, and planted with a maximum spacing of 5 feet on center.
3. G^oundcover: Shall be placed 24 inches on center maximum spacing, covering
a" l ground surfaces.
4. S)d lawn may be used in lieu of groundcover.
5.2.8 Guidelines for Exterior Property Lines
1. S °de/Rear Yard Requirements Adjacent to Landscape Easements
a Parking lots require no setback from the Landscape Easement. Parking
lotsshall be back five (5) feet from side on river property lines.
b. A minimum 60 foot front yard setback is required. Landscaping within
this zone shall conform to praking lot landscaping and transition zone
landscaping.
5.2.9 Guidelines for Free Preservation Outside the "Preserve" Zone
Trees selected for preservation shall have a "tree well " (fill retaining wall )
constructed to maintain an undisturbed existing ground area around the tree.
Provide approximately 5 sq. ft. for each caliper inch of trunk measured at 48"
above existing grade. The tree well shall be constructed in a manner to protect
all roots. No root cutting allowed. Special care shall be taken to maintain
ground water level and quality as nearly as possible to pre-development
conditions. This may include special irrigation and drainage systems or culvert
systems connecting the tree wells to nearby wetlands so that the rise and fall of
ground water will be similar to pre-development conditions. Storm water may be
retained on-site as necessary or desirable to assist in maintaining ground water
levels. '
Tree wells may be constructed of railroad ties, treated timbers or poured-in-place
concrete, with an 8 inch high curb of timber, concrete or asphalt on all sides.
Provide hand rails where resultant depressions are more than 30 inches deep.
Conditions may vary at each tree location. Analyze each tree to ascertain the
best solution or combination of solutions to minimize adverse environmental
impacts.
Consult an Aborist regarding selection of trees to be preserved and preservation
procedures to be used. Selected trees are subject to review and approval by the
City of Renton.
6.0 Signing Guidelines
6.1 OBJECTIVES The objectives of Signing Guidelines for Blackriver Technology
Park are:
1. to allow sufficient, though not excessive, business identification devises so
that the name of each business locating in Blackriver Technology Park is
clearly and individually associated with the facilities it occupies, when
viewed by motorists passing by on fronting streets
2. to prohibit signs and business identification devices from being used for
advertising of any kind including, but not limited to, advertising of pro-
ducts, services, or job openings
3. to allow on each lot sufficient, though not excessive, informational , direc-
tional , and traffic control signing for convenient and efficient operation
4. to have all informational , vehicular control , and temporary signing be
uniform in design, size, height, color, material , and topography
5. to permit sufficient, though not excessive, temporary signing including those
identifying the future occupant, the design consultants, the general con-
tractor, lending institutions, sale or leasing agents, and the building
product to be offered
6. to insure that signing and identification devices do not, because of their
height, location or design, contribute to a decrease in the safety and
efficiency of traffic flows in fronting streets
6.2 SIGN SUBMITTALS:
1. An overall sign program including any (1) detached business identifica-
tion signs, (2) building mounted business or building identification signs
and (3) informational and vehicular control signs shall be submitted as part
of the preliminary plan submittal to the Blackriver Technology Park Design
Review Committee.
6.3 DETACHED BUSINESS IDENTIFICATION SIGNS:
1. Detached business identification signs shall be limited to the display of the
name and/or symbol of the business or businesses occupying the site. No
messages or advertising of any kind including, but not limited to, adver-
tising of products, services, or job openings shall be permitted.
2. No more than one detached business identification sign shall be permitted on
each street frontage of a development parcel .
3. No detached business identification sign shall exceed a sign area which is
the lesser of 50 square feet per side or the maximum sign area permitted by
the local governing authority. The sign area is defined as the area of the
surface or surfaces which displays letters or symbols identifying the bus-
iness or businesses occupying the site, or when the sign is of free-
standing letters, the single rectangular area which fully encloses all
letters or symbols identifying the business or businesses occupying the site.
The sign area shall not include the base or pedestal to which the sign is
mounted.
4. All detached business identification signs shall be permanent "ground hugger"
type signs and shall not exceed a height of five feet above the underlying
finish grade unless otherwise approved in writing by J.A.G./Renton Properties
Associates.
5. All detached business identification signs shall be of such materials and
design to be compatible with and complimentary to the on-site design concept
as well as landscape and physical design features.
6. Illumination - Detached business identification signs may be illuminated by
continuous and uniform internal illumination, backlighting, or ground light-
ing. No flashing or moving lights will be permitted. No unprotected lamp
providing sign illumination shall be directly visible when viewed at
any angle from a distance of twenty feet or more. No sign illumination shall
cast a glare which will be visible from any street or access drive.
7. Location - Detached business identification signs must be located within 20
feet of a fronting street and the access drive but shall not exceed 30 inches
in height when located in the first 10 feet adjacent to access drive closest
to the street.
6.4 BUILDING MOUNTED BUSINESS OR BUILDING IDENTIFICATION SIGNS:
1. Building mounted business or building identification signs shall be limited
to the display of the building name or the name and/or symbol of the business
occupying the site. No message or advertising of any kind including, but not
limited to the advertising of products, services or job openings
shall be permitted.
2. No more than one building mounted sign shall be permitted for each street
frontage of a development parcel .
3. Business or building identification signs may be mounted to any vertical
surface of a building or building associated wall provided such signs appear
as an integral part of the overall architectural and site design concept.
4. The sign area of building mounted business or- building identification signs
may not exceed the lesser of 50 square feet or the maximum building mounted
sign area permitted by the local governing authority. The building mounted
sign area is defined as the area of the surface or surfaces which displays
letters or symbols identifying the business or businesses occupying the
site or when the sign is of freestanding letters, the single rectangular area
which fully encloses all letters or symbols identifying the business or
businesses occupying the site.
5. Building mounted business or building signs shall not extend beyond a height
above the ground floor which is the lesser of 32 feet or the maximum height
permitted by the local governing authority.
6. Building mounted business or building identification signs may be illuminated
by internal illumination or backlighting provided that the color and inten-
sity of such lighting appears as an integral part of the overall architec-
tural and site design concept. No sign illumination shall cast a glare which
will be visible from any street or access drive.
6.5 INFORMATIONAL AND VEHICULAR CONTROL SIGNS:
1. All informational and vehicular control signs shall be of uniform design
using ASI/Fiberglass Post & Panel System or a sign system of equal design
which is specifically approved in writing by J.A.G./Renton Properties Assoc-
iates. All lettering shall be Helvetica Medium, white in color. Red and
yellow may be used for stop and yield signs respectively.
2. No informational or vehicular control sign shall have a panel face which
exceeds 5 square feet in area per side.
3. No business name, symbol or advertising of any sort shall be permitted on any
informational or vehicular control sign.
4. No informational or vehicular control sign shall exceed a height of 4 feet
above the underlying grade.
5. No informational or vehicular control sign shall be located so as to reduce
the safe flow of vehicles or pedestrians.
6. No informational or vehicular control sign shall be internally illuminated or
illuminated from the ground.
6.6 TErPORARY SIGNS.
Only one temporary sign plus one financing sign shall be permitted per
development parcel . No additional individual signs shall be permitted.
J.I .G./Renton Properties Associates or its representatives have the right to
remove unpermitted signs and charge the individual tenant or property owner
for the cost of such removal .
2. Temporary development signs shall be of a uniform size, area, height, color,
and design as illustrated here and shall , at a minimum, identify Blackriver
Technology Park and the business or company developing the parcel . The
remaining sign area shall be limited to identification of the following
and no other information:
a. a concise identification of the nature of the development
b. the projected date of completion
c. the construction lender
d. the real estate brokerage firm
e. the general contractor
f. the architect
g. the landscape architect
h. the structural engineer
i . the civil engineer
j. the mechanical engineer
k. the electrical engineer
3. No temporary development sign shall be located so as to reduce the safe flow
of vehicles and pedestrians
4. All temporary development signs shall be removed prior to occupancy.
7.0 Lighting Guidelines
7.1 OBJECTIVES
1. to have on-site lighting contribute to the safe and efficient use of a
development site
2. to have on-site lighting contribute to site security
3. to have on-site lighting compliment and reinforce the architecture and site
design character
4. to have on-site parking lot lighting fixtures and illumination levels be
consistent throughout Blackriver Technology Park
5. to prevent on-site lighting from casting glare onto adjacent lots
6. to prevent on-site lighting from casting glare onto adjacent streets in such
a manner as to decrease the safety of vehicular movement
7. to encourage lighting design that is in conformance with energy saving
guidelines
7.2 LIGHTING QUALITY
All lighting potentially visible from an adjacent street except bollard
lighting less than 42 inches high, shall be indirect or shall incorporate a
full cut off shield type fixture.
7.3 PARKING, ACCESS AND CIRCULATION AREAS
Parking areas, access drives, and internal vehicular circulation areas - All
parking lot lighting fixtures shall be a zero
series or a fixture of similar "shoe box" type design mounted at 18'-0" atop
a square metal pole. Both the fixture and pole are to have a durable black
finish. The light source shall be 150 watt color corrected high pressure
sodium. The parking lot illumination level shall achieve a uniformity ratio
of 3 to 1 (average to minimum) with a maintained average of 1 foot
candle and a minimum of .3 foot candle.
7.4 SERVICE AREAS
Service area lighting shall be contained within the service yard boundaries
and enclosure walls. No light spillover should occur outside the service
area. The light source should not be visible from the street.
7.5 BUILDING ILLUMINATION
Building illumination and architectural lighting shall be indirect in charac-
ter. (No light source visible). Indirect wall lighting or "wall washing"
overhead down lighting, or interior illumination which spills outside is
encouraged. Architectural lighting should articulate and animate the
particular building design as well as provide the required functional light-
ing for safety and clarity of pedestrian movement.
7.6 PEDESTRIAN AREAS
Pedestrian walk and area lighting is segmented into 2 zones.
1. De first zone is pedestrian area lighting. This is for outdoor pedes-
trian use areas such as courtyard, entry way, etc. Pedestrian area
l - ghting should achieve a uniformity ratio of 3.5 to 1 average to
minimum, with an average illumination of .60 foot candles and a minimum
01 . 18 foot candles.
2. The second zone is pedestrian walk lighting where point to point
lighting is acceptable with no specific illumination levels required.
The main emphasis in this zone should be to clearly identify the pedes-
trian walkway and direction of travel .
8.0 Appendix
CONTACT AND REFERENCE LIST
DEVELOPER (Grantor)
J.A.G./ enton Properties Associates
Alterra Corp. , General Partner
710 Che'ry Street
Seattle, WA 98104
Phone: (206) 382-0333
Contact Delton Bonds
PROJECT CONSULTANT (Planning, Site, Civil & Utilities Design, Landscape
Archite :ture)
Richard Carothers Associates
814 E. 'ike Street
Seattle , WA 98122
Phone: (206) 324-5500
Contact Richard A. Carothers
GOVERNMENTAL AGENCIES
City of Renton
Municipnl Building
200 Mil Avenue South
Renton, WA 98055
o Planning Department
Ronald G. Nelson, Director
Phone (206) 235-2540
Contact: Roger J. Blalock, Zoning Administrator
Jerry Lind , Land Use Inspector
o Public Works
RiH:hard Houghton, Director
Phone (206) 235-2569
Contact: Richard Houghton
o Enii neeri ng Department
Robert Bergstrom, P.E. , Director
Phone (206) 231-2631
Contact: Robert Bergstrom, P.E.
o Fi 'e Department
James Matthew, Fire Marshall
Phone (206) 235-2642
Contact: James Matthew
PLANNING & DESIGN REFERENCES
Renton ?oning Ordinance
Building Regulations, Title 4, Chapter 23 (Grading & Filling)
Subdivision Ordinance, Chapter 11 (Preliminary Plat)
Controlling Building Code: Uniform Building Code with City enacted amendments.
Maps ani plans, Contact J.A.G./Renton Properties Associates
Covenants, Conditions and Restrictions
Con tents
DECLARA ~ION OF COVENANTS, CONDITIONS AND RESTRICTIONS
FOR BLAI;KRIVER TECHNOLOGY PARK
Page No.
REI ITALS 1
1.0 DEFINITIONS 2
1.1 Architect, Landscape Architect, Civil Engineer
1.2 Beneficiary
1.3 Declarant
1.4 Declaration
1.5 Deed of Trust
1.6 Improvement - Improvements
1.7 Lot
1.8 Mortgage
1.9 Mortgagee
1.10 Occupant
1.11 Owner
1.12 Record - Recorded - Recordation
1.13 Sign
1. 14 Street or Streets
1.15 Subject Property
1.16 Visible from Neighboring Property
2.0 SUBJECT PROPERTY 4
2. General Declaration
2.;' Addition of Other Realty
2.3 Notice of Addition of Land
3.0 CONSTRUCTION OF IMPROVEMENTS 6
3. 1 Approval of Plans Required
3.? Basis for Approval
3.3 Review Fee
3.4 Result of Inaction
3.5 Approval
3.6 Proceeding with Work
3.7 Completion of Work
3.8 Declarant Not Liable
3.9 Construction Without Approval
4.0 DE'!ELOPMENT STANDARDS 10
4. 1 Minimum Setback
4.2 Exceptions to Setback Requirements
4.3 Landscaping
Page No.
4.0 DEVELOPMENT STANDARDS (Continued)
4.4 Signs
4.5 Parking Areas
4.6 Storage and Loading Areas
5.0 REGULATION OF OPERATIONS AND USES 14
5.1 Permitted Uses
5.2 Prohibited Uses
5.3 Nuisances
5.4 Condition of Property
5.5 Maintenance of Grounds
5.6 Remedies for Failure to Maintain & Repair
a) Remedies
b) Foreclosure of Lien
c) Cure
d) Nonexclusive Remedy
5.7 Taxes and Assessments
5.8 Refuse Collection Areas
5.9 Repair of Buildings
5.10 Public Utilities
5.11 Utility Lines and Antennas
5.12 Mechanical Equipment
5.13 Mineral Exploration
5.14 Other Operations and Uses
6.0 MODIFICATION AND REPEAL 23
6.1 Procedure
6.2 Modification by Declarant
6.3 Governmental Regulation
7.0 ENFORCEMENT 25
7.1 Abatement and Suit
7.2 Right of Entry
7.3 Deemed to Constitute a Nuisance
7.4 Attorney's Fee
7.5 Failure to Enforce is No Waiver
8.0 ASSIGNMENT 27
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE 27
10.0 WAIVER 28
Page No.
11.0 PUNS WITH LAND 28
12.0 LIGHTS OF MORTGAGEES 28
13.0 CAPTIONS 29
14.0 EFFECT OF INVALIDATION 29
DECLARATION OF COVENANTS
CONDITIONS AND RESTRICTIONS
FOR
BLACKRIVER TECHNOLOGY PARK
This Declaration, made this day of 1984, by J.A.G./
Renton Properties Associates, a Washington Partnership, is made with reference to
the following facts:
RECITALS
A. Blackriver Technology Park is the owner of that certain real property in the
City of Renton, County of King, State of Washington described in Exhibit A attached
hereto and by this reference incorporated herein, and known as Blackriver Technology
Park.
B. Blackriver Technology Park is being developed as a planned industrial park.
It is J.A.G./Renton Properties Associates desire and intention to subject the real
property in said industrial park to certain covenants , conditions and restrictions
for the benefit of the property, J.A.G./Renton Properties Associates, and the
purchasers of lots in Blackriver Technology Park. It is intended that said
covenants, conditions and restrictions bind and benefit not only said purchasers
and J.P .G./Renton Properties Associates , but also their respective successors,
heirs aid assigns and that all lots in Blackriver Technology Park should be held,
used, leased, sold and conveyed subject to the covenants , conditions and
restrictions set forth in this Declaration.
1-
C. It is the intention of J.A.G./Renton Properties Associates to further a plan
of subdivision by means of the covenants, conditions and restrictions set forth in
this Declaration. Said covenants, conditions and restrictions are intended to be
common to all of the lots in Blackriver Technology Park and to enhance and protect
the value, desirability and attractiveness of all such lots to their mutual
benefit.
1.0 DEFINITIONS
Unless the context otherwise specifies or requires, the terms defined in this (1.0
Definitions) , shall as used in this Declaration, have the meanings herein set
forth:
1.1 Architect, Landscape Architect, Civil Engineer. The term "architect,
landscape architect and civil engineer" , shall mean a person holding a certificate
to practice architecture, landscape architecture or civil engineering, in the State
of Washington.
1.2 Beneficiary. The term "beneficiary" shall mean a mortgagee under a mortgage
as well as a beneficiary under a deed of trust.
1.3 Declarant. The term "Declarant" shall mean J.A.G./Renton Properties
Associates and, to the extent provided in Article VIII of this Declaration, its
successors and assigns.
1.4 Declaration. The term "Declaration" shall mean this Declaration of Covenants,
Conditions and Restrictions for Blackriver Technology Park, as it may from time to
time be amended or supplemented.
1.5 Deed of Trust. The term "deed of trust" shall mean a mortgage as well as a
deed of trust.
1.6 Blackriver Technology Park. The term "Blackriver Technology Park" shall be
synonymous with the term "subject property" and shall mean all of the real property
2-
now or hereafter made subject to this Declaration. 1.7 Improvement - Improvements.
The term "improvement" or "improvements" shall include buildings, outbuildings,
roads, driveways, parking areas, fences, screening walls and barriers, retaining
walls, stairs, decks , water lines, sewers, electrical and gas distribution
facilities, hedges, windbreaks, plantings, planted trees and shrubs, poles, signs,
loading areas and all other structures, installations and landscaping of every type
and kind, whether above or below the land surface.
1.8 Lot. The term "lot" shall mean a fractional part of the subject property as
subdivided on subdivision or parcel maps recorded from time to time in the Office
of the Recorder of the County of King, State of Washington.
1.9 Mortgage. The term "mortgage" shall mean a deed of trust as well as a
mortgage.
1.10 Mortgagee. The term "mortgagee shall mean a beneficiary under, or holder of,
a deed of trust as well as a mortgagee under a mortgage.
1. 11 Occupant. The term "Occupant" shall mean a lessee or licensee of an Owner, or
any other person or entity other than an Owner in lawful possession of a lot with
the permission of the Owner.
1.12 Owner. The term "Owner" shall mean and refer to any person or entity which is
the record Owner of fee simple title to any lot, excluding any entity or person who
holds such interest as security for the payment of an obligation, but including
contract sellers and any mortgagee or other security holder in actual possession of
a lot.
1.13 Record - Recorded - Recordation. The terms "record," "recorded," or
recordation" shall mean, with respect to any document, the recordation of said
document in the Office of the Recorder of the County of King, State of Washington.
3-
1.14 Sign. The term "sign" shall mean any structure, device or contrivance,
electric or non-electric, upon or within which any poster, bulletin, printing,
lettering, painting, device or other advertising of any kind whatsoever used,
placed, posted, tacked, nailed, pasted, or otherwise fastened or affixed.
1.15 Street of Streets. The term "street" or "streets" shall mean any street,
highway, road, or thoroughfare within or adjacent to the subject property and shown
on any recorded subdivision or parcel map, or record or survey, whether designated
thereon as street, boulevard, place, drive, road, court, terrace, way, lane, circle
or otherwise.
1.16 Subject Property. The term "subject property shall be synonymous with the
term "Blackriver Technology Park" and shall mean all of the real property now or
hereinafter made subject to this Declaration.
1.17 Visible from Neighboring Property. The term "visible from neighboring
property" shall mean, with respect to any given object on a lot, that such object
is or would be visible to a person six (6) feet tall , standing on any part of any
adjacent lot or other property at an elevation no greater than the elevation of the
base of the object being viewed.
2.0 SUBJECT PROPERTY
2.1 General Declaration. Declarant hereby declares that all of that real property
located in the City of Renton, County of King, State of Washington, and more
particularly described in Exhibit "A" is , and shall be, conveyed, hypothecated,
encumbered, leased, occupied, built upon or otherwise used, improved or transferred
in whole or in part, subject to this Declaration. All of the covenants, conditions
and restrictions set forth herein are declared and agreed to be in furtherance of a
general plan for the subdivision, improvement and sale of said real property and
are established for the purpose of enhancing and protecting the value, desirability
4-
and attractiveness of the subject property and every part thereof. All of said
covenants , conditions and restrictions shall run with all of the subject property
for all purposes and shall be binding upon and inure to the benefit of Declarant
and all Owners, Occupants , and their successors in interest as set forth in this
Declaration.
2.2 Addition of Other Realty. Declarant may at any time during the pendency of
this Declaration add all or a portion of any real property now or hereinafter owned
by Declarant to the subject property, and upon recording of a notice of addition of
real property containing at least the provisions set forth in Section 2.3, the
provisions of this Declaration specified in said notice shall apply to such added
real property in the same manner as if it were originally covered by this
Declaration. Thereafter, to the extent that this Declaration is made applicable
theret), the rights, powers and responsibilities of Declarant and the Owners and
Occupants of lots within such added real property shall be the same as in the case
of the real property described in Exhibit "A".
2.3 Notice of Addition of Land. The notice of addition of real property referred
to in section 2.2 shall contain at least the following provisions:
a) A reference to this Declaration stating the date of recording and the book or
books )f the records of King County, Washington, and the page numbers where this
Declamation is recorded;
b) A statement that the provisions of this Declaration, or some specified part
thereo `, shall apply to such added real property;
c) A legal description of such added real property; and
d) Such other or different covenants, conditions and restrictions as Declarant
shall , in its discretion, specify to regulate and control the use, occupancy and
improvements of such added real property.
5-
3.0 CONSTRUCTION OF IMPROVEMENTS
3.1 Approval of Plans Required. No improvements shall be erected, placed,
altered, maintained or permitted to remain on any lot by any Owner or Occupant
until final plans and specifications shall have been submitted to and approved in
writing by Declarant. Such final plans and specifications shall be submitted in
duplicate over the authorized signature of the Owner or Occupant or both of the lot
or the authorized agent thereof. Such plans and specifications shall be in such
form and shall contain such information as may be required by the Declarant, but
shall in any event include the following:
a) A site development plan of the lot showing the nature, grading scheme, kind,
shape, composition, and location of all structures with respect to the particular
lot (including proposed front, rear and side setback lines) , and with respect to
structures on adjoining lots, and the number and location of all parking spaces and
driveways on the lot;
b) A landscaping plan for the particular lot;
c) A plan for the location of signs and lighting; and
d) A building elevation plan showing dimensions, materials and exterior color
scheme in no less detail than required by the appropriate governmental authority
for the issuance of a building permit. Material changes in approved plans must be
similarly submitted to and approved by Declarant.
3.2 Basis for Approval . Approval shall be based, among other things, upon
adequacy of site dimensions, adequacy of structural design, conformity and harmony
of external design with neighboring structures, effect of location and use of
proposed improvements upon neighboring lots , proper facing of main elevation with
respect to nearby streets, adequacy of screening of mechanical , air conditioning or
other roof top installations, and conformity of the plans and specifications to the
purpose and general plan and intent of this Declaration. No plans will be approved
6-
which do not provide for the underground installation of power, electrical ,
telephone and other utility lines from the property line to buildings. Plans which
provide for metal-clad buildings will be approved only on the condition that such
buildings are constructed so as not to have the appearance of a metal building and
any metal-clad building must be specifically approved in writing. Declarant shall
not arbitrarily or unreasonably withhold its approval of any plans and
specifications. Except as otherwise provided in this Declaration, Declarant shall
have the right to disapprove any plans and specifications submitted hereunder on
any reasonable grounds including, but not limited to, the following:
a) Failure to comply with any of the restrictions set forth in this Declaration;
b) Failure to include information in such plans and specifications as may have
been reasonably requested by Declarant;
c) Objection to the exterior design, the appearance of materials or materials
employed in any proposed structure;
d) Objection on the ground of incompatibility of any proposed structure or use
with existing structures or uses upon other lots, or other property in the vicinity
of the subject property;
e) Objection to the location of any proposed structure with reference to other
lots, or other property in the vicinity;
f) Objection to the grading or landscaping plan for any lot;
g) Objection to the color scheme, finish, proportions, style or architecture,
height, bulk or appropriateness of any structure;
h) Objection to the number or size of parking spaces, or to the design of the
parking area;
i ) Any other matter which, in the judgment of the ,Declarant, would render the
proposed improvements or use inharmonious with the general plan for improvement of
7-
the subject property or with improvements located upon other lots or other property
in the vicinity.
3.3 Review Fee. An architectural review fee shall be paid to Declarant at such
time as plans and specifications are submitted to it based upon the following
schedule:
a) When the plans submitted are prepared by a licensed architect, engineer or
landscape architect, the architectural review fee shall be the sum of One Hundred
and no/100ths Dollars ($100.00);
b) In all other cases, the architectural review fee shall be the sum or Two
Hundred Fifty and no/100ths Dollars ($250.00).
3.4 Result of Inaction. If Declarant fails either to approve or disapprove plans
and specifications submitted to it for approval within forty-five (45) days after
the same have been submitted, it shall be conclusively presumed that Declarant has
disapproved said plans and specifications; provided, however, that if within the
forty-five (45) day period Declarant gives written notice of the fact that more
time is required for the review of such plans and specifications, there shall be no
presumption that the same are disapproved until the expiration of such reasonable
period of time as is set forth in the notice.
3.5 Approval . Declarant may approve plans and specifications as submitted, or as
altered or amended, or it may grant its approval to the same subject to specific
conditions. Upon approval or conditional approval by Declarant of any plans and
specifications submitted, a copy of such plans and specifications, together with
any conditions, shall be deposited for permanent record with Declarant, and a copy
of such plans and specifications, bearing such approval together with any
conditions, shall be returned to the applicant submitting the same.
8-
3.6 Proceeding with Work. Upon receipt of approval from Declarant pursuant to
Section 3.5, the Owner, or Occupant, or both, to whom the same is given, shall , as
soon as practicable, satisfy any and all conditions of such approval and shall
diligently proceed with the commencement and completion of all approved excavation,
construction, refinishing, and alterations. In all cases, work shall commence
within one (1) year from the date of approval , and if work is not so commenced
approval shall be deemed revoked unless Declarant, pursuant to written request made
and received prior to the expiration of said one (1) year period, extends the
period of time within which work must be commenced.
3.7 Completion of Work. Any improvement commenced pursuant hereto shall be
completed within two (2) years from the date of Declarant's approval of the plans
and specifications therefor, except for so long as such completion is rendered
impossible, or unless work upon the proposed improvements would impose a great
hardship upon the Owner or Occupant, to whom Declarant's approval is given, due to
strike, fire, national emergency, natural disaster or other supervening force
beyond the control of Owner or Occupant. Declarant may, upon written request made
and received prior to the expiration of the two (2) year period, extend the period
of time within which work must be completed. Failure to comply with this Section
3.7 shall constitute a breach of this Declaration and subject the party in breach
to the enforcement procedures set forth in 7.0.
3.8 Declarant Not Liable. Declarant shall not be liable for any damage, loss or
prejudice suffered or claimed by any person on account of:
a) The approval or disapproval of any plans, drawings and specifications, whether
or not in any way defective;
b) The construction of any improvement, or performance of any work, whether or
not pursuant to approved plans, drawings and specifications; or
9-
c) The development of any lot within Blackriver Technology Park.
3.9 Construction Without Approval . If any improvement shall be erected, placed or
maintained upon any lot, or the exterior design thereof, or any new use commenced
upon any lot, other than in accordance with the approval by the Declarant pursuant
to the provisions of this 3.0 (Construction of Improvements) , such alteration,
erection, placement, maintenance or use shall be deemed to have been undertaken in
violation of this Declaration, and upon written notice from Declarant, any such
improvement so altered, erected, placed, maintained or used upon any lot in
violation of this Declaration shall be removed or altered so as to conform to this
Declaration, and any such use shall cease or be amended so as to conform to this
Declaration. Should such removal or alteration, or cessation or amendment of use
not be accomplished within thirty (30) days after receipt of such notice, then the
party in breach of this Declaration shall be subject to the enforcement procedures
set forth in 7.0.
4.0 DEVELOPMENT STANDARDS
4.1 Minimum Setback. No improvements of any kind, and no part thereof, shall be
placed closer than permitted by Declarant to an interior property line, except as
otherwise provided in Section 4.2. "Interior property line" shall mean the
boundary between any lot within the subject property and all other lots bordering
upon said lot. No improvements of any kind, and no part thereof, shall be placed
closer than twenty-five (25) feet from a property line fronting the following
streets: (1) Southwest Fourth Place and (2) Naches Avenue S.W. "Property line"
shall mean the boundary of every lot.
4.2 Exceptions to Setback Requirements. The following improvements, or parts of
improvements, are specifically excluded from the setback requirements set forth in
Section 4. 1:
10-
a) Roof overhang, subject to approval in writing from Declarant, provided said
overhang does not extend more than six (6) feet into the setback area;
b) Steps and walkways;
c) Paving and associated curbing;
d) Fences, except that no fence shall be placed closer than twenty-five (25) feet
from a property line fronting upon any public street without the prior written
approval of Declarant;
e) Landscaping and irrigation systems;
f) Planters, not to exceed three (3) feet in height, except that planters of
greater height may be built within the setback area with the prior written approval
of Declarant;
g) Industrial park identification signs, directional and parking signs and signs
identifying the Owner or Occupant of a lot, subject to the prior written approval
of Declarant;
h) Lighting facilities, subject to the prior written approval of Declarant; and
i ) Underground utility facilities and sewers.
4.3 Landscaping. Within ninety (90) days following completion of construction, or
by the date each improvement is occupied, whichever shall occur first, each lot
shall be landscaped in accordance with the plans and specifications. The area of
each lot between any street and any minimum setback line as set forth in Section
4. 1 shall be landscaped with an attractive combination of trees, shrubs and other
ground cover. All other areas fronting on a street and not utilized for parking,
driveways, or walkways shall be landscaped in a complementary and similar manner.
All portions of a lot not fronting a street and not used for parking, storage or
buildings shall be landscaped utilizing ground cover and shrub or tree materials.
The Owner or Occupant shall be responsible for landscaping and maintaining the area
11-
known as the 'transition zone' ; refer to Landscape Design Guidelines. An
underground landscape irrigation system shall be provided and maintained by the
Owner or Occupant for all landscaped areas. Areas used for parking shall be
landscaped, bermed or attractively fenced in such a manner as to screen said areas
from view from adjacent streets and freeways. Such screening shall extend at least
forty-two (42) inches above the high point of the finished pavement in said parking
area. Plant materials used for this purpose shall consist of lineal or grouped
masses of shrubs and trees.
After completion, such landscaping as is herein required shall be maintained in a
sightly and well-kept condition. If, in Declarant's reasonable opinion, the
required landscaping is not maintained in a sightly and well-kept condition,
Declarant shall be entitled to the remedies set forth in 7.0.
4.4 Signs. No sign shall be permitted on any lot unless approved by Declarant in
writing. No sign shall be approved other than industrial park identification
signs, directional and parking signs, signs identifying the name, business and
products of the Owner or Occupant of a lot, and signs offering the lot for sale or
lease.
4.5 Parking Areas. Off-street parking adequate to accommodate the parking needs
of the Owner or Occupant, the employees and visitors thereof shall be provided by
the Owner or Occupant of each lot. The intent of this provision is to eliminate
the need for any on-street parking; provided, however, that nothing herein shall be
deemed to prohibit on-street parking of public transportation vehicles. If parking
requirements increase as a result of a change in the use of a lot or in the number
of persons employed by the Owner or Occupant, additional off-street parking shall
be provided so as to satisfy the intent of this section. All parking areas shall
conform to the following standards:
12-
a) Required off-street parking shall be provided on the lot, on a contiguous lot,
or within such distance from the lot as Declarant deems reasonable. Where parking
is provided other than upon the lot concerned, Declarant shall be given a certified
copy of a recorded instrument, duly executed and acknowledged by the person or
persons holding title to the lot or other property upon which the parking area is
located, stipulating to the permanent reservation of the use of the lot or other
property for such parking area.
b) Parking areas shall be paved so as to provide dust-free, all-weather surfaces.
Each parking space provided shall be designated by lines painted upon the paved
surface and shall be adequate in area. All parking areas shall provide, in
addition to parking spaces, adequate driveways and space for the movement of
vehicles.
c) In determining the adequacy of the number of parking spaces to be provided by
an Owner or Occupant, Declarant shall consider the nature of the proposed use of
the lot, the amount of vehicular traffic generated by said use, the anticipated
number of, and manner of employment of, persons to be employed upon the lot; the
nature and location of proposed structures upon the lot; and such other matters as
Declarant shall reasonably deem relevant.
d) No parking spaces shall be located on or permitted within setback areas
adjacent to a street as set forth in Section 4.1, except that parking spaces may be
located on or parking permitted within such area if Declarant's written permission
is first obtained. Permission will not be given in any event unless parking areas
within such setback areas are screened from view of the street by shrubs and trees,
by a screen wall or by berms, and any such screening must extend at least forty-two
42) inches above the high point of the finished pavement in said parking area.
13-
4.6 Storage and Loading Areas. Storage, maintenance and loading areas must be
constructed, maintained and used in accordance with the following conditions:
a) Unless approved in writing by Declarant, no materials, supplies or equipment,
including trucks or other motor vehicles, shall be stored upon a lot except inside
a closed building or behind a visual barrier screening such materials, supplies or
vehicles so as not to be visible from neighboring property and streets. Any
storage areas screened by visual barriers shall be located upon the rear portions
of a lot, unless otherwise approved in writing by Declarant. No storage area may
extend into a setback area as defined in Section 4.1 except with the written
approve of Declarant.
b) Provision shall be made on each site for any necessary vehicle loading and no
on-street vehicle loading shall be permitted.
c) Loading dock areas shall be set back, recessed or screened so as not to be
visible from neighboring property or streets and in no event shall a loading dock
be closer than seventy-five (75) feet from a property line fronting upon a street
unless otherwise approved in writing by Declarant.
5.0 REGULATION OF OPERATIONS AND USES
5. 1 Permitted Uses. Except as otherwise specifically prohibited herein, any
industrial operation and use will be permitted upon a lot, provided that Declarant
specifically consents to such use in writing. Such approved use shall be performed
or carried out entirely within a building that is so designed and constructed that
the enclosed operations and uses do not cause or produce a nuisance to other lots
or property, such as, but not limited to, vibration, sound, electro-mechanical
disturbances, electro-magnetic disturbances, radiation, air or water pollution,
dust, or emission of odorous, toxic or non-toxic matter (including steam) . Certain
activities which cannot be carried on within a building may be permitted, provided
14-
Declarant specifically consents to such activity in writing and further provided
such activity is screened so as not to be visible from neighboring property and
streets. All lighting is to be shielded so as not to be visible from neighboring
property.
5.2 Prohibited Uses. The following operations and uses shall not be permitted on
any property subject to this Declaration:
a) Residential use of any type;
b) Trailer courts or recreation vehicle campgrounds;
c) Junk yards or recycling facilities;
d) Drilling for and removing oil , gas or other hydrocarbon substances;
e) Refining of petroleum or of its products;
f) Commercial petroleum storage yards;
g) Commercial excavation of building or construction materials; provided, that
this prohibition shall not be construed to prohibit any excavation necessary in the
course of approved construction pursuant to 3.0, Construction of Improvements;
h) Distillation of bones;
i ) Dumping, disposal , incineration or reduction of garbage, sewage, offal , dead
animals or other refuse;
j) Fat rendering;
k) Stockyard or slaughter of animals;
1 ) Smelting of iron, tin, zinc or any other ore or ores;
m) Cemeteries;
n) Jail or honor farms;
o) Labor or migrant worker camps;
p) Truck terminals;
15-
q) Automobile, go-cart, motorcycle or quarter-midget race tracks and other
vehicle endurance or race tracks;
r) Retail stores or shopping centers;
s) Commercial service stations or gasoline stations;
t) Commercial restaurants or snack bars; or
u) Banks or savings and loans institutions.
5.3 Nuisances. No nuisance shall be permitted to exist or operate upon any lot so
as to be offensive or detrimental to any adjacent lot, or property or to its
occupants. A "nuisance" shall include, but not be limited to, any of the following
conditions:
a) Any use, excluding reasonable construction activity, of the lot which emits
dust, sweepings, dirt of cinders into the atmosphere, or discharges liquid, solid
wastes or other matter into any stream, river, or other waterway which, in the
opinion of Declarant, may adversely affect the health, safety, comfort of, or
intended use of their property by persons within the area. No waste nor any
substance or materials of any kind shall be discharged into any public sewer
serving the subject property or any part thereof in violation of any regulation of
any public body having jurisdiction over such public sewer;
b) The escape or discharge of any fumes, odors, gases, vapors, steam, acids or
other substance into the atmosphere which discharge, in the opinion of Declarant,
may be detrimental to the health, safety or welfare of any person or may interfere
with the comfort of persons within the area or which may be harmful to property or
vegetation;
c) The radiation or discharge of intense glare or heat, or atomic, electro-
magnetic, microwave, ultrasonic, laser or other radiation. Any operation producing
intense glare or heat or such other radiation shall be performed only within an
16-
enclosed or screened area and then only in such manner that the glare, heat or
radiation emitted will not be discernible from any point exterior to the site or
lot upon which the operation is conducted;
d) Excessive noise. At no point outside of any lot plane shall the sound
pressure level of any machine, device, or any combination of same, from any
individual plant or operation, exceed the decibel levels in the designated
preferred octave bands as follows:
Octave Bank Maximum Sound Pressure Levels
Center Frequency db) at Boundary Plane of Lot
Hz
31.5 78
63 72
125 65
250 59
500 55
1000 52
2000 50
4000 48
8000 47
A-scale levels for monitoring purposes are equivalent to 60 dB(A) . The maximum
permissible noise levels for the octave bands shown above are equal to an NC-50
Noise Criterion curve when plotted on the preferred frequency scale.
Reasonable noise from motor vehicles and other transportation facilities are
exempted, so long as the vehicles or other transportation facilities are not
continuously on the subject property. The operation of signalling devices and other
equipment having impulsive or non-continuous sound characteristics shall have the
following corrections applied:
Corrections
Pure Tone Content 5dB
Impulsive Character 5dB
Duration for Non-
Continuous Sounds
in Daytime Only,
1 min/hr 5dB
10 sec/10 min 10dB
17-
2 sec/10 min 15dB
The reference level for the dB values listed above is the pressure of 0.0002
microbar or 0.0002 dyne/cm2.
e) Excessive emissions of smoke, steam or particulate matter. Visible emissions
of smoke or steam will not be permitted (outside any building) which exceed
Ringlemann No. 1 on the Ringlemann Chart of the United States Bureau of Mines.
This requirement shall also be applied to the disposal of trash and waste
materials. Wind-borne dust, sprays and mists originating in plants are not
permitted.
f) Ground vibration. Buildings and other structures shall be constructed, and
machinery and equipment installed, and insulated on each lot so that the ground
vibration inherently and recurrently generated is not perceptible without
instruments at any point exterior to any lot.
5.4 Condition of Property. The Owner or Occupant of any lot shall , at all times,
keep it and the buildings, improvements and appurtenances thereon in a safe, clean
and wholesome condition and comply, at its own expense, in all respects with all
applicable governmental , health, fire and safety ordinances, regulations,
requirements and directives and the Owner or Occupant shall at regular and frequent
intervals remove at its own expense any rubbish of any character whatsoever which
may accumulate upon such lot.
5.5 Maintenance of Grounds. Each Owner shall be responsible for the maintenance
and repair of all parking areas, driveways, walkways and landscaping on his lot.
Such maintenance and repair shall include, without limitation:
a) Maintenance of all parking areas, driveways and walkways in a clean and safe
condition, including the paving and repairing or resurfacing of such areas when
necessary with the type of material originally installed therein or such substitute
18-
therefor as shall , in all respects, be equal thereto in quality, appearance and
durability; the removal of debris and waste material and the washing and sweeping
of paved areas as required; painting and repainting of striping markers and
directional signals as required;
b) Cleaning, maintenance and relamping of any external lighting fixtures except
such fixtures and may be the property of any public utility or government body; and
c) Performance of all necessary maintenance of all landscaping including the
trimming, watering and fertilization of all grass, ground cover, shrubs or trees,
removal of dead or waste materials, replacement of any dead or diseased grass,
ground cover, shrubs, or trees.
Nothing contained herein shall preclude an Owner from recovering from any person
liable therefor, damages to which such Owner might be entitled for any act or
omission to act requiring an expenditure by the Owner for the maintenance and
repair of the parking area, driveway, walkway and/or landscaping on his lot.
5.6 Remedies for Failure to Maintain and Repair.
a) Remedies. If any Owner shall fail to perform the maintenance and repair
required by Section 5.5, then Declarant, after fifteen days' prior written notice
to such delinquent Owner, shall have the right, but not the obligation, to perform
such maintenance and repair and to charge the delinquent Owner with the cost of
such work together with interest thereon at the rate of twelve percent (12%) per
annum from the date of Declarant's advancement of funds for such work to the date
of reimbursement of Declarant by Owner. If the delinquent Owner shall fail to
reimburse Declarant for such costs within ten days after demand therefor, Declarant
may, at any time within two years after such advance, file for record in the Office
of County Recorder of King County, Washington a claim of lien signed by Declarant
for the amount of such charge together with interest thereon, which claim shall
19-
contain: (1) a statement of the amount unpaid and the interest accrued thereon;
2) a legal description of the lot owned by the delinquent Owner; and (3) the name
of the delinquent Owner. Such claim of lien shall be effective to establish a lien
against the interest of the delinquent Owner in his lot together with interest at
twelve percent (12%) per annum on the amount of such advance from the date thereof,
recording fees, cost of tile search obtained in connection with such lien or the
foreclosure thereof and court costs and reasonable attorneys ' fees which may be
incurred in the enforcement of such a lien.
b) Foreclosure of Lien. Subject to the provisions of 12.0 Rights of Mortgagees,
such a lien, when so established against the lot described in said claim, shall be
prior or superior to any right, title, interest, lien or claim which may be or may
have been acquired in or attached to the real property interests subject to the
lien subsequent to the time of filing such claim for record. Such lien shall be
for the benefit of Declarant and may be enforced and foreclosed in a suit or action
brought by Declarant in any court of competent jurisdiction, if brought within one
year of the filing of such claim. Any such sale provided for herein is to be
conducted in accordance with the provisions of the Civil Code of the State of
Washington applicable to the exercise of powers of sale in mortgages and deeds of
trust, or in any other manner permitted or provided by law. Declarant, through its
duly authorized agents, shall have the power to bid on the liened property at any
foreclosure sale and to acquire, lease, mortgage and convey the same.
c) Cure. IF a default for which a notice of claim of lien was filed is cured,
Declarant shall file or record a recision of such notice, upon payment by the
defaulting Owner of the costs of preparing and filing or recording such recision,
and other reasonable costs, interest or fees which have been incurred.
20-
d) Nonexclusive Remedy. The foregoing lien and the rights to foreclose
thereunder shall be in addition to, and not in substitution for, all other rights
and remedies which any party may have hereunder and by law, including any suit to
recover a money judgment for unpaid assessments. If any Owner shall fail to
perform such maintenance and repair and, notwithstanding such failure, Declarant
should fail to exercise its rights and remedies hereunder, then, any other Owner,
after fifteen (15) days' prior written notice to Declarant and such delinquent
Owner, shall have the right, but not the obligation, to perform such maintenance
and repair and shall have the same rights and remedies with respect thereto as are
provided herein to Declarant.
5.7 Taxes and Assessments. If an Owner fails to pay taxes or assessments on its
lot which become a lien on any portion of subject property utilized for parking,
service or loading areas, then any other Owner may pay such taxes or assessments,
together with any interest, penalties and costs arising out of or related thereto,
except while the validity thereof is being contested by judicial or administrative
proceedings, and in such event the defaulting Owner obligated to pay such taxes or
assessments shall promptly reimburse the other Owner for all such taxes or
assessments, interest, penalties and costs paid or incurred by such other Owner and
until such reimbursement has been made the amount of the payment by such other
Owner shall constitute a lien on and charge against the lot of the defaulting
Owner subject and subordinate, however, to any deed of trust then outstanding
affecting said lot.
5.8 Refuse Collection Areas. All outdoor refuse collection areas shall be
visually screened so as not to be visible from neighboring property or streets. No
refuse collection areas shall be permitted between a street and the front of a
building.
21-
5.9 Repair of Buildings. No building or structure upon any lot shall be permitted
to fall into disrepair, and each such building and structure shall at all times be
kept in good condition and repair and adequately painted or otherwise finished.
5.10 Public Utilities. Declarant reserves the sole right to grant consents for the
construction and operation of public utilities including, but not limited to,
street railways, interurban or rapid transit, freight railways, poles or lines for
electricity, telephone or telegraph, above or below ground conduits, and gas pipes
in and upon any and all streets now existing or hereafter established upon which
any portion of the subject property may now or hereafter front or abut. Declarant
reserves the exclusive right to grant consents and to petition the proper
authorities for any and all street improvements such as grading, seeding, tree
planting, sidewalks, paving, sewer and water installation, whether it be on the
surface or subsurface, which in the opinion of Declarant are necessary on or to the
subject property. Notwithstanding the provisions of Section 3.2, Declarant
reserves the exclusive right to approve above ground utility lines across the
subject property or any portion thereof on a temporary basis for the purpose of
construction, and such lines shall be permitted when required by a government
agency. 5.11 Utility Lines and Antennas. No sewer, drainage or utility lines or
wires or other devices for the communication or transmission of electric current,
power, or signals including telephone, television, microwave or radio signals,
shall be constructed, placed or maintained anywhere in or upon any portion of the
subject property other than within buildings or structures unless the same shall be
contained in conduits or cables constructed, placed or maintained underground or
concealed in or under buildings or other structures. No antenna for the
transmission or reception of telephone, television, microwave or radio signals
shall be placed on any building or other improvement within the subject property
22-
unless (a) such antenna shall be so located that it cannot be seen from any point
at the ground level of the subject property or (b) the consent of Declarant shall
first )e obtained. Nothing contained herein shall be deemed to forbid the erection
or use of temporary power or telephone facilities incidental to the construction or
repair of buildings on the subject property.
5. 12 Mechanical Equipment. All mechanical equipment, utility meters , storage
tanks, air conditioning equipment and similar items shall be located in such a
manner so not to be visible from neighboring property.
5. 13 Mineral Exploration. No portion of the subject property shall be used in any
manner to explore for or to remove any steam, heat, oil or other hydro-carbons ,
gravel , earth or any earth substances or other minerals of any kind, provided,
however, that this shall not prevent the excavation of earth in connection with the
grading or construction of improvements within the subject property. Water may be
extracted to the extent permitted by the appropriate governmental agency.
5. 14 Other Operations and Uses . Operations and uses which are neither specifically
prohibited nor specifically authorized by this Declaration may be permitted in a
specific case if operational plans and specifications are submitted to and approved
in writing by Declarant in accordance with the procedures set forth in 3.0, of this
Declaration. Approval or disapproval of such operational plans and specifications
shall )e based upon the effect of such operations or uses on other property subject
to this Declaration or upon the occupants thereof, but shall be in the sole
discretion of Declarant.
6.0 MODIFICATION AND REPEAL
6. 1 P ,ocedure. Except as otherwise provided in Section 6.2, this Declaration or
any prevision hereof, or any covenant, condition or restriction contained herein ,
may be terminated, extended, modified or otherwise amended, as to the whole of the
23-
subject property or any portion thereof, with the written consent of the Owners of
eight percent (80%) of the subject property, based upon the number of square feet
owned as compared to the total number of square feet subject to these conditions ,
covenants and restrictions (excluding dedicated streets) ; provide, however, that so
long as Declarant owns at least twenty percent (20%) of the property subject to
these conditions , covenants and restrictions , or for a period of fifteen ( 15) years
from the effective date hereof, whichever period is shorter, no such termination,
extension, modification or other amendment shall be effective until a proper
instrument in writing has been executed, acknowledged and recorded.
6.2 Modification by Declarant. For so long as Declarant owns any interest
excepting a leasehold interest) in the subject property, or any part thereof, or
for a period of fifteen (15) years from the effective date hereof, whichever period
is shorter, Declarant acting alone may modify or amend the provisions of 3.0, 4.0
and 5.C ; provided, however, that (a) any such modification or amendment must be
within the spirit and overall intention of the development as set forth herein; (b)
prior to any such modification or amendment Declarant shall obtain the approval of
any governmental agency to such modification or amendment where such
approval is necessary; and (c) any modification or amendment shall not provide for
any type of improvements or use not presently permitted by this Declaration. No
such modification or amendment shall be effective until the Owners have been given
thirty (30) days ' prior written notice of the proposed change, and a proper
instrument in writing has been executed, acknowledged and recorded.
6.3 Governmental Regulation. All valid governmental enactments, ordinances and
regulations are deemed to be a part of this Declaration and to the extent that they
conflict with any provision, covenant, condition or restriction hereof, said
conflicting governmental enactment, ordinance and regulation shall control and the
24-
provision, covenant, condition and restriction hereof in conflict therewith shall
be deemed (a) amended to the extent necessary to bring it into conformity with said
enactment, ordinance or regulation while still preserving the intent and spirit of
the provision, covenant, condition or restriction; or (b) stricken here from should
no amendment conforming to the governmental enactment, ordinance or regulation be
capable of preserving the intent and spirit of said provision, covenant, condition
or restriction.
7.0 ENFORCEMENT
7.1 Abatement and Suit. The Owner of each lot shall be primarily liable, and the
Occupant, if any, secondarily liable for the violation or breach of any condition,
covenant or restriction herein contained. Violation or breach of any condition,
covenant or restriction herein contained shall give to Declarant, following thirty
30) days ' written notice to the Owner or Occupant in question except in exigent
circumstances, the right, privilege and license to enter upon the lot where said
violation or breach exists and to summarily abate and remove, or abate or remove,
at the expense of the Owner or Occupant thereof, any improvement, structure, thing
or condition that may be or exist thereon contrary to the intent and meaning of the
provisions hereof, or to prosecute a proceeding at law or in equity against the
person or persons who have violated or are attempting to violate any of these
covenants, conditions or restrictions to enjoin or prevent them from doing so, to
cause said violation to be remedied, or to recover damages for said violation. No
such entry by Declarant or its agents shall be deemed a trespass, and neither
Declarant nor its agents shall be subject to liability to the Owner or Occupant of
said lot for such entry and any action taken to remedy or remove a violation. The
cost of any abatement, remedy or removal hereunder shall be a binding personal
obligation on any Owner or Occupant in violation of any provision of this
25-
Declaration, as well as a lien (enforceable in the same manner as a mortgage) upon
the lot in question. The lien provided for in this section shall not be valid as
against a bona fide purchaser or mortgagee for value of the lot in question unless
a suit to enforce said lien shall have been filed in a court of record in King
County, Washington, prior to the recordation of the deed or mortgage conveying or
encumbering the lot in question to such purchaser or mortgagee, respectively.
7.2 Richt of Entry. During reasonable hours and upon reasonable notice, and
subject to reasonable security requirements, Declarant, or its agents, shall have
the rigtt to enter upon and inspect any lot and the improvements thereon covered by
this Declaration for the purpose of ascertaining whether or not the provisions of
this Declaration have been or are being complied with, and neither Declarant nor
its agerts shall be deemed to have committed a trespass or other wrongful act by
reason cf such entry or inspection.
7.3 Deemed to Constitute A Nuisance. The result of every act or omission whereby
any concition, covenant or restriction herein contained is violated in whole or in
part is hereby declared to be and to constitute a nuisance, and every remedy
allowed by law or in equity against an Owner or Occupant either public or private,
shall be applicable against every such result and may be exercised by Declarant.
7.4 Attorney's Fees. In any legal or equitable proceeding for the enforcement of
this Declaration or any provision hereof, whether it be an action for damages,
declaratory relief or injunctive relief, or any other action, the losing party or
parties shall pay the attorney fees of the prevailing party or parties, in such
reasonable amount as shall be fixed by the court in such proceedings or in a
separate action brought for that purpose. The prevailing party shall be entitled
to said attorney's fees even though said proceeding is settled prior to judgment.
26-
All remedies provided herein or at law or in equity shall be cumulative and not
exclusive.
7.5 Failure to Enforce is No Waiver. The failure of Declarant to enforce any
requirement, restriction or standard herein contained shall in no event be deemed
to be a waiver of the right to do so thereafter or in other cases, nor of the right
to enforce any other restriction.
8.0 ASSIGNMENT
Any anc all of the rights, powers and reservations of Declarant herein contained
may be assigned to any person, corporation or association which will assume the
duties of Declarant pertaining to the particular rights, powers and reservations
assigned, and upon any such person, corporation or association evidencing its
consent in writing to accept such assignment and assume such duties, he or it
shall , to the extent of such assignment, have the same rights and powers and be
subject to the same obligations and duties as are given to and assumed by Declarant
herein. If at any time Declarant ceases to exist and has not made such an
assignment, a successor to Declarant may be appointed in the same manner as this
Declaration may be modified or amended under Section 6. 1. Any assignment or
appointment made under this article shall be in recordable form and shall be
recorded.
9.0 CONSTRUCTIVE NOTICE AND ACCEPTANCE
Every person or entity who now or hereafter owns, occupies or acquires any right,
title cr interest in or to any portion of the subject property is and shall be
conclusively deemed to have consented and agreed to every covenant, condition and
restriction contained herein, whether or not any reference to this Declaration is
contained in the instrument by which such person acquired an interest in the
subject property.
27-
10.0 WAIVER
Neither Declarant nor its successors or assigns shall be liable to any Owner or
Occupant of the subject property by reason of any mistake in judgment, negligence,
nonfeasance, action or inaction or for the enforcement or failure to enforce any
provision of this Declaration. Every Owner or Occupant of any of said property by
acquiring its interest therein agrees that it will not bring any action or suit
against Declarant to recover any such damages or to seek equitable relief because
of same.
11.0 RLNS WITH LAND
All covenants, conditions, restrictions and agreements herein contained are made
for the direct, mutual and reciprocal benefit of each and every lot of the subject
property; shall create mutual equitable servitudes upon each lot in favor of every
other lot; shall create reciprocal rights and obligations between respective Owners
and Occupants of all lots and privity of contract and estate between all grantees
of saic lots , their heirs, successors and assigns; and shall , as to the Owner and
Occupart of each lot, his heirs , successors and assigns , operate as covenants
runninc with the land, for the benefit of all other lots, except as provided
otherwise herein.
12.0 RIGHTS OF MORTGAGEES
No breech of any covenant, condition or restriction herein contained, or any
enforcement thereof, shall defeat or render invalid the lien of any mortgage or
deed of trust now or hereafter executed upon the subject property or a portion
thereof , provided, however, that if any portion of said property is sold under a
forecicsure of any mortgage or under the provisions of any deed of trust, any
28-
purchaser at such sale and its successors and assigns shall hold any and all
property so purchased subject to all of the covenants, conditions and restrictions
contained in this Declaration.
13.0 CAPTIONS
The captions of articles and sections herein are used for convenience only and are
not intended to be a part of this Declaration or in any way to define, limit or
describe the scope and intent of the particular article or section to which they
refer.
14.0 EFFECT OF VALIDATION
If any provision of this Declaration is held to be invalid by any court, the
invalidity of such provision shall not effect the validity of the remaining
provisions hereof.
DECLARANT
J.A.G./Renton Properties Associates
A Washington Partnership
By: Alterra Corporation, a Washington
Corporation, General Partner
By:
By:
By:
29-
20z:
I ems' /
I
1. zeo
t
s,
LEGAL DESCRIPTIONS
PARCEL A
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M. ,
in King County, Washington; and
That portion of Junction Addition to City of Seattle, according to plat recorded in
Volume 12 of Plats, page 75, in King County, Washington, together with vacated
streets adjoining which would attach to said premises by operation of law, and of
C.E. Brosnell 's Donation Claim No. 41 , described as follows:
Beginning at the south quarter corner of said Section 13; thence H00'58'28"E along
the north-south Centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feet;
thence H80'04 '48"E 232.00 feet ; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence N42'06'08"W 87. 16 feet; thence S80'04' 48"W 232.00 feet; thence
N12'01 'OC"W 40.15 feet; thence SE:59 '00"W 133.01 feet to a point of curve; thence
along a curve to the right having a radius of 230.00 feet , through a central angle
of 27'47' 31" an arc distance of 111 .56 feet to a point of compound curvature; the
center of said curve bears N15'46' 31"E 160.00 feet; thence along said curve to the
right, through a central angle of 701'48 ' 19" an arc distance of 197 .73 feet; thence
582' 15'OC"W 67.68 feet; thence S31'32 '221%1 71 .06 feet; thence N81'11 ' 35"W 193.00
feet; thence 582' 15'00"W 92.99 feet; thence 535'29' 30"W 143. 18 feet ; thence
N74'44 '00"W 84.85 feet; thence S60' 16'00'W 67.00 feet; thence S12' 16'00"E 97.35
feet to the north line of a tract of land described in EXHIBIT 5 to Agreement
recorded under King County Recording No. 8301050539; thence S68'06'46"W along said
northerly line 375.53 feet to the northerly line of a tract of land described In
EXHIBIT 8 in said Agreement; thence northwesterly along said northerly line on a
curve to the left, the center which bears west 195.01 feet, thru a central angle
of 78'4l '24", an arc distance of 267.83 feet; thence N78'41 '24"W along said
northerly line 180.00 feet to an angle point in said northerly line; thence
N33'00'54"W along said northerly line 109.47 feet to the south line of the
Burlingtcn Northern Railroad Right-of-Way, said point being a point on a curve,
the center which bears 539'23'00"E 1853.00 feet; thence easterly along said
southerly line and curve to the right, thru a central angle of 2'01 '59", an arc
distance of 65.75 feet to a point of compound curv,e; thence continuing along
EXHIBIT A: 1 of 5
said south line on a curve to the right the center of which bears 537'21 'O1"E
having a radius of 10543.00 feet, an arc distance of 186.51 feet through a central
angle of O1'00'49" to a point of compound curve; thence continuing along said south
line on a curve to the right, the center of which bears 536'20' 12"E having a radius
of 1657.00 feet an arc distance of 193.93 feet through a central angle of 06'42 '20"
to a point of compound curve; thence continuing along said south line on a curve to
the right, the center of which bears S29'37'52"E having a radius of 6738.00 feet ,
an arc distance of 197.76 feet through a central angle of 01'40'5h" to a point of
compound curve; thence continuing along said south line on a curve to the right ,
the center of which bears S27'56'58"E having a radius of 1768.00 feet , an arc
distance of 194.45 feet through a central angle of 06'18'06" to a point of compound
curve; thence continuing along said south line on a curve to the right, the center
of which bears S21'38'52"E having a radius of 8603.00 feet , an arc distance of
204.54 feet through a central angle of 01 '21 ' 44" to a point of compound curve;
thence continuing along said south line on a curve to the right , the center of
which bears S20' 17'08"E having a radius of 1922. 10 feet, an arc distance of 178.79
feet through a central angle of 05'19'46" to a point of compound curve on the east
line of said Charles Brownell Donation Land Claim No. 41 ; thence continuing along
said south line on a curve to the right , the center of which bears S14'57'22"E
having a radius of 2814.93 feet, an arc distance of 659.42 feet through a central
angle of 13'25' 19" to a point of compound curve; thence continuing along said
south line on a curve to the right , the center of which bears SO1'32 '03"E having
a radius of 1165.09 feet, thru a central angle of 37'39' 19", an arc distance of
765.71 feet to a point which bears N41'28' 10"E from the TRUE POINT OF BEGINNING;
thence S36'19' 35"11 188.63 feet to a point on a curve, the center which bears
536' 19' 35"W 967.46 feet ; thence northwesterly along said curve to the left , thru
a central angle of 4'39'32", an arc distance of 78.67 feet ; thence 538'54 '221V
451 .74 feet to a point on a curve, the center which bears 543'36'23"W 170.00 feet ;
thence southeasterly along said curve to the right, thru a central angle of
3'08'37", an arc distance of 9.33 feet; thence S43' 15 '00"E 20.74 feet; thence .
527'21 '32"V 44.74 feet to the TRUE POINT OF BEGINNING.
PARCEL B-1
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington, of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
and of C.E. Brownell ' s Donation Claim No. 41 , described as follows:
Beginnin; at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence S68'03'54"W 351. 11 feet to
the TRUE POINT OF BEGINNING; thence N68'03'54"E 575.56 feet; thence /112'01 '00' W
40. 75 feet; thenci S77'59'OO"W 133.01 feet to a point of curve; thence along a
curve to the right having a radius of 230.00 feet, through a central angle of
27'47' 31 ' an arc distance of' 111.56 feet to a point of compound curvature; the
center of said curve bears N15•46'31"E 160.00 feet; thence along said curve to the
right, trough a central angle of 70'48' 19" an arc distance of 197.73 feet; thence
S82'15'071.1 67.68 feet; thence 531'32 '22"W 71 .06 feet; thence 1481'11 ' 35"W 193.00
feet; thence S82'15' 00"W 92. 99 feet; thence 535'29'30"W 143. 18 feet; thence
N74'44'07'V 84. 85 feet; thence S60'16'00"V 67.00 feet; thence S12' 16'00"E 97. 35
feet; thence N68'06'46"E 53.79 feet to a point which bears N72'04'34"W from the
TRUE PONT OF BEGINNING; thence S72'04'34"E 389.92 feet to the TRUE POINT OF
Bi:GINNIN .
EXHIBIT A: 2 of 5
PARCEL B-2
That portion of the south half of Section 13, Township 23 North, Range 4 East, V.M.
in King County, Washington and of Junction Addition to the City of Seattle, according
to -plat recorded in Volume 12 of Plats, page 75, records of said King County, and of
C.E. Brcwnell 's Donation Claim No. 41 described as follows:
Beginning at the south quarter corner of said Section 13; thence N00'58'28"E along
the north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to
the TRUE POINT OF BEGINNING; thence 568'03'54"W 575.56 feet; thence N72'04'34"V
389.92 feet; thence 568'06'46"V 429.32 fest; thence south 85.47 feet to a point of
curve; thence on a curve to the left, having a radius of 60.00 feet , •thru a central
angle of 126'52' 10", an arc distance of 132.86 feet; thence N53'07 '50"E 199.18 feet
to a point of curve; thence on a curve to the right , having a adius of 200.00 feet
thru a central angle of 53.59'30", an arc distance of 188.47 feet; thence 572'52 '40"E
290.00 feet to a point of curve; thence on a curve to the left, having a radius of
197.00 feet, thru a central angle of 39'08'51", an arc distance of 134.60 feet; thence
N67'58'29"E 380.92 feet; thence N31'27 ' 12"E 204.86 feet to the TRUE POINT OF BEGINNING.
PARCEL B-3
That portion of the south half of Section 13, Township 23 North, Range 4 East , V.M.
in King County, Washington; and of Junction Addition to the City of Seattle, according
to the plat recorded in Volume 12 of Plats, page 75, records of said King County,
together with vacated streets adjoining which would attach to said premises by opera-
tion of Law; and of C.E. Brownell 's Donation Claim No. 41 , and of Tracts 25 and 26,
Renton Sore Lands 2nd Supplemental Maps 1958, described as follows:
Beginnin; at the south quarter corner of said Section 13; thence N00'58'28"E along the
north-south centerline thereof 1092.82 feet; thence N68'03 '54"E 224.45 feet to a point
hereinafter called "Point A"; thence S68'03 '5 ."V 575.56 feet; thence N72'04'34"V
389.92 feet; thence 568'06'46"W 429.32 feet to the TRUE POINT OF BEGINNING; thence
south 85.47 feet to a point of curve; thence on a curve to the left, having a radius
of 60. 00 feet, thru a central angle of 126'52 ' 10", an arc distance of 132.86 feet;
thence N53'07'50"E 199. 18 feet to a point of curve; thence on a curve to the right ,
having a radius of 200.00 feet thru a central angle of 53'59'30", an arc distance of
188.47 feet; thence S72'52' 40"E 290.00 feet to a point of curve; thence on a curve to
the left having a radius of 197.00 feet, thru a central angle of 39'08' 51", an arc
distance of 134.60 feet; thence N67'58'29"E 380.92 feet; thence N31'27 ' 12"E 204.86
feet to aforementioned "Point A"; thence N80'04'48"E 232.00 feet; thence 542'06'08"E
215. 00 feet; thence 531•14'05"W 358.99 feet; thence 547'10'01"E 71 .34 feet; thence
east 114.27 feet; thence south 68.91 feet to the southerly line of said Tract 25;
thence along the southerly line of said Tracts 25 and 26, the following courses and
distances: N88.15'00"W 180.65 feet; 1433'07 '25"W 154.51 feet; N27'21 '32"E 387 .32
feet; N83'17'25"V 171 . 17 feet; S46'22 '22"V 324.66 feet; S72'37'52"W 458.93 feet;
N70'54'02"W 354.53 fest; 573'56'OI"W 130.08 feet; and S4l• 16'07"W 316. 18 feet to the
north boundary of a tract of land deeded to King County and described under King
County Receiving *umber 6607786; thence westerly along said north boundary on a curve
to the left, the center which bears S39'41 '39"W 627.46 feet thru a central angle of
39'41 ' 39 ', an arc distance of 434.70 feet; thence north along said north boundary
25.00 feet; thence west along said north boundary 245.69 feet; thence north 156. 13
feet; thence N50.39' 19"E 330.21 feet; thence S78'41 '24"E 180.00 feet to a point of
curve; thence on a curve to the right, having a radius of 195.01 feet , thru a central
angle of 78'41 '24", an arc distance of 267.83 feet to the TRUE POINT OF BEGINNING.
