HomeMy WebLinkAboutMFP24002909.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP24002909
IVR Number: 24002909
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:06/06/2024Application Date:1742900020Parcel Number: 553 RAYMOND PL NW
Permit Type:06/24/2024Issue Date:Franchise
Permit Work Class:06/24/2025Expiration Date:Minor Utility
Job Number: 101174612Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REPLACE 1/0 CABLE FROM P01 GRID 318192 165596 TO V01 GRID
450264 156681 BY TRENCHING AND BORING APPROX 225' IN HARD SURFACE. 2 BORE PITS 2X8X3 IN HARD
SURFACE; 1 TRENCH 1X195X3 IN HARD SURFACE. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY
OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101174612
553 RAYMOND PL NW
RICHARD MILLER 253-355-6930
MFP24002909
8:00am 3:00pmMondayFriday
Scott Warlick CED 6/24/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
RAYMOND PL
NW84TH AVE SP01
BP2
BP11515
15 15FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS ALONG
WORK AREA
RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
V01
STOP
W20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7AW20-7A
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Sultan Wakid
425-424-6658
Sultan.Wakid@pse.com
1 OF 1553 RAYMOND PL NW, RENTON, WA
0
12004359
05/28/2024
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
WORK PIT
TRENCH
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
John Crofoot
Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658
MFP24002909
533
P#1742900020
539
P#1742900010 RAYMOND PL
NW
NW 5
T
H
P
L
1-2" - L______'
EIX074 - BØTRENCH OR
BORE
~
195
'
75kVA
120/240V
25T
T92308
BP-1
BP-2
TO BE
ABANDONED
IN PLACE
BØ3279
1-2" - L______'
EIX074 - BØ
25T
T92308
RAYMOND PL
NW
75kVA
120/240V
EIX074 - BØ
1-2" - L______'183 lbs
172
lbs
533
P#1742900020
539
P#1742900010
25T
T92308
101174612Potelco, Inc.DESIGNED BY
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
12004359 101174612
-
108156194
584051579
593258418
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
SCALE: 6" = 1 MILE
PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE)
LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE
(gal.)REMARKS
FROM TO SIZE
(in)QTY
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
TYPE BENDS PULL
(lbs)
PULL
REV
(lbs)
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only
Check applicable box
DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS
BUILT
P01 V01 2 1 195 183 172 1/0 AL JKT 225 -EIX074 -0.6
TOTAL 2"195'TOTAL 1Ø 225'TOTAL LUBE 0.6
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
V01 (450264-156681)
-REMOVE EXIST 75KVA TUT XFMR
-INSTALL NEW 75KVA 120/240V TUT XFMR (6045.7000 - TUT1SRA)
-SPLICE OUT CONDUCTORS AS NECESSARY (6041.2000 SPL10J)
-INSTALL NEW CABLE TAG #EIX074
P01 (318192-165596)
-CUT AND ABANDON CABLE #3279-BØ
-INSTALL 1-2" RISER ON STANDOFF BRACKET (6042.1000 - RIS3CSS)
-INSTALL 12 KV 1Ø TERM, LB (6043.1000 - TSU1C1), FUSED AT 25T (MID:3412400)
-INSTALL NEW SWITCH #T92308
-INSTALL NEW CABLE TAG #EIX074
-
P01 TO V01
-INSTALL NEW 1-2" DB-120 COND APPROX. 195 ' (L_______')
-INSTALL 1Ø PRI CABLE APPROX. 230' (L______')
OVERHEAD CIRCUIT MAP: 2305E028
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. MILLER 253-355-6930 5/17/24
L. NEELY 253-569-2523 5/17/24
---
R. MILLER 253-355-6930 5/17/24
RW-134559 CITY OF RENTON
558798 PCR-13 CREW2 539 RAYMOND
REPL 1/0 CABLE 3279-B O#558798, RAISE TUT LID
553 RAYMOND PL NW, RENTON, WA 98057
O-558798 N/A
-101174612
AS SHOWN 1/1
KING COUNTY --QCSOKE
SW-07-05-23 --
2305E027 2305E028 2305E027 PCR-13
-
-
-
-
-
-
-
-
-
-
-
-
--N/A
N/A N/A N/A
N/A N/A N/A
JOB SITE
B. DARE 253-355-6850 5/17/24
L. NEELY 253-569-2523 5/17/24
JOB SITE
VICINITY MAP
SITE PLAN
SCALE: 1:50
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
318209-165586
75kVA
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (TUT)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
75kVA 120/240v
6233150
V01
318209-165586
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
ABANDONED
CABLE LEFT IN
PLACE
ABANDON
CIRCUITRYFROMTO
3279 11161450 P01 V01 195 YES NO
TOTAL CIRCUIT FEET 195'
PRIMARY UG CIRCUIT MAP: #2305E027
(PRE CONSTRUCTION) SCALE: 1:100
PRIMARY UG CIRCUIT MAP: #2305E027
(POST CONSTRUCTION) SCALE: 1:100
PRIMARY CABLE & CONDUIT DIAGRAM
SCALE: 1:50
SITE NOTES
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION PROPERTY
CLASSIFCATION
SIZE (FT)REM CU YD
(APPX)GRAVEL FILL
CU YD (APPX)
COMMON SURFACE
TYPES
REMARKS
BP-1 BORE PIT ROW 2 X 8 X 3 1.8 1.8 ASPHALT
BP-2 BORE PIT ROW 2 X 8 X 3 1.8 1.8 ASPHALT
OPEN TRENCH TRENCH ROW 1 X 195 X 3 21.7 21.7 ASPHALT
TUT XFMR VAULT EXC PVT PROP 7.5X8X3.6 8.0 6.3 GRASS
TOTAL PVT PROP CU YDS (APPX)8.0 6.3
TOTAL ROW CU YDS (APPX)21.7 21.7
TOTAL CU YDS (APPX)29.7 28.0
MFP24002909
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS