HomeMy WebLinkAboutR-429317A PORTION OF THE NW 1/4 OF THE NW 1/4 OF SEC. 28, TWN. 23 N., RGE. 05 E., W.M.
N
0
W
,sao;H�in (oajzz)
NO.
BID SET EB 4/05/24
PERMIT COMMENTS EB 4/19/24
ADDENDUM 1 EB 4/30/24
REVISION
i
a� II II II \ 1
II III II
SURVEYED:
DESIGNED:
DRAWN:
EB/AM
CHECKED:
Ty
BY DATE AP P R APPROVED:
AR
SOIL
PLAN LEGEND
SYMBOL
SOIL REQUIREMENTS (DEPTH, TYPE, ETC.)
7 7 7 7 7 7 7 7 7 7'
STRIP SOD, ROOTS AND STICKS FROM SURFACE TO
00000 00000 0
7 7 7 7 7 7 7 7 7 7 7 7'
MINIMUM 3" DEPTH AND HAUL OFF, AFTER STRIPING
00000000000
INSTALL IMPORT FIELD TOPSOILS AS NEEDED TO
00000000000
MEET FINISH GRADES SHOWN ON GRADING PLAN
AFTER SETTLEMENT IS ACCOUNTED FOR. DEPTH
VARIES BASED ON PROPOSED FINISH GRADE. ALL
AREAS SHALL RECEIVE AT LEAST 3" OF IMPORT
FIELD TOPSOIL, WITH ADDITIONAL IMPORT FIELD
TOPSOIL ADDED AS NEEDED TO MEET PROPOSED
GRADES.
STRIP SOD, ROOTS AND STICKS FROM SURFACE TO
MINIMUM 8" DEPTH AND HAUL OFF, AFTER STRIPING
INSTALL 4" DEPTH SKIN MIX ON TOP OF MIN. 4" DEPTH
BASE SAND AS NEEDED TO MEET FINISH GRADES
SHOWN ON GRADING PLAN AFTER SETTLEMENT IS
ACCOUNTED FOR. DEPTH VARIES ACCORDING TO
PROPOSED FINISH GRADES.ALL AREAS SHALL RECEIVE
AT LEAST 4" OF SKIN MIX AND 4" OF BASE SAND, WITH
ADDITIONAL BASE SAND ADDED AS NEEDED TO MEET
PROPOSED GRADES.
REMOVE EXISTING INFIELD SKIN MIX, TO MIN. 6" DEPTH
AND INSTALL IMPORT FIELD TOPSOIL AS NEEDED TO
MEET FINISH GRADES SHOWN ON GRADING PLAN AFTER
SETTLEMENT IS ACCOUNTED FOR. ALL AREAS SHALL
RECEIVE AT LEAST 6" OF IMPORT FIELD TOPSOIL, WITH
ADDITIONAL IMPORT FIELD TOPSOIL ADDED AS NEEDED
TO MEET PROPOSED GRADES.
STRIP SOD, ROOTS AND STICKS FROM SURFACE TO
1=III=III=III III -III MINIMUM 3" DEPTH AND HAUL OFF, AFTER STRIPING
III III —III —III —III —I
I—III—IIIIIIIII—III IMPORT TOPSOILS AS NEEDED TO MEET FINISH GRADES
SHOWN ON GRADING PLAN AFTER SETTLEMENT IS
ACCOUNTED FOR. ALL AREAS SHALL RECEIVE AT LEAST
3" OF IMPORT TOPSOIL, WITH ADDITIONAL IMPORT
TOPSOIL ADDED AS NEEDED TO MEET PROPOSED GRADES.
STRIP SOD, ROOTS AND STICKS FROM SURFACE TO
\\\\\\\ MINIMUM 11" DEPTH AND HAUL OFF. ALL AREAS SHALL
RECEIVE AT LEAST 8" OF IMPORT TOPSOIL AND 3" OF
BARK MULCH, TO MEET EXISTING GRADES.
AFTER
DEPTH
PLAN
FIELD
FIELD
DEMO, REMOVE SUBGRADE MATERIAL TO 8"
BELOW FINISHED GRADE SHOWN ON GRADING
AND HAUL OFF. INSTALL 8" DEPTH IMPORT
TOPSOIL, GRADE TRANSITION WITH ADJACENT
SOIL AREAS MUST BE SMOOTH.
GENERAL NOTES
1. SOIL EXTENTS SHOWN REPRESENT ANTICIPATED LIMITS OF
DISTURBANCE AT PROPOSED LANDSCAPE AREAS. PROVIDE
AND INSTALL SOIL TO ACTUAL LIMITS OF DISTURBANCE.
2. REFER TO SPECIFICATIONS FOR ADDITIONAL SOIL
REQUIREMENTS.
OF WAS/
J RASM
rora
SCALE: 1 "=50'-0" <
mm1430 NE 65th Street � 20
Seattle, WA 98115 ��S'3sexP.slze
0' 25' 50' 100' t:206-322-1732 CAPE AR1
fora.land
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
SAMorman 06/07/2024 '
CURRENT PLANNING
JDing 06/07/2024
SCALE: DATE:
VERTICAL: NAV1988
HORIZONTAL: NADD1983/1991 C TY 0� CASCADE ELEMENTARY SCHOOL 04/19/24
®
FIELDBOOK:
RENTON
PAGE:
FIELD IMPROVEMENTS
ONE INCH DATUM DRAWING N0:
AT FULL SCALE Planning/Building/Public Works Dept. L2,03
IF NOT ONE INCH
SCALE ACCORDINGLY SOILS PLAN
SHEET: 17 OF: 3 4