EXHIBIT A: 3 of 5
PARCE:L B-4
That portion of the southwest quarter of Section 13, Township 23 Korth, Range 4 East ,
V.M. in King County, Washington and that portion of Junction Addition to City of
Seattle,, according to plat recorded In Volume 12 of Plats, page 75, records of said
King County, together with vacated streets adjoining which would attach to said
premises by operation of law, and of C.E. erownell ' s Donation Claim No. 41 , described
as follows:
Beginning at the south quarter corner of said Section 13 ; thence 1400.58'28"f along
the north-south centerline thereof 884.84 feet to the southeast corner of Tract 26,
Renton Shorelands Second Supplemental Maps 1954; thence S72.37 '52N 382.60 feet to
an angle point in the south line of said Tract 26; thence N7045F 02"V 354.53 feet to
an angle point in the south line of said Tract 26; thence 573'56'Ol"W 130.08 feet to
an angle point in the south line of said Tract 26; thence S41'i6'07"V along the south
line of said Tract 26 a distance of 316. 18 feet to the north boundary of a tract of
land deeded to King County and described under King County Recording Number 6607786;
thence •esterly along said north boundary on a curve to the left , the center which
bears 539.41 '39"W 627.46 feet, thru a central angle of 35'41 '39"; an arc distance of
434. 70 feet; thence north along said north boundary 25.00 feet; thence west along
said north boundary 245.69 feet to the TRUE POINT OF BEGINNING; thence north 156. 13
feet; thence N50'39' 19"E 330.21 feet; thence N33.00154"V 109.47 feet to the southerly
margin of the Burlington Northern Railroad Right-of-Way, said point being a point on
a curve, the center which bears S39.23 '00"E 1853.00 feet; thence westerly along said
southerly margin and curve to the left, thru a central angle of 3'59' 19", an arc
distance of 129.00 feet to a point of compound curve, the center of said curve bears
S43'22 ' 13"E 4030.00 feet; thence westerly along said southerly margin and curve to
the left, thru a central angle of 2'48'32", an arc distance of 197.57 feet to a point
of tangency; thence S43'49'09N along said south margin 271 .00 feet to a point of
curve; thence on a curve to the right along said southerly margin, having a radius
of 1571 . 00 feet, thru a central angle of 7'32 '0I", an arc distance of 206. 57 feet to
a point of canpound curve, the center which bears N38'38'49"W 727.00 feet ; thence
westerly along said southerly margin and curve to the right, thru a central angle of
16.55'35", an arc distance of 214.77 feet to a point of caapound curve, the center
which bears 1421'43 ' 14"W 1055.00 feet; thence westerly along said southerly margin
and curvu to the right, thru a central angle of 11'24 '08", an arc distance of 209.95
feet to a point of compound curve; the center which bears N10' 19'06"W 696.00 feet ;
thence westerly along said southerly margin and curve to the right thru a central of
3'44'25", an arc distance of 45.43 feet to the easterly margin of the Charles Monster
County Road; thence 534' 18'31"E along said easterly margin 43.46 feet to the north
boundary of said tract deeded to King County and described under King County Record-
ing Nurnber 6607786; thence N74.13r19"E along said north boundary 443 .31 feat; thence
N59'53' 4i"E along said north boundary 377.52 feet; thence east along said north
boundary 35.00 feet to the TRUE POINT OF BEGINNING.
PARCEL C
That portion of Tract 25, Renton Shorelands Second Supplemental and that portion
of the southeast quarter of Section 13, Township 23 North, Range 4 East , V.M. ,
and that portion of the southwest quarter of Section 18 , Township 23 North , Range
h East, 1'.M. , all in King County, Washington described as follows :
EXHIBIT A: 4 of 5
Beginning at the south quarter corner of said Section 13; thence N00'58 '28"E along
the nortti-south centerline thereof 1092.82 feet; thence N68'03'54"E 224.45 feat ;
thence N30'04'48"E 232.00 feet; thence S42'06'08"E 87. 16 feet to the TRUE POINT OF
BEGINNING; thence S42'06'08"E 127.84 feet; thence 531' 14 '05"W 358.99 feet; thence
547' 10'01"E 71 .34 feet ; thence east 114.27 feet; thence south 68.91 feet to the
south Ilse of said Tract 25; thence S88'15'00"E along said south line and the
north lire of the south 650.00 feet of the southeast quarter of said Section 13, a
distance of 2080.76 feet to the east line of said Section 13; thence 589'10'25"E
along the north line of the south 650.00 feet of the southwest quarter of said
Section 18, a distance of 81 .57 feet to the south line of the Burlington Northern
Railroad Right-of-Way; thence N71'29'03"V along said south line 85.52 feet to the
east line of said Section 13; thence M71'29'03"W along said south line 826.56
feet to a point of curve; thence on a curve to the right along said south line ,
the center which bears N18'30'57"E 1005.37 feet, thru a central angle of 33.54'00",
an arc distance of 594.8h feet; thence N37'35'03"V along said south line 308.70
feet to a point of curve; thence on a curve to the left, along said south line,
the center which bears S52'24 '57"W 1165.09 feet, thru a central angle of 16' 17'41",
an arc distance of 331 .35 feet to a point which bears N41'28' 10"E from the TRUE
POINT OF BEGINNING; thence S36'19'35"V 188.63 feet to a point on a curve, the
canter welch bears S36'19'35"W 967.h6 feet ; thence northwesterly along said curve
to the left, thru a central angle of 4'39' 32", an arc distance of 78.67 feet ;
thence S38'54'22"W 451 .74 feet to a point on a curve, the canter which bears
5-43'36'23'V 170.00 feet; thence southeasterly along said curve to the right, thru
a central angle of 3'08'37", an arc distance of 9.33 feet; thence S43' 15'00"E
20.74 feet; thence S27'21 '32"W 44.74 feet to the TRUE POINT OF BEGINNING.
EXHIBIT A: 5 of 5
GRADING & FILLING
DRAWINGS
EXISTING CULVERT PEAK
DISCHARGE 4 CFS
rca
I NOTE:
ROW
N.,,..
EROS/ON CONTROL FENCE TO BE
i CONSTRUCTED ALONG ALL F/LL
SLOPES jgR,xc r•;;a °A7OPERTY ONE,
EXISTING CULVERT PEAK WEST EROSION
D/SCNARGE 7 CP5 —\, CONTROL DITCH
r)Ml7 j i SCORE-aoof7 n.q,,,,ode»y
STATE OF
WASHINGTON
GI TE IT«.
2"CMP 1
14%,,,
u.."1 `
Raj IA ERGS/ON 7 ` TEMPORARY
ICM OACAl10TMER4
carvlcwn p•n
i CONTROL FEAKE j WEST SEDIMENTATION `,. `0 CONTROL POND
TEMPORARYWESTTOTALD/SC//AROE CENTER EROS/O' EAST SED/MENTAT/ON4*7 r2.9= /3.9 CFS CONTROL
DITCH7—
Facho EL L. Dy5=0.O0/7t WEST :P.OS/O.V
C'CONTR.Z D/TCN 4 d e
nr
5=
Z
7'%S Ex/STING CULVERT F$
I' .
ç4FGS (CHG)
1' CONTROL POND y
V
c Ac)' /3 AC @ Z34 CFS f
j'`` ««..« ,.- ............».....•,. ..-•». AC C 2_CFS—.`
r
I
DISCHARGE TO____----"
V«
1«'— \«
y..,,.y.,, V
rr
y,u4ru„ 1 _
BL5CKR/VER E/ T DITCH EST/MATED PROPOSED t!/TCi
CAPACITY 50 TO 70 CTS, TO BE CON°TRUCTEDEX/57, DITCH EST/MATED
BY OTHERSCAPACITY /CA 70/30 CF5 CHG)
GEOTEXT/LE
EROSION CONTROL PLAN
Sij
Ir NTS
cs
WµED GRAVEL Crc
p 3/4`WASHED GRAVEL 05•C,,,IIy, qq ENDS 70 BE WELDED lip
Nom-CORROSIVC TO 0,75'D/A. FRAME6"
BOLTS AND WTSPLACESUPPORTS
G TO B FEET O.C. TRASH SCRCEN i
ZSEEDETAILLI
LI
EROSION CONTROL FENCE 0.75"D S• •Z
MAX. 3"SRAC/NG l"I a75"D/A. O
u "."° FRAME
0•
i 3 0
Plan U Q _Lill
NS'2 WOC2
ZpH0W
II TRASH SCREEN W W
f
CC QNITRAPEZOIDALDITCH ZICC
Section NTS 2 10 w 0
y gg, ,01 . ,
r
a
4 EA. 025'•1 i 5" / o Viy •d d/4'WASHED GRAVEL STRIPS WELD TO O ALL STEEL PARTS MUST
v
0.75'D/A. FRAME tl BE HALVAH/ZED dN0
o p SPACE UNIFORMLY ASPHALT COATED J 0 W
TREATMENT T OR CO r
CCCPERFORATEDBETTER). iJ 1
CUP PIPE
r '
r
Section
Elevation
SURFACE WATER
1 z
zitV EROSION CONTROL
SEDIMENTATION POND OUTLET TRASH SCREEN 37"SLOPE Of
ILODITCHOaFT. NTS
NTS MC
V" DITCH
Section NTS
9
T -
1 r
I
LTa.
M
MI II.fI//t r
l)'
ff
i '
yr' -iI'
r
A
t / /
1!
RRR Ne1/C /9ty t 1r
R,vF ti - -i LEGENDrNOODY'PARK '
rCG.
r l
e z,,N
t , e -- PROPERTY LINEREMOVERA/LROAD TRACKS AcAEEnEDL
e I m
0
k. W/TN/N PROPERTY L/NE5
r EROSION CONTROL FENCE
I y1-^u--=i
R
e
f I `,
PROS/On'CGNTROL =ENCF 3
L V' DITCH I. 3.__
I
Q -I -` • - - • sue ia: i D OrcHN CG/TROL /
eTRAPEZOID DITCH swore,ameeeree
VICINITY MAP RTEDF
s....»....EXISTING DITCH
CA1601.41 its
EX/57/N j CpRO VD SURFACE 7 'CULVERT amna*ars
1 1E-: I'LALE .4OVF.1J FIL1EREA&RIC UNDEFL ROAD, To 92 It, .° / " .
oCH '.IDE. OF GENIER-LINE- 01= D-7 ° 1 2' EXISTING GRADE
TYPICAL FILL SECTION 6369
SCREENED) LD
h_ PROPOSED GRADE(INTERIM)y
NTS j o
k fj-j BtACKRIVER BOULEVARD
r'''
a'' 'I PIGHT OF WAY w
4,,, :15
GENERAL NOTES
1. CONSTRUCTION SHALL CONFORM TO 'STANDARD SPECIFICATIONS FOR
MUNICIPAL PUBLIC WORKS CONSTRUCTION,• 1981 EDITION, WASHINGTON D1
STATE CHAPTER AMERICAN PUBLIC WORKS.
a
1
2. RAILROAD TRACKS WITHIN PROPERTY LIMITS SHALL BE REMOVED.
15
3. CUT SLOPES ALONG ADJACENT TO RAILROAD ALIGNMENT SHALL NOT BE I / {, "
GREATER THAN 3 HORIZONTAL TO 1 VERTICAL.
J
SpbS '
4'
4. FILL SLOPES SHALL BE CONSTRUCTED AT 2 HORIZONTAL TO 1 VERTICAL. f I.2 -- •-'',/ , ` 22
5. EROSION CONTROL FENCE SHALL BE PLACED PRIOR TO FILLING.
6. SITE SHALL BE DRAINED PRIOR TO PLACING FILL.
v
7. SLOPES WITHIN THE SEDIMENTATION PONDS SHALL BE 3 HORIZONTAL 12N 7- •",i'.
TO 1 VERTICAL.
z
41r'"" `\`\\\\ '
j
P
ti a.
N°
j ;i
O
F" I
AJ44?5
r, --.. t •13.19.1- CD
l o Uly iogBr y@ ams
1 r
yA \i*`' y-, CD
Z,\"
s`
W
0, \VW= O
i JJo W0
vo z
GRADING & FILLING
giA\ m- 0422
11/ RA`C
Key Map
20 0 40 80
CR.
51) \10
x .
I v
r.' I
b 6
1
I / c.....
w. \...1.
Vi
s.:
N., '.,-*:. • .,
ce
s,r-
r
1-
i• c-.,z-
l. 7On.,
v.„‘" '1/4 `, '•,' --•
5-
j..
7.-
N •4,„ \,,
45
e
i.1 t_ '•, \\‘.
A.• \g,! *.% e•I`•..., •. \ \,
4.,„
k:
s.,...,_;... ...,"\
N\‘•
s\ . ::,:...., _,,,,,‘.',.:,...,,,:•.,.,....:;:‘,:".:,..2;tk. 4.
A,j s,.1..1\
4.)iz l•.
i• -- i' "
I'',.. /- .;,:‘'',#
OR i
i ; 1 ' // ' .
s \ 7
le
1\
I/ i tt,
4.
1 Iii .... -
1 II ; k
1 . 1
li :
I ,17
k,
2.• . -
7., •V0 -
11;'•,-,-/
3033...... ..
0 /
it.•!
7/
i
1 .
k
il/
ftx
A t,/
0,"
s'
N.'''';
a-. • ..P.,.\ - \\
0
l' V 4,
v \\ ‘7'
s- ----; :`,
A\ li 'z',, x ,-;; s. r,
N. ..„ r.,
k c-
01 ,4 . / ' A 1) :',.
0
N41• ,-• /17)i
M ,,
s\., ..I'' t's3 cs
18•.. ...
03
co'I 1
I \ \ ,
t1_ \14
1
0 I
01
dk
J
7,BLACKRIVER TECHNOLOGY PARK 4/
0., N • S . ,
0
s
44 o
4.
to
11
ALTEERA CORPORATION n710CHEFRYSTREETSEATTLE, WASHINGTON
00 . t 2.
0 '1 '' - ' • ..''',,„„,,,, • '
E RENTC)N, WASHINGTON
CZ
O
41 d1-
r- I
k.
ti
V
G
i
iy ti`
PZ • \ D
w `\--\t o a
o
OpZ
ni T D
Z
On
23.Ion
o
i m
t.. / /
WI
1 AI
O NIP'
Hill BLACKRIVER TECHNOLOGY PARKlo M
0
t:"
ALTERRA CORPORATION rar-r-
ix E_
710 CHERRY STREET SEATTLE, WASHINGTON s.o z`
F i 8'
z RENTON, WASHINGTON ai
0
M O I'_ i
i •4
44c j W V \
ll
10 ,6' g^.. \\,..'•
ffi.._,:::: _._._.-----::-'--... -
77:7
g ` t
I I I
4.7 / / / / / I I / Z .. /
1 ,Z /
I
I
1 \ \
R i ` i wa
4"''
I i / ( i,,,'
f 1
7,".
I
af J it „
e 3
i
t \....\ ',
h
1
1 1i
e0E1
th, '....‘ '•„ ,,
i •'
x\
rt,
1
t
4. \N.7\\ t 1 I
7-r,,,,..Ny....---.--\''4 1
o
lit r•
Lo.,,,„.
4,. .,...„—• s.
c,..,..,. _...„...,,, c .,. 4•-•,......_ SI
goy o BLACKRIVER TECHNOLOGY PARK
A aALTERRA CORPORATION4it.T 710 CHERRY STREET SEATTLE, WASHIN(3TONc R i
RENTON, W ASHINGTON
n
2 1
r
A
J (Co
z
NORTHER).
R R---
w ''
t _ ./
d
ram . {r
DITCH IE.20.
BUR,wCTON is• A _ ....
ef1,, ._ - .r_- __
A-
f`
t R•L074Sr'•
d am'"`t0-3!T/OJ it
7, ..iTw woOSe _ J
r_ I
n tt
r
1rf
r
AG OtMER3'
cancan rD/ i ` y' t
te 7 \Vt'' I i \ \
t' 0 1`> c.:'' • p_ ` ——
re r 0,
o'.
t.. a . / :•
6 tit" tr DITCH G. 20.00
iCL
4'1?.Ip % Pc'1;7 ice- I O 0
i
f' 23 I
i zzo zj1
3 O
1 w cc r 0
SW.444!
j .,‘,.c_..........
TOY ih.,.: .- ____----::-
f•E
t` W O w Q
t
1 \ \\
DITCH LE lE rf 0.0017t //' :,,I /.
cc
w
cc 0
to
v `
D":
1,
I6.
O
Z1IIIIKb/TC Z.E.Z.E." ("
9:
74—.3."1 •
t,• W
Ile is
1 '
ti s•cw'?I 1—c,
1`
m CCa1•
7. "
1%. 1. i •
1 0 r e AE Ian EROsiou
1 .1128_ I2-CAIP , `COAITROL FEACE I j 1 O
Atr GRADING 8 FILLING
1
t t` y :'' .•` ,
a'` i` t
a't
Ay` AIL 4
9 \ -M
1, I
s{
b!ill' 1 \\ i i t
t
ro'
a' u+,
Wy Woo
efi
J o
L E. /tW0 w.RAC1
I I r L I l I yr,
411KeyMap2004090
fa:1-
I I
a0'.59'.48'CW/72'Bala,,
WAIIIIIIIDGTOS
y., ..
R
tl a!• v`DITCH `, . 00
3E11
ia
4,,,+ E!
T
Im...:\(
s\'‘''''•:
J I
r \ \\
its.' DONJ j, ERnS/ON
y
r'
C
M1
CONTROL FENCE 1
s• Ls
N
I
0 6'
P
n.
1 I !/
50'CW O'TCN GE.\/S J
1Ji j Er i
j 30'CWtit
cp‘ l
3.//
t`
J '
Ip
I ..r• \
A P'
liCt
J BJ. ,• !
y ti
ti
2CIP 7OCN
1
N\I.
3 /E I O
O
T WEST ///MEA?47/ON POND
r., Js1rEN.Z
CO
04836 C9 'Base J18
E 0 SEOIAf NTAT/LW T
E F»vo 07fTLET 1 I 0i. t-
y .
O
STRUCTURE
e .
r / •+' Q
W
r
i•. . ! '.. DI 27' W Y. F~-
I
I.
r.\
e If I.E. IZ.00 4.f
I P'' '
a`. O Q Z6(
E —` `o/rcw It /4 s/
OFFF /
i f,'
M
y
CC N
i
s i :..fin!
r \\;\`^
r\,` t
7 , s ,+,
M1- iA.A7CN r.6 /S i a! Ia Y. Q co
71—
w.. .... m... .m..........0
CC ui
CC 0
7$\.•....
fit!•i J ••
r
i7 _—!_.—
i.i L
Q/
I
W
U11."ti'B8'.:J w
LL'WvWWY. /Wuu.ur--•'.y—//•.WYYWVI'W li k',-17 a' Z
ERGS/ON
u...........u.........•..w............•yr.0 T
O
CONTROL FENCE 4
PIJ/J,•Wuuiu.uw y W.a•W!WI iD W
w«..w
r
W 1uuu•WuulBu•
u..r Nu.r..
W Q Li
27`CMo SLOPE A7 j w.....•,.o.....,,
0.0/00 70 OAYL/GHT
IA/ TRENCH- EX/STING STORM
DRAIN TRENCH
GRADING 8 FILLING
a41Z
NV 1
6
20 0 40 80
Key Map
f•
e' rca
t._..:.
t':,..
3
STAR 0'I EG,ISTER D ,
I a
ttt J.q R,CMMD RS
f: mFIiC 1[D\f
OS:77._ , \-- 10 n
r
r t„,
e
I1--------''----*.
e----------'*---- ....''''
7:
r :
1
ti'
r.\\
r
C'
i it'
CC
P
liCt
a
0 Z—T;
yam'
s.'
2. •
I
Olt.T ka/72 ase As,
i" Center of 36' rw t.., rrrr W
o—" 24"Ash rr
a'
D W V
Ds
Q Z
I
N.
r. .:2 D"AN r \.
D
a
i.
1 C= er of 36 8 30 -h - 24 aft
a\
t\ \,
jr ui 1
A LIJ
iN. M
I CW • p
N/ Cr)
t. a -:> r wlg
N.
4'Ash.O 3 h Yr i CC Q
r q^ 1 rir 'r
D
Cr
N.0
30'C rr
2 r
N. O
a°
ER'l95/ON 1 \ ? \ Q r V Z
t N. 40'CW/o' COA/7ROL FEA/CE J _1 0 uj
1. CC N. O - - j/r\
t _-
E. /G.1i - \'.
D +'^
MM Q IN. CC
y
50 Io
o ``
o\ f O /OGRANGh FILLING
Ii
40'C W'
tfIlk
h J
Base j oi N__ tr38' /62•B d>r
13 ® :'
K P 20 0 40 80 - - 0 ' -.
rca
0
NNN.Ns,NN::,
4:------'6::Pf.'4-6.1-e
s7t, ,,,•;,'•, ,,
a..--,
p
A.
OF
s44., 4. .3..:>4...,
i„,
110.5141/40TC.
14‘.t. ..'.. . 4.. '' '' '''/' er
REG/31'041a.,14,:''':::'''c',4,
A.CP ROT.li 5
1 •,:::,,N,,_
4;Z'4,ii1::,:..“..':-•s.: '
O'''' '
1/4'Z'....,4!
COMMOVENii,„.
DITCH tE.V. "qt, l'-:••••:"....,
L
1 " :, ..,,,, ' , ,,,.. ,...
et' c'
t
8
i-I Ir, •/
i#,,,,..,,..
110.
14.4046:00:00t
VII"47:9e
ft..%
or.-. -------------.:.1-:
fte.„-
r---------_---::
0...
0,..
44,4.4.„1,,„r I 1%.a..... . o' ... 1
t,---;---!--:..„: --, '
t---___
7-‘---- .....„,,, ,•••,....
z--„___,.., - .. iftkir----I
DITCH IE./5.1_.1 4.%'%**.,
s''
CC
is 1,-- s . ....-
r___.
te.,":---...„. ---..0'--Pler.rAlN,' ."
ER05/0A/
s,
CL
7.-•- --..---_.,' -,6 sfo464/7-Anav A7.,,,,aN CONTROL EA/CB . *."'•;;.,„,..,. ---
s`f.----
1/.."', ---- --... -
le its.-
14"*...., 44148 .'1. ''''•I`t'
0
a ii li144,1? i
r - ----... ..• a-
F---,I •CI Ctle,il•ati•... .
411111 1 0
0
N...-"•411....
0 1'
SED/m,(L/TAT/01,/ \ 4
a,;aft..ER05/0.V coLaRaL
4.4."!,%. STRUCTURE
em.,,,,,.712,----. -----f'•--- •---...,0 1
s
st
DI •12'
Ih
L:."' aft.•••,„,...
0 z c,;SEDIMEA/TAT/OA/
Dz.•12'
DITCH
Z 0< Z
I.E.•12.00 -
4 %
d
COA/ZeX SriadrTuRe
Le r4,,V \ ii, -----.......y- 'oho
0 ,
0o ,,,,,,,
DI • /2'
16'
DITCH
1
Dz •12' 04
2' . •
1 ''''' '' -11:7------::-.:---------------
fi-ii
1 '''----'.‹.---*' '' ------
Ir''.etti—.—": °
ZE.L4t7 Le
LE.•I2.00 11111111111111411 ....VOIRORAWI,EAST SED/AlEA/TAT/OA/itT4/0,-"--\------._____VII 9 F.Assiz.rmi I4.-- e
4.••••• 1
5=0.0017t-'",--.-
Ir. ,t s,, ,_-------,,,, ...1------...,-,- ------,„-_-_ -___...•,.-:,_. --.:,rirni",127-1111MISMAIIMUI iferliraliThNnogi.
a ..
1.__.. .....1......t.PuNiu_rmumu—..- . ....-- -.
N, .- -:': 1,k Fn. 0< Z
m0114141104404411.4 4 WinUIPUIUUS UP
41E,..EP .,•,•••
nano 4,'• ,0 CV t..I "......._ i--e,
sa.-----__
s' 4
Z1 d:17"... ..., ' CL co7-----
y S-aootal
h.,
EXISTINO__/ s.L Le. 8.75
7— -- -. IE. 9.40
4
I.E.
74=Le.11.0d ,, , ,vef Jo s I,s/s7
I U-I 0 tuil .itC
DITCH
EK1-42"CAIP o
FC
12"ClolP SLOPE 0.01 70
AT.0/ SLOPE
227.4,P&act e 0.0010 ‘., ITD,OtlYLIGHT/A/ TREA/Cl/
u)CC 0:t
04YLIGHT /A/ TREA/CFI 704/APsrE
RZOuciDreDDRA6rebVAGorEh:e.
D:ersCN) ..
t.
1.,
r .1.•,,,1 ----
7---"' CIC CC. Z
L X tuCC 01.
0 LLI t- 1—
I— u Zzz's1:, a ....1 o uj1
GRADING& FILLING
03
5.
1.,••
0",;•,-
ilk
1,=i' MI/
At
C3'-c,
8 ,.
20 0 40 80KeyMap
PRELIMINARY PLAT
DRAWINGS
i
c: ittr ar,,, ac.,ii 1,_ ....-z. 4...-ytto';,-; . ,•, --,:.......ms ,
e.-- - Of :a z-i.W.Vi;r .i... --
i ,,.. ,
i,, t
ti fp,plo Air, ,,,,,,r• , 1 ••., 1 i„,"--„, do 4,16, id tit/ _....ifi*E.14,
rca
4,
k:;,_,.... .,.., _ „pp.. .
alp 4f ,,. .,..
4......
t... 4....,. .;
le s•erl 4 iikiit 1
4-.; l''\
g141111
4 ofii - .1
7.--- .__,....._ --_, 6, et ip - I ip,-..fih-s,- -./ __-' k
811i 4i.,- ..,'
a CKRIVER . b °
6wity LEC EN
s' 0 J. 1 o ySr hy or
l' Rep ,
ii fir Tote Site Boundary
WASHINGTON
T
O z!° '/
tei7 j screened)
I.11,...... - i i '; gable Arear<.s
T ,.
x-- I. r
41 {`
screened)
a
J
j•:
a 1 i la•,...-- r• —•;.R`
s_•cr ,--
j - ; Be idary
0
l ';;, 1
P;
Lot nes
t, : ; r-,., , k .I ti 1 Lance-:cape Easement
y Road Centerline
ZONING f;, 0.
Roar- Pavement
VICINITY MAP L-n 0+
Lot ;35 mber0jG
Lot :.ize 840 Ac.
aR „;, ; . l/1:
T
z,
Utllit es
i Existin,:i' ; „ o
x.
r, Storrs )itch
f Propos:d
A•' Stor, Ditch
WateriitjpR' ``p0# /
r T ..
iiss/ r Sanh / Sewer
Zi1111fF
7/ DATAf0i1SITS
i x.j/ s
5,.
5/ /
Build rig Lots 1-46 45.861 Acres CI o
i _°' j Roadway R.O.W. 5.375 Acres/
l tt,` 'y fir/ Ease rents pedestrian a utility 536 Acres Z/Z!)-
4,
t a« °
t rty /lncl.19.388 AcresGreeeItProperty
4'
s'
s ._?'34n_•..
p-
r'. _1-t., `
1-•a 3 11[ _ _ --:
i_.-•-° Floc d Control Property & V Q J
t , je3y / r ice , City of Renton Property I_0 a _Z
roe,;/ Total 71.16 Acres IW
Road R.O.W. 7.5% of Total Area z
7.
Road•=gay Pavement 5.4% of Total Area Qi
a``. .J J olij
PRELIMINARY PLAT,
North
7 Key Map 20 0 40 80
C=11=-1MilliMMIMMI—
0
0 0 8
P
1
a
x •s
Ici N‘ •., ,•"..,:.••
a
v Av
P
j \
S.
tr
c.
1a ,
yj
w;
I R
rP.
i, ..i
i- / /, ; 4" d v ,.,,
ii ;
vaka
i
cI 1
Ai
44 oN
SY
d::
O r -
1
1i------.Y 1' 1
s
il
do. ` r
l`
A,j
j \
27
o
co
O41
IO
o I IlkO
g
II " !
0
BLACK;RIVER TECHNOLOGY PARK
u
in,
P Z ALTERFaA CORPORATION 9w=>
710 CHERR( STREET SEATTLE, WASHINGTON
T $ p;o '
rn)
c)RENTOIJ, WASHINGTON 3 3
I c5 041
f, j
i i.
i--/-
PI
t,,
tz,\ . .; -,'-\--Ns,2
P'!. .."" ''':•.:, \‘, \ ‘
N
k. ....‘,..:. \\-=-
t.,
r • -,
s •••., \
N ..
1
r--------------
24--------- ' -----,.
0
F.
N..
t
41
N.)
fa ,
6,
4
i0•
ve‘
96/
s.1.• .
Z
c-
ps,
01
01
I III
oibi MI.
0.
1
4R2:1' rr'l BLACKRIVER TECHNOLOGY PARK
1
E.AL TERRA CORPORATION
7-1 710 CHERRY STREET SEATTLE, WASHINGTON
RENTON, WASHINGTON
1.--::\,.1".\‘'V'.•..'-, Ai. ',.>
1
6______
0‘.6 s•
H .i
Ii. '-,
a • -,
1 i
4., Zi•'i
Cr, ......,
11J
e
Tr.::' ,
S.'
0'
i./
4
0 .
1
w.
t( .
I
I ,
7/
0
1
s,,\
a
p i'''''::::) .
0 /
k‘)/
f: .
r.....
k
te. .'
1,-:'... •
u• '.........
k.
1., ..,.".. r..:L...."..,.
S
i '•
3,i .
L'..
a.,
0...
0.
ei MP v
0,,,. .
A_•.A.
8/
BLACKRIVER TECHNOLOGY PARK
ALTERRA CORPORATION
d710CHERRYSTREETSEATTLE, WASHINGTON
11 ts VREFTON, WASHINGTON P.
5I>
ae f'
i'
rca______Y'
It
I Z I_._
utility Eeaenwlt 157
1_ - - _ "
z_.___ _-=
i — -
NB 161 ... r
B f4
ter—1 r r— / t
3' 'lla'1W+" I. sd
ss• - -- 1.
a
Ree7tJ leasir`a 3 ''
r.
1111 U\ '+ - -. -:'.is _ .- ; et N
I 1 atwn or
02 c+
p
0
I
1
I
aATI OOat•;
1,,,;,/____.---------s
s 1
A.CA1101-141IRS
I\
I
mRnstwa as a
A
0
c I h H NI ml Ss1 Ac.
14. j N
803 Ac.
a1 0 , I
1
r
I
84 --
row
AC
0 _ / -
823 AC.... tt
Vie, .
a/
20 ixf•
i ems 8
1 • o +el
I 8.15 Ac.1 a I___
Pzi)G.,/::7-------,*.e5,00.
I r
0' ,,- -.
7; ,.--', -
14 0 - 'a?
w
ni.,._;:..----, ..:...:_____",
820 Ac.
N % 1-------
icy
131JIT
N 1 I 8>". Z
1D2 1
i
r
1 O Z(7,
1.•••••••
2 1g.
4.lek C 411111
771 Ac-I V Q J I.
o ,r•' 30 N s2o Ac. 34 F' C3
ham 1 1:103Aa WOQrOr' Z
29 836 Ac.
1
1.042 Ac.m
a.
1,11 =
1.110 Ac. ,CC CC I- Cn
826 Ac- I.
LLI
1 i- i I 28
si.; —,
6.8. _
IV.e zz 90 liz. 2
7 0/ ./
E._•_
1
1- a.e1aI zed CC
h
1
t
36
1
CW J /- 1
1_
u.--.
i
I CO.l Q ti
e
s\ 1 I
a2_cw
I 27
I
PRELIMINARY PLAT
n
0-
e+ ! 40. et... \
R
PRELIMINARY
sasac.
v 8/6/84
off
0 .,
13'i'
e
a..._. ---
1 c,,,....„),,„..._0_2_._-,.,
a•_at was_
Kay Map 20 0 40 80
rtri
r
r
n — ---
Q„4EO0 /72 Basa
I \\ , /
N 6,:a••,•,,•,..„;:
sr,\.•
Z''
S2," nl.-- .././ 1/ . ' ?3-T.:...„..-- n •.//7
l.AGR° [RSitt '/
Y l
l
I
T RI_Cp a. —
COMMIE 1106.711
L.:I-. ------,.:(..:';--.:
1-
337, .- .'
0)'
N.'\
e/K 4,
50'CW.c• •
s_ , ;
fr
r•'
i/yy24' CW
7 I \
i
N\7 -
Y,
ti
r ,+ B!
1
O'CW 19
i CC
862 Ac
Eli2) .
Irla' (:-/ ,,,,-;„:, '-, 30".CW •-•
e C.^
Th‘
S mil /
I :
NI • '` y• y•/
J,N- .‘?‘'‘ i 9.i 6:
ON
w
50-,48736-C 9 Base
N
M\ /. • / / le, y '-•• Z CO17., ., 1 e '
2°
6//.
y sij'. °\\. \ rf
1Itiii 04
43 i- U Q J
i / 901 Ac. r W
nI;n,' ,/J.....l r..
7
1,, it,.,
CC
0 Q
7 ;N .-
2- /..,/.
gypp L c r i.,y 908 Ac. Z
77
1
ate s 288 Ae
4i9
Wator.4"rnent
i
U O
Tom. _1 ° •
RR
RaRa iiRiiANii'IAi i 14 _ 316 11 JOW
JO' 1 1-'_+.' - i i SMr mi "Ratata ta taRSM My.
I
PREUMINARY PLAT
d,i gillk
Gril-I sieis4
Q
DU
I6
IMIIII
20 0 40 80KEYMap
rca. ..m.
131. ••••••••......,
13e.
06./. ...:::: .• .
411444111S.
0,.::,-_____ .......ner#204... ................,______
i!"---. .;=,--,..?. -,,--'
re
I ,, .I
I
1------
I ,
I
I
45, , •'
S-........"... ,
G7172:77.'
TICT
R ERSA-CAROTH
CIRTIFKVI 44.V
i
iI
i y
V/
ifr:.:, ..•%.,........
1 , '
14 1 , .958 Ac.
1
874 Ac. I \
883 Ac.
voist
de
N
i
N.NN'''-'1:;- .'-
1 \. \\ \ *\"..:\,:‘ \7 847 Ac. j/
c• „,
L................t.t...,I....1j I i - \
r----------
1 0
re
sss............. -
f ,L.C.16214 16, it
40'
CL
N'il•05.
1..............,...
Ne
836 AC.
s,....
4.z1,
0 Z
I--....
20. c. ,•—•---..
1
4.4::
i...\\s7,...: ..
N / V
0 1—
J 2
7--------_ — •---,....::::;:„
Not4 .............. '''',Ns.
I, V
0 Z uN
817.............
4..... • N N. ts4
9
Z 0< Z
N.7
N -/N.
v sr---,
I—ur I_
1111••••
i -,
X 0
IN i •
Ts Iase 834 Ac.1•.. 4.
0 1,4—I
W CC I: (5
Conte ot 36.°'...„
N.......
1}...
IN. .\ *C‘
6,,•
11 ' 0 IC Z
A 24"Ash .. ... \ s.
4N . \tt NN .%,,,\\,.\\
cc
occ ccuil- :
36
tio/(N.„.i 1 1.125 Ac.7 \ (II S\2. \*.:4:44%•,..,,
P.
v, \ ....\.
4r.:••••%1: \55- \1- 925. Ac.
0,,,'
s „N .
CC <(1) ''
CC CC>.
Z
I
1.089 Acc
V
gill'
38•••—
N.46.CW s..
Ds.
N
4'Ash° :,A1 No\
6-CW .
3.‘0./Ic'w
343.C77 117
0
A‘\
v...
N
t, • ,
C.) CC Li 0
Or ILI Xs; ‘\,• \
co..
46 .
jecciss rsoL) ccuJZ
i
7' 410
c\N` ] . \
a ,3 • ,\ •
g
i
1.277 Ac. 40.C ..
L.11? '
852 Ac. z, N„,..,
C)
S. , r 5: C W..... ,s,
i
l'....
7/
4\_ P‘.
iii PRELIMINARY PLAT
I 1 ,
39
4. %0- /
0/
s‘\•,..;\'''
ilk
11,*s /
998 Ac. c 4,0
C1.
9.
11,
46.\:5:
0,
4,
1'
s
rm.
62'Bases. •\-- .
1?
12•21 Xi6...\\i"\,...
esee, .,e-
Key Map 20 0 40 80
rca
1.I.",\ '6.4:•„, :•,:'..
f,
STATE Of'
0,1111N.S.....GTONI cr
i _ '"-•••:`„_•:-:.::.;;•.,,.'.•,..•;:---.,, ...."14,.:,,, ' -,',.
4,. ".
1 .-`';-,,,'..sL:' :- -'. - '--------___/..•'.- ..'- ',/0..7.,„ .- .i ''',--, ..'..,-„,,,,-: . • :----.. ' .----.:,,:-.'4%::".,:`-,,.HLVE101 .-C.
1111:
011HERS
cowman r....1/
1 -..„ •
a4,‘% '''' . '‘•. ''::' '''' ''''-'-':'', '''
I 2.':'•1- ''' ,-., ''''''''''':', ,„.,..,-<''''' :,..!......
7..... . ..,. ..... ",..... . •
L„........................ ../(7,1._,..... 7........:-...
s,..'....'.',. ; . ...',„ .•' ---..;:-.. . ^,k,i,*:,,,,,,,.._ .
77,:-..,,..
tif/
0 s•-'>--..... -. '
s-C.-7.-
844 Ac.7 '--s.-..----------------", - ' ----------n.------.'.'.: --
7-----.'•--,= .-,'--,„_ •
7
2 71-. e
1141 ---'il411'gt/0..Cr7"-- :,,,,,, ••------'''-...,_ - ---__
1_--.1-._13S_
e,•.181_.4.-1,pn_-_-_-__P,
h_—
L____Ar tr 10.006 Ac.
OLt
I"
n
lc,' . 1.----...„. ••• .*N„, .,'
4 ------
i I• ,,
44.44P` .-- - 0
N' N,4'.yj...,.,.••• 2
1mi Zk3.
I v. %\.........\ ........„---- N\
A\•,'....(-. ..,ED '.11-•-•::_,: _. „...,..._• '•••••_.....:,_. ,,,._ .
Z 0 Z
1 z...._...._..............
s... ..,
71 1.-•,
IMM..0"."At.
ur 1.-0 4—11
y.1— 0
912 Ac. 1-i \. 1 „
is„ i, 1
s
i -------.,- ' ---•••• - :-.-- '... .. -• LIJ Sao I"'Z1)
0<I. . Wi ,.•,,..: ....'..."•-•,..... .
s am CO I1-1-
dlr."...z ..............
CC CC (1)
tv2?-66".ftli i to
4 tm...m..:.F.:.-,....-n..m.. •.... ...•..• • •,...•.m• • • •l.l•..,•m,,. ......... •mp••.•,...-rwrv=is.TATNt.rr ffiurnisirrwrintrivria•rverrurs m 111111TIMI sr rarr..C.9 ,-------•• —filimm
sed. W 0 ilj 4w
5-. . Exliftlno Storm Ditch I 1 To x Um UM*.of WW1.Toe..Cpabit,
I , 30 22' I ,
1 CC30' M = 80.
ea
CC Zs
I
0 CC ru 0i6
re ctLLI x 1-""1 i
1.-0 zi
1..1 ...I 0 Ill
s
al <rs CCct ;is7-
75 'i
3
0o.
PRELIMINARY PLAT
i,.• Ai,
Li_l 80-------Q
20 0 80
I cf..,,'''s--0,,,,••-0-1-t_c)-•pr..
Key Map
o
If
o
p E
fo °
J4
Co137THST >s.
s. yc' i.crc.v.fi......,..;..;
IA"
1
AA•01•4040
I
r
A_•
yn4
3 P'•• + •O
f /°
IA
sTAT[or
11
TOTOOEO3
ARO A.CAROTN•Rf
MCAT[N.27., f
If3O9E°
S—______:0 a P
c•
O posh
R o f
r fj .ems I
I •I
c/- '-/—*
o
o p
i opt
i r/' S 1011
111 15
W:
fJl
Z/o . w
s 1
IN
Z
so ;; rf,.
p BLACKRIV : R TECH OLOG4AR :O o
r
3 ,r,,K i Z
l
13
S.
20 19
0 0 18I Oz•
0,.. ,v." „..20
LU
f0^° ••••••• ie+' )(
21
sjls.`r
r fs+/
248B s .
U)
s+.efL. e+•, CC f
7...
rr Ili 0
IPJL P2
3
f> )
f>
s e
es.
s °.
fik"Ski.
zfEj g9P.••., \
23 i y°Fsp a
r T,-
s ,
yb •s LMim.
Z
Nv is ,...•,
w°•
n ,
sa
f[.- St o to ,D+°
ssr . °
o°•° •,
e
i
CC
24 sr) 722950 1ENttON
9 p)+ 918900 H J J O Z
OE r.e'h 2
wtir 23A
1.eI•
I„
ele•
1''•
VOL122/98-10 s•-
I • : Q rr,f• CENTER CO Q f•
v.. •A,.r,I TECHNICAL
1
f•
WA HINCTQ
1 26
f S • "o I Jo°s• >.,` KING COUNTY
1 I 4• /
a..,r.,e
t
N`0+,' !
I{ I Q Q 1/4 SECTIONS
1 rN, \
a+° TRACT 31 a TRACT 29 OP .y- •- '`.i. wZ o
eo a Ilk r. est>:
yS NICO;
e,> RENTON 51' 1 rfz r .." I J!• nCe _.• 6/8RH
t -,• •+°a TRACT OP so,G 1 ~: e
P / 'ir.b : !. r r..n,30s 70 t
Z...u`- fl'[
I{
S rc Mr RAC
s,,
qte 1{ \"
r•
ejf NAS. MONSTER RD. SW •f„ •r,f ff ep pb!° T n Ta
P Q,'
r-
fey...i•n A'
sITTT.,•i
wr.r I y o'` % ! ° L[ r.pc
y• > ,,."
w r1 . i°'TRACT I •
S.4 \ \
CO!;
r /, ,o°
o;r
9
Z, °,OrAO(N,
u
4r
za.
dyt >! i i ',LOt,.• • ..
s
a \ , q
f 0.
r
i • ..
7 .i-y '
4
41 ' . ',
cif,r_ % .,
s,w'
r
J,
J: '
0O
r . z 4.0f 6:.°0 ``' , irCa1,4c
i n F <.- M1• +
lys' °
yN Pt.n. I*f c0 Ar° ,,°n 0,
f1,C .., "ter°. 3,. '6*
i otr s- J -
fps:__,_
tas
t-
r...,
AL MINE CO. I-S ilio/'R •'.
nt.-E\ s.. .
s r % 4 1
M
y e i
rt
ri1[w° _
a—.•• •
R
1 P _ N N'! \9O j.- 4
p
a`
4'J00 S` •4ti;.
o S _
o
13e.o
s ° .o y
pi ;
40
n
i
N
h
N `
n
t.ssw.r.s
O. a n
eI 411r• yn.. r
1
o
O C11aM[lt!
comma marN
s7e .+ nun
04
es
e
N r6'
N it1/4:-.. . .'
r°
r 4 1, 1
0 l,
4 '
iiii7c. ,„
y
I
r _ -
2
a
t.
mac,\ \ 2J Id
ti
0— NTH, 1 'S
n ,
4.°
t C'tT O. ` 0 ill Pt , is / ;.,,,,,,,,
23`°
o
1
p5, s s
9/• ,. .Zo _
iota /
N
r • \ \--..---.
t `\
a or
f
f',t.5.
4/.:
lG
N BLACKRIVER TECHNOLOGYN v:5
s CPARK71rQ
1:i. .1 3 - ,
4
o.M
2,
eel,brw[.! 1325.30 N H cps oiw z!
a
a• .'
N
26'._ — za
to
N
41
0 I-
i.
4.‘
0..of 722950 '
J` kAtt,,.:' ' , r, . .,0-Jzi
b eLIWZ(P ,
e [J•%'dtc
c
sr
o(e.
e
00',.• ,0
L'.e w O0 • a/ t0 o. rrr
AC owneq,p..NV.fU,O(tY :
Q Cb
CC 0
w0.s OS s...ri
t zn
A j
14
DETENTION/,BASIN ji' so:.-.,-r;f 'f; .-:----_-,-''
4/4 ; -- - .° -
N Project Boundary e J J o W
wy«....a/r J./e.{.0
b
e I
ems-
ea
CO
to \I
I
I
o/4 KING COUNTY
I 918800 1/4 SECTIONS
w HlZ
gill/ 1
ti$' I i
R y0L 122/9B•I 2
v„/
J
J
4 s°.°+ 49
wiM
71 GENTE1..
O..
ir-,
a,
e WASHINGTON i a
dp 7;
I t I_ ti . n ,
11' 104' 300' Distance Arc
MI
50 0 100 200
rca
0,
LEGAL DESCRIPTIONS
OasNINGTONPARCELAPARCELB-)
STEREO
PARCEL B-4 L TRT
That Doreion of the forth half of section I), Township 2) North, Range 4 East, von.,The[ foretop of the south het! of section I), Township 23 Korth, Rang. 4 East, Y.M. That portion of the southwest quarter o' Section I), roww sh 1p 7) North, Range 4 (oat,
r'in clog County, Washington; and In Ring County, Washington, of Junction Addition t0 the City of Seattle, according w... In King County, wfhlrg tan and the •o•[lon of Junction Addition to City of r D A.CANOTNg3totheplatrecordedInVolute12ofPlats, pet• 75, records of said Ring County,Seattle, according to plot .•corded In •_r r• 12 of Plats, pate 75, records of said t>:fNtllICATE Na 27ndofC.I. Brownell'• Donation Claim No. 41, described es follows: King county, together with r«•ted etre I•. adjoining which would attach to said
That portion of Junction Addition to City of Seattle, according to plat recorded in
street t2 of Plats, Dag. 75, in King County, Washington, tpertner with vacated
8rglBeginninging at [
p.swish by operation of low, and of L... 'rovsell's Donat icn(Wm No. hi, describedstreetsadjoiningwhichwouldattacittosandpreeiseseropretiono/ law, and oftheseuM Cent., turner of bold lac slop Ij; thence M00'S8'7e"F along s folio-ram:rs:C.E. 8rownrll's Donation Clain no. 61, described as follow.•: the north-south c•nterlin. thereof 1092.82 feet,; thence 561.03'56•11 351.11 feet totheTRUEPOINTOFBEGINNING; thence 1161'03'56"9,575.56 feet; thence N12'01'00"W Beginning at the •oath quarter corner 0: ..id Section 13; thence N00.58'28"[ •long60.75 feet; thence 577.59'00If 133.01 feet to N point of curve; thence along • the moth-south centerline thereof 80h.C. feet to the southeast corner of Tract 26,
Beginning at Me south guarder corner of said Section 13; thence 000'58'21"( along
the myth-south centerline thereof 1092.82 feet; thence N68'03'Slot I24.15 leer: curve to the right having• redius of 230.00 f,et, through• central angle of tendon Slow•lends Second Su i ..nt.l Me 1958; thence 572'37'52'6d 3e2.60 feet to27•47•31"en arc distance o/•111.56 feet to a point of compound curvature; the an angle point In the south line of bele 'rest 26; thence 170'SE'OS•V 356.53 feat to
thence N80'04.48"( I32.00 legit; thence 542'06'Oe"[ 87.16 fee[ to the TAU( POINT Or
B[G 1NNIt , thence N47.06'08'1,87.16 feet; thence S80'06'48'Y 1)1.00 feet; thence center of said curve bears 10I5'66'31"[ 160.00 feet; thence•Lowy said cure• to the en •*910 point In the south Iln•of sold 7roct 26; thence 573'54'01'V 130.08 feet toNI2'01.00'L Iwo.IS feet; [pence 57759.00'Y 173.01 feet to • point of thence
68
right, through• central angle of 70'68'19' an ere distance of 197.7J feet; thence ton
rananglepointInthesouthlineofstileTct 26; thence 561'16.07'V along the southalong; a curve to the right having • radius of 2)0.00 feet, through a central angle 582'15'00V 67. feet; thane• S31'32.22'v he71.06 feet; tws• N81'11'35'1 193.00 line of said Tract 26 •distance of 316,', /eat to the north boundary of a tract of
of 27'47'31•'an arc distance of 111.56 feet to-• point of cu.Douna curvature; the feet; thence S82'15'00'v 92.99 feet; thence t35.29'30'V 143.10 feet; thence lend deeded to Kin) and describe/under King County Kecordl.g Nueber 6607786;N76.14.00v 84.85 feet; thence S60'I6'00v 67.00 But; thence S12.16'00•'[ 97.75 thence resterly Along said north bound•r a curve to the left, the center which
center of said curve been N15'46'71•'E 160.00 feet; thence ,long said curve to the
right, through • central angle of 70.48.19"an arc distance of 197.73 feet; thence feet, thence N68'06'46"E 53.79 feet to a point .nice beers M77'04'j4'Y from the627.46 rei582'15'00'RJ 67.68 feet; thence 531'32.22•V 71.06 feet; thence N81'11• ell u[ POINT Or BEGINNING; thence $77'06' G"[ aDean Sj9'U'
the
671.
t
I.
lot
three • ce•i nl angle of 39'I1 y9": an arc distance of3h'v 197.00 9.92 teat to the TRu[ POINT or 136.70 ha;
boundary
north along
toaaldt
ww h aane•ry 25.00
NIt , [
nonce rest .long
feet; thence
4.85 feet;
92.99 feet, thence
67.00 feet;ence
feet;
00'1 9
BEGINNING.
said north boued•ry 245.69 logic to the T:'J[ POINT Or B[GINMIIK; thence north I56.IJfeett'
00'v fit 85 feet, thence 560.16'00'v weer; thence 512.16'O0'•[ 7 75
e
feet; thence N50'79'19"[ )70.11 foe[; [N n<• Nlj•00'Sh"W 109.67 retie to the soot hr.ly
feel to the porch line of • tract of and described in [tN 111T 5 to Agreement
recorded under sing County Recording ND. 8J010505 J9: menu S6B'06'46'Y along sad PARCEL B-2 margin of the
Dot.,
Burlington Nboor. R•Ilro•.i Right-of-Way. sold point being . point on
the center which bears 1loft, ,0"C 185).00 net; thence westerly along saidnortherlylinesaid37Agreement;
leer to the
an northwesterly
Ilse of a tract of landt described
line
in aorsoutherly margin and curve to the left, 'ben.. • I angle of 7'S9'19", arc
i.111T 8 in Agreewent. thence nor[nwefterlr along said northerly Ilne on • That portion of the forth half of Section I), T.a'.thlp 2) North, Range 6 East, Y n. distance of 12'1.00 feet to • point of co.1aund curve, the center of said curve bears00000to [M left, the center which Dears west 195.01 feet. thru • central angle in King County, Washington and of Junction Addition to the City of Seattle, according 51J•22'19•'( 4030.00 feet; thence I• •long said southerly eergln and curvea toof7e'61'24", an arc distance of 767.e7 feet; thence N78.41'24'V •long said to plat recorded In Vol.... 12 of Plats, page 75, records of said elog County, •rd of the left, thru • central emote of 2'48'3:", an arc distance of 197.57 feet tov pointnortherlylineIe0.00 feet to an angle point In said northerly line; thence C.C. Irp,rnell't Donation Claim No. 41 described es follows:
of tangency; thence S6}•69.09•V•long sale south margin 271.00 feet to a point ofBurlingtonalongsaid
rorMerly
line 109.67 feet to the South line of the
thence on • curve to the right •Ic y sold aw Mealy margin, having • wad Bus
s33.00Burlington northern Railroad Right-of-our, •alo point being a point net • curve, Deginolrg at the south guiltier corner of sold Section 13; thence NO0'58'28'•[ •Borg off 1571.00 feet, thru a crntr•1 • ie •ofrMecent•• which ears S)9.1)'00"E 1857.00 feet; thence sisterly •long sold the north-south crnterllm thereof 1092.82 feet' thence N61'OJ'S6"[ 224.4S feet toA '-32'02", en arc distance o 206.57 feet to
southerly line and curve to the right, thru• control engl• of 2'01.59•', an
arcCC
a point of ca.pornd the center wd.l:n bears M78'
right,
YtheTAU[ POINT OF BEGINNING;INC; thence S61'O7.56'Y 575.56 feet; thence N72'06')6'V westerly I
9' 127.00 leer; thence
y along old southerly margin and :urns to the Icht, three a
no, lb
central angle of
distr..tance of 65.75 feet to a point of compound curve; menu continuing •long 389.92 feet; thence 568'06'66'V 629.32 foot; thence south 85.67 feet to a point of l6.55'35 tin arc distance of 216,17 feet to • point of capourd curve, the cent•rsaidsouthlaneonacurvetotherightthecenterofwhichDun5)7.21'01"( turn•, thence on • curve to the left, having • redlut of 60.00 feet, thru • control a.ict bears N21'63'11'Y 1055.00 foot; theca westerly along sold southerly...reinhavingaradiusof10543.00 feet, an arc distance of 186.51 feet through a central angle of LIP S7'10", tin erc distance of I)7.e6 toes; thence NS)•07'S0'F 199.18 leer and c
95 Q99- ear • to the right,
od •
central tin_;• of 11.21.01•', on are distance of Iangleof01'00'19^ to • point of compound curve; thence continuing along said south to a point of curse: thence on a curve to the right, hewing • radius of 200.00 fret fee[ tov point of compound curve; the colter which bears N10•19.06'V 696.00 feet; alineon • urve to the right, M e center of which Reap 5)6'IO'17"[ having • .ad.us three mencontrolco of 5J•59•30", an arc distance of 188.47 feet; thence S72.52'60'•( thence westerly •long said southerly.•rg'n •nd curve to the right thru • central ofof1657.00c het an arc distance of 193.93 feet through • central angle of 06'42'70"290.00 feet to• point of ; thence on a curve to the loft, having • radius of 3'41025", an arc distance of 65.43 feet t, the easterly.ar9ln of the Charles Monate,to a point of conpoum curve; thence Continuing •long said south line on • curve to 197.00 feet, three a central angle of 39.08'51", an arc distance of 1)4.60 feet; thence County Road; thence 534'18'31"C •long sal[ easterly Bergin 63.66 feet to the northeright, the center of whichcn bears 529'77'SI"E Having •• radio, of 6738.00 lee[, m67.58.29I )80.92 feet; thence .31•27.12"C 204.86 het to the TRUE POINT OF B(cINNiI•G. boundary of said tract deeded to King y and described undo. King County Record.a arc distance of Ic7.76 feet through a control
angin
of 01'10'Se to •• Brio^ of Co..o.
irg N.e.ba 6b077e6; thence N71'Ij/19"E sling soldld north boundary 46j.j1 thence 01 Zca.Doune curve; then a contlnuinq •long said south line on • curve to the n q [,
t59'S)'1)•'E •longboundarynorthboundary 377 52 feat; thence east along sold north
O
0hecenitirof .nice Dears S17'$6'$e"f having • radius of 17E8.00 feet. an are PARCEL B-3 ervnnaerr 75.00 feet to the TRUE OINT or t(6100I G.I.-distance of 194.45 feet tnrougn • central angle of 06'I8'06" to• point of <amoovne
curve; [hence continuing •long said south line on • curve to tno right, [ne center
That portion o/ the south hat! o/ Section I T
Zmewlofwhichbears5n•)9'S7'•E having • rsaiu• of 86ol.00urca, w are distance or Township 2) North, Range 4 last, u.. PARCEL
Co 0 to
C4.51 reef tb o.,qh , cent sal angle p/ 01'71 VY• to• point o/ coaDowd curve. In King County, Washington; •rod of Junction Addition to the City of Scottie, accordingwm
to the lot recorded In Volute 12 of /I peg. 75, record Count 7
thence continuing along said south line on • curve [o the right, the center of D Plats, s of laid King Y. ina portion Tract 7 Kenton Shoe•together with voted streets et/joining
y per,_ or
t
S.
and•. Second Supplemental end that
nice Dun s20 17'09"[ paring • radius or 1922.t0 feet. an arc distance o/ 178.79 joining welch would attach to sale premises e o
guarder or Section I ppr tJ on o Qfeettnrougn • central angle o! OS•19.46" to• point o/ cn.vand curve on the east flip.of law-, and of C.C. Broww•tl's Donation Claim No. 41 and of Tracts 25 and 26, tired:^
e••arnsiat
J, Township 77 North, Range 4 E.f , v..., line of said Charles Brownell (Jonathon land Chi. No. 41; tnencr continuing along
Renton Shore lends 2nd Supplerental Maps 1958 Reser lewd •s follows: 4
t portion or the ,ou[1w.at •wrhr ,r section le, rprn•nip 7) North, Ran Ocost, u. all In King County, Wnhingt,a !escrlbed es follow,:
Rangesaidsouthlineon • curve to the right, the center o/ which Dears SI4.57.2I"E
having • radius of 1814.9) leer, a arc distance o/ 659 62 leer through • centr•
Ieglnnl nq at the south guar ear cormr of said S..ctlon 17: thence M00.58'2e"[ along the Beginnint tit the south 0 )
J
angle of I)•25'19•• [o • point o/ compound curve; thence continuing •longsaid
north-south c•ntrr line thereof 1092.82 fret; thence N68'03'54"I 22/.65 feet to• point
gwrtor cow nor of sold Sectl V Q r
1hereinaftercalled "Point A••; thence $68'03'51"f 75.56 het-, thence N72'01. 6•'a
the north-south centerline thereof 1092.e2 roes.
on l7: thence N00'Se'71"[ olo
M V
south line m • curve to the right, the ce n[rr of which Bears S01'37'03"[ na.,nq
389.92 feet; thence S68'06'46"v 6I
5 thence N68'03'54'1 221.45 feet;W InL.I~" ,I/ i9.17 lest to .he TRUE POINT Of LEG INNING; thence
thence t80'D4'4e"[ 2)7.DO feet; thence S17'C6.OL"[ e7.16 feat to the TRUE POINT 7
radius o/ 1165.09 leer, thru • central angle of )7')9.19•' an arc distance of
South e 6 B[GI NNI NG; thence 567 06'08"f 12 .81 feet; Z765.71 foot to , Dolor which Bean .41'28'10"[ fro. the TRUE POINT Of IEGIwNIeo, 5. 1 het to • point o/ curve; thence on• curve to the left, having • radius et; ;hence S 1'14.0 'V
Or
O<thence 536'19'75'Y 188.67 leer to o Donne on • curer<, tnr center which bean
of 60.00 foot, three a central angle of 126.52'IC', an arc distonc•of 132.86 feet;
517'10.01••[ 71.)1 leer; thence Root 111.1J !eat; thence south 6d e91efoottto ttM cr
KKea
W i176.19')5'Y 967.46 leer; Mencr nortnwef ter ly glory a Id curve to the left, tnru
Sawthening
N53.07'50'I 199.18 feet to • point of u.ve; thence on a curve to the right,
north II m of th•
a I t62S: theme, T88'I$"0"[ •long sill tooth Ilse •rd tn•
Ni •n9 h of 4.39.32", an arc fist•nce of 78.67 feet; thence S78.54.22'v rg • wad Bus of I00.00 feet three • central ample Of 50.00 /eat of188.47 feet: thence S72•52'40'1 2
9 Sf curve; he
ere
n
distance of
al+ton the .W theau Owrter o/ sold S•ctlw 1451.)4 leer to• point on • curve, the center which esirs 54]•J6'2)'Y IJ0.00 feet. 90.00 hot to a polo[ o! curve; thence on• curve to
ce of 2080.76 feet to the east lino o'
7
r 9 right, e q
the left heel • 9 stone tnr north line of the
sold Section 17: thence 584'IC'75"[
0
8 B 1
O W
CC CC
thence sou rhea+terl ,Ion said curve to the tnru • central angle of Keying radius o1 7-00 tut, three • central angle o/ 79'01'S1", tin arc
stone t
11,
south 650.00 f•.t of the southwest quarter of sold II18Ni)'08')1", + arc distance o/ 9.)) feet, thence 54}'IS•00"I 10.74 toes; tnencr
distance
f0
I)6,60 teat; Menu rbT Se'2
Ile
710.92 feat; thence NJ 1'27'12'•[ 704,86 di ttenee of 81.57 feat to the south line o/ the Iurlinyton Northern Wfeettoaforementioned "Point A"; thence w10.04'411.1 232.00 feet: thence S42'06'08"[
Railroad Rlgnt-olong; ehenc• N)1'29'07"/•dnq sold souM Ilne U
51)'71•j7•v 44.)4 feet to the ia01 POW Or IFGIN.I.G.
215.00 het; thence S)I'11'OS'Y I t line of sill Section 1 5.57 teat to the751.99 feet; thence S17.10'01"[ 71.j4 /eat; thence J: thence N)I'29 0)'Y along sold souen Ilm 876.56 r-
east 111.27 teat; thence tooth 68.91 feet to the southerly line of sold Tract 25;
feet toe point o/ urn•; thonu on • pure• to the rlpht along told tooth lino, QhencealongthesoutherlylineofsaidTracts25and26, the following
the center which bears N18')0.57 1 BOOS,}) 'vet, tMu• cent nl I.ofeadistances: N88.15'oo•Y 180.65 het; N
3q co387•f •M
tin art dlf unu p/ 594,8 /eat; thence N
aM JJ•56.00•'t M Z72'11 324.6 (feet;
peat: N52"W458.9 )
87.32
feet;
hot to • point o/
7•:5'0)•v along cold south Ilno )01.)0 Lim
feat: NB j'27'2S'
5
171.17 /•art '
01"V 130.0
j26.66 feet;
1•16.0.
52'Y 6.1.y7 free: Rhone• on . wry co the le lt, alwq sale souen ln•. 4LLN70'S4.OI'Y)51.5J feat: 37)'S6'01'V 1j0.01 /•tit: and TU'1{'07'Y )It.l1 het to th•the center which boors 551'I'S]'V 1165.09 retie. three •cutnl 1• of BPI 11", U = Onorthboundaryof • tract of lend deeded to King County and described under Kingan arc ,
11(11•
o/ j)I.7S feat to • polo[ ,d. oh boors 61.71'10"t fr,. the .
17'
WCantyRec•Ivlq Plumber 6607786; thence westerly el DIN1 Or B[G IINItri; thane• SJC y')5'Y 188.E; loot •to •point one urve, thetotheleft, the center which boar. $39.61' °•6
sold
thru
boundary an • c orve
which Deep S)6'19•)S'Y 961./6 /oo t; ;hence norMrester ly •long sold cww9,41,
thence
16 hot thry • central angle of to the Irft, sews • control eo 1, of 4• 15 V9•, en are distance of 436.70 net; thence north along said north boundary thence S)1'S1'27'Y 651,11 basso • Ins'on
tin arc dl stance of Ie.67 lea t;25.00 feat; thane•rest •long sale north boundary 265.69 feet; thence north 156.1) i4 M • Me censor whlcA Mars tit M MIra; thence r50'J9'19't 330.21 feet; thence S71'41'2"E 180.00 fort to• point of 76.7)'v 170.00 /•et; thane• southeaa earl•. •long sold wow to the I ht, ehrW `.SC v.SJ'' Wry Y.curve; thence on • curve to the right, Saving • radius of 195.01 feat, thru • centre]1 angle or )'08')7", an •.c alas once o/ 9.)J hot: Mawu s1)•15'Oo't y°
angle of 78'41'14", n arc distance of 767.83 tat to the TAU[ POINT Or BEGINNING.
