Loading...
HomeMy WebLinkAboutC970049 PERMIT NO. C970049 TEXACO MINIMART 5TH Floor Conference Room FEB.19,1998 10:00 AM Owner: RENTON FUEL COMPANY LLC-MICK SANTA Engineer/Architect: BARGHAUSEN CONSULTING ENGINEERS ,INC. Contact:TRAVIS SANTA Phone:425-6414242 FAX:425-6414219 Contractor:SANTA PROPERTIES & DEVELOPMENT 4509-116TH AV. SE, BELLUVE, WA. 98006 Phone:425-641-4242 License:SANTA PD 053PB City of Renton License:10997 Project Manager: Paul Lumbert 425 -277-6204 Inspector: MARK WETHERBEE Mobile Phone Number: 206 - 999-1829 FRANCHISE UTILITIES: 1. The franchise utilities require copies of the approved construction drawings befor C' facilities. Provide a copy of the approved composite drawing to each utility for inc r J` permit application. 2. Each franchise utility must apply for a separate permit prior to construction in existin Z of-way. A blueline drawing showing the location of all utilities, city and franchise, in submitted to the third floor counter for City review two weeks before installation. hJ 3. All franchise utilities shall be separated a minimum of five feet (5') horizontally a (12")vertically from City utilities. r r- FIRE PREVENTION: Z 1. Maintain access to site at all times. Must be able to support emergency equipmen weather. Hydrants must be in place prior to any combustible installation above the fou 2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa w e. An alternate fire hydrant, Clow Medallion or Mueller v manufacturers of Cory h'P Y (� have been approved for use. Any hydrant installed shall be equipped with "quicl �(► fittings. 3. New hydrants are to be covered with burlap bags until operational. 4. All blocking must be inspected by a City inspector prior to backfill. 5. Leads that exceed 50 feet in length shall be 8". 6. Call 911 from a local phone if the watermain needs to be shut off(emergency only). All other water mains or valves shut down, call Renton Water Department at 235-2646. 7. Fuel: any temporary on-site fuel supplies shall have a separate permit from Fire Prevention. H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON-P.DOC r PERMIT NO. C970049 TEXACO MINIMART 5TH Floor Conference Room FEB.19,1998 10:00 AM Owner: RENTON FUEL COMPANY LLC-MICK SANTA Engineer/Architect: BARGHAUSEN CONSULTING ENGINEERS ,INC. Contact:TRAVIS SANTA Phone:425-641-4242 FAX:425-641-4219 Contractor:SANTA PROPERTIES & DEVELOPMENT 4509-116TH AV. SE, BELLUVE, WA. 98006 Phone:425-6414242 License:SANTA PD 053PB City of Renton License:10997 Project Manager: Paul Lumbert 425 -277-6204 Inspector: MARK WETHERBEE Mobile Phone Number: 206 - 999-1829 FRANCHISE UTILITIES: 1. The franchise utilities require copies of the approved construction drawings before designing their facilities. Provide a copy of the approved composite drawing to each utility for inclusion with their permit application. 2. Each franchise utility must apply for a separate permit prior to construction in existing or future right- of-way. A blueline drawing showing the location of all utilities, city and franchise, in redlines shall be submitted to the third floor counter for City review two weeks before installation. 3. All franchise utilities shall be separated a minimum of five feet (5') horizontally and twelve inches (12")vertically from City utilities. FIRE PREVENTION: 1. Maintain access to site at all times. Must be able to support emergency equipment in all types of weather. Hydrants must be in place prior to any combustible installation above the foundations. 2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa and Renselear are manufacturers of Cory type. An alternate fire hydrant, Clow Medallion or Mueller Super Centurion have been approved for use. Any hydrant installed shall be equipped with "quick connect" style fittings. 3. New hydrants are to be covered with burlap bags until operational. 4. All blocking must be inspected by a City inspector prior to backfill. 5. Leads that exceed 50 feet in length shall be 8". 6. Call 911 from a local phone if the watermain needs to be shut off(emergency only). All other water mains or valves shut down, call Renton Water Department at 235-2646. 7. Fuel: any temporary on-site fuel supplies shall have a separate permit from Fire Prevention. H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON-P.DOC 8. All underground mains serving fire sprinkler systems must be installed by a Washington State certified fire sprinkler contractor. 9. Notify central dispatch 24 hours prior to work in the existing right-of-way. (Local Land Line: 911) or Fire Dispatch(cell phone-253-854-2005). 10. Any Hazardous Materials Permit or Hot Works Certification may be applied for through Fire Prevention, second floor of Renton City Hall. 11. All fire hydrants must meet City of Renton Code and Standards. CITY UTILITIES: WATER: 1. Pipe materials, valves and fittings shall be as indicated in the approved plans and standard notes. In the case of construction in proposed new roadways, all construction of the road prism shall be accomplished and in place prior to utility installation to avoid damage or disturbance of the infrastructure. 2. All connections to existing mains shall be accomplished by the City of Renton. The contractor constructs the new water main to a point about ten feet short of the existing main. All necessary excavation, shoring, and materials are supplied;by the contractor and shall be on-site prior to scheduling. Allowing at least two working days advance notice, schedule the connection through the construction inspector. 3. Procedure for cleaning and construction testing of new water lines: a. Temporary and permanent thrust blocks shall be formed. Concrete for thrust blocks shall be delivered to the job. No on-site mixes are allowed. All blocking must be inspected before backfilling. b. Pipe cleaning shall be by poly pigging through vertical crosses installed at the ends of the water lines to serve as pig launches and sediment traps. c. All water lines shall be pressure tested to minimum of 200 psi or 150 over operating pressure (static) for 2 hours. services may be tested separately by visual inspection of the corp stop under static pressure. d. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly. The inspector shall schedule chlorinating. Five working days advance notice is required. e. Water used for flushing water lines shall be drained into sanitary sewer only. f. Purity tests are collected by the construction inspector at blow-offs and hydrants. Water purity tests are taken to the laboratory on Wednesdays. Contractor shall arrange courier service for any other day. Test results are available in 5-7 days. 4. Crushed rock backfill to grade is required in City right-of-way. Recycled concrete may be used in lieu of crushed rock backfill. Pit run type material may be considered for use in backfill by the construction inspector. Compaction testing may be required. H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON P.DOC 5. Where conflict exists, the water main shall go under other utilities, however, it is preferred that no water mains shall have more than 6 feet of cover. All water mains shall have a minimum of three feet of cover. 6. Final acceptance shall be after final walk through inspection, adjustment of all structures, and approval of as-builts and cost data inventory. SANITARY SEWER: 1. All pipes and materials shall be per approved plan and standard notes. However, any sewer pipe with less than four feet or greater than fifteen feet of cover shall be Ductile Iron, Class 50 or C900 pipe. 2. Pipe bedding for PVC pipe shall be pea gravel or 5/8" minus crushed rock as approved by the inspector 6"above and below the pipe. 3. Backfill shall be compacted to at least 95%of maximum density. 4. Contractor will be responsible for TV of the sanitary line. TV after channeling is complete. Air tests on main and sidesewers shall be per City specification. Number 6 wire shall be wrapped around the stub and extended to the top. 5. Contractor shall asbuilt the invert elevation of side sewer stub. If cleanouts are installed, the top and flowline shall be asbuilt and noted on the record drawings. STORM: 1. Approved temporary erosion control measures are to be maintained at all times. 2. All pipes and materials shall be per approved plan. All roadway excavation and backfill for construction of the road prism shall be accomplished prior to installation of the drainage facilities to avoid damage or disturbance of the new infrastructure. 3. Contractor must notify engineer of any vertical conflict prior to proceeding with construction. Submit a shop drawing for review. 4. Bedding material shall be per Standard Specifications 9-03.12(3). 5. Backfill shall be compacted to at least 95%of maximum density. 6. Catch Basins shall be grouted smoothly. 7. System shall be flushed and cleaned. City may requires that the line be lamped. 8. Smooth interior wall corrugated polyethylene storm water pipe, where permitted, shall use heat shrunk or watertight couplings. It shall also be bedded in pea gravel to the springline. TRANSPORTATION: 1. Uniform traffic manual shall be followed for street closures and routing for traffic. The approved traffic control plan shall be in place as required. 2. Paving -- The minimum compaction shall be 95% of maximum relative density on subgrade and rock surfaces. H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON-P.DOC 3. Contractor shall not leave open trenches overnight. Backfill, plate or fence all trenches. The proposed method of cover or protection shall be submitted for approval to the inspector. Shoring plates and cold mix to be on site at all times. Cold mix for sidewalks and driveways may be required by the inspector for safety. 4. Keep field records for asbuilts. 5. Truck hauling to be in non-peak hours only. (8:30 to 3:30) 6. Watch for pedestrian traffic. Provide"sidewalk closed"signing as needed. GENERAL: 1. CALL FOR INSPECTION (24 HR NOTICE) BEFORE YOU START WORK. NOTIFY FIRE, POLICE AND METRO OF CONSTRUCTION SCHEDULE. CALL 911 FROM A LOCAL LAND LINE ONLY. FIRE DISPATCH FROM CELL PHONE: 253 854-2005. 2. Contractors are advised to only use sets of drawings stamped and signed by the City of Renton for constructing utility and transportation improvements. The approved plans do not constitute a fill and grade permit or grant any rights to fill and/or grade outside of the right-of-way. Keep a set of approved drawings on-site at all times. 3. Work hours for hauling in right-of-way are weekdays, 8:30 am to 3:30 pm, Saturday by approval only and no Sundays. Construction hours: 7:00 am to 8:00 pm. Any changes to work hours shall have prior approval from the City of Renton. 4. Contractor must call for City inspection before 3:00 p.m. on the previous day. Overtime takes special authorization and scheduling in advance. Pay schedule is $50 per hour for overtime. 5. Keep the streets clean. Truck washing and other measures as approved required for the duration of the project. Provide whatever measures necessary for cleanup and dust control during job and at night. 6. A Traffic Control Plan shall be submitted for approval prior to permit issuance. Traffic control and signing to be in accordance with the Manual on Uniform Traffic Control Devices. Flaggers shall have hard hats, vests, signs and certification card. Haul legal loads and observe all traffic laws. All truck maneuvering and materials storage to be on-site only. Right of way to remain unobstructed when possible. No stockpiles on right-of-way. 7. All utilities must be inspected prior to backfill. 8. The contractor, as well as the engineer, shall keep as-built drawings. All changes shall be shown on as-builts. As-builts shall be per City specifications. All bends on waterlines shall be surveyed prior to backfill with horizontal and vertical control for all bends established. Sewer lines may be surveyed after backfill at manhole access. As-built drawings must have a P.E. or L.P.S. stamp. Final occupancy will not be issued until receipt and approval by the City of project utility and transportation improvement as-built drawings. 9. For any field changes: If minor, submit a shop drawing or schematic through the inspector or by FAX 425-277-4455. If major, the project engineer should submit drawings and complete justification, information and calculations as applicable to the Plan Review project coordinator. The City will H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON-P.DOC answer by memo or schedule a meeting within two days. The field inspector can not give approval in the field for construction changes. 10. Authorization of Special Billing form to be signed at Precon meeting by Owner/Contractor. H:\DIVISION.S\DEVELOP.SER\PLAN.REV\PRECON\PRECON-P.DOC