Loading...
HomeMy WebLinkAboutMangat short Plat (C21001474) - Construction Close Out Complete.msgHello Mangat, All construction work associated with the [Mangat Short Plat] has been completed and the City has signed off on the Construction Portion of the Civil Construction Permit today. Please note that with the sign off of this permit, your 2-year Maintenance Period begins today with your maintenance period ending on June 6th 2026. If you have any questions, please let us know. SCOTT WARLICK, Engineering Specialist III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425)-430-7216 | swarlick@rentonwa.gov <mailto:swarlick@rentonwa.gov>