20.71 feet; thence 577.71•)1'V 11.)6 feat to Ih• TRUE OINT OI 1[CINNING.
f
LEGAL DESCRIPTION
8412
8/8/84
Oil
r RAC
EROSION CONTROL CALCULATIONS
G C K /` /v c r (-7 i c e i G r/z77 I/
gro5 Ravi Cont-c> --
TP Lrr s/vr C_o ,-) irol
C.,(2e67 E r o s s /p V) Cv r -hr c, / 7 e'1 c_h
0. 9 - -;;,5(co)
80m n
f=or 2Sye,01r 5`Zorr1 I = Q. 01
Or 8cfre. ra it ( C. = O . /S
A 3 O a c. . of rye c fi 7/
Co-TA = Q. x U. /5- x 3O - 2 . 843 CP-5
o fTr er)c A ©, oo 1. S -CfV-c'-1
Q-t 0 too '7 C,CS Q,s G A
mod/e,r
An ro X G Slope- of -t re n e-/ = O. oo/5 f ti -1
I
l-or n = 0.04- D V
t C-S Qs
Z. 0.7? 6 .3
5 0.93 /0,39
3.0 0.85 /5. 34
3. S o.Sn7 2/. 7--
iv.r O fi c.e, cr r G 7 z 7z 7/d/ z/
Gr'oslo _Coro_
tr) n e_ I... ,tch 1nver+C
LnVe--f clrt Po n a( = l7
00
3 ce- _ /c,/aD
Fdr O. 001 7
p± f•• sfa r-f
a. ooi 7 it 38aa = Z.c
S 7,4P Ifl ve rt'
O fvv co 41'"
stUU 96 /
I S tvv /7 9/
to-t' ) /z06
2.$ tC? /6Z
30+ OO /s 36
3Ct vV Pit sip
3 St oo / oc,
o c. q L r--
3 K o Z S'35C o = g'S 3410> CU re
Z o c pow /n o,s f
J e /8O r
ouoo/ 2 g L cV V I/1Z a/
ylipt- po yt - -a La n Ss V
SeSS82 = .(77577 X X /
sJ-D -fie "2 = Et (2 'O) 6 'Q = d_7 D
2/ _ d
z -n =7D
Z
U i(it/ /717 _ (
07) ccli L'O + O/ 1
1.00£/
V ' - L )o..r,_Lto-D LA of Ua
Q y /
o j uo
73/L2/2 G-llf J 4140 -A'?4 f)/ ›'2'J//
B//c /< A'I V e r OcA c e- I ct, i t 6 Z7/ , /4
13_C4 t 0_1
LGsf ErrpS,O'l Co1T7'-ra / /•r2viC
00
O 60 = 2'7G7if3 ( )
r
A Gc_ . C Z
CIA = I. I (0. 2) I = . 22 •c-F-s
c, Er-o.s ,oP; Cori o / CCn••1
I x , z x435-Go s / S / S f3
A ss .n.G
gc_q r c 3a c'-E s
f
v C i v I (t_ / U I /'f-w- c c./ cl r / u
Crosic n - or,7r..-
C I G ,
i
sroivw/ C IJA/Ii/UEt A/U/1 L Ys/
riV1 °:Eon)AL CNAN41&z.
s"r//
7= 0. 044 S' o. 00/8 if
7,
1
HUE) QCcFs) c_cyKit'll==iv7-
Z
o33U--
z = 6-4sr o oc.J c_:L (0„pcs‘d)
9? L
LJE ST OF NACIIES(EXi5T/4I1G)
ACV )) C/JA/U/U :
n= 0. 04 S - o. 00 /8
H ( 0 Q (cfsJ C.o/4ME/11r
30
5 418
6T } NAC/1E5 /PO - L (Ex) 77i )
2g I
Siu+o7 r7 1f/ ' piD y o/' '4 1c 4..o4D a cDD .
mad /o 71,,la/1/ a fd' a /$ / 'wyj
Jr) -, roo4l r'7o//iv p u Spa
Sa,a10 --alma s2id i,uo f 414/1 rwa 1,--)D 47
S-aS-to-D u i 7 p
J ?7Z S .t a c o Q741/. 2/ p J?'11ft J/ y7L J o
C t / I., o Peg, cr) -sy;. %Z //r7pAou - J
d fa7i pU Sayo1io / fuOD ao/s<7_/a
oci G v/
7/._ 7Z c f ye,Ds //o S y4. o
7/ vi fo a'S ,,vayti-J (/f.,- o 'L/aL / D7/ci
S V r.,/n/ a S , --icy. S/ ti d /o`/,.l v o-) LA 0( J3 c£
r‘/
r )7k/
f" a?-o/ spc,o U o.7i u ci i b .c of v r711 ,r a t,(o.i_u a 1
C p ya noS 'Uo
rc
o i UD aSbC,
v071-uad/ Jo 4/D ( "? Sc / / , off (
a r Ic 47/1.// •/-: / /71ua/u 72._G ocl az
1/ / u/ o,,//4u / U lJ ' ' ',t''0A1
0/''J if t, e,o .Sari --7-y4 ca q/ 1,.4 /n
9- /9 fib/L2i9 _..f) ///, U 0,4 a-D/ r) -(041, / ar-D 1/s/
SQ)rYt er)G /i 0 kJ PO/ (' Uv71 Ie-1' I-,f e-' S) •in s
007
70C 2.0
600
0002 —
SO(
0003 -
400 0004 .000/
0005-
JA
0006 3 O
1D
c .o00d .0002 .
O .00/
06 O 0003
10)0004 I
84.
90 001 .0005 4.0
76-
0006
71 k .003 -.000B
N004-
44 00/
4 .005-+_ O S.0
00
60 Cl. 006 i
O _
90 4) -54 O
v .009 ` s•2 " 1 _
e0 48 1 .0/ 144 6.D
l 4Z
004 CC -s
02 OOS
4+ — 7.0
03
40 JO
04 .0/0 O
0s—r InLis 9.o r
cc -- J O 14
06 —
O.O06 - .0Z0
izi -1/ 0 r
IQ
kJ
t.
L
kJ -a 060
I -
OBO44
CC /1 00
O
vr 1
f CJ 6
I--is 013 i
NOMOGRAPU FOR COMPUT/NG
40.0
REQUIRED SIZE OF
C/RCULAR .DRAIN
FL OWING FULL FOR
i
n = 0. 0/2 OR n = 0. 024
CHART 2
26
a
M 4t rc r T. f' •-I...AVOW•••"1,' , •41 4r • r •..4.:,
i
y''7. .: Y.f•4•'3 '•IN'. . ;'AiK..lt.•-• -
r
w t py $ V YAt 'Y,` i .. art s r• ~
rW :•
r. -•
t•.ti ` '''''A
t kb:Isr.i- , .+`+ ?Niel',r
S 4 F. .„ t , 1. i ! •.',V. d '`
Y ., i i
i,n a (r
A i• r.
f`1. (..`, " " .
T ,
r',';, f
r`;rj{t4~S an f n.1 / ' : f +r v.i 't'
y{I s'fY!r i 'fti ` v. }aV ,.
l., vy 1Y r,• 4n `• h t t r w ar.i tf,7 r >
t S' 't Mat jl 4t.. „
r AI1 - 1,
7 ,J, " }•
r t
tytyff,"•.Jf;i >, 1
A ni r.',S"'if r• • . iT
vt'
a +
t''s •,
Y. :•it
V• ,
ik,, w ste i ••, •r4. ", , t4.K*-• '(
f!y a '•
L ! Y t ..Yt .' r r1h. ` f `• Oa 7 1• r
a v V.Is
t ! `u. S . ,:Y K ,;, /' a.'' t'Qr }- „Y a 1:0 ,,T t p,
t i.pf),r*
f` *41,1'.:ya T•%.' •`
q1;,r'`F: ,tiifj K;li '.'.aS'
Q`4„
f"' '; •V ,• i '11.^.
t"`ikx: I• `'!,?:..t,
t f• • yr as a"
a b+` , )+,.... ,`j
Sr c'.Tt ^t•
w. '
i ifw!1a,,• 4 At 'yr 1:t. \¢';1
t i !y r • 'AA+ne ;;i 4
e M1t c.
y y,.
1.
r„
r; a
t
i •t'1Ay,r 1! Y. ' pp,,f4/ ! .. yr: ',
l'.
i
a..
4,. f(. -
i
f i.kf
r, 4:+ 1r ry W
tf i S 70,f,4 le,C
e
y..i\"',IA:f,• ` ,
r
ik,14N ' 1 3 a 'T
y'
a
y .'r r y`
r+X• iP-• • •+
A yr % • t
I.ry
t hj k p,,
y
p `.
s as• tt ,Fo ,.4 t w•r- ..
S, t1%r a R u r,
1
I i.• !,7 ! A '. ,l.
Y tr`c
t •12 ..1 ''•, ,) ';•
r • r ' •
i ,'I%•. a Ia y;•' •` _ • ••
1 •
t x r
a, t !
t.'dJ
K'''
K'T •t t i+
Yr
o N fr r
t` t'....
i +- .
J `•,
1 I t
gt .'( rya x
1 ',4' -e
r r•.•,..Y;, '' t.4,i: r r Srvi4t4'•{+s+_ r srr
a• 0," .t,if c'{. rr 4 ti•dx..lt ^cit •. ', .„
fr j. r Ji•-` •.$-• • S4'4.tr yyray •r
r '` ,
ri.... , -i4• 7., i..''.40,1yay,4 wa s.rC 4 a •
fit^ N:I.,af t•:. •
r '. ;'i •
i yti >.'
1 r• T•`:;f{j' f rh/
l.' ,'{,,*}}
y ^a,ye„•y.-Y t
r> '
trTr
i r
r r l..:f.l'
r'
y,,
d•tI'1 4, /1r1r1.
x • '•s
r
f '.r 7
a.3.• , S
r I +..
71
1f er+a,•r r; ',.,
r' •
r • c'al •7 •.
4,ii j°r f yit)1,1:• 1 irr 4 r t; a..t\I r'` tf: '
tY Y rS1 H 'Y I1' 41.4- • S r yr w
4
0, •
ti Yy .e.0 i s,..f • _r ,
w
u...t• n iic' e. ;:ryv•e i` •. a.
yj
y 1 rr J., j°
t. ..
Y #
n '• .„. , -43 iaw
Y/
s
e
an ' 1 t
r `•1 r
ram ! , YJ as 1 r F yA 1
3s4t +c• f,"! t y'!' r qtY$ ,,fr?r"'iile`.+. s .i I.;`..'++Ir
xn ..
MMM /, t 0. ?k,
r i ,r f
1 + jr•'ti•
yt-Tk s•r G
r•-. rynQry4f1'r
rr
yy C
Y 1r'• H 1
j r
t
r
r>
f
rat
eii
rN•„r
iv' •.• 4 ' f..
may.
Z'
i'
4 y[ {t.,'4 6 "' S I " 'i ,M.,r ,.-., X 4, V '1 hs
i
i iL rj NV r en M YAMM 'a.
e re
i'4*tf .J
af j }t • •
f A.rA}•`
v F • 1'sr t. ,.,w/. P`, 'f„r 1 rr Tr -1,
t a d :.,,^ .
t .ec L .`Ii:; r4 ltt':1 'M i`'x
r y ' r, -
i Z+x.;,a:
rt
f c a vr fa •4 / Ii t v f r
r. ya Fr , ia x.• #+: tte!a•.. Cr,,.1y t. f•r4y pa , •,,F:, ,,,, ''`t
A' U y' k -t U Try •f{..X
e ;eir,,f K. w'•' ',nvS 21 .:1 t`
ie 2 V.;[? J 4.,,. 1-
y
F1T ty { ,F•t .;e_fFi r rR' -0 1 f
t
v'1 't'• tt;:tit.7 J 1 R;
Yilf,
r)ij
y*y,e,,,• 7r r e;p k ` '
1'k, y' C .
y,y r
s'
r'
t
j'`'< '' it a;.:3 ''' 'ri yf:. ar* s•fiR e % f,' +y1,5+.;rp .
i
t
q ^ ki lr:Of. '' ?t a t ',"' AAl F q' S`)4t;li;'
Y* t e T"_ ..
i ma's V c!d' i s' r.k +'t s N ~,) 0'4,
r 41. l . , 4 S '+ # riW4'3f i s.r..
A' r t >
ti . a 1 A p 1.
t f i ,,,p v,it'i
F+ y4 ir^` •i't'
i•
f
yy a
f ya r iT Y +i^ti- 4a'1„",.-'n,F iM•s rt,(,jr1.a f1 a
r1.• r' 1? •
i,.rt •'y,'l rZt.t:.•
4'1 r-.
4'.. '
Y4M' '? ;;.C'} YfFKf i,•Y;•.
7•
X. .:k. y•*t:•., Ji•fr'n 44,•'1` } rr/
I
i.
Y ",• •,
f• ,} ?'.'••`
r
lata- ,.1:ft34t •; T ra[4.
t. _ .
f n f•' ',"i:,•;t:1•
r./
t
s '!. J. S, C 4 t { i^ Trl•ts f },. rF511,,.'irti'`:' y k'`tt ri v ry rif./%.,f..t r w9 t': I tf,",1'•
f 4. rya ,'it,.'<,.,/.:•l..r,
fi..:, i . tr,p{.• r ,,, '
j,
J
r
t 5 ;Nei ,.t14'M•* '.'JW Zz • fir;I40 Y,(,
r
t
Y.,
A ;X' ,4,; .•. ry'• t •.:f•4,,trf • j `l,f, 1 'F ti. •• •tf +/. " r +' '
1,',% tI:
r -
x,v •
11z; 4 ,yf 4';,),, w /_ i I ... 5;i t .
1
A,
rlT s1.
f*
r. '/;'Sq t. ! .r }
l.'tr i-t A' r
x ;
r.
4r :i, s . f-'+ 7 ..•t'. •` R•-t •n.'i T^L
1,
s.','•d ` .n•r y r-r • r: / ...+
y r f .1
t ;,
k • i
1*••• t f Pa rat` ' p - +r1 !0a t 4i.'rla • • cc• IZ - •
Table 2, below, provides a summation of the estimated 25-year stormwater
runoff that discharges to the Black River channel from the proposed develop-
ment site. The Rational Method of Runoff estimation was used to construct
Table 2 .
TABLE 2
ESTIMATION OF STORMWATER RUNOFF
FROM BLACK RIVER OFFICE PARK SITE
25-Year Storm Runoff
Drainage
PREDEVELOPMENT POSTDEVELOPMENT(
1 )
Description Area Max.Rate(
2) Volume Max.Rate<<) Volume
Acres) CFS)AC-FT) (CFS) (AC-FT)
1 . Black River Office Park 71 .1 28.4(3) 13.7(
3)
55.0 20.5
2. West Culvert 31 .5 7 1 .3 7 2.0
3. Center Culvert 15 4 0.8 4 1 .2
4. East Culvert (
4) 51 .0 18.2 11 .0 44.2 13.2
1 ) Post development assumes 80% of site will be filled and improved with
buildings, roads, or parking areas and the remaining 20% will be left natural
or developed for flood storage.
2) Maximum runoff rates are not additive due to differences in time of concentra-
tion. Runoff volumes are additive.
3) Assumes an Rational Method Runoff coefficient of 0.4 for runoff rate and an
SCS curve number of 83 for runoff volume estimate; however, runoff rate and
volume values could be higher as discussed in text.
4) Consists of West Hills drainage area north of Empire Way (32 Ac. ) and
Earlington Woods P.U.D. (19 •Ac. ) . - •
00/
06
09
01
09
05
Off'
OF
0?
0/
0
1
L
r- . •
Fl ,
mos
I
r
i
pIUplIL. .:j4mrnrn.II ---
N
E
w..
I
t'
a'
ii.
a!\•
11111
w
Y
w..
w
N
17//.
i\.
N..
y.....:.
n
i /
ii
w
w..
w
w•
M
M
M
A
1!
iF
w•
A
u
w
w.
w._
W !\
n. \
u
7'i-''
4. -
It'
UA
MKI
r
w.. __
w=
1 ..
w. ....
i- .
iiVI.
CRI_
E_
1
s
t
w•
milim
Au
l
ww
nw
iremt
t
ram:~
wAuu
w
r.
e •
M
1a
rw
A\
a...
w
a.
0...
w.
ww..
w=:
w
w.
w.
w:
u
r
i.
r,..
0-
0
s
aA
w
w
1 .. .
w
w.
w...
ww.
w
M
M
w
o...
Y.
w
oJ \.\....
A
ww...
ww.
w
w..
w......
w...
u
NEi...
a....
nai.
na..
0....
1rI;
Ilm!"re
in11
1OnI
li
I
I
Iililliikllauh
IIIII
1EImIu
EsrmHiopuiN'
rsr
IM
1111 "
w
ti
isls
i -
f :,...
1:
1raa '
irua
1111I ;
3iIM1iss?
w
1
t_
k
i
f !
I
N..
P . .. :.. .
i .
1 ,
t
1 -` .
w
IiiIi1ii1gii1R
w.
w
w . _
pM
t-
i
L •_
fi_
1
f
E ..
w
w
i
A•
w
Eu
j
i,
1i : _
r
w: -'-
l
x
4
I -
r ! -
1R1
IISIII
1
1 '
1
U
17
M
u
auI•
k
1
1::::.:
IJ :: _
w.
u
u
1 ,
I::
i::::::
1: :::. ` -
rr-
11111
RRR1n
11
1Ri
111111111111:
1111
11111111.....
w•:_ .
N..
w.
aAw
r..
Aw ...
w
u
u
1 ,
I
11111
1110
11.
R1UI111111111111M11N111111111N11HIR11
i
S.
r .
MIME
w
A
AA
w
w
r.
w
A
a
i - -
I ..
A.
www
w
w
w
wu."
M:
w____::: '
C =.
o ::
1-. - .
1
a:
w
i
wwr:
a
ra_
ia_:
muum :_ ::
i :::
a
r
mww..
w•
w
A.....
0 :. ... . _''
I
mow .
a.-
m.: :.
w
r
t, +
w
w....
w
C
wu.
u .
i..::_..
Ir.
i_
7 } ,
w.
w.
w...
ww.
w.!! ... .
w..
1 ;
1- -
l
1E711' -
11
E51EIPE .
1
1,
111111111s,:
nsi _
L-_
t_ -
7
9
1.-
1 -
111
u.
a..
i .
w
1
T_;
I
I1 ,'_
NMAAa..
l
mow
A .
a
u
a=
a:.!
r .
w .
s.
rww
w
w
w.
w . .
4.,
1
wwA
w_.
w
A! ....
a ,
a
tom• ::::::_:: :
C:
i': _ ~
r
waiiwww..
w.
w•
inia:
Zs :
i:
WI
i
bildbi.....:. .. .::. _._- -
4-
4- -
1 :
i::::
i
ww:::
i :_
w
w
1
i .
a
2
SOILS REPORTS
t r s+''Y x ri .r.}t ,rt € 6 ..
i tt,-.4.• J F0:1G. f"*,r :-; w,
a it i ..+s
74
1 ,„ -o`!
t .< ?'t . # :"Ki`:''t a ",y"
i.:."„:
c '‘,
rrC,i 1: .;'-.< .. n + . ' ., r'°-rs ..
t, '':;
r
i+}. ..., ,,
s t,,
4
Xtt ll y..
ri'sCi: :' tir..h4;<', d...•.'
v;
Y , .p?. rq c. '‘. ..'
r:'
ti M 't""'• F f .'' f• y y3 4r . tb/Y
A. `'
s,''
yE
T},>f rt:
a' "- t+ ' y` „
r 'r;F. 4 .,n{"'``,'i' 2 ,a 1 _h .,r ,'w's
Y; +, a 4',-
ry#s.'A'e,,,. y +
k z' y $
c.• 3 '},t„,..' = f
S
k
k,
xk 1 ,( '.r;, .'' ,, r
t 't Y'
S
9 ,t t 2,h r !.`4 X .a.r.N st t *t.Ys°i k '
r t +
A' _7 L Y • -r sL
5, ,yAt& 's`t sr,. =-` i. a3. q' ..., ', t'
r
f
i7a. 3 l
r S•
a
s i 4 k
f••
f
t ka t x,
T' .F`,
t 1 rr Y k i a • a
I
t s e • t' ,
t k,,,, y; t,'`.tr _ r
i-'sF
x t _ • { -
fi -r .ti!.r
f • .. .[ F'• ¢
T• all
x,
v.
i+l4-+ F. 8; i r 7 r b# - ,x
k
jE+ ..•
ti t r' 4{G k.. S{ s{Y 3 a+
to ` r dad`i l
t #.,;, r t7,'r3 C i a..
Y k
t. t a .•
7
e C.
b + 3} 7k ti r F 4 J
i. d. yy,
7 ,
v}i
3
a '-.r i; ,:
k,.'T f ]t . t $'x f's
xb t• e st S, s ro
a _ t y tt 7K v„i
T '
Ss''. .•.
eI.
w. - s- 4i
a y ,ITT a
a z. ,
t.%
5
rr tr tkA e
r ` fir 4 ':+.s' r `
Kin i y + r +.<
x a ;
a. 9f: Y
t t'
t.
y
yet 't z1 ;1.' „a ! f i,a t' 'Lt X:'p` i,
r
i n
c t
d*
a •fr •:3`vt Lr,"'s
w s"i. ;,,t a {
3•
i' ,(. }t • ¢, t :. a 'f d+e Y• ..
4,. "
t F dr'Y,' 3x+f -:
v y.: '. ?:: v' x ' r'' t'-, e r
S
t#
t.:_, *.,
YK k,
i+ey#`(r: #+µ' +
t ,..
t v v v ,
t
r t,.., y,d
f J
s*
k •
r'' •i t"?7s ?q,,,, r T,k,{F e
r
t
s <..
h t k '
a
f r y4F',. r.
ss,. }$. x,S 7x ..4 ,r"tAs`t`''stir?`^ ,*
Lt -:.. iY '+'v
an- .p {°{'
s'`x At' r < {
axi':4;; } #
ifs
41-,; ,,,,
1y ..;+ „t
i. t
4" ;.`s„a {,r ` r d'_3?`Cx N .
r
y 'S' ./. :,ct?k
tt+' ''- rvL- ..`}'4 .lx sy, 7
o; 1 „ +.i'
r '
F 1 i . Yn'"i -a 9f : •r';!C
t", , -~
1. ":
ns3 " .,{ i.
j.
Tt w r° ,,
n At. :5i; F
i'
F, f>
t.
i•2
a1d'x'
j4.
x,
v.rft} 'tSq`$ ,( ".",s , ,,,, ,,s : .,.,, r y y t ..+" t t
a, ,, •a!--•. i.vr ¢ "ay+.a'§. iz'4 F+f \># n u,' `a!,}.X { 'f S+Yk f'Y„ s$.4 r,C"ge'kf k' s P t d S if r S J'{''f },', £r r7 .N''_ 'y.#Tx
k,•<..#'•
5,
R ,d`k
F'VA `--, 'r 'p ^ys.,a"R', ,
r
i.
s: y k .1; }r,;° .r J '`:.^ .+"`,a,. f,,r
P` ,{T ,,,,,
R"? ' '4 a &"ZT! ,..
y+IL x`
y",,• 4t tfk,. A i., i k, T.
1
s
d kgi•+4 :'T iw y:a ri^} .
i>
ryT ,
e,
i'i t".••
1'
ft: .
4 _.
r t L,•; i,is t #.1 y a eT t ,.,>3 YrL- 'vF ,,-'
t-`, t +
r,*:,i4 .
i'S f # s.'a.el a t.3 .e' hr a TK lir h ;i = f .,
k r t c_. e f*a In
t xr '. !Y r• s r{
4`. ,
Ifi.'.
t, Cif e3 rve ? s _ i.. + ,# ,, ri}SQf ," fts S
v+ q i.
C fx 1 t r S k; n ,, r',f' lei.'+'- 7 '+f T'SF ri
r, szT 3 .4A .,
A I* 1nyy1 a . o, "tfF '" k# j` ?r3r Y wa 41i s i e..
4.4
r :'
8
r `^ 2 cw :
i -`A y1 .'.s 7' } .; hp y_ t.-
t '''
w{ ip..I Cr • 6"S i +
Z
K4 'pp
t+V
i,'*{tli IDf
Y
t.: •`
rx;v `•x'grR;{ t9t1
1r l.,
1.iA 1 r y.5R. W i i'T.i$Fl•S't •il A.
1%.
0. F Y
y s4 ,t`t ASS' ''. ! f • £i}
4.
Y
s
A•X.:.
f:, , ,,
n !., s !t _x 4X r r t {. #€,f,s !Ss ix! x sF..'f
7'4.
a
iZ.' .• n u +.
r k, y,: r Ss t tk` S.YFke 4;
rt , "t
Y
3" '
s' j a M`.•>
f'Fa ,i,•
dS•`y^ h=}
R`
t .YS S i, .b= a •a*N, fie.}
t ' e+ sr t
H
t C+
C
t•a• r .: i`'• .,. e ;
4..,
h+}
t'S,`
1
kj r
p
s t ,,
ti r
is ,. .
y'"' . .
Y
e d'. ,r, ,+
re
15-'
n
r*
r` '
w
t a
r
rr - .,d '
e-.1.x t "r a° T t r
r 41 ,- 'FF: 'ie .
Y,,..
e_3 s z it i''
v
tom# ;:
A
k} ,
r +.iz
t
t3 s y'rr > t{ {4;1t is o n f • t k
A¢g: .5' i!k
s. e Y
a fi • "
Y s ' tr. , 'urt;'tle;r,
T ' e i ,',}}., -1P`
v ;'¢ t1 e'
1a;'
7 ?7k• 1 "o;j G rYt;y}` ,
ti;t„F.t, 1 '. tc' T :" `,'a des "'
T ,.
k ,
s,.# :fF7.F vri 3''xs rx{„
r. lix:'if+f s•^.. :,
k J!r=`{r5 `.
1 t p i,. ,(,
r o-
ti
k'y
x q ++,.q
7; t ,
s `'t'w *SitiC dt. t t:r } f+
s
t„3 '
14.k ;
ya , '' Y
r
r`!
t r }'
f
N ,
S,
y,,`-x`• +'
y.,, tie$i
Z. `,
t"S• 34.k' F ', ,`,, +, : t... ,, -,,/,,`t,a „. _ •
44
C S p';,7,, ;L1' `tW...T ,ti_;.t4s., :T. k•t •tia'
1
s q''g' - k+
E
1
t ` 4 `.„. + 't
A , S. °`,'ss."''.,'_ s' ;'• .
i x i u N r 'ti N b se f1 k t a qt'.
rf } 'My',, ' ' f F r d t:t`
r. -Y".' t`-
r,,"?'
4"'t, S 'r .a; .0 , '
r(rr. .i, v J.a t r-
s"St ye - r .-'
t` rx d, nFtF , r r - F r_x3
F }"3,TV}#,. ' srt'"'w t#,s'r'
d r.
a,.
d r t
r k fi' __ y 4 'b 'f,Tip•V
j[ ,'s/' <
t rT4:w"y 'M1 '4 5 Y 1id2 '"', > 71 A. = 4A A r , keg Y i.
r
t! g k
cd.i 4.if
to,.'T. X. ,. y ` .T yr },'
r
e x
t {
r w•
t '' `
sxY, '.:,,,,tit z:,' M1 f 7 '. totyr 't
tt sa a 4 r Fd 1 r {
Y
s y
4
J . T , , o t k
ID
f+ .G"
t>`?- k S':F[ t . .y , ID
wr.,T' v x T IDC. tt x 'kryz h 1't d .,J `F 4 r z T '
4'
is, X R t"
9-.a
t .,;
Y
t ' ;, } .. ''
a _ r R ?" P ''s 7d. -a;,' i p• S , t 'pp.z '
k,
r
r
s
rt r
ti
t'.
4 f rt Wit
t t`4
iatrf r, ' t- r}.. ,
r'* i r -' '{
x '{ib«k, ?
f• '''y. w W # -v W$. :'". 'Xf r }
r7'•,,. ''
K,, Yt ='€' s .541
1.j"' L { 7 '
3-1,
1 'i'g nr ••.,
t
t i a{``Y?.Lc} a t.''fi trxx" u4 x,Y- 'k {' .
Y}'
y^=t5 TYY.e i.{.+•4 i i.. ..`
k`'r'.L" ': j *,.bt% q am`
i'`t
tf,b
i.t ei"
4 `St*
r ; ' ,'
i st•% r S'
pit r t t . t
r+
1 .,
j'',;.
i
a s H
r ' t t
d, SS' `iL iT •
S" Y Y
yr x^ ,1T4n
s
v
d j tY Qcit
q . •.; fi!,i`+.
III #
e. f `V40`,4`•i t ( `-
r,.
a
L a etr t F - ••
1.
yt:
P '
s, r I,_. r bC "ca' ,y t T
1`
s
r.,
r ••,.
a F ., x,
rif,z
kti
ri tr '.
4
oyk:,7t, i.f t } }
x S s Ss t p.
5. c o y F v.YspF1' ,.
ski ,'
kTLRa` 5 • 5
t
t
1 ;
II Earth
ons 1Cuto Inc.
Geotechndcal Engineering A Geology
i j '
k
I.
t;.
x y,_ ' 'x, +
fi•t
d _fit .y r__i .. _ :
za
a r L -# Fi'S
ti pa„ .}.t fa
Iw i' ialt; ••'si. -.
2 -
K t.
r "
4'
e,3 r
f t` ...„ , }'
r
T' ar,: fi
gy,, #.. k -t. t ',^++.+ax a .':w v ,
y k"' _kit*,t r
se „t ' :
3ti
is "i f f 7 -a.,
t re'tt{ .k"x' 10'. ':..r' '"
t: 1p,Att-G ,•
td' ^ ,.
3 _
r
r ty,_.,t } o¢i t k !,r, xroP-x Y Y,`4,4.'W.i.,
s' f' v ''1* i
tom` s.
g e F c. r i St .', fit r r
tS. rFt
F rl. 53.z r
v fi r
fft +p 4
r rp ,. :.. .y
r f #w5 4 i' .y
3 . '.t rk . T ,,, i"t .r
r
4 ' r
e}$ `t 1 $n 4`+ '' t `,_it`n..... - _.# vs+ '. ^, l's, - .
d P .. .?'2`, k4d
t<,.' ., ;
a. .!
s.xM,+
Earth t
onsu1tants Inc.
t
Geotechnical Engineering and Geology
May 10, 1983 E-1990
Alterra Corporation
P. O. Box 86101 0 3 19 '1
Seattle, Washington 98166
Attention: Mr. Del Bonds C;!hlzr“A'f'i``F``
Subject: Preliminary Geotechnical Engineering Study
Black River Office Park
Powell Avenue Southwest
Renton, Washington
Gentlemen:
At your request and within the scope of our proposal dated
March 22, 1983 this report presents the results of our Preliminary
Geotechnical Engineering Study for the subject project . The purpose
of this study was to explore the subsurface soil conditions and to
provide preliminary recommendations for preliminary foundation design
and the site preparation for the site development process . Further
engineering studies will be required when plans have been finalized
and building locations and grades are established. The scope of our
study included test pits , borings, laboratory tests , geotechnical
engineering analyses and the preparation of this report.
Our study indicates that the site is immediately underlain by
fine grained compressible soils . The depth of these soils varied
across the site, but in general, they ranged from about five ( 5) to
thirteen ( 13) feet in depth. Beneath the compressible soils was
loose to medium dense silts and sands over dense silts and sands with
varying amounts of gravel . The static water level measured at the
boring locations was approximately two feet below the existing grade
in most areas where there was not standing water.
Based on our exploration, development of the site as an office/-
warehouse complex is feasible. From a geotechnical view, the primary
design consideration is the existing Eine grained compressible soils.
These soils are not suitable Eor foundation support and will make
site preparation difficult, especially during periods of rainy
weather. We anticipate significant settlement under fill and build-
ing loads. For planning purposes, it may be assumed that office
structures and/or lightly loaded office/warehouse structures may be
1805- 136th Place N.E., Suite 101, Bellevue, Washington 98005
Phone: (206) 643-3780/Seattle (206) 464-1584
Alterra Corporation E-1990
May 10, 1983 Page 2
supported on pile or augercast pier foundations or conventional
spread footings bearing on a structural fill mat. For a pile or pier
supported foundation, the piles or piers should be extended through
the compressible surface soils into the underlying dense silts and
sands. Since significant settlement may occur as a result of fill
and building loads, a conventional spread footing supported building
would require that the building area be preloaded with a surcharge
load to compress the soils prior to construction.
We suggest that the site be drained using interceptor trenches as
soon as possible to drain much of the standing water off the site.
Roads should be constructed as soon as possible to allow for
settlement prior to paving and placement of utilities.
PROJECT DESCRIPTION
At the time our study was performed, the site was as shown
schematically on the Boring and Test Pit Location Plan, Plate 1.
This is based on a site survey plan by Triad Associates dated
April 1, 1983.
The project was in the preliminary design stage at the time of
our study. It was our understanding that the study area is to be
developed as a light industrial park comprised of office/warehouse
structures. Fills on the order of five to ten feet are planned for
much of the site to raise the site to a proposed building grade of
about Elev. 18 to 20. A large detention pond is to be developed in
the western portion of the site . Development plans call for the
excavated material to be placed in the study area or disposed of by
the developers .
If any of the above design criteria change, we should be con-
sulted to review the recommendations contained in this report. In
any case, it is recommended that Earth Consultants, Inc. be provided
the opportunity for a general review of final design.
FIELD EXPLORATION AND LABORATORY TESTING
Our field exploration was performed from April 1 through April
12, 1983. Subsurface conditions at the site were explored by
drilling six borings to a maximum depth of forty-nine (49 ) feet below
existing grades and excavating twenty-six (26 ) test pits . The
borings were drilled using a truck-mounted drill rig. Continuous
flight, hollow stem augers were used to advance and support the
boreholes during sampling. The test pits were excavated using a
rubber tired backhoe . The locations of the borings and test pits
were determined by approximating site features. Elevations of
borings are approximately determined by interpolation between plan
contours. Therefore, the locations and elevations of the borings and
test pits should be considered approximate only. These locations are
shown on the Boring and Test Pit Location Plan, Plate 1.
Earth Consultants, Inc.
Alterra Corporation E-1990
May 10, 1983 Page 3
The field exploration was continuously monitored by a staff
engineer from our firm who classified the soils encountered, main-
tained a log of each boring and test pit, obtained representative
samples, measured groundwater levels, and observed pertinent site fea-
tures. Observation wells were installed in all of the borings except
Boring B-2 so that groundwater levels could be monitored. All
samples were visually classified in accordance with the Unified Soil
Classification System which is presented on Plate 2, Legend. Logs of
the borings and test pits are presented on Plates 3 through 23. The
final logs represent our interpretation of the field logs and the
results of the laboratory examination and tests of field samples .
In each boring, Standard Penetration Tests (SPT) were performed
at selected intervals in accordance with ASTM Test Designation
D-1586. In addition, a 2. 4 inch I. D. ring sampler and 2. 5 inch
shelby tube was used to obtain less disturbed soil samples at
selected depths.
Shear strengths of the soils were measured where practical in the
field with a penetrometer. These results are recorded on the boring
logs at the appropriate sample depth .
Representative soil samples were placed in closed containers and
returned to our laboratory for further examination and testing.
Visual classifications were supplemented by index tests such as sieve
analyses and Atterberg Limits on representative samples . Field unit
weight and moisture determinations were performed on undisturbed
samples, and moisture contents on all disturbed samples . Results of
density and moisture determinations, together with classifications,
are shown on the boring logs included in this report . The results of
the sieve and hydrometer analyses are illustrated on Plates 24 and
25.
SITE CONDITIONS
Surface
The site is located in Renton, Washington. Irregular in shape,
it covers approximately 71 acres . The site is bordered by the
Burlington-Northern right-of-way to the north and the Earlington Park
development to the south. There is a cover of brush and grass, and a
variety of soft wood trees on the site . The Black River flows west
along the western portion of the southern property boundary.
Approximately ten (10) to sixteen ( 16 ) feet of fills have been placed
along the northern margin parallel to the railroad tracks. About
four feet of fill has been placed in the western portion in the
proposed retention pond area. In addition, some fills appear to have
been placed along the southern margin parallel to the Black River . .
These fills may be spoils from dredging the river. The approximate
location of the fills are shown on Plate 1 .
Earth Consultants, Inc.
Alterra Corporation E-1990
May 10, 1983 Page 4
At the time of our field exploration, the central area of the
site was ponded with standing water. Much of the water was one to
three feet deep, however, in some areas the depths were greater than
four feet. Surface water was observed flowing onto the site from two
twelve (12) inch drains under the railroad along the northern margin.
Subsurface
The site is immediately underlain by approximately five ( 5) to
thirteen ( 13) feet of soft to stiff clayey silt. Beneath the clayey
silt is loose to medium dense silts to silty sands over dense sands
with varying amounts of silts and gravel. The depth at which the
dense sands were encountered was about twelve ( 12 ) to twenty ( 20 )
feet below the general site grade (Elev. 0 to -8) . Borings B-1
through B-3 were located over the northern site margin fills and
encountered six (6) to twelve ( 12) feet of fill consisting of clayey
silt to silty sand with gravel and varying amounts of debris
including wood and concrete. Boring B-6, placed in the proposed
retention pond area encountered approximately six feet of sandy silt
fill. Test pits in this area encountered three to six feet of fill
varying from sandy silt to gravelly silty sand and silty clay. A
lens of medium stiff fibrous peat approximately two feet thick was
encountered at a depth of four feet in Test Pit TP-3. This was a
generalized description of subsurface conditions, more specific
descriptions are presented on the boring logs.
Observation wells were placed in each boring except Boring B-2.
Groundwater was measured in each observation well and is presented on
the boring logs.
DISCUSSION AND RECOMMENDATIONS
The following sections of this report present detailed recom-
mendations for various geotechnical engineering aspects of the
project which should be incorporated into the project design and
construction. This report has been prepared for specific application
to this project in accordance with generally accepted geotechnical
engineering practices for the exclusive use of the Alterra
Corporation and their representatives. No other warranty, expressed
or implied, is made.
Foundations
For planning purposes, it can be assumed that the proposed office
and office/warehouse structures may be supported on pile or pier
foundations or on conventional footing foundations bearing on a
structural fill mat. The building loads may be supported on piles or
augercast piers extending through the compressible site soils and
bearing in the underlying dense sands. Based on the subsurface
Earth Consultants, Inc.
Alterra Corporation E-1990
May 10, 1983 Page 5
information obtained for this study it is anticipated that the
required depth of penetration will vary across the site ranging from
approximately twenty-five (25 ) feet near Boring B-4 to forty ( 40 )
feet or greater near Boring B-5. Possible pile capacities are on the
order of thirty ( 30) to forty ( 40 ) tons . It should be noted that the
depths of penetration and possible pile capacities are for
preliminary planning only and that specific pile design criteria
could be provided after development of final building plans and
additional subsurface exploration and analysis.
Alternately, the proposed structures may also be supported on
conventional spread footings bearing on a structural fill mat. The
structural fill mat should extend at least two feet below footing
grade and at least two feet laterally from perimeter and interior
footings. Footings that will encounter original ground should be
overexcavated to provide for the minimum depth and lateral extent of
the structural fill below the footings. We expect significant
settlement under the anticipated fill and building loads, and
therefore, recommend that the building pad be preloaded with a
surcharge load. Near the railroad, the existing fills may have
preloaded this area, depending on final building grades.
Site Preparation
Much of the site is covered with standing water which has
saturated the fine grained surface soils. In their present
condition, site grading will be difficult. Therefore, we recommend
that the site be drained as soon as possible by use of drainage
trenches. This will allow drying and surface dessication of the fine
grained soils, improving their strength and workability. We
recommend that, if at all possible, the grading, drainage work and
initial fill be placed in the drier summer months.
All building and pavement areas should be cleared of large
vegetation and other deleterious matter. Care should be taken to
minimize disturbance to the ground surface . We suggest that the
brush be cleared with a hydro-axe to minimize ground disturbance. A
filter fabric placed directly on the excavated surface would help to
bridge unstable areas and reduce the quantity of fill required.
Placement of a filter fabric below the main roadways is recommended.
Structural fill should be placed in horizontal lifts not
exceeding eight inches in uncompacted thickness with the exception of
the first lift. The first lift should be eighteen ( 18) inches in
thickness to provide a working surface . The fill should be compacted
to a minimum 95 percent of the maximum dry density in accordance with
ASTM Test Designation D-1557-70 (Modified Proctor) . The site soils
contain an excessive amount of fines that will make them difficult to
compact or work when wet. An approved granular imported fill may be
Earth Consultants, Inc.
Alterra Corporation E-1990
May 10, 1983 Page 6
required if grading operations are performed during wet weather.
Ideally, imported fill should consist of a granular material with no
more than 5 percent fines, passing the No. 200 sieve.
A major excavation for installation of a soil conservation
service detention pond is proposed in the western margin of the site .
Based on our field exploration, we anticipate that the excavated
soils could be used as on-site fill. However, the material is wet
and could be difficult to place. These materials can be placed in
areas where no buildings or roadways are to be constructed or in
building and roadway areas that are to be surcharged, or where the
buildings are to be supported on pile foundations . We recommend that
if on-site materials are to he used as fill, that it be spaced out
over the site so that the thickness in any given area that is to
support roads, buildings or utilities, is kept to a minimum. For
ease of placement, it may be desirable to place a working pad of
off-site granular material on the ground surface prior to placement
of on-site materials.
The fill placement and compaction should be observed and tested
by a representative of Earth Consultants, Inc.
Surface Water Control
The subject site contains fine grained soils that will make
grading operations difficult during wet weather. It is important
that surface water be controlled. Surface interceptor ditches should
be placed along the site perimeter where water may infiltrate. The
site should be graded to drain at all times and all loose surfaces
sealed at night to prevent the infiltration of rain into the soils.
After rainfall, equipment should remain off the soils until they have
had a chance to dry sufficiently.
Settlements
Total settlements are dependent on the final fill and building
loads. We anticipate settlements on the order of five inches for
about five feet of fill. Actual settlements will vary across the
site depending on the thickness of the fills required to develop
building grades and the depth and compressibility of the fine grained
soils. We recommend placement of at least twenty ( 20) settlement
markers throughout the site to monitor the progress of the
settlement. In addition, this will provide information on the
settlement characteristics of the site soils. We anticipate that it
will take approximately three months for the settlement to stabilize.
Earth Consultants, Inc.
Alterra Corporation E-1990
May 10, 1983 Page 7
Additional Services
It is recommended that Earth Consultants, Inc. be provided the
opportunity for a general review of the final design and specifica-
tions in order that earthwork and foundation recommendations may be
properly interpreted and implemented in the design and construction.
The analyses and recommendations submitted in this report are
based upon the data obtained from the test pits and borings . The
nature and extent of variations between test pits and borings may not
become evident until construction. If variations then appear
evident, Earth Consultants, Inc. should be allowed to reevaluate the
recommendations of this report prior to proceeding with the
construction.
It is also recommended that Earth Consultants, Inc . be retained
to provide geotechnical services during construction. This is to
observe compliance with the design concepts, specifications or rec-
ommendations and to allow design changes in the event subsurface
conditions differ from those anticipated prior to the start of con-
struction.
The following plates are included and complete this report :
Plate 1 Boring and Test Pit
Location Plan
Plate 2 Legend
Plates 3 through 23 Boring and Test Pit Logs
Plates 24 and 25 Grain Size Analyses
We trust the information presented herein is adequate for your
requirements . If you need additional information or clarification,
please call.
ccs R• Fi4'74 Respectfully submitted,
of• 1 `' "
4_ /0 • EARTH CONSULTANTS, INC.
M " : •
I i
I, : AmidIi iri( /
e ,. ..... ....iSTECA f.
James R. Finley, Jr. , P. E.
l/ONAI Ve01... Chief Engineer
JRD/JRF/jg
Earth Consultants, Inc.
MIIIMINIMIIMIIIMIIIMINIMM
Z / N VICINITY
17: ,• N: MAP,-5
g.
c
xa <
44.
F+.
a
s
34
sr 3 Approximate Scale
aY
sc SC
f4 0 400 ft.Nal:,x • , ; v
s Q
J'-az a;: .:3,•;: `q. s , tic+•
cx r_y c '
le TP-I I
i"`"`
Stis'
s , 5T LEGEND
NII SITE
12 B-3 Approximate Boring
TP f9 s>
TP-15 Location
R
II olel
In"
Y im TP-7 Approximate Test Pit
TP-14 Location
TP-18 , x;
F. TP1O
s ,
r-
Approximate Area of• '
i Fill
TP-9 QM B 4 a...t...;i4,;yi, ...,:
TP-8
y
0 TP-3
TP-7 TP-6 TP-5
TP-4 off TP-2 ie TP-1
Reference :
Conceptual Land Use/Preservation Plan
NACRES AVE. S.W. POWELL AVE. S.W.
By Richard Carothers Associates
Property Line Dated 5/21/82
it•.
l'I'lEarthI11)EARLINGTON PARK Consultants Inca .p
GEOTECHNICAL ENGINEERING £ GEOLOGY
Boring and Test Pit Location Plan
Black River Office Park
Renton, Washington
Proj.No. 1990 IDate May '83 ]Plate 1
y was" mt '4 f- >
4 ; .
si 4:. L' 4 gig uy,..i/
y'4 .
siNi,N` Dy
A
41"•(ft
Y: @ a c
t ro
47111-113•4' s.:
iaV ram
lR'1,:
aa
a '
d
y::.. . . /
4
B-5
r
Y TP-26 PITP-254.-.V:::.... ..,",,,....7,,,,,,,,,
Property4.• ': yy .;.14,:; 4r , Line F e• y.
F,(i_
yYy
as w-
de•nr
F/
t Nj`•'f &. i•:::.. qx- A. rq r`3 • )
w s I, :^
j :t,y TC `tom`•H:.. Y ' i R•!R l`-y' I
14
r,.
f
Mr i <5 % r3. a'.%Da....
lej Ti
v a: i:.:$ .,
e% `
A"•:fSs'• Y.:.. ''R,':Via. li..
1.014*W.4.4.*0140#) e
xft....*.4%..... ..i. *
C.,,,4.1
r__,.
e
mac,` ,
k„
4^ik• t: . ' 4 .... 5 l.a e y; -•'''.,. .'•y ,fir
S" j...v::yc: :' eft' w.c'i...%'.:'? .,.
4 y„y 77C
4:,.:' ...*** r
4;
t>. CY-r
v `s
1--<:_-_-
Detention Pond
ems_ N T—
Flood Control
Building
CHAS. MONSTER CO. ROAD
i
I
GRAPH LETTER TYPICAL DESCRIPTIONSMAJORDIVISIONSSYMBOLSYMBOL I
d.,
pO..O O / '
till-SPADED SRAV(LS, GRAYEI-SANO
C
O
G t( MATURES, LITTLE OR NO FINES
ANO
CLEAN GRAVELS '° rt 0 0
GRAVELLY (
Mlle N me i .
I. .•. • ••
G P
POORLY-GRAOED GRAVELS, GR
a
Av[L-
SLS SAND NIXTU*LS. LITTLE Ow No FINES
0 ' R: :
COARSE L.•
GRAINED il
Sl
l {
GM
SILTY
sale
GRAVELS, GRAVEL-aAND-
NOII( THAN SOX SILT MIXTVAE3
O/ COARX FRAC- GRAVEL! ITN FINES l
TION RETAINED (•s••o•MN• wows •f
1
ON NO 4 SIEVE hn••) CLAYEY GRCL wtYs, GRAVEI-aAND-
t
GC CLAY rlXra
A
WELL-GRADED SANDS, GRAVELLY
ao° ° ° 1 SW
P °
SANDS, LITTLE OR NO FINES
SAND
CLEAN SANG o
AND
Ilrrl• we AA II•••) I• ' °• '
SAVOY
SOILS n
O(OORLY-SRAD SANDS, GNAVELLY
MORE TNAN S0'. I
SP SANDS, LITTLE OR NO FINES
Of MATERIAL IS
LARGER THAN NO IL
ZOO SIEVE SIZE Fr` SM MTY SANDS, SAwO-31Li rIXTUR(
MORE THAN SOS
SANDS WITH FINES 4.1. ilj:L.
OF COARSE FMC- i•
TIOM GASSING (•
FPP•cl••1• •.•Goof of l A A
0•)ll
w0. 4 SIEVE Irf •'f••A SC CLAYEY SAMOS, SAND-CLAY rIXTURtf
I
otO1r$AR IC SILTS NO r[RY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAT1Y FINE SAND[ OR CLArtY
U JILTS WITH SL';GNT IL.•LST141TY
INORGANIC CLAYS '7F _ow TO otOIUM
FINE SILT!
CL NOYPLASTICITY, SILTY
LL1
S,•
LE,
LIQUID LIMIT
RAINED AND
LESS THAN SO
LNOY CLAYS, >,Ltr CL1Ta, LEAN
SOILS LAYS z LAYS
1 I
ORGANIC SILTS AND ORGANIC
OL SILTY CLAYS OF LOW PLASTICITY
L
CH
INORSAIIIC SILTS, MICACEOUS OR
MH DSATOMACEOUS FINE SAND OR
SILTY SOILS
WORE THAN S0% SILTS
WITERIAL IS LIQUID LIMITSNFIORD
ANIC CLAYS OF NIGN
SMALLER THAN NO
ANO
GREATEN THAN SO LAST,CITY, FAT CLAYS
CLAYS
ZOO SIEVE SIZE
ORGANIC CLAYS OF IEO TO NIG
OH TY _V* IC
IIM N
PLASTICI . GAN SILTS
EAT, ...AAA. '•. SOILS
NIGHLY DRGANIC SOILS P 1
I WITH HISS ORGANIC CONTENTS
TOPSOIL Humus and Duff Layer
4 (4 Uncontrolled with
FILL i:. Highly Variable Constituents
NOTE DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFIC T'ONS
SOIL CLASSIFICATION CHART
THE DISCUSSION N THE TEST OF THIS REPORT IS NECESSARY FOR A PROPER UNOERSTANOING
OF THE NATURE OF THE MATERIAL PRESENTED N 'HE ATTACHED LOGS
1 2'O.D.Split Spoon Sampler
t Ring or Shelby Sample 1103f) Sampler Pushed Earth
41f Sample Not Recovered Consultants Inc.
L Water Level ( date)
LEGEND1; Torvane Reading
cu Penetrometer Readings
IS
Water Observation Well Proj.No. 1990 Date Apr. I R3 I Plate 2
1 BORING NO.
Logged By JRD
Date 4/6/83
ELEV. 23-
N)
Graph cs Soil Description
l;efp- Sample Blows (%)
Ft.
V • fX
12
s
v•s••• ML Dark brown clayey SILT with large pieces -
1•• • of concrete and some wood, medium stiff, -
OV• moist (FILL)
10
44°.a
See note below)
I:
2 9
liii I MH Mottled tan clayey SILT, stiff, damp 15—V
10 41 `
u=
1.5 tsf
ML LL=52
PI=18
P 35 q
u=
1.25ts`
20
I! ' ! ML Brown sandy SILT to silty SAND, grading - 5 46
SM to SILT, loose grading to dense at
about 25'
25
32 53
il 30
SM Gray gravelly SAND with silt to SAND 41 7
SP with silt, dense, wet
35
T 30 14
Boring terminated at 39' .
Water observation well installed to 39' .
NOTE: Boring was drilled through backfilled test pit excavation after
removal of large pieces of concrete.
BORING LOG
i)BLACK RIVER OFFICE PARK
rth
RENTON,
WASHIINGTONConsultantsInc.
GEOTF_CHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 [Plate 3
BORING NO.
Logged By JRD
Date 4/6/83 ELEV. 19±
US N)
WGraph
CS Soil Description Depth Sample Bloom ( )
Ft.
N ;
k '.', ML Dark brown SILT with sand and gravel, - I 3 23
y very soft, damp (FILL)
CL I: 9 40 q
u=
1.5tsf11 ) MH Brown clayey SILT, stiff, damp 10IIIML (grading to medium dense below 7')
6 35
SM Brown silty SAND to SAND with silt,
1S
SF loose, ..ct
16 20
0
grading to sandy SILT below 12')
11 22
25
SM Brown silty SAND to SAND with silt, very - 55 16
SP dense, wet
30
50/5" 21
D5
T 50/4" 19
Boring terminated at 38' below existing grade.
BORING LOG
1
h BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc. •
GEOTE:CHNICAL ENGINEERING & GEOLOGY Prof. No. 1990 I Date Apr. '83 Iate 4
BORING NO. 3
Logged By JRD
Date 4/6/83 ELEV. 18-
Graph cs Soil DescriptionSDefpth Sample Blows (%)
Ft.
4 ' SM Dark brown silty SAND with gravel, it 4 18loose, damp (FILL)
5 Q
4/19/33
ML Brown sandy SILT to SILT, very loose, I: 3 37t•1.Lf{ SM damt P
10
30 28
15
SM Brown SAND with silt grading to sandy -
19 6
SP GRAVEL with silt and gravelly SAND, 20
i%%. GP medium dense, wet
GM
23 14
25
grading to silty SAND below 17')
S .I 11 31
30
102/G" 18
SS Greenish brown weathered SILTSTONE, hard --,,,
a BEDROCK)
100/4" 27
Boring terminated at 38' .
odater observation well installed to 38' .
BORING LOG
1
F
BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 ! Date Apr. '83 (Plate 5
BORING NO.4
Logged By J RD
Date 4/11/83 ELEV. 13-
US N)
Graph
cs Soil Description Depth Sample Blows ( )
Ft.
Q 3 43
1 ML Brown SILT with clay to SILT, very soft .A/19/83
MH to stiff, damp 5
T 3 67 c=0.5 to
1.25 tsf
52a
i;;';: P 17
1:r1j:: 10 12 19
1.1.1:I: 33 9
SM Gray SAND with silt to gravelly SAND — 15
1:j:H: SP with silt, medium dense to dense, wet
30 12
201 T 31 7
Boring terminated at 24' .
Water observation well installed to 24' .
BORING LOG
0 41)41 BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTEi.HNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 ,Plate 6
BORING NO. 5
Logged By J RD
Date 4/11/83 ELEV. 13-
US N)
Graph Soil Description Defpth
Sample Blows (%)
Ft.
11111 MH Brown clayey SILT, very soft grading to _ V
2 qu> .25-tsf
ML stiff at 3' , damp 4 19 3 TT 75
5
3
1.25tsf
11 P
10
i .:;
SM Brown to gray silty SAND to SAND with - IL 18
SP silt, medium dense, wet
15
Z24
20
I3 LL=45,PI=14
H ML Gray medium stiff clayey SILT to SILT _
25
with clay and trace of fine sand, pieces -
of shell, very loose, wet 1 3
30
I 5MLGraylensesofsandySILT, SAND with
35SMsilt, and silty SAND, loose, wet
6
40
SP Gray silty SAND to SAND with silt, dense _ 33
SM det 45
30
Boring terminated at 49' .
Water observation well installed to 49' .
BORING LOG
BLACK RIVER OFFICE PARK
Earth I RENTON, WASHINGTON
Consultants Inc.
1'
I
GEOTECHNICAL ENGINEERING & GEOLOGY Prof. No. 1990 [ Date Apr. '83 'Plate 7
BORING NO.
Logged By JRD
Date 4/12/83 ELEV. 17-
Deo N)
Graph
US
Soil Description Sample Blows
W
ft.)U Ft. (%1
I. 30
ML Brown sandy SILT, dense to medium dense,
damp (FILL) I 23
K .,ti, 5
I,; ML Mottled brown clayey SILT, stiff, damp 4/19/32 = 6
Jfll!JJI1i MB
10
z 15
SP Gray SAND with gravel grading to
15
y.:. GP gravelly SAND and sandy GRAVEL, medium -
i: dense grading dense, wet
26 qu=1.25tsf
Y ' Y : !r 20
ir
TIIr . .e . .e 39
Boring terminated at 24' .
Water observation well installed to 24 ' .
BORING LOG
niglill BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.Nr
GEOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 ,Plate 8
TEST PIT NO.
Logged By JRD
Date 4/1/83 Elev. 14-
Depth W
ft.) USCS Soil Description
0
38 q =0.25
MH Mottled brown clayey SILT, soft to medium stiff,
u
tsf
ML damp to wet
5
grading blue gray below 5' )38 qu=0.5-
i
1.0 tsf
10 --
Test Pit terminated at 9' due to caving.
Heavy groundwater seepage below about 2' .
15
Logged By1/8RD TEST PIT NO. _2_ Elev. 14±
Date Date
0 - - LL=51
PI=38
47 qu=0.5-
MH Mottled brown to blue gray clayey SILT, soft to 1.0 tsf
ML stiff, damp to wet
r
q =1.75
5 -- u
tsf
SM Blue gray silty gravelly SAND to silty SAND with
14
gravel, medium dense, wet
10 _ Test Pit terminated at 9' due to caving.
Heavy groundwater seepage below about 3' .
15
TEST PIT LOGS
4• 1140BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY ' Proj. No. 1990 I Date Apr. '83 'Plate 9
TEST PIT NO.
Logged By JRD
Date 4/1/83 Elev. 13-
Depth W
ft.) USCS Soil Description
0
67 q=.25-
MH Mottled brown clayey SILT, very soft to medium
5 tsf
stiff, damp
5 --r:-i A Pt Brown fibrous PEAT, medium stiff, wet 223 `;u
5tsf
42
SM Gray silty SAND with gravel, medium dense, wet
Test Pit terminated at 8' due to caving.
10 — Heavy groundwater seepage below about 3' .
15 -
JRDLoggedBy
4/1/83 TEST PIT NO. _4__ Elev. _l3±
Date
0
37 gu=.5-
ML Mottled blue clayey SILT, soft to medium stiff, 1.0 tsf
111
MH damp
5 —,
j SP Gray SAND with silt, medium dense, wet 39
Test Pit terminated at 8' due to caving.
10 Heavy groundwater seepage below 3' .
15
TEST PIT LOGS
1M BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 'Date APr• '83 Iate 10
TEST PIT NO. -
Logged By JRD
Date 4/1/83 Elev.ev. 14-
Depth W
ft.) USCS Soil Description 1%)
0
60 qu=.5-
MH Mottled brown clayey SILT, soft to medium stiff,
1.0 tsf
5 —LW
ML damp
36 qu=0.75
l tsf
Test Pit terminated at 8' due to caving.
10 — Moderate to heavy groundwater seepage below 3' .
15
Logged By JRD
Date 4/1/83 TEST PIT NO. 2_ Elev. __-
0
MM Brown clayey SILT, soft, damp
q =.5tsf
43 u
SM Brown silty SAND, loose, damp
50-
CL Brown silty CLAY to clayey SILT, soft to very
5 AL stiff, wet
56 1.0 tsf
SM Blue gray silty SAND, medium dense, wet
22
Test Pit terminated at 8.5' due to caving.
10 -- Heavy groundwater seepage below about 3' .
15 -
TEST PIT LOGS
BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GECTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 ]Plate 11
TEST PIT NO.
Logged By JRD
Date 4/1/83 Elev. 13
Depth W
ft.) USCS Soil Description oh)
0
qu=.5tsf
MH Brown clayey SILT, soft to medium stiff
81
ML
I1
5
SM Blue gray silty SAND, medium dense, wet 32
Test Pit terminated at 8.5' due to caving.
10 --- Moderate to heavy groundwater seepage below 3' .
15
JRD
i5±
Logged B
4/1/83 TEST PIT NO. 8 Elev.
Date
0
ML Brown clayey SILT to SILT with sand, soft, damp 41
qu=.5-
1.5 tsf
5 - MH Brown clayey SILT, soft to stiff, wet 96
Below 12'-some peat mixed with clayey SILT)
SM Gray silty SAND, medium dense, wet
10
Test Pit terminated at 11' .
Moderate groundwater seepage below 3' , heavy
seepage at 8' .
15
TEST PIT LOGS
4411BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GECTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 'Plate 12
TEST PIT NO. -_9____
Logged By JRD
Date 4/1/83 Elev.
17-
Depth W
ft.) USCS Soil Description
0
45 q
u=.
5tsf
5
MH Mottled brown to gray clayey SILT, soft to stiff,
ML damp
q
u=
1.0tsf
10 — HHH
51
Test Pit terminated at 13' .
15
Minor groundwater seepage at 12' .
Log ByDate44/1/83
D
TEST PIT NO. __..L0 Elev.
17+
0
ML Brown SAND with silt-SILT with sand, medium dense,
SM damp 45
q =1-2
u
tsf
5 ~111 MH Gray clayey SILT, stiff, damp
ML
59
10
Test Pit terminated at 9' due to caving.
Moderate groundwater seepage below 6' .
15
TEST PIT LOGS
441; BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GI:OTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 'Plate 13
TEST PIT NO. __IL__
Logged By
JRD
Date 4/1/83
Elev.
13-
Depth W
ft.) USCS Soil Description
0
46 qu=.5-1
MH Brown clayey SILT, soft to medium stiff, damp tsf
ML
5 — iH
i;
54
Test Pit terminated at 8.5' due to caving.
10 _. Light grading to moderate groundwater seepage
below 4' .
15
Logged By JRD
17
Elev.
Date 4/1/83 TEST PIT NO. -12_
0
v CL Brown clayey SILT, soft to stiff, damp
qu=.
5-
1.5 tsf
J/ LL=45
5 _ PI=13
31
SM Blue gray silty SAND, medium dense, wet
10
Test Pit terminated at 9.5' due to caving.
Moderate to heavy groundwater seepage below 4' .
15
TEST PIT LOGS
BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEC)TECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 IDate Apr. '83 'Plate 14
TEST PIT NO. -13
Logged By JRD
Date 4/1/83 Elev. 13-
Depth W
ft.) USCS Soil Description
0
84 q
u=.
25-
MH
Brown clayey SILT, soft to medium stiff, damp
5 tsf
MLI
5 --1I, HI grading to blue gray at 5')
38 qu=.75
tsf
Test Pit terminated at 8' due to caving.
10 Heavy groundwater seepage below 2 ' .
15
Logged JR°
1/83 TEST PIT NO. -14_ Elev. 13±
Date oats
0 -
MH
Brown clayey SILT, soft to medium stiff, damp 37 5-qu
5
1 tsf
SM Blue silty SAND, medium dense, wet 30
10 — Test Pit terminated at 9' due to caving.
Moderate to heavy groundwater seepage below 3' .
15 -
TEST PIT LOGS
BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.11114)41
jPiateGEOTECHNICALENGINEERING & GEOLOGY Proj. No. 1990 Date Apr. '83 15
TEST PIT NO. —15--
Logged By J RD
Date 4/1/83
Elev.
15-
Depth W
ft ) USCS Soil Description
0 -
MH Mottled brown clayey SILT, soft to medium stiff,
ML damp
43 qu=.5-
5 -- ; l tsf
ML Blue silty SAND to sandy SILT, medium dense, wet 38
ar SM
Test Pit terminated at 8' due to caving.
10 --
Heavy groundwater seepage below 4' .
15
Logged By1/8
RD
Date TEST PIT NO. 1 _ Elev. 14—
0
46 q
u=.
3-
1 tsf
5
Brown clayey SILT, soft to medium stiff, dampML
46 qu=.5-
10
1 tsf
Test Pit terminated at 10' due to caving.
Heavy groundwater seepage below 4' .
15
TEST PIT LOGS
11 BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 'Plate 16
TEST PIT NO. -L_
Logged By JRD
Date 4/1/83 Elev. -Li-
Depth W
ft.) USCS Soil Description
0
SM Dark brown silty SAND to sandy SILT, medium dense,
ML damp (FILL) 26
n
5 --
ML Gray stiff clayey SILT grading to SILT with sand
and sandy SILT, medium dense, wet
43
10 --
Test Pit terminated at 9' due to caving.
Heavy groundwater seepage below 3' .
15 -
Logged By 8
TEST PIT NO. __Et__.__Et__. Elev. 13-
Date 4/5/83
0 -- -
qu=.25-
53 .5 tsf
H
Brown clayey SILT, very soft to soft, damp
5 -- AL
42 q =.5tsf
10
u
Test Pit terminated at 10' due to caving.
Heavy groundwater seepage below about 3' .
15 -
TEST PIT LOGS
41)4111/ BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Prof. No. 1990 I Date Apr. '83 jPlate 17
TEST PIT NO. 1_
I.ogged By
J RD
Date 4/5/83 24-
Elev.
Depth W
ft.) USCS Soil Description
0 N
5
ML Blue gray clayey SILT, medium stiff to stiff,damp
32 qu=1.0
FILL)
tsf
10
t
MH Brown clayey SILT, stiff, damp 41 c =1.5
tsf
Test Pit terminated at 13' .
15 Heavy groundwater seepage below about 12' .
Date 4/5/83
Logged By
TEST PIT NO. 20 Elev.
23+
0 xxx-
12
C
5 —-,`‘<
ML, Dark brown clayey SILT with large pieces ofYYg
concrete and some wood, medium stiff to stiff,
damp (FILL)
r.
xr
10
c
j 29
Test Pit terminated at 13' .
15 Heavy groundwater seepage below about 12' .
TEST PIT LOGS
BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc. 11)41
GE )TECHNICAL ENGINEERING & GEOLOGY Proj. No. 19900 I Date Apr. '83 'Plate 18
TEST PIT NO. _2L__
Logged By JRD
4 5/83 Elev.
16-
Date /
Depth
W
ft.) USCS Soil Description
0
ky a
6ifs[` 18
h. X,.
L'x
rf ML Dark brown SILT with clay, sand, and concrete
5 and miscellaneous debris, medium dense, moist to
damp (FILL)
10
MH Mottled brown clayey SILT, stiff, damp
39
tsf
Test Pit terminated at 13' .
15 _
Moderate groundwater seepage below 12' .
TEST PIT LOGS
i BLACK RIVER OFFICE PARK .
RENTON, WASHINGTON
Earth
Consultants Inc. r
GEOTECHNICAL ENGINEERING & GEOLOGY Prof. No. 1990 'Date Apr. '83 !Plate 19
TEST PIT NO. _22_
Logged By
J RD
Data
4/5/83 16-
Elev.
Depth W
ft.) USCS Soil Description
0
SM Gray gravelly silty SAND, medium dense, moist(FFILL)
9
5 —
I
H 38 LL=42
10 —a II'
ML Blue gray clayey SILT, soft to medium stiff, damp
PZ=10
III
1 34
15 --
Test Pit terminated at 14' .
Minor groundwater seepage at 13' .
20—
TEST PIT LOGS
441 BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
G EOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr, '83 'Plats 20
TEST PIT NO. —21--
Logged By
J RD
Date 4/5/83 Elev.
16-
Depth W
ft.) USCS Soil Description
0 xx
2 SM Dark brown gravelly silty SAND, medium dense,
moist (FILL)
ML Blue gray clayey SILT, stiff, damp (FILL) 23
5 j,
31
ML Mottled light brown SILT with trace of sand,
loose to medium dense
10
1 'H grading to sandy SILT at 10' )34
Test Pit terminated at 13' .
15
Minor groundwater seepage below about 11' .
TEST PIT LOGS
04 BLACK RIVER OFFICE PARK
Earth RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 I Date Apr. '83 IPlate 21
TEST PIT NO. 24
Logged By
J RD
Date 4/5/83
Elev.
16-
Depth W
ft.) USCS Soil Description
0 -
SM Brown silty SAND, loose to medium dense, moist (FILL,
17
5 ML Mottled brown SILT with trace of sand, loose to
R medium dense, damp (FILL) 34
10
ML Tan silty SAND to sandy SILT, medium dense, damp
h SM (FILL)
ti}h 30
15 _
Test Pit terminated at 14' .
No groundwater seepage observed.
20—
TEST PIT LOGS
BLACK RIVER OFFICE PARK
Earth lI RENTON, WASHINGTON
Consultants InC. I
GI:OTECHNICAL ENGINEERING & GEOLOGY Proj. No. 1990 1 Date Apr. '83 'Plate 22
TEST PIT NO. __25--
Logged By JRD
Date 4/5/83
Elev.
18-
Depth W
ft.) USCS Soil Description
0 '„
40*
SM Gray brown silty SAND to sandy SILT, medium dense,
4v0, ML moist (FILL)
19
qu=.5tsf
5 —, ,
ML Blue gray clayey SILT, soft, damp
1i 35
rr
j ML Brown silty SAND-sandy SILT, loose to medium dense,
10 '' ' SM wet
40
Test Pit terminated at 13' .
15 _ Heavy groundwater seepage below about 10' .
JRDLoggedB
4/5/83 TEST PIT NO. 2_ Elev. 14-
Date
0 < e
i s
ML Brown SILT with trace of sand. , medium dense (FILL)
31
5 — ''i qu=1.25
tsf
XL Brown clayey SILT, stiff, damp LL=33
39 PI=5
I ,1,
10 SM
Brown SAND with silt, medium dense, wet
20
Test Pit terminated at 11' due to caving.
Heavy groundwater seepage below about 6' .
15 -
TEST PIT LOGS
BLACK RIVER OFFICE PARKEarth411;RENTON, WASHINGTON
Consultants Inc.
GEOTECHNICAL ENGINEERING & GEOLOGY Prof. No. 1990 I Date Apr. '83 'Plate 23
SIEVE ANALYSIS HYDROMETER ANALYSIS
SIZE QI- OPENING IN INCHES j NUME3ER or MESH PER INCH,U.S, STANOARO _ GRAIN SIZE IN MM
Q N m Q o R g 8 g o s8OroaMNM.ri a 03 2
0mA100
y l--O 0
m
z 10 v. VIIIMININIIMMINIMMIIIIIIIMIIIIM11111111111111111or
r : 80 MM
zo
F?
m
IIIIIMIMIll
m ~ z
70
30 n
m 1 I m
inFm60
Z
40 -I
0 DO
M
111111111A1111 0
m 50
O T —
50
N
o 1
D
m
k co
I
30
MEN I, MIL
il
70
m
p 20
BO—
MEM10
NA 90
MINIIINIMIIIIIIMILD
c as N Si
At
J +o
100
O O
000
O CO
o
O M N
OCOW VMN M (D O M. N. r DD 1p V M N 0] tp Q f7 N
D M N
GRAIN SIZE IN MILLIMETERS
o O o 00 00 0 0 0 0O
i. O x7
z
COARSE 1 FINE COARSE I MEDIUM ( FINE
cD z H Cr) FINESCOBBLES
GRAVEL SAND
i ;O m
D
n
O
Z Boring or DEPTH MoistureKEY
z H D Test Pit No. (ft.j USCS DESCRIPTION
Content (%) LL PL
yo m (11 Q B-1 12.5 MI! clayey SILT 41 52 18
v z ro
D'
B-2 17.5 SM/SP SAND with silt 20c.
ElB-6 0.0 ML sandy SILT 16
B-6 17.5 SP gravelly SAND 10
m-
7 SIEVE ANALYSIS HYDROMETER ANALYSIS
SIZE OF OPENING IN INCHES 1 NUMBER OF MESH PER INCH.U.S.STANDARD GRAIN SIZE IN MM
E.pp pp 8 g g a o
0pg § § 8 g0 . M N .- .-ri vie el o V' 00 N O
d t0 OOD
N
O O O p O
m A 100 NCI.NMM MN CAN r.tlm ri ImgNEumImo....•.m°O Q NEm..MN._I•aD U.mo.iAn.m......mmo1m.ommo•_ _ mu.IQ MGI I:•Il...m * MI NM I• .•_I•I 1 i.•a....._I.,, y Lio 9011111111)•I1111.11>•momow .m um t.im mt•tw..e.smiIMM..MI•=ME=I_MIMI I.e.•=IA4.1111 11•M 10
Z gig fs# Ill1==i111111rn_NO•_MOININI IIM 1111111111111I=MI_I•I.IIIIMMINIIIM..•_tIIMIIIMI...mmIlimmi
n WI Ma 11_MI M_ ..In111•_ N 1.M 1..immilINIIMINIIIIIIIIIMMOIN..=MINIM111•11 111•_MINMI MS.•=....x. Di 80 I.1=...Il•I. _•m_...N.mIMMIC == .•EMI_ NE IM.a..1v...MN 20
To* m =Mimi=.m t.t..1.IM.= I1.11•I1 I t0 I11!•...M1 L--....Itl•II•t.Z o* Do a1111111= 011 M=M11111=EMME MN=____ M.t1•....•__ 00Hn ssi minemmimem MINIM MEI=EMU 0 MEIN Mi MINIMUM III....=emeimmo• m
M m 70 1•M Il• .II•I)• Il.11.I1•Il•MMUS MINNMNIl•Il.l•....INIsuIMM..OM M MO.. M.____...M_mo 30 nmZ __._.•I•_MIME M•• I..t MMimI1 IMI.I...tNl ti.t lmt lINimIIl• I1.1 I1!•I t mxi . I—_EMME_•_ 11. 11•1 I._I!• Z
4 g° =_,==_sme:a==_,_:_____ ae MI a:-
NN_
a_eA•.::====a° -I
cp m _MM=._=.•_= II_ M_I__M.I.Il•MI_
Il•I. C)
1
let
M
50 EEME EL II _: .. I .: C:z:z.NEj, -•—..I.III_
5a 17>
fnr
IM . mON . 111 MINNI ._ ..IIIMINIMMIMI_al
11 IIIII 1 MEIN& I 11111==andoomm... 60
co
MI I•I•.•M Il• __ M II ii MM Iiii iI•I1II!•.I•.•Il•=.NNI MI>•Il• •....NI I II— 70I30I11!_MMIII• _t•II••M I1!•Il•.
IIIMINIMMIIIIIIIIMII
Il•IMIMI •MI!•.I. I - m
I!•I•I II• I• • Il• simm
20 I11•_. . '..---...•
nig= INENNEINNIMININMINNII111111111111.1111MINIMMIIIMMIMMIIIIIMINNI INOMIIIIIIMMIIII NM EINEM MOM IIIIL
NO
IMI:::=11:::::::
111mi%
AMM
INIIIMIN EIIMMENIEINIE MEMIENMINNEEIMMII
o u1 G) 0 I• U 1 I.I_-MEnl1 I m 1 I •
0 0
NIEHAININIIM
p p p
C'] D co
0 0 CO G0 v M N .-
O ao i0 o M N CO t0 V co N '
O O O 0 O O O O O O OIOOGRAINSIZEINMILLIMETERS
M N
o
co y —
o 0 0 0 0 0
c"D O 'o COBBLES
COARSE I FINE COARSE I MEDIUM FINE
Z N GRAVEL SAND FINES
ri m
a E x
n O0 z KEY Boring or DEPTH
USCS DESCRIPTION Moisture
D Test Pit No. (fti Content (%) LL PL
0o Z H r
W a n --(
p N TP-4 7.0 SM/SP SAND with silt 39
v Z ro cn
ni
co
0---- TP-12 4.0 ML clayey SILT 39 45 13
N
TP-24 13.0 SM silty SAND 30
t4,-.., ,:-, ., , • .. .; ,i,-1-•.;,1"-.,,,,..;;',•, ..• •.•-•!„,•,•,•t,c,..!„ ,• •„-11„; • -
4'A.,‘..-tt•, " '•..,,,,:''4,:!..711,41i.,.,...-.. 1;'', .."(1- '. ''°'4".l''''',,'''44.••','
L.. .',, .' ,i'''',!.:. .,,,i',i4".;:
j'i ii`,'4'
1'Z,;',.' -- 'V4..,:,,%;"`ieetA7'1 .df,-..:
1,*t•C“-:',...,''.,.,', '' ',- ‘I.,'' ,,,t.'''''.A
f' : 11.4
1 '-''''''' .•_
k.91't ti C,11';'1,** .A:N"-!".., -:,...-4.''.`4'; . • "-* ='";'''''')...1 -
z,- . -.• ,.:. ,4.4,,,..0,,,..- t,,,,--:4- ,k‘'.`1„;.44`.0-1 .:4' --
f.ptv: '..'tYst:---. 4....A.-', '''.::e.gl. 4', -4-7„,&-, ..,
i; f;.-7--\„,.4.A.-,,,.„z.: ,/,cir,x,::\,-..i. .---•.
1.,,,..,As,1....
1,,.:7,, ici.t-N4'
4".•• ‘'•'kt:,-•"': '4 ---11,''-'4`t••• .‘,„ •, .,,,-,1 -itt-4e,*,it-.-.", ..--;"•="‘• •,.. . -40, 1- ..:' z; ,4.,..;,-,9i* -, ,4,- , „••L'07-- 4•,,,„3r, -, --:. ..r•-4.
4.,.,..,6,''' .14 ,,,'.r,s:,.•":4•,..0.-4. . • ; 4 4,..,4 Or..;:il•y:':e1;,'• .. },. w .14,4%. A •,,, 1:6,-,,,•: ,,., ,, ;.• '
0'''•.,..••',..'4,if, • ..-, ,,,,:-;::',... ,,,,;,,,,, .,:
4
4,1' '44*'
t.i.
m.:;t4 tr..**,
p 4 ,- '''`.' '.-.:,, ,'...•, ''
1-,.-:''''.•';,.,:,.•-,^....,
e,.,
l,:',,iA.s,
l''
4.
i„,„:
1°.
Y.;4:'
Xf„.,r,/T';""=*.
l '„ ,'!-,S4„-1,
N,,..,
1'
Y44)?l.'.)9•.144.,., .,4,
4,..",',.
4-.1r'','"l..fi:t,oi'l• v. '..!.:,,,1,'ll`.,,,,.."''
1,4I7,,;(
4`.
4,,11.'./:
74..,1k',.,f'tR.o-,:',,4.411,t;
y°,$-,-,„.
i,,
7''.'',1''''''''f''
r-• ',
in.,.., -.?, Y1%eY1A„.,4,4211,
V','
4j...-t.
F.'/:s11), 1e I 4
1,.
4'•-7•,•....•'?,%,.,*;,"',:4',:.
2;.•‘,''",^„
gkri"•k't1-t,,•
4*.e:,,,44'" -',.."!'"....:.''•'.' t' "'-44 fi'-:','.
t. 2,,,„,,,,p,,,,,,1/2.,-,:,....ev,.. ;i.i.,-.,„ii,e-i.-1,. . 1.1.114e1,. , 14, so-OVA:"1''''
1. .. 41,140 .1.‘,/ 0, ,..,r,,,,...,
e, er e.g.4.••',`.,--,•4, ., ,••'''"''-,,-*. ,-.I.'4.•
11/44...-!..*.tt.7,4. . '' '1,174,4,,.4;NA' 4.t.,4"4-4)'''''' ,'' .:,',,,,,,,,S;'''''tk,;.',..'..,'‘‘,"'' • : ''.('' '1'.;''
4'':',,,-,t6t,4%
Itt,.i.„,,,V.z.:4-f;:im:tit.,
4.:,c---,...t.,
l i.73 '-iti4WiT'Z'il:' 1415%-'."-:),., -ie.4,0,44,ti,,e 1., 1-f , 7. ...-t:,,,,i4-=.,:-....,"-t(-...
I ';•'..1,"•41..c.;.`''''. ,41is'- s "- '' ; ',:,' -- ,,;'t.,- '..,,-‘,•4574....-
11-41:g-',..44;ficsli:pr.:,,,.‘:`,.;:-44;41 :ra:'-.04A,,:-:i."1"C-1,V,(•41:4Z4,414•4.%. .k.'"':'..;
4;Nt:;'''':RI.*'s---.14,i,i- -,..,*;
A4 . ,*4g4::-• -.' .' :,. --!..,•`();_tv.1;.. -;
1-7- ,' -isIR:$V:04?-,-y14,0%14'0,-74,A4...4-ii4;1,44,,,,I,,,: 4a.,'..'vt,:„".. -.,,,e‘,7;:',,,.,-:,,-- ''••,•:,t.?•11,-,-,i,- ',- '1-0 --A, -, -,;;-..,,,-,„;, ,. ,,, -:: '''..1„:-..,Ap% 4.,,,,:,..‘$.y-1
c- '-- :r‘•.'4';*'1'1'..4:-. f.'-'6., 4"1:4Nkgar-'',`.(. ,,11'-''..-tij.:,0"..WIlikr 4 v4A,': '-', ',.r;:':',,-i.,:!,,,'•,1.,.,„f‘ailit 's,,,s,1%-,4--::' ,-',. .,'-ei,..--:.,..--,-,-,. , ..P1-..sl7;:-.,I;e‘
i ' ' ' '',... • 4 i-.-e , 41',, • •-t Viale" .•,(1 .— ,-, l'', -,,rfpie'.1- • ' ."-A,'‘- '' 4•-it 1 • ,ik'' . ' ' ' ' '''''''''',. ', 1,,^0'?`-' "
2 .% ,,..,-.. ,"•/?.?,1, J&,-,• ••t...1•41,•,,,4?..•••44' 4,, .„,„,,,,....,P4s1i4„,_,.!' 'WO.44,`r.‘..":',
Y,,..,., ,,.-,*+(,,,,...
t.,14.2...,,,',:, .4-4r7,.34.4,4•,•,•tt .*"• .•'''•••
t - .•:"•,' ''''S*.•.?,•1,.;,•'z;•,,•••,.
r:_;;,,,,,rt24,44,,,,,!,„'Airi- Z.W. ....., ;Pay, tt .1444.41;Y: ' '-'4.:Vt•t.‘tf:a•-•••-'41-C:":VPr•Arttl:;:'1.4i• • ',7*----,IS,'"*. -.44-4.•-•.':--' - ••' 't---' i'' '-.1-rt-'41'
i',,,-`• 'I;i'•'-'}A'ffirf,...V9Mrlf..,' ,..,:,17 ,,,—;.,.,:g,,,,,A
teAts,:-P.4.44,3;.g. wv.. "z%, ..f,,v1i,,, ..4itly:1.-;,.. -,7',..,f, ,-Ii.t.gligfrz?,
ktoyi , ,, .-.,,,,,pe"..z,..41,,,, ,f,..?k, otti:vx,„.,. ,.,,•it,,,:.., , . ,s ':. , ', ,.-. . ' - „ ,,,'..:i..4.
1'.'z'114.k.
s..:,7:sk: ,, '- ' "........4.V4t.444,P.4- • sT.,41ei;', 4,1'14,-;°,i']."--:4:'",!:,r1..;,-ft4;;i-....vt- .',44,..2,4, ,,,,,Alt.:0,1,-vii.d,,,,,:,.,-, .. - , - •.,,,. ..'.,, ....,'- :‘,,:,74,-e'
41.0-,,-,y,.e-1
4 g‘t •, ;al• ''''& '• -•;111444&;•14.;tt'-t goitiz,it,'kefri ‘
4
i'N,'N'Itt. tt-4,-*4,4,,A 1.. - - , : ,,. , — .--.,,f, ., ,.1.--,,, ,,..-
n-eC-4"- , " ';: ''.42 ZA'44-111,..rirANV 47F.,"),N4,.%'",..', 9r:', ,4,,,,01,4,,,,-„,1*# ,..?.,,,At„,:`,,4,4:.. .,1•. - s:, -,, ..,„:;,....,t :',t,-;)..•., 4 ,
SOIL INVESTIGATION
PROPOSED DRAINAGE CHANNEL
EARLINGTON INDUSTRIAL TRACT
I
FOR H.
PACIFIC COAST RAILROAD COMPANY
SEATTLE, WASHINGTON
FEBRUARY 1967 f,
BY
SHANNON & WILSON, INC.
SOIL MECHANICS AND FOUNDATION ENGINEERS
1105 NORTH 38TH STREET
SEATTLE, WASHINGTON
t..f.-....,..,..e.st--v.k..:xew..•• •
x
I
2
o
3
Y
A
h^? /o x
A PROPOSED z
b PUMPIN3 PLANT a
Yir 1
1 b
Aqi I isio 0* .,:s.
7)
0_ /
9 'i
1:2-; er
Nil C) r ill! 1 Z%
N...' ),...9 /N.
try% `o
4 . ,i,;-•,, ,
J./ 4.- *,--f
1s1:
e
471+30AH / ' / w Q rL j e
Q Ir/466+658K/ ;' /
Sta.47;?_3_5 , ,
O ^)
o r B
o_o__
tp i iSt'al.5,1 6+3
m 4Q O d`
t /OS i• 6
Q, '
r!' GOLF COURSE 0
r 41 AQ Ex n9—ditch
se. )
o.r [t o°Nf;
s, h S ta.491+95
Q00 9\ SCALE: In =400'
i
Proposed channel for
flood prevention and
drainage-Soil Con-
servation Service
and local sponsoring
agencies
i
it
EARLINGTON INDUSTRIAL TRACT--' .
I
LEGEND i _
9 Boring location PACIFIC COAST RAILROAD'COMPANY
Test Pit location EARLINGTON INDUSTRIAL TRACT
LOCATION
OF EXPLORATIONS
DEC. 20, 1966 W-0770-I
SHANNON & WILSON
I
SOIL MECHANICS & FOUNDATION ENGINEERS
L FIG.
I O d
0Q SOIL DESCRIPTION w PENETRATION RESISTANCE
o cl
i.t z
W r; . I D 140 lb. weight, 30 drop)
24 a oQ
ot ;.za W A 81e,r3
Surface Elevation: a 20____ __ _40
OL Medium to very soft, brown, clayey SILT 0 I
0,
8 w/organic matter tI
OH 2 I i
3 ,
4 T 5
5 + 11(
7.5 I
OL Very soft, blue-gray, clayey SILT w/6 I
81 organic matter T 1
OH 71" I Of
8 j
N.)
10
14.0 10
SP- Gray, slightly silty, fine SAND 15
SM II 4
16.5 I
20 f—-- ——I— — --
I
0
LEGEND j Atterbera.limits: Water content
I 2 0.D. split spoon sample
t-----•--I Liquid`limit
k.---w Natural water content
0 D.thin-wall sample ,% Plastic limit y'
P Sampler pushed J LOG' OF B OR l N G -
Sample not recovered .
BORING NO. 101
Q Water level
0.! DEC. 20, 1966 W-0770-1
Imper-vious seal t Fu 4i;5 i'
4
4
Piezometer tipNIONv.. # SOIL MECHANIC! w F UNDAT OON !ENGINEERS
FIG. 3
o m
a
aiQ SOIL DESCRIPTION r-'w Qct PENETRATION RESISTANCE
W i nJ. n H 140 lb. weight,30 "drop)
N a oa
is . I,..l a a 3 A Blows per foot
J Surface Elevation: a N ° 0 20 40
OL Medium dense, brown, clayey SILT 0 1 0
w/organics
Cr.
2
3.0 --
SM Loose, brown, silty, fine SAND 3
4.
4 -
5
r ..7.5
ML Loose, gray 81 brown, fine sandy SILT 6 111.
9.0 -
OH Very sof t,,gray, organic SILT 8 peaty 7 10
SILT
8 163 -.-•
9 I-•-,
10
1
SP Loose, gray, clean, medium to fine SAND
15.0
11 -
15
20 I
r
0 50. 100
LEGEND Atterberg limits: Ye Water.content
F--0-11F•LIquid limitI •2 0 0.'spiit'spoon sample
Naturol woter content
II 0.D:thin-wall sample Plastic limit
P. Sampler pushed LOG OF BORING..:
4e Sample not recovered BORING NO. I62.
Water level
lmpeo : seal
DEC. 2011966 W-0770-I
SHANNON.aL.WILSON
SOIL MECHANICS • OUNOATION ENGINEERSP'eZOm@ter tip
FIG. 4
E
Jo
Zip-: SOIL DESCRIPTION r'w o PENETRATION RESISTANCE
no I a D 140 lb. weight, 30"drop)
rz o
z.G w CC3 A Blows per foot
D 1 Surface Elevation: a I) 0 20 40
OL Medium dense to soft, brown to gray, 0 I 0
SILT w/organics
r
2 4
3.0 — I
SM Loose, brown to gray, silty, fine SAND 3 4
1
4 5
5 1
7.5 _
SP- Loose, gray, slightly silty, fine SAND 6
SM
7! 10
411\:
4L___?agr8l
12,0 --
SP Loose to medium dense, gray, clean, 9
coarse to fine SAND i
10 f
15 f
II 4
12 6
18.0 —
1
20 t 4
0 50 100
LEGEND Atterberg limits: Water content.
I 2 .` O.D. split spoon sample
t---•'f-Liquid limit
Natural water content
t. ,. Jr 0.D.thin-wall sample Plastic limit
P Sampler pushed LOG OF BORING
Sample not recovered
BORING NO. 103
V , Water level
DEC. 20, 1966 W-0770-I
Impervious seal SHANNON & WILSON
Pie'zometer tip SOIL MECHANICS S FOUNDATION ENGINEERS
FIG. 5
J 0 t
v)Q SOIL DESCRIPTION w 4a PENETRATION RESISTANCE jfluJz
w H a D 140 lb. weight, 30"drop)
z a w a a 3 131ows per foot
rpvTSurface Elevation: in v7 (9 0 20 4Q_,
OL Loose and soft, brown, clayey and sandy 0 1 0
SILT w/organics
2 "-
3 4
4.5 — 5SMVeryloose, gray, silty, fine SAND 4
5 Ilc
6
7 10
10.5 —
SP- Gray, slightly silty to clean, fine SAND 8
SM i
a
SP
g115
10 I 4
ill 4
18.0
20 I
0 5Q 100
LEGEND Atterberg limits: Water content
I 2" O.D. split spoon sample
F----S -t-0-Liquid limit
Natural water content
f O.0.,thin-wall sample Plastic limit
P Sampler pushed,LOG OF BORING :.
Sample not recovered
BORING NO. 104
Q Water level
DEC. 20, 1966 W-0770-I
Impervious sieo(, . SHANNON It WILSON
Plezometer tip SOIL. MECHANICS It FOUNDATION ENDINEENs
FIG. 6
zJ0 d
Nvr,Q SOIL DESCRIPTION r'w 0 PENETRATION k.51S14NCt
w4 D 140 lb. weight, 30"drop) 14a2O`t
z 4 w a a A Blows per foot
Surface Elevation: c
0 20 40
OL Medium dense to soft, brown 8 gray,
0 I 0
clayey SILT w/organics I
2
3.0 - I
SM Very loose, gray, silty fine SAND and 3
M
fine sandy SILT
4 5
5
7.5 -
SP Loose to medium dense, gray, slightly 6 1i
81 silty to clean, medium to fine SAND I
SP- 7 10
SM
B _
9
10
15 i
II it
12
I
13
19.5 -
20 i
f
0 50 : 100
LEGEND Atterberg limits: ToWoter content
I 2" O.D. split spoon sample
1—'+-Uquid limit
Natural water content
II 0.D.thin-wall sample Plastic limit
P Sampler pushed LOG OF BORING
Sample not recovered
BORING NO. 105
Water level
DEC. 20o 1966 W-0770-I
t
lmp rvious seal SHANNON & WILSON
Plezometer tip
SOIL MECHANICS & FOUNDATION ENGINEERS
FIG. 7
Z E
J o d
Q SOIL DESCRIPTION w co PENETRATION RESISTANCE
U
cc
of a. D 140 lb. weight, 30"drop)
17_ N d o<
z a w a o: 3 Blows per foot
D
V Surface Elevation: o N 0 20 40,
ML Soft and loose, gray and brown, slightly
0 I
0
8cloyey SILT to very fine sandy SILT, 1
OL w/some organics 2
3
4
it
5 r
i
6
9.0 —
OH 1 Very soft,brown,peaty SILT 7 10
8
12.0 —
SM Gray,silty SAND,peat and organic SILT 9
PT
OL 10
15.0 — 15 i
SM Medium ,black,silty to clean fine SAND II t
to 1
SP 12
13
20.0 14 20
OL Soft, light gray,organic SILT
21 .0 -
0 50 100
LEGEND Atterberg limits: Water content
1 • --Liquid limitI . O.D. split spoon sample
Natural water content
O.D.thin-wall sample Plastic limit
P Sampler pushed LOG OF BORING
Sample not recovered
BORING NO. 106
Q Water level
DEC. 20, 1966 W-0770-1
Impervious steal SHANNON & WILSON
Plezometer tp
SOIL MECHANICS SiFOUNDATION [NGINUNS
FIG. 8
J O N
oil
SOIL DESCRIPTION w PENETRATION RESISTANCE
a nLil_ 140 lb. weight, 30"drop)
N O
z a w a cc 3 A Blows per foot
D --1 Surface Elevation: n 0 0 20 40
OL .Soft, brown and gray, slightly clayey
0 I 0
I.a SILT to very fine sandy SILT w/organics
2 —
il
21
ML
3 , 1
4 —
5
6.0 —
OL Soft, gray, slightly clayey, org. SILT- odor 5
ra
7.5 -
OH Soft,g y,peaty,organic SILT g 1
i7 10 ill)
OL Soft,gray,
1I 0 8 rpeaty,organic SILT a silty fine SAND
9a
T
SM 13.5 --
SP- Black,sl. silty to medium to clean fine SAND 10
SM 15
to I I
SP i
12
I
13
14
21.0 —
i
LEGEND Atterberg limits:
0 • %
Water content
I . 2.. O.D. split spoon sample
I • -*-Liquid limit
Natural water content
II 'O.D.thin-wall sample Plastic limit
P Sampler pushed LOG OF BORING
Sample not recovered
BORING NO. 107
V Water level
DEC. 20, 1966 W-0770-1
Impervious seal SHANNON & WILSON
Piezometer tip
SOIL MECHANICS • FOUNDATION ENGINEERS
FIG. 9
J 0 d
0Q SOIL DESCRIPTION y'w PENETRATION RESISTANCE
W 0 a W 140 lb. weight, 30"drop)
z a w 4 cr3 Blows per footoD(31 Surface Elevation: a N 0 20 40
ML Medium to loose, brown 8gray-brown, I (
0
clayey SILT 8 fine sandy SILT w/organics s
OL 2
3 f
4 5 1
75
5 _
SM Loose, gray, silty, very fine SAND 6
10
10.5. - j
OL- Soft,gray,peaty,organic SILT and mottled 7
OH I organic CLAY
I 8+
13.5
SP Medium, black,sl. silty to clean, medium to 9
81 fine SAND 15
SP-1011(
SM t L'
11
4 // ' -
1
121 20
1 1
1
23.0
131MLBlue,fine sandy SILT w/wood 24.0
25
0 50 400
LEGEND Atterberg limits: Water content.-
f—4*-Liquid limit
I . 2 0.0. split spoon sample `
Natural water content
II 0.D.thin wall sample Plastic limit
P Sampler pushed LOG OF B OR 1 N GT- 4 . ,..
Sample not recovered
BORING NO. 108,.
V Water level
DEC. 20, 1966 •W-07p-t `
Impervious seal SNANNON & WIL.ISON;;'r
Piezometer tip
SOIL MECHANICS 6 rOUNOATION IINGIM[[ps
FIG. I0
N. J O d
OR SOIL DESCRIPTION w fpjr PENETRATION RESISTANCE
w i,-- a. D 140 lb. weight, 30"drop)
i
s w a IY 3 Blows per footDvSurfaceElevation: 0 rn c9 0 20 4Q_
OL Soft, brown and gray, clayey SILT w/0 1 0
organics
2 11
3
54
i
5
T7.5SMLoosegray,silty fine SAND cleaner w/deptn 6 i
7 10 I( .
I
8
Brown, peaty SILT 12.0 -F
12.5 9
SP- Black, sl. silty to clean,fine SAND 10
d SM 15
to
0
II
SP
12-
13 0
14 20
I
SP Black,coarse to medium, SAND w/gravel
22•0
15
r
layer 16 i
24.0 -
25
LEGEND 0 50 100
Atterberg limits: Water content
I 2" O.D. split spoon sample •
1----1"f-Liquid limit
Natural water content
I O.D.thin-wall sample Plastic limit
P Sampler pushed
LOG OF BORING
Sample not recovered
BORING NO. 109 . •
Q Water level
DEC. 20, 1966 W-0770-1
Impervious seal SHANNON & WILSON
Piezometer tip SOIL MECHANIC$ a FOUNDATION.ENGINEEns
FIG. II
J Z T;`-
O
NQ SOIL DESCRIPTION
Cl)
PENETRATION RESISTANCE ,
wIL a DW 140Ib. weight, 30"drop)IT_riizwo 3 . A Blows per footSurfaceElevation: o cn cD
0 20 40
SM Medium dense; brown, silty, fine SAND 0 1 0
w/organics i
2 r
3.0 — I
ML Loose, brown, very fine sandy SILT 3
4 5
SM- Loose brown tcgraysiltyfine SAND 81 fine
6.0 —
5
ML- sandy SILT w/organic clay layer
OH 6_k
7 10
1
8 _ i
9
S M-10Loosetomedium,gray,silty,fine SAND to fine
i35
4MLsandySILT.
15 i
II
1
12
18.0 —
SP Loose to medium,black,clean to sl. silty, 13
a fine SAND
SP- I4T 20 4 - --
SM 151-
16t
24.0 .l
25 i
0 • 50 . 100LEGENDAtterberglimits: To Water content
I 2" O.D. split spoon sample
F----40'-Liquid limit
Natural water content
O.D.thin-wall sample Plastic limit
P Sampler pushed
LOG OF BORING
Sample not recovered
BORING NO. 110
V , Water level
Impervious seal
DEC. 200,, W-0770-I19661966
N & WILSON
Piezometer tip SOIL MECHANICS & FOUNDATION ENGINtIRS
FIG. I2
O cD
cnd SOIL 'DESCRIPTION w CD
a PENETRATION RESIST: .C1:
o ff" J z
wwi..z
o- 140 lb. weight, 30 dicp)F-
D-ISurface Elevation:
w a
cb
3 Blows per fo,.t
v u' 0 20 40
OH- Very soft to soft,brown and gray,clayey.SILT
0 I 0 t T
OL and silty Clay w/organics and occ.sandy layer
2
i
3
i_
4 5 - --
5T A
6
8 i
9
13.5 -
SP Gray, clean to sl. silty, gravelly SAND 10
a 15---
SP-11
SM
12
13
19.5 -
20 .- ---- -
0 50 100LEGENDAtterberglimits: Water content
I 2 O.D. split spoon sample
F--- RI-1_Iquid limit
Natural water content
IC O.D.thin-wall sample Plastic limit
P Sampler pushed LOG OF BORING
Sample not recovered
BORING NO. III
Q Water level
DEC. 20,1966 W-0770-I
Impervious seal SHANNON & WILSON
Piezometer tip
SOIL MECHANICS & FOUNDATION ENGINEERS
FIG. 13
i
TP - I TP - 2 TP -3 TP- 4 TP-5
0
use
0
use
0
use
0
use
0
use
OL I Gray B brown, OL Gray a brown,OL Brn. 8 gray, clayey SM 1 Gray a brown, silty, SM Reddish-brown,silty,
slightly clayey i slightly clayey 2 r SILT w/organics _ fine SAND w/org. fine SAND w/trace
SILT w/ SILT w/organics of organics
organics
SP-! Gray, slightly silty, •
SM j fine SAND
6 —6 6
OL ; Blue-gray, slightly OL Blue-gray, slightly SP Gray, clean, medium 7-- ---_____— 7 --J
clayey, organic clayey, organic to fine SAND w/ SM Blue-gray, sil'y,fine SM Blue-gray,silty, fine
SILT SILT trace of medium to 1 SAND w/organics SAND w/trace of
9 9 coarse SAND /9 organics
OL Gray- brn., slightly IC
clayey SILT w/ ISPtGray,clean, fine SAND I IIorganics1
2
TP- 6 TP - 7 TP-8 TP-9 TP-IO
0
use
0 use
0
use 0
use
o
use
i OL I Gray 8 brown,slightly ML Brown, slightly fine,OL I Gray B brown,OL I Gray B brown, SILT OL Gray & brown, org.
clayey SILT w/or-i sandy SILT w/org. slightly clayey w/organics SILT w/organics
ganics 1 SILT w/organics
i
5 _ 1
ML Gray- brown, fine, SP- r—Gray, slightly
sandy SILT SM I silty, medium to
1 I iI fine SAND
I l 8
OL Gray, organic SILT
g /SM\
Blue-gray, silty, 1
g 9 — g - { —
a fine SAND S fine, SM Gray, silty, fine 10
OL Gray, organic SILT 10
ML peatyTSP-SM OL Dk. gray, SILsandySILTw/org. SAND
I II . I I .
TP- I I TP-I2 TP-I3 TP- I4 LEGEND
O,
usc
0
use
0
USC i
0
usC
OL Gray a brown, I0L Brown 8 gray SILT OL Brown, clayey SILT OL Gray 8 brown,
Ground water level
clayey SILT w/ w/organics w/organics slightly clayey
organics 2—
SILT w/organics
USC Unified Soil Classification
3
SM r--Dark gray,slight- _
8 I ly silty to silty
7
i fine SAND
SM
ML I Gray, fine sandy EARLINGTON INDUSTRIAL TRACT
9 _ {
SILT
9 9
OH i Dark brown, peaty 1O
ML Gray,fine sandy SILT
10 IO
OH Brown, peaty SILT TEST PIT LOGS
j SILT OH Dk, brn. peat SILT OH Dk, brn., peaty SILT SM
11 I I
y 1 1 I I ' TP- I THROUGH TP-I4
DEC. 20, 1966 W-0770-1
SHANNON & WILSON
SOIL MECHANICS & FOUNDATION ENGINEERS
FIG. 14
ousc
TP - 15
ousc
TP- 16
OL Gray-brown, clayey OL Gray 81 brown,
SILT w/organics clayey SILT w/
organics
SP- Gray, slightly silty,
SP- -SM fine SAND 9 toM Gray, slightly silty
II II
SM to silty, fine SAND
TP -17 TP - I8
ousc ousc
OL Brown, clayey SILT OL I Gray-brown,clayey
w/organics SILT w/organics
3 --w
SM Gray-brown, silty,
fine SAND
z_
7
w ; OL Blue-gray, clayey,
organic SILT
II II e
TP-19 TP-20
ousc ousc
OL Gray-brown, clayey OL Gray 81 brown,
SILT w/organics clayey SILT w/
organics
8
OL Blue-gray, organic,
9
clayey SILT ' OL Gray, clayey,org.SILT
1 1 1 1 4-
PACIFIC COAST RAILROAD COMPANY
LEGEND EARLINGTON INDUSTRIAL TRACT
USC Unified Soil Classification TEST PIT LOGS
TP- I5 THROUGH TIP-20
DEC. 20, 1966 W-0770-1 -
SHANNON & WILSON
SOIL MECHANICS & FOUNDATION ENGINEERS
FIG. 15
GEOLOGY REPORT
EAST GREEN RIVER.
STORAGE BASIN TO
STATION 669:00
SECTION I)
t
WASHINGTON STATE
OCTOBER 1981
SOIL CONSERVATION SERVICE
U S.D.A.
a_.tt)t3 DY'Tt7T'
SOIL CONSERVAM ?VICE
a-_-'
67
NATERSHED East. Side Green River SUB-V. _RSHED SITE MN
OCATION OWNER STATE
King County
WA
OGGED BY DATE PROJECT:
Jahn A. Wilson 1/15/81 WP-07 WP-08 X FP-03 P.L 46
BILLING EQUIPMENT LOCATION OF HOLES
B-61 Track Mounted Rig P-1 Channel
1.
HOLE U SAMPLES
STA. 3 DEPTH
S TYPE
HOLE SURFACE FROM! TO
I 2
DESCRIPTION OF MATERIALS
I
FROM TO CSE. REM. REC
N C BIT NO. TYPE
NO. ELEVATION FT. FT. I I MIN.
S USED FT. FT. % DIAM.
I 0 BLIVE/VI'.
400 r,7 /1rJ ) 0 3.5 Silt, plastic, dk. gry. org. I1 3.5 4 .0 2
it ,C' 33110.E Silt, non-plastic, brn. org. odor, soft L 4 .5 15.0
I
S 10 t10.5 f 1 .
10.N 13 Sand, silty, VF, brn. W.T. @ 12.5' M 10.511 .0 J 1
S 11.0111 .5 2
13121.4 Sand, poorly graded, F-M, dk. gry. wet P 15 5.5 I 1
I TD-21 .5-Ft.
Aet---- - 5.5 6.C- ---2
I
16.016.5 - _ 3_--_
20120.5 2'5 (
I
21.0121.5 6
I 0 3.51 4 I '
401 7yoffie 0,4..0 Silt, plastic, dk. gry. org. 11 4 14.5 1
0
610' 41 17Silt, brn, non-plastic, org. odor, soft . . L 4.515.0
I
1
17121 .5 Sand, poorly, graded, F-M, dk. giy. wet M 5.017.2
1
1 W.T. @ 13.0" LITD-21.5 Ft. — — Y
10.5111 .0 2
t 11 .512.0 2
15 _I15_.5 I 1
15.5116.0 - 1
I 16.C16.5 12
20 20.5 2
I. DISTURBED-UNDISTURBED-ROCK CORE 2. COARSE MATERIAL REMOVED 3. PERCENT SAMPLE RECOVERY 20.5 21 3
21 .021.5 5
Sheet 1 of Sheets
SOIL CG .AVATION SERVICE
Rc'Sr•a-crr
WATERSHED
SUR WAIERSHEI)1SITE NO.
East Side Green River l
LOCATION
OWNER STATE
King County WA
LOGGED BY DATE PROJECT:
John A. .Wilson 1/16/81 WP-07 WP-08
x• FP-03 P.L.45
DRILLING EQUIPWN01 LOCATION OF HOLES P_1 Channel1TrackMounted
HOLE U SAMPLES
STA. & DEPTH S TYPE
1 I 2 3
HOLE SURFACE FRO DESCRIPTION OF MATERIALS FROM TO CSE. REM. REC-
N C BIT NO. TYPE J MIN.
NO. ELEVATION FT- FT.S USED FT. I FT. % 1DIAM-
qb
0 BLWS/FTC
402 t 76f•55 0I5.5 Silt, brn. , soft org. IL
S
14 0 5.5126.5 Sand, F-M, loose, brn-dk. gry. few P
5 5.5 I 2
s. gravels, M-C @ 10 Ft. , few layers of 5.5f6.0 13
II F. sds @ 11.0 Ft. , silty sand layers 3.06.5 1 6
1
@ 26. 0 Ft. , W.T. @ 8.0 Ft. 10 110.5 12
TD-26.5 Ft. 10.111.1 I 3
I
11.d11 .3 13
I 15 15.5 1 3
15.5[ 16
1
6
1
16.d 16.S I 9I
20. 20.5 1 3
20.- 21 1 6
11 1213 9-
1 25 125.5
I
4
r5_926_,0_- -5
1. DISTURBED-UNDISTURBED-ROCK CORE 2. COARSE MATERIAL REMOVED 3. PERCENT SAMPLE RECOVERY SHEET - OF --SHEETS
r---
SOIL Ci a1TION SERVICE
WATERSHED SUB-WATERSHED SHE rim
East Side Green River
LOCATION
King County
OWNER STATE
RYA
LOGGED BY
John A. Wilson
DATE
1/16/81
PROJECT'
XWP07WP08 FP03 P.L.46
DRILLING EQUtPM.EgITTraCk Haunted
LOCATION OF HOLES ,
Channeltt3iOO11
I
HOLE U SAMPLES
STA.& DEPTH
S TYPE
HOLE SURFACE FROMI TO DESCRIPTION OF MATERIALS I FROMI 2
TO CSE. REM. REC.
N C BIT NO. TYPE
MIN.NO. ELEVATION FT. FT.
S USED FT. FT. % DIAM.
I 0 I BLW1S/FT.
403 667/50 015.5 Silt. plastic_, _bin. org._, spft ll—.
I05 5.5 1
J 4.0 5 5i12 Silt, non plastic, org. soft L 5.516.0 1
I S 6.0I6.5 1 1
12121. 5 Sand, VF, dk gry. F-M , W.T. @*12.5' P I
I Loose TD-21 .5 Ft.10 ll .5 I 1
1-- —
W.T. raised to 6.5 in. 1 hr. 15 116.0 1/2
1.____ - 16.d16.I 1 3
20 120.5
I 20. 21.0 I 4
0
404 - _65Flee - - 012.5 ' Silt, non plastic, solft, brn. •L. 21:_g21 :o I 5
IMS
470 2.5 i 8 Silt, v. sdy, F, loose, hrn. , strat . L H 51 7.5 1
1
S E
I
8 20 Sand, V--M, poorly graded, dk. gry.L
I
W.T. @ 8.0'
B 3.5I4.0 i 2
2
I Y 4.0 4.5 _..
4.515.0 I
TD-20.0 Ft. _—_ ____-_-
1
10.
io.111 . 1 3
11111 .. 1 4
r ------ - 15 :15. ; 3
1 15.J16.0 I 6
16116.5 1 12
3
1. DISTURBED-UNDISTURBED-ROCK CORE 2 COARSE MATERIAL REMOVED 3. PERCENT SAMPLE RECOVERY SHEET OF SHEETS
WATERSHED SUB-WATERSHED ISIuF. 'In
East Side Green River
LOCATION
King County
OWNER STATE WA
LOGGED BY John A. Wilson DATE PROJECT:
1/16/81 WP-07 WP•08 X FP-03 P.L.-46
DRILLING EQUIPMENT LOCATION OF HOLES P 1 Channel '
R 41 Trek Mounted
HOLE U SAMPLES
STA. & DEPTH
S TYPE I 2 3
HOLE SURFACE FROM! TO DESCRIPTION OF MATERIALS
N C BIT NO. TYPE
FROM TO CSE. REM. REC.
NO. ELEVATION FT. I FT.
I MIN
S USED FT. I FT. % IDIAM.
0 I. BLWi/FT.
405 &4194-5T 01 12 Silt, brn, soft, off. @_15" dk. gry.
S
12Ig, Sand dk. gry. w/1-2" silt sms. , P 5 IS.S
I
1
I
I F-M, W.T. @ 15.0' 5.516.0 1
I TD-21.5 Ft. 6.016.5 I 1
10 I11. i I 1
I--- -- --- - -
15 I15. i 1
I
I15.1 16 I 6
1 16 16. 5 1 8
I
I 20 PO") 6
I
r
21I21 . 3 I 8
I.--.- I
1
I
I. DISTURBED-UNDISTURBED-ROCK CORE 2. COARSE MATERIAL REMOVED 3. PERCENT SAMPLE RECOVERY SHEET 4 OF SHEETS
SeR-c1_ ++rMIN aemrc2 WZII.=-er
WATERSHED SUB.WAIERSHEU SIZE NO
East Side Green River l
LOCATION
King County
OWNER STATE lot
LOGGED BY DATE PROJECT:
John A. Wilson 1/19/81 WP.07 WP-08 X FP 03 P.L.-46
DRILLING EQUIPMENT LOCATION OF HOLES
B-61 i and P-9 Channel Intercept
HOLE U SAMPLES
STA.& DEPTH
HOLE SURFACE FROM' TO DESCRIPTION OF MATERIALS
S TYPE 1 2 3
N C BIT NO. TYPE
FROM TO CSE. REM. REC.
NO.. ELEVATION „FT.. I FT:.. . I I MIN.
1,S_ USED FT. FT- . % DIAM.
1 o
L
I B L /F'I'.
406 (-f2f-C 0 14 Silt, (Fill material to 3.0 Ft. )
m. firm to 6.0 Ft. , soft, @ 2 Ft. 3.514.0 I 2
layer of peat @ 12.0 Ft. 4.014.5 13
5
14121.5 Sand, dk. gry. , m. , pt. sms. @ 20 Ft. P 4.5 ,5.0 13
Poorly graded, W.T. @ 3.0 Ft. Y1 I 1
TD-21.5 Ft. H 8.5I 11
1. I
B
L__Y- _1- -- --_r
I 11 12 1 J.1
I
f
12112..i
1
16.I16.o . 1 4
I
16.9 17 1 5
17 17.5 9-
20 20.5---l.---1- -
Z 21 1
1 21 ±21...5 - .I - 3
1 1 I
1 1 1
1. DISTURBED-UNDISTURBED-ROCK CORE 2. COARSE MATERIAL REMOVED 3. PERCENT SAMPLE RECOVERY SHEET 5 OF SHEETS
7
r ,::••
t
yV.
1:
t
r*
Y
1
f
4'"•.
r '",,
l
1
u '.
a.
w' "
1.-
y.r
F';
a',
i„." .
q ,
Si ,
s„ ,. ^,
4•
tlF
4
Yid.,
t ,!'- •..
k •
I-
4:
h`
f'
R1.
l
a. '
k4.
7 •" .
1 ••.
p
4 ,
e4,
r.
t ,
i
1 {.
AA,
1
3
i.
t ,
r
v:,•
F
4
y'. • ,
x
s•
s '.-.
g,, •
1,,
t,-
t
o -.
t
i
1
i
p=
t;,
kdfa_
e +^
c.
s
Fr
C
a•
i•
k . ' .
r
i
i
t ..
e'..
Y
A.
0• !
i1rC •
Yt `..
ftrp+.''
g'
p+
1";"..
y
f
a
t'..
y. ''• ,
r -
x.
M'*'::
t
1
J
M• \
a
Sd:•
A '
l •
i'
vt;,,,,,
y''
r•
G ..
Y.
y,
7;
H4 ;
F
t•
s'
lit
16
I
F•.'
Px, . • ''^'•
F" _
y
jel:
Jvr
a
T
N
r .
t
r
1
0-.
4 ••
J. .
v .
x
r
flT
r4'
t'
f
it,
iK • , '
S '
f•
J1,
l
etei.
C
A. '
r1'°
i
f.•,
s
r
7 • ;'-
r
4w
gyp_ #,' '
y
3
t.
4'..
1
Itr
nF' '
fat.•
fE0 -_,
e . $•
A
1
Cf $)
M
e'
r
s
1,..
40..,..
4..., ,,
v,, ,'
7K1•••• ''••
e• * ... , . ...
c
IV '.
w'
s
e
ar `
i
f
AA
i
4.
F+
4' '%,.
x
y
4
p'
6'
t"`!
Y.
w
rk^
3i
S'
SFr '
F '
y'
S;•
X..•.."
r
I !..!:
7-'
ke''',..*.
e.
a',.
4 - . ' ' ': % ' .
1
X
1
r .:},
a•
i/ "
4-',.:'*-
L `
3.
r,.;
Jai .!
4 .
r"
i+'
44 "
T. •
YI
sWL..'
Ci
r•
Cprvi
7•
T•
A.'
k
xe ,
k
di:.;' ':
tr`•
A •
d•
rL.-.•>
F
r •
tt ;
r
r .
w •
s
b
71..,
yL
a.
Mra
t ,• '
t"
tdt{
rr
jr
Y ` •,"
E'•"
P
a
1
i
5 _
r.:
7
a
s''
t?
1`
p#
w?'
14f`
a
40;
6
t ,
any
ti.,
t
r
Fytl
i.
r
f
M ''
t,
at
t
a
i .
aa '
a
tir
fie
4.
A';
1'
4.
t:. . '-
4
1m.„-•,..
4.
7:
0,
4e4, . ‘...... ...
AA -
f1.
1,',
0:'-,•
z-'-
f'
r
u=
sue,
z
s
r
y
w
r1.-
ire•,
J
v,' $
l
i
i -
e.
alr
f1 !}.
41..^
rY'
7)
I">
1'"
i'
a;,
4 •
t
7. •
J.
1 '
k11 .
f_
C
l.';'•;:
41.‘
r '
Y-•`,
Q'
o.•i::-.`.
7..ar
fi•.
n:
7043" }
s
r
4
4c
w
R
1..
k-.'%1.-'' : '. .. -. . .:
d•
h
y
y,•^
i'
r
cf'
t
o ' •' "
i
is
4t
I
1,:
r:,...'''
t-
1s:
fryi..
yY.. •`.,'
s
if'
a
iC
i {
G
i
t:'
ry ,
ol,' •
A•;•
R,
r + )'{'
r
M
S' ,
r•.
t' •
J
R
L,
Krr•
iyc`•
V ••
r.'
f"
t
flt
wL ,,
vi
I
J
E" •
4,'
s '
1 •
x
P.
C
l -
0111j .•
44;
fe '
y
J
aF,•
jjllr..
f
F
r •
a•
I
F`
in
4
I,'
1 . .
R
t' •.,
i
4`
7.•'.
3, . .,
o
its,"
alt
dV
r(
of.
f
4 '
r.•
J
Yr +
y{ +
i.
iiFF
r:
s'
1
f., .
14'
1,,
y,
JT%
r
I
i
aI'
isT
ty!
k
L # "'
t,••
t' `* ,.-`" ''
M. + .?
t•
74,. .
t
M].+, ,• „ -
i
l
1W
1 •
Tl
Jyi
r
I.
yS !
a „
w'
ti
q. *
iiIf
f
t
M
i ,
mot.
Y *.• -
e
a '
I .,. " .).:
I
k
Arc
t
1_
y-'
Fa _
t
I
s
a
q .
g{
T .
a
J.:
i
i.. ,. ,'•
k ,
i, .
p
w ;
tea:..
4
v:
y
a.
f { . -
fit`
i.
4
t'
I
t
9
fir
r
r
4. .
J %
e ,`
y
i +•,.
i '...
jrna
9'
i
T
y ..
T •
ZIP'',
E
t' ;
a '
h'
f'
i!
i.
k. ,:.'
a,.
r
Y, .
F
4
L -
jt;
4
1
1 ` • •
tit
i
4
d
t, „ ;
11;.
f
f
f
1
f .
4 '-
fi
fa • `
r •+ .
a
f
k1'
1 •
14
t
4
fl.
l
S
y
yr
f"
T'
r',•`
z
t, '
b.
s
4Afir. , •
1
C•
t.`
i
r•
f.
r•
W!
@,
ti ..
ta
1 •
l
191„•• >: '
a
t4.\"''''.
4'..7."---'....!..
lr'-''''."..
4.".."'",•:':
474°. $
7** .
1.,
ii...L..
1. ..
i......
4114.4;•
4;•
v..
v;,.,...
m., ... ,. ..,
t-,-;...! ... .. „•,,,,,,,..
10,,
a . ..„,.
4.
1i.--
r.
i.-
e. . . • ,
1 $.
01Y-. ...
1":.°'.. * - -'
liv
t--.:
1
1.
i ',' ''
vsy.. }
1.
l!•.
y ;
10
ti''
F•---
Ar
w
4•'
t..
M
x ,,,
iyl
J' . . '•
1 • ;
ij "'
y4.
f
y
y+ ' ,,.
r
SM',.
yr. >• •
s
ww.
Y ,
w.+,:... .... ,
yw
r
r
y'
t
ft
4
r•..,
P
s(
ti _„
lr,,,
t ^
k,
ti•
Yr.. .
Yf,
i'
L
sm4144 . ---.:.-
r,,,
r -
yR_•.
c-
i:
fy:,
f ,
a.
Gl+ =
t'•
t
4y.. `+
r `
T'
SJd'
yy+
My' •
t1F.
A "`'` .'
ki•
dY."
9'- ''
r"„-;
r.,°`
aN %.
Y+
ee•
C
r'
r`_
1C'.
YKr:
wt
t+,
jxi,
K.
t,, `,
u'
ile.,•,
S`
c
Ai
4?
CS
4
w"
s.
Ey{'.-
1, {
a.
t,i„
Y'
f
x. +
ly;
x , ,:,
i1
r
t
Y.,'
t.:''••
0^
rY{
q '
7
h
ww
Qf
t
a;
I
r
r
r
fz°
i
t
4 "`
yL .
i !
04.;
y50.• . ¢ ,
qry,•
r
r
C .' ; .,
l
4
J
w
in
h`
r{-
yS:.
ff',,
fr1,.
j' ` .
Q
F ' ;
tif:
j(
t ' ... .
a .,'
r7K
t
I +'
Y•-'.•-
si :+' <.
4 •
y
e
f '
tJ ;
ss.`
y?!
9.: ,
sf';
tf
i
k'
r`
4' ''
i '
r7'.
M.'°+,,
is
Al-
a'
p,
01-
n •^
7ur •
tl•;
x .
I1, <
J „
ds•
9 .•
y
pi' `
Vt
tyk. • '"' -•
i,.'. .
0.
M.
141V...q
i
W"
III •
7,
4 •. '•
Xi•
1'
s
w
t.
i."
F4
i
t•'
OP-
a ''
Y
k;
7t :•,,
i •
a,
i. "
St
Jai,
i
n
o,.. ,,
N.
7,..,,` ',,.
yt ,
4 '
Tl . ,
J.
T..-
w.
hnesn'+ '
S
M:
A '..-
a
t
11
4 : ''
r ..
i
i'
J
7
y .,
i ,
t
y,
ri' .
pj,.
t
Ht
y
MY'
K '
JGF^.
i•
X' ~•
n$
1
7Jb '+.
ii',}
M.• +'{
Fy,-•
iJ`.
XlC4.'? ".
r" ,. ..
s. ;
i,
f'- • .-
k'"*:.
s`
sJ _.. '
4"
t -
i?:
vr'-..:`'#
i ,,-•,._
v:. „
r.
x.
s`
1
F
4
Z.;
i
I... :
1 •
7
i
jk
1t•
1
i/'
i
j
j-
i
1 .•,
fit;':
t1
i
I ..
i
i ••'
I—`
14,.
r.
R.'
tie... ,
1
1 ! !
f
j • '
1
1".
1
1
I
I ;
1/4,
e•-.••
f
1;
S
Pi
c
i
1
I
1 1
I ..
I
1
1 •
1
1
l "
4.
wil. -••'.•
7/
44
1. ::-. •*
r
I
I
C, .
j-
n,
I: •
ti\
i' :
j ..(
1 :
I
l' .,
p- ,
1 , •,
z.. ;
1 -..,. .. .
s, . :., • ,
1
i
1 .,
a•
4 •-: ' ,-"•-
i •
ram,,.
i
1 (.
1
y
C
1
j
1
t
iR!
l `.
ft. .
e
r
1
t
I
0•
f .
i
I
11
1
1
f
t
j
I
4'
r.,
f
I
I(
7
i
i
1
i
4i
is
I
1 .
if
t
I {
l)\-
0
F
0
I
1
Q
x
Q
i
1...................t.
rti.
t .."
17:
w.j'..'
1:::..:'.
rJ
ittiW.:
1.:
S
1
1i
i
4
II'
kWtrr'
s -
f ; ' ;
a
4. t •
1 ...
N
fir, :
Pr
I
i
I.
cv .
ii
i '., -
I
s
t .• •• • ,•. •
t•
ti
Mt
t
i
1
fin ' $
j
I < <
t
7
I
1
ii
r...
I
I'
T
I
r.
1
C
i
I:
t
1 ••
i
1
A.;
r
t
r141.
Si..
r
F,:
r
x, +
l, '
k'. ;
lii
I
C
i
1
0•
a :,..,
I .
i .
1 ,,
4
1
1
11 '..•
i
I :
1 •
14.
4
I
f •`}•
i
7
i ,,,
YYYJ
1
1
1
iI
s1 /
I
1 •
7
171
I, •
17f '
f
b
t.
i..+_ ._ . ..
t. ...__
1.--.,..
j -....__.
1-_.._ _. .. .
L_. .
1...—.
6.• ._
1II -' -..
7....- .:..__( —.
1
4.......
4'
4
7—,. —
11-
111:
41',':.
yr.•:
yw -' ?
air,
i
1
1
1
t/ .
I
cR
if
i -
i • \ : •• :
i
1 .:•
k .
f
1
I
il . •
1 , . ., ,„.
1
it,
f
T
C
1
11 {
t..'.'.
r._. ..
4
1 ;
Ya
h -.;;
ate
Y^ -
yt
s;_ .`-,.
t„
I •
v +
yr
ttl.• '
t.•
t
Y
e•:
J
F ` ...
i{ ;, `. -
r`
i
fir
is
7E
t•'
i ...
f '
1''
rF.
4?.'
M
J' •. .'
CR."
y'
l"
q !.
t`
t
c
it
4 .
9
r
y
v' ''"•
a' •'
A
r `',"'
cr •
a ...
41` "
1
e
T•
4
r
1
yam," +
r
lj
lr
y+'
y
j
t
p.:`;
r -
Ail `• „•
a '',,,
iv-,..
1{ .
r "'
f
i.
A
R »- <... ,.
r ..•" '
Ylti<
7"
r,:'
t •''
C.."
w
y!
t
y
r
1e" :..
is
rR:
f_•"
r,
ny '
r, ;
t
A ,
i
o
i'
t, ..,.. «'
y•
4ry2.
s:`
4.;'
r _
44:*t::::
w
y
r
jr.
x '^-'
fit .'-• ,• :.
7 ,
Nt,.,,
P.:
y
t(- .. "
kJ•
w`:
t
44,vN.
F`• :
4
t;-
4,
r--^
1t>- .
r6, ••'.. .
4.'
4t -
4Y'- °
r`"
rr. ^.:.
14
1.'' •• .,
r,
L-)
r
My,
ol{ • +:. -
r
M
73'''„ '^ . ,
Y.,#
r
Y"
4..
i
C,
y4'
r-
Ci
C. •„.
r" ..
pp
7'
r'
a
e`
c^' _ •—
tr
2 :,
sg
A;' :
fit
rtt:.
ti`..<; •
yY, .
51r _
zV^'-;
r:+"'
1
fi4 . '.,
r.. -
y)
t,,' ,.
ttv,.•''''•:
R ,
a•
r':
FAk'
t.
RiXs
f
a: `
yr '
c
p `:
v
4,-,.
i,
j.
J_
Al....,mid, -
f
fi .
ic
a.
4•
44,
xr
fit
1
bra-; •
rw3 . „
a ..:
yr ,
2. &
r
y .,
Y
j
i ~
p„
Y.
try
r •} ,
b5Y
ak
r
P;444%
r +
rs
v'
ti
Ra•
ti
3
t
ti.
S
1 [ - :-
4,
7
46,
4V
y
x
F
1 ,
4.
4 ..
A ,
44:
e
a ........
r`
K
oamff••
i (
ir•
r.
e
Y. '
f1'
l',
4 _,_
yyr '
h.
L
or-
i'
p
i;
i• .'
r..["
IYR, .. "
P
r _
r•'.:,
G
L• °
x
M4 !`'
f".
r,"
Its '
h•
i:
7
y
r.,
f,,
fi ,
3
naY<
y
t.:,
1`
k ?
t
t..
l
3
fL..
s
aR
T.
ee •
as'
1; '•'
iY•
r: '
M.
i.
a.,
v
s•
i
74••; •.,•, ".
i • $
A ;
4 / '
s{.
r'
t
Y• '
r
Ifywir
e. ,',
r,-
i. `
r +
Y+'
a''
S `
1
t-..
2 ' •
A • '
wt ••' .
tT
T ,' •
p •
r :
R ,
r
y .• $
t
y : •
y
i
t ,,
jam.
YJ : ,
p_;.
j
w
g
1
4..,,.
t, .,
tla
A
I• • •"
S•
r •
A
w,
L1
ht •^ !` " •
p
L
t< /(
jar•" _
l •
KJ
i.
t ••.,
y0••.
iL
J' ,,••
T
l
1
W
li.
it
yr
xy.
i.
f ...
r -
TN-.
I•
1 -
T "
r.
tC ''
fY
i.
1 •
F '
v•
E.
7,
t•
v
r
y ,. .-,•
Y
5•
W .
S. °
W:
Y
1e
4 .
T,. . _
r.
i '•
J ..`
fi., '• ,
ut "'.
1., ••
9s
h
d`
41''
y,YY
F•'
lt
y'
l '
r:
ysi
b-
d:
c'
Y
f
7 •
A :,
j,
ff::
3 * " '
k
rat ::.• .
Mri
4 '
i'. .
b....
4•,' •-•
s•
40
1I /
f.+
i'...
ti. -,
7
Y1., `
S
we
r+
r '
4y
y{
5.
ya.
y
Y .
i.
aw'
s
j,
s
fir,
f, )
aQ '
T'
C.•,•
6.
4r --..
i, ..
4',.. •
r
i,
r•.
3;
PF.
iii
nxiF` -.
CS:
f
4,
A •••
ti:'
1.
14-
4lettiffii,„,...
4..
V •.:
Z:
rii:
Y .:.
r..-.
m.73-*
1„....,#,
rtf.
t.,„,
L. ,
j
1 ..
t,,. ,./ -
b1,
M.,
Y4„.
r.'
17•,
t -
r
Uri . "'
f
S.
44
ff
rr
r
a. ..
c..
4.
4..
2.
44.
47.,*
1
5 '/
al'.
if>..
M.
S
Jed.
Cf
Y
4ft
t•` ^
Y.,
t,
i
464..
4 .
F`•
A.•
T
AI
r` `
may, • .'",
4
T
y7
c
a, . .,,
S
i
If
yF$
r
4 /
1)
1
oott .•.;..,..,....;..,:
t.
4- ....,
01...
1 ....;•.)::,.. , -.,
r, ,...!,. .
iitli' ''.
4, :' .
4._ ..!..--
r,:
t.,,
1,,,'-',
0.,,
tg— ":. .,, ,...--
z—
vi..'- ,
r -
14'.,.",
s,,,
i."-', , .;.. - '- .; :•-• .
t ,
4..„,
40044.
4.
i ., , .
N,,t, ...„,,... ......,... ....,, • .
J
tr,
Ifs
ex
a..
t
t } ,..
2!
b1'
1„a •
C[!jti, `
a
m" :
A'".•,
r ''
3'
i ":
1 "
i••.M
j.
L•.•
y.
r..
a
tRit.,,',.
Cam..
t;
ifr
ly -•• '
vity : ..
4t.
Y
4 -•-
e6< •
Hi•
ltr
o
e'
r•
m4V--
y: _
r
r,~
e.
t
O
c •`,
V ;• •
r:
a +
1p°
y
w
j_,+
1
c"
k. .
Hf.,'
x.. •[. ..
4:
l'
a ,
IY
d
x
1 ••.
4•,
i'; `
Y" '
a•
tXJ',
qy' ..: . • ..
V.
A,r'.'. . '
YS
11
w.
w,. - . •
t
yQ
fit
ti,
y'. '
tom?
4
h. •',•
r-,.
a-
c'
r•
j
C
q
F
P++'-?
yr.
d* °
dn '
rl,+ • .
y:'. '
Y. ..
t1` *
c
Y"
y
yZr ,
a
Al
7.yy .*:.
i
f•
N -
1,{{
py
e
Tfir3tij2
r
i''`•
i
p
ems :
y.
3 •
s` - •
1r
r '
i"",
i^"'
i'`"-
tat• ',
t, .
rr
t. .-•
3.
A
gi
p'"
fig., ,, -
oS
y '
r-
1r
F
Taa
v •„'•
i •\.
tt
ti "
L.
Yr}["
St
1.
r
1`
b, ,
fir-',:
t '",
P +_
t."'
µ: '
a,',•
It
4
r1
1 ,,..
lk
a .
y..
1•
t.
a „
r`:
4.,*
r • +
v.}•''
C
r
x
r
s
y1
Sa
rY
r•
Q -
f
1•
i, .,...,.'• per.:i.....--.- .--e,v.c:.,;,-, ..4.,,...0; _ ,
4
1 - .itto, : • ,••4 . ..., y t i. .. .' f- , ..i: , • •t 4,Ile.4 t.j.; 1 ' f 3). • itzleP i;•' e '•":•,., ,3e(1.;"./ •". ' '•..
r ).r ',...:. :''',”:".- 'qt.- r- .'''': "07' 4. ••I•
4
lit,i,,N,. f1)
kik.'i-...
Z.•10:
9. .. .& ,..;!:1.1 ..i. IY.4-'''y• i-Af1 • - - -• -4.,:' k. .1' 44 eji Z,
i-iet",•1..
1
y - -
I.P ' .: ,
a,•'
7 • .,_..
Ir. ‘,•, 1 i lit.:. 'j7 tt...••.':`1. qp •-• 1% Y ^ 44", '4) r.‘..; ,. •
v.,,--- -
1.... . • iv .,,-.vo v..c:.„„kc-,-.
v
i .,..1x...„).... t. • t . .., ••-• *.. e.:v.4.-...., r
r•':.t+-...•• :•*
14 C' It".• .0 „1 •'''i,? 'tzit . ' 1:;‘...!i4..44. tr r -.- :•••••••.
1 :,• • ... f- -i-. ic a, • '4 ' . ' .v..4....1.•• Ni fr t., .1; ...
ji, • 4-.11 • '.t01"' r:k. • iI ' .i•,,,..1., . •4...,, ...• 1 41 14° ik ' I.•
4
0 ".' : - • ,..*".ti/A..:`, x • , IPA.,..
9,. 44...• •• • . 4. ..3 ;'.•41.A. 0 kr43.,... .4 .i '••0. °•••• ••• '.... ''.1::)•1 ,v'"*. 4); ' •.',4`i.,Crtir fr.
IL,• •
ri:''S• ,f 3..tA-* it. :I- •' ,•-, • ..,- .. ... ifit . '• 0, ! -" • , -V4,- ' ,., 47,4 ..ne ,' -
4,• i I 'z.l..• 4.:4.".• ".
f•V 4 ''
ese-, • '- , q• .' • 1 .•,,,.". -Ls. "' cir••'..r•47 •c, •-,•. -- . •- 4 ' eit-Ar' . v--#,-'- - - s* i \ 7 -AS'- '.1 :4t? '6'-,:f 8.4AZ4 •-"'i ,If,,i„," ' '• • it.' ';, . i4.1,,r1--4
I....M.
1:,:
4;
t4.
11
4,?,,„
e".1,,;,,,i),,I
14.
i. ' :.." '' 'i•*1.:''' •t . let.,Sli..,:.**t',.' '
I./ ' ' . A -. ' •
r'' 2, Ilris.':.'•-1:4,,, p.,...• i ,,,ty 1J.
1!.. : q3.1.:-,t- ; • .; •e --f,?. ', ,.,,,:•.:, 19k . 71..- 7.% .tit.• .•,,...,.. 4:: •.,I t kikiekilit V ';''. ,f,... ' .1'1 Z.::: 1--k.'- ,kr,,.'c"i- -,‘‘-41:' i-
fr k pit- .:- 4 . , ..
A• . 1.' - • 4. "l•-•,. S F:t•--.:-'''* '
t. ..•.4‘,.:,... ,....1, .- 4 ,1-'11-.4.•;* •Us.% !it".,•
1 ,"'''741":••••„",-,d*ct •" 0.' •,• „jrj,.." .",:....st --1...'1':
c,
4 . ., ..
1...-,,.„...".• NA. ..Y.-'-z...-.:' '•'•'s•;,-•,.t:.r:ii•7" ' •;••••i_ :-`-c` ' '7 .• •. '
1. r.;,),4 c
i met..; ,,,,,.,,,,,-.2*.t--;.,-•••*-,'•- •.:.• ..-J, • 7 .. ..• • ...... -........,..:.,,..r V,,,,,,tit,:..'-‘, ...„ 4.4*.zf'44 • .• ; !**"4.t .
t :. •••, . • 4 .A ' tt .f': •
itt "..6,, , . , ,,, St IhtIA: V. 1 4'. 6 ,.,.t. .. .4.I-t,1 6
mi,, ."1",..ki,.. '. 4.^r i*Y . 44.41.• _C •r.....
1\ .
1 .r.V r 1.4.r TO tle'... .• ',,i;:• . -'
j
V..f,'• ili• ' gi
i ' i -4'06-*""4 ''''fo•is..,' -2''ift-,•,'. ) •t414,',.. 1._.‘j.,, • • ' 1 -4,A I 4 00, 0, , . '.1; 0"....''. •.'" •‘ •7 .
74,7 .'" :=',::,':. •31.* .0,
f. q
T..t.4 . ....ii : ..
41...,.... , 7. ,--,..4,:,--4,•,.'': , .‘,.
w , ,,...v :J. -wt. ' • -4 .4, . --
q-4-,• .e. 1 A A 1,,,.:.1.0
0. r It Ak..tg- . - '., ..'. - ' ',',.•'.•.. ''s-if46.4.., • - • .4,8,4\
4-•• . ••.. .... ''''''N'.,' ie. ' .• 111... .74,11. ..4 : 8.,
X41^4 4., i'.
i'• 'i:7
irt. .......-4- 1, .00-0.4.
0. ,....,..1 „If - i f..."...;;:.;:fii•.. i.. 14
1
t : ,, y.-•1
le,.r;-,.:••4riffi.,4 . ', - ' .. • .. - .!
e• : IL. 4..!1,..4 it. C,••1•
4.- ' n-41.1e21 lel, .' •• ; '. 3.. ;ja..f•liadet12411111111tt' ...,' ,... %1St
4147t.: ..- • '1,
1K Al.1;48alifej§4.38Maigiaggie,.”,•.•-..eVit •7.71;i:,'•,,r :X•''.., '''''. • ; -',Y4T. ••.i. ...." -' '- ...",.4-••%..• •••• • 1;'.•0,-. 1,
W.**47-*••••• • 1 j'S1I ...-, r . ‘ ,,... :„.40,..."4••.0. 4, w. . aletairokitiltaritt&6;Witi,7:4:. calEillgt . ,itt. . 3411,, , , , , ,t#. ,, ........,v ,,,,,, AN,mt•-.1 '• ,-• , 9--,• - --••••‘+'=.,'4.'"'. ,,.• •• :.
t"tii.• t. r "..‘:.40.4 .••.....04 •. --•;,..C. *" 4 44" P .0 7.,11? - ' '-"„s ,-,Ilki- '.
7...A,-...- -..:,.....t •-..-.. 7.4.... • " ` 'idaw...‹.1':
r•••.). '-•;.,'„,
re.t.e.:,•,,,tzr.4,,i,....,-A„, , .,,, . „........•: .... ,..4.4.4....wimita,.„.„,,.: . 1Ptit'l.A/36 6 ..4 ,,.. .tOtrikii:4,111r4iiiiiklialleiNr
k,..• ,,.._.. ..,4,. ..;.• !•.,..k.#,;.• 4_,.;:,,I.,., i..,„ --I. ....--., ,. n .;.., . „,.i.',, •,,,-- , , _•,.i.„,..,..4„...• t.,,. ,.. .,.7,,.,.. ..,..;.. ... , i... ,,,:f1....-... ••,,i.3...,- t4,,,,:,,1. .-•.`,,-;‘," - ''...''. •-••••••,•••••,.. - -;•e• . .:,, -'1"...7'
r .-.!,.-...,---...,--..,,-.4,-,-4. ...-....,1 1,,,,,,‘,-.: .. .......-„„„,1,,„..-.:1: 'J., ....- ,- 7'''-• ''''• •
1* '.....•= '•••••1 ;-$c•• ;-4-...*:'t it--•• -,,•.- •- :s.-- cti,....tr,t oft--...-,,./ .! •:•••4i34.,•••,-,:.•*•.-.-4-.;i-,-**--.....:...zt."- 'It.,-":'f• ' . ,'""'""A•.". - 1•• . -;-- ,••-•!--."• :;••'''''"-
4 .--'
4F-.7 ?-
1--
4 • r_:••,-.-- *.,• :c•••••••..-: J,- -''•,...'.•;:, '•` ••••;••••0• ,,•••• .-!•4.-' ' '• ' •2,,, ,t,' .-, I
7.1'777• • ---"'"'""--. -: •* ...-.3, .-1.........° ; • '.........4.-4.*•*..7 . 4.•••••„••••...,- t, L• ,...,-,t- 7 t.- •• .-•-,;••,'-1,4 ••'' :,..1.'...-'
7',..g".41,.:,t-....r.- . A%.,..#.•4,il:. ,t4.z-,.. _ ,,- . 4,4.....„,- ..__ .i ,.,-4,......:...
f.... ,,,. _
s ..- t-,-..2.:. . ......•••••4 --.,,7,-. --,tz.:L
4, • „...:„ .... ..-,.• -.,.. . ;
4.. . i. - ; .,.„„.--•i .•••• , .-7,2-6.--- I-: •,-,-...,--,,.-,..7 --7.4 7. - -;7"....C.•• --•• •, 7 • •1
w.•
4.••..1.,•••••• 44.1' •.••?..
4•..-• •i'4.-......1 •-' •••.1..•••'•. .. ••:-. - .I,-- --•••••. .,...,i-•,:• i • '•••••, . •...•4, ,,.._ •••• . ' :' •:70. ''.,7 ',‘•- • • 4,.... -et. - •••
1'-. , .!: • ....'‘.-••' '
4- ' . : '.. '1;7? ki,,...",cc-A-A- .
r-.7..."...- . •.',. ...•-":"•••-•• - 1. -•• . - $14. • .• , • -••v •••• ...-.••••••,...••••`..*"4„`.:::: -.'•.. •. ••'• :. .t....-'..;-•'.......i ...:-.•'•:•"..7.....
7..•'
3;::....•1:•-t• ....r....4 '' -
7'...., .*'..:•••'..
1.: ..' .....•-•'.4'-'''...1•'•''. •..... -I-'''' ••-:' '''• -• 7-.ft..•••••7 .' ;.'",..
4"%•• '-.- '.".I•••••"; -''1.. 1 711.'1-• '
14*•••- '1'..:•-•
i'i:......::"••;...'';•‘ ..:.1'..2.-"; .;'% V `••••NTt''..%.: ::1•47••••-•:30••%:t I
A...•
1•"•''':. ' • • •••••. '`""-1-- -s 1;"''-.., . ---•- 4 tr.-•--:-•-, 1 • f-',,":4-.,.•-:t- -• • t - • ' -.-i--- --'''' -0.-- 1.,,,zi-••-'-A-..,- • . 1....,:.....
i:-_,--4 •:'•••;- '.-• ''.4.'.'•* •'.g. t• ‘`'''*.Z-''• ..j...•.1..4 " '• • "••••;... • '' ""'-^....... :;^:. ...L-...-4...........Z.,..... 04.:-^-4-r..--4-;-;•-•;.....«..--;-"1"-•:::..t.-^-...".:-;.....".4.'"7*^:....1.^^;0.^:;:•••-•.':...,.:...,.....--,..^....r..-
1-:--4-.^:-..^-4;^...... ..---.+. :. . ' .-4 ''''''4.24......-............... .....;.......... r.).•'-;:-
1"... .-- ''
4-...
4..... 11';'‘ .
I, 4 •• ••••;• -..`..4•• . .• . . . ... •••....",;"•-...‘.•••• ...t'...•^V;i7.--.-'..'"*A...4'. .i,•;, ,...14.',...' `.-.. •. .4 . •- ,-.1...0 .....4.(.••I:-..'4. 4. -a, • ''') • ' . ..
4 I .14.. .-• ..). t 0 ' ' ,••',, " i ' .- • ' r '.* t•''. • .....r..... •:,• ;•. -.. _•/-- . .-.-L. , ',..L.c., •• ,..",..:•/...:.;-•'.-....•. ' •" '
4 1-..i .' '. • • 3'.•..:.
j.-'4:,',14'.i.
1••'•• t., . • I ''''••••-•..
i 7. • ;!.`""e.
1'`'''s3;" :•7 .:..i....--`''•'''7'''•t:;;•-'•' '7-' ''''•i - 4...• ' • "''''''''• ';•••••./"..••••-• 4.."r• - - ' - ... To. 7' t.....' ""1;:-...;‘•••••••• '.-"'i---'-. '''...Z.;%. ; 1-...•••. -.: I.,' '. •....- ....7.''' •":...
7.':.:r• •..•••;:•.".- ••. ' _..,.....•'.-. .7......... ..".: i.:7' ,%"-.`*;.17'.:. ''?........•',:•: • ,.. ft-!.•:,-1 "•',W77...• .
7 7,..,1 t •-•,_ ,;••,:*-'.. ...... : '..• - 17.-- ,...:.1•::::.:• ,'•-• :.',Z,t1;".; ...... ....,-t...': -• .... ; -..zt7• 'i - • -• ,,• --,• • '• •• ___,....-; r;-m-• •-7;•,-„ ••••--r_„,„'t•-•-• t -#. • .
4.--: • -
1• •*-•--,- i,---- --. -.---• •-••••-•4;" *",ts
t.....-... •....--. '' •-. • • 4".- --..
s.• , ' ....... 4. ..k; -.. . .• ', 4 - 4 '• - -.4." •."`."°` •. ,:-.1.. '-^'k,''',. •' .• • . :.• •7.''• ',"•.:' ' •:.. ... •".:•:.'t... '.- . ; ••'
4.• •' :,.....
r.'
1- • L...' 71,.. .7•!.•• ... T:-Ar Lr.1;,.„ ;i - •. • .: ..•••! '.`' r,. .. ...: •: . •• 7 ..
7`1- . U111111k„,j;I. T-4.0.•...S.,..•••....-..,.; •"..',Li"- -4.-
r'r 4'1'3-, v...... ...,• .•.... ..• 1 r):.: .: ..:..„ ---. .-- ,--,!--; : .,. t'-' 1. •••••., •:-
1....;...........,.....1.•••: e...,...2.:.......:........).................4.....,......-......--......4.......41.......................... 4 -1.. , z--.4 ' t.4 7 41.2, i..............+-...--...-...-- 1...................;...--- . .....
x.-...; . ... ..,. .
4' •• " - . '4 '''." •t*-e'x •-• P-' ' -- ri•• '''.1•Z:,'i.:-.:%.'''•••:.Ft•-.•••• -.•:7- .
1, ..•,,- '...7 '!'„...:.., -
t: :: ',.'. -.-:I '' :.• ,,.- . .: ::,..: ' ., 1......k.GEZ\ , .•', r,:-...: -•-•:•,. .•
1..*N..t•';'"' ' ....." . . '. ' '‘.
vl- .
j-•'.., •
4.--.-•--,-- --- -••••••--1.-;••••-•«--•••• •-•:4- . . .:•--------,-•-•,-,i4-••:- :, ,..:. ,,-; ,.., ,-.±77-t-' --- "----1---- -;;•-t-7 ,. ..:. -, ••. • . • 7er,Z .-"--/--- • ......: 7 ..c.,.--.'*-------- ----!- -
7---'---.77'77" :-..`'...-.- ...- ••.•-•'-----"
1.-- • 7-.. r. -.,i,.. •.-.. 'f'• •
Ak".. .:*:.';' - ... . • : -4 ---
4--- ...,..^:;... . ......;;_
44 r. 1...7.:11:: ...;,,-• - . .1'.• N
i...•---.4....--.:-....• . . .fr.-....-. ..... '' -- ' ' ..1.,....... •• •
4.:......416;;•• 1 . 4..; -,.. ..; . .1 s- ' .."7 . .!. ....,- 71',.. ...
7.:- '•.• . • - ; •: '.'-
I:. ' . . .
f7.'6 --E3J,tev Ff.'-'• r.,. -, , . 4:- •
I ....' .... . 1 L•14,--••••••i^••••-..;•••••,.:;----
4 • 1
4 - d ' '
4: .
f?"(
ss .Ail •••.' ... ...- ' : • .:_. ."!.......
N 1-: ...,1_, ' •• •
A 0 , . '* ••••••.45......; ____,-..-_i .:..•._-___„:•.L._.a.„,....z... .__..:..... . _.........' -;-____....-1._-..-a,....:a......-------...-------..-_. . ..,,D .D.i,s-tc_r_e.-Q.a_cl.____. . .. - 1
i . ....,-.. ' . ...- •---,N. '"'- ;...' 1 . •N... i ...-
s....
4'-••••,:- '.---• L - . ,
L.,.• ___.--- ,
pr••
y eicsr,f!:,(2._keTt Py-c". , i 4e, Ti sN, : • ....- , ....... (../ - mil di c, -/-,_r,ir-ILri • i
411. .....-ar,
4.....r ...m..............a...•,. .........
M........mo•••. )0....... s P. .
5r0a.--.4...--
su -....... . '' .....r1.... --.......,-,.......... 7'..-
7....•••••••••••••...........
ar .6a(..ic,•.o at V.-_,›-Pii .• i 1,...... - .. , t • t ,
1. .br.11(104-C.- -,• 0 -4. • •-
aamalas 13 -LcA...7:72,.)..2127Ace-4. . •
e„. - na-• .,!,-4-'-•,_-1•3!"-.. ,:_rii-. ... t., 4.1..---• ,......• ....._. ....•__•_.. .
i1 •
4,-;--- •"Vili./. 0
rid-c---tren-c-tr---- 4.---• - - -s. , ••• • •
t- - -.•.. -,...„... . ' 9 de._..
I
i
Al‘i
V/T-14 )7Le 76-761?-..--7,--,....:-•••--. i. .: , r*
fr--' .... ----
i - i
i
i . 1.0 do' ,4'..)619^; 7C
I I 1
i ;4 h;c•--, .,,...1!s•et‘.t'..-•.,A.•60. ' -;c; •• • •-:, '•
r..............__ •-• P- 1 C H 14 N 1\4 t.. L C.)-E0t-00Y 1 ..i t
s...,- /)
I
p _1. Chazbst t.4' .6..--0.z.loictla',...a ;... .1....-
t __.:___ ... ..-..__ Li .e. __,...... EAST Si r-....E GREEN R IF II F-' F
1.
1 . . . i• • 2REFT1 Fki•,iFf: F1_Cab ,....0/\.; t.: . • . 4AI -.- -- •0.4--2.,..t. ..:. -_-- IC 1
4,.....". 100:er.........._...,..... 1r ••••"-_, -, --• ---
1 c•-•;*--- .
r-
U. 8. DEPARTMENT OF A(..'TR. I('U.I4rF 1:RE
T i
i
I 44...........---.-.3.....!..Z..' . SOIL C'()NSERNTIVI‘I()I\ -). 1--.,11VIC.,___t--
chroi.ccee De,- , Ai.4-4••,v.• '. :•,•.,
1„.. 24..9 i. J.
1
4 E 8 i 9/Ts'? I2 ? . .I•t.4
I
i.. 1
I I•.-•tte
1 r I
ho.,ept r•/.11•i r•r. .
Chpai.td N a /
70e. 15?4,0 •1 - ',ADO 1
4 44....4.4.4,“••1.g,.. I• , • .44:1' X i f:,••:•••-rri CI-R./)i (kJ r.....r.,..../....!....•14:11c4V-A.014.
j'
S•
Sheet ..
to
65•
t , >
r
r
t,
Ot
4
j'
3
i
c
IR
4( -
i
1
41`
Y ,_'
ty, \ .
ar-
1,+•-
tr
L .
I1
L'""••.
A
y. {
ii -
t
k
Y
sy. '
st .,
a;
ili .
I
I '
in,.
4..
7.-
tt-
4, 04,-, . . .
p.
1
0 •
i :
y
r>, ..
r ,..
iWw ,. . A
tM,
iyi. .:
v
a
4
i
411-
11";
44
ASZI + : -
i •,' .
w
A,w
vt
1..
t.
L ~ ,
r. .
µs'..
r
aAVAZITIC
It",•, ' ;
4-, '
i,
i
y`
liailf4;
14 -
1,-,:----,,,-"...._.
z.: .•
st4e.
1
t -
flp .
IN
l'•
4
r.•
7••
t . .
ate
r' +
ri1._- ..
4
ter,
s^
Y
Y
do. ``
may
y
q% t.
ies
4.
1 - '. +..
44110
r
r(
R.
s•,
4.
4.,
i
t
1.
gal
wa
d
U
1 •
r.,
yam
01
V
t-
r_,
1,_ \
i•
2r
r`! • ,
i
k ...
i
ra :
C -
q
0
fr
ii
sio '
44.,
i
af
10".
6151:
70 .
IP:
WWII,,,,,,
44
i
0
e
IP
1'Itt • .
i•..•.
r. . •
y*
bt.
t01
y'
4 •. ' ,;`
a
i•,.
f• •
0,•.••;•,„
4'
k'
1 .. ! { ,
r
t
1
ail ' ';
Z
f
Alb"
fit
Itt-.
2.
014.-,.. ,
41--..
c,'" '
V
i
x"' `
j-
y1,,- •.#
f_
a
T'
t
T+
r. _
S. ' .,•-
rM.•
t
k `
t
W..:..
t
qp
i'
R'.
s !
r-
1
c
L `/
r .
j4y
xq
ai,
i•
rf
4
t
t
t
i-
f
litillit .
4-.. " -
7‘
414
4`
e- .: *
4100.
i:
1. "
4..
0: ,
1 . '
I
r''
4.
A.
i
i
n
if
3
j}
F
r
ea `
qy..
r.,... .
f
r
r -
i,,
x
k
t+
i•'•,
r, {
w%.
it
u (
li
i`
kw ''
rat
T.
k
f•
jjA
4 -
n.
4
r
a
ait • '
4'
4 },,'.
a
a
l
i ^
k;
t °
4.. • ^
tf
r '
BYO
4 •• •
t
T`• •
3y •
A
14
4.. - •
ti
t ,
A_+
Ir
f
r
Iv ` !! "
e +
y
r/ ..
ji
1. • ' „'
w„
i.
t
r!
sa:;.•
r.
a '. '. !
J {
t •
r`
r
I.
or...
lift{$'
Rd' .•
sY
S
i
i '
d`"`
qr !'"
sr
i
t,
i
J
h ;
rsa
4
Ili - .
11. .
4-
I .
le
4
y
1rF•
Mlrir
tot
t ••
a1A
s
t,
cf
iiji,
Alt
rr
M`.
t 11111111111111111111 1111111K-11111 . f IMa_ All i III I" AZIIIIIIIIIIICXIIIIIIIIIIIIIII ;4 F ......r4 i
vt,„ ••••1 , , . ...--,-.-' r `•,,, ' •
hel '
v4•1•114rAir''.4111 .':.---7'. • ''- -1.1MNOMP111111,1/41!'- OP---J 011 r......1... -•.--...--1 ,4 .
7,4.,..4"; 4--s it:: . _4t. ..-.1_,„., ..:t"..-":.•.., ; .. !• '- • . 1 ' —1-._-•x-,
I 1 7.. ..' , -.*
I,.•,:.•. -I •, '• .••,,- --: i .
t
1........--------......,... ..._.-........._-___-- a x • .
4.4:-e•.•...
r......7.-.- -..-............-..- ....:....--......--.. T . ,,:- . ... .
I . •'74---. . . - -.It.;:.*. •._ ..._ ._-• -7. ". ,4--. ..
1..) 1 i.• 1 • .-,. .. •- • i... ........ .. ... i t ....
V,„ i.:•:;. -:- 1. 4.. .; .. ... , _ . .
I
r--.....47.•-•--"-.. .I "-.."...-.---''..r.
it,ti. .: ...-._-..'.• • .
I Ir.
1 et . . 17"I st, dr, 4 a 11...lo•:3-....:,.i..- *".: -
1
I. . .
T] i.;-___;._„' ,......._ .-_-_-
1-_-_ 4- ; ....,., .i. 12......•-4. ....: . .0.11.0...
1... T-n 4c. ... i • .
2.; r".1 4 : •... 1P•ow.. • wee' 1114,,,
t, _,o......! 111111UMM ' -At '•F764.1PO.."..-"i‘.. 1 •
Z -Le4 -!.- --
t.•,*X
1.• -I 11....„.- : .
00.r. ew.....• ... '
s. ..-. ''
i '
d.'• •
I
6..--.......--,--......-- -----.---
y-,.......--..-.-.....-41:6---•;1014•"4."'^'••••••"---- '—-"*--""""; • ""--- !4-3V 2"4"-T- , s.
4
N:v..z..._ -...._ #
4:;--... 4
4.-./-_____,,.....\_......._f_......
CY oiN.. . ...
o. . . •
itlx7 r fled( • rex- pr.:4;
t t- - .. . .:.... ,,-nli ao P
i
1: .
I •...•.•••....•••.•••
d' 4111111111111111 I I 1 lir • •Ell IMMIEMIIIM t'.'''". , :-.. •;
e' .
M..1 Qi Ik a rI I.MT 1i • lira
11•11......*•-"""rin
4-— ...
1 .. ......-..... •2.5"itc3E,la..,...at gw.....,- , --.. ,.
1
J3 ...Air•.. .. 4,...
la- ..0i-...-
1.:.. "'".. t r.
1
algannIMMUMWM#431311111011111 .
A..liti
1
Ili MN • 0" . ' .' 1.4..1' ..-..
1 • I -
NI . k -",'.
4 ^ . ... 1"..44'-","4---• 4---
1.%. L i. -.i- . i-.. --.-..„-2..... -.,,:-....,-.--I- -
1,./.74L- --7-'T. T
3\ i• '..4..4) . ...'111111111 Vil Loi ; L-.
1- - - - --.-.. .• . ,.. . ;: --!,. '..:
air
r.. ..-4.----r--
4 . I • 1 e.37....).........1/4......„..,
i
1.-- d....',..........-4' , • .1.- '.. .-4::V.IT, ''' - - --------—------ - 4,— -I 2 7 ...1..,,,Y... •
1
0, • ..••-4,
i
t P.,""•
I t7.-:,,-*:-''.. .' .--77 7- " ----- 1
1 t
i 1 . r..: ': i
1 prarr.• 4
t1— f i "" • im.-4„.__
1
i P. 1
4
irszev•_..1=---.............- +----.-------.---.--T
e
4 II1i1
2)P••••
1.,
i -„,•--...
1
1 1 . . r . _ uz i
1
I
1
i::
i 1 2 . _ . _ _____________________...._._.,.._____,___ ______ .
1. 1 ..,... t4
t ; - — .. _ . . _ _._ . T riTe "St- +.0 ., r
1
4. R t
LC.... • co _ 14.4.._....___________
1 I t am..
t Z 1
tt
1 •••... 1
1._ .., c.. 1-,- If; .
4
ZS
II
I
Z i .
e-- 2,.......:....... - .. t..-.i...... ... -.......-.
1...... .....---•.........,..
ki 4. t.a....__. - ,--•'".------ 7-',
1..... -c1 r
N., 1 1 11
t i t..
11.4
I IINa. , 1,----4- - „, „, .- ----• ---,---..•J :12 —4-i''' •4449- sail 1
CA 1 C..ito 4
1 .....,hstiSt 0 0 660 t 00
I. i.s 64v 1141.11460 I•-•WV,MI lir•It.I •I+•0-..1,11,6•41,
fir, .•1 4. r t` 1 I. . . . . t;
is f-.. ; a • '1 1
4iir,_...,=_..:.I.:,E,EmmigmimTj•. a 1..•
at Sr.` i".. _
7°
7'6:V. z.. T •
L... 'I
g. '::___,1Y •x' ti =
7 F
i•. }-.•.., ••
lA •4-.
h..' .''-
w...
f•
rY 1 'T•f + •
L~, t' " r., ' .":fa v
7.F.ti ;`- :s`.' 7 ,
yam
J r. \ J:.:'' 44- 1- 6`. v .k'.+to ,•.rs!t'iy•^ r 4 C'..:` -7.^
E1, iC" t ,Y `/.{r?., ,t rr^ R I..=;. w;. t 1 b .+ -•.:._ ..'K
71-
r
I,:.:
w•:• a
L: y ••!. jig E i
if kr.
1;11111111514:r. ' •-
1!
1:
1 .4t -T
v f , se f ..1Z•'•S,.
r .*•'
a``,' ..". tRyt Si rXra•l~ '4"*".
z.„,,44, I '4ej;A.'il tia•r • {.. °'• - 4y' •.u: j ,I,:. J ,.; Z' - s lf .
t.'
a'.•i.> :YHt < s. • .t .. t. Y' M_I' '. .,
J '
M r. •
S Y'
I
W- T
to.
4.
a •. r. . C' t ' + +1 .+. N,, ,-..„ ,,, i ,..... '
e.
r ' aw i k; a
3i o' i11• J
r{ ' s
i • • 7 r' ti. ; • tir '• .• Vl M ,.
a^ A t,.44 '`',_ R,. i it f
If
7 'T
Y •_WW
a:a. ' t 0 • t.a. J4lk'q.+P4110- 7y1.•,a `",84.17 pr cr'
i 47.1411.S y v+
t.
4 iit,
Y.4.. r :' .' M'L='Y•: t
r> •
Zll:l y
f
j ns
4 7 ,
ati . T'r ',, ..
f
t:. _ _L`." ,6„. y t`( `:. + r t. e ;
A«y` y
4•
ts'ba
g '•4Y y• :
7 q
r+f 1 i y.
C, I Y 1,., ``4.`'a
a. • 7:. R t, '.
a s' i
ry
fjII,
41/4:144*., •.' ' S'S.4 a w - iv-. J -} * R ~ w
i . . +.. j.f i J. i. a weL .'.
w
f
1 x'e".. yl.y 7' _A. .. ~I
4.
t el: l
J
f'`• Kr •
f •. `
M »" fr .•!i1 , •
J•'
Y'' '.'
Y p
Ft • 0 4Z. 1. • 1' T }".'1' itiLi • . t yr r tiV j b, xi
tL. is.'
1.
i s• a: F, ;.i Y. i .
IF. (
i "i Q'- ,F.. ,i • .I.i - W.'$
49 f'
iv .y t
r,F
U •
q• ..77FFI ya
P•- a
i /
t j•• M -
h Tl ,. ,
a i.. s'r, q "'+. w t tf r i sh'f z i, " '"T' a rftf R +. yy,_ s+
i
je<:iv: r a • 1 x.a. ' jj.
y Q. •'•, y ;{.' iS f' `R r
j`:*< _f{+ r'.!. 4
A.1 1 ` i
t 11.
4
hf :Ak.•>ttA4+: --tfi(" no• • 'r ,l >fE+. 3'T"`"'"'. ttr i"`,
Qa.. ,: !{r'1 jam'i Imo.•* 3• '•+y;.iv a.' .r
116 0.' Ti i.
r .. i M 4. J' y j" `
to ': 3 .; _ • •r F`:-'+! P,FI;,p. .s tVF 3-+}'" Its. :'* r- .? •t f.. t - t ..• 4o. JF h.
r'
Y• s
is *
1.
t, '++Yw' •'„`,•,.,r'
y.`•"
M.•,,3,. -: •s, a•_;
n;•+f. B a.
a
T. j4 it.Wit, if t`.•F "'bY(J.s,,. 1cY ,+ ,.Wit,::i- 4 '2r, 15. t
t.r k sfi r.' 1 '. A
r''*
7 ir+.-F
t t - q.`
s C F! .r•• o •:•y t• III •2•.
yt
r+;.
j 1..' •`
r
y,
4
x
w
ham1Wr++v.` ° ..;. 4 ••/'a'L!
r
b.• 'S;tr w t. •1. 1 • TIP j.. raj;4.%'"
x,
01
j r' 2'4, "vt_ . •••S fat •,Y
4
P-'r ;:.'' ." ay v 1+.: O"{x• S .'ae't_
t..k• {< t- w St 64 ,.r., "Jlr as fi'. .`a. i..• •"tom"i,iv y r'
f M • .p s. L @.r 1.w , y,
ri-. 1 l•, 46y 5.. fir t 1• Ja - l' as l..f.a AS p'tatit •..,.
2' r 4. irrd 1, i 1 taswf
1
L
3 ate • :. r rL'-t
N i+'..s" gib• ,.:. r.:`f 4 7rfl. ` 1' > i F, '\•L r}r•`f F >y, K. J III
yam y l b
a,.Er e e KIf
t L,
wi.
t fi^ t •
r
7F'a 1.tAs
h.• e?+?t. '• t:
3".' !Iwsr,,. -r' '•
1
n
a f,
4 vca.. -
y. y
T'.' '.a .' • ul ..
7"-' ' ••';. ,' . ,;
a T:. i` L.,h..- a 7'- •.. wr`G .`'
d!
i!+{'+A.•.' Q y4 -•`
4tX• A, . _r.. :!.-x .
K .'iY Y ..
Sw
l.
t .
aarr••.•
1 •. • ',,.... .a4..r•
a#41'' rp 4'! ' x.; -du ..` .ems :a 3 rP rr= • !:
ir twa,r '
it s r ie_ • . t e! r H ,
y'„ i'"',ya
3 CIF
L,P i
WI I
1•'. '• . '
A r. h + •ay r. p: 1
N tit' e}
a t''i.
y+•Q,., ryy'' a..tif its
lliQrv ft• r'
i., i :w. • ?t s t a.e re•fs.,.if
vi
i i
Y
t
y, r,
r .,, ';
i
f• • .¢rf Y
aa•:
tt"
y
r?' '" i.lty
yT. Js ',f(y { 'S1'3< t t. e'•
t 4 ' 5':'3R {y-•1:• A1}.
y•'
e
ytf
t t1'! ( r- yk (•'T• T ,,. -i ,* i • r A a JIF. I l*' .
R'•
f
e':'lS
y. •w1t ;•1- j . r.
it,'.
a rs
iiv,
T, to
11• /+fit, ! , .cam 7'41 i. -
1, ..
a I ,:. A'
411.:
11.;': .
f r ''y •
i
d •r
t
x
t ,fit jiE{y
s •' ' + r t 4
t ':4 .. * S 46144i.'t•' Jy/. f.'
i:•, "_iFt ' ... • . 1 ; ':::
1‘ 1--:
j., iY gay,4,'r
w ,
Z•
7 fl,-_ oit„„+ + „..c. • ' • ~ .1.e. 00
ice.
3
i7 ,`
a•'
t +..#• r
t'!+!! .
1 ril'u.
1?
a. .y
i`t`'•
t J
ems R .'r a P i ''. . ``,.Y .
fir !'. c t. ,
r,.
rli aj iy
V• w•. r
i i t S f
r
pif}'•• '
g /7. ..a.x, . • +: r4 r
4 14-.:••
ir.4:1."-.•-:.. ..'L., •..,',*•,.... . ' ....
1'' .,. .41."‘". "' .
Lolt-4.1L
0 .......,, 1%
b, ,
4, •
t, 0441•04104 "
4.46:41;44-..- ,
ir ,. - •
Illt.4•.,..414•. i
tt
Y
Y
r
f
f .V .
a.`s'
iy, i V •
h
f c.i,'•'•
1 4 vim` •
w 7 .v v
1>V• lx:,t...:•A ,+
r+ 71 ti}y. ,•At, 1' '
S d. • . t..-tf i.X`i
1 ' _'+'
v-
a... t. '
r.' -.'fM _ ••y
1 • ..r.-.iryt • {VM.: 4;,•..,. r. :.
f ..d .. t •, .
a ., •:_ rF_. r•• .1-4 S
4-
4. ' • si. 1'^. _
r - i.
t _ r.w r.
7 CImit. ,j . 1Ly'a' a' tj i
1. • •::1i .._ _t t!
i r w
5^t • !C. '•-
1 - 1' 1 •'3Y .. a.. C r.. ; .. ram' 40 O
r- i a•.'Ar»- t•. .. L T -
y am-:
a
t a
4 + • r. -• r-- i. • ti
r j •, .i
t ..
r
ST 17f. y
T.
1"' T^•
2-
v .: , ...
r . t r- 7 t 7
LZisaL..: .4LeiSI4L a ant2L.L:_._5.: Q. 4?.
le
w------ r-+•• ems-
1r1... :_.._..._. .... ._.-' -.._._ . .„ .__.._. . ..._..._ _ ..__.-__—_ _
r....-- r
1 T '\
lI
ter.•a. —_.. _...__._..._. 5— __ .._._1. ..___
T—
i -- '_— , -F'P•ELIMANAFV DESI6N
0 i 1 _G"r r d f! ? J,` "_ c , ,•• -` •/ 1 j :f.
c C t{
11. S. DEPARTMENT OF AC RICULT ;RE
SOIL CON SERti I'ION• rSERVICE
j.f r,._-.
l i'^'
rt_-ri-T- ---TI
t•¢neQ
L t
i'°^ AiVC'i w 1 •y
I Title
Jr `• '~ J.-
T.-._.._.6.-+-.._I.,. ._— •1..;
if,I., {J
t
t 1
t
is
t---7---*r— - . . 14 i--._.__. 11 Tru*d i',tle
t------•+..7•.`• --•.._.. J.--..«..--•«-''---_.. 'f- t
7 f'I• -AL• ;--+»---y'-:-;-+•;---^•--.} .. .. . _.M
Stter! 7•dw , N•?
t
r.:
tr ? i f ' • Chiclea
Z
1 i
r'1
i..lobSt 00 660 t 00 6fS'*00 zSpt a0- J:.?
u•.<• .. a-M.ar 1.
w Z.f. Cn... C/`C 71T'•.1:,. _-,.. _ n:•f it, ,
3y ate r 4 rr`1 r +, 2 g+1j y #r Kf >i st r t^t ttM tier ,} ..
r r .;.' t
t`l`, 54r1P if
t 4
S ,. A is j rr,X. y, tV .cT}
f y
r„ R}3, ~
t 'Pe 'if il? 1" h
f
r
i tof:'.b. fE i, + 'vit fx w*Y {
411"4 n #• t
4e5
t. ...v'
p".•g.-;y ` .
r.
7't,4
Interstate Route^ 90
Mt. Baker Ridge Tunnel Bore
Seattle, Washington
DESIGN SUM - ARY REPORT
for
Washington State Department
Of Transportation
Howard Needles Tammen & Bergendoff
Shannon. & Wilson, Inc.
April 19 8
nrlry^.a.....r.....r=.:.S«..wi..ukr-w.1....:r^n.,,.s..e...,. .._.._,4_...... ._.i.__.__......._. czd...:..;_....c..:._
t.._I- -405
E`C/
11' St.CTION s
FOR THIS ( to
E
J
RI PORT1 3 BE. E VUE.
I— nu 1— 901
is
Nt I- 5 J EASTGATE
w
U
W. SEATTLE NN
AREA MAP
N N N J N
Li
o m LAKE
o d
a_ .1 81
o > WASH-
W
in "'
t- N >
Z ING TON
Q =en Y d
Y
O J_
ligi:.!!!":.:-. ril*:.:*:il.t.::::-
F (.._ PROPOSED TUNNEL
S
1IAREA I I I 1 1
VICINITY MAP
r
PROPOSED
MT.RAKER RIDGE TUNNEL
AREA& VICINITY MAPS
JUNE 1Y51 W.3577.17
SHANNON • WILSON.INC.
Oooto.Antaol Con.ulbnu
FIG. 1
SECTION A-A' SECTION B-B'SECTION C-C'
B_•
4
1 :_ am, _ I .
l k r ( 11 . R
t _ ._• •)
fit: Term .. IRVINGn .§T.' : ••. itii!i'.n r
A `. 1}_
I
r
J;
f
6
J •1 • vi f. - . c fi r N` n1Ula1s1is:,pia41111111111/011 v., : I` IRVING, •SST. _i
1 f
t I'll 1.'`'•,
G° j; ..!! ,. 3 R; 1•" Q_I .,` , i
I 9Q' I.Ti
ill i-. II .
1 .1 m,ql a i 1 uPN1t n i,.
1'
WEST-ACCESSSS .Y I•• `- 114 , W P.: :1
Q ` j1 t
PIT
1 - 1} i. . , `-.IIx H ria. )3
0- I E •i
Tf1. 1 Ir , ` a I i t 4,.•
kir"
NN
C a A.
cCillig t
MII: nl "' r
e!.. 1LT7 'yl'i
s 4s ` ! I 1 (ttA f;
iM6F '
MAWS:.T>`-:,
1
to ti o Y' 7 '''-,t 1 i`a
1 '
9
7
o a0+
1.:.M e. Mph
f • :.;: .. 1 `i gl:•;<.:. a.';Td:'r`'0d'• 1° m j:,9
a li(' I rl uriu uuuulYl a n,, ,..,- Ilriii:.- , ' :.rrr t.
iW: 1'
B- - - 1',
r' WI.-.' I.•
y
10
Il r1Ar!2 rTprimiltIIITine >4•11
ll
4 '
k
w.. \
L.
S
ii Tr' / 1 4'1
l
i4i, uH11'I(
uAw
i ' '111iY i.oi `::u . ... ..( '-:j`:: ul uY..S ij•i I i iYjll u 1 1,y, yyy y1'
i :.•`,.
I
1(iii 'r/1 -.. -
I
rIj
e rsle
1 I._.. WI/1/ 1 ISMl,ll H sum n!. !AI, 1 !.,•.., u. 'up. NpM"• !II •1,,, 1 'MTT T1R lar:7 oaedfex. :f11,T1DTTI !!s,`
1" .
1•
1)
1 15 'I
7' s it9 ffi :;i< I <. Tu. B& x a ):::: :.:z'
E 0 , 'th 9d11 BP1i .d&yyyJJJ 2
1 ...O.'.... a Tiiii .ii iii p u UI Yii?i l I iiirir '_
Imouii
iii ' 1' Ifll 1 Q! • 111111# 'r.0 i
I .. ills ra:.., . !I I ,`
l•
ti
I I &\ i'R;' ; if a1: .
Mi j )
r
EXI N'LS FdJjI ,' '' i //! i ejMl1,• ! 1 3, jI .'.!I'•'
ii 1 Ts 1
le l 1 .; p 11 . 1
r
ec7r• I i
Lso.,„L .
T-16 LEGEND NOTES
WASHINGTON STATE DEPARTMENT OF HIGHWAYS BORINGSB-2 DRILLED CIRCA 1936 1. Basic plan provided by Washington II-
D-70 SHANNON & WILSON, INC. BORINGS DRILLED 1965 State Department of Highways,
t ic WASHINGTON STATE DEPARTMENT OF HIGHWAYS BORINGS February, ;.9ti9.
PROPOSED
C- 10
dr
DRILLED 1971 2. Boring locations provided by MT.BAKER RIDGE TUNNEL
T
SHANNON & WILSON, INC. BORINGS DRILLED 1971 Washington State Department of 0 tOO 342Q0 0
SHANNCN & WILSON, INC. TEST SHAFTS DRILLED 1971 • Highways. BORING LOCATION PLAN
E
3. Lug, ui ourIngs are round in JGAL1 IN FEET JUNE 1881 11.U73.17
If1-I
SHANNON & WILSON, INC. BORINGS DRILLED 1973
Appendix B. 31tatNNON& so1l
Is>.I.w...
v SHANNON & WILSON, INC. BORINGS DRILLED 1980
FIG.3
Yakima Ave. S. 30th Ave. S. 31st Ave. S.32nd Avc. S. 33rd Ave. S. Lake Washington Blvd. S 35th Ave. S. Roadway
Waterbearing SAND Recessional outwash SAND Lakeside Ave. S.
Advance outwash Waterbearing near base
1, 14. EAST
WEST Estimated Profile I I Q.
of 1940 Slide t- I i I 300
3 _
ei
200 Vashon Glacial TILL-'
1+., -: . i 200 0
cZ
T _ _ _ _ _ r—
Lacustrine Deposits
I.
1_—I— PIVPCSED TUNNEL overridden by Vashon IcePROPOSED TUNNEL I
w
i 100- L_ — —L _r•->*• . fi- fir•1r- •;T,.. .•: .
1
1 1 00 I
r sr`;• . . '7—r Trs•'sif;'t7i.74:•- t. 1 Lake. •• . i'1
Sal •••j.• Washington
Older Glacial drift (Possible Salmon Springs)
LEGEND
NOTES:
0 100 200 300 400 Reces..ior.al SAND
1) ThE STRATICRAPHIC INFORMATION SHOWN ON ThIS SHEET IS BASED i aiGlacial TILL
ON OUR INTERPRETATION OF THE INFORMATION FROil THE LOGS OF
SCALE IN FEET 0 Vashon Lacustrine Deposits
BORINGS AND TEST SHAFTS. THE ACTUAL STRATIGRAPHIC CONTACTS Older Glacial Drift
EHOWN HERE ON MAY BE GRADATIONAL IN NATURE AND MAY VARY
ss- BETWEEN BORINGS AND TEST SHAFTS.
2) THE INFORMATION ON THIS SHEET IS INTENDED TO PRCVIDE
ay GENERAL GEOLOGIC INFORMATION ONLY. . SEE FICS. 6 THROUGH
ts- 9 AND APPENDIX B FOR MORE. DETAILED SUBSURFACE INFORMATION.
PROPOSED
MT. BAKER RIDGE TUNNEL
ft
GENERALIZED GEOLOGIC PROFILE
ALONG PROPOSED TUNNEL ALIGNMENT
Vi
1, LOOKING NORTH)
MAY 1981 W-3573-17
SHANNON & WILSON
6EOfCNNICAL CONSULTANTS
FIG. 4
SECTION A-A' SECTION B-B' SECTION C-C'
EAST
EST
E f
300
Q y Loose to medium dense brown, silty, fine
II BORING it SAND 'reeling to SILT with gravel and •f I
BORING C-102 C-10] organics coilh
BORING TH-iBORINGTH-24w Tye?NO.1 T r 42 or -T 52 g 7
y TS FT.301
T'A•
Medium to very dens!,gravelly, BORING ! lie
TEST SHAFT 44 Sl/6"
C-10{ VI
TS-2 127. 83 brown to gray,SAND 52/6" 10FT.N0)<I c
c I
S7 grading co SILT with cobbles and 53/6, o 0I .
ACCESS
MP?S0) 123-
a
EASTi
BORING E-I 7— oulder r,
PIS 60FT.N0.1 lltl- T 67l6'- 237/6"
BORING t 0 T
AB 99- 7-`--_--_44 48 19- ^
TEST SHAFT.•
ACCESS PIT
Very se_iff co hard, ra TS-i ROO
Y - s -45 - Y g y.7__31 4 _ _________ . -_ SSC-'100 29-___ BORING
a`c?____ _ _ __•34llaminated, silckenslded SILT t--2• t_2l. T_ SOFT.NO)3I
at iff, or•nm. '•11'T, SAND BORING E-2.
8-v57/61-_______
f--_
28 ___.
50 and CLAY - ---=y—Very stiff [o hard,, gTIY, lyssla•F 1
17-----T
BORING OF222618tC-105 (20 FT.S0)
with 443 SSFT.Na) T 0-. 4]+-•---- 18- 7- —
1 silckensided CLAY•wich scattered y
PROPOSED TL•NNEI. BORING r.orsa'
BORING tr 31
22 27 cobbles gavel a osaibl boulder 22- T ?
7
S 15- c-106 rt
47 \\\\\\\\\\\ \\\ \\\\\\\\J2
17 BORING.4i ISO
62FT.SO f 43 7 --"I--4U
76.-
21
20- 28 64/6'- L[ E-I{
24- 26 30 r 2 S- 41- 2} 7 16 Ai
Jl__ __ --
27 32'F
U 36—_
7 -=j 30 __'_.
JU +j 29 2: __Y
7-
rY—
woo
33 7
20
26
Tom.
39 ? 19
iT.30.1 s
26 r Very stiff [o hard, gray, laminated SILT: ice?
2 -__-_ 4
79 JU .and CLAY with some dickens}des and = - 26`^
s.
1 5 7-_ t.
2L .
s J2 .' Os70r 29
ravel
29
T
62
2. 0.078„ 3
J3 48"'--
3] 39 - 9 49
6l
4 21
T
J4 100c gs
4
25
T.
42
6l=___• tr- 41 •
30 60/4' ?___, T_ SS/6' _—? T
56 77 6B- `
5O _ .-40
2s R
53 18l J4 `\\\\ \\\\ \\\\\\\\\\\ 60/4,5' \\\\\ \\\\\\ \\\\\\ \\<
C- '.\\\
62/6" -• Hard brown and ra SILT SAND and CLAY•-
6B 44 i2B•`_.-, ____ T..-_.•3
SSt. 75 50/4 75/6" 48--71 _ _ Hard. Bray. undY lSU/7't 6/6'. 9 _•_._•_497lY' 188J_' _._..__ ace.??^;e•M54/6'15.10n,:::1/:i:•:::.::.-: .... 1.::.: i ' ••.. 57 - l 77l9+ or clayey SILT 237/11U 52/
rd 10'- 142/11 T66tiT 7-r.-. mSu • 1} r.+tT-rCr $, }.147- •..
54/6" •:113/9' .':+C:?,•
7.+,i•r-7rt 97 SO
9U F•.+...:..'..:.:.• b8/6= PRO TUNNEL
d SANDtll
POSED
ISS/9!r 101/9' •.:'+: " :::188': ::
Very dense, Drown Coto gray, silty, fine
1J0/10 :t;t
r. 4tl•ylrYdense rgrlY. it lty-to clean,.floe SAND., 115/9,
PROFILE ALONG c OF PROPOSED TUNNEL
sores
0 50 100 150 200TheBTUTIC*ATMu
IOS O
TIOR
IFOI ON THIS DIEET IS SARCD
LEGENDOSOURINTERPRETATIONOrTHEkircaNATteeIRONT1mLOGSOR y
BORINGS AND TEST BEAM. TES ACTUAL ITRATIGRAPNIC CONTACTS PROPOSED06BEAM.
SNOWS HEREON NAT AZ GRADATIONAL IN NATURE AND NAT VAST BLOW COUNT PER FOOT 17 7 SCALE IN FEET SIT.BAKER RIDGE TUNNEL
BETOEIN ESBORINGSANDTT SRAM. FOR 140 LB.;HAMMER
75
Q MEASURED LONGITUDINAL SUBSURFACE PROFILE
DROPPED 30 IN.WATER LEVEL APPROXIMATE CONTACT
IN GENERAL,THE YAM LEVELS NOTED OR UTTNlSDI YER TO 27 QUERIED WHERE EXTRAPOLATED ALONG QL OF PROPOSED TUNNEL
READINGS AND OUTSTATIONS DURING AND SNORTLT ArrED DRILLING OR NOT OBSERVED IN BORING. JUNI 1901 1.4477.17
D ARE IMISTEDNEIMMOTO BL AT oA AR SEASONAL 5AK1wns. ACTUAL CONTACTS MAY BEWILSON INCANDMISTEDTO
GRADATIONAL IN NATURE.
1 ...
FIGS J
Ygigg
1•
r
S
l,hr 7•
F
pf' •3iy 4
T C '
t
ti•..<M4i t< >• i.`Y•-•tom
WE
nc.o at• 1•o••tort wT•1 i.c t,.•• -- T -
T- ..
loll o.•. -
ge n•1.0.••f rtr *ow R7'[ r•u• s[KMG1••.•s1 c r.w.•e •Crc•••T•O•• T[s•
1
i i 7LL D[!C•i•
9OL pgCA•TOf
Ob,nvrol;l•O•••q1•r•)00••aJ ' MNT[M •• i•
st. Elev. 171 ft X to •o co IC ro •o •a 5 a st.Elegy. 161 ft, o
I 1 I • i S. Ie. t'c,1. •
r
yy \ S •7 •C.i_? '
1 5.011•re•••aJL
f• •I
s•OL.
i
r •
1 a I I
Li:: T
arm t0 r. Cryey 5..1 w i i . . . —t-
3a.
I if I
I r:r.... s .t o 51 r 1 I i
i- i
O••-is I 1
0
1I 1 i • wiO : of
I.
a Io1I1III
i •I
Z !- 1 I I Z tI1t....., of I— I
s•.rt yey a•
1
s..ry C.•v•/ • I
1
1 •e` •••
SI i
sr
ff.• 1 1 r•1
of I 1 f••.9••Y Yo I f-•'-__.
as
iii
I I • C•• s•ny C,.AY fo1 l t —"--'
o p • 111 rill....s:•
dV•I •
r •
1 o•.• •as •j t\ i
u 1• 11.
1
Ottt.1I A i--
l6Jl°p s-
b1 1
n I i
Il•,
it.I
I I
Sotto••e•e••••••s ej
i
x
r tSAC 11
51° t 4$S _•.•. --_
I
f0 1 I tt,,••o••e•e••..q
I
ao
1 1
100
I
I
i —
i—
I i
1 0' j •f
120 i
I
I I 1 I I I)oi 1 l
ISO
LEGCNC
CGCNO
coot•lee• ••••• 0 Vsca••e••O CO^/es•••••ff• O pce•te •.'et .'.t•s•IS
I...at :e•••••t
toot
C) : [•_0 • ..mono ssw•fy y.
Rfr.r.
OP./fM.••ffr • V.
Sq.0 ••/•
N•
t.0_tot C tt-fc••Eo•d' •If1
e• COecraes.1.• tee*
t•.••.O COw••If.tM•if t•I _. S•v.• .°
a t
G.•
I t., S' •••
eqy r^•f r Se^t••• yt•••e - 4 ' •
te.•so'ff•N.+r•-Si
S Se••••• W•,•N
7-N_ ..'•
Cv•se•force•
C•
f••.w•
t
fit_ loll- .•
I e.•vr.• ..•toot
CD 1.!.•-•• h.•.•••CO^coo is•On ft s•t.••or •e •c-<N rT•Ii K4•c '.S•
W • 1••+•M w•• rfeP••r 0•/•••••I•I••I••
1 •.•r•- •1 •_•N.
0••
Vora•.f•a t.•w•l.! e•• e•"•
t n •e.•1
Do- s 1•• _,:.•-II:
ec **
eft....• v•:
ct u'
t1-u..A:Y C' F END AND LABORAT,^,RN _ BORING B-1 t••-..-• e
j,;•M4RV or :IE:D AND IASORATCa' DATA BORING D-1
T, D OAT• L•D0.•T 01•T DATA LD DATA La.•OR•TOR• D•T•re i
r
i• 4" T.wO••0 p(r.(TG•T.P. TEAT
G 0•i Ta.rpaRO OVAL TR•T1OM TEST ..
R•(aR (T t(.•[Tn-.ai—
y:
NA. o(XRiDT.oN t Dr•..vroo,:.•c.won. etc*/ MKR pwT(w1,V.
v• S. D[lC R,DT.ON Q 2 i.
i Al
br•IIOM(MO•w9hr.7C..•>tl vTSR OD..T[rcT V.
ji .Est. E.ev. 151 f 3 Sp rac: F. r^ •r GQ 3dEet. Elev. 127. Ls s :o •o GO - p rc 9 .
e
I
j'
Den•a.•.e..•
i
Ir
an .py T
I i p. y.yya...y:.•vI
i
T r/.w.w i- • p (h---
r o9a . I
a••••....•e I 'EP (
1_____2I
Z
2a 1 ,
y
i
r
I
wnI
I 4- _
c
1rt D I / i a 1t '1. w
I ]I '1 • !
St..r1ti r
JI
a I D•,Tr re
1
w •
e.d.wa,ry t Ii • I r•.3••y a.1y ! iip i 1 CL•v ra.n
51D r I
T!
po .. a I I I •I
N
1IIIee.,.>••e•a I •
40 t 40 I
I 1
si I t i Sr lk
1 mr-- i
1 T I 7^AA s D !
ao i 1 I Xi iIIi) I
11lew•e GI
I mi. rib,"'jay D1lT
5. 1
o`7 • "i 1 1 p I
i
t
tea'.r3 y T I I I i. • I T I I I '
0—°Q.+
y.y SILT I I
a.N pa•11.rsa
T 2 D M--'t" I 1 'e i
TO
D. . D...y
v
D.r••••a•••.wy
7
1 I i
yy DDt 1i
I
I
I of 1 z I
i
I
I
a 00110011
i I I
pIjD1101
I
r
1,4 1 1
T lCGINQ CG[NO
0 i I 00 •b•••••••, ••.••• 0 L.••••••.••W ew.y.•mane•••r a ...cc-as tares e.e.n•0 i S"eD .•r.l y.•r ..•• 0 7w4I4rw4.4 o•.y.rw•n•..• o v sow Do;•OorH .eR••••r••
I •,•CO 51.10y •.q4 C C•...o•m,b.. ••••
Pr•.a c..p.u..on••a• ea.• ce.rea.•n T•srroD5••1.y rw•14 c C.•weor•., 1n,
r-•. M^.•r; -.Ce••ae••ee.•...••e.ewwae a Dewy p•• nw. y• eer ...••N
7•,-
1TJ -.. -....... . .
o u. .•. o-•....o
a
r.......
r..e• • ,->•.a>,o•...,
1 ,•.s.•b
r.
w. .•..,T`
v,.el.o tt•..rMcr....n•.[.n JG[ 7........0r[L 5r . w oc ' :aM.. o-. r..
o•c ra. • ce v.
a ••. f l ov .rr [J nnO r•AO4arO4v Oe7a BOcrirIG D-7 t ..d-
o
r•d.frM
i i'00 a/Irl spas. ...yy)+'sy rwp•
an,••
PO
C CsT•e.eet'w• toot
Aw••4.9 ...Hr.
rwco.
ya.
u.•s wa .nw
a.e•.p•••s.ow rear
Cens•t-••1•e•• •e•.N
Yl••••• ••a•
r•.••.•,t•T•••ar•w Hits.
t•-o0 S isy wwpy
O ••+ew.r.•.w ppw/,eu••••t••r
C C•••••••oh•w swt
o vc on so taoe•
tr,••n•er•e a.
n1• YM •
n•,••
iwasiumumulommoroweimayamomineumumimmemmismommimimimimarnmenimmomm:0041or.... 1 y•
I(L0 DATA IADORATDRT DAT• Qr q
L0 DATA l••OSAYOSV DATA
SMEAR STRCNGT.7-5-r - f
I
1TANDAOO DC NC THAT Joel TEST .,fwCAi fT OC NGT N,r)r
1 fi NOARD PENETRATION T(!T F 2
O
r !pl OESCRIDTION
I p z 1-'-" G'
t.t SDR. OISCMDT,ON ¢¢ :I ete.vrw,0404 wegwr•30.6.0 F
p
vAT[a CONTENT, TA v A'o..lreo•(•on wager,IO'.lopl .+ f—.+i[i Co.lt[NT, x
a Lst, Elev, 262 ft,i 0'9 20 40 cq p 29 40 co 3„ Est. Elev. 264 ft A on ...ec /C_= D C 6e,14
I 2..
i
I
C•Tr
P.01t...o
03
M•••w M^Sf 1 t Mee•'.'w ee^S•e I
O
r •• •,/I..• S••0 1 D D SAND.4/9.ev•1 t
Sri•
20
14_
I 2 •
IID e1_. 50
I 9. 2D• I57'2l l
Pr' 42p
27
or"---.-?
5r.11 •e•••ys•.•r 40
inIPI w
Vey c.oyey I
21.
3.
41p40,0.
HI.
25
Sllt ^,.•n.w
I
24. 0 t/RAG
S•IT ••••e•9f r II,e 2r+ f
n 11 S2.1..'o/zGkf •
so'
p 1 Pick.
p,9.oyuoyey 2s p. t,; r I
50 I mt. S.L1 a.rw.n 29.->'
1,,. 1 __.
4/' •
76• 32, i
y II
Tj es. IIc
I
66'
le
TQ°
to
I I
TI,•p
l
I,"4t 1/39/6J j '—.
e I 1
2-
I
riD I I •
6" 43.
eo 1 l.eo L
9
9I
45.
I
1
1 • I 9 I
50 il50r7 l F•.
l S•
oI 4.
Q •••
It fin S!. I I
Cw 40EPC.A. r •w.w,
00 O,.I!••
S
p00
s.., p•.•.w9s i
Il
CH MHO,yeti a..,y x
N. A r p•.1,n9•
ae
r
ts10 N.
I o p0/ 1 •
0
N K I • .
i:
o
Z.
S.
IIP
col
II II1 50
I- Gi
IM fsT y
f
I D e • 61 u 7r. It I
i :•o k CCII o o t
e, 10 rT °
o '5I k Te,
W 1]
6,...
i 151P
1
I •
7• z e,
62
e]`
Aa 1D
c0 4 /
9'•
y160 T . 13ITIe,_
T.G7
TTyp- I r
9 T.Ito II
r
1.1 N_
7 e. S,,If,e
r
T 1lk: 195r-^ ML we.a.gr W,l Corley •e.1:Le0'• I a51
I t 1
c. 14lI snr6.3.4.1 t.o.i1l/ 151
MsN
I
a,.r ierT^n9a 9S
I Lt S.[w.w r eC e.yra.el 0°1
c
I
s.rr p•.r,wg • o: p
i I OPY re--
j I r,,D-- -- - ---Dore w Of De.,w9 I
l/)o/fir
Oe r h•w•r so••w9
L._ ..
