Loading...
HomeMy WebLinkAbout200065.1 No V TECHNICAL INFORMATION REPORT FOR Walker's Renton Subaru City of Renton, King County, Washington August 2000 Prepared For: Hansen, Hansen &Johnson 1230 Fryar Avenue PO Box 1008 Sumner, WA 98390 Prepared By: Glenn C. Hume, E.I.T., Design Engineer Reviewed By: James R. Carlsen, P.E., Associate } 01 0006 Gil I SEP 18 2000 BUILDING DIVf6i0N A HBL m • TECHNICAL INFORMATION REPORT FOR Walker's Renton Subaru City of Renton, King County, Washington August 2000 Prepared For: Hansen, Hansen &Johnson 1230 Fryar Avenue PO Box 1008 Sumner, WA 98390 (206) 863-8126 Contact: Andrew Orsen Prepared By: - AHBL, Inc. 2215 North 30`h Street, Suite 300 Tacoma, WA 98403 (253) 383-2422 010 �• ,____ A�i��� Glenn C. Hume, E.I.T., Design Engineer EXPiR'r_'2 �i Reviewed By: James R. Carlsen, P.E., I hereby state that this Technical Information Associate Report for Walker's Renton Subaru has been prepared by me or under my supervision and meets the standard of care 200065.10 and expertise that is usual and customary in this community for professional engineers. understand that the City of Renton does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me. TABLE OF CONTENTS SECTION PAGE 1. Project Overview..................................................................................................... 1 1.1 Purpose and Scope............................................................................................. 1 1.2 Pre-Development Conditions............................................................................2 1.3 Development Conditions.................................................. 2. Preliminary Conditions Summary...........................................................................2 3. Off-Site Analysis......................................................................................................3 3.1 Upstream Tributary Area..................................................................................3 3.2 Downstream Analysis .......................................................................................3 4. Retention/Detention Analysis & Design................................................................. 3 5. Conveyance Systems Analysis .................................................................................3 6. Special Reports and Studies......................................................................................3 7. Erosion/Sedimentation Control Design..................................................................3 8. Conclusion............................................................................................................... 5 Appendix A Exhibits A-1 Vicinity Map A-2 Drainage Basin A-3 SCS Soils Map A-4 SCS Soils Description Appendix B Exhibits B-1 Computational Methods per KCSWDM B-2 100-year 24-hour Isopluvial B-3 Hydrologic Soil Group of Soils in King County B-4 Runoff Curve Numbers B-5 Basin Summary (Existing Conditions) B-6 Basin Summary (Developed Conditions) 1. PROJECT OVERVIEW 1.1 Purpose and Scope This report accompanies civil engineering grading, erosion control, utilities, and paving plans for the proposed Walker's Renton Subaru development. The proposed development is for the demolition of existing and construction of a new building on the existing site. The proposed building is 1,989 square feet including office, storage and carport. The civil design minimizes the impact on the existing site. This includes limited grading and utilizing the existing storm system with supplementation of one additional catch basin. The proposed development includes Lot 1 of the City of Renton Lot Line Adjustment No. LUA-99-089-LLA prepared for Safeway, Inc. located in the northwest quarter of the southeast quarter of Section 28, Township 23 N., Range 5 E., Willamette Meridian, Renton, King County, Washington. The site address is 250 Rainier Avenue South (See Appendix A, Exhibit A-1). The full legal description is as follows: That portion of the H.H. Tobin donation land claim No. 37 and that portion of Government Lots 9 and 10, and that portion of vacated Lake Avenue South per City of Renton Ordinance 4714 recorded under King County Recording No. 9804220125, and that portion of Tracts 13 and 14, second supplemental maps of Renton Shorelands, adjacent to said Government Lots 9 and 10, all situated in Section 18, Township 23 North, Range 5 East, W.M., described as follows: Commencing at the intersection of the west margin of Shattuck Ave South (formerly Shattuck Street) and the north margin of South 3rd Street (formerly 3`d Ave.); Thence North 88°40'50" West along said north margin, a distance of 686.22 feet, to the true point of beginning; Thence North 00°07'37" East, a distance of 189.91 feet; Thence North 88°19'25" West 222.31 feet to a point on the east margin of Rainier Avenue South as shown on Renton Shorelands, second supplemental maps, said point being on a curve the center of which bears North 89002'51" East, having a radius of 779.02 feet; Thence along said east margin and curve southerly and easterly an arc distance of 139.56 feet through a central angle of 10015'53" to the beginning of a non-tangent curve concave northeasterly having a radial bearing of North 55012'41" East and a radius of 129.15 feet; Thence along said east margin and curve southerly and easterly and arc distance of 121.48 feet through a central angle of 53°53'31" to a point on the north margin of said South 3 d Street; Thence South 88°40'50" East 103.96 feet along said north margin to the true point of beginning. This report and the engineering plans are being submitted to the City of Renton for site development approval. This report provides the analysis utilized to design the stormwater and erosion control facilities for the proposed car dealership. -11 1 The 1990 King County Surface Water Design Manual(KCSWDA and the City of Renton Standard Specifications ("City Standards") establish the methodology and design criteria used for the project. 1.2 Pre-Development Conditions The proposal is to demolish the existing building located on the 0.899-acre lot as described above. A new building will be constructed near the northeast corner of the site. The existing storm system is utilized to collect and convey stormwater runoff in the developed condition. Currently, the site is predominately asphalt concrete paving with several cement concrete pads. Used vehicles are displayed on the lot. The existing building is approximately 3,300 square feet and is located near the center of the site. There is approximately 3,000 square feet of landscaping on-site and 32,500 square feet of impervious pavement. The Soil Conservation Service classifies the on-site soils as predominantly Beausite gravelly sandy loam- BeC. Appendix A, Exhibit A-3 provides the SCS soil map. The soil description (Appendix A, Exhibit A-4) state that the Beausite soil's runoff is medium and the hazard of erosion is moderate. Existing stormwater runoff is collected in a series of catch basins and discharges to a 24- inch storm main running through the middle of the site. The existing storm system is utilized in the developed conditions and discharges to the same 24-inch storm drain. 1.3 Development Conditions The developed conditions consist of one building totaling approximately 1,989 square feet, 33,692 square feet impervious pavement including cement concrete sidewalks and asphalt pavement, and 3,493 square feet of landscaping. The site will be developed to convey all paved surface runoff through the existing system of catch basins and pipes. Discharge will be to the existing 24-inch storm drain. No treatment is provided prior to discharge. Runoff generated from the building roof will be collected in a series of downspouts and conveyed by closed pipe to the storm system. Based on the meeting minutes prepared by Hansen, Hansen &Johnson, dated January 27, 2000, no treatment is required for stormwater runoff. Additionally, detention is not required if the on-site flows are not increased by more than 112 cfs. (See Attachment 1 for meeting minutes.) AHBL2 2. PRELIMINARY CONDITIONS SUMMARY A landscape variance approval was required and granted for this site. (See Attachment 2 for landscape variance approval.) 3. OFF-SITE ANALYSIS 3.1 Upstream Tributary Area Based on a site evaluation conducted by the project engineer, there is no offsite drainage flowing onto the site. 3.2 Downstream Analysis The downstream drainage from the proposed site consists of a 24-inch city storm sewer. Based on the above-mentioned meeting notes, detention is not required if the peak flow is not increased by more than 1h cfs. 4. RETENTION/DETENTION ANALYSIS & DESIGN Hydrologic calculations were conducted to confirm that the peak flow for the 100- year, 24-hour storm event does not increase more than 1/2 cfs from the existing conditions. Waterworks® was used as a tool to calculate the fully developed stormwater runoff volumes for the 100-year, 24-hour storm event. Waterworks® utilizes the Santa Barbara Unit Hydrograph (SBUH) method with a Type 1A rainfall distribution. This method is accepted by the 1990 KCSWDM for a basin of this size (See Appendix B, Exhibit B-1). The calculations demonstrate that the developed flow rate matches the existing flow rate of 0.73 cfs for the 100-year, 24-hour storm event (see Appendix B, Exhibits B-5 and B-6). Based on these calculations, stormwater detention is not required. 5. CONVEYANCE SYSTEMS ANALYSIS Conveyance calculations were not conducted due to the use of the existing storm drain system. 6. SPECIAL REPORTS AND STUDIES To our knowledge, no special reports or studies have been performed or are required for the project. -11 3 7. EROSION/SEDIMENTATION CONTROL DESIGN The proposed development includes an erosion/sedimentation control plan designed to prevent sediment-laden runoff from exiting the site during construction. Erosion/sedimentation control will be achieved by a combination of structural measures, cover measures, and construction practices that are tailored to fit the specific site. The temporary erosion and sedimentation control (TESC) plans include the following structural measures: 1. Siltation fence along the northeastern and southwestern perimeters of the site. 2. Sediment barriers for existing catch basins Prior to the start of any grading activity upon the site, all erosion control measures, including silt fence and catch basin sediment protection shall be installed in accordance with the TESC plans. The planned construction sequence is a follows: 1. Arrange and attend a preconstruction meeting with the City and obtain required permits 2. Construct filter fabric fence and catch basin sediment protection. 3. Erosion control measures shall be inspected a minimum of once weekly and after every storm event. 4. Complete demolition to provide new building. 5. Rough grade site. 6. Construct permanent drainage facilities, other utilities, and building. 7. Complete all utility installation and testing. 8. Demolish existing building and related utilities once new building is functional. 9. Fine grade site and install subgrade rock. 10. Pave site. 11. Remove sediment from catch basin sumps. AHBL4 12. Remove remaining temporary erosion and sedimentation control from areas of the site that have been stabilized with permanent vegetation and after removal is approved by the city. Cover measures are critical to prevent the transport of sediment off-site. Soil stabilization will conform to the City of Renton Standard Erosion Control Notes. If sediment is transported to adjacent asphalt surfaces by way of stormwater runoff or vehicle transport, the contractor shall clean the sediment daily. Cleaning shall be by shoveling or sweeping, washing will not be permitted. 