HomeMy WebLinkAboutC_Applicant Letter DNS-M_20240603
June 3, 2024
John Kay
K+ Architects
10317 8th Ave NE
Seattle, WA 98125
SUBJECT: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION
New Life Church Office Building, NEW LIFE CHURCH OFFICE BUILDING
Dear Mr. Kay:
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they have completed
their review of the subject project and have issued a threshold Determination of Non-Significance-Mitigated with
Mitigation Measures. Please refer to the enclosed ERC Report and Decision for more details.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on June 17, 2024.
Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor
Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected
at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first
floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional
information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If
the Environmental Determination is appealed, a public hearing date will be set and all parties notified.
This matter will also be presented before a Public Hearing at a date that is to be determined.
If you have any further questions, please reach me at amorganroth@rentonwa.gov or at (425) 430-7219
For the Environmental Review Committee,
Alex Morganroth
Principal Planner
Enclosure
cc: New Life Church / Owner(s)
Washington Department of Fish and Wildlife / Party(ies) of Record
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
Project File Numbers: PR23-000146/LUA23-000330, ECF, CUP-H, SA-H, V-H
Project Name: New Life Church Office Building
Applicant: John Kay, K+ Architects, 10317 8th Ave NE, Seattle, WA 98125
Project Location: 15711 152nd Ave NE (APN 2323059021)
Project Description: The applicant is requesting approval of a Hearing Examiner Conditional Use Permit, Hearing
Examiner Site Plan Review, height Variance, two (2) street Modifications, and Environmental (SEPA) Review in order to
construct a new office building on the site. The subject site is approximately 55.1 acres (2,401,898 sf) and is located at
15711 152nd Ave SE (Parcel no. 2323059021). The project site is currently developed with a 54,320 square foot religious
institution (New Life Church), a 36,000-square foot church auditorium, and a 38,680-square foot private school serving
children from K-8th grade. The site is also developed with a parking lot with approximately 796 parking stalls, a storm
water system, outdoor play areas, and a multi-purpose playfield. The applicant proposes to construct a new 6,400 sq. ft.
2-story office building on the northern-most portion of the existing surface parking lot. According to the applicant,
construction of the building would eliminate approximately 40 surface parking stalls and require rerouting of some storm
detention pipes. A secondary fire exit is proposed via an exterior stairway off of the south side of the building. Site access
is proposed to remain via two existing curb cuts off of 152nd Avenue SE. Wetlands, a Type F stream, steep slopes, a high
erosion hazard, a Special Flood Hazard area – FEMA Zone A, and a high seismic hazard areas are mapped on the site. The
site is also located within Maplewood Wellhead Protection Area Zone 2. Eight (8) trees are proposed for removal. Partial
frontage improvements are proposed along SR 169 (Maple Valley Hwy). The applicant submitted a Critical Areas Study,
TIA, Geotechnical Report, an Arborist Report, and an Environmental Checklist to evaluate the proposal.
Lead Agency: City of Renton
Environmental Review Committee
Department of Community & Economic Development
Date of Decision: June 3, 2024
Mitigation Measures:
1) The applicant shall comply with the recommendations of the
Subsurface Exploration, Geotechnical Engineering, and Stormwater Infiltration Feasibility Report,
prepared by Associated Earth Sciences, Inc. dated January 31, 2024, and any future addenda.
2) The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to
verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter
stating they have reviewed the construction and building permit plans and in their opinion the plans and
specifications meet the intent of the report(s).
3) The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional prior
to the start of any construction. The applicant shall provide notification to Tribes’ cultural committee prior
to the start of construction.
The City of Renton Environmental Review Committee has determined that probable significant environmental impacts
from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required under RCW
43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their
authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
Environmental Review Committee Determination
June 3, 2024
Page 2 of 2
SIGNATURES:
Martin Pastucha, Administrator
Public Works, Chair
Date Anjela Barton, Fire Marshal
Renton Regional Fire Authority
Date
Maryjane Van Cleave, Administrator
Parks and Recreation
Date Gina Estep, Administrator Date
Community and Economic Development
identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead
agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on June 17, 2024. Appeals
must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub
Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date
if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance
Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the
appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
6/3/2024 | 2:36 PM PDT6/3/2024 | 1:56 PM PDT
6/3/2024 | 2:23 PM PDT
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNS-M: The City of Renton Environmental Review Committee (ERC) has determined that the proposed action has
probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using the
optional DNS process in WAC 197-11-355. There is no further comment period.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
June 3, 2024
PROJECT NAME/NUMBER: PR23-000146 New Life Church Office Building /
LUA23-000330, ECF, CUP-H, SA-H, V-H
PROJECT LOCATION: 15711 152nd Ave SE (APN 2323059021)
APPLICANT/PROJECT CONTACT PERSON: John Kay, K+ Architects / 10317 8th Ave NE Seattle, WA 98125
/john@kplusarchitects.net
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also bit.ly/3rqZqlK
PROJECT DESCRIPTION: The applicant is requesting approval of a Hearing Examiner Conditional Use
Permit, Hearing Examiner Site Plan Review, height Variance, two (2) street Modifications, and Environmental (SEPA)
Review in order to construct a new office building on the site. The subject site is approximately 55.1 acres (2,401,898 sf)
and is located at 15711 152nd Ave SE (Parcel no. 2323059021). The project site is currently developed with a 54,320
square foot religious institution (New Life Church), a 36,000-square foot church auditorium, and a 38,680-square foot
private school serving children from K-8th grade. The site is also developed with a parking lot with approximately 796
parking stalls, a storm water system, outdoor play areas, and a multi-purpose playfield. The applicant proposes to
construct a new 6,400 sq. ft. 2-story office building on the northern-most portion of the existing surface parking lot.
According to the applicant, construction of the building would eliminate approximately 40 surface parking stalls and
require rerouting of some storm detention pipes. A secondary fire exit is proposed via an exterior stairway off of the
south side of the building. Site access is proposed to remain via two existing curb cuts off of 152nd Avenue SE. Wetlands,
a Type F stream, steep slopes, a high erosion hazard, a Special Flood Hazard area – FEMA Zone A, and a high seismic
hazard areas are mapped on the site. The site is also located within Maplewood Wellhead Protection Area Zone 2. Eight
(8) trees are proposed for removal. Partial frontage improvements are proposed along SR 169 (Maple Valley Hwy). The
applicant submitted a Critical Areas Study, TIA, Geotechnical Report, an Arborist Report, and an Environmental Checklist
to evaluate the proposal.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on June 17, 2024. Due to
the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the City Clerk’s Office
is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally
due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically.
Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified.