Loading...
HomeMy WebLinkAbout20240222Cascade ES SEPA DNS signedCAPITAL PLANNING AND CONSTRUCTION 1.If during constructions soils are found to be contaminated with arsenic, lead, or othercontaminants, extra precaution will be taken to avoid escaping dust, soil, erosion, andwater pollution during grading and site construction. Contaminated soils generatedduring site construction shall be managed and disposed of in accordance with state and local regulations, including the Solid Waste Handling Standards regulation (Chapter 173- 350 WAC). 2.All imported fill mut be clean fill utilizing an approved source. 3.A Construction General Stormwater permit, if required, is to be obtained prior to clearing, grading, or excavation activities. The lead agency will not act on this proposal for 14 days from issue date (issue date: February 27, 2024). Comments must be submitted by 5:00 pm on March 12, 2024. Comments can be mailed or emailed to the address listed above. There is no agency appeal of this DNS; appeals are governed by RCW 43.21C.075. Responsible Official:Matthew Feldmeyer, Executive Director of Capital Planning and Construction. Matthew Feldmeyer, Executive Director of Capital Planning and Construction Renton School District Published in the Seattle Times: February 27, 2024 Date SERVICE I EXCELLENCE I EQUITY 02/22/2024 7812 S 124th St., Seattle, Washington 98178-4830 I p.425.204.4403 I f.425.204.4476