EGENO LEGEND
1 t 0D sod spas. s••••••e U Uwc. .n•A co•peteswn leer o Us t eared.•..Pa•^•e I 2 00 •pl.r spoon serwpl•C U^[o.l.ns• co...res.. .•es• A u- ••• •I•-1 ,•a• ,r.•o
TI zi O.% ]w•t Y s•wp,• C Ce••w•4o••ow rear
r..•••a.ten•pr.aa,ow,•ar I ?:00 Ss•Isy sawpl. C Co.so'oo••on rs•,
a•' -• •s
0 • ]•w•••• pew•• An•••er9 Iowa/ A Cowsol.eo,ee+s5.5-see P ]o.npl•r psne• Arte•ee.9 1..s.rs 51 on•.•a 4^1,T ^•7
Y• I.'oY.O t•^•.1 r•.••••I Ce.np•665.06 r e aT 54Tpl• not .eCWereel T-'l''O t.^.,1 r t• a. C-^7•e aS-I^•e
W He r•[e.e•fe N•1•ryl•.•r.,cs•lenr Nor,,.e.eau•cpnr•n,
W•• •e.e• h•,IK If•w.1 MT. SANCl SIDGC TUNNELS WA'.' 'eve.015114 h•n0 10 I NA•I U 4 .;k I Jh•.0.'l
r Dec.ID,9GS .-GS •2r Der S. i.•'• •• .• e
Cp SUMMARY OF FIELD AND LABORATORY DATA BORING B-4 sw•wwn• y1> SUMMARY OF FIELD AND LABORATORY DATA BORING 1-5 sn•••••••
a C
11(LD DATA LABORATORY DATA
I
Q
I.ElO DATA IAeOR At Oa DATA
y tTTT SMEAR STRENGTH,17f c !TA«DA40 PENETRATION TEST
SHEAR !'K.t`,r 71_- -
STANDARD PENST
rt1A1,/
TEST n
y 90f1 OESCAIPT10N p 2 t. r SOIL DClCR1DT10N 1-
Wove/fool(,•0.e.marl,30•uoN • h 4.
1•VVIOOI(IeOM r,•.9rl,beropl u yyATER CONTENT, A J G 1.A1(• COr•TC wI •A
i -Est. Elev. 206 ft a o Zo o co f" I) 20 0 6q g„ Est. Elev. 262 f a o,0r0 40 cD i0 i0 c j
1'AIM ,.oe-Se II I p
I I I'l
CL 9re..... CLAY I
TILL)
10'
II D10 0!
I I It 2I 1
3.,fI t..e.y i/
1,em....1p tense T I
NL st.1f c.e,,e,tIIp 0 • 1---I 2EP
S1L I ..... M ._ / _-__L SM ere..n,,,,y r.n. tOl
MN SAND..lame••IBO
s..r pett,w9s
iI
I
31P I I.I 31P
30'I 50;
Z e 1
I
I
IP 3e' 51
45 0
I Sr.ff to
SI I re•e,gr•1 cleymy eyP I 1
1 NN
SILO.,ifw.n
11 perI.n97 I I--I
w..•.9•9 90 II ao' sol
eN .,
r,y CLAN,..1
eI eI Ito.%st11 portols
CyP I--•
T:.
GIID
1
I• I u
so
ITI.. TIri \ I
7 I P TIID t 1
62— .
sI e I
i
i
IT
eiP .. I I1I 8kP I I
1 --
1 i o
1
o sI MI I l/ I • j Si 1
l
t. • 1
A i
I 60,
W SIP i r I 9EP I I I
HI.
et.lf t.
F 10I 10I k I
ttm•r•,9roy c leveeJ. S.LT ...tr.,.
s.11 pert.wee I 10I P 1 I 31Il to 6•
ro.0.9••y 0..19 .
0:PP
CLAY w.'Ir,n
III IIIS.,per1,n9e II:
l
uIP I I I jP
91
NJ11
uD 1 I ID^ I
w.1 12I 1 2 I y, I •
2I P
1
I 12 II P
r
1•
62,
An •w910 vets of IEO 120 I
SM mows•s.l1y f•n•
IjI ISANO(wm••
1! I f
ML
U•y•y SILT
uo j I 13 1.4 QQ
t
LEGEND P I I
130'_
4erro.w et De..n9 N II{SD I
I 1e I I I
I ( 00 sol.f spoon lamp..0 UnconOn•• comp.os•wn foot 0 uncoNsol.amee unar0.ne0 tu14 I
COO SA•194 Nwpl• C Con•Wdo1.M 1••1 tnet,nl COInDr•77,en Te71 Oa Is IID
L.
P S•mf+f•r WIrN An•,pt,q I.mtl• Consel,•m••000rs,se• 140 f i - -'
S• $s MI r•ctMr•O V ,towed limit t..•e.al comprels.0n test i 1SI E1/•I,•• •rolef(P11M1
P. Woter lever M••IK Imul MT.bAHCA RIDGE TUNNELS z
SUMMARY OF FIELD AND LABORATORY DATA BORING B-6
Oea.D 9M6 S
a yI -
c9•e21 F eIID l 1 L '=
I ,o iIcj
1
1cIID I • 1 I
1 .60 1--
pALIT
i
A
O"
ITIP 1 -
lOt 170
SI 1
SI.MI to rota
ML 9royutyt9 Isl°
e SILO.q/n,n
160
I/pat l,'Is 10I
SO'ISIIP h—
190—
bettor.of Der,n9
LEGEND
I 2 OD spilt spoor sem91•0 Unconl,n•e cotwpres•wn te•r • C•-•.-f.'.• o-.•e .••
I zj'oD 7ne,sy s•.np1• C Consoleor.on noel
v e,o. c.-.•.+s•e-'••.
U/
P Semple, pinr•n An.'10./•9 1.m,11
Se.rpl. not 'eco.ere0
r—lawn 1.11
t•ntu.nl ta01•r(tiMt
q watt It••I h•p10 bmd MT DAwCA e D..0 •,+•+E.S
Doc ,v. e65 . cs •.,
A SUMMARY OF FIELD AND LABORATORY DATA BORING B-25 %N.-- •
tlitAitift.64V
eg4...n i. I4t+ wtia rYG' r.
n4D D.,• I u•a.•r an p.r•ra%D_D•.. _.
illRMD••D Ktt[T••TtOr• T[!1 I f.[• l7KMft w,.aT— aT- t•rm•aD •a Mc•.•• s.•i• Si.-....-. •.•
Fi
P. r 1 11
Y IPTION " e( •
rNfoM(t•O•..tq.?.l0• w s VOA- pC lCII••ION ^ KXJt Wasp) Ana C.ONTIM'.-A 1 d I .rr••+••ae.I,.O ID..9.1,V16,t 4,- [D•.tt•(t. '•
j s[. Elev. 150 fS <p io .y "q 1;1 to • 1° `a 311, st,E1ev, 157 fCA
I
ro •c tc
I 7 I
1 s•t•to wery • .
o
I
MC .•...sr*,C.•yay ! w.3.1•y I i
S
I 3 I T r.-PK••es •
SM I f..a r•ee••.e II
I •_• _ i
I •
r y s••e = D
II A.MO.vgr•.el 1- _
1I
L. IP
944 i0 t0 _rot__
26
I. I i
I
s II P
I
r---r--1
i 1 \it •
M
41.
13 1 r I 1 1
c =o. •o 31W w
O H—-
sr If t. v 1+
N
tw4q•yy
3.Ity i sI L.
rli we,3••y...PI Z
25p.
CLAY tw•n O
f 5.7..t..w silt Pu.ngs to
Prw
3.1.r••••ss . =•2.
J SIP
ca
ni i SI
ro--•
1.. r
fel
I
Ir eo
1 I SO
1.
p A T— StAf a A
s•T
MI-
hare,qr•4 clayey
dt
A
3eL7. n..I I
mergers**•...w
41
s.l••a.•..qs),^Y.
3N attq f..• •_ ei• I I
y •
fit,
3.10•:,ra••1 •y.1 W
tie • • W I / I 1
3 I.
VIII
19••••..of p...wq rl rJf4F
SAND.,q.•.•f .
DI i124 i •
Sr' IP 1
I
I Wow.at D. .q
Co
t
I
I I
tCI t I to
I
i
i i I 3D: 1 i
IEGCNO SEGEND
n I r:D are••••••.3.•w. . .. C l...[.N...• ....rw••w.•.1 • t,r•[••1,0.e••u 0.0.e..Id I =•OD we ormon e.•P•• C Uncenhn•a comem•s•.••.•.I . Conte,0. .e*nn0.o w.o
I.•. a'm.••e 33.en test' D• ••c^-D•e3 s•o^'.
I :1 O: ri'1y err.. C Ca•ee•OD.•.n t.N I II OO ril y wi.• C -e••.o•oo•a ••••
P S••.•.. .••a t•q mots Cans WIC.•e••.w•d P Se...t•• p•vre nrat•q '-.•.
r.•• • C_-rest. "tel..O+•C .•
T • S.ny. rr• •t con*•N Md.•.
O.+
wl [
wN.t
M• AO •oo••rM
0
wa••• •t+•• SM.4 I..,1 r1 y.22R.DC T •NCl3 S7 va.e• ie.el
D• C•••C a[ .........f.S
s. !GS 5.33-el1 c •,..•e t
T e uysRv OF F•E:D A. LASOPAT0Ry D..TA BORING 1-8 W•` SUMMARY OF FIELD AND LABORATORY DATA BCRIt43 B-9 v........• .
FIELD DATA LABORATORY DATA
SOIL DESCRIPTION i W tI i STANDARD PENETRATION TES
Clint !6 WATER ODNTENT
W
u SuAoto Elevation: III 4 4441
Z.W 1 Ala_ 11 I l0 y
lane e.. areal, fail, . tips AM le fen.
uRI) 1117, Iracaa .1 alalin 2 I Is
ill 4 1
ale Sala I. vs,. sett
0•sI IE
InI :fine tall PHIOCCt At I^
2f !foil Sulteitll
4I
ilt 1 17
tl v l:r
Ito) stiff, vol. tell) CLAI. II 11 ;
limited t 111 ell/ ,/Sllt
autinSl t NoL So aP. tilt) Clap 11:r' 1I
Ill/eat At 1• to 21•
20a. ." 7I = 7O
1l. II _
II 41
ril._ 11I
171.4
I•.s SO III SO OP
flop alit,. Slat. silt) 1(01. Cal 41•
I sl tttttt Jed, •; Il(k0nIN. III E
iI
googol
uI 2 se1III ' I lt CI
I4I 1
III
N
1 I 4. --- ----- - -- ------------
f$
V..) CCITT tl Leis. eial. sills 1•. 11I I ---
CLOT I tl.t.t alto. ,AA. .il/
Inel1t0i 141.41i I Rlli1)
lII
Ii11 tar 11.p I•
1•.. III I -
wN.
Iun11 i
S•+ 711 S:
Al 4 Sid ill III 11
Atu. el WIN' (11I 1 lett)
Cupletil 4/1/11
5T(s:
1 1111111 c-111 Ill 111111$ II
141O ION lot /t10SS1
7. A LAM ROCK VAS 1NCSOIT(I(I
AT OEPT% 0r 47 MT. TI(
10111111 IA1 POStS IS rill t5O1I
Of ORIGINAL (*CATION. It
IIr10NITl 111111I1 OO 141 I
110 MOO OIPIN Or SO PUT
IO (1i INAII INoiOle Slvl((III
11 III N011 I LISI(I lIllttliT. I
Of CIITIIS$ I_
4 late llsli tl ll
rfll0ntl IN tali 1/1111
1
CT7[R T
Tat SIS IIlICIII.N Lists ON 1N5S1 SOUS; LIII
SIPIt It11 III *PPiIOIIAlt stur0lll13 I(TII(
Sett ibis. IOOtt1S. III TUrS1T111 ISO. I
I
1
t
LEGEND ca.o1 coe...4.1P *t (Fig.15) PROPOSED
I 2'0DI•lil0•.a.sampler 0 Tri.wl took 11..1.14117 . 17) MT BAKER RIDGE TUNNEL
II V OD 11.n•well lobo sample W Unc.nhn.r Como."...par,Csf
P Sol../i.O.MN s Sills le.l ITi•le 3) LOG OF BORING C- 104
Som01•MI MC••wN C Creel 1.41 1f11.21)
y.. WoIW 10•41 GS Grew W..nd)4. (fle 1))01
Aii.rt...IWO*: P1I Po.tin.
OCTOBER,1971 W 1984
r.-1l4u44Gm11 S1.11 Silo0.n•14.e SHANNON & WILSON
H.W.01 ref..tm1M1 Fir BaNOewO Soil YICN*NIC1• FOVNOL1lON(NCH.I'•a
Plaslit limtl O•s•r••lian well
noes p•orome1«
FIG. B-6
I,
Y DATA
z
FIELD DATA 1 LABORATORY DATA
r
R C01iTENT
3
SOIL DESCRIPTION i 9., L' STANDARD PENETRATION TEST11 ,la
I
y„WATER CONTENT
L Y1 11.0.e r..qN.SO"WOOS
t I f
e _ 1
W r Fl- Woos per MUI
1— l ___ 4
u 11Surfoc•'Elav0on:717 7 I,.I
o s j
SI NO l 1 11 l.1-
L
IL"' L1
II _
1•
7I 1-
1 I/
j1 11 f.
0.„t. 1 Vaullp 1100 (III 1
II r
71
70
1 1..t 11.11 I. 00.0 loin? 1 calk ,Is, S i
1
I•.,na III 1.111 C111 I [I.[.t Sill •.trll
l
Y'I [
e111.nis I sl,.l.n..0.t •.00.n1 .l .0e1.1 t.. •
10• 10 30• lice 1011[.0t.1
1%/ I ll' S,
0 f 0
1,...„. . 1 Ile ll Cl1
l ,
I 1, 0 SI
71.0' 1 1
11 l IS,ee- I I I O
IIIl
Y— j, III SD
IS' 111411
0 1 If I CO
17ll1
IH f
4.1U•le SO
rrl slot, 1'4 ''•10 1,101 1 00,1 t111,17
t_ _._
srlrt Cs 11.1 Ill•1110 r.1• fo al lIl•J
I 1C
0, S 11
lyj0RI, 1,1r.I,11 [11 nt.0u t .[c..1”.1 1t G11
CO
111 0.11.nit 1cII
s\
I S I 11
1 Ill
111
II
1 --
1It
till. -1
I_S' IlIctl s
j S 11I pectin's III IO 1 0 S.1
10' a 17 1 Cosset
1 I.1p 11,11 10 hell 1.101 1 °sill its, G11
t11Ip Cl1[ 1 cloy[, Sill Ice.„elll .' 41' 1
1,11 e1,t11.tt. tl.cl.ntl/[t 1 ..,l,ccl 1l.010
III III
joints 11/e..I •s111, h1117cnlcl
S
V..
lit
1
I OUIIe,t 11in,
O. 4.11 r.!.1t--7 " -
4- IL
S1
1 SILLk/ 1 II 111
ellnle 1
711111
1 12,1.$
Di. 11
i 1
Li
III Ill 1` __
5.11 lafl„lllfe IIIy'
17 7— 71 1 0.1 St
1010• 1.1101 1100. SILT •'I0.a 1 Spin 01
j-Ijl 1--lass-r
ally cIS7 •/teN °oilshot S cl I[Uet.HO IIQO 1I1 71 t7
P 11 A,..
131.111 1
111Ue •I ••1u, 11)1 1 10111
i C0e0101e/ 3/77/11
III,
lilt Mil 111CIl10N IINIS ON 111(S1 1011Nt LIIS
I1/11i1N1 Till IIID1111TI 100NDIIIIS I11111N
SOIL 11I(S• 1101111111. III TI NSI111N /Ill, IN
1 FOCI, II SII/Vil.
LEGEND c.ne01 C•ncolldol.•nl.al (P11 IS) PROPOSED
TUNNEL i ' I 2-0.0 spill spoon••.*Pl 0 TYIoia1 Not lk tool III ICo•IT) MT BAKER RIDGE TUNNEL
M P,
Sa O.0 ottsr011t•
N tempi, 0.. Unc•nheed Coa0,01$1•e 1.11,111
Itob
J C—IOC 0ropI Wsll•d
a alert U11(
rig.
3)
c,,,•,,,,IF;/,:„ LOG OF BORING C-101
aorn•le n•I[.[..«N
ICC ' I 11_ Wolof Ia••1 0S Groin sire anol7•I(FI•IS)
OCTOBER, 1971 W 1984-01
Allen/HI II,m.ls. Pl. Partin/
Al
Liquid brn,l Slick SII ides SHANNON d WILSON
Nolorol raw c•ntont 0/ddin/ 0•l MsCN.1.0.•• .fu..a.t.,..tuG.MII••
00ler•all•n relyPleellcli,nd
Pne.11n^l01 O'.1601•0,
Ir(a B—.
1• een•,..,n ayl!• ..r.....
sass .- FIG.+B-7
i
MUD DATA LABORATORY DATA
4 501E DESCRIPTION a STANDARD PENETRATION TEST
U+010.eg11L Y7'aopl elm e %WATER CONTENT
W i•it A RIM..r.-f1.[.1
SWTO_c•_ E.I•IMIIOA: 717 7 feet . cs
W
i
I! .- III ..-l -.- .. _. IS
W ••.•.
Ssef { S.sltl Illt .e/.1 •seelll_
r r_—
vS a_U—••-
f.st. is rill, i•.J. {1e7, 111
A.
till,. list le .silt/ SIN. •,
el raves. sl.i 1 Ifee {nut,
7I 7•
e!
evecll I boles IS lift
s
1I . .
1I - 71
11
I I •
IS
t T . 1S -
71 S A_ .. __ ._______---. .__. 71.•
I ,
Ill, Its,. 81111. Ile. le
1
covet. SINS vulltt el sues flee 0
fl:f'
le .sent sled (T1111 tI 41.
7., 7 11 17/5•-•111
I=
Nord. It 111 I leis {re/, clamSILT
1 filet vet, sill IelU.Il .I 71• l•I IA. ----.---- -- r .. - ix::;
1r.. S•r.
III
Is
i.
71:0-^ I7 r pi I.S 0•••.•.-CS-M
uI 4
S.
1 IfI d
187 1_
7/
11
ar, tlllt Is ..Il, 1101 1 Inl I{IP It II CISI.I
CS
Ins. 111l7 CUT,(u•lsotol to,..)..
s...lest Ilfe•.st lies1 I r
1.1et Ir.t. silt torl1e11 I I
Indus' ettru. S. to 1I• Its. 1
e.,lrenul 8:.41,1,111 Welt
suttelu uef I {nut usl.leslt IIg to I1 -.- T -.
Slit 1
t.rtr...III a.
16 7SU? - tie - --t -'--- -------^
1111
81111511
11 1
I
to CI
II Ur III
I
I l.I
11 IS
71 I -
II I-I.t C e1
22 g 1 III
711
1
7 N
t
17 II 11•` i y
t -
7iI 13
tit I
tl tl
i 1.7 ------J~--
J1t
I u, slit/ IS Sand. Alit I WA 71 tr. 1/I
11.,, tie 17 Silt I t1117 Cut.
I.....Ire). t11 left 1111e1
1r•r s.II p.11.n1 Wets I 1.1
PORING COAT MAIM AEXT PAGE
EIMN4-II12.71
181 Sttttttlt1111• tills •N 1111( MMSIMI lets
0Its,1181 I01 Ar 1111SAI( /SS.SIS1IS Il1SESI
Sell TiPIS, I MII(S, III IIINSITIIN AI, IN
IIC7. II ItttttS.
1 F.(AF ND C.•nsM Cen••n..••lgntetl 1r.0131 F'I<OPOSEU
1 ;'on tpn,sf•u.n sOrnpl•0 1r.o..ol..tick lain W(I.I?)•
Ml BAKER RIDGE TUNNEL
n 7 (1 L.non wall 1„Ir.%o•nple O., UnCOel.n.d Canpr.slrM t..I,M/
u Samp..p
S Slo.lest (Tot** !)
S:.r.pr.rr.., a....d C C.esp leel 1r.421) LOG OF BORING C- 102
V. wo1.1 1e.e1 I.S b.e.n We onol,n If es IS)
rbe.q 1 T 11 p,. po.t,s.
OCTOBER, 1971 W 1984-01
Lewd u.w.1 • - Suat Slic er...I.t SHANNON EV WU_SON
Nluu.`.isles to.•.en, N•or.nf r••unw..• e ....wu•.,..r.r...•w..w•
1.1.0.. lere.t
I oils...u...n .01
1 .. ...i ....r,.11..•II 1.r....rn..l•t I.•,0.n•1e4
S.IEET 1 or FIG. B-8
f .:4.
7
Z FIEF DATA I LABORATORY DATA
ill
SOIL DESCRIPTION u Zoc i STANDARD PENETRATION TESTA
01r1. y,µATER GONTENI
uY au..11 r.1oalnm 11Sti
Su.1oc• Elevolwn, 1u 1 t..1 o g , ;o l 1 :l 1(
1
t.l
3113, Is1.----•-----i -
1,
11 aI 1 cll 1 jv_NN s3
Slit
71 / SCONIOL. 1•IN
10 )n
Intli t 14I 110
1•
tli,11 ))IIr L C n
I.1.L
31 i Ile
n
11 IIr
r.301 110
1!=-- _-------- ---• - ---- -
71I1 1itP ill
loll.. •t I.t.n (111.1 1..11
111 1 11)—
CO.rl.1.• 1:)1/)1
I
II 1
1
4, .
j,
GENERAL NOT€
TNI STINIIICITIOS list) IN TNISI 0011111 LOCI
IIPSUSINI Ts[ P101111T1 10YN0111[S I[11[[1
SOIL MIS. NOttttt, T1I I*&S$I111N 11111. IN
IIC). II 1100131..
Y
W:
LEGEND Con.ol Consoll.•lionf•a (PIe.I5) PROPOSED
4 Z 2'Qn split q•ee sow**,0 T.l•.gl eui011•4f,tsf% Ie.)T)
I s'ao.INw•••IIl•Ia.•wIPN Ow ul.confin.a Comp.,•.Nn 1•01,10I MT. BAKER RIDGE TUNNEL
02 , 4
P S.•IpN••AIM I Sills 1•d IT••N 3)
Simple n•l..Cl. d C C..q 1021 III 11) LOG OF BORI NG C- 102
sow Wet 03 Groin alto•n•Inl• IP14131
01 sowAt1..•o.et1.w11.: ie Pullwe OCTOBER. 1971 W 1984-pi
L,Ip1.h.!,ShellSn 1.•. SHANNON & WILSON
N•IY.N•11M.MIM1 µSold ins
PINIk Il.wll 6 OON.vIIM ••11
Son.Y K•••wo w.a rr, +..o ...o•+.•w•
I
OJT Go..nuln In.1 1..1 I Ile II PMYT1110•i..O.w•IM
p
r SHEET 2 OF 2 FIG. B-88
I ,
z FIELD DATA
4 SOIL DESCRIPTION r-- , n-- r--
l ABORt.IT I,r DATA
j
1 i.1 c STANDARD PINE THAI ION TEST.
LL y W S 11.0111 1e..,M,SO J,JV)
C1.Is 9.WATER CONI E NT
I.l _ • li o.t or•m1 I I:I f
Su,toce Ele.ol,on 711 7 'get 0. a ;;a 1 I
t
r
1r
1 tY1 tl,ll II nI11. tII,s1 full e.r 11c11 70 I 110,___.
I
r
I 1 __
1,11T CIIt 1;e.lnlleI.e, I1(It (r41, - 11.011
1
till pll1ln(1 1e0e,ng (e11eee11( I \ CM `1
1u 11enL11. relllcll Ielntt L 10.1 1t LIII7 I 1 III
F_i fillIlk's'., •IIIc111t,411 1°tllcet.
37 I Iio._- - - . - \4 -.It —- __ . • I --- —
I. • 11 Q1 0 II.41 44 a 4,4
1.111c11
1I1e11
11 I Ile 10 s'-.41
11111
11 1 --- --- --..111
0.,I, 1,101 I,.,, u„el t10rer fill . 1e1n.-p.
1 I Ity Clal.(In,111, Ie1,111Ua)•• fell pl" 11L 110 _ I 10-I_0111,e11 0, 1.101 (1I,, 1,11 1 silos
1I,t11n1,/. 11111n( •ells' It 11 1 IL 1
It 1
cam
U III
lolteo at Spring tIII 3 tail) 111.11Iz If0 — ._ 1 1'_
Cultist'. Cull.11. e'1,I1
I I
Te
1
GENERAL 1
101 tip llll[11101 tii1i 111 TMIlS 001111 (III
11111111111 101 Irr0011111( 1000181U 1110111
1011 Hest. 00211111, Ill TIU01111111 0111. 11
lids, SI LIIOSiL.
LEGEND C1nw1 Cons0lId•Iwa1•II (F.g.15)PROPOSED
I 2'oDwa•. .ew010.0 T1•.a1o11II.,,lsi(Pig ITI
MT BAKER RIDGE TUNNELtlt'00 Ia.. ..•Il lot.10r„•I. - Ou ti con11°e°C°Ing•Illen L11,I1I
a1n".. SIe1°'°" "°.1. al
LOG OF BORING C— 103SoTYl.tool,•UNU° C Gun lul If.01,1
ilk V. vole, N.•I AS Gown I,00.n°ae,1 u tit 131
OCTOBER, 1971 W I98•4-0I110••19 IMO.• Ply Pot flay
L,•we Lrnel Skit $1.101n.,des SHANNON & WILSON
11•IY1 e1 r01•.ioal•nf Bedtime w1 Y1C1,•b,<• • I IN1M I..I.IIa.
X106114 11a111
e GJ1 c1, Fi091 S CDeu ,
oi1. •1.10n.I.,
SHEET 2 OF 2 .. FIG. B-9
FIELD DATA LABORATORY DATA
i ! SOIL DEICR$PTION i $•St STANDARD PENETRATION T
u.0 ID.ews D
If'aaot e WATER CONTENT
3 Swtoce Elevation: 711 1 lest p 0 Uio..11w IOW
1 _ LI 41 Ill
1Y -_ T-
Mediiiit .
taws.. aeon t. 11 s1, .sty
u 1. foots Is CeCr H tlSANSa/eo I I .
1s,Sp1 7
fI 1 11
1.1.7- 4.
17.S 11111111E1U11.e 1s . 1rq. very 1111y, II
tsl lest 11111 11.e) I
111 /71
R111 .
Vs., stilt. Illy. tllly
Slit
I clef•/ Illyl•s I I rt
llll Isu941t1 ./1.991 grog. 4111
rig Tin({ INI e.(nso1. I41111(
11 1 •_•-CND •1
Neil i•eltl I 71 71
1/1 1 17 11
W. %1Ill It heed. Ilgnt t dal1 11e1. IIIIII 1 I
slily CIA!. 1111Te winosellI$ 1,rr111
slicks111tet. e111i1e.a1 11991 V•y. 4144
1
17•
soul t ii.. sled Ii11isgs, Ills,. of re111y1
11I 41 p
1e11 / Igo. 1111.1 lit f1.
I/e1.ni 0 to S' Ilse N.11i.1111 Slicks I I I
Soon
111
1/. C1 -
1/
J1• 1
Slicks
11 I
d 17 Ur 41 0„ •_I•
Slicks
17I
sullnls
may
CM 11,
I
llltls ii 7CP IIM1 0„ 7.1•
Postings y
11•y
Sl lcks III
So 1•,,
I••
I _ D 5 77 - -~
9 41 I.
SN -I1.
7
111 1 17
Noe.. light t 1411 ',sp. else/ Sill Igo }
1• 11I
I silly C161 1oo1 s,l.1 a/ligni gray. ./ 41. l C1 Ise
sill Spill legs I sli 0000c11st slnu slicks 1/III E I1 SC•nsrl - -- ---- -
1a1t1n1 0' Is S• Item 1s11Spotll
III I
e-Id111
71 at 100
a.•k I1--d--_-
1,1111C T---
71 I
Silt rigs
1
I
71 III 11•
ISI
11 II
III 1_,
111 Il
l of roil o.1s.. is... 111s, 14 a 171
e. ~
Sill. I...soled. silty. floe ...1
i llals t silt '.hoofs. s,.r 19.1. 73 I
11
silt/ cloy I 1.
h111.111
S - ______•_ C 1_-_
la as1S•
211 III
17 1....-_
III
gory . l.s.-01.1e, silly Is
71= ill _.
1, 5 IS _______-_-__
c Tian, lips I• ..t.e. 1ARO 11s.111
4111 51/1'
4S 1_ 144 7I=
WI.. 11 I1rlw/ (144.1 1..11
C4N11141 3/14/71 err
1.r
r
rI KM IIQTT
Ill SIOi11r1Cl111N 111111 SI 11111 1011111 l0••
11rt11111 IN( I rS01!IIl1 1011040111 1111115
SOIL 11r11, 411110111. 1111 10AN11110N OAT. IN
PACT. II 01A•1A1.
LEGEND Cen.o1 Censehdel..nwlt 1F.9.14) PROPOSED
Z 2'0D split$a.M•ample.0 'novel..ilk1 1,$sllly.IT) MT BAKER RIDGE TUNNEL
II 5.0D Ihn-gll lobo s.mpo. 0. Unconfined Cempnslon lest,fed
P Sample p.Md
S Stoke feel (TON I) LOG OF BORING C- 104
Sample I..l loc.l.rd C Creep feel IF*al)
Wafer level cS Groin*it*onolye4 I Flo.ISt
OCTOBER, 1971 W 1984 OI
Alle or.. .limits: P19 Por 111.
l.ed111.11 S1.cs S11c 1n04os SHANNON & WILSON
t.lorel..l.l EeM.11 9•ee.n1 SOW NlGN1{N.C.. • YN N 1N01NO0ITI011M
PI.SIIC III•II Obs.1.OliOn N/I
Pne.mol.c p'•roi1.IN
GOGese Tel lela use(Fig 91
FIG. B-10
FIELD DATA LA80RA1,Ar DATA j4SOILDESCRIPTIONvz
za 2-STANDARD PENETRA_TiON TEST.
ono, %WATER CONTENT
e it W • (140 lb•••cr ,30 0ropl
a.>,
W W i 4 • • Wont pot tpol UM
u S1Mfoe• EI.volion: 101 1 1 let o•S t0------40 /0 o r0 411------)r
tras•S.., l.•I 1. Tf I- TIIt:e. theta •,::'
ffif fentf b1 1t-40
1,4.•1 1I Let 1•..
134 t_ 72
Oust. Its. bell holly lone $110 e• I
11 •
1)0 1..letltthat tt•,t° 14.0 1 71
t•nittttt I1llS/—
J
10•-S0• 0 O
it
c• II
sett.III w 10
011 -- ---- ••a-- ~'- ,
eery tt,tt. vet. fully Cl11 ( tell II
11.t,a.e tttttt lint 1 11•.61.
fa tl,tt•nt odes 1 a1.11.•5I Sin., 1 I = 4Ilit1Ittutu11
44
1
cs
I+ 1I
n
0y t
s1t IiT s/ _—._. - ._ _ a-
Ott
17I 01
l/r 3 ir•t. S,1tptttsl
et•ut, flint tr••. I .,•°. 1)II7 r i 0 ill !t
Silt. I./nl stay. WIT Cut I tits. i1j1/ 10 -- ---'---•--'
av 7
III --- --.- - -- ----
t••n. tone ten., Sill 1••. I 1
1 true 1. •e°,.• hart 1'411.4 15 I 4 >!
I
11, I.II.•$. tee. 11•t two on/ I1
IMP /
0 4, It' - _ . -. . . •0M1rt.W.Li _
I`
III 0 01 01
te•1 6..14 ti..n If .,•1
tun. Ste0 •eels If Off. Is 00--416
tun. ha •ha,•• %tetp ha,•• 14 lets
t0I .o 104 .24
It 5-..._--- -- - ' -- - - --------- - .1f )I I cl •
1.•1,.• .t 0.I.11 114 Iha1rC441.141.4 e.l'11
ISO- _4 .. -
t•
GENERAL 4..4
141 ltlltl11C1110M 1111(1 oe I•ISI 1011•t 10t4
11110221111 Ill rr00tII%11 1O0041110 1(10111
SIIIl TIr1f. °0°I°lO• Its 10/11111101 OAT, II
11CI. IC 11t11t1.
LEGEND C..,ta Cen.aleol.ont•.1 (dais) PROPOSED
I 2'00 tool woln.ompl«0 Tnoeiol quick 1°°t,fa VI.I?)
MT BAKER RIDGE TUNNEL
3E 3.0.0 tNn•well tone 0 cmpt Q. U.00nf ineo Compression t..t,ltd -
P Set•pt•IMAM S Slo s t..t (Toole 5)
Semple net f•c•• M Creep t.tl trio on LOG OF BORING C— 105
Wolof Wes' GS Grain site analysis If Ica)
At1te110t010•110: 10 P.4I1n0 OCTOBER, 1971 W 1984-01
L.µid 1im11 Sl.ta SII I tHe SHANNON & WILSON
N114.1,01• ur11tn1 AV 0•aa,n0
PIe4114 limit O 06tavot.on r.0 souu uw •nt»ctronic.• roo .•r.a,
r.,n7 r- nn kart le.. I rit 9) S Par..tint p.elemp,N
Met.'__ -..
FIG. B—II
i
4 FIELD DATA. LABORATORY DATA
SOIL DESCRIPTION STANOARO PENETRA310N TEST —
11yL"} .' (14O lb er1pM.SO.Oropl /I M I 1 WATER CONTENT
yl Sorting ElfvONOn: UI l last c II f A20 Ow
tool
1
Kits .
20 {I In
1 1
Ord. 1041I
It, lone L1 huh SINS e:11 I1I
Slat lino T IS
II
ll
CZ Z\ 121 1.r_
11
11.11. rip-Nun. ClItip. Ilia Is
II
21
rll{ 1
tan. sane, SILT (TILL) _-_ ...,_..
21
J•
11,I /loll Ie toll. ir•y. IIllt C US Ortllllatl/ 11111• mil
1111
Z u
111 I-_ 1/
Mui var.,0 . I"ly 1 sley•I II : Ib 1Cs -- --*-ate--. - -..-,
Sit, • some slily Cur I00000.
II .oi IIQ•I to all all•"I till
I••I.ntt. OM, n•lllinlel III :
1t1.0.ng Ilan sl•Inil III tin telee v
S! real once II 1
k
Neill. 1o11 III .- B-
1 t
Ito stained 17I
F Wets
17I M— -- --- — 1
III
n 1111 i
ter, Slat Wit. lit* III fa A'
It ,colt, SINS containing
Int utlont er III, { .I•, Silt a
III I{{_-e•-i•
col '1oh/ loll till. 11 17 felt le
Igo-..`+
II I. ! n_' 11 III 0 II
rot, . s1.,-glean, silly. I.ne III
11 .4 S MI
1I t ...-...__ I/ 0 III 11— $
Solt" of oolong (la S Sul)
crlrl.l s 11.'11 it
P
1 M0T11:
1 1011M1 C-101 OAS 211111.10 I1 I SI MINI
I e1TM01S.
1 iOlSIuh( COMIIMTS 01 SIMO P001If1T
1111010 II DR Ill a 110.
r.
GENERAL NM
lit STOIIIIICIII/M LIMIS OM IMI0I 1011111 LOU
SI PSIIlit 1M1 000000l till IOul101ilIt 0111(IPI - 1
SOIL 171.11. MOe11Il. lot 1t1MS11llM Oat. II
SILT. 11 IS1011L.
LEGEND conga con/1;40 llletl (24191 PROPOSED
1 7.C D spiel spoon••Sidle,,0 Tr10a l quid'Not.1d(Fif,IT)
MT BAKER RIDGE TUNNEL
2 )•C 0 ln.n•roll I.De saeyb Ou .Unconlmed C01npp9•01en te•/.101
P 10m91•ouoiN S SIOIe 491 treble S)
S•r•.ol•not rece.erN n Creed feel Isla 21) LOG OF BORING C-I06
V_ Well, 4.•1 47 Greln Aire ee•1te)0 IFIg.IS)
Al Ior tug 11nwf0' Plg Per ung OCTOBER, 1971 W 1984-01
llgw.g Mwb SbcM Sl .11I,lee SI$ANNON & WILSON.
N•1.1e1 MM1 9.O01wg u
flail Ili rl.etlen e111
m.o. I"Molt• • .0wt1•t10r•ew•.w
Poettic 11e111
r 1=1..
n1n.Her_.
FIG. B-I2
s,
7 FIELD DATA 1 LABORATDHV DATA
7._"
SOIL DESCRIPTION ATcic F STANDARD PENS THAI iON TESitI
W --i,.... U4o to..anl,So'ar l
of"I" %wAiER CONTENT
1 Qat', Blows o„1nO1 folio
W Su,fCu Elevation. 17 o 1t,1 a s u;—_— Ly---
70 es _ 10
Y," 1611 1. Lan (,., h,.a-,a„i, l1.,.; 4 0 -- -- --
fill . I..II.,.n I.nn I till, 11., I.n.,lI e
7 ID
7I h?r p
C
1• _CI I
f 1 II; y2-
J .n
Li_- . 7o I III 71 Z r4_!lt•II
f,, m ,mist (1. •101n, c1.l.r. „11,. l,nn V
1
SAM1 • (,..,1 1 1.11 I.f/,S 16000.,lnf
73 T I ..1 r
1.l {.nu. (Ill . .i,(nll, 6,111. I,,.U
to •wits• SAN!,nullity Ill 11IL-L.- 41 II
tttttA of lilting (II 1AIM
C,gl,t,I 4/1/11
i
i
CA NI RAI_wD'
III STRATIFICATION LINTS OM !NISI 1O11111 LOSS
II AISINI INT IPPIOIIIATI IDUNDIIII! 11101111
SOIL 11 CS. NO1(111. TNT TRANSITION Nit. IN
FACT.
LEGEND Canal COnsol,dOI.onlost If,g 15) PROPOSED
I 2.O.D.SCIil{faun Nmfl{,0 TnasoI Iuito test,1f Ifq.IT)
II 3.0.01Ne-well tu I SImp1I Ou Unconfined Compression lesl,t•f MT BAKER RIDGE TUNNEL
P Sam*1vH1N S Sloss loll (Taal D)
Sample Ale lotoee,ed C Clasp lost (FIB.V) LOG OF BORING C- 107
WO*, level 4S Groin Poo•nolyl'I (f It.IS)
Anae.,g Moils: Pt. POI ling OCTOBE R, 1971 W 1984-01 •
Liquid suns.SIKI Slit Men,de,SHANNON & WILSON
I
P1e,11t limit 11
u
Obtre voitOn .e11 sow.M[CNANIC{•IM,NDA 110N[MO,N
t rr, •.I•••, II,.
o. rnrmol,c r,I/emel«
FIG. B-I3
il[L) DATA L•90RA11)tdv DATA
SOIL DESCRIPTION 7 1 7i'.,1AND•RL)I'I:NCI RAT KIN 1(51
Jk+e W•blowsti.3Cfdlad V.RATER WNTENT
slots Et.volion. MI 1 tat ni Y1*'11 II yr t41
es..o to omit•. (Iowa to (let. Idly 1000 d I I — 0 3:
lilt teal lel.d 1.a..1 lid III Wit •e1111 el 7 I
ITestlble loll)II t. 4
dI 1 11
1 I
p7+...
t.
I,• I is sI•
t.11 lisle to sodium genie. Val Oak $1.... 71
Siit7 to clayey 1110 alit icettsled tilt I 7/
c
1•4,1I mai ellselt sell lel.
IillI71 •
11,11_ drool, these Slit 11111 1ie111 s41 III
chat, al glop f1111 coal Sod1Un1 untie',n 1
il t
171 11 171 1/ ,
1.1l tt.11 a hetd. glopWI! CUT •.Line. IS r—•—•.. ••
tlattmild A Ali i lento SAO. 14
7M It
Ill slid. II 1
11 d/ i
II
CM
10
f M
I I II
et n I t Stw OM —
66
J11 1 7/
ts se
111.•se Is ale,
an. it., Lint Ind date /1.1. lam.S7n 1"f-Ca
I
111 Cltl an. ,lamp Lill ills t11c1..e kdts 11 l•__.—__.___ _ ___._
I•—. .. _
11w a ..
a 1•.at.
11 tl
N p
4.11•. •1 O••.m1 Ili 1•.01
C•melelad
wit. la.l biotin' delllg Op Ike •a1.im11 i
Ill Y _--,
that, O.NIIme.1 Al MI .
Cs•aelod 1/711!71
1
11) Rol NOTE
III S1(IIIIIC111•11 LINTS •N 1NIS1 1{NIMC LOCI
elP11ISIN1 1Nl I N•11.11I 1.$N01NUS •111II
SOLI 110(1. IlOillti. IX( 104111110M OAT. IN
All. II
LEGEND Como' C..su t.l.onis.t IFS IS) PROPOSED
I 2.0D..1•I spew..ww.l•r 0 Tti•m•el••utINt.1iItF•11.IT)
MT BAKER RIDGE TUNNEL
I 3"OD tbm•mre111•M hserm. On Unto-timed Contp N.asiem •4tN
P Se..N.•named S Silts 14s1 IT•{•. sl
SomtmlI mot recovered C s..a.1.N (F»!1) LOG OF BORING C-108
1 . water level Gs Wei.so.•motets 1ri•IS)
Ally.a•r.tlehile• Ng Pottle.. OCTOBER, 1971 W 1984-01
l . _--lmtto: mce S1,41 Slict.mel••• SHANNON & WILSON\;dlw
14.1u1N(Tali t•MeM iQ •calms
MI 6oaN gas•r wll•m ..N
GUN OKCau•w.ca•ttl•Iwo.••••.I..0•11 amn
t..1 r.o.... ...• . Io•.0` .....•
O'. ....slot.Nlermer, .
ttr.•_
FIG. B-I4
cuD u^m ao~^*' o A
U om ocsmpnow
E
nUr CONTENT
sm""" o"^"" "^ ^ ^° 70 do go 0 '^ ^" ^~
aw
T , --- _ -z_ m , l ' ='*---------'^- ---'
CIA,,, ^^^
z`;
w ` / ,r 16
w
GENERmW071
INS STRATIFICATION LINES *. ,";`v ^OR..vLOSS
mvnu* ,m ^,,^^n"m, "wwAII"^ wnu,.
L ,,,p. 111mwx. ,w ,SANSmSM "*. is
w,. 19 ^www.
1 "
c
w . ,o.~*w/`.,&,,,,..*
v,^ . vu*t
PmPP E
MT BAKER RIDGE TUNNEL
LEs[mQ
z 2*0.0.lippim 10400 6sompler LOG OF BORING C- \ \[j
wxmw wmw °
CTDB[R, |$T| vY |984'{x
SwAmwOm & w/LsOw '
OIL mac°^ftKo°"ou""ATIC)'""NGINZE
8 " FIG. B-15
STANRARD /ENETRATION RESISTANCE
SOIL DESCRIPTION
13 IIo 10. weight. 30'0rer)W
s o.- x Alt.e per loot
m i
S. 4 so W 40 60
Surface Elevation: 123.3 0 o
r.0 0 j
Eroin silty fine SAND with fine gravel, loose 2.5 1 Imoist i
Gras , stiff clayey SILT and silty CLAY, moist.
t
1 . . . • : : : . : . 1
10 — < . .
11.5 f 1
Gra"ell SAND - brown with all sizes of sand 4
i# "
and fine gravel, loose to dense, wet. 5 y
1
20 _.._._...._.........._._......."
am...
21.5
7
Satt iy SILT with occasional gravel - compact,w
moth. 8 GJT
26.5
Gray sandy CLAY, very stiff to hard, moist
10 g 30
0.
Silty CLAY below 31.5' , very stiff to hard,
12 y-'
dry to moist.
13141 1'1.._
15— afi
16." GJT a
47
17
I
Crity SILT with lenses of filty fine SA(D and SO
la ,ers of silty CLAY, hard to very hard, dry
c .
to moist. 19
20 1
22 99-..-4
60
23I 4/
24
I,
73.5
26 I
Bottom of boring at 73'6" 1
Hc1e caved at -10.5 upon auger removal,
remained same 24 hours after, no water above. 80
1
LEGEND
I2"0.D. split spoon Sample
1 thin well sample
GJT Goodman Jack Test
Sample not recovered PROPOSED
NOTES:
MT. BAKER RIDGE TUNNEL k
1) Logs developed from Washington State Department LOG OF BORING D - 70 i.
of Highways Log dated 1971.
f
JUNE, 1981 W 3573-04
1) The stratification lines represent the approximate SHANNON itMILSON, INC
boundaries between ..:I I types and the transition sae,k,,.,rk CONS.u..s
may be gradual.
FIG. B is
STANDARD PENETRATION SESISTANCI
i., SOIL DESCRIPTION W c140 Io. weight, 10•dre
i a< 4 slo.s oft loot
surface Elevation: 133.1
G.
N " o Q 20 49 40
IGravellySAND - brown, silty with small 0 1 0
ff
amount of rubble near surface, loose to
dense, dry to moist
2I
Sandy SILT - brown with fine sand partings,.
10 10
dense to very dense, dry to moist
13
3 I 8I-j
SILT - gray hard to very hard, dry
4I 112-•t• A.
v 20
1
5 I ° 66 —.
Small amount of gray Clay 6I c4 AC-
28.5 Q
30
bottom of boring at 28'6"
hole caved at -22.5 upon auger removal - dry.
hi.0 •
1
LEGEND
12'0.0. split spoon sample
13'0.0, thin sal sample
Semple not recovered
PROPOSED
MT. BAKER RIDGE TUNNEL
Noyes: LOG OF BORING D - 791) Logs developed from Washington State Department
1 of Highways Log dated 1971 . JUNE, 1981 W 3573.04
2) The stratification lines represent the approximate SHANNON&WILSON, INC •
boundaries between soil types and the transition aNOTICHINCAl CONSUONIIS
J
may be gradual.
FIG. B • 17
H
STANDARD PENETRATION RESISTANCE
SOIL DESCRIPTION W I40 lb. weight. 30.drop)
o ='- = Allows per foot
Surfacr Elevation: 137.0 ginm I) 2 40 Q
an.y SILT - brown and ray, trace of fine 0 1 1 Or
gravel and peat, compact to slightly compact,
2I 4 I
Brown, silty fine SAND with gravel and N
cobblrs, compact to dense, dry to moist.3 10 .. ....:._..:.: :_... ::._...:...:_.._1.. ................_..
41 1
61
18
Grave'.lySAND brown, silty, compact, wet to 51 20 .. ._._ ..... 4+i
moist (-4" layer of wet trown clay at 18.5') I , ;
own silty SAND with occasional gravel, 25 6 I
derse, moist to wet, wet at 23.5'
Botton of boring at 25'0" 30 _. .........._.___... __..._:.__.... .__...._........
1 hour after auger removal hole caved at 17.5'
dry remained same 20 hours after. i
LEGEND
I2'0.0. split spoon sample
1[3`0.0. thin wall sample
Sample not recovered
PROPOSED
MT. BAKER RIDGE TUNNEL
NOTE;: LOG OF BORING D - 80
1) .og developed from Washington State Department
f Highways Log dated 1971. JUNE, 1981 W 3573-04
2) he stratification line& represent the approximate SHANNON &WtLSON, INC
ooundaries between soil types and the transition wA+ """Ts
nay be gradual.
FIG. B - 18
s .
sc
MCI "':' •FIELD DATA LABORATORY DATA
SOIL DESCRIPTION Lie '^ f. STANDARD PENFTRAOON TEST us,rc. I3
WATER CONTENT
11A lb.•,yet Yl .1.go
TESTS
gq F 1.11 Blor{on'I...,,
9 1 D IsliiWSwfoceElwahon:101 1 101 t y 0 20 1; 601
L11tt Id •iI,a• dint,, 111h1 0'0.n. 1,a.111, I I
0
Ill
1: lilt!, line SIND. Sa••Ist 4 and ! a•diUad iI I I1,'
6`- ialutllld. fist• 01 4040 laded in WWI J 7 v 1 I I
1101I111y It1L'l
10 1
III I
v 1
nut, test. SILT a cis!., Sill Coolainl pa•
cc.l,.n.l l,ghl •,a,- fill I tans 0111,nIt
l L t 11 Its Mtn jl.)1 S
u. I'at {1111. cur cane{ and ac atitnal r sae zo a--'- T• 1
lli{I,nt.d.O Clay tdn.f S.•010 IC ntd .41 1 T
101 Idol
lilt tenet •r.,eni
III I
I I r
1 i { —114
y
1
1JI 1 t1 V
11I ir
IIQ100D-- 1 Ira ltl —.. .. n..n 11 .1 ,,.
IllA lad,„
III
50 o T — i
IyuI,, III 10 00,4 11,01 t,il, Ct1, . III
occ.n,.,,al wt., Sill 11n01 6.nllllip
I;ti.I • „•nroo I tl,eldnlhnet Cahill 70xf.
1 •
C —,
Occall0nal thin IJ!.IS •I Sand and 110..1
j} 11 00
and IanO/ end E,teel It 1On41.Cobbles
iigf,
SN 4
or boulder•encounter•d In
sample 20. 23I
10—____.,\ _—_ 1
r•
21 I
d
211 0d
10 I 04 111
I
j th I! 1
1011 I y' I• i
11
1
iII II it
I
211
4
10 10 I
no.. light I'd dais gist sill, CIA, Ind n I
CIA, Cdntllnt Il,cl.nl,dld '.vital.%
1G
thieulndut, OCCl/i1na1 land And Sill •Irt,n/1
DIy 101.!•cl
1.0 •cc Alilnh1 110.01 •a.t,cl•{.
110 1.
0u.eI 1
SI fir 1 1,1
77
I
110
16I
III
1
II 1 1!I
Z.
Ns'•. 111y. slightly C utey. SILT. i10
A i•n11111t thinit •,lignl Illy. silt S/][
101 I
Cl
I
lilt partings n•It ty ndr,lln Ill. nomaf.dt 3R
2 I. 1' tines el 1110. II ictlns,ded 1
silty tilt. OCCIlilna1 Ind viral
ISO
311 oilI
e•1.a•n 0/4111 III to 111 last
SII
i- I
y` AO
110.
F I 111 0 if 4, Nu •ui1,C
n,,
10I
e
III 11 1_0
X
11 I
1!I •
1I
11 10-
het, OIntS. gilt. lies 11010 Ind 1.14. I'd!. 112
SILT in It utn.ta 1 (t• I'1 41 Sind 110
dl•1I/ laid and fins 1tu•1 In
tiltP. 11/' It)Nan Oustlt
11 1 IISto
Tall 01111. (fig. {Scan 10 lolly. line
01•I
nod,.. 1110 • •CCailaeal CIII,. lint and 412
III
fuel IOAINL f0NI1N0[0.Nf 11 rlii
LEGEND coNsoL. Consolidation test PROPOSED
f I I.0 D.spI S spoon wm•1• Q T,ie/la ou1CN NO
3QQ o.0.thin-well l.uelomol0 unconlln.etana„ao1 hh1 11.11 MT. BAKER RIDGE TUNNEL
U Sample
ot recovered
A sdnW1•Anon c ;;,II LOG 0 F BORING E—Iamnianot,•w.MN
04 3, Water N•N
GS Oreln else.ndyua
Ales,bang liml•: Pig Potting I pal-O
eE 1-ioe'd1u•1 slits sllcaen•d/•JUNE 1973 84
I/elu,al..l e,consent /// 11•dd(rp
1•Nw1.mi1
g O•I•,wtlon.01 SHANNON 9 WILSON, INC
FtwNlnitkartomll•, SOIL MECHANICS O FOUNDATION ENGINEERS
yr Wel unit rNOMpc IJ
FIG. B - 19
g FIELD DATA LABORATORY DATA
301E DESCRIPTION z Wl—A
Fo p'
STANDARD PENETRATION TEST OTHER3commieroom 11111m1 IA•[ id f 040lb.on WATER CONTENTf,30-On* TESTI3 .,- A ale..o..loot
5ufoc• EI•votlon 7u 1 1..1 1 j CTTrl jj /J It ) 2.11 11 U
1(rp dish.. Ilan. tits. is /flip. IIn. 11= 11/11=+.A •
Is •Idiom SAM1 a/otosti.nit coarse .ond
Q
and /Ina glalll. S dills Iola. 171 teat 1I1/1'—ay&
ap/sal/l sail/II/tad. Sand Molted in ..oat III
lass dI1111na Ilan 171 Is 111.5 loot 1.11
nick nap 1nIo, that sane silt •I etlll n, SIE
1-r.A
In / Ilt.
six 1/—+tA
111
132 I.117=te11,
I.
7 1 111.1 S.Z
II5/1 ..J
IRIS Of Siting 7.1
C.sll.tod 4/4/7)
M011S:
1 Illtnl m11. by 1shhlnolef Stlt. Mllhslp
oflall.1nl wool a hello. hie• saga( II111 1
r11.
7 tab/rotelp Isla It/l11ad If 119 Ielhinllee
tilt. M11h•lp 011hrtment.
I III •tll'111faltln lines en tnelo I.Ilnl
Isla 11.Ihsln1 the a//(..(mill Ills
nlll.esn 1011 1,111,Ina Ilanlllll•
sly. In lilt. I/ •Vona(.
a Loons I.I 11..a1.1 by Shannon 111l....
Inc.
1
1
1
f
LEGEND CONSUL Co".alrlllonlost
I 2' 1D soli/spoonwmpl• 0 Trlauolµlc.last PROPOSED
D )-110 thin-.all NO*.ompl• 0u Unconhn.d Compn.scntasi 11.11
P So.'plap..hod s Slobs eve MT BAKER RIDGE TUNNEL
Sel,pl.not n. o.N C Creep POP
tt Pos•,level LOG OF BORING E—I (COCA)
A.I lr G..111".t• Plg Pa limo
t,ouMhmll I". sllcn•n.'r• JUNE 1973 W I984-02
Notwol.•I.r Comer.. /// tS.00.n1
Io•balimit
i Opllsn•hl^`.,' SHANNON 9 WILSON, INC
Pneumolk plaiarw..M
SOIL MECHANICS & FOUNDATION EN711/ECRII
Cont.) FIG. B - 19
1 ,L
a
g FIELD DATA I LABORATORY DATA
47- SOIL DESCRIPTION r a say' STANOAI(0 PFNFT0ATION TEJI
f EI 1 !f i Z N1G In.dyne,vi a,upl I Otp1f It %WATLR CONTENT
A
a Wu.•pa tool
T Ct T3
W S.MtOC• Elenr011on: L•11.Hirrl t.1
i
11 `1 —t I C.yf r1.)
up I•.. 10*Wu.d1.1., •erlt I• W. V_ 1 l `
biome randy Sill • tome 11tt11 la V. 2 I '--
3 I
Cen+e le yeIp dense. ••n1 vie Sill 4/I 5 110 1 --- y - -
11 clop Ice.Ccn.onli U11•alldet'
C 1I P d'I.9•.1
7 r ow 1P,H
N I
9 I2Q
10 1I P
11 1
12 I r1?—
13 IS, 727.1r4I
14 n P 1G-041 1 e (~ '
1:'.`H - - - - ... ... _ _. - --------•3a0
15 1 Iw.10113
rete 11,11 I•(old, moist. Ilse CLAY a/pulpy 11111$
el stile clef loll silt. SU11t 16 '1
Slim 17 1 40 0,—
Watt 18 P P quo L ai --
11111 . 19 • 0w.1074
20I 1
50
21 I I(
222 I II .
60
23
1
P QU•t 77 r - CL-I
24 1 1fw.106E
11101 25 I
770
t11 u t 26 i
2/ I
60 7yI•9 36 1
38 lip w•104•/
I.L'
1
w.tb7
b98 SIliiti"d70 30 I 2+4
00
yelp dent.wit.1111,e Tree SILL
37 I 76-.-lla
Sand Pty.32 I 104--+10.
100
4 !
P
90 •
t 02 r
fw.1305
498-- — --- -- -- 1070 35 1 155—•••
loft 11.11, N111. Vq SILI ad 11111 SIPS 116
layoen.
36 I 168-+.L
40H-•-- -- — 1160
atop date. soul lip MO•et, clay SI le su07
r-' 37 I 1't.19_.-•
SILT. 126
34 d--- — — — - 1220 » 38 Z 116-e.41
Pail 1a11. guy. ail[ S110
let NI/1 04110•l 127.0 loot O- A I it PI at 1
23 3- .. --------- .. _133 5 = 401 124-1.41)
Sallee of twos(11I.S1)
MIIeled 1/I1/T)
Pont.
1 1111np 0.1,ep /.111111111n (lets Mtlk.., 41pt1 l..nl
allot laulp aIIII Ill.
7 (Ikailt.Ip delt e1.1t•ed be Ike Isahollnn $1.1•
4: Mlln.op 01p111e061.
IN tII.IItic111ok Ilnet on Mote Genes loot
Iep(Hrnl the 1pp1e111111 esuoda,les 000000t
toll Woes. . the Uaticue III. le
loll, Se I .
4 toting log pnotod ea•11k1n11e1 Slate
MtlMol toeai lNnl. ter
i LEGEND CONSOL Consolidation Wet
1 :'OO.pill 1pe0nsamp11 0 TIIIIialQMlck teal PROPOSED
U 3-0.0 thin-wentplwsample Oa Unconfined Comoceeeiwptest (aef1 MT. BAKER RIDGE TUNNEL
P Sample pushed S Sickle lug•
Semple naeloererad C Cm')Me' LOG OF BORING E-232- Wee level GS Gran ton analysis
I'.'
Apgrhlrryl•rele: PIS Parting
6.4-•UC.d Nltil Ilia SIKMenalde. JUNE 1973 W I984-02
NHK llm•1 11 MOa wel lll
i Pmarnoltc prtometw
CANNON IS WILSON, INC.
flL wSil Standard r Ring Sanole 1w Wet unit weight (pcf)
SOIL MECHANICS FOUNDATION ENGINEERS
19 FIG. B - 20
fiao DAD. LABORATORY DATA
SOIL DESCRIPTION tc
r
STANDARD PENETRATION TEST OrNEII S.WATER CONTENT=
WO IG w"pht,30'M.pl TESltMo..Nr fool
R1 1 IrSWISS, EM1o11A1e 184p4 teP1 Q
1150
no.e sail,rnI NIPS ISIIII SILT _ .-- —__15 2 f
3 I
M•.. feast Is. • 1..N.relit to Ml
4 I
buss Wry 3t111, U1 '
l
tit subs•1
pane nrrt. 4 S I1C
lbla taw sate MI•H 11 IMI.) 6 I
blly silt 7 I
1680N — -- —
16D 1 30•2D3
life; stint IS bal•.Mill, alt•rs•111I 1233!
Inns•t pa clam SILL SILL awl CLAY 210
11 Ii51occasionaltunesIIIImoviral11•
I..e psi.12 I
13 IP W.11:37 1 •
CM I
laws/slag 14
Ifw.D4A
16 I
lio
17 IP 1 X3.266 1- H_6
ant: bw1M7
I. Smog W.b 1•I11g1N IUl1 11Mt.n T law 18 Lq
N•1.IM.1 womb Wm,u111 r11 I. 131.1 swag sill 19 I
ntl. 1MM..Mr •1 isle•ill••bl.•u
Mot MIbM.
50
i
7. l.w. MU/nfl•1•M IN•s11.11N
71 I
11?
1'
1 Sues•IrsM Nper••Ml.
22 I
I
7. M .tn111 IIMt r boss Mites
IP t1.f17 1--
H
lap Ian N.t OS N1ns1NU Mood F..
23
I
w-117(i.3
w...f. .8.1 types: I.MN1, the lr•llstlim
I
M/. ..lid. SsMsrrl. SILL 24
70
11 ids 25 I i
4. Me aq log p1Nn•11 f•11.91r ION
t 1y1wn sp•ltswO. 3110s 28 1 1
27 Pp i w.-OH2
1 1
Silts 26 I
F 90
E 29 I
1 A3oI
1
100
wp1e go
lamsItw 31 IP 0:tulsed
mallow
sir
32 I 75
Suds led
a.• sin s111 1•tl.pey Ill;sill 13 I
a....r1. Is.sold IMo.
Isom/U/.Ir 14 1 ell"'
I.111.1•1?l3
shall 35 X 135/13" +
36 I D4 fr— 4
130
J •
Ante.-_•37 I
4704
1370 3H I 1014'--a
WI, . •.1 Is M1. Psis •claw MI. 140
39 I 92—__
40 T le
rt at ISYQ 15,4
1 1 7l3 •.•A
I V.". ..-
A
ltO
tit
103.0 —3 I 2-....4A
wt..sI b....I c.ni•ta•iinsn3
I ICI
r
LEGEND cowsol_ C.r...4141...l1.1 PROPOSED
I 2-
iS••5wuN 0 T...•tliats• btM
MT. BAKER RIDGE TUNNELII !O D u.w-..0 Lr sample O. Ur.e.wliwM C..1pers•1.••11 In11
l.pinball Slobs
losew.pwMlr..>w..4 LOG OF PORING E-3
v_ IOW*.Wool
Gs Gomm sue t..wyr i
111..«t.. as •tio1.q W i984-02
mow. .— 1
q..,•..l«
t slab sm........,sm........, JUNF 1973
t. 1.r s...rr. Air your
ps..I.•I1..N
S DISSIr5.515. m SHANNON SwILSON, INC
pw.o....i.gi.r.Aw SOIL MECHANICS•FOUNDATION ENGINE ENS
L ws:M St.ardwO T Pry Sartnplr Sw Wee unit welatt (Mtn
FIG. B - 21
z
FIELD DATA LABORATORY DATA
SOIL DESCRIPTION z QQa 2 i' STANOARO PENETRAt10N TEST
S ' Y U•0 Ih.• n1,3c7'aropl OTnER %WATER CONTENT
sa I a.•
BO_S S loot TESTS
u Swfot• Elevation:111.0 re•1 tt 7711
X'i IQ /0 Iq o 1 11 /lt
rely 1111 Olt.n, I t •'•1{sorts 0
1,6 1.ne r.•ls .nd 00n10, 01e0n, Lilly line 1 A.`_+
Ill 0 \$•$
M0 •'Ir.r.t 1 le 1111.1 -•1 =Z2Z 1
M1
lily still to Sill. e1.•n Ilredrni 11 Iran AA/ 1t 0„ 1 1
11,1111a tl.p.l Slit It tic tl C10, / SI
10 1 ') 11r -- •
1.nt1! I.mu nttsl 10 Isspu 71. N.•01e.4 II 112 1p11
Clay sllc Ientrle its,.. end line till
4411•nit 1n.e.Ih6e1, 116,01 01 Iles.,
II
01 10
loll 0,, i-
171 I 11 it 0l It11
Weil still to hard. 1111. titles SILT 1 i,1t1
III Y• •
Clad (lenu th a thinly Io Inlctly Iaernitll
171 1103 10c1
and tontllnt thin rill peelings end 'hie sand l7I 70
n.011. Gin.1 till I1ill ill.d and 111ttl etl did I/11/ 11 1 III t•
01t+11011A1 :.Sly and lifts 06 .11, ion* 17I I• ,
III 1@1 Iptl
t• thus 01.
IIII j 0 61 Its 1 •
II J
Y. •
Ili lot Ipcl
701
50
7Ir
I
77I
1 1---- - 1 0 1--
72 i 1 11 111 lLI
r
241
y
10/ Ips1
Se.
11I
Net• S
1a' i, —H
2/1
271
11 1 to 7r 1a
11010. 1111. slip! $111 1• ottt elth ls.ttt.t 111
sill peltinit Ind thin 1en11t et lint mid
78I 1e.1'-
10I St'11-1A
10
1 •1
77Vr 1 52,1_•-i&
p7I
17 I
poop
115.10•+,A
111
at=
ALA.I ._ 181
lei,dens, el hall. 110y. tlndl. 411/e1 3SI 11 +.A
11 1
Ott •.'same line le tens) /level (fill 11111
111 1 I`i
Vire . trip. Chin I. silly 1661 SANS. 1I 11-•ye
oanplet 71 and II edpur 'slated
371 110.'11'..
11s
ISO —_--"-01'T`—
I-.
AA — tr
L_1 111 0 ]•I It1•11' .
Setlu 61 Oiling 171
Cegletil 3/11,71
110110:
1 Meisel pale bp i.shtn@10e Slits Millie',
Seplttmeet .lug r.tttp dull III.
1. Sspp1. 1 emitted In eveit11
1. t.10re1ery 0010 plerl•el 1/ Ill legilelte
Slate mllhet/ 011att60.1.
I. The st a tlllc•tlen li te. is these betide
loge 1•pttttt! Ile IPttttt.ull Nuvhdt1 ul
ett•eee tell l yet t.the Ititllt Ne
P: nap. In tett• be 1 I.
