CONSTRUCTION MITIGATION DESCRIPTION:
NEW LIFE CHURCH - RENTON
September 20, 2023
PROPOSED CONSTRUCTION DATES: APRIL 2023 – FEBRUARY 2024
HOURS AND DAYS OF OPERATION: M-F 7AM-5PM
PROPOSED HAULING TRANSPORTATION ROUTES: FROM THE SITE TO 152ND TO 169 MAPLE VALLEY
HIGHWAY
MEASURES TO BE IMPLEMENTED TO MINIMAZE DUST, TRAFFIC, AND TRANSPORTATION IMPACTS,
EROSION, MUD NOISE, AND OTHER NOXIOUS CHARACTERISTICS:
BUILDING CONSTRUCTION WILL BE DONE BETWEEN HOURS OF NORMAL OPERATION. NORMAL
CONSTRUCTION NOISE WILL BE MADE. FOR THE POWER LINE CONSTRUCTION ALL PRECAUTIONS OF
TRAFFIC, TRAFFIC ATTENDANTS, DUST MITIGATION AND EROSION CONTROL WILL BE IMPLEMENTED
TO AVOID ANY SUCH NUISANCES.
ANY SPECIAL HOURS PROPOSED FOR CONSTRUCTION OR HAULING (I.E. WEEKENDS, LATE NIGHTS):
NONE AT THIS TIME
PRELIMINARY TRAFFIC CONTROL PLAN: ALL TRAFFIC DUE TO THE CONFIGURATION OF THE SITE WILL
BE THROUGH 152ND STREET AND 169TH. IF ANY SPECIAL ACCOMODATIONS NEED TO BE MADE
CONTRACTOR WILL PROVIDE A PLAN AND ATTENDANTS TO DIRECT TRAFFIC AS NECESSARY.