HomeMy WebLinkAboutAddendum - 2WSDOT Contact:Lucas Rogers
WSDOT E-mail:Lucas.Rogers@wsdot.wa.gov
WSDOT Phone:360-705-7761
Amendment Number Contractor:
Term of Agreement
Vendor #Contact:
Service Area Email:
RECITAL
Heather Gregersen
Administrative Amendment
Regional Mobility Grant Program
Construction Grant Agreement
This is the second AMENDMENT to AGREEMENT PTD0417 entered into between the Washington State
Department of Transportation (hereinafter referred to as “WSDOT”), and City of Renton (hereinafter referred to
as “CONTRACTOR”), and/or individually referred to as the “PARTY” and collectively referred to as the
“PARTIES,”
PTD0417 - A2
July 1, 2021 through June 30, 2025
SW00122000 0
Whatcom
City of Renton
City of Renton
PW Transportation; 1055 S Grady Wa
Renton, WA 98057-3232
hgregersen@rentonwa.gov
WHEREAS, the PARTIES amend AGREEMENT PTD0417 to:
NOW THEREFORE, the following AMENDMENTS are hereby incorporated into AGREEMENT PTD0417:
- Extend the contract term to June 30, 2025 to allow the City of Renton to complete the project. State funding for
the project has been exhausted. Local funds will be used by the City of Renton to complete the project and meet
the match requirement as committed for this project. The City of Renton will report to WSDOT and submit a
summary of completion including provided match once the project is operationally complete
CAG-21-286, Adden #2-24
2. Amend Caption heading 'Term of Project' on the first page of the AGREEMENT to read as follows:
3. Amend the current funding table, Funding by Project, to read as follows:
Funding by Project
Project Title:
UPIN #20210026
Scope of Work:
Funds
Current
Percentage Prior Funds Current Funds Projected Funds Total Funds
Regional Mobility Funds 17% 2,000,000 - - 2,000,000
Contractor's Funds 83% - 10,000,000 - 10,000,000
Total Project Cost 100%2,000,000 10,000,000 - 12,000,000
Budget:
AGREEMENT
1. RECITALS from the AGREEMENT are hereby incorporated into this AGREEMENT.
Current Funds reflect total funding appropriated by the Washington State Legislature for
the Project in the 2023-2025 biennium.
4. A copy of this AMENDMENT to AGREEMENT PTD0417 shall be attached to and made a part of the original
AGREEMENT. Any references to the “AGREEMENT” shall mean “AGREEMENT as amended.”
5. All other terms and conditions of the original AGREEMENT not hereby amended shall remain in full force
and effect. This document may be simultaneously executed in several counterparts, each of which shall be
deemed original having identical legal effect.
City of Renton - Rainier Ave So. Corridor Imp - Ph 4A
Continue construction of previous Rainier Ave. improvements and improve access and
mobility between the Renton Growth Center and connections to regional transportation
facilities of I-405, SR 167, SR 900, and the Tukwila Sounder Station. Includes construction
of BAT lanes, transit facility upgrades and other improvements.
Term of Project: July 1, 2021 through June 30, 2025
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
Authorized Representative
Public Transportation Division, WSDOT
Date
IN WITNESS WHEREOF, the PARTIES hereto have executed this AMENDMENT the day and year last written
below.
5/3/2024