HomeMy WebLinkAboutEx_05_Landscape_PlanMAPLE
V
A
L
L
E
Y
H
W
Y
15
4
T
H
P
L
S
E
15
2
N
D
A
V
E
S
E
MAPLE
V
A
L
L
E
Y
H
W
Y
15
4
T
H
P
L
S
E
15
2
N
D
A
V
E
S
E
LOT 3
KC SP
N
O
.
L99S
3
0
1
9
AFN 2
0
0
1
8
3
1
9
0
0
0
0
2
15
2
N
D
A
V
E
S
E
MAPLE
V
A
L
L
E
Y
H
I
G
H
W
A
Y
-
S
R
1
6
9
KIDS OFFICE
(10'X8'6")
CARE
(9'9"X9')
YOUTH
PASTOR
(10'X9')
WORSHIP
PASTOR
(8'X10')
I.T./
STOR.
JAN.
SM CONF
(13'6"X9')
DIRECTOR
(10'X8'6")
FINANCE
SUITE
HR/PAY
(10'X8'6'')
KIDS OFFICE
(10'X8'6")
KIDS OFFICE
(10'X8'6")
KIDS
BREAK
AREA GROUP
PASTOR
(8'X10')
YOUTH
WORSHIP
FIR
E
SP
R
I
N
K
Δ
1
5
2
N
D
A
V
E
S
E
RESTORE EXISTING LAWN AREA, TYP
RESTORE EXISTING
LAWN AREAS, TYP
LANDSCAPE CALCULATIONS
TOTAL SITE AREA 2,463,754 SF (56.56 ACRES)
TOTAL IMPERVIOUS SURFACES 487,928 SF (11.20 ACRES)
TOTAL LANDSCAPE/PERVIOUS AREAS 1,975,882 SF (45.36 ACRES)
PROPOSED NEW LANDSCAPE AREAS 3,575 SF (0.082 ACRES)
140,065 SF - EXISTING LANDSCAPE AREAS (shown around perimeter of existing building)*
excludes natural areas in calculation
3,575 SF - PROPOSED LANDSCAPE AREAS (shown around proposed building)
*Landscape Areas are based on available survey data
DATE:
NUMBER:
PROJECT:New Life Church - Renton
May 15, 2023
LLA0404.23
TITLE:
DESIGN:MJL
DRAWN:MJL
CHECKED:EW
SHEET:
SCALE:
NE
W
L
I
F
E
C
H
U
R
C
H
15
7
1
1
1
5
2
N
D
A
V
E
S
E
RE
N
T
O
N
,
W
A
9
8
0
5
8
PROJECT ADDRESS:
21
1
1
S
o
u
t
h
C
S
t
r
e
e
t
,
T
a
c
o
m
a
,
W
A
9
8
4
0
2
2
5
3
-
2
0
9
-
4
0
5
3
|
M
o
g
h
a
n
@
L
y
o
n
L
A
.
c
o
m
REVIEW SET
NOT FOR
CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
s
,
LL
C
REVISIONS:
REV 1:
REV 2:
REV 3:
Know what's below.
before you dig.Call
R
DRAWING SET:
PRELIMINARY
SUBMITTAL
L1.00
OVERALL
SITE PLAN
1" = 70'-0"
Graphic Scale: 1" = 70'-0" at full size (24" x 36")
0 35'70'140'280'
SEE L1.01
SEE 2/L1.02
SEE 1/L1.02
RECEIVED
07/06/2023
AMorganroth
PLANNING DIVISION
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
KIDS OFFICE
(10'X8'6")
CARE
(9'9"X9')
YOUTH
PASTOR
(10'X9')
WORSHIP
PASTOR
(8'X10')
I.T./
STOR.
JAN.
SM CONF
(13'6"X9')
DIRECTOR
(10'X8'6")
FINANCE
SUITE
HR/PAY
(10'X8'6'')
KIDS OFFICE
(10'X8'6")
KIDS OFFICE
(10'X8'6")
KIDS
BREAK
AREA GROUP
PASTOR
(8'X10')
YOUTH
WORSHIP
FI
R
E
SP
R
I
N
K
Δ
1
5
2
N
D
A
V
E
S
E
(3) TREES TO BE REMOVED X
X
X
PLANT SCHEDULE
QTY. BOTANICAL NAME COMMON NAME SIZE & SPACING, NOTES
SHRUBS
6 Choisya ternata Mexican Orange Blossom 3 gal, spacing as shown
33 Mahonia aquifolium 'Compacta'Compact Oregon Grape 3 gal @ 3' OC, triangular spacing
14 Nandina domestica 'Gulf Stream'Gulf Stream Heavenly Bamboo 3 gal @ 3' OC
8 Pieris japonica 'Mountain Fire'Mountain Fire Pieris 3 gal @ 5' OC
22 Prunus laurocerasus 'Otto Luyken'Otto Luyken Laurel 3 gal @ 4' OC
14 Spiraea betulifolia 'Tor'Birchleaf Spirea 3 gal @ 3' OC
GROUNDCOVERS / GRASSES
89 Arctostaphylos uva-ursi Kinnikinnick 'Vancouver Jade'4" pot @ 3' OC
'Vancouver Jade'
6 Calamagrostis × acutiflora Feather Reed Grass 1 gal @ 4' OC, triangular spacing
‘Karl Foerster’
35 Pennisetum alopecuroides Little Bunny Fountain Grass 1 gal @ 2' OC
'Little Bunny'
47 Calluna vulgaris 'Firefly'Firefly Heather 1 gal @ 30" OC
EXIST. LIGHT POST
TREES
2 Abies lasiocarpa Subalpine Fir 6'-8' ht, uniform & full bodied, B&B
5 Acer buergerianum Trident Maple 2" cal & 8'-12' ht min, 35' OC, fully branched & uniform, spacing as shown, B&B
2 Acer truncatum 'Warrenred'Pacific Sunset Maple 2" cal & 8'-12' ht min, fully branched & uniform, spacing as shown, B&B
SPECIAL SUN MIXTURE 8,700 SF ±
Perennial Ryegrass 80%By Country Green Turf Farms
Fine Fescue 20%Seeding Rate: 6-8 lbs per 1,000 sf
X Existing trees to be removed for construction
8 trees proposed to be removed
9 trees proposed to be add. Greater than 1:1 replacement
LANDSCAPE SPECIFICATIONS & NOTES
1.SCOPE OF WORK
a.The landscaping and irrigation work is part of a larger site project resulting in disturbance to the site, landscape and irrigation. As such, the landscape
contractor shall coordinate all work with the general contractor, both before any construction begins, and during the course of construction.
2.MATERIALS
a.Topsoil. Topsoil A shall be a 3 way blend of the following products; sandy loam, sand and organic compost (40-40-20). Refer to Specifications
b.Mulch. Mulch shall be dark fine mulch, applied to a 2” compacted depth on all beds. Mulch available from Pacific Topsoil 800-884-7645
c.Fertilizer. Agraform 21-gram tablet time release fertilizer shall be used in all plantings. Place 1 for each ground cover, 2 for each shrub and 4 for each tree.
They shall be placed in the plant pits as detailed. Also, top dress all plants with a suitable 'starter' fertilizer.
d.Tree Stakes. Tree stakes shall be 2” diameter x 8' length Lodgepole pine. Fasteners shall be 1” PVC Chain-Lock, placed as detailed.
3.SOIL PREPARATION
a.Prior to any landscape work, contractor shall remove, or have removed, all debris from the other building trades from the landscape surfaces. NO landscape
work shall commence until the areas are cleared of other trades debris.
b.Cultivate the existing ground surface to a minimum depth of 8” and remove all rocks over 1”, existing roots and other debris.
c.Fine grade the subgrade to adjoining surfaces in preparation of adding specified topsoil.
d.Beds. Place a minimum of 8” of specified topsoil on all beds and till or cultivate the topsoil a minimum depth of 8”. Remove all rock and debris which may
surface. Finished grade of topsoil shall be 2.5” below adjoining paved surfaces, allowing 2” for mulch. Therefore, finished grade shall be 1/2" below paved
surface.
4.PLANTING OF TREES, SHRUBS AND GROUNDCOVERS
a.Contractor responsible to verify quantities.
b.Contractor is to confirm that all beds are prepared and ready for planting, without interference with other trades.
c.Layout all plants as per plan and approval by Landscape Architect or Owner's Rep, making sure the plants are orientated to give best appearance to the
viewer.
d.Pit plant all plants into prepared soil and plant per the details. While planting, water the plants into the plant pits thoroughly soaking the root balls and soil.
Place fertilizer tablets as specified, filling plant pits with specified topsoil. Top dress fertilize when completed.
e.Trees planted 5' or less from paved surfaces shall be planted with root barrier control.
f.Shrubs and groundcover shall be planted to attain coverage of 90% of the planting area within 3 years.
5.SOD PREPARATION
a.Place approx. 4" of specified soil mix to prepare the areas prior to placing sod, filling all depressions and removing all high spots. Compact uniformly with a
water filled drum.
b.Install sod, making sure the sides and ends are butted tightly together. After sod is installed, roll it with a water filled drum.
c.Installed sod must be flush with plant beds and adjoining concrete surfaces.
d.Water with automatic irrigation to assure well rooting and growth of the lawn.
e.Fence off areas from foot traffic or others through establishment period and until final approval.
f.Mow a minimum of 2x before when lawn is long enough for mowing prior to final approval.
6.LAWN ESTABLISHMENT
a.Confirm a full coverage, working automatic irrigation system, prior to installation of lawn. Mow every 7-10 days until established and approved.
7.WARRANTY
a. All landscaping shall be warranted for one year from FINAL ACCEPTANCE. Plants requiring replacement shall be of the original variety and size as specified
herein.
8.IRRIGATION
a.An automatic irrigation system shall be installed through the Bidder Design process
b.Contractor to confirm location of controller with owner.
c.Contractor to provide Coverage Test for approval by Landscape Architect or Owner.
d.Contractor to provide As-Built Drawing of irrigation system.
DATE:
NUMBER:
PROJECT:New Life Church - Renton
May 15, 2023
LLA0404.23
TITLE:
DESIGN:MJL
DRAWN:MJL
CHECKED:EW
SHEET:
SCALE:
NE
W
L
I
F
E
C
H
U
R
C
H
15
7
1
1
1
5
2
N
D
A
V
E
S
E
RE
N
T
O
N
,
W
A
9
8
0
5
8
PROJECT ADDRESS:
21
1
1
S
o
u
t
h
C
S
t
r
e
e
t
,
T
a
c
o
m
a
,
W
A
9
8
4
0
2
2
5
3
-
2
0
9
-
4
0
5
3
|
M
o
g
h
a
n
@
L
y
o
n
L
A
.
c
o
m
REVIEW SET
NOT FOR
CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
s
,
LL
C
REVISIONS:
REV 1:
REV 2:
REV 3:
Know what's below.
before you dig.Call
R
DRAWING SET:
PRELIMINARY
SUBMITTAL
L1.00
LANDSCAPE
PLAN
1" = 20'-0"
Graphic Scale: 1" = 20'-0" at full size (24" x 36")
0 10'20'40'80'
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
15
2
N
D
A
V
E
S
E
MAPLE
V
A
L
L
E
Y
H
I
G
H
W
A
Y
-
S
R
1
6
9
STREET TREES, 35' OC
RESTORE EXISTING LAWN AREA
LAWN, MATCH EXISTING
RESTORE EXISTING LAWN AREA
(4) TREES TO BE REMOVED
X
X
X
X
LIMITS OF WORK, REFER TO CIVIL
LIMITS OF WORK, REFER TO CIVIL
MAPLE
V
A
L
L
E
Y
H
W
Y
MAPLE
V
A
L
L
E
Y
H
W
Y
RESTORE EXISTING LAWN AREA
X
(1) TREE TO BE REMOVED
LIMITS OF WORK, REFER TO CIVIL
DATE:
NUMBER:
PROJECT:New Life Church - Renton
May 15, 2023
LLA0404.23
TITLE:
DESIGN:MJL
DRAWN:MJL
CHECKED:EW
SHEET:
SCALE:
NE
W
L
I
F
E
C
H
U
R
C
H
15
7
1
1
1
5
2
N
D
A
V
E
S
E
RE
N
T
O
N
,
W
A
9
8
0
5
8
PROJECT ADDRESS:
21
1
1
S
o
u
t
h
C
S
t
r
e
e
t
,
T
a
c
o
m
a
,
W
A
9
8
4
0
2
2
5
3
-
2
0
9
-
4
0
5
3
|
M
o
g
h
a
n
@
L
y
o
n
L
A
.
c
o
m
REVIEW SET
NOT FOR
CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
s
,
LL
C
REVISIONS:
REV 1:
REV 2:
REV 3:
Know what's below.
before you dig.Call
R
DRAWING SET:
PRELIMINARY
SUBMITTAL
L1.02
FRONTAGE
LANDSCAPE
PLAN
1" = 20'-0"
Graphic Scale: 1" = 20'-0" at full size (24" x 36")
0 10'20'40'80'
SE
E
2
/
L
1
.
0
2
SE
E
1
/
L
1
.
0
2
FRONTAGE LANDSCAPE PLAN2
FRONTAGE LANDSCAPE PLAN1
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
SCALE: 1" = 1'-0"
CONIFER PLANTING DETAIL
COVER SOIL
LOOSENED AREA WITH
3" OF MULCH, AS
SPECIFIED. KEEP
MULCH 3" AWAY FROM
TREE TRUNK
SOIL BACKFILL
(SEE SPECS)
PLACE ROOTBALL ON
SOLID SOIL
REMOVE BURLAP
FROM TOP 12 OF
ROOTBALL
TILL COMPACTED
SUBGRADE AS
SPECIFIED
DIG THE PLANTING
PIT AT LEAST
TWICE THE SIZE
OF THE ROOTBALL
PLACE TOP OF
ROOTBALL 1" ABOVE
LEVEL GROWING IN
NURSERY
NOTES:
1. FERTILIZE & WATER AS
SPECIFIED FOLLOWING
PLANTING.
2. SEE SPECS FOR ADDITIONAL
INFORMATION
3. SEE STAKING DETAILS.
SCALE: NTS SCALE: 1" = 1'-0"
CONIFER TREE STAKING
2/
3
H
E
I
G
H
T
O
F
T
R
E
E
2" Ø LODGE POLE STAKE.
PLACE
OUTSIDE
ROOTBALL
1" CHAIN LOCK TREE TIE
3
'
M
I
N
45°-60°
8
"
M
I
N
SCALE: NTS
SCALE: 3/4" = 1'=0"
DECIDUOUS TREE PLANTING DETAIL
PLACE ROOTBALL ON SOLID SOIL
NOTE:
1. DO NOT FERTILIZE. WATER AS NECESSARY
FOLLOWING PLANTING.
2. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
3. SEE STAKING DETAILS
SPECIFIED TOPSOIL
DIG THE PLANTING PIT AT LEAST 3
TIMES THE SIZE OF THE ROOTBALL
COVER SOIL LOOSENED AREA WITH
3" OF MULCH, AS SPECIFIED. KEEP
MULCH 3" FROM TREE TRUNK
STRONG STOUT STEMS AND BUDS
ROTOTILL
COMPACTED
SUBGRADE AS
SPECIFIED
WIDE BRANCH
ATTACHMENT
REMOVE ALL BURLAP FROM
ROOTBALL
SCALE: NTS SCALE: 3/4" = 1'=0"
DECIDUOUS TREE STAKING DETAIL
TO
B
O
T
T
O
M
B
R
A
N
C
H
E
S
STAKE TO PENETRATE 12"
MIN. BELOW BOTTOM OF
PLANTING PIT1'
2" Ø LODGE POLE STAKE. PLACE
OUTSIDE ROOTBALL
(2) 1" CHAIN-LOCK TREE TIES
SCALE: NTS SCALE: 1/2" = 1'-0"
SHRUB PLANTING DETAIL
FG
SPREAD ROOTS OF BASE
ROOT PLANTS OUT OVER
CONE OF HAND-FIRMED
TOPSOIL
CONE OF HAND-FIRMED
TOPSOIL FOR BALL &
BURLAP PLANTS
NOTES:
1. USE PLANT STARTER SOLUTION
DURING PLANTING OPERATION.
FEED AS SPECIFIED.
