Loading...
HomeMy WebLinkAbout20240430 Memo (Stm Evaluation) 2200335.10 Page 1 of 1 TO: Huy Huynh City of Renton Department of Engineering Division DATE: April 30, 2024 FROM: Todd Sawin, PE Seattle - (206) 267-2425 PROJECT NO.: AHBL #2200335.10 PROJECT NAME: Watershed Affordable Housing Apartments SUBJECT: Watershed Affordable Housing Apartments - Storm Line Evaluation Mr. Huynh, I have reviewed the video inspection of the storm service in order to assess pipe condition. Based on my evaluation: • The bellies in the storm line from the Pro-Vac cameras appears to be within acceptable limits. • Calculated flow expected from the proposed development is based upon accepted design standards and guidelines. • It is my professional that the storm line has the capacity to convey existing and proposed flows from the proposed development to the City’s storm main. To the best of my knowledge, information, and belief, based on available records, applicable field measurements and video footage, the storm line is in a good condition and has the capacity to coney the proposed flow to the City’s storm main. TS c: Taylor Galbraith, Sierra Construction Company, Inc. Attachment Q:\2020\2200335\10_CIV\NON_CAD\SUBMITTALS\20240328 Close Out Items\20240430 Memo (Stm Evaluation) 2200335.10.docx