8. CONCLUSION This report accompanies civil engineering grading, erosion control, utilities, and paving plans for the proposed Walker's Renton Subaru development. The proposed development is for an automobile dealership consisting of a 1,989-square foot building, including office, storage and carport areas. Stormwater and erosion/sedimentation control measures as described in this report and shown on the engineering plans should mitigate anticipated effects on the downstream drainage from the development of this project. This analysis is based on data and records either supplied to or obtained by AHBL. These documents are referenced within the text of the analysis. The analysis has been prepared using procedures and practices within the standard accepted practices of the industry. AHBL, Inc. Glenn C. Hume, E.I.T., Design Engineer GCH/jlg August 2000 20006510.rep AHBL 5 APPENDIX A Exhibits A-1 Vicinity Map A-2 Drainage Basin A-3 SCS Soils Map A-4 SCS Soils Description AHBL APPENDIX B Exhibits B-1 Computational Methods per KCSWDM B-2 100-year, 24-hour Isopluvial B-3 Hydrologic Soil Group of Soils in King County B-4 Runoff Curve Numbers B-5 Basin Summary (Existing Conditions) B-6 Basin Summary (Developed Conditions) AHBL 3js rx.n sl,., rrg s lnrn I s iz�ao�L �l.jt �umrnrr'.s p i 1 N z. - i t e ±I a ice- sr `-----•.-[+={{ 6TN ST y !-� �` MID!l al _m T s N si. z 1 rEOu inn < 4t. � F• ` ss ,anTM sT I °t I I N I ;t ST j! r 4TH Fti'0 c 9 jvo � j'ti �130TN y $T .may."si 2/i ~ cC O. RFxrav vlIr= zl'-r _ ST♦. a• s g1$r _., —9` J' z PL i N AIR gT t ran x I } W t7 f S ._.1321q ST ' Z S�rll _ST S �'ET $T kFSTr ?�a 'r aL S Too,, rgL.11 S 4 a S 1]4Tp�� I cro,°a i RENrON.a -��^ s - ! 17i � s 1.8. is j LraeaTr/ 1--� r : S 2ND PARK { aH2 ! ! 0p ND T R__- J e/ t rAw May° I , t• + ■ �% RIVER PART( sn _ SW sl SUN 1 s 14THt¢.41 Si I<' I" - y, ,9 V� i� < a.uu N s"IT"ti'f�a nFPER .� RED REMTON 9� v �•K $TN ST crx;ERTJTH St r ST 4+y$6 Ls� i j f1 TN CT :yam_ SW_ 7TH 1 J� y. 5.r'TN 5T ! 11 � 3f`= ;I �1 ig + �: PARR� i ! Q`�- � � -�' <� -•gip G4TE ei —. �i S T 3I W Y ENTDN VILLAGE ` L5 �ARIK7L0 tN r 5 W . CENTER _ 'PARK 6 0 st r GRAVY w sy r>4rE S RE4TON VILLAGE Pl I �i %IDAY �� ;• ` 20 A tfr r s15TH !t ^dim y 1 tT'k 16 c' x. 5T SW A, 'C" -ST ( ,3, 6C0., S t >r I S r sE 16iN f eAt7o+ a l S 18 SM 19T11 ST -mG 9�,n'" ... !ST�,',�°' �.,,' �, •+'1,.eM sL{R ?ti,. t W I 5 19TH ST -jTALBQT z.n.r Ts to IPL �m7Np�RK P S T mu>fi:7-Et qg: r �rL Zls r ; • �JGET M""+' -p% 0 J r will-:-7,T Sr �. Y Ei+.ws b{,F+,•�� �i u..�r',E> 91}5i�.LIST � j �� i . - $w 23RC 5T 5 2JR0 x� Ai $T , f. sEy,QI.iE1D R- rE®rrz Sw Iz)rH ST �n +„aK iS 27TH s " 'E -- 4TH ~ — t _ s VT. j�' N CZ a<5� r 5 2Bn, _T • Tx J ! E wi R£N7t7N IWETLAAOS - T PL�. cS/.•cF t1 Gi E t6u N u ^ATM. r leI Sn 1 NI 30 V9 >' I SW 30TN ,�c. l s t Q < "W $!.. ; aE I ST .` -+ SE 3157 57 3TSfZr Lj __�33RC S7 SE ION i sw 4TH ST AA'rNFR o IF `J ^ 347x Si$ SE 173N0 _ S7 I SE,T7. "GO N ' _.. - now I c`�' CREEK�� Ln �.,, �j IS w y SN i=L Ilm S_ AN METtAAM i ��-' _ 5 sr 37T $T S L SErW_TN ST FS i SW E 94H ST wETUh05 �CT �z ..��� E _J 1 A B L VICINITY MAP A-1 VI�&ST RUCTURAL r�S,, CIVIL ,�R■UCTURAL i ENGINEERS.PLANNERS Walker's Renton Subaru 2216 North 30th Suite 300•TACOMA,WA 98403 (253)383-2422•FAX:(253)383-2572 200065.10 c�RnnoNl 33.10 2- �_ 8�/ / H �V �/ �tia I (\ v1 / 3 O 3 _ i L 1 1 0' 10h !?' \ 9B � 2e.3s 27.90 i 2 w N 192 jz'� �O wAHBL E , 88 . •W v / 284.1 zJ 90 S 2.31 \ e — 28 7 \ \ 3 0 30.29 �061 Uj o;sQ ,. 5n 3i°B \� i� / S�`�° Area Summary for o_ , Walker's Renton Subaru w R - .0 EL POST L - 2 .44I I. ..• LE-FENCE/ `l So A / FF.�•4 \/ / '' 3123 Existing Conditions ti 40 4 GP Total Site Area = 39174 sf=0.899 ac Q 40.88 I Vx f"Jl On-site Landscaping =2983 sf=0.068 ac ,+ Total Impervious Cover= 39174 sf - 3493 sf= 36191 sf= 0.831 ac o oy5 --M �! A s 10z9.31• �/ ,y` p R - 129.15' S0 L= 23.65 / / o / // �1^ Developed Conditions a� / Y0 1 1 r Total Site Area= 39174 sf= 0.899 ac 300J° • �"� /� j�' he ,ti'1 JB 31. '��•� On-site Landscaping = 3493 sf=0.080 ac 1 ' w Total Impervious Cover= 39174 sf- 3493 sf= 35681 sf= 0.819 ac 0- 04' 9• •�� � oti R s 1 .1�' L 11.3 S y� 12"W $ O WMH \ '� ✓Q..q�s 1E.J�hb� dl� �vY��C:�Cj'� �.t�-V+Ow�.Cr� O 1/GUr>, %�— V �ST. Ex! by it o_ G G o G G W` ry H {y. �`o G h a x 3a�� i i �• .• , INS •{ • =fit' Ay� w,i'`>%' h RiverLILL t'I •'� S 4 , t A R 0 p J 3 e r `Eiel 1 900 •• �• 7 1 1 n rf �' lb BM •,• .� asflb'ait 257 / if `� i - i `t Park F C oil Rh• FzA_ ROA7 r: `R h J � wD t , ti• `i' ter l�I •�' ' �'• j (tTC. Y�'wL' - -, 3eL �\3 oit�aurse rtr`A .Sew gz� , pR` _1 ♦��' •F _x•- '. �� � �I►'�=,DISC `,y; ��• sIY � Wit. �� �rf-r- Substa A• a�,0{ 20 r lat. t .Longacres' �=+..fa�l PuT �' 11 �f�ll i t 4 ��''• uf.3r x� 1. �. ��.% _j�� -/" �j: r t i ft •�� `I - 1 r -- 4 (ago ;R \- ,i#L= v.py II SCS SOILS MAP A-3 1 CIVIL&STRUCTURAL ENGINEERS.PLANNERS Walker's Renton Subaru 2215 North 30th Suite 300•TACOMA,WA 88A03 (253)383-2422-FAX:(253)383-2572 1 200065.10 ' Beausite gravelly sandy loam, 6 to 15 percent slopes (BeC) .--Areas of this soil are 20 acres or more in size. Slopes are long and convex. ' Representative profile of Beausite gravelly sandy loam, 6 to 15 percent slopes, in woodland, 570 feet south and 800 feet east of the northwest corner of sec. 29, T. 24 N., R. 6 E.: 01--2 inches to 1/2 inch, undecomposed leaf litter. 02--1/2 inch to 0, black (10YR 2/1) decomposed leaf litter. Al--0 tc 6 inches, dark-brown (10YR 3/3) gravelly sandy loam, brown (10YR 5/3) dry; weak, fine, granular structure; soft, very friable, ' nonsticky, nonplastic; many roots; slightly acid; clear, wavy boundary. 5 to 7 inches thick. 821--6 to 19 inches, dark yellowish-brown (10YR 4/4) gravelly sandy loam, light yellowish brown (10YR 5/4) dry; massive; soft, very friable, nonsticky, nonplastic; many roots; slightly acid; clear, irregular boundary. 10 to 15 ' inches thick. B22--19 to 38 inches, olive-brown (2.5Y 4/4) very gravelly sandy loam, light yellowish brown (2.5Y 6/4) dry; massive; soft, very friable, nonsticky, nonplastic; common roots; medium acid; abrupt, irregular boundary. IIR--38 inches, fractured sandstone; medium acid. ' The A horizon ranges from very dark grayish brown to very dark brown and dark brown. The B horizon ranges from dark grayish brown to dark yellowish brown and olive brown. It is gravelly ' and very gravelly sandy loam and gravelly loam. Depth to sandstone ranges from 20 to 40 inches. Some areas are up to 20 percent included Alder- wood soils, which have a consolidated substratum, ' and Ovall soils, which are underlain by andesite; some are up to 5 percent the wet Norma and Seattle soils; some are up to 5 percent Beausite soils that have a gravelly loam surface layer and subsoil; and ' some are up to 10 percent soils that are similar to Beausite soils, but are more than 40 inches deep over sandstone. Roots penetrate easily to bedrock and enter a ' few cracks in the bedrock. Permeability is moderately rapid. Available water capacity is low. Runoff is medium, and the hazard of erosion is moderate. ' This soil is used for timber and pasture and for urban development. Capability unit IVe-2; woodland group 3d2. 1 BL SCS SOILS DESCRIPTION A1 1 A-4 ' CIVIL&STRUCTURAL ENGINEERS,PLANNERS Walker's Renton Subaru ' 2215 No,lh 30th Suite 300•TACONIA.WA 98403 (253)383.2422•FAX:(253)383-2572 200065.10 APPENDIX B ' Exhibits ' B-1 Computational Methods per KCSWDM B-2 100-year, 24-hour Isopluvial B-3 Hydrologic Soil Group of Soils in King County ' B-4 Runoff Curve Numbers B-5 Basin Summary (Existing Conditions) ' B-6 Basin Summary (Developed Conditions) 1 1 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL The design storm event is specified by return frequency and duration. Section 3.5.1 explains total rainfall depth and rainfall distribution associated with a design storm. 3.2 COMPUTATION METHODS --• All conveyance systems, existing and proposed, will be analyzed and designed using the analysis methods described in Section 3.5 and 4.3.3. All runoff control facilities, existing and proposed, will be analyzed using hydrograph analysis methods described in Section 3.5. EXCEPTION: For large projects, such as Master Planned Developments (MPD) and projects that contain drainage basins of over 200 acres, the SWM Division encourages, and may require (both prior to and after development), the collection of actual rainfall and runoff data to be used in developing a calibrated SCS model or a continuous model and for monitoring. These projects fall under the classification of Master Drainage Plans (MDP) and will be reviewed by the SWM Division. The SCS TR-20 and Army Corps of Engineers HEC-1 computer models are also acceptable, along with models using the Santa Barbara Urban Hydrograph technique, in performing this calibrated modeling. Contact the SWM Division for information on the model's data, formulation, calibration, and monitoring requirements. (See Core Requirement #3: Runoff Control, in Chapter 1, and Appendix B, for additional information on the requirements for Master Drainage Plans). Figure 3.2A defines the acceptable computation methods and their limits of application according to basin sizes. FIGURE 12A COMPUTATION METHODS BY BASIN SIZE <.:.:....<.:;�> «>' : «> .:.::::::•;.<.:.:�::.;::: SANTA BARBARA URBAN W 'r:`:+5'::r:•i::;:t••.`;•$:'•.'.::?`•�<:;4ris::;r;22i%`ss:::;:•:Ri:�': a HYDROGRAPH METHOD Z N `+oiciA::•>:::isii?'sS:::%::.cY::;:•;::>.;"::: ii:;:::::r:::i:s::;::;.;::•:>:r>:i;: �.;'. :;::�r:.;.`.•?k:.ksai.<.::.:::`:::•::::,::;;..t;:'<.o5:r::`::Fii:•ii:�::Y:fir,.:::::: a RATIONAL METHOD :rYc:i•;:,:.::rr:iarc$•,.•::;:::•? xfife:::::::+......d:e^>i<2?r.:;r"oa::ti:v:`.%:%�::i£:: ...:•:a•,i:;.:,�.r...::...:.....•;::•:•:::::::`::a�ic•::�x:: or.::yr..i::: i`::+ii:::'i':ri::'.,v'.:: W f: N �?tf• fi:if> cri�::' rf::,f.....,.:c::'i:::::o: �;::stf'.Yi�::i`�:t<'::.':::i•.,a.;.:: .;:'io::::r•::: .....:..... <.,.::,.+..r..: SCS TR 20 HYDROGRAPH METHOD .............::..............::::. :...::::.:.::::::::,::;........... U OTHER METHODS (as approved by SWM) SANTA BARBARA URBAN HYDROGRAPH METHOD 0 z WITH THE LEVEL POOL ROUTING METHOD iy c� C 20 u <..i... HYDROGRAPH AND ROUTING METHOD O .1-.1....1 1---1 Z U =)U- OTHER HYDROGRAPH AND ROUTING METHODS (as approved by SWM) BASIN SIZE - ACRES 3.2-1 11/92 ix ap km 17 gj k LAM ail■� � , � �� `l,�1► ._.� ► 1..,��,/ �'�� Won Me. MEW Plop. p F kit- MR 4113 11,111iii, IN .. ' KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL (2) CN values can be area weighted when they apply to pervious areas of similar CN's (within 20 CN points). However, high CN areas should not be combined with low CN areas (unless the low CN areas are less than 15% of the subbasin). In this case, separate hydrographs should be generated and summed to form one hydrograph. FIGURE 3.5.2A HYDROLOGIC SOIL GROUP OF THE SOILS INKING COUNTY HYDROLOGIC HYDROLOGIC SOIL GROUP GROUP* SOIL GROUP GROUP* Alderwood C Orcas Peat D Arents, Alderwood MaterW C Orid;.i D Arents, Everett Material B Ovall C 0 Beausite C Pilchuck C Bellingham 5 Puget D Briscot D Puyallup B Buckley D Ragnar B Coastal Beaches Variable Renton D Earlmont Silt Loam D Riverwash Variable Edgewick C Salal C Everett A/B `Sammamish D Indianola A Seattle D Kitsap C Shacar D Klaus C Si Silt C Mixed Alluvial Land Variable Snohomish D Neilton A Sultan C Newberg B Tukwila Nooksack C Urban _ Variable Normal Sandy Loam D Woodinville D HYDROLOGIC SOIL GROUP CLASSIFICATIONS A. (Low runoff potential). Soils having high infiltration rates, even when thoroughly wetted, and consisting chiefly of deep, well-to-excessively drained sands or gravels. These soils have a high rate of water transmission. B. (Moderately low runoff potential). Soils having moderate infiltration rates when thoroughly wetted, and consisting chiefly of moderately fine to moderately coarse textures. These soils have a moderate rate of water transmission. C. (Moderately high runoff potential). Soils having slow Infiltration rates when thoroughly wetted, and