1. 01sett1lien •all teadrnli tektite ester
Iestl 11 still lteyptng (5/0.11).
1. @oriel log pups.ed by olive,. 11111011,
tit.
LEGEND CONSOL C•nselidebon lest
I 2.00 001.1 Mvem«11ose 0 Trio rol•Yich sot PROPOSED
Y II J•00 roU-sellIYN«IpN OY UneonernidCemp«aienlid lid)
P Selpplewahe• S SI•«+•el MT. BAKER RIDGE TUNNEL
Semple nal resented C Creep WI
s water level OS Guineas endears
AtierWsg WNW Psi Pariah/ LOG OF BORING E-4
i•YY limit Slick StllcaMleiM.DUNE 1973 W 1984-02
M bedding12NMlwolwqrcontentg
Plastic limit
S Observation well
hPneumaticPneumatic +mepletoler
SHA N N ON 8 WILSON, INC.
RS
I,. Wet unit weight tpct) _ SOIL MECHANICS 8 FOUNDATION ENGINEERS
I FIG. B - 22
B - 21
FIELD DATA LAOORAIORY DATA
SOIL DESCRIPTION W I F_ 4NOAR0 PENETRATION TEST pr,l[ft %WATER CONTENT
F
B40 I•wen"3Graerl TESTS
w SurNocs EtMotloo t 173.53 feet . i t-. A Blows pit lit
G 2n
t L
41111 1e flip 11111, nail. •Iteteet leg
2 P
Frith el elan clepa, TIL1. )Ill end CUT. e 3 1
4 I
Q .I 11t
Ina el tW 6 E P IJU-1 44 I s—I •
w yowl 7 I
rw.10401
Z
9 I••
10 I P 4U.0 62
M 1
149 5------•
240
11 I1.1.
11 w4001
Vet, full, let,n gray. clayey SILT le 12 I
UMst11 feet.
1-113 I • H
330 U 14 IP U•099 y CH ___
140 5 - — '—w.1041
eatdM eI wring ceNleta 4/10/11.
4e
Mill:
1
1. linos eali Sy IsteleltM lisle M1rl•s, 1 twee*
using retsrp drill Ns.
1
1. MNutee,lila rnlleer It the uteleltM late
Magee,Iepreret.
1
1. ilia stU1111cstlea IIe•s M Nets less
i splint* lee ippree teals Mendel lee between tell
lyres. , the Iu at111M wee. In tut. be
a ONn.uUe.rill town au be let loomed by
tutus situ.
1 !.
lei,ni leg pl eplee ee 1•splipten(Intl 'lilts?
Oapt tout.
LEGEND coNsot- Cen.elldetlonheel PROPOSED
I 2.0 0 split Ipoonsomplo 0 Tt.
Unc
nil quite tut
MT. BAKER RIDGE TUNNELnr0Uteen-.ell NM MmpM Ou Ur.t oral'Mg Compreeetsn Met (1st)
P Semple no' C
Creep tut LOG OF BORING E-5SemplenotrecoveredCCreepMel
Wei level GS Gran Nee oltdys*
tut UmItelt•1 Pig Pawling
DUNE 1973 W 1964-02
Mitrle,viod511ce5addlSitchn.
siNe
Nel..el.tiler s.rlre /// f)es•Ity
Plastic limit O o.•tion wll SHANNON Ol WILSON, INC
Mumetk pMeewtetw SOIL MECHANICS• FOUNDATION IMOINIIRS
SW W'Jsss '.Wrl•r+t 7'0.11n0 Se..eu. Dw w.l .Intl wNunt (PO)
FIG. B - 23
1
FIELD DATA LABORATORY DATA
SOIL DESCRIPTION z Q,
c3
STANDARD PENETRATION TEST
5 5F ••z 040 10 twpnl,70'0so•t OTHCA %WATER CONTENT
8 [.;g< 810.e•.,•., cilo
ESTS
W Svt00• Elevation: ro7.4feet 7) 4) IDI 4 1;tl
2I11: hod,* dense. silly S110 0 eddd i
I-1' M ies. 1•nt•. l•.n, silt. SAND e/ II
ei•micl II
1.1.5' Still, till SIII f cl.11t 1111 Ili
r NOR /ts111.
Seel chunks 1! II.
141 a
1.!-IT Oedrx" nense ere.n fills lies Ie17 ti
n•d iu• SAND A.soot glassi II
III 1 Still 1/ •.rl 11111 1ig11 biol.. slightly //''__''
If'
7= 0u•
1a11/ SIII. Ihinll le•one1e/ al nits / 0 !f 1[I
LM
ogles I..i11 nrlinis 1d r.
Very 11111 Is nei/ girl •Ilrinelini I°I III 11[1
a ts.•f till f 1i111 Clil i•n•1•I11
I
lr.clut.n and 11tll.eslied Inlloiteel / 17I
Inin sits Nilixll Ini eugn•ul A rock of 1lnr 110[.t 17•1'_ r SOCSI •- - --.1
unknown else was encountered at 11
I!j
depth of 29 feet. III
Ill 0u• I1 1/
II 0 /c 111 LY '-I
11 r 401
j/
r. -1;
V , 00 T
II ICI
Sae
ell. 1 }
11 4
o
1 •
tt lI
2r r
u + 1 711 1
NItoe •I lofted
C86II814/1/17/11
l01[S:
f0
I Soling •eft be 14Snrngi•n Stole Si
OeyesI.nnt using a 1•II•• sled •tt•r
0111 sod.
1. 11I11/llrt Ie ts Oilfield 1l flu Weilltttee
Still Illinois O.Olrtllnl.
3. Iles •II.Itliceli•u lines •n Inese be/leg
let• r/1r•I.nl II. eon•l tests Nulflr i..
4.tuil• 1.11 I, the IIIdlIlion
r
esp. in fall. 11 I •
4. Wog level Is II Ile !allied •1 II
F 1/1/I1 feeding.
I Seeing III Oraluad Op Shannon 10IIee1.
Inc.
1 1
J
Y.i
1.
LEGEND cousoL CMN.Ii••I1an hit
I t'o.0•01il spoon••51ele 0 Tfi•.i•txticn tut PROPOSED
a s•oo 111••.•lllobe eel. of Unconfined e«er....l.ft Nil "'1
MT BAKER RIDGE TUNNELPMineolaproem' S Slone toes
Sample Rol,•dewed C CnN 15S1
wow loved
S Gran sirs warms LOG OF BORING E-6
Attie dry Ismail P11 Polling
Li•tla u•lia SUe1 Slieldn/ens JUNE 1973 W 1984-02
1`--NHtrol[role.content /I/ y61.14
PbHtetlelit p oaaa•a+•nwu SHANNON a WILSON. INC.
r.ttrl•akol.ia••w
le. wa delft wpM IPc/1 SOIL MECHANICS S FOUNDATION ENGINEERS
FIG. 8 - 24
t'
MILD'DMA LAI/ORATDR V DATA
304L DESCRIPTIONs 5 p e' 9TANO.RO PENETRATION TEST OTHCR %WATER CONTENT
w Swipes ENwtlpk 1349 feet
psotn gororspatt}
t hp
TESTS
20 40liQ4
Iett• it ITT t•TITTT Sow item rtTIW 1 1
130 4 _
t 2Ik441a11yt11Il."I "smolt"toil/14.6
2 I
r.otlll 3 I
Melee/m/t t. arI Mom. rut cries
4 Itilt, UMau minim grovel. AVOW 'AO it 5 I rt.e s 6 I
r' akw a 7 II
E. 1 68
1151'
ft— 1195 9 la' 61-+
Pill, Itl. is Islip Ito, pet till 10 I 102/10'-'
crimes.lu llgell pin/an).
dr WO it IP 00.352
IP tilt
12 I 108
j
Swm42
tow tar 13 — 85
102.9 3I29 14 I
Sus, ewp, Vp CIO cite Iqus el slave,
SIWMu mil 151
Olt.Nit trip. 16_I
moot. 675
Slimes 17 jj>"' tw.l1 i? 1.__-a
Stites 18 777 11,0.0.1t l<iStites
I
itl1M
809 ' --- — 490 ,
L i
IIUI. UN to lslllj III II Mt11 stay ZQ•
t11i ells eetslIMll I Stttl el elm, W
clam Till .M tost1NN nos moll pllletl'-
21 I
r. In1.1.r Now N 22 '
e
OUw.106G
L. 6
r.r pp.
2Hop3
Y pprM 24 I
r•
2 16\
i1.91-.-
bid pl..
60 9 '-- ------- -. __.
NMI 74.0
26 I
r moll mamammasoil, trey SILT sad SILT cite mamma
M l
11 awl mrit.t IsPr trr 27 pt}124 ty
Woo Woks 28 7 7-" „nz
r&per.nil sand 29 I 92-•-.4
30 fl4 93- 4.
Ptp_.the e
smil Ism
31 I 115--4.-+
let`s - -- 1980 C
32 111- --4
s-
I...e. moist le yet, Ism pap S . tllptly C 33 1
I1tr- einslad
r
34 I 87--'
prow
M11mo.I Will tnlllid 4/I1/11
NMI:
1. lel1 at.re bp 111 I.ttm Meow
np.11...' islet p1Mp 1,111 III.
I. 1.Mt stet, .ell III•IMd be IM Al1ltyt..
Stet.CO.! Ip.I11..1.
I. le• tlt.tllle.tlmo lime M them Mlle,
left IMtemel me pogo.Lute se..l.r lea
Ht.«. 1.1I time; e..er•t. tee tree.l Its
w. I• 'Mt. M retool.
4. Sell.'tell., lee mewed M Ip11.ttM Hata
Ipwq Iemttsaet.
LEGEND cans«. c.....I4Su...11.1
I T•00.pitl'nemMOOTS 0 TrMMehl(Meek Met
PROPOSED
u 3-0 D tees.-wellNM.eW O. UncontiM4C4e.pn..i..feel Ito') MT BAKER RIDGE TUNNEL
P Somme probed S 51.4 Mee
Water towel"°"" Grim,
C Geo."
n omat..ie LOG O F BORING E-7
Mar Owl lime, Pt. Nelms
Limeid Woe Stook ShCb ..ipee JUNE 1973 W 1984-02
Helm&.,tor an.h/ • /M Md..
PLe.LIaelI
oM..wl.n well SHANNON &WILSON, INC 1
1i P..e+...*H ptrerater WIL Y[CNAr1Cle• FOUNDATION [IIYIN[[R•
III wY><l 5111r'oarl Z'Rlttq Sorrow rim Wet unto w•ir (pct)
FIG. B - 25
1 .
FIELD DATA I LABORATORY DATA
SOIL DESCRIPTION a s;n . -$TANOAWD PLNEIFIA1ION TESTS Otlrfn1 1.WAILR CONTENT —
U40 too-.hyi•l Yi row•• . TEAL Iys. ,
W
A • A Hio-.w. It..,
AF
ma $1MtoCe Elesotlon: t3•.ry 1.•I•t
Y'•u it 'u fd'
1 1
let II, clomp bison SW •1 In ten si Wit
2 1
Serino 50
170
1 if
63 I f
Sodium noose to dense. IsIlip dry to wet to 4 I I
11.P. bitten tilt, SAND. In scalI.l.d{rn.1 5 I1 _' --
soon .eeataan.l thin ta.dl sell 1.r.lt.
Vol
Ae
G III
7 I t
B I
r ern 9 1.2(
I par
11) I A III .
Gabble
11 I
Croy silt 12 I 11(YrG Vidal-. ' 1)0 1 t 13
hl r.us
rnr cult. w,.aP, 'tin, cur .rum eriatlnnsl surmt 1,1 III• t)-t/In
gntet, Slicks 15 I frN•104C
Sant sill 15 I
Y
1,
S 17 e
Suess
IS-silt D1L
16 g
Pi
117
H --
19Lw.1052
470
IrM sand Ion c
BH6 - 20 co tsoilstiltIshot, doll to Lilly err to
nort1, {ray SI Lt oith Lyon .I cloy and Cloy um 21 I Iuclayeysilt. sds andtillotos.
Clot./sill 2l I60
Cloven sill ML- _
Ith sill za TIGO 1 S2
tonsils ollO.o LSw.105.1
and sty. 25
1"cloy lowe
Is,Wings 26 I111596
76.0
r IS layer 27 7
said. {toil SRI and solids,SILT with nurrsus
and I
Sar limed 38 I' 7?-
r tar leas 30 I
e 1
Sou sand.Id
1` y_ 11 TtilllawNI(i
oils,1) _
Dense,.ol mt to sotalielnlrng twit of p
32 T 1.
er 190
silty SAND and candy till.Waived33 •
pave 34
111
Null plops
al cal 35 IIT10
At
211
1145 = 36I
Dettem If bating coeplebl 1/23/I3
120
NDISS:
I. Siting moos by Washington Store Nlgheq
Dgelt.sdt using total! 11111 III.
7. Laboratory data presldod by the Washington
Stale N1gh.a! Dqu(Sent.
S. 1hs sUallicotc.n boss on lbsa Milo,
logs rtYr tt.nl the qal ssilots MY....U{
bet.nn toil Haas, na•.te1, the 111ns1 lien
mop, rn loot. o1 1 I.
1 Sluing tog pie/lied by Washington Stott
Nrghwsy lessItessl.
LEGEND• CONSOL Consolidation test PROPOSED
I 2•00 IOW ePD01110mp1e 0 TUnconfined p
lWurckteat
MT. BAKER RIDGE TUNNELII3.001nin•ell tut,'Wimple Ow UUnconfined CorrwoMn test (101
P Sdmplew+ll« C C,ipI«t LOG OF BORING E-8SemplenetI.11arerM
Waist towel
GS Gown sin onds,rew
At(Srber6 Ir0w.a. Ptg Postslsg
LrwNn.t Slick Shcbnedo. JUNE 1973 W 1984-02
Ne11.•1 welds,Con Mt 72l Nodding
les inIowa
i prsr.euon wu SHANNON IS WILSON, INC
neumatkv+=wnet« SOIL MECHANICS II FOUNDATION ENGINEERS
M III wSHD Stonoora 2" Ring Sample rum Wet Lout weight(pct)
2
FIG. 8- 26
FIELD DATA LABORATORY DATA
BOIL DESCRIPTION
tis
to
3TANOARO PENETRATION TEST urleEtt %WATER CONTENT 41.
ij i
040 lb woM,30.4,00 TESTSmowsP. fool
la Surface Elevation: 2013 to.t n •1 to
IY ISM+It sag C le1 I
Imo l.slst. tea, silt, SANE 2•I
slightly ctayq with sec.11a.al pavol
s.4 I11s el impale inert'. 3 I
4 I ID
Nam. laW t•sot to.out. 'rap aid Ue.n, O I 75_._gips r
till Ills silt, Self.ill scattered curs. occafe. 1
load mid Ilia to tuns ravel III occasional S•,,it .
7 I 76--
matelot. e B I20 lt '•
y
I I 173 -'!
10 a 72/5 —=-+
Piths, g It 1 ti!, ..d
voter Uhl$ ^
2S
12 130 4 ha ---411- -- -
2293'- --- - — - - — 32.0 = 13 I 115--_
terry/.au, 'r+y-Iroea. Simile Slli 14 I t39—•"A
NW test Shall lilt Illttorod. caus. sold.
13 2 96 --
ot011onal csoal, (Glacial I111i)
C•MII 40
Mall, 10 I 1110 •tit•
tot oh
VG 3, 450
knelt et 17 r 75--.I
nut Is .ley stilt. do.. to.ant, alts,lstl.t sd es 1A'
glop SI13. UM. rid s::to Clay •Ito•ells 50-
sign.l ravel end Metal Si late shod. i SIP J•I.46 r
4r slla,
l
19 L r rw•I73.1
clog' 20 I
sum ed
Slit otos.21 I
Slta.d 22L
0I0.
1r
7C3
S1101 eM r 23 y P XI. 2.S4
MH
silt alp.
24 l 4w-142.7
Slags 2., 1;
ill]
Scathing I
grovel
I,V time 27 I
soh MO• Vl
scathing
1
1 ples of 2A iPa
CHUhl,
mite sd 29 l[ highly
stele dry 30 I
f lilting
Slat I
slsnal 31 I
NO1TS: -trawl d
trove II lint
1 Mr tog side by Iasi l.lten Stile Nltn.q ling 32 I
qa,heat•cant rosily drill rig. I silt Pty.
j• [
110
CH
1
P 1 1• 7.13 r-t- - ----
7. Lebo,aloe lot,1,i.11sd by the lilh,e1 tan
Islet snao 34 w.11i.3
State N.'nue hp.rwat. 35 I
12 f)
3. In st..lil,cat en Ilan et these tootles Slide 36 I
left spinier the aflleel.all boundar,rs
W ritten ,o.1 hen. I, the Itanut,,, Sias__ 37 I I
e,. In tact. be ',ideal. felt pip.13(t MI-1
39 TP
e• halt tu.cd .n nth, sedate Wei 3u4t,1 .tn Slintd 39 1) silt otp. 40I
11:
Stocks one14,
S. L ot p'oins On be I. 41 I
1h,nll.n Stott WI Pill.
Welt__
e o.yt,t.tM
tett glee.
Slices 111 42 I
silt rip,1
43 IP 418 ).31
Slat east- 44 1. I..,07.1
t.el royal
45I
I
Silt lip.100 4------i---• - r
970 -
Sn9. --153.5 46I 1 •
Wolin•el Wetont coaplsted 4'7603 ----
17C I 1
LEGEND COlSOI Consolidation lost PROPOSED
1 7.00 split t.eonsorhple 0 Triable!gulch tail
U 3-00 thin-..itI.Ilsimple 0u Unconfined CemPtvoslonlett (psis MT. BAKER RIDGE TUNNEL
P Sonpl.palled S 5tahe lose
nogn reom,ved C CM•.'"I LOG OF BORING E-9
2. Wolo.Ural OS Oran lit.endyo..
An.,1••a I is P,a Patina W 1984-02
ee.l l,wel Still 311 ..•wo. JUNE 1973
N.tu.el.o1.r•en40 ,, Bad ding
nasalnl„.1
Obo ..nenoll SHANNON •WILSON. INC
rrrnelwPrs.nl•ln pal MECHANICS • FOUNDATION ENGINEERS
111 W'.l,ae St&Ward 7'Ring Sample •w wet „rut we.ohl (pcf)
FIG. B - 27
iIIY
a FIELD DATA LABORATORY DATA
Al SOIL DESCRIPTION
s Orr ' le STANDARD PENETRATION TEST"
u 6 i O a u 1140 to re,11n1,30-0,0Dl
TtSTS .
WATER CONTENT
L5 r Surfoc• Elevation: 3 7 I.et X' &; 'b'- A Blo.spw too,
u @ 7D 4.1 t,'i CI 2D '1.') Ct,
Aymara Surfacing f' 1 I &.
Ioo,. to vet, Oro". 1al1.ly no, In arid.
tumid. to 11,4, till Ilan u11y SAC1,1n
I
I roh oe.1pelf
tCt Mlar ern parr. r,a sonN HMO.
4 I IC ----- .. - -` •• —'- 1
11 A
satlarw h- e I A`
clot p tut 7 I
taaairr.
N I;4
I
4I rru
fMpylerll 11 I if, ••& owli
IlppayootCclll taleree JIilebille12r3c
rear.r ylae 13 I 1%. o.*
7l7L
Nara tau ly dry to Oagn gray SIIT withIractl -
l6:a
I4 I I N'/ .4
of lino srsod, slightly clayey. 4C J
1j Moons el 15 I HT—•
tine sad.
Thin lays's of
2147-,- '-- --—-.du"---,490
16 ix 5Q- 1.i8
Maid, fairly dry to Wry gray CLAY rain tr Kai
01 sl It and silt partings.Sill rift.
1e I 4"
A II P Qui109
20.12
sues . (
Y)1 20 f — ------- --y -DYT'9 — • —•
Online of loting
Carl sled 4/I1/13
IUTES'
I. Soling pule key easlunglon State Hlghaay
Department using Rotary drill rag.
2 laboratory data provided by the Washington
State HI n.ay Department.
3 Ine strati I'cation Imes on these Donng logo
repteseit the appioamate boundaries between
soil types, however. the transition slay, In
fact. be gretual..
4. •Irlog log oreo11e0 by 6laregton State
geaq gaps'taut.
l
37
A i
LEGEND coNsoL Consolidation twat
I 2 0.0.split spoon sample : 0 Trieaialivice last PROPOSED
a 3.0.D.thin-well tube moot* OM U4461AlnedComp4ea140111nl (loll MT BAKER RIDGE TUNNEL
Sample pu•1Nd S Slake teat
Semple net recovered C eat
LOG OF BORING E-IOV. Willer level G4 Wan sus•nMysmYiAtterNiloWads:Pig allrp
0,--.-* L.audllmd - Slice SI,eaenorel JUNE 1973 W 1984-02
Notwol troler cr,Nm /
I/ 111dd,l.g
1e11,e H,wu Q OMMntlM roll
I
Pneumatic pieaaa0er
SHANNON IS VIIILSON, INC
OllwWetunitwe9MIN') IL MECHANICS II FOUNDATION ENGINEERS
27 `4 FIG. 8 - 28
HELD DATA LABORATORY DATA
SOIL DESCRIPTION r:
M 4 6TANDARO PENETRATION TES{orMEl111.
8 Slate foot TESTS %
WATER CONTENT
u Surface Eletlotlen: 157e1eel
F
3 IQ 20 1p at 4D
on . fatly by Ilgbt brew' to 21
A
gnash. lone le tans gravelly Ali bid
SIM(11 ly Catania) 3IGantMM
out et I')
r NMI 1iM S
4 I
t483-- — -- - .. 9.5 SI tC Y
sic..ins., rltl to n(TiltIrrene kill
and lone SANS with 'WWII'sass.toed ad Z 6Il P
t/ -
143.f-.LY le COMM gruel Is 2"1.-om{Mlar. - 145 Fi 7I
Stoll to very dill. Iiep, cal MAY, saintly wit, a
tilt, alit occasional I)yns el rant) silt, O
91 2C
statical gravel and granules curl tan. "sin 1 ; CH 1.
customs' toll clangs and thus lenses II
mils 10 P i QU.348
Ilea u./. 11
I 11 w.X154
12 I
13I3G
14 P I QU•124
C!-i . en
Sleeks bw 1(1fi
1f11a1t15I
le W 2r 16I 41
Silt 11{t. 17I 4G-'"— • - CH•i1811PiU•446
19I Ew.1.1..3
O Silt 201
10/f
t.. . ..,
0,4 bG- -a L
11111,,4.
Maid, Mail le done. Glancing day allyI
Cal andand clayey SILT.intentional bolt et
lI 1
tonic ultnll,fall rtg. 6C t4
q p U.104 r - '4
943'6]6 2d Z<w.14
Maid, ba/. 'lay MI bloom Al', oupUy
tlgq, lotto Illa sl grata floe tan/ flint 251 1
palings nod Flo INS. SIN rip, 7G
Shad 26I
43• Silt
rig' 27I
BG
Dense, eels( le dry, brew' Ilne SANS slightly 23 it p
sills Ia fatly clam, Ntasll.usd gasal to
29I
1"Sab-.nguul.
goy 391 8(0177-44
9C
311 i 1e/10'-a• •
321 78-+•A •
ICC
331 P
Witten/was 31 I 40
laws of all' 11G
351 i
42.8-....-----
115
36 z 94 6•--..A
Casa, dry to mutt to oil, loght Neon loon
1.14 S1M0•.Ih station./ lone grail Mat QG
um IS talus sand, ably clan. 372 P
r Iq.r MC 3 81 105-•4
tare.
en39I
r
eO1
14C
1421f 41S ti
Salts.of Owing
Cs.alsta 1/11/13
MOtls:
1 D..i r..a•.,... by I.th...elei' \1.1.Mn•bay
Drat tallI sting Situp s,111 log, 1
1 Is..n l..lots 1s1. ...tidee by Mt 1.th.hgton 1
Slat,MIgn1.f 0eaar loft.
J. top stIee,entl is
loan Float Oh andst eI
lag Cogs
reDr ent IM sad vela ,oundar,ei Nts.an
tell Inns, , the Ilant,llen may. In I
tell. N vernal.
LEGENDe get oog leg grated by 1athonglon Slate MtgMy hspaslnit.
cowsol. corn all/efienlsM
PROPOSED
1 2.00,purl sp.onsonrpIs 0 Trlasiolasle11oot
n 3"OO me-sell labos.m*1. O. Ifneonl mod eaapn.o'.nfoot (to) MT. BAKER RIDGE TUNNEL
P Sample pr.SW S Slots Net
S1.epls nor reentered C Cn.p ens LOG O F BORING I"-I I
St_ wet.1.ot
uOSGran s.analysis
rtrl..b.eg bona. Poe Passing
Nao11.,.awc•nIM
51,.h el.aandde• JUNE 1973 W 1984-02
a/ bMrne
SHANNONPloor.chr..., O Ob•awuonwas SH 8WILSON. INC.
Puonndr(prsrrnoda OIL MECHANICS • FOUNDATION ENGINEERS
1
11 w;:\1i y14raard 2-Ring Sample boo wet unit weir (pct)aMz,
FIG. 8 - 29
t
gi.
FIELD DATA
t LABORATORY DATA
r SOIL DESCRIPTION jec W STANDARD PENETRATION TESTIT
qL ,•._ OYtlE9 %WATER CONTENT
V 9 a U40 lb..qni,30 adds TESTS
ty
W
Blow.per loot
SVri0ta ElavotiOn: 155 3 feet Qut, p 4r? t;-, Q ?? a
u, . dense to dents, moist..light him Silt 1 I
and Iles PAID slIe sutterel pant And c11n.
3Itans, slightly lilts (Vicinity II I"te.ef Ins), -
148;
J704I4-`
Nt11, 411 fig!Ot.n,1udLii11 cum g0 5 j 10 4",
au1, 'Iwo light 111.n Changing Is auy al it 6 1 P
1ra.ally Iva. Silly SAW.
0. 7 1 4
8 s 61/8_. .J
9' 2C d./t, - I
10: 72/6" :..
11 I a.
12 I P
13I 7, -.*
GO 1238-_.
Slicks —
315
14I h IA
Mold, damp to I.itly ay. Illy C11I .il11 0. Sill
hCallend line la mite sand and tins gravel. pig
15 I
y CH_.- 22
Slicks
16I P tiu.3b0
17 140 l 18 N.1067
I
18: Ciu.440 MN-- e
19I 11 N.120 3
2OI
50
Iery rarely
21`1P
rine sand 22I 72--..4
Wu bp"
943 ' -y610
i 1I.4651/01-4
Mac.. LIMY dry, dial Sill, slightly clayey 241 H bw4_. • .1t86
ha tar I 251 68-44
SIII pip. 70 I
8.18- 170 5
Main. damp to la.ilt dip Meal Na.n Sill .. 26 IC P 1+1U 2.14
ncc.t,snal Ilne Lim!, Italieud maiing%of 27I 4Tw-T23
lim. toad. 281 4•1•1 e.*
HO
lisle taw 291 ho
I wu.
h9 t
860
30I 94kr 4,4
Gems, !suit dly, light bison lin, SAst,
96
slightly Silty./dccltunll this lilt Selma. lSw=IODB
3132 100--+•f
I"Iaysi tad.
to tutu 13 I 1 l .41
tar,r Slit lx i I
loin,r
l ISulIWO
35I 11t
11C y
351
C 37I 5?+i
a 12C
r Igor 381 to7+4
my sir •
126 5-WY sill J S 114 -441
7'i f --
1.100 _ 1 tO•
r. 401 III
S•
Paso, sot, light st..n, stavfly 1a t111r to
WIN11r clam., c.a1N le llll :Alb.
21 1 1 *41
fi
14ci t----
i c4 421 10iAl• 1>41
elght el listing
0. Loma laity 1/11/11
Aff MOTSS'
V, I. lltin(mall by 111hlniton Stale Mlglinp Npruut
Im mitag Rotary drill ttg.
1. l.beutitt dela Vallee(' by ih.hails/COO Slits i
M1geap ups,tmeet.
S. Th. t:tltil,c11tee Intl en lists boring lap
tog 0000tl Iba ippistimalt bemndari it
typos, h.o.Isi, Ike tlansltisn key, Si last, Is
Lr u.11.
S
a 'vim' Ile pnputd by Washington Mils Ripest Npsita.nl.
LEGEND CONSOL c.n..Ild.uenNst PROPOSED
I 2 0 0 WI pow Nmph, o 1 1.0.101 a,lek Not
U S-oa rain-wellliSedaipla Om • Unc0Mta.dCempr.o.lonl«I list) MT. BAKER RIDGE TUNNEL
P Semple patted S flake Wet
Semple Pelr.a..«ad C `""~a' LOG OF BORING E-12
St_ level OS Oran ale*Wien
i,Atar Saul llnmlo: Peg Perliiy
d`- l i5.idhnml Stick ilic«l.7Ma JUNE 1973 W 1984-02
N011:w01.rc.M..1 777 MWeg
Plastic bout p OM«vill•• SHANNON a WILSON, INC
Pn.mmells pimento's.,
IS III WSOH Standard 2'Ring tr unple 11w.. Wet antt weight (pci) SOIL MECHANICS* FOUNDATION ENQINEER$
29 FIG. B- 30
i
i
P1ELD DATA . LABORATORY DATA I
901I. DESCRIPTION t ANOARO PENETRATION TES OTHER
eW &`~ INO 14 wept.3VibWd TESTS
x'WATER CONTENT
w Swims Elwretl.tt 12311 teP1... I_ _1 viz,. •Blow•psiI.
1
00
E 0 WI Afty0
i
1lOU
loose, teem. tales SILT with trap et / 30 2 I
oriole:%otitis' owl suttePN Ilea U
3 I 411111111cuntgrovelsWtellies.
M11w dowse toNose Oleos Itg f M with
I,a I.tynt N neieplIs u t.rN 4 I1•
goo1as tItIt1n. aI. to r1w
toe 5
toady 1u,ly_sut•t u.,not.._... ._ --
ws `
iw130 3 •
M---•
9 Ip 336
is,li tilt! isms. llq G11 with scattered e9
L w.1076
floe le 1u111 vowels Mil silty slag it
it 1 • 1.1 lost.
12 I
t3 11 41.1 71 0 LL. _....
Sup dell is MI stag eloped tell nth 14 tali
led pops.Slices et owed 1ps. 1;• f'
lb I bt
tivu. 340
1.201
hese. moor MI ,.ttl oNN sill I000n oe4
t111M
5G •1?+1f1
snots it silty Ilea to etrte gulelly sot 1`
1t r 20 '• oet sullyt111 set ueltelN looses el (log
wilds
clay. HIS t1111ottl a1 tilted Wins'u1
slices souse the till liable. EIN3s K 103 ,• .
21t0 • •
w.124 7
ir ism23 I
t112wtoside
elope 24 L
sow tilt
25 I
e12coo4530
Poly Mow, guy silty SW with'alined 28 a
silt (islet sod MIISNtst Wiles.
27 =
1
MI
1
28I
29 t:
al
11(, ea
11r, . P.P. ism uM ..pre Si sass. 10 t 119
tilt n.i 11ems some set ei ea woe 111 Lost
lye es.11 ls4 11.4 is a,lu 1
rts
1,1.41. .t1• 71 I
u.laI NN1e1 a Mo 11u.sl Moo tilt. It1 I.
32 i 1 •
sn
3*
0
123 110.7 35 :
6
Wise Si swiss topletod 4/11/t3'
Slat:
I. Doors eats by 111514(M Was eiMsq I I
1Nl1...t testis wail 1/s method. I 1
1. '.Null, dolls pu114od by Ms esMl/yls•
1
1
Sn tl.Niglio',Sep U t.
1. 1":"."st 11„l,lltelnl 11met H ta.te N1us
I
I
Ina ,loathe 1M eppneusn ws.odUlu
4,4..e. 1.11 host; he.Iul. III It Ms,llme
A
I. ,s 1141. e•PIM.1.
I. S,MIi number Climb•,WIIi le lees
S. 1e11411 IN persist by Iss5Is ten Stole
11r104iy MN11mew1.
I
1 T
I
I I I
LEGEND coPlsOS C.n.•1w.lien told
PROPOSED
I 2-nII split 4 pos.M,•ple O ln wrt"roc NM
II 3-OD th.n-.SIIIsSSSatepl Os Uncoil.in.dC..w eMel•M (1M1 MT. BAKER RIDGE TUNNEL
P Semis.*p•1M4 S SIOM%el
pNisei CS Grp„'.t.y.;. LOG OF BORING E-13
s awls,Nisei
Ms•,Mq I...ls Psp Per to*
1.•rA 1M.1 SI•c Sl,c u4es DUNE 1973 W 1984-02• \
Met...'smite,eswMw m Seddon•
Plastic Howl ON.e..Ml•n soil SHANNON a WILSON. INC
g •toe
ROIL MECHANICS•FOUNDATION EN11IN1[[y15
III ws0H SlanOard 2-R.ng Sample VA. WeeiI unit weight (pct)
FIG. B- 31
F1
FlEI.D DATA 1--
LABORATORY DATA
SOIL DESCRIPTION e:
I^ STANDARD PENETRATION TESI
s
OTNEN {,WAl-ER CONTENT
i'r. I40 11.,..Onto NO-arutd
I
sa
a• i a TESTS
10ee.pert I
20 40
W SArtoee Elevation: 129 t Ices I_- ; 8'0 t' Q • f4'
11111. boo..., sandy Sill •/s,atle nd /t.•.11,
1 I
Cobbles and eig.nto•
2 1
SO1241 -
rrii Still. boon CIAt 3 I
31: 1,^.21IO 4 I
Cense to rats dense. Olden. Ion. Ila talus,
1,5 I10 r
silly, graeelly 1ANO•/tcllleled tilt 110111,
6 I
cobbles and hntaenlal 'Md.'.
7 I 62+
Cobbles A 1 14-
7.St.NA' 9 I2—.,I ,1/1) •e•
10 I
11 I
12 I t
II)_1•
991 - 30() 13.4 rut,1..VA., Mn Witd, CIA, t one %III •/1u111110 147If. AlA ,fins to coats. [,sloes. 15 P eini 12
16 I
SI,t11 9.'I4C ti1111••
440
watts (too to hobo sat ./srallU.d Walls -- 20I AC:
I
a•1 nay. l Nl.,dg, i i r11
j,i.
loci, 0..s, hi.. en, 111.0 Itotnn;e wally i.t I
Slit ./te.ila.d enroll end clap HU.11.
131 C, w•26(w.i2 t,1
bat 640
Vat/ dents. ltel. slightly $.111 1104 Id 26 I tph
i
Saba./seaUled lsanls to I" log tilt I r=
594- — —--- --
4997
27 I7C 1.'",+
tip dense. rip to Udell silty Itoe SOO r
28MZ
301 7 rip r...A
W..1 - • --. 810
1 Veil dense, bleed lino sandy Sill nth lusty r—
31 DX 1Ir; ,
taint end nall:entail 1100,.1.
Q I 1.f:,--es• S
day dense, goy to Hobo OCCatnnally Silty.,
IS'Silt
line to medium SAMO./italbrel sill 1e1111 -
IOCy1d-M
and MIIL.1a1 Milo'. 74 IO._
V: 1H3 110.6 :Sow zTC 149.-a.a
leltam el lotto'(110.1) Co.plated 4/I1n7
M01( :
I. gonna wide sr path,ngten Slate Mlgh.ly pgotbl.l
using loth lore Sethe0.
f. 7. labdnl.iy dila etl.r,ded by Ind I.MIIl0M Slots
I Of O.pa11N11.
1. 1ne II I,talun lines u. Inosa Nting Iola
te,.tdnl Ins al.nttm.la louses,los below•
sill II'.,,Ise It Mt,llel U1.!Il
left, be 11 I.
i
4. No tetrrsi, lows S,opl.l 11.14 71.1 71.
S. Wring log pflosfo0 by lash,.glM Slits
llgMo1 Oep.t germs.
y• .LEGEND CONSOC Consolidation lnl
I 2.0 D..plll S0004IOaple 0 Trammel quick Ie., PROPOSED
U 3.00 unto-.ou tube dsMiele 0u Unconfined Compression NO fires MT. BAKER RIDGE TUNNEL
Sample pushed S Stall Nil '
krnitl•nil r""
Ni7 LOG OF BORING E-I4
I Y. rater Wool 0S Groin rile oi.elersie
AiNtb.rl litluU: 15 Pertr,p
r LleuEual Slick Illcb.nId.. DUNE 1973 W 1964-02
NOlyc01 eOle1(Male. /N bde,all
el..ht haul
i
QONrr.li•R roll
neuaelkpwoa.lr SHANNON a WILSON, INC.
tilts DI vv5'W 5•a•,_irc: 2•RMq Sam.Ae -w Wet unit weight (Oct) SOIL MCCNANICO•IOUNDATION [NOINICRS+
FIG. B- 32
15
1
I SOIL DESCRIPTION
FEtA DATA LABOR/DORY DATA
s r".e STANO4O PENETRATION TESTter- 1140 Is w,ptl 30'dr p1 TEATS
WATER CONTENTiAIMCM
r
1:10
40 VSlarfwuEl.vfIM 1I77 feel 1
1' Hpa.11 $ollvily.ITANS. Pi/1os still I
1539-/sty.ultLt*!a/!ult«u panel.-r.B
i 3 ILiss. t.Mho 4.u, gay t.Mt. fight
brow. silty, Ilse t.aroma SIMS hits fiat B 4 I
colitis. rotes.(4'4')mid uetlwed grovel, /Blood 5 I1r illr411...... ar'
6 I
yI
Vitt stiff I.bird, den is llrlt Off pry 1) ]P 1 CN
CUT ./ led mod floe le 12 I
sun.grovel. Sllebi 13 I t
A _3G QUr1.56 1
bw.1207
11.1111 16 I
ptr. 17 IgorySloe
trill poem 16 I4C S
ditto 11'31161 460 &20 I 14w•1100
i Slid. dry is died gray CUT aM SKI./ 21 I IS.
acla.l gv/1, Mescattered I1N seed r
1}1.!
A' i 1uun
6 a { I 111.lil4 red( . /
10...1 4'550 N.4.1111%
Nord, d.r to do, slap Slll ./aterei 11 1'. 1;4 4 1,1
Iiau1N.
6C
Silvis 25 I 7 -a..-
92.7— 650
2
bare,M.gray OM.Wood ad peel to If w wplr.
S75 26 i1c 1.9/
Nord ow grayUenglog tobreamSILT«ta sa Ow
d T7 h 61
I sle 1a I/I'sad lists of grovel to)/4'
N• fIN
1291]
I.
sad sly.
28I 92-.J
sad-
ee7-4 750
Noss, Iallly dry grey SILT ail lime hoe WO.
791 -. -- 5 29 IeO 96-+r
gotten el lenag(11.5')
C.. l/tH 4/11/11
w11S:
I. kilos woes by NMHS.IN Stile Ntaeoy Pi..ldenl
liaise'glary drill (ag. 1
I. Loorltop dill provided by Me'gMlogten Stata
Nlgr.uy Piper omit.
3 Ta. ttnllllallen It... ea /5B1 billies logs
aenn'Iwe11 Now mitesi
tell tyPH, N/.1r«, IW I,Msllle.say. 1• lost,
sa varier.
1. 'g tet..ery It..moles).e,eoe IS.
I go..ot log ..quo NT 1H.t.ps.Slate
Nteeea.Srps.i .l.
1
f I
LEGEND CONSOI_ Comolid.henleol •
I 2.0 D (PMspoon tomcat' 0 Tt.os.ol q..elt Thal PROPOSED
11 3'00 MM,n-.al11NW sample 04 untonrin.ICarser...l..lw stir) MT. BAKER RIDGE TUNNEL
P Semple pushed S 51.41.aa
ample we,recwored C test LOG OF BORING E-I5YMelo.11.11 GS Glee Sae wn p.ae
Au..der.Laois Patton§
I i w«a..lelaI She1 Iltcbwwee JUNE 1973 W Ib84-O2
Q oN. ..I`..`.lt.
SHANNON 8 WILSON, INCp+.awn..liellea••'w•tef
E N$X S7eJI[ ? Ring Sample 4 w 'Wet unit .tlgl (ptf) OIL Y[CNANIC1•FOUNDATION [ININ[41K,..1
FIG. B - 33
I i1CL0 OAIA I
1 AIff11.A1pkT (MIA
Ie .I SIANOAkD 1'(W.Ik IIM T1S;SOIL txsta1p11oN I- Is Illl I.. . lenl 7v a...l • .safe
AIIM I(WIIN1
A ale.. 1..1 111•:
S..I.i1 11..011a.' 711 7 I..I I` I• 0 71 it ell a ,7S e0 .1
Vr.. .Ir i..r I......., ..lie IS,,, 1, iu. :ASP.1I 1
a 1.1r ....I 1 .•nd awl Ilur ...1,1 I..I Al IA1 111.1•11 •1]. Ay1 I .i17 '
I-I
1 Z 10
1 1 le 1/• 1
1 7 1 ..A
SI r
11-
111 I. 171-
1 Z , I I!-
11 I1
11 .. 117--->'
71 IOI ..7
I
111-
1J17.7 i D.e:.r 1.. 1 el 1 dr1.:.r, 1.1..1. 10 ytav-hfuea, a111V. 11 T ..1 .I
Ill.• I. r...IS. BALD; 4...11.1.d rca.el.
I 20.IG I
11•, I0 I
70I.1 17.! ,71 el---IA I•
uso tra
I .
V.,.tell sluff I. hard- a.• 111,01 N111: (enerally
11
1 I•alr; Wet sell or else I DOS.trace I I I O.Icr.1,I. trace sllctrnsldra.
site ' 1/ - -__._._t- "- TO - 1 .-
I I T I
fir
ism1
1
lo= IS 1
A
II I •
72 li I I
71Z 4
111
71 u
71 I I'
2111P .'°.. IS- - -- -
I -•- - .
1
71I " Lr
70Rr o
PI " I
1I "II; `
0 11
Pecs sU tt to herd. tray. Moe. SILT to silty 110
CIAy; cenrlall7 osssssr; trace 1 I fine J
sand; 11 sre (caret; trace allrtrnulel. IIIIP/
71
1
11IIr 11
I.IICZO11I '•'-"DAMAGEDDAMAGED Al 4r
7/jj 1 0/ I7. 1 1..1.70 1SF 1--+Y--=M
71]
1 1. • 1t1.1 p.1
471 4 fN
7
lli
II/
rii6
IIIIr
112.2 ells Slj lei I
v.n sot11 se 17.1 [rso, U1tr II07 lauutsd 11 111 Ql.e-
y,,. a11. dater atlt and lane .as.l, Sa
j. soars. 01 i 1
17 1
e, .
17.1 ,..I
u
l. as pi 111 ._ . .1C.-1.07 111 I .---...
i. ••
1e, Icl•7 ,..1 • • 1
11!
I
1, i I •asap
II
III .
11 CM
U.1
Hard, tray. claret SIII, !seers of silly caw 7elscp IS/ ---- -.,.--.I
and 11110. !Inv to •rllu.; nand; ,a.tnlled to I
71f 1,1-=a. I1
L
Hon ....1 Mt: 1.1•:11 AI'CU UN Mn.1 1•AGL
III 811 1111C1110N 1111(S IfPAls(NT TM( A//IIII.ATI
ON101011S 11111111 $OIL 1V(S NI 11( 11A.s111/.
µ{ I41 11 C01/0/l
ua'Q PROPOSED
11' 1.1. 11111 eOAn u•11.0
II f' 1.1. 111n-ealI tale u•11• Ienteel_i. seal MT. BAKER RIDGE TUNNEL
II /.ttlnite0 u20111
Islet Islet levelLOG OF BORING TH—I
84./1e set !.tell/..
o 1 118111: 11Hre01 lea Sett 01
N_.Unlit 112I1 1 MARCH 1980 W 3'. '3-03
I In...1 . ..4...•..1..n teal: fat SHANNON I lIl SON.
to.. ,.I
I1.111e l.sol 11 11ar. 1...1. 1'1..11.11v a1/11CNNICIt I1a1Ylts
M7
NI Ills. 1.1. ,.1ass1.11V
33 SHEET I OF 2 FIG. B-34
i
FIELD DATA LABORATORY DATA re,.
SOIL DESCRIPTION r-•. T.'._l STAl01RO k1ETRATION TEST I _._.
t :-mom
u1lb. 'eight. )1- fill) I
OM.RATERCOME$'
Y 5•1: •Ilan ou I sl
f1
It I_
2t s1 1III1211 " ''
i
s.
a, .
I7I l a••
1217 I l l I • y.
1I
16IfI111--•.TS)'11%.4.1A
I
ivf111
11 I
NIT!
11 if -4
I113.-I '-.41
51.2 .4. - ITS 11
II I III lo"-+• I.
lnt,tbtddtf, %try fret,, gray. stilt. fine SAND and III, I I
121 .
harp. oral. cleles Sal old sshlt SILl. I
11.2 — 11111 I8IIC /SI I•-------... . •
Pert . grit. slightly silty. tine SAND: IIII 214-4-iS IIIofclove), silt; (Tilt medium to Coors, send.
III 141-_
IIII 11 115--
11/ 1/,-.-1 •111
i -- 1Mt1100 OY 1MMIN1: (213.1 legit)--_^ 713.1
etiMP2111.0 1/71/10 I
i
III p{
NOTES:
I. bOIIINt,IcAbL by MASnINLTON SIAII DtPAMINLNI of 1t:ANSPO4IA11AI( (MSDOT) USING A
Idd(p. 'UUhlli1 hJalll MOW I d•lii INtlll Mlb AND A 4-!NTH I.D. MUTTON Sltoi AMGtIt.
bOMIN ;n4 IN BASID ON IIIID LOuS by WSIWI AND LAsUNA100 Dt (.oIPTIONS .Y I,r,
11ANNUN a WILSON. INC.
3. Nu. ;Id.11l1LATI0N LINLS UN 114S4 oMMIN( LOGS NtrItStII Ilk APPMUAIMTt WOND-
i,,I(S ot1MLIN SOIL TYPtS. HUMtYEM. IHt. TNANSITION MY. IN FACT. dt osADUAL.
1 1' 1.1. split cmccc simple,
71) PROPOStD
n 1- I.I. 1m1....11 Iat• ...pi. 1 Its sell
I•st..Iill simple, MT. BAKER RIDGE TUNNEL
2s..1. ,.shed 1[f. Ill,. ler,t
Savoie r,/~,ref I LOG OF BORING TH—
snuteig 016,19: I Its,ne(Iee .a11 er
i-- —`--4 —11I.i4 (loll I ) rl eta•(ter
nli.ee c np.e..Ion r.•I, I.l
MARCH I980 W 3573—O3
v. r
1., wr...nll wlK,.t, pcl
pill,le Ilnt PH • clay. 1.1mA pl..SNANtIGN ( fil Slid. •;Nr. -
NI. Silt. low pl.•I1.1cy C711ttlll
Ill 11 , tp . Ft',-. B-34
A
c
FIELD DATA LABORATORY DATA
STANDARD PENETRATION iEST -
A-
SOIL DESCIPTICM 1---— en"
flu 1.. ..1,AI, fo dt.rl i CATER CONTTNI
o. Ins In IuI till!
lla..l lea: Irr.o 1•.t 1- • • 1;-- -A I)1 lit II
1,1, 1un.r, I.lu.n, .1111, IIn• AA•tll, list• i 1_ tf-/1
dims In r, tan., lint In Casimir ar.lrl, 3' tin ---
aw0 nitswlf. 11. .
1 •^ 11) 11 I
1 J. 14 1•
1.i, Jen.•, 1,1n.n,Inv NANO, list• S•1 11
arJ1u• lu costae sand and line In r„a1.•
6.11.1.1, Irosr• of (lase) sill and all I 11 -+
alit, lie. sal T„l II.1•r1.1 1;111 1 Si 'I, 11r it/-j_1A
Its n.r, I'.1 a1'-nln•n, slits Ilnr SAND;1 I I/
arJ1u• to coats. sand mind 4tavr1 1 I I
i
11G l-..Pi 10I. 0
Srls S.W. 11•,. .lair, SILT I• s11 ty CLAY:
1 -
Its,. .41J •rJ rlarrl, 'ill palllnra;
all i0r.1I I i
I1
1411 P
11 1 i I •
1/ 11
t11111
r7
24
141 . 51 1j: I
rely altft I. nsid. 2. . ..I1, 11A), II., 711I 1•
I •
sand And {r..el, sill pall iii-.; *Iii ides 11
I
1111Pi:„/e
y I •
17 '
iI1i 1
IS
II
11
A1
1
41
Iii
AA I.AI miss
11,1
1 r'
1 I
1I r
Si 1/1 Nn•1.4I.- - -i---i —(2t-- -
I1
4
iv ' 1i'.: pc . •
11 liu•1.11 1Si
r._ •
IN
I
1 11 .0 pcl
i. 111.k-- - ---- ----- 111 I{ I a
k'f C'er1 stiff to i.rd, 1r.1. A11ty l'IAY; 1 SIS1 II
1
and is)eri of Claye) •lit; feat. Silt pirtinls; II
altcl.en.ldt. I L.
111
3
II
17 li
I26 Ps
11 I ' r - 1 1 .1 p,I , .• --
1 _-
Ir
41:1
51
II
7i
II
c 13.S iu I/ . /1
t, Nerd. gray. clayey SILT; trite 4111 sad e.a•f 71 i
silt p•rtiw,t; 'anal I t silty ttsy 11 -
r flat sand; Is.l , Irate al/tteaald.s Qu••.1. TS/ iM I
a
11 IS•-•..5 -
I! •1 p.l • •
mix
1/ t11---• 4 _•. --«
4.; ggq I ,/ II•i1+'--
IS
n i ...—.-._-._ _' _._ _ __. _.__._ miss_ 1 —.
t miss -
11 I--
t1MTi1 r,ttiTff'F.D'US1T AC
101 21111111441110 III!! 1I/1t1ISI Tel Apf1111.Ai1
saw umt•111 Illolle S111 I1ISMAS/ IMI TIA/SILL/.
IISFACIs AT II
17- 1.1. 20I1t spat. n•/1.,
PROPOSED
II 1• •.1. ttla-..I1 tube simple Saata.11e sell MT. BAKER RIDGE TUNNEL
Ails/tea moll/
Ile tttttt I"'!
LOG OF BORING TH -2A
SIo eelrtm.rolr -' ' 'Lee toll•rILrmrSMille:
t11.1111.11 pi MARCH 1980 W 3573-03
W • UneeMlned ...ry,..n.1•e 1•att tar
SHANNON a WILSON,INC.
ll.i to Ii•1t r1l • W1 unto 'fright. pcf 6COTECNNICAL CONSULTANTS
fN • Clay, hlph pls•ticlty
ML - ill!. los plasticity ..
SHEET i OF a FIG. B-35
PIELD DATA LABORATORY DATA
SOIL DESCRIPTION C- =r•1 SIAIQARD PE1iTRAT101t TEff— outs B RATER CONTENT
11 i ^ _ 111.• psi loot R111
1 1J.._ 18 I1L--11—•_J L-- I bib--
1 1, /1.11 141—..4
le illII.s.
171 i I I 41.Y--e
f7.1 -- -- - -. ..._ _ dada.. - 11111 111,-•----.._------
1L71111:_rA
Paid. gray tiey•7 SILT; layers and IOnse of. 1/1f El 113•..y
Clean line to ',Olds sand;Ill port- 11 141 91 y.,•
Inns; tray, font Arno! 11± 111
1111111
IIt11! 111 I5 /
j
11.1 1111u— I1/1'
ter) , pray. fide to tost.e SAND; -
11'1" sl It 1lafea sod hue suns 114 x
illy
ISOM
111 - -
5O7TOM OF DOMING - - 111.3
COMPLETED 7-7-AO 211 1
IIIl y
NOIESI
1. BORING MADE BY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION USING A TRUCK-
MOUNTED MOBILE MODEL 1-61 DRILL RIG AND 4-INCH I.D. HOLLOW STEM AUGER FOR THE
UPPER mO FEET AND 3.5-INCH TRICONE ROTARY Ill WITH DRILL RI6 FLUID FOR THE
REMAINDER OF IRE HOLE.
BORING LOG IS BASED ON FIELD LOGS BY WSDOT AND LABORATORY DESCRIPTIONS BY
SHANNON A WILSON. INC.
3. THE Sie.AIIFICATION LINES REPRESENT lit APPROXIMATE BOUNDARIES BETWEEN SOIL
TYPES. HOWEVER. THE TRANSITION MAY. IN FACT. BE GRADUAL. f II
P
B
LUND PROPOSED
I 7' 1.1. split ttttt simples
ji 7 1.1. tons-nil 1511 umpla Beat/alto MI MT. BAKER RIDGE TUNNEL
I 1.sbUltSA motel
1..1ls ttta.d l• • Islet level LOG OF BORING TH-2A
Lq1. .et tatat•t•O
tnrt..o 11.111: 1 lo. ,.II •t
1 • --' Ilsoli 11.11
Pi/assets/ MARCH 19t30 W 3573-03
SHANNON a WILSON,INC.
t1 r'tl 1rt•1 A^1.
I vv<%a.n staid III GLD7 LCMNICAI CON$JLTANT$
plaslls milt Ir • re p
IN Cloy. 111,;1, p14•Ilrll•
MI Slit I , t'I..t 1a 11• I
SNIIt z -- FIG. B-35
1
I .,
Est. Surface Elevation 212 feet
8 0'
SAND and Drove 15 min. Blue CLAY hurn• 30 minSmallGRAVEL
ater
it
at 1 ft.
ose t . #
n (.6 :in.ose t.• n
999
m n.
Drone 15 min.
n m n.
Q
10' 90'
SAND and Drove 35 min. Churned 20 min.Small GROVEL Water T st at 100 ft.with Sma 1 Rose ft. 11 45 min.Aaount o Rose C ft. in 2 hrs.CLAY
20' 100'
Hard Pan Drove 12C min. Churned 15 min.
Water /e t at 110 ft.
Rose 9 tt, in 16 hrs.
Drove 120 rain
Blasted
30' `
Blasted
11•
Blue CLAY Drove 35 min. Churned 25 mmn.
Wafer Test at 125 ft .
Rose 50 ft. in 60 min.
Rose 51.5 ft. in 65 min.
40
Churned 15 min.
Bottom of boring - 125 ft.
50'
NOTES:
Boulder
Drove 5 min.
1) These boring logs are redrawn
Drove 30 min.from driller's logs prepared by State
Department of Highways circa 1937.
2) The stratification lines represent
601 the approximate boundaries between
soil types and the transition
ggl1ue C,AY Churned 25 min may be gradual.With White Water T st at 70 ft.
Partings Rose 2 t. in 1 5 min.
Hole Diameter 1L ft.
70'
Bile (:LAY Churned 15 min.
UdaterTest t
30
ft.
ose 5 ft. n s0 min.
Rose 7.5 ft. in 60 min.
PROPOSED
gp' MT. BAKER RIDGE TUNNEL
2A LOG OFBORINGT - 1
S JUNE. 1981 W 3573-04
SHANNON & WILSON, INC
tie meowficAL CONSUL TAN IS
55 FIG. B • 36
WORE Ind
Surface Elevation 147 feet
GRAInd
Drove 30 min.
Brown CLAY
6'
Brown CLAY
s
Drove 60 min.Wate
a small
GRAVEL
4 ovel
11'
Brown CLAY Drove 30 min.
C1rsY
17' SAI
a
Blue CLAY Drove 10 min.
na
2 0'
B1Ve CLAY Churned 30 min. COW
mallGRAVEL
Water Test at 30 ft. Gray
5 Rose 2 in. in 0 min.
30'
Churned 30 min. Blue
Water Testt at 40 ft.
Rose 5.8 ft. in 10 min.
Rose 6 ft. in 30 min.
40'
Blue CLAY Churn/ 30 min
Water 44s at
in 10
s0 ft.
ose 1.5 tt. in.
NOTES:
1) These boring logs are redrawn
SC'
from driller's logs prepared by State
Brows, JM D
Department of Highways circa 1937.
CChVrne 60 nin. Sample at
and GRAVEL 5 1
CLA and SAND
shows contact 2) The stratification lines represent theof
55'Water leaks out in SAND. approximate boundaries between soil types
and the transition may be gradual .
gl 4e CLp Churned l min.
and CRAM Water lea s out 10' in
60'Q 30 min.
Churned 15 min.
64'
D o n CL/Y Churned 30 min.
Wrath SAKI Water Te t at 75 fit.
and GRAVI L Rose 1t. n 15 min.
Rose 15 ft. in 30 min.
70'
Bcttom of Boring - 76 ft.
PROPOSED
MT. BAKER RIDGE TUNNEL
LOG OF BORING T - 2
JUNE, 1981 W 3573-04
SHANNON& WILSON, INC
GlOitCsousCAl COrwl,A+flI
FIG. B - 37
Est. Su-face Elevation 226 feet
80'
Drove 120 min. Blue CLAY Churned 25 min.
Water Rose 6" in 15 min. Rise 31 ft. in 30 min.
o;ater Tabl z
overnight
10' Y_— 90'
Rq{
ed Drove 150 min.
churn*4 5 min
L ise 313 t. in 10 min.
andBrown ise 0 t. in 3Q min.
1•v 15' Rise 39 t . in 660 m n.
aND Drove 150 min. Water
nd GRAVEL Rose 8" in 10 min.
4 ft. in 30 min.
201 100'
C Churned 1GravelrvledWaterRoseove120m12" in 15 min. Riieni8 ft.min 1Q min.
Aise t. n 7uu min.
30' 110'
Blue CLAY urned 13 min.1ateft. in 10 min.
Qt. In 30 min. Bottom of Boring - 113 ft.
2 t. in 60 min.
40'
NOTES:
Churned 20 min.
W t r Rise
i
1) These boring to s:are redrawn
C: in 3 min. from driller's logs prepared by State
35 t. in 60 min• Department of Highways circa 1937.
2) The stratification lines represent
50' the approximate boundaries between
soil types and the transition
Churn a 0 may be gradual .12.mtn. 10 min.
es Rise 444 t. in 0 min
Rise 0 t. in 0 min.
6O0
Churn
r.
r.in. 8Sae min.
Rise 29 . in 3 min.
Rise 50 . in 0 min.
70°
Churned 5 min.
tise 7 t. in i0 min.
Rise 3 t. in 0 mire.
Rile 52 ft. in o0 min.
PROPOSED
MT. BAKER RIDGE TUNNEL
80' LOG OF BORING T - 3
JUNE, 1981 W 3573-04
SHANNON & WILSON, INC.
1110TICNMKAL COMenttues
FIG. B - 38
Est. Surface Elevation 174 feet
Yellow CLAY Churned 20 min.
No Water
10'
Blue CLAY Churnqs; 25 41n.Rise 3 in o0 min.
20'
Churned 25 mtn.
Rise 8 " in 5 min.
30'
Churned Z0 min.
Rise 14 it. in 30 min.
40'
C AVEj,1nd hur A 20 sin.Bllue cc i
Else
In 110 pin. NOTES:lye ft. in 6i min.
1) These boring logs are redrarnBottomofBoring - 45 ft. from driller's logs prepared by State
Department of Highways circa 1937.
2) The stratification lines represent
the approximate boundaries between
soil types and the transition
may be gradual.
PROPOSED
MT. BAKER RIDGE TUNNEL
LOG OF BORING T - 4
JUNE, 1981 W 3573-O4
SHANNON& WILSON. INC.
itORCHww cauw1AJOS
FIG. B - 39
i
lr
Est. Surface Elevation 204 feet
pp pp ,,/A
80'
1aidwGRAVELDrove30min.Blue CLAY Churned
se 8nit.
4'in 11 m1in.
Brown SAND Drove 10 min.
Water Test
Prained out 1 ft. in
10
30 min.
90
Blown CLAY Drove 27 min. Churned 25 mtnandSANDWaterRose6/ tt.
in 10 min, 30 min.
16'
Blown CLAY
19
Drove 5 min.
20 cx '
GRAVEL. and Drove 5 min.
SAND
23'
Bottom of Boring 102 ft.Blue CLAY Drove 5 min.
Drove 5 min; No Water
30' CChurned 30 .
Water Rose 5.5 ft. in
l0 min.
40' NOTES:
Churned 25 mi8fn.
t. in
1) These bcring logs are redrawn
90C min.
Rose 1
from driller's logs prepared by
State Department of Highways
r Statecirca 1937
037. 2) The stratification lines represent
50' the approximate boundaries between
cent soil types and the transition may
Caen Churned
ose
37
it.ryin be gradual .Wat 11
in l0 min.
60'
churn. 20 minateFRose8 tt.
in 10 min.
70'
ChurnedCu 22 min.
int10 mine 48 ft..
PROPOSED
80' MT. BAKER RIDGE TUNNEL
4 LOG OF BORING T - 13
67344 JUNE, 1981 W 3573.04
SHANNON &WILSON. INC.
wo mmuc u cossu.uan
B — 39 FIG. B 40
i
1t, -
Est. Surface Elevation 260 feet
t 90'
e sow 2'
C rented Drove 3 hrs.Water Testat 11000 ft.
f
l'
C VEL In: 6 f``
t. in 35 min.
Rose 21 ft. in 16 hrs.
kited at -
10' 100'
Drove 75 min. 102'
1' ter eat t 15 ft.
Blasted at ose in mip GRAVEL
and , Diamond Drilled
14f t. Cie,' f;. n 25 sin.
EL 105
Drove 85 min. Blue CLAY Churned 35 sin.
Water re t at fiQ ft.
Aose 1 tt. in 0 sin.
j 20" 110"
pltlaied at
22'
ji TPacked Prove 45 mien.
fhGRAVEL
fD grit! in 7sipt.
CLAY an
Agee 9 t. in 0 sing
Drove 30 min.
30' 120A
32"Churned 35 sin.
Cesentelr Drove 60 min
GRAVEL Water Test at 37 ft.
Rose 3 tCC p
Blasted at 37°
Rose
11 ft. in 3o sin.
27 ft.
Drove 195 min.
40 Water Test at 45 ft. 130'
Rose 4 ft. in 7 min.
Rose 5 ft. in 32 min.
3L sted at
45 ft.
47'
Packed ; AND Drove 70 min.
and GRAVEL 50' 140A
52
Churned 15 min.
3'
Drove 4 hrs.
56 Nater T st t SS9 ft.
ar-- Rose 9 rt. in 8 sin.
RAVEL Rose 25 ft. in lQ sin.asked 7a0' hose 40 ft. in 0 re.
1S0A
ClELei Drove 3 hrs.Churned 30 min.
Little Blue
Lost Water at 165 ft.
CLAY
68"
Gementel'R 70' Drove 1 hr. 160'
GRAVEL
73' 163'
Blue CLkY Churned 1 hr.
SAID
165
Water inert at TO ft.
Rose 4 it. in 0 min. Soft Blue Churned 5 min.
Rose 7 ft. in 50 min. CLAY
80'
Churned 35 min.
Bottom of Boring 170 ft.
to 100'
PROPOSED
NOTES: 90' MT. BAKER RIDGE TUNNEL
1) These boring logs ere redrawn LOG OF BORING T - 14
iron driller's logs prepared by State
Del-artment of Highways circa 1937. JUNE, 1981 W 3573-04
2) The stratification lines represent
SHANNON i WILSON, INC
the approximate boundaries between
ronc.wCA corwumn
soil types and the transition may
be gradual.
FIG. B • 41
I,
171
Est. Surface Elevation 151 feet
Brown CLAY Drove 30 min.
7,
A i'
EL and
9' Drove 10 min.
10'
Brom CLAY
Drove 20 min.
16'Drove 15 min.
Blue CLAY
20'
Churned 24 min.
Water Test at 30 ft.
Rose 2 ft. in 10 min.
30'
Churned 45 min.
Water Test at 45 ft.
Rose 15 ft. in 16 hrs
40'
NOTES:
1) These boring logs are redrawn
from driller's to s prepared by State
Bottom of Boring - 45 ft. Department of Highways circa 1937.
2) The stratification lines represent
the approximate boundaries between
soil types and the transition may
be gradual.
PROPOSED
MT. BAKER RIDGE TUNNEL
LOG OF BORING T - 15
JUNE, 1981 W 3573-04
SHANNON & WILSON, INC.