2. SHRUBS SHALL BEAR SAME
RELATION TO FINISHED GRADE AS
IT BORE TO PREVIOUS EXISTING
GRADE. TOP OF ROOTBALL SHALL
BE 1" ABOVE FINISHED GRADE
SAUCER
TOPSOIL BACKFILL
(SEE SPECS)
REMOVE ALL BURLAP FROM
ROOT BALL
MULCH,
AS SPECIFIED
3"
M
I
N
18
"
M
I
N
6"
12"
MIN
SCALE: NTS
SCALE: 1" = 1'-0"
GROUNDCOVER PLANTING DETAIL
6"
6"
1 FERTILIZER TABLET
SPECIFIED TOPSOIL
MULCH, AS SPECIFIED
SCALE: NTS
EQ.
1.
5
x
SP
R
E
A
D
EQ
.
BACK OF CURB OR
LANDSCAPE BED EDGE
GROUNDCOVERS,
TYP
NOTE:
1.ALL GROUNDCOVER SHALL BE PLANTED AT EQUAL
TRIANGULAR SPACING AS PER PLAN, UNLESS SHOWN
OTHERWISE
2.SET GROUNDCOVER BACK FROM CURB OR WALKWAY AT
LEAST 1-1/2 TIMES THE SPREAD OF SUCH GROUNDCOVER
1 2 3
4 5 6
SCALE: 1/2" = 1'-0"
TREE & SHRUB SLOPE PLANTING DETAIL
EXIST. SUBGRADE
SCALE: NTS
12" MIN
FINISHED GRADE
ORIGINAL GRADE
MULCH, AS SPECIFIED
PLANTING SOIL &
FERTILIZER
BLEND INTO
EXIST. SLOPE
SAUCER BUILT
ON LOW SIDE
PLANT SET AT
ORIGINAL DEPTH
EXIST. SUBGRADE
12" MIN
FG
ORIGINAL GRADE
MULCH, AS SPECIFIED.
KEEP 3" AWAY FROM TRUNK
PLANTING
SOIL &
FERTILIZER
BLEND INTO
EXIST. SLOPE
SAUCER BUILT
ON LOW SIDE
PLANT SET AT
ORIGINAL DEPTH
7
DATE:
NUMBER:
PROJECT:New Life Church - Renton
May 15, 2023
LLA0404.23
TITLE:
DESIGN:MJL
DRAWN:MJL
CHECKED:EW
SHEET:
SCALE:
NE
W
L
I
F
E
C
H
U
R
C
H
15
7
1
1
1
5
2
N
D
A
V
E
S
E
RE
N
T
O
N
,
W
A
9
8
0
5
8
PROJECT ADDRESS:
21
1
1
S
o
u
t
h
C
S
t
r
e
e
t
,
T
a
c
o
m
a
,
W
A
9
8
4
0
2
2
5
3
-
2
0
9
-
4
0
5
3
|
M
o
g
h
a
n
@
L
y
o
n
L
A
.
c
o
m
REVIEW SET
NOT FOR
CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
s
,
LL
C
REVISIONS:
REV 1:
REV 2:
REV 3:
Know what's below.
before you dig.Call
R
DRAWING SET:
PRELIMINARY
SUBMITTAL
L1.03
PLANTING
DETAILS
As Shown
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A
DATE:
NUMBER:
PROJECT:New Life Church - Renton
May 15, 2023
LLA0404.23
TITLE:
DESIGN:MJL
DRAWN:MJL
CHECKED:EW
SHEET:
SCALE:
NE
W
L
I
F
E
C
H
U
R
C
H
15
7
1
1
1
5
2
N
D
A
V
E
S
E
RE
N
T
O
N
,
W
A
9
8
0
5
8
PROJECT ADDRESS:
21
1
1
S
o
u
t
h
C
S
t
r
e
e
t
,
T
a
c
o
m
a
,
W
A
9
8
4
0
2
2
5
3
-
2
0
9
-
4
0
5
3
|
M
o
g
h
a
n
@
L
y
o
n
L
A
.
c
o
m
REVIEW SET
NOT FOR
CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
s
,
LL
C
REVISIONS:
REV 1:
REV 2:
REV 3:
Know what's below.
before you dig.Call
R
DRAWING SET:
PRELIMINARY
SUBMITTAL
L1.04
PLANT IMAGES
As Shown
PLANT IMAGES
DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A