consisting chiefly of soils with a layer that impedes downward movement of water, or soils with moderately fine to fine textures. These soils have a slow rate of water transmission. D. (High runoff potential). Soils having very slow infiltration rates when thoroughly wetted and consisting chiefly of clay soils with a high swelling potential, soils with a permanent high water table, soils with a hardpan or clay layer at or near the surface, and shallow soils over nearly impervious material. These soils have a very slow rate of water transmission. • From SCS,TR-55, Second Edition, June 19M, Exhibit A-1. Revisions made from SCS, Soil Interpretation Record, Form #5, September 1988. E` 3 3.5.2-2 11/92 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TABLE 3.5.2B SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SCS in 1982) Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A rainfall distribution. 24-hour storm duration. CURVE NUMBERS BY HYDROLOGIC SOIL GROUP LAND USE DESCRIPTION A B C D Cultivated land(1): winter condition 86 91 94 95 Mountain open areas: low growing brush and gmislands 74 82 89 92 Meadow or pasture: 65 78 85 89 Wood or forest land: undisturbed or older second growth 42 64 76 81 Wood or forest land: young second growth or brush 55 72 81 86 Orchard: with cover crop 81 88 92 94 Open spaces, lawns, parks, golf courses, cemeteries, landscaping. good condition: grass cover on 75% or more of the area 68 80 86 90 fair condition: grass cover on 50% .•�ids to 75% of the area 77 85 192 Gravel roads and parking lots 76 85 89 91 Dirt roads and parking lots 72 82 87 89 ev DVS Impervious surfaces, pavement, roofs, etc. 98 98 Open water bodies: lakes, wetlands, ponds, etc. 100 100 100 100 Single Family Residential (2) Dwelling Unit/Gross Acre % Impervious (3) 1.0 DU/GA 15 Separate curve number 1.5 DU/GA 20 shall be selected 2.0 DU/GA 25 for pervious and 2.5 DU/GA 30 impervious portion 3.0 DU/GA 34 of the site or basin 3.5 DU/GA 38 4.0 DU/GA 42 4.5 DU/GA 46 5.0 DU/GA 48 5.5 DU/GA 50 6.0 DU/GA 52 6.5 DU/GA 54 7.0 DU/GA 56 Planned unit developments, % impervious condominiums, apartments, must be computed commercial business and industrial areas. (1) For a more detailed description of agricultural land use curve numbers refer to National Engineering Handbook, Section 4, Hydrology, Chapter 9, August 1972. (2) Assumes roof and driveway runoff is directed into street/storm system. (3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers. j 3.5.2-3 11/92 8/22/00 4 : 5 : 16 pm AHBL Walker' s Renton Subaru 200065 . 10 DETAIL BASIN SUMMARY BASIN ID: EC100 NAME: Existing Conditions 100yr 24hr SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0 . 90 Acres BASEFLOWS : 0 . 00 cfs RAINFALL TYPE. . . . : TYPEIA PERV IMP PRECIPITATION. . . . : 3 . 90 inches AREA. . : 0 . 07 Acres 0 . 83 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 90 . 00 98 . 00 TC. . . . . 4 . 26 min 4 . 26 min ABSTRACTION COEFF: 0 . 20 TcReach - Sheet L: 182 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 0198 TcReach - Channel L: 317 . 00 kc :42 . 00 s : 0 . 0050 impTcReach - Sheet L: 182 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 0198 im TcReach - Channel L: 317 . 00 kc :42 . 00 s : 0 . 0050 / EAK RATE : 0 . 73 cfs VOL: 0 . 27 Ac-ft TIME : 470 min Yz c;j�s TIME D SIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) 10 310 0.1618 610 0.1820 910 0.1217 1210 0.0885 1510 20 320 0.1943 620 0.1738 920 0.1230 1220 0.0873 1520 30 330 0.1933 630 0.1745 930 0.1229 1230 0.0874 1530 40 0.0015 340 0.1948 640 0.1734 940 0.1218 1240 0.0885 1540 50 0.0069 350 0.1959 650 0.1746 950 0.1230 1250 0.0873 1550 60 0.0135 360 0.1969 660 0.1746 960 0.1229 1260 0.0874 1560 70 0.0253 370 0.1893 670 0.1555 970 0.0935 1270 0.0885 1570 80 0.0386 380 0.1822 680 0.1378 980 0.0686 1280 0.0873 1580 90 0.0464 390 0.1824 690 0.1393 990 0.0706 1290 0.0874 1590 100 0.0529 400 0.1830 700 0.1403 1000 0.0693 1300 0.0885 1600 110 0.0582 410 0.1846 710 0.1391 1010 0.0705 1310 0.0873 1610 120 0.0627 420 0.1840 720 0.1393 1020 0.0704 1320 0.0874 1620 130 0.0724 430 0.3025 730 0.1404 1030 0.0886 1330 0.0783 1630 140 0.0825 440 0.4134 740 0.1392 1040 0.1064 1340 0.0700 1640 150 0.0858 450 0.4064 750 0.1393 1050 0.1050 1350 0.0706 1650 160 0.0885 460 0.5746 760 0.1405 1060 0.1052 1360 0.0694 1660 170 0.0922 470 0.7299 770 0.1393 1070 0.1052 1370 0.0707 1670 180 0.0947 480 0.7209 780 0.1394 1080 0.1052 1380 0.0706 1680 190 0.0960 490 0.5005 790 0.1213 1090 0.0961 1390 0.0695 1690 200 0.0989 500 0.2956 800 0.1035 1100 0.0866 1400 0.0707 1700 210 0.1006 510 0.3123 810 0.1050 1110 0.0874 1410 0.0706 1710 220 0.1012 520 0.2923 820 0.1049 1120 0.1225 1420 0.0695 1720 230 0.1036 530 0.2762 830 0.1049 1130 0.0845 1430 0.0707 1730 240 0.1047 540 0.2778 840 0.1049 1140 0.0535 1440 0.0706 1740 250 0.1138 550 0.2307 850 0.1140 1150 0.0912 1450 0.0319 1750 260 0.1222 560 0.1874 860 0.1235 1160 0.0870 1460 1760 270 0.1228 570 0.1909 870 0.1227 1170 0.0874 1470 0.0002 1770 280 0.1249 580 0.1919 880 0.1217 1180 0.0885 1480 1780 290 0.1248 590 0.1907 890 0.1229 1190 0.0873 1490 1790 300 0.1258 600 0.1909 900 0.1228 1200 0.0874 1500 1800 5" 8/22/00 4 : 5 : 16 pm AHBL Walker' s Renton Subaru 200065 . 10 DETAIL BASIN SUMMARY BASIN ID: DC100 NAME : Developed Condition 100yr 24hr SBUH METHODOLOGY TOTAL AREA. . . . . . . : 0 . 90 Acres BASEFLOWS : 0 . 00 cfs RAINFALL TYPE . . . . : TYPElA PERV IMP PRECIPITATION. . . . : 3 . 90 inches AREA. . : 0 . 08 Acres 0 . 82 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 90 . 00 98 . 00 TC. . . . . 4 . 26 min 4 . 26 min ABSTRACTION COEFF: 0 . 20 TcReach - Sheet L: 182 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 0198 TcReach - Channel L: 317 . 00 kc :42 . 00 s : 0 . 0050 impTcReach - Sheet L: 182 . 00 ns : 0 . 0110 p2yr: 2 . 00 s : 0 . 0198 im TcReach - Channel L: 317 . 00 kc :42 . 00 s : 0 . 0050 EAK RATE : 0 . 73 cfs VOL: 0 .27 Ac-ft TIME : 470 min ✓-=L TIME DESIGN TIME DESIGN- TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) (min) (cfs) 10 310 0.1606 610 0.1817 910 0.1216 1210 0.0884 1510 20 320 0.1930 620 0.1735 920 0.1228 1220 0.0872 1520 30 330 0.1921 630 0.1742 930 0.1228 1230 0.0873 1530 40 0.0015 340 0.1936 640 0.1731 940 0.1217 1240 0.0884 1540 50 0.0068 350 0.1948 650 0.1744 950 0.1229 1250 0.0872 1550 60 0.0133 360 0.1959 660 0.1743 960 0.1228 1260 0.0873 1560 70 0.0250 370 0.1883 670 0.1552 970 0.0934 1270 0.0885 1570 80 0.0381 380 0.1812 680 0.1376 980 0.0685 1280 0.0872 1580 90 0.0457 390 0.1815 690 0.1391 990 0.0705 1290 0.0873 1590 100 0.0521 400 0.1821 700 0.1401 1000 0.0692 1300 0.0885 1600 110 0.0574 410 0.1838 710 0.1389 1010 0.0705 1310 0.0873 1610 120 0.0618 420 0.1832 720 0.1391 1020 0.0704 1320 0.0874 1620 130 0.0714 430 0.3013 730 0.1402 1030 0.0885 1330 0.0783 1630 140 0.0813 440 0.4118 740 0.1390 1040 0.1064 1340 0.0699 1640 150 0.0847 450 0.4050 750 0.1392 1050 0.1049 1350 0.0706 1650 160 0.0873 460 0.5728 760 0.1403 1060 0.1051 1360 0.0694 1660 170 0.0911 470 0.7278 770 0.1391 1070 0.1051 1370 0.0706 1670 180 0.0936 480 0.7190 780 0.1393 1080 0.1051 1380 0.0705 1680 190 0.0949 490 0.4993 790 0.1212 1090 0.0960 1390 0.0694 1690 200 0.0979 500 0.2950 800 0.1034 1100 0.0865 1400 0.0706 1700 210 0.0995 510 0.3117 810 0.1049 1110 0.0873 1410 0.0705 1710 220 0.1002 520 0.2917 820 0.1048 1120 0.1224 1420 0.0694 1720 230 0.1026 530 0.2757 830 0.1048 1130 0.0845 1430 0.0706 1730 240 0.1038 540 0.2772 840 0.1048 1140 0.0534 1440 0.0705 1740 250 0.1128 550 0.2302 850 0.1139 1150 0.0911 1450 0.0319 1750 260 0.1212 560 0.1870 860 0.1233 1160 0.0870 1460 1760 270 0.1218 570 0.1906 870 0.1226 1170 0.0873 1470 0.0002 1770 280 0.1240 580 0.1915 880 0.1216 1180 0.0884 1480 1780 290 0.1239 590 0.1904 890 0.1228 1190 0.0872 1490 1790 300 0.1249 600 0.1906 900 0.1227 1200 0.0873 1500 1800 Attachment 1 Meeting Minutes AHBL 2 000 ras 3 0 MEETING SUMMARY for SOUND SUBARU January 27, 2000 Renton City Hall Att,<n�er�: Peter Rosen, Senior Planner, City of Renton Paul Lumbert, Development Services, Public Works,City of Renton James E. Gray, Assistant Fire Marshal, City of Renton Roger Hansen, President, MU Construction, Inc. Ray Johnson, Business Development Manager, 1 HJ Construction, Inc. Andrew Orsen, Project Architect, Hansen, Hansen &Johnson ITEM NQ DISCUSSION 1.1 The City issued memorandums from Fire Marshal,Utilities/Public Works, Planning, as well as a preliminary list of development charges. 1.2 The meeting was spent discussing the City department memorandums. Items listed below are in addition to what is noted in th,e memorandums. 1.3 Existing fire hydrants (2)are rated at 1,000 GPM each and will meet 1,500 GPNf requirement. a. Hydrants will need a new fitting. The"stores fitting" is a quick disconnect required for fire hoses. (Owner to purchase/install. Tread types/sizes per City details.) 1.4 All underground tanks on Sound Subaru property have been removed. (?) 1.5 Sewer Main: gravity type. (Not pressurized.) Need to saddle and tap the main only (NQ manhoie required.) a. Must plug sewer at property line during construction. b. Sewer slopes toward "Safeway" 1.6 Water Mains: a. Must plug existing waterline at property line and remove existing meter(s) b. Will get credit if reuse existing meter(s) c. Will require 2 meters and 2 taps to water main(1 domestic, 1 Hansen, Hansen 6 Johnson 1230 Fryw A.e. •Po 8c■ tCU5 5vrrx er. .va 98390 =3)063-8128 FAX #88a585-: p_ rJb:' L11 Lriritj ti7: 1 r ZnZibb.-nb74 nnj r_uc. u4 Sound Subaru Meeting Summary January 27, 2000 Page 2 irrigation.) Irrigation use not included in determining sewer usage. Taps to be straight line from main to meter. d. If new, larger meters are installed,redevelopment fees are triggered. e. AlI water main taps are by City with fee as follows: S600—'/4" meter S1,100— 1" meter S2,400 - 1 '`/�"meter $2,800—2"meter f. Water meter size will be determined by new building fixture count per the Uniform Plumbing Code. New detection check valve needed for irrigation line. 1.7 Storm drainage line runs toward Rainier Avenue. a. Civil engineer required to show that project is no adding any more water to system and flow not increasing by more than % cubic foot per second. ('Phis will allow use of existing catch basins. No on-site treatment required.) b. Civil engineer to show how existing catch basins on site are interconnected. (City drawings do not show.) 1.8 City will determine traffic mitigation fees. 1.9 Easement runs through center of site. Contains sewer and storm water line. New building, including all overhangs, must clear 20' wide easement. 1.10 Fees will be assessed because cost of building will exceed S50,000. 1.11 Pedestrian connection to handicap ramp required both from Rainier Avenue and 3'a Street. These will be 48" wide stripped`paths"running through the Iot. 1.12 City is treating corner of 3'd&Rainier as a "City Gateway"and will require landscaping. 1.13 Comments about right-of-way use permit option and street vacation option were based on City of Renton owning the right-of-way. 1.14 Maximum size of new building to be 3,999 S.F. to avoid an environmental review. EIAA0wagusc r4 3UWV%..aq X--WV t-77DO.000 Ub.e L11 -'dUU KY7; L i ZO:ir G-=,G74 Sound Subaru Meeting Summary January 27, 2000 Page 3 Should you have any questions and/or find any discrepancies in these notes,please contact me Thank you. HHJ Construction, Inc. Andrew Orsen Project Architect Cc: Dale Walker, Sound Subaru Roger Hansen, President, HM Construction, Inc. Ray Johnson, Business Development Manager, HHJ Construction, Inc. Andrew Orsen,Project Architect,Hansen, Hansen & Johnson F'IARCKI06Td*.*W 3ubwu%i0" 00nr-7 t I711DDOC Attachment 2 Landscape Variance Approval AHBL ;OQOG.-:30 CITY OF RENTON Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator May 11, 2000 CERTIFIED MAIL NO. 7099 3220 0005 0280 1897 Mr. Brad Medrud AHBL, Inc. 2215 North 301h Street, Suite 300 Tacoma, WA 98403 SUBJECT: Renton Subaru Landscape Variance Project No.LUA-00-043,V-B Dear Mr. Medrud: The Board approves the requested variance from Section 4-2-120.A of the City of Renton Development Regulations, subject to the following condition: 1) After review by the City Attorney and Property Services Division, the applicant shall record a restrictive covenant which shall allow the City to require the property owner to install, or relocate from the right-of-way, the minimum on-site landscaping improvements as required by current code provisions at such time the right-of-way adjacent to the subject site is improved. The satisfaction of this requirement will be subject to the review and approval of the Development Services Division prior to the issuance of building permits for the redevelopment of the site. This is the only variance granted under this application and all other provisions of the Renton Municipal Code will apply. An appeal of the Board of Adjustment decision is governed by Title IV, Chapter 8, Section G, which requires that such appeal be filed with the Superior Court of Washington for King County within 21 days from the date of issuance of the decision. The land use decision is considered issued three (3) days after the City mails a written decision. The appeal period for this variance will end at 5:00 PM on June 1, 2000. The Board of Adjustment decision will become final on June 1, 2000, if the decision is not appealed to Superior Court. If you have any questions, please contact me at (425)430-7270. For the Renton Board of Adjustment, Lesley Nishihira-) Project Manager cc: Mr. & Mrs. Dale Walker/Owners Mr. & Mrs. Richard Snyder/Owners norac r - 1055 South Grady Way - Renton, Washington 98055 BOARD OF ADJUSTMENT OF THE CITY OF RENTON Renton Subaru Landscape Variance No. LUA-00-043, V-B FINDINGS OF FACT, CONCLUSIONS AND DECISION FINDINGS OF FACT 1. The applicant has requested a variance from Section 4-2-120A of the Renton Municipal Code in order to reduce the minimum 10-foot on-site street frontage landscape width required in the Commercial Arterial (CA)zone. 2. The subject site is a corner lot, bounded by Rainier Avenue South on the west and South 3rd Street on the south. The property is also considered a "gateway' to the City. Currently, there is a portion of unimproved right-of-way (approximately 1,081 square feet in size) that borders the site's southwest corner. 3. The variance is sought by Walker's Renton Subaru in order to perform modifications to their existing auto dealership facility. With the approval of the requested variance, the applicant is seeking to provide the required landscaping improvements within this off-site right-of-way area rather than on-site as required. 4. The applicant is proposing new landscape widths of 10 feet along the site's west and south street frontages (totaling 3,267 square feet in area), as well as along the southwest corner of the site within the public right-of-way (approximately 1,081 square feet). The proposed landscape plan includes street trees, shrubs, and ground cover suitable for a"gateway' location. 5. The applicant has proposed to record a restrictive covenant, which would run with the title for the property, which would allow the City to require the property owner to install the on-site landscaping improvements as required by current code provisions at such time the right-of-way adjacent to the subject site is improved. 6. No comments or testimony was received from the public in opposition to the requested variance. 7. At this time, the City of Renton does not have a study or plan which would require revisions to current traffic circulation patterns on South 3rd Street. decision and rndinxs CONCLUSIONS: FROM THESE FINDINGS OF FACT, THE BOARD MAKES THE FOLLOWING CONCLUSIONS: Development Regulations Section 4-9-250135 — The Reviewing Official shall have authority to grant a variance upon making a determination in writing that the conditions specified below have been found to exist: 1) That the applicant suffers undue hardship and the variance is necessary because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings of the subject property, and the strict application of the Zoning Code is found to deprive subject property owner of rights and privileges enjoyed by other property owners in the vicinity and under identical zone classification: The applicant contends the triangle of right-of-way owned by the State of Washington located at the intersection of Rainier Avenue South and South 3`d Street creates an unusual shape to the site. Instead, the applicant proposes to landscape the entire right-of-way triangle rather than provide for a 10-foot wide landscape strip located entirely on the property as required by code. The applicant argues the improvement of this portion of right-of-way would be more in keeping with the City's "gateway" requirements. It is also indicated in the applicant's variance justification that a right-of-way use permit would be obtained for the proposed off-site improvements. The landscape requirement is intended to provide for a continuous, perimeter landscape strip on private property that fronts arterial streets. In addition, "gateways" to the City are intended to provide additional landscape embellishment as entry features to specific areas. The request is to eliminate these basic landscape requirements and, instead, landscape the right-of-way adjacent to the site. The adjacent property (located on the northwest corner of the Rainier Avenue South and South 3`d Street intersection) is currently improved with substandard on-site landscaping. The site provides a minimal amount of on-site landscaping and has provided off-site landscape improvements on adjacent right-of-way, similar to the subject variance request. The initial review of the proposal for the adjacent property did not require the approval of a variance, as should have been required. However, the presence of similar circumstances establishes a precedence for the approval of the requested variance. Furthermore, the traffic flow on this corner of the Rainier Avenue and South 3`d Street intersection is a unique circumstance that applies only to the subject property. The traffic flows around this corner in a limited direction that would not likely require the need for future revisions or expansions to the right-of-way. (South 3`d Street is limited to a one-way west- bound direction, limiting turns into north-bound Rainier Avenue to two lanes of traffic.) In addition, the applicant has proposed the recording of a restrictive covenant or the establishment of a bond that would allow the City to require the property owner to install the minimum on-site landscaping improvements required by current code provisions at such time the State develops the subject portion of right-of-way for transportation purposes. This would allow the City to require "gateway" landscaping improvements in the event the proposed landscaping is eliminated. 2) That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated: The applicant contends the approval of the variance would not be materially detrimental to public welfare or adjacent improvements in the vicinity because it would result in a more attractive "gateway" that would be of benefit to the City. final dec&fnd However, comments received from the City's Parks Department and Strategic Planning Section express concern over the potential future elimination of landscaping in such a significantly visible "gateway" to the City. In response, the applicant has proposed a restrictive covenant, which would allow the City to require the property owner to install the appropriate "gateway" landscaping improvements when the State of Washington develops that portion of the right-of- way. RMC section 4-11-030 prohibits structures or plantings within the sight triangle (defined as the "clear vision area"). Although the applicant has proposed suitable landscaping appropriate for a "gateway", there are additional code provisions, which prohibit planting within this area in order to avoid vision hazards. 3) That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated: The applicant is of the opinion that the variance would help to achieve the desired "gateway" appearance at this intersection of the City. Arguably, the desired effect may be achieved, albiet on a limited basis. When the State exercises rights to revise the intersection, the proposed landscape solution could be eliminated. However, in recent years the City has approved a project located on the northwest corner of this intersection with reduced on-site landscaping. Although this approval was given in error, a precedence has been established which supports the approval of the requested variance. Therefore, the approval of the variance would not be considered a grant of special privilege inconsistent with limitations on other properties within the same zoning designation and vicinity. In addition, the recording of a restrictive covenant as proposed by the applicant, would provide the City with the assurance that the desired "gateway" improvements would be accomplished in the event the subject landscaping improvements are removed. Furthermore, it is not foreseen that the subject portion of right-of-way would ever be improved or necessary for transportation purposes. The traffic at this particular corner of the Rainier Avenue and South 3rd Street intersection circulates in a unique pattern (South 3rd Street is limited to west bound traffic, only allowing two lanes to turn north onto Rainier Avenue) that would not likely need future revisions to current circulation patterns. 4) That the approval as determined by the Board of Adjustment is a minimum variance that will accomplish the desired purpose: The applicant states in the submitted variance justification that the requested variance is driven by their desire to meet the intent of the City's "gateway" designation for the corner of Rainier Avenue South and South 3 d Street. With the recording of a restrictive covenant that would require the installation of on-site landscape improvements in the event the State develops the adjacent right-of-way, as presented by the applicant, the approval of the variance would be the minimum variance that would accomplish the desired purpose. final dec&find DECISION: FROM THE FOREGOING FINDINGS OF FACT AND CONCLUSIONS, THE BOARD ENTERS THE FOLLOWING DECISION: The Board approves the requested variance from Section 4-2-120.A of the City of Renton Development Regulations, subject to the following condition: After review by the City Attorney and Property Services Division, the applicant shall record a restrictive covenant which shall allow the City to require the property owner to install, or relocate from the right-of-way, the minimum on-site landscaping improvements as required by current code provisions at such time the right-of-way adjacent to the subject site is improved. The satisfaction of this requirement will be subject to the review and approval of the Development Services Division prior to the issuance of building permits for the redevelopment of the site. DATED this 10'' day of May, 2000. An appeal of the Board of Adjustment decision is governed by Title IV, Chapter 8, Section G, which requires that such appeal be filed with the Superior Court of Washington for King County within 21 days from the date of issuance of the decision. The land use decision is considered issued three (3) days after a written decision is mailed by the City. The appeal period for this variance will end at 5:00 PM on June 1, 2000. &'4� � ' A�_ �3S 5W Greg Guille George Feighner �: QA Teri Brier i JacqL4s Jay,Xallke Ralph Evans decision and f7ndines f1 �J n L� Fj �I �E I� r-, Li v v AA1 I B L _ �a 2215 NORTH 30TH STREET SUITE 300 TACOMA. WA 98403 PH:(253) 383-2422 FAX:(253) 383-2572 e-mail: ahbl@ahbl.com www.ahbl.com