OT{CMMK.AI CONi tIMITI
FIG. B - 42
Est. Surface Elevation 162 feet
Brown CLA'Drove 5 Ain.
Drove 7 min.
10'
14'
Blile CLAY Churned 45 min.
20'
30'
Churned 30 win.
Water Test at 40 ft.
Rose 6" in 5 win.
Rose 1 ft. in 30 min.
40'
Churned 25 min
Water Test at 30 ft.
Rose 2 ft. in 10 min. MOTES:
Rose 2.5 ft. in 30 min.
1) These boring logs are redrawn
from driller's logs prepared by State
50'
Department of Highways circa 1937.
Churned 15 min.
2) The stratification lines represent
Water Test at 60 ft. the approximate boundaries between
Rose 2 ft. in 10 sin. soil types and the transition
Rose 2.5 ft. in 30 min. may be gradual.
60'
Churned 15 min
Water Test at 70 ft.-
Rose 4.5 ft. in 10 min.
Rose 5 ft. in 30 min.
70'
SAND and Churned 15 min
Small (RAVEL Water Test at 80 ft.
Rose 4.5 ft. in 10 min.
No water overnight
PROPOSED
MT. BAKER RIDGE TUNNEL
Bottom of Boring - 80 ft. LOG OF BORING T -1 6
JUNE, 1981 W 3573-04
SHANNON&MUM, INC
w.11c rx o NOWLIArrll
FIG. B - 43
SURFACE ELEVATION 155.7 FEET
0
2
4
6- •
g- Brown, silty, fine
to medium SAND
with grovel 9
10•
cobbles sides of
hole caving
slightly
12
14
16
I-
w
L 18
201
w
22. LEGEND
PBT-I
e 0 Plats bearing test
24- location and designation
Brown Iron
26• coined(audited
TILL pocket)
eon tine b Very dense groy,
Brown Won- MN:WM very silly, fine to
28• mewed SAND), medium SAND
aiduea with scattered
TILL PotkH) grovel and cobbles
30 —
Pe®) Giociol Till) with
clean tine additional features
D os noted in
log32- co,.Gr twee
graphic
sandy SILT
34•
PROPOSED
MT. BAKER RIDGE TUNNEL
MAP OF TEST
SHAFT TS- I
38- OCTOBER 1971 W 1984-01'
MAP CONTINUED ON NEXT PAGE SHANNON $WILSON INC
GEOTCCNNICAL CONSULTANTS
SKr T I Or. s
FIG. 8-44
y•r
8S W N E S
wry dense.gray,wry silty. flow to
o medium SANG with 'mothered {L'
r growl (TILL)
HigNy slickensided
r confect ti;:::rr below
42'
441
Slickensided pocket
4 6- parallel to shaft
cicurnlerence
Gray song CLAY with
48' i slickensidesitop a bottom Hard, gray, silty
r CLAY with some
scattered gravel,
50 i 0 PST-t massive,slickensided,
Darker CLAY trace of white silt
stringers with
52 Fine sand Ions odditionol features
as noted in graphic
log
54-
t'
W Ton silty CLAY
Silt sloe-`Sin stompers
56 —
Z Ton sandy CLAY
2 58^ Tan silty CLAY
Drown, silty line to course
60.C--Jak- —_--` SAND (Dscompos d)->
LEGEND
PAT-1
o
Plate bearing test
62•location and designation
Hard ton SILT Hard, tan, silty CLAY
Silty sand
in fine%God with truce of sand and
64 Groy cLAr occosionol thin gray
Groy CLAY `
t streaks with odditionol
f ww."'"2 u1ty CLAY rt., features os noted in
s
i; graphic lop
66
1.- •- Irreeulor pieces of
L_ -) -41
nord Ian SILT In
68' l t)`b '^ovi, et lane SANO
V .,\°Grey SILT oatj ,
70 2 • -3\l T CLA
i--
a-n _
zb=«-
Hord, ton,slightly clayey
to fine sandy SILT with
sand 9 Groy SILT with ton (
some$
72 owl wd
PROPOSED:
74 /SILT
noted in graphic log MT. BAKER RIDGE TUNNEL
Silty said ` Croy,silty to clean.line
sue-,SAND dinning _n- MAP OF TEST
sees__ .?1.11 SHAFT TSI
76 •` OCTOBER 1971 w 19134-OI •
Groy sill•c --J t ( t ' SHANNON S w1LSON INC
1 - ,
us01WCIw/N'.A1 CONSIll7ANTS
MAP CONTINUED ON. NEXT PAGE witty z or 3
FIG. 8-44
78
S W N E S •
Very oenu. Gray,fine SAND
brown•QrO. — -`-- I
80- Sand-Till texture
I silty ;novelly One
TILL TEXT
Ton, to cooru SAND hlyM)
wnda II T fine
82 AHo
s ofir
84 .____________J'
I- Cloy filled joint
w [•no of f set) Ton•silty fine SAND with
clean sand stringers
86- Ton, silty to clean
fine SAND with
clean fine to mediumF-
w 88- sand pockets or
u
7 lenses a occasional
c— _ ----.. silt stringers or
Cleon sand(type)!••
lenses with
90- odditionol features
as noted in graphic
l J ti log (Clean sand
92- pockets shown
diogramotically)
7 NT-1
95 C.......z'.,- Tr--,. .
Bottom of Test Shaft
LEGEND
eT-1
0 Plate bearing test
location and designation
M
A+'
PROPOSED
MT. BAKER RIDGE TUNNEL
MAP OF TEST
SHAFT TS- I
OCTOBER 1971 W 1984-01 •
SHANNON IS WILSON INC.
GCOTCCNNICAI CONSULTANT{
SHEET 1 OF s3-44: FIG. B-44
D
R
i
SURFACE ELEVATION 204.6 FEET
4#
S W N E S
0 Loose.Drown,silly, Imp io Tedwin SAND with grovel and _. ti
roots(TOPSOIL)
2- r
c1::• Brown to light
5:7:• ' ' s ;.^ Drown. silty fine
s-'''''••-• ' French Drain `.• ::* i:".
4- vpv.:. SAND with
Bocklitled with ,s••.,.. ovesi.i••• rounded cobbles .: .
r
4.
gray*-- _. •ri..•• fit:
4i:•..::•Green-gray, silty
8-• s•••'•;:•rf.• . 1: fine SAND with
i;'?;: grovel
12-
14-
16-
i.. W
IsJt`
18-
z
S
a 20-
WO
Gray.laminated.
LEGEND22- slickensided silty
CLAY with silt
gratings through- --'-,,m Major slickenslde with
relative movement, If
24 Z—.---_ tuoutandoccoonol
scattered grovel
discernible.
and cobbles.
26
Approximate
lines
represent dark
gray cloy layers.
28 Space between is
light pay, massive,
A silty cloy with silt
30- patinas though-
out.
32 f
34 •
PROPOSED
MT. BAKER RIDGE TUNNEL
36-'
I
MAP OF TEST
SHAFT TS-2
OGTOBER 1971 W 1994-01
MAP CONTINUED ON NEXT PAGE
sNANNOM f WIltON INC
GCOTCCNNICAI CONIUL?ANT$
r i°`
FIG. B-45
11
s W N
42 S.oy,fine io medium SAND
Fine SAND--.AV'113
44
Fine SAND Gravelly
1 CLAY
46 /_ '
Sandy CLAY
Cobble
48
50 -----<6"owlly CLAY
52
corbble
Random U
slickensides
54 Typ.
11W
Wv
56 --Gray,silty CLAY
i slickensided sond
with scattered
w 58 ' `
grovel and cobbles,
I
massive.
o
1' L,
60
PST-a
1 \
LEGEND
g Major slickenside with
relative movement, if
62 ..__ discernible.
FIST-I
64
0 Plots bearing test location
and designation.
Shaft diametrical deformation
measurement
L
70
SIICLensleed'`
72 zone
PROPOSED
Some erotic
MT. BAKER RIDGE TUNNEL
74 sill portings . MAP OF TEST
SHAFT TS-2
76
OCTOBER 1971 W 1984-01
SHANNON a WILSON INC.
GCOTCClei ICAL CONSULTANTS
MAP CONTINUED ON NEXT PAGE
45_
SHUT 2 O•
FIG. 8-45
al.fimmmr
i
76S W N E S
i T .
Wit patinae
78- /.
84-r
861 1.
88
GroCLAY---
90- Dark gray CLAY
i
i-Gray,laminated,
silty CLAY with
silt porting*
t5
96'— throughout and
occasional scattered
grovel and cobbles,
98 opprosimotey LEGEND
horizontal lines
IIrepresent dark gray 'Major slickenside with
100 cloy layers. Space relotive movement, if
between Is light gray discernible.
massive silty CLAY Per-I
with silt partings
Plate bearing test location
102 and designation.
Joints (Typ) throughout. Unit
r contains two major Shaft diametrical deformation
joint sets, one measurement
104 , I' oriented North-South
dipping 90 degrees
and the other oriented
106 East-West dipping 50
degrees to the South.
108 ~. Th my Iomm01
110
PROPOSED
MT. BAKER RIDGE TUNNEL
112 L.L. MAP OF TEST
SHAFT TS-2
114
OCTOBER 1971 W 1984-01
SH4•JNON 6 WILSON INC
MAP CONTINUED ON NEXT PAGE
GCoytcHMlcAI CONSULTANTS
SHEET >,a•
FIG. B-45 ----_
4.
W N E
114-
116-
118
Pe T- (.(5-1/11-17—.gotTire-Tc—rne
120
u_
F. 122
a.. JoInte-N-S
UJCI 124- Approximately vortical
126-
128
SlickensIde with 1/16‘-1/0"
opening between surfobet
130
Bottom of Test Shaft
LEGEND
slickenelde with
relative movement. If
discernible.
PST-1
Plate bearing test location
and designation.
ion Shaft diametrical deformation
measurement
PROPOSED
MT. BAKER RIDGE TUNNEL
MAP OF TEST
SHAFT TS-2
OCTOBER 1971 • W 1984-0i
SHANNON &WILSON INC.
GEOTECHNICAL CONSUlTeNTS
SHEET 4 Of 4
45 FIG. 8-45
11.1111,,11•••'-
ri
I EB /06: .4e4. • '
319# LA • ' : : ; ; :
El. 80.7
4.4! , . ; • • : 1. • .. . .
4 1,t§SL fr?/171,211; - 1,. YBDO 47a1V0 t:PF:Ff;t://
L-
3:43 7/Z5-
7-
ajkit?—ffr J
g' J—
1 ZLi:1"..4 'Ai. ...54:.Conilcioi- 13/6Wri -av, Sapd &nye/ Si,: i/
ci ,
Sca/.: .
tisn"./.:, We r
13.-1 1 i54;:i.itei.ie. *:17ne :Soiirl'Y'S.o;ne-* . 3io!..ar. / .127y .5,/riy So `,(17/7i.Z.n..1 •
HI- ; 4.71•11.10,e/
114. .5tii Al AO/aid, Bricii)i, - • . ' . - - I I
Cl. , v Sil l. /...5ino7i.7-7--7--awr77,5i/ri12•2. i I
Vci..54 F.itic:Sotto/ I :
36-
57. .
1 G.E.aiel. Scai.: Thrzi-iocil/ s,,,7-
0 we,, Sandy...14:.5;1/y16/nye!, Wei
1
8-12- --
3 _ . :-: . , : : : . .tSe.4?tr-oeuti-1/7 Gray S)/t' VS;h1
I A4/A.-;-. : : ' ' ' a..- __...Tr;) :6-etliP.1,....,06;2p__—___1
3/cry L: nse. . :retywn-371.7y ---- i
69-— Fiiie :Sand 11/...5oine Grover(
1 I
29- , Cain Ti> De.h.ie 2ifeOwn_I
3S- ., 1remel . A7ne_ Yi. 7 : . I i
i. -r_. •
scthcie:tin ---- 1 - __L_L__ ___ _. ..1
Tz I
j -* i- 1
54_ . DeJ7.5C . 15317:41/7 Exieen:zi - • ---- I • : • ": '
75_ : :,
F.Tfit.:. to•./Fii7p._Sand 77 I
44%Snloil A' Linz': 57//
1 - 1
1 i
45-___i.
li: Comi en,f..-f, ,--oi,L•e7,.3,//iy, F
lt .
ine 1
I AlB1 /•__ 1
4. 0/7704117.1 0.e 4.7 ra ye/.
EB . Sr.ove ,l 61;.er•/.7..ac71,
2_50.'IL.A I -
1
1E/. . E57' . :: 1_7...I
11 ' ' ''''''17- 4., me/c71 4' Cbirica il...i-Tdroi/t
We
i
2•/ove , es , . I
1 15 -Ai..‘2:6OVO-c.10.s.soriel Grifivel
I :....1.?/. . icin E/cf..0 From /4' 14- • Sand-, ..57,: triiiiacl• Gray,i
e2c,- Gra v../._.__j7/) --L-
i 11
I BrOci/ti, S;hig; • I
t.-1 . .F.717e w/as..soried E.-envey
100g3 j___,- , - • - " • -: '1 • 171VG--i -LO G S :
70- : Gray.?Broiin?
e,,,,
k--
61/
7
ne...
L'
ez/
OCC rare/ 7---- ----: -
26,7iss.-aeL k -zr.....8 7.,_R-- Cf--- —C.S.' 1798 Li •
44.7/4--c oq.----75.5). i.0 -L K. WASi-i INGTON
4,8/6-' : c/a• ti •'S,V Sazid:Very L6:7_1i. ' '-i------- r
artini . ..r1 • •- .!. i --1 *
1• 774-4-;---'"."- .. " " ... ' . ! . . . - . . .. .•1--__. i ' ,
4z_ , - ; . - ; ;.; - - . - • tp- t.1.:.,
GR '
50n,':1; Pens , 2:3i-eieiin-,•,..1h1 Silly, -- --.-si,-ale ,--,._•4:......._2.0t. _.__. ..._•-• ..._-_,. .1
se- 11 : :I :. I
124 .=-_,- Sand • rottel, Very Derse, . : :.: •-• 1 ' 7.,..............1i
Brown SI;•.57//y
Si : . r• .
1 1 1 Sheet 1.9...........r Dr* Hole)! 1 e
I 1.-•"!-: .'
r I Fl G. B-58
i
I
If'
so. Wes T C rw.ar i
i
o (
1 I i I 1 I i i
P.,.7-x
II
q
i I i I1 I
1 1
14L/ilI
f3 eo WA/ C/.l4
1 (.__
LNr 't :L-LI1I
r i 1__. 1 . I -
1iiII /o'
7
1
cxerel '
i
i2.
i 1i,8raHire .C/A • i
1 i 4 '
I I L- I I 1111 /Q isd6 -
60
oPy.
1-,./
7- -- .}.,' ' ,d,
I 1 -1---. - ,...,,• „..... , ,..4 •.•
A.,•:.•fi,•...v.ts-.- ..... •• • .. :•• .
pp...•.
6)44j1 .._ . ... 0 ,......, ......• ..., ,
t:
3.
7.-7.....-7.7•77.7.n:.;;.... :,'""T. ::•. ., ..-. -. • . .
II
t.
1 i
I•
FIG. 8—s59
I
1,
r_
BORING LOG .S-44
SOIL INTEPPAETATION STANCAPD PENETRATION RESISTANCE UNDRAINED SHEAR STRENGTH OTHER TESTS
A 0 w.i.0 we e-I. SO .KA 4990 I I I1 1
fte '..crittilliiii N ill.04. i I.0J1,110 0000 BLC.S ',EA rtEt A
Cowed Bruce Sgeeta. Aeoreatirately 131 PSI E19.S1•00 IART Sew*.. I 2 5 ;0 20 50 100 C 00 1 0 I S 20 25 10 1.5 e0 4.5
MEDIVN DENSE. RAMP. LIGHT SWORN. SLIGHTLY TO OS-1, G}l AD -.
I
I jr I i r
GRA LLLLY, SILT SAND. TRACE OP ERICA I I II I MA, NO
FRAGMENTS. ORGANICS. COAL.a'S : I
FILLI I
p
i'
5 f
li •
ii
l
10
is
IQ • II
l I I0 I
20
9 I .
SOFT, DAMP, GRAY TO WROWN, FINE SANDY I I I
SILT. TRACE of GRAVEL AND WOOD. _ 10 a i!a I
I I ;III iMEDIUMDENSE. DAMr. TC. WET, GRAY TO .SROWN,
SLIGHTLY GRAVELLY. SILTY SAND.
25 j
II l
12 I1 • I IIIIJICI
IDI -30 1i.; lMEDIUMSTIFF, WET, SWORN. FINE. SANG II i • M
I I
iSILTWITHORGANICS. (TOPSOIL! I Ili' li I
I
90 l Ili i t illDENSE. MOIST. BR iOWN. SLIGHTLY SILTY. VERY I , I
SANDY. FINE GRAVEL IVASHON RECESSIONALI I
I '
I
l iII
3S
IS; t ;
1
I tljalto
I
1 low 1
DENSE. MOIST. TAN. SLIGHTLY SILTY.
SLIGHTLY GRAVELLY. FINE TO MEDIUM SAND. I64 ! I i I
I
I I;rrMMM I 1 II I I
40
1- f I I I f
t}I
1II I
oo
I ;
I Ios; I, - i 4,1asvIVERY0[NS[. SATUItATEO, TAM, FINE SAND. I INI
Is I 0
At
BOTTOM OP ROWING AT 44 FEET 0 i I I
COMPLETE 1/22/Sa it
I
65 l Il j I l
j
l l I j l I
I I I l 1IiI
I
i I i
60 1 ,
i t !'1 11Iil
I
I Ij l i Il
i l 1,65 j liji I
II
li I 111TOili+11
I
i I i j
Ty I I l
BO
Be
95
100 1I2510205000.5 1.0 1.5 2.0 25 3.0 3.5 40 45
NATURAL WATER CONTENT (Porte,!)•
GROUNDWATER LEVEL SAMPLING HEAR STRENGTH TESTS. OTHER TESTSSoildescriptionsareMisfire- Wafer Level (Dols) to 2"O.D. Split Spoon Sample 0 Uncon.olldat.d UndroinsdHr. and actual tonges may ATD-At Time of Drilling MA Meehanlcol Anolyeiebegradual. 3'0.0, Shelby Tube Sample Triaaiol
HY Hydrometer
Bentonite Seal m 3"O.D. Pitcher Tube Sample Torvone
CA Combined Analytic
No Recovery 0 Pocket Penetrometer
CT Consolidation TatObservationWellTip0UnconfinedCompression
a Slotted Section CU Consolidated Un-
WATER CONTENT drained Trla.lol
Test
Lelie Limit 1-411--4 Liquid LImil CO ConsolidatedhreeM Pao.st) Drained TrloaolHewettwater
nt COW1eM Test
Psrc.M)
05 Direct Shoot TAOC)
W
Ttta-30 te10
8 MAR!-CROMs1111 A it,. lee.
41 6..... _.......,
BORING LOG s-4 6
SOIL INTERPRETATION STANDARD PENETRATION RESISTANCE (1NDRAINED SHEAR STRENGTH OTHER TESTS
I,40 so.nd A.e,OAI, 30.NA a+ogl Ile)
BORING COORDINATES. N 2Ie.Tos E I,6311.1103
Doe* SLOPS PER FEET
Gre.FM SWrfSCS Ele.etleR mossimillly I3e Fsat Elewtla. IM Sap.' I 2 3 10 20 SO 100 0 OS 10 L3 20 25 50 SS 40 43
0
1STIFF, MOIST. RUST-TAN, MOTTLED SILT.I 1
TRACE OF ROOTS ANC CHARCOAL,
FILL) I
L.i : ! , 40
I I I'r 1s
i
GRILLING ACTION INDICATES GRAVEL AND I
CODDLES FROM 7.0 TO e.0 FEET.
130 -
3 I A
MEDIUM DENS[. DAMP. LIGHT DROWN. GRA,.E4Y, 10 1
I
SILTY FINE SANG. THIN REDS OF FINE
SANDY SILT. I IIVASHONRECESSIONAL)
3 Y
IS 4 f
I I
A
I . 14
u A
20 I
LOOSE. MOIST. GRAY. SLIGHTLY GRAVELLY.
SILTY SAND.
S ,•/ O
I
I
i
III -
25
HARD. MOIST TO MET, GRAY SILT. HORt-
ZONTAL TO VERTICAL LAMINATIONS. REACTIVE
WITH HYDROCHLORIC ACID. 11e
I OLDER MARINE)
30
I
II
STIFF TO VERY STIFF. MOIST TO WET,35
Y ' Q
i-i
GRAY. CLAYEY SILT. TRACE OF FINE PUMMICE II -GRAVEL. MODERATELY SLICKENSIDEO SURFACE I
MARRL ED DISTRIDUT ION OF SILT ANC) CLAYEY Ip +I
SILT. REACTIVE WITH HYDROCHLORIC ACID. e ,
i . NA_wIl
40 a a
L }
it 4 1
I
ll
I II
I
MINOR PARTINGS.
II
1
1 I
1IOCyy
I jr-
45 I 1
I 1
III
IIT
4 INCH ZONE HEAVILY FRACTURED ANO 13 4 III,1
3L.CKENSIOEO. I ,ill I I 11 I 1
I
I I III I I ! ,I II i
4 /----
VERY STIFF, MOIST TO WET. GRAY,
I
I •
I j I Ili I I I '
SLIGHTLY CLAYEY SILT. TRACE OF HU41-
ZOHTAL SILT PARTINGS. AND LAMINATIONS. it ` I II' 1
I
j (
SLIGHTLY SLICKENSIDED, REACTIVE WITH
r60 II I_I ftf ,11 [- I
1
I II ' I I
63
13 I —Al; I I II IHr--III LrI
ist/ . je ! I I I
r_________I I } II 1
17I/ , i II I i ' I IVERYDENSE. DAMP. GRAY. SLIGHTLY SILTY.
1S" I I II1,6 AAI •
FINE SAND.73
Br ~ .I J.J.
I i
I II 11'I I (
HARD. MOIST. GRAY, SLIGHTLY CLAYEY STET, I 1. I
TRACE OF FINE SANDY SILT PARTINGS.
11,.' .
60 V I
BOTTOM OF BORING AT 7e FEET 80 '
1COMPLETEDt/I/S0
NOTE. OBSERVATION WELL WAS DRY TO
THE BOTTOM OF THE BORING
AT TIME OF DRILLING AND ON I ,
10/3/IO ANO 1Z/1S/e0. 85 1 i
90 I 1
gy 1
100
I 2 3 10 20 SO 100 0 0.3 1.0 1.3 2.0 23 3.0 3.5 4.0 41
NATURAL WATER CONTENT (/want)•
NOTE w GROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS 2THER TESTS.
Soil descriptions ors interprs- - Water Level (Date) 2.0.1). Split Spoon Sample 0 Unconsolldated Undroined MA MecMnicol Analysis '
live and oCluel changes may ATD-A1 Time of Drilling Thalia!
be gradual. IS 3 O.D. Shelby Tube Sample Hr Hydrometer
Seal EI 3.O.D. Pitcher Tube Sample
Torvone
CA Combined Analysis
CT Consolidation TestNORecovery
0
UPocketPenetrometer
Observation Will Tlp
0 Unconfined Compression
CU Consolidated Un-
or Slotted Section
WATER CONTENT drainedTest Trlo lol
iestle Ll.Rlt 1-0--11 LIOWId Limit
CD Consolidated
been)) hrceRt) Grained Trla iol
1Ntoril luster Test
Content
11 PercaWl OS Direct Shear Test
G)
CO
41-11e-30 t980
in
NART-CRows[R I letes Me.
IJ
BORING LOG S-45
SOIL INTEAPRETATION STANDARD PENETRATION RESISTANCE UNDRAINEO SHEAR STRENOTN OTHER TEST$
A•) ...... ..a4,, SO .u •.el 16411
BcPi'G CiWOINArts. N lie.Arl. f I.611.111 06006 LOWS 0tA MT
641046e 111.1660 /y.fl,y r4rsfi.Fllfl; III (INN Cifr{tise Its' 4ArN'1
2 5 ID 20 SU 100 0 US 10 1S 20 2S 10 1_5 40 4e
meows* SE1DEN , MOIST, e SLIGHTLYlso•N, lcMTLY
0
T
GRAVELLY. VERY SILTY FINE SANG. 1 I i
FILL) 1
CA
e a •
Loose to MEDIUM DENSE. MOIST. BROWN TO
GRAY. SLIGHTLY GRAVELLY. PINE SAND. 3 .
TRACE Or BRICK FRAGMENTS AND ORGANICS. 0 A
10
r 0
A 0 . t.;,y
MEDIUM DENSE. MOIST. BROWN TO GRAY.
SLIGHTLY GRAVELLY. VERY SILTY, FINE SAND. s / o
TRACE ORGANICS. 15 III
e V
41411
T I•-, a
20
LOOSE. MOIST, DARK BROWN TO GRAY. VERY
a ,
A Q 0
SILTY FINE SAND. TRACE OP BRICK FRAGMENTS, I
CHARCOAL ANO W000. 9A ri p
102.S 0 UP ;a1 IMEDIUMDENSE. MOIST. LIGHT BROWN TO RUST
F2' I
MOTTLED. SLIGHTLY GRAVELLY SILTY FINE
SAND INtene(oOEO WITH FINE TO COARSE I0 '/ V MA
i
SAND. IVASHON RECESSIONAL)
IIAA .
I
lb
30
12 0 , u ml
VERY DENSE. MOIST, GRAY. SLIGHTLY SILTY. ly• u 4
SLIGHTLY GRAVELLY. FINE TO MEDIUM SAND.
F33 ti III J
40 s. IVERYDENSE. SATURATED. GRAY, PINE SAND
WITH A.TRACE OF .SI%T.
Is OAS , A A
4y '
T—..s -
16 @ ' W la
BOTTOM OF BORING AT 4e.5 FEET
S0 4
t"
COMPLETED 1)/3/e0
55
i I I
60 i
65
f
75
90
65 1
90
95
1 II I • I I
1 2 5 IO 20 50 100 0 0.51.0 1.52.02.53.03.54.04.5
NATURAL WATER CONTENT (Percent)•
Id= S 9ROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS OTHER TESTS
Soil descriptions are interpfe- Water Level (Date) 2.0.D. Split Spoon Sample O Unconsolidated Ulbroined WA Mechanical Analysis
be wand actual changes tltay ATO At Time of Drilling
3.0.0. Shelby Tube SampleE
Trioslal
NY Hydrometer
3.0.0. Pitcher Tube G TOrvo.ie
Benbnite Seal Sample CA Combined Analysis
No Recover O Pocket Penetraneter
Y CT Consolidation Test
Obler•OIioR Well Tlp 0 Unconfined Compression
CU Consolidated Un•
Or Slotted Section drained Trlasiol
lYATER CONTENT Test
Mettle Limit --41— i Lisvid 1.111411 CD Consolidated
Pagel) trercuMl Drained T ioslal
n Neletet Wolof Test
Content
sn+4t)DS Direct Shear Test
W
1-41E-3 0 11111110
HART-CEOw 6fR I lelee Iwo.
0 1
BORING LOG S-47
SOIL INTERPRETATION STANDARD PENETRATION RESISTANCE U ORAINfD SHEAR STRENGTH OTHER TL1TA
ii AO p,M .i•I(. !O...A •eel i tat 1
BORING COORDINATES. N 21I.I$I. E 1.4311.4413 0401 BLOWS PER IE-ET
Gomm. tlwtWce Elllyaltall AIe eIISStely I3e 'POI Elaetli. twit S•RW• I 2 s 10 20 so 100 0 as I o 1.5 2.0 2.5 10 IS 4.0 4.3
1 SOD
0
IU
MD
tows OO6E. WET, GRAY-1,1004. &IGH1L• GRAVELLY.
SILTY PITS SA/O• TRACE cmGAMICS me CHARCOAL.A ll
FILL)
134.S 1D 0IA II
MEDIUe OEMs[. MOIST, TAM-DROWN. GRAv[LLY.
5
I
SILTY, SANG.
IVASHON RECESSIONAL)
2 N MA
10
DENS[. MOIST. GRAY. SLIGHTLY MOTTLED.
SLIGHTLY GRAVELLY. VERY FINE. SANDY SILT.
3 -' d
IS I I
122
HARD. MOIST TO VET. GRAY. SILT.
THIN LAMINATIONS OF FINE SAND AND SILT J
DIPPING IRON O' TO 30'. REACTIVE WITH
HYDROCHLORIC ACID.20 CA. Ho
OLDER MARINE)
S 2
25 IBECOMINGDISTORTEDWITHNEARvERTICAL
PARTINGS. AHD SLICKENSIDED SURFACES.
30
rP
35 I
I ,
141 I 0 0--
uu
40 v 0• All•
to , 4 1 a o o O
q uu
45 II CI
BECOMING THINLY INTERBEDDED CLAY AND SILT
I
il._/1. I. 0 0
UU
WITH SILT PARTINGS. LOCALIZED ZONES
12 - I
INTENSELY SLICKENSIOEO. S0 13 I' 4
I. '
a O
55 I
IS g a
TRACE OF FINE GRAVEL. PUMMICE.
IT1'1 0
65 IHARD. MOIST TO YET, GRAY. SLIGHTLY CLAYEY
SILT TO SILT.eASSI Vi. L I'
I I 5
TO I
1 rg - . ..
75
MARO. MOIST TO VET. GRAY. SILT ANO CLAYEY
SILT. THINLY BEDDED WITH FINE SANDY A
SILT PARTINGS. MINOR FRACTURES AND 20
iiSLICKEN3IOE3. 80
21A p, 4 INCH BED OF FINE SAND.
85
22 k,
90 I
23
TRACE OF COARSE SANG. 95 i I
3?1 I •
BOTTOM OF BORING Al 99 FEET 100
COMPLETED •/I3/eo I 2 5 10 20 50 100 0 0.5 l.0 I.5 2.0 25 3.0 3.5 40 4.5
NATURAL WATER CONTENT (
NCITE. OBSERVATION HELL DRY OF THE BORING
KM I)•
AT TINE OF DRILLING AND ON 8/19/SO. -
NOTE
Io/3no. I2/Is/Eo.
5 GROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS OTHER TESTS
Soil descriptions are h$erpra- Water Level (Date) 2"0.0. Spilt Spoon Sample 0 Unconsolidated Undrained MA Mechanical Analysis
rive and actual changes may ATD-At Time of Drilling Triasial NY HydrometerEl3"0.0. Shelby Tube Sample
actual.be gr El
a Torvane CA Combined Analysts
Seal
3'0.D. Pitcher Tube Sample
0 Pocket Penetrometer
No Recovery
CT Consolidation Test
Observation Well Tip
O Unconfined Compression CU Consolidated Un-
or Slotted Section
drained Trlaslal
WATER CONTENT Test
CD Consolidated
Plastic LI(•11 I ---i1—'4 Liquid LIIRII Drained Trieste'
T,l
lhros•t) tPercent) iTest
Natural water
EiColltent lP. :.nt)
DS Direct Shear Test
a
co
fT A-7/7-30 1ee0
CM MART-CAOwBER A tat•• tail.
r
BORI LOG S-49
SOIL INTERPRETATION STANDI.RD PENETRATION RESISTANCE UNORAINE') SHEAR STRENGTH OTHER TESTS
f 1 40 pound .6101, 30 Inc% drool 1eel)
col., ,re01NATESI N 21e.90e I 1 .611.216 Oepts BLOWS PER FEET •
drawe Soli• Ele..tl.m AproloAdsoi, I11 ,Nt EI.Yatea fast 3er.yl• 1 2 3 10 20 30 100 0 03 10 1t 20 23 30 SS 40 •3
0
I 1
LOOSE TO MEDIUM DENSE. DAMP. YELLOW-BROWN.
SILTY FINE SAND. TRACE OF FINE GRAVEL.
I i I A a
VASHON RECESSIONAL)
hin52 " , ' 2
1
A I p A
s '•'
15
47.s
VERY DENSE. MOIST. BROWNISH GRAY.
GRAVELLY. VERY SILTY FINE TO MEDIUM
SAND.
6 •' - A
IASHON TILL)
20
V
4..
25 r
80. a&
e4.5 -
B Ira i • 4 21
II
HARD. MOIST. GRAY. FINE TO COARSE SANDY 1 1
SILT. TRACE OF FINE GRAVEL. REACTIVE
30 IWITHHYDROCHLORICACID.
OLDER MARINE) 9 11 A
BECOMING DROWN WITH A TRACE OF FINE SAND
35
BEGS. NOT REACTIVE WITH HYDROCHLORIC
ACID. -
10,-'
to o
40 r.W 1
w0
Al riA
45C
v
I 1213 0 A la
6
64.3
50
BOTTOM OF BORING AT 49 FEET
COMPLETED 1/2e/e0
55
L 60
I I -
65
70 1
75
60
85
90
I
95
100
I 2 5 10 20 50 100 0 0.5 1.0 .5 2.0 2.5 3.0 3.5 40 4.5
NATURAL WATER CONTENT (Portent) •
3 SHEER TRENGTH TESTS QTHER TESTS
NOTE GRO(1NQWATER LEVEL SAMPLING S
Soil descriptions or• inlerpre- sl Water Level (Dote) Z 2" OD. Split Spoon Sample 0 Unconsclidated Undralned MA Mechon(cal Analysis
rive and actual changes ATD-At Time of Drilling Trios al MY Hydrometergn'a1l E 3"O.D. Shelby -Tube Sample
be gradual. A Torvone
Bentonite_$eal
3"0.0. Pitcher Tube Sompls CA Combined Analysis
O Poetical Penetrometer
CA
Consolidation Test
No Recovery
0 Unconflled Compression CU Consolidated Un-
Observation Well Tip
or Slotted Section
drained Tnoelal
L_I WATER CONTENT Test
CO Consolidated
Plastic unlit I--49--i L1erld Limit Drained Trlaslol
PMCMII PMCMI)
Ndtu,al Wall,
Test
Content
YI
Percent) DS Direct Shear Test
J-712-30 11100
CO NARY-CROwS[R A Isles lac.
t
BORING LOG S-53
SOIL INTERPRETAT,ON STANDARD PENETRATION DESISTANCE UNORAINED SHEAR STRENGTH OTHER TESTS
40 00..,1 .A 9,0. )) ••c.. a.o$1 Alt 1
I.... 'rT.aclw.i115. . lie •.A1 ! cle .tr Doom HiurS 01R III? A
5131011 t,1114EI EI1181:8d i18flit1f121etflf 1.3 in! Elfielli>^ 111. sy^lble
1 0 20 50 W u 05 u I! 20 25 30 35 +u e!
o
I,,500 5-1 ` I - j I
MEDIUM DENSE. DAMP. GRAY TO DROWN. VoPY I 1
TL TY FINE SAND. TRACE OF FINE GRAVEL. I
BRICK FRAGMENTS ANO CHARCOAL. 5'2
I II I L1 .1FILLI1I 1
5-! II
5-A Z _
10 I5-S
93.5 -
MEDIUM DENSE TO DENSE. MOIST. BROWN. 5-6 I I he
SLIGHTLY SILTY. FINE TO COARSE SAND.
TRACE OF FINE GRAVEL. 15
VASHON RECESSIONALI
5-6 I I
20
1
BECOMING VERY OENSE.
i. 5 °
25
I f -.I .
5-Ioe ,. a
VERY STIFF TO HARD. WET. GRAY-TAN CLAYEY 30SILTTHINLYINTERBEDDEOWITHSILTYFINE
SAND. NOT REACTIVE WITH HYDROCHLORIC
ACID. GRADING TO HARD. WET. GRAY. SILTY
CLAY WITH THIN LAMINATIONS OF SILT AND 5-I1 - d
FINE SAND. m
e N
67 . • m S-12 CT- . .
40 v
I•
II5-13 0 .
S-1A
45 5-IsA15
a
5-16 , '0
56 -50 S-1T FA 4 I I
24
VERY DAMP. MOIST TO WET. BROWN. SLIGHTLY
I
SILTY. FINE TO MEDIUM SAND. r
IVASNON TILL)
r 5-I6 'A • I
55 I - I I
I
T50
I
HARD. WET. GRAY. SLIGHTLY SANDY. CLAYEY 4 11I II I • I
SILT. MODERATE SILT PARTINGS. NOT
1. 5-19 '2 , I I •
REACTIVE WITH HYDROCHLORIC ACID. 1 I I 6
i I
I •
S_20 2 , 12 1
I
6'
65
I--
I (
1
I
HARD. WET. GRAY. CLAYEY SILT. MASSIVE. I
I
WITH TRACE OF SILT PARTINGS. REACTIVE
WITH HYDROCHLORIC ACID. S-21 '14 II
70 I i
Si"
5-22 r I lh
75 4
5-23 sr
27 -BO
BOTTOM OF BORING 79.0 FEET r
COMPLETED S/S/S0
I•
85 I
I.
90
95
100
I 2 5 10 20 50 100 0 0.5 1.0 1.5 2.0 2.5 3.0 31 4.0 415
NATURAL WATER CONTENT (Percent)•
M.iE 3 GROUNDWATER LEVEL SAMPLING HEAR STRENGTH TESTS 9THER TESTS
t
Soil descriptions ore Wafers- 54- Water Level (Dote) 2"0.D. Split Spoon Sample O Unconsolidated Undrained MA M.ChonlcOl AnalysisliveandOCIUClgrangesmayIATD-At Time of Drilling Triaxial
be gradual. 1
3 O.D. Shelby Tube Sample HY Hydrometer
Bentonite Seal Ei 3.0.0. Pitcher Tube Sample
G Torvone
CA Combined Analysis
No Recover 0 Pocket Penetrometer
y CT Consolidation Test
Observation Well Tip 0 Unconfined Compression
or Slotted Section
CU Consolidated Un•
WATER CONTENT
drained Tria:ial
Test
Flung Limit 1. --9---I Liquid Limit CD Consolidated
Percent) Percent) Drained Trl018ol
T
Natural Water Test
Content
C) Percerd) DS Direct Shear Test
03
r?f
J-712-30 1010
NARY-CROMB[R B efescletee IRA.
BO 3 LOG S-54
SOIL INTERPRETATION STANDARD PENETRATION RESISTANCE UNORAINED SHEAR STRENGTH OTHER TESTS
i140 Dow., .Gant, 30 ,Plc( diopl ul I
Aloe. C:OADINATES, . 21t.6:4 E ..619.;21
D6001 SLOWS PER FEET •
s.,#d SWrtecs Vow.** Asossie lely 1 0 I 1NI (Ie.,twt lost So.*ha
I 3 10 20 30 ,00 0 05 10 (S 20 23 50 33 60 4S
I:D S-I X I I f I — I-- —
LOOSE TO MEDIUM DENSE. DAMP TO WET. TAN
L_]1
I 1 1 I I
TO BROWN. VERY SILTY. FINE SAND To vERY I iRl
FINE SANDY SILT. TRACE OF FINE GRAVEL 5-2 1
ANO ORGANICS.
5
11 I
1
FILLI S-3 0
sa.ot G TO LOOSE. WET. GRAY. SILTY SAND
IFILLI WITH TRACE OF-ORGANIC FIBRES. 5-6 I 0
e.3
MEDIUM STIFF. WET. DARE BROWN. VERY SANDY 10
a
QSILTWITHFINERIOTS. (TOPSOIL) 5-S AAA
i
MEDIUM DENSE.•MOIST TO WET. TAN TO BROWN.
96 -
1
SLIGHTLY SILTY FINE TO MEDIUM SAND. INTER-
BEDDED WITH SILT AND SILTY FINE SAND. S-e d
TRACE OF FINE GRAVEL. 15 1
ASHON RECESSIONAL) 5-7 I.'I 4
I I
DENSE. WET TO SATURATED. VFRY FINE
f.RAVELLY, MEDIUM TO COARSE SAND. 5-•
20 0.
1
S-9 ,4
A 0
25
I 1
VERY DENSE. SATURATED. BROWN TO GRAY.
SLIGHTLY FINE GRAVELLY. SILTY FINE TO S-10 00
MEDIUM SAND. INTERBEDDED WITH FINE SANDY
SILT.30
5-11 = 0
35
0
s 12B p
GRADING TO VERY STIFF, WET. BROWN. SILTY 40 1
CLAN INTERBEDDED WITH FINE SAND. BECOMING
GRAY.
AP5-I3 -'
4y
S-16 ,
O 0
S-Is CI
I I
S-14 ,
I G O 0 CT
GRADING TO STIFF, WET. GRAY, FINE SAVOY. 55 m b 1
SILT. R
5-)f .
I
VERY DENSE. MOIST. TAN TO BROWN. CLAYEY O
5-1• '
S-Is
A 4.
VERY SILTY, VERY FINE TO GRAVELLY. FINE u... l i
TO MEDIUM SAND. g60 ,n 1 i
1
S-2o 12 j
65 I i i
L.j
I
GRADING TO VERY DENSE. WET. TAN TO BROWN.
iSLIGHTLYSILTY. FINE TO MEDIUM SAND. IIS-21 01 a
e ^70 4
BOTTOM OF BORING A9.0 FEET I I i
COMPLETED a/12/•O
75
90
e3
90
95
100 1
I 2 S 10 20 50 100 0 01 1.0 U.S 2.0 23 3.0 33 4.0 4.3
NATURAL WATER CONTENT (Perawtl•
NO E
2
GROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS QTHER TESTSI1
Soil descriptions ore inferpre- Water Level (Date) 2"0.0. Split Spoon Sample 0 Unconsolidated Undroin•d MA M•chonical Analysts
tive and actual changes may i ATD-At Time of Drilling SI 3A 0.0. Shelby Tube Sample
Triasiol Hydrometer Hydroeter
be gradual. A Torvone
Bentonite Seel
3.0.0. Pitcher Tube Semple CA Combined Analysis
No Recovery
0 Pocket Penetrometer CT Consolidotion Test
0 Unconfined Compression
Obswwtion Well Tip CU Consolidated Un-
or Slotted Section drained Triasiol
WATER CONTENT Test
ed
Plastic Limit I- o l Liquid Limit
CD Comol ed T
P•rCMt) Percent)
Drained riasiol
News! Wets/ Test
yf esCOOPO
P
erwt) DS Direct Shear Test
1-7111-30 lesa
HART-CROWUIR a 1•tse sae.
BC IG LOG 5-55
SOIL INTERPRETATION STANDARD PENETRATION RESISTANCE UNORAINED SHEAR STRENGTH OTHER TESTS
i,40 ....Ad ...Oni. SO ,Acn '$.l 1 IU i
Domii6 CarPDINA yes, N 111.rt. ( 1.119,•41
Dasik SLOWS PER !([T
4., .d ea time t11.atma AA.reaim.telf Its INS tie.eil0A feel s°T°'e t 9 v d ad ;rr u u a Ib !ci ! iu ! to /5O ,.G
1 ISTIFF. MOIST. GRAY TO BROWM MOTTLED. FINE N I i ISANDYSILT. TRACES OF GRAVEL. 1
tFILL) I n iDL
5 1
2
I
STIFF. MOIST. GRAY, CLAYEY SILT. l- 3 ILOOSE. MOIST. DARK BROWN TO GRAY, VERY B i I * •
SILTY FINE SAND. TRACE OF FINE GRAVEL AND I
ORGANICS.
S X 1
I . •
CIS
I , ,
1
el
106 . I
MEDIUM DENSE, MOIST, TAN TO GRAY, FINE TO
F
f")I
MEDIUM SAND. TRACE OF SILT AND FINE 7 LXYI f I 4
GRAVEL.
H20
VASNON RECESSIONAL) L e ICI .
r
A
25 J
r
INTERBEDDED •ITN SILTY SAND. IOA,•,
B rg
r
r A
BECOMING DENSE.
30
11 I
0 A
35\ I
co
I2 .' ` A
40 II0HARD. MOIST, GRAY. SLITLv SANDY SR]. TRACE e. .U+
OF FINE GRAVEL. NOT REACTIVE WITH lrrCRX.1-t Ric r 13 '.' ' 0 AACID. VASr{.l TIl1)
e1 .
BOTTOM OF ROPING AT 44 FEET 45 1
COMPLETED .9/4/60
50
1-55 1 -
i .
60 I I
I 1 I
I .
80 II l t
II
65 I I
I . #
I
90
I 1
n95
I100I j
I 2 5 10 20 SO 100 0 0.1 1.0 1.S 2.0 2.5 5.0 1.3 4.0 45
NATURAL WATER CONTENT (Percent) •
NOTE S GROUNDWATER LEVEL AMPLfNG SHEAR STREhgTH TESTS OTHER TESTS
A 1
Soil descriptions are int.rpr.- 4L Water Level (Date) 2"O.D. Split Spoon Sample 0 Unconsolidatec Undroin.d MA Mechanical Analysis
five and actual changes may AID-At Time of Drilling
3.O.C. Shelby Tube Sample
Trioxial
be gradual. Y HY Hydrometer
77 1 A Toryism)
Seal 1 3 O.D. Pitcher Tube Sample CA Combined Analysis
No Recovery
O Pocket P.n.tr mister
CA
Consolidation Test
Observation Well Tip 0 Unconfined Ctmpr.ssion
CU Consolidated Un-
or Slotted Section
Test
1..._,t WATER CONTENT
amed Trion0l
Plastic Limit I—•--I Liquid Omit CO Consolidated
Percent) IMceMM) Drained Trlauol
11 Natural Watts Test
Can teen
P Pe.coo.)OS Direct Shear Test
6 7i2-30 1e.0
V HART-CROWSIR a Woo lee.
BORII _ LOG S-56
SOIL INTERPRETATION STANDARD PENETRATION FESISTANCE UNORAINED SHEAR STRENGTH OTHER TESTS
40 oc.-a ..A.t. 3: •c• wool 11•I I
BORING CIZ701wTE5, 4 21,.a01 E 1.619.561 O•016 n.uwS PLR 'LET •
Gre.nd twist, [Is•e1,ss 11,4Ma•„Ae4II I I9 tNI fle.s1i.4 ISO SA,,,P,•
1
SOD 0
I.
1MEDIUMDENSE. MOIST. GRAY AND BROWN 1 r I III I j II I I
MOTTLED. SILTY. FINE TO MEDIUM SAND.
1 I I 1
TRACE OF GRAVEL WITH GRAVELLY UNIT FROM I 4
5.5 TO a FEET:. .. . ... . 1. ' I 1 I I.FILL) 5
113
2 1 '
I
I.
I IMEDIUMDENSE. MOIST. GRAY AND BROWN I
1
I
MOTTLED. VERY GRAVELLY. VERY SILTY SAND.I I I • •
1VASHON RECESSIONAL) r 1
109 -10
VERY DENSE. MOIST. GRAY. SLIGHTLY
F
1
OS IGRAVELLY. VERY SILTY SAND.
9 '
S SO.
IVASHON TILL/ h I 1 ,"
15
6
I 1 iiir'S9.
6"
F20 j
I „
F
L 6"
F25 I93.5
r
VERY STIFF. MOIST TO WET. GRAY. CLAYEY
SILT. TRACE OF FINE GRAVELLY PUMMICE
MARBLED WITH MODERATE SLICKENSIDES
9 rd A
THROUGHOUT. REACTIVE WITH HYDROCHLORIC III
ACID. 1-30 10 , '• OLDER MARINE)
I-
CI
II. L
11 _1 r
r35 II
12 , '
TRACE OF SILT PARTINGS ORIENTATED FROM 0
45 DEGREES TO NEAR VERTICAL. VERY
SLICKENSIDED.
40 13 -
1 /'
45 I r
up k
INTENSITY OF SILT PARTINGS INCREASING r50
EPTH TO SPACINGS LESS THAN 1 INCH.
ITY OF SLICKENSIDES INCREASING TO
16
r
55
4-
LOCALLY BLOCKY. FRACTURED C ' 1T 1
IIBOTTOMOFBORINGAT59FEET
60 -
6O gat 1
COMPLETED 8/IC/e0 w, `
I
r
NOTE, OBSERVATION WELL DRY TO THE TIP.
RECORDED ON 8/19/80. 10/3/SO.
12/15/80.I165
6. F
r 70 1
r I .
r
75
F.1.
80
rB5 M
1-
H90
I -
95
100 I 1
1 2 5 10 20 SO 100 0 0.S 1.0 1.5 2.0 2.5 3.0 3.S 4.0 4.5
NATURAL WATER CONTENT (Percedt)•
NOTE 3 GROUNDWATER LEVEL. SAMPLING SHEAR STRENGTH TESTS OTHER TESTS
Id-1 Soil descriptions are Interprr- Water Level (Date) 2'0.0. Split Spoon Sample 0 Unconsolidated Undrained MA Mechanical Analysis
tiw and actual changes mayI ATD-At Time of Drilling Tria lol
De gradual m 3 O.D. Shelby Tubs Sample MY Hydrometer
8enfonite Seal m 3'0.0. Pitcher Tubs Sample
a Torsions
CA Combined Analysis
No Recovery
O Pocket Penetrometer
CA
Consolidation Test
I'll Observation Well Tip 0 Unconfined Compression
CU Consolidated Un
LJ
or Slotted Section drained Triosial
10/ATER CONTENT Test
Plastic Limit --- _— Liquid Limit
CO Consolidated
1
Percent) ercentl Drained Tr1o110i
Natural Water Test
0 Gamed(
Percent) DS Direct Shoot Test
CO
fA J-112-30 tee0
CO MART-CROW{[R 111 isles IRs.
BORING LOG S-57
J©IL INTEMETATfON 4T11NoAR(1 rtNcTHATIC40 RESISTAW1 IRinfiAINEn SHEAR STRENGTH OTHER TESTS
40 Doane ...pnt, 30.ncn eropl 11111
BOP ING CcC110 INA TES. N z1e.SsA. E 1.639.660. NOW BLOBS PER FEET •
Gr.,r4 3.Mtece Ele.et,OA Ap9realIR.NIy I4A r.Mt Ele.etien INt Sew.ple 2 5 Ti 20 SO 100 0 05 10 15 20 2.3 30 33 40 45
MEDIUM STIFF. DAMP. BROWN, FINE TO COARSE.
0 I 1 I !I- i-
SANOY SILT WITH CHARCOAL FRAGMENTS. I I I
i I
RILL) 1
I I
I•
139 -
5 ?' I 1
VERY STIFF. DAMP TO MOIST. BROWN (RUST
MOTTLING). FINE SANDY SILT. HORIZONTAL
LAM)MAT IONS. NOT REACTIVE WITH HYDRO- I I
CHLOR)C ACID. z (J.(jl
OLDER MARINE) 10 I I
I I
3 . I AO
15
9 i , . 0 0..- uu
20 s 1 . ,
VERY STIFF, MOIST TO VET. GRAY. SLIGHTLY I I
CLAYEY SILT. INCREASING DISTURBANCE ANO
CLAY CONTENT WITH DEPTH. SLIGHT SILT
PARTINGS ANO SLICKENSIDES. REACTIVE WITH 6 I I A•
HYDROCHLORIC ACID. 25 0
I`r
4 TD k INCH HICKr FRACTURED 9.ICI(ETGIDED Z . n T
30 I .
e , 'M'^'-- 0'
L u
TRACE.OF FINE GRAVEL. 9A it j A •
35 Bra. i
I :
10 '
40
HARD. MOIST. GRAY. VERY FINE SANDY SILT.
TRACE or COARSE SAND AND FINE GRAVEL.
REACTIVE WITH HYDROCHLORIC ACID. II '/
45 IVERYSTIFF. MOIST TO WET. GRAY CLAYEY
SILT. SLIGHT SLICKENSIDES AND SILT
PARTINGS. REACTIVE WITH HYDROCHLORIC ACID 12
50 I — I - I
o
V .I
0 13./ Al
I I
55 .
I
SILT PARTINGS.I I.''
as - I
BOTTOM OF BORING AT 59 FEET
60
COMPLETED 9/e/e0
65 I I } , ,
II : I 170I
75
80
85 l
I
90
95
100
2 5 10 20 50 100 0 0.5 1.0 I.5 2.0 23 3.0 3.5 40 4 5
NATURAL WATER CONTENT (Percent)•
dtQTE
S
GROUNDWATER LEVEL SAMPLING HEAR STRENGTH TESTS OTHER TESTS
Soil descriptions ore interpre- 2 Water Level (Date) 2F 0.D. Split Spoon Sample 0 Unconsolidated Undrained MA Mechanical Anaiys's
five and actual changes moy I AID-At Time of Drilling 3 O.D. Shelby Tube Sample
Triosial
HT Hydrometer
be gradual.
2]
A Torvone
Bentonite Seal
3.0.0. Pitcher Tube Sample
0 Pocket Penetrometer
CA Combined Analysts
No Recovery CT Consolidation Test
1
Observation Well Tip
0 Unconfined Compression CU Consolidated Un-
or Slotted Section
drained Tnosiol
L WATER CONTENT Test
CD Consolidoted
lestic Unlit I---S l L.outd Limit Drained Tllaetal
Percent) Percent)
11 Natural Water Test
0 GROW
erciM) D3 Direct Senor Test
CO
J-111-3 0 1110
CO NAM-CROrM•111 I tale• me.
1h----10 0
BORING LOG S-58
S61L INfEhkOffel04 3 f AIWA r,ij rc!it i mill l..p ridi!3TAllLA 1_dtiiriAilltIi itil:Ati STHENChTIt 1TIIER TESTS
1,40 so••o .o•el, SO,ncn aropl ail 1
BOWING CornOINATES. rI 211,77T, E 1,6370ee3 poptl. BLOWS PER FEET •
Grave Svrtece Clerutiee Apwou.Mrslt 169 Fowl Elewtioi toot Sow (i I 2 S .0 20 50 100 0 05 ,0 ;5 20 25 SO 3.5 40 •S
VERY STIFF. MOIST, BROWN, GRAVELLY, SANDY.
T
r 1 1 1
i I ISILT. TRACE ORGANICS. I , I I i i I'i
TOPSOIL) I
Iee - 1 0 ..1
I
I • 4 ft I'
VERY STIFF. MOIST, BROWN TO GRAY, MOTTLED. 1SILT. THINLY LAMINATED UITH HORIZONTAL 5
SILT PARTINGS.
I
OLDER MARINE) I
2 i to
10 IVERYSTIFF. MOIST TO WET. GRAY SILT.
TRACE OF NEAR VERTICAL FRACTURES AND
SILT PARTINGS. GENERALLY MASSIVE.
REACTIVE WITH HYDROCHLORIC ACID.
a 1
A D
r 15
I i i
BEDDED CLAYEY SILT AND SILTY CLAY NOTED
r
FROM 17.5 TO 16.3 FEET. 0--
20 s -' D
VERY STIFF. MOIST TO WET. GRAY. CLAYEY
SILT. VERY DISTURBED SLICKENSIOED ZONES eA grA
LAYERED WITH MASSIVE CLAYEY SILT WITH B r-T
SILT PARTINGS ANO FRACTURES. 25
30 Ii•
11 gl . A •
ao
I2 . I
45 I .
IS ' ' r •
120 - --
BOTTOM OF BORING AT 49 FEET 50
COMPLETED 11/11/S0
NOTE. OBSERVATION WELL DESTROYED.
GROUNDWATER LEVELS WERE NOT
OBTAINED.55
6
r
F
65
I .
70
r
L75
r
I
80
I
85
690 I
95
100
I
I 2 5 10 20 SO 100 0 0.5 10 1.5 2.0 23 3.0 3.5 4.0 4 B
NATURAL WATER CONTENT (Percent)•
MIL
2
MO GROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS OTHER TESTS
Soil descriptions ore interpre-37fWater Level (Dote) 2"O.D. Split Spoon Sample 0 Unconsolidated Undroined HA Mechon.cal AnolTsla
five and actual changes may ATD-At Time of Dril lino 3"O.D. Shelby Tube Sample
Triasial
HY Hydrometer
be gradual.
t 3"O.D. Pitcher Tube Sample
Torvone CA Combined Analysis
Bentonite SAW 0 Pocket Penetrometer
No Recovery CT Consolidation Test
I Observation Well Tip
0 Unconfined Compression CU Consolidated Un-
U or Slotted Section drained Tr.oa.ol
WATER CONTENT Test
Plastic Limit 1---0--I L.au.d Limit
CD Consolidated
Permit) PatentI Drained Triasial
T ROOMWowe•f
C)
Content
IPercen,) DS Direct SMar Test
IT
CD
y 12-30 teeo
NART-CRowatR a Iet•• IRE.
i:"
lb....._
BORING LOG S-59
SOIL INTERPRETATION STANDARD PENETRATION RESISTANCE UNDRAINED SHEAR STRENGTH OTHER TESTS
1140 pound .e.961, 30•nc* drool list I
BIG CCCPOtNATESi N 24e.Tes. E 1.e3e,3ST Deem BLOWS PER FEET •
Grave %Oace Ete,stie. AppeeWerey 12S Feel Ele.etie. Ise SCRWI I 2 5 +0 20 30 100 0 05 10 15 20 2.5 10 3.5 40 4.5
CONCRETE SIDE.ALK. TO - I i i '1
MEDIUM DENSE. DAMP, BROWN, VERY SILTY 1 1
FIN( SAND. TRACE OF FINE GRAVEL. I I I I 1
S
2
QQ
I
I
BECOMING LOOSE. MOIST. MOTTLED. BROWNL.I/,
TO GRAY FILL WITH ORGANIC CONTENT.
F r''
1.10
A
A e W
FILL) p
MEDIUM STIFF. WET. CLAYEY. VERY SANOY IS
I
r
SILT. 6 I I
T I
20 1
MEDIUM STIFF. MODERATE TU SUBSTANTIALLY 1
ORGANIC SILT. TRACE OF WOOD. (TOPSOIL*. 1
e I iILI I 1 ! 'il!
102.3 e
A I . +
i MEDIUM DENSE TO DENSE. MOIST TO SATURATED B j +
I i GRAY TO BROWN. FINE TO MEDIUM SAND INTER
BEDDED WITH MEDIUM DENSE TO DENSE, MOIST 25
I 1 .,
t I
TO WET. BROWN TO RUST MOTTLED. SILTY FINE rSANDANOSILT. SILT CONTENT INCREASES
r
10
I + ' r
WITH DEPTH. A
ram-_ .
30 12A IIll
kiIUiiIllHhi
0. ,1
II l-
35
I._
1_,
IA I
I
I 1
I
Is! $i i qI40. 1 I ' 1
1 I
o A + I I
HARHARDD.FMONIS SANDY
N.
T,
I
LOCAL POCKETS
s2 '
45
16B
I
I '
I. ..-. .. ..
Y E SI
OF SILTY SAND. NOT REACTIVE VITA HYDRO- I
I
CHLORIC ACID. h t F ,
IVASNON TILL)
0
tea*0 `
HARD, MOIST, GRAY, VERY FINE TO SANDY Snt s 11 III r1111',v
50
SILT. NOT REACTIVE WITH HYDROCHLORIC t IACID.
d
y IFiri I I
1
BOTTOMOF BORING AT S9 FEET o
COMPLETED i/2e/20 1
J : I
r i
II
1H1iH
ram-',_, r
Lf' I ,
1.
F-1- '
i j `•rM 2AI-k ruuUEe'.15 aD 2f,L2at, I Its i I` +
r ' { ;
1 '1111111 I 1 I Haiti I I
f Ii
95
100 t
I 2 5 10 20 50 100 0 0.5 1.0 1.5 2.0 2.5 3.0 3.S 40 4.5
NATURAL WATER CONTENT (Percent)•
NOTE GROUNDWATER LEVEL SAMPLING SHEAR STRENGTH TESTS OTHER TESTS
Fi
Soil descriptions ore interpre- 3zl_ Water Level (Dale) 2"0.D. Split Spoon Sample 0 Unconsolidated Undroined MA Mechanical Analysis
five and actual changes may I ATD-At Time of Drilling 3
Triosial
De gradual
O.D. Shelby Tube Sample HY Hydrometer
6entonite Seal Z 3"O.D_Pitcher Tube Sample
Torvone
CA Combined Analysis
1•,
0 Pocket PenetrometerPenetrPenetrometer
No Recovery CT Consolidation Test
I Observation Well Tip
0 Unconflned Compression
CU Consolidated Un-
LJ or Slotted Section drained Triosiol
WATER CONTENT Test
Plastic Linilt 1 -—I Liquid Limit
CO Consolidated
Peroeet) Perceetl Drained Triasiol
111 Natural Water Test
Cameo
G) ilimmeW) DS Direct Sheer Test
FA
J-712-30 teea
V,
s MART-CROWIER I lets• inc.
4.
BORING LOG . S-44
SAIL INTERPRETATION
STANCAP) PENETRATION RESISTANCE UNDRAINE:D SHEAR STRENGTH
40 Pm.. ..a•I. 3o .,,p, e.ei OTHER TESTS
l f1uE .a j.litii N ill.'54. I I.Eil.140
r.rl
Gna so, aew)w pr. AeuRierpresty 131 rest
9.alA BLcw1 PER rtESamar'M Wrle
lMh's% I..) Sow '
I 2 10 20 50 100 C OS 10 IS 20 25 10 Sd eD ebMEDIUMDENSE. DAMP. LIGHT BRQWM, SLIGHTLY OS-1, C,O Ae I
r 1 ir
rTSh.T $AND, TRACE OF •R1CR SAMPLE I I IF4AGMENt3, ORGANICS. COAL. D-S' II.IMA, Mp
MILLI K]. I a •
10
I
S
T
I • 11
I
lice / Ie '
I
20 lt4' I 1
SOFT, DAMP, GRAY TO BROWN, FINE SANDY I I I I ISILT. TRACE or GRAVEL AND W000. 10 Q II
MEDIUM DENSE, DAMP. TO. VET. GRAY TO .BROWN, 1 I I HI 1SLIGHTLYGRAVELLY. SILTY SAND.
25
II 1N •
I
II ,1
1 11
1 21 I
I
i •
I I III I
j
101 ^30 1 I I I'• ;
MEDIUM STIFF, YET, DROWN. FINE, SAND
f
SILT ITN ORGANICS. ITOP3OIL1
IT 1 I{i;, • M `I
II
SILT I I
00 - I I Ii1I I I I II.I
DENSE. MOIST. BROWN, SLIGHTLY SILTY. VERY I I I , 41A
Amoy, FINE GRAVEL IVASHON RECESSIONAL)
I I II
33 71 i l+I
IS I I ' 1ICIiIz
1 so"
I j jl IO[NSE, M0171, TAN, SLIGHTLY SILTY.
1 ISLIGHTLYGRAVELLY. FINE TO MEDIUM SAND, I6r`/ I I I III: I II
4 r I _
1_
I ;{
l i
N 0 I IIII I11oQ$ IT i I i
Y 4
j
II I451iI
Veer DENSE. SAIURATEO. TAN, FINE SAND. I
1
z
0....
IBarronOFBORINGAT44FEET
a
50 IIII I
COMPLETE e,22,SO 1 ,
SS I 1 1. + I ,
1II ' II I i
1i
11,1 I60
I 11
I•
tt I111I
65 Il I
I i111
1II
I III
70 it II • Ili I I1II
I I
75 II
1 4 '
1eo
85
90
95
100 1I2510205010000.5 1.0 t.5 2.0 2.5 3.0 3.5 40 R 5
NATURAL WATER CONTENT (P.rt.wr)•
NOTE GROUNDWATER EVFI SAMPLING SHEAR STRENGTH TESTS 9THER TESTSSoildescriptionsoreintopre- Water Level (Dot.)2"O.D. Split Spoonpfiretxtdactualchangesmay
Water
Tlnre Of f).illinQ
Sample O Uncon.olldoted UndroiMd MA Mechanical Analysts
51
be gradual.3"0.0. Shelby Tube Sample Triostal
HY Hydrometer
TorraneBentonibSeal3"0.0. Pitcher Tube Sample CA Compinpd Anotysh
No Recovery O Pocket Penetrometer
CT Consolidation TatObservationWellTipOUnconfinedCompression
or Slotted Section CU Coroun dat
rl
Un-
WATE$CONTENT drained Trlasloi
Test
Rustic Limit 1'+--1 Liquid Limit Co Canso1idofed
t ero w l erseet) Drained Trlouiol
Natural Weer
Ti CaAtan)Test
GI
wuM)
03 Direct Shear Test
pW J-711-30 11180
Q NANT-CROWIIIIIN a Wee IRe,