HomeMy WebLinkAboutMFP24002747.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24002747 IVR Number: 24002747 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/29/2024Application Date:0089000090Parcel Number: 3030 NE 10TH ST Permit Type:06/12/2024Issue Date:Franchise Permit Work Class:06/12/2025Expiration Date:Minor Utility Job Number: 101160408Franchise Type:Electric Description: Puget Sound Energy Electric At SW#X369, Grid # 318494 166804 install 3 Siemens Fuse savers. Install stirrups with hot taps and all jumpers will be insulated. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101160408 3030 NE 10TH ST Kailena Phetsomphou 425-553-9981 MFP24002747 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 6/12/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ROADWORKAHEADW20-1 ONE LANEROADAHEADCW20-4 ONE LANEROADAHEADCW20-4 ONE LANEROADAHEADCW20-4 BEPREPAREDTO STOPW20-7b ONE LANEROADAHEADCW20-4 BEPREPAREDTO STOPW20-7b BEPREPAREDTO STOPW20-7bW20-7A W20-7A W20-7A W20-7A ROADWORKAHEADW20-1 350' 350' 350' 350' 350' 350' 350'350' 250' 250'250' 250'Kirkland Ave NEKirkland Ave NENE 10th St NE 10th St NE 10th StNE 10th StJefferson AvePrivate RdLynnwood Ave NELynnwood Ave NEDVWY DVWY DVWYDVWYDVWY OFFICE: 800-343-4049CELL:425.290.2577WATCP@KNDSERVICES.NET CUSTOMER:CONTACT:LOCATION:DATE:W/O #Kailena Phetsomphou425-553-998105.06.24DESIGNED BY: BRANDON CALLIHAM11906745PSE 3030 NE 10th StRenton, Wa BRANDON CALLIHAMWSTCS#012803EXP:4.30.2025 PLACE 72HRS IN ADVANCE ON BOTH SIDES OF THE WORK AREANOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 LegendConeONE LANEROADAHEAD CW20-4 one lane road aheadFlaggerNOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39PoleSpotterROADWORKAHEADW20-1 road work aheadW20-7A Flagger AheadBEPREPAREDTO STOP W20-7b be prepared to stopWork Area Manifest29 x Cone8 x W20-1 road work ahead4 x CW20-4 one lane road ahead4 x W20-7A Flagger Ahead3 x W20-7b be prepared to stop1 x No Parking R7-T391 x Sign PLEASE SCHEDULEWITH DISPATCH@ 800-343-4049 OPT.1AND PROVIDE ACOPY OF THE APPROVEDTRAFFIC CONTROL PLAN K&D Services, as the preparer of this trafficcontrol plan makes no representation as to its'general adequacy or being approved for implementation.Approval must result from the Traffic Engineer orother Public Official having statutory enforcement authorityin the jurisdiction. Utilization and implementation of thisplan shall be a result of that approval.Ref. MUTCD 2009 6A-01 (10) NOT TO SCALENSEWNOTIFY EMS, FIREAND POLICE72 HOURS IN ADVANCE www.invarion.comMFP24002747 100T X92105FS PRE 11 N Vicinity Map LAT/LONG: 47.49899/-122.17773 101160408OVERHEAD CIRCUIT MAP - Before SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: N.T.S. OVERHEAD CIRCUIT MAP - After No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" PRE-11 SW#X369 INST 3 FS NE 10TH ST GENERAL SPECIFICATIONS Project Summary: At SW#X369, Grid # 318494-166804 install 3 Siemens Fusesavers. Install stirrups with hot taps and all jumpers will be insulated. Non-storm customer minute interruptions saved: 3732 Non-storm customer interruptions saved: 75 Non-storm outages saved: 0.2 Project Justification: In PSE's service territory, it is projected that 60% of the outages on overhead systems are temporary in nature, such as a limbs falling through the primary line making contact along the way. Fusesavers are devices that when placed in series with fused cutouts will provide an instantaneous operation and then after a period of time reclose. If the fault is temporary then customers will see the brief drop and pick, but if permanent it will allow the fuse to blow. Construction Criteria: Use temporary jumpers around existing fuses to keep system in service and avoid the need for customer outages during the installation of the Siemens Fusesavers. Install grid number boards on PSE poles where they're missing. Install new OH switch number boards if not present. Provide Planner with preliminary and final work sketches and notify Planner when the project is scheduled, then complete. Keep Planner notified of correspondence with ROW. General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. Owner / Developer Contact Info officeATTN: N/A N/A N/A FREMONT AQUINALDO 425-396-3818PHONE CABLE TV 11906745 101160408 593257705 PROJECT PHASE PWR NOTIF#ORDER# Superior OH Expense E-Mail: Cell Phone: Project Manager Contact Information: Manager:KEVIN POPICH 206-716-2712 KEVIN.POPICH@PSE.COM UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K. POPICH 206-716-2712 9-13-23 A.CRAWFORD 425-559-5712 9-13-23 N/A N/A N/A ACT-JS 918-899-7502 9-13-23 N/A CITY OF RENTON PRE-11 SW#X369 INST 3 FS NE 10TH ST INSTALL 3 FUSESAVERS 318494-166804, 3030 NE 10TH ST, RENTON, WA 98056 Design By: Actalent Services N/A N/A N/A 101160408 AS NOTED 1/1 KING N/A N/A QCSOKE NW 09-23-05 E N/A 206-084 2305E034 2305E040 2305E034 PRE-11 COMCAST - EVERETT N/A N/A VERIZON BUSINESS/MCI N/A N/A PSE N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PLAN VIEW SCALE: 1" = 50' Installed at site: Grid Number: Company ID#: Primary phase connected to: Material ID#: Foreman to redline the following information FUSE SAVER TRIP SAVER INSTALLATION Installed at site: Grid Number: Company ID#: Primary phase connected to: Material ID#: Foreman to redline the following information FUSE SAVER TRIP SAVER INSTALLATION Installed at site: Grid Number: Company ID#: Primary phase connected to: Material ID#: Foreman to redline the following information FUSE SAVER TRIP SAVER INSTALLATION P01 318494-166804 9946707 P01 318494-166804 9946707 P01 318494-166804 9946707 JOBSITE P01 318494-166804 -EXISTING POLE TO REMAIN -REPL EX BUCK ARMS W/ 11' DBL DE ARM (6011.1020, ARD4S11) 2-21x3 -INSTALL (3) #2ACSR DE'S (W)(6016.1000, DEDR21A) -INSTALL 3Ø ARM MTD FUSESAVERS ON WEST SIDE OF BUCK ARM (6022.1060 WAIVER, FUS3AM) 2-24Nx2 -REPL EX C/O'S ON EAST SIDE OF BUCK ARM (6022.1060 WAIVER)2-24O -FUSE AT 100T -RETIRE SW# X369 -INSTALL SW# 92105FS 6022.1060 WAIVER LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION PROPOSED FUSESAVER X92105FS100T480-203-4272 4-15-24 K. PHETSOMPHOU 425-553-9981 MFP24002747