HomeMy WebLinkAboutWWP272986(9)s ENott Bridge #3166- Replacement CIP 401288, Contract C4301 1C King C nty Engineers Estimate Pacific Road & Bridge ITEM NO. STD ITEM ITEM DESCRIPTION UNIT MEASU RE ITEM QUAN TITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST PREPARATION 1 0001 MOBILIZATION L.S. 1 $835,717.64 $835,717.64 $830,000.00 $830 000.00 2 CLEARING L.S. 1 $1,845.00 $1,845.00 $2,000.00 $2,000.00 3 0025 CLEARING AND GRUBBING HA 2.9 $4,000.00 $11,600.00 $500.00 $1,4%00 4 0050 REMOVAL OF STRUCTURE AND OBSTRUCTION L.S. 1 $57,220.00 $57,220.00 $18,600.00 $18 600.00 5 REMOVING EXISTING BRIDGE L.S. 1 $250,000.00 $250,000.00 $69,000.00 $69,000.00 6 0120 REMOVING ASPHALT CONC. PAVEMENT S.M. 7500 $3.00 $22,500.00 $5.25 $39,375.00 7 1 0170 REMOVING GUARDRAIL M 230 $10.00 $2,300.00 $13.30 $3,059.00 8 0190 REMOVING PAINT LINE M 1 880 1 $2.50 $2,200.00 $1.60 $1,408.00 9 0199 REMOVING PAINTED TRAFFIC MARKING EA. 2 $35.00 $70.00 $75.00 $150.00 10 0230 REMOVING WIRE FENCE M 375 $5.00 $1,875.00 $5.00 $1,375.00 1 1 REMOVING DRAINAGE PIPE M 105 $10.00 $1,050.00 $10.00 $1,0%00 12 REMOVING WOOD FENCE M 235 $10.00 $2 350.00 $7.00 $1,645.00 GRADING 0310 ROADWAY EXCAVATION INCL. HAUL C.M. 1370 $6.00 $8,220.00 $12.00 $16,440.00 0350 UNSUITABLE FOUNDATION EXCAVATION INCL. HAUL C.M. 250 $20.00 1 $5,000.00 $25.00 $6,250.00 1 0431 GRAVEL BORROW INCL HAUL TONNE 66650 $5.00 $333,250.00 $10.50 $699,825.00 16 1 0440 ISAND DRAINAGE BLANKET TONNE 2490 $14.00 $34,860.00 $18.00 $44,820.00 DRAINAGE 17 7006 STRUCTURE EXCAVATION CLASS B INCL. HAUL C.M. 3960 $6.00 $23 760.00 $1.50 $5,940.00 18 7008 SHORING OR EXTRA EXCAVATION CLASS B S.M. 4096 $12.00 $49 152.00 $0.50 $2 048.00 19 1030 DITCH EXCAVATION INCL. HAUL C.M. 190 $8.00 $1,520.00 $10.50 $1 995.00 20 1040 STREAM CHANNEL EXCAVATION C.M. 9200 $25.00 $230,000.00 $1.00 $9 200.00 21 WETLAND EXCAVATION INCL HAUL C.M. 5500 $6.00 1 $33,000.00 $12.50 $68,750.00 22 7014 GRAVEL BACKFILL FOR DRAIN C.M. 1 32 $30.00 $960.00 $49.00 $1,568.00 23 1073 LIGHT LOOSE RIPRAP TONNE 500 $35.00 $17,500.00 $26.00 $13,000.00 24 ISTREAMBED GRAVEL - STEWART CREEK TONNE 1240 $30.00 $37,200.00 $29.00 $35,960.00 25 STREAMBED GRAVEL - UNNAMED STREAM TONNE 45 $30.00 $1,350.00 $100.00 $4,500.00 26 1086 QUARRY SPALLS TONNE 400 $20.00 $8,000.00 $19.00 $7,600.00 27 1160 UNDERDRAIN PIPE 150MM DIAM. M 98 $30.00 $2,940.00 $33.00 $3,234.00 28 1170 DRAIN PIPE 150 MM DIAM. M 28 $30.00 $840.00 $33.00 $924.00 29 3091 CATCH BASIN TYPE 1 EA. 26 $800.00 $20,800.00 $900.00 $23,400.00 30 3105 CATCH BASIN TYPE 2 - 1200 MM DIAM. EA. 1 23 $2,000.00 $46,000.00 $2,000.00 $46,000.00 31 3109 CATCH BASIN TYPE 2 - 1500 MM DIAM. EA. 1 $4,000.00 $4,000.00 $4,600.00 $4,600.00 32 CATCH BASIN TYPE 2 - 1500 MM DIAM. W1 FLOW RESTRICTOR EA. 3 $4,500.00 $13,500.00 $5,000.00 $15,000.00 33 ADJUST DRAINAGE STRUCTURE EA. 7 $400.00 $2,800.00 $300.00 $2,100.00 34 9605 CONNECTION TO DRAINAGE STRUCTURE EA. 3 $500.00 $1,500.00 $300.00 $900.00 35 3110 LOCKING SOLID METAL COVER & FRAME FOR CATCH BASIN EA. 13 $300.00 $3,900.00 $135.00 $1,755.00 36 1993 DEBRIS CAGE EA. 4 $1 000.00 %4.000.00 $1200.00 1 $4.800.00 y I ISCHEDULE A STORM SEWER PIPE 1050 MM DIAM. CMP I M 1 25 1 $300.00 1 $7.500.001 $440.00 1 $11.000.001 SEWER PIPE 300 1 $4,000.00 $4,000.00 7 $3,000.00 $21,000.00 426 $120.00 $51,120.00 172 $225.00 $38,700.00 160 $250.00 1 $40.000.00 56 I ICONNECTION TO EXISTING SYSTEM EA. 8 $2,000.00 $16,000.00 $100.00 $800.00 57 DUCTILE IRON PIPE AND FITTINGS FOR WATER MAIN 200 MM DIAM. M 284 $180.00 $51,120.00 $150.00 $42,600.00 58 GATE VALVE 200 MM EA. 6 $1,000.00 $6,000.00 $2,200.00 $13,200.00 59 ADDITIONAL DUCTILE IRON FITTINGS Kg 500 $5.50 $2,750.00 $5.00 $2,500.00 60 REMOVAL & DISPOSAL OF EXISTING FIRE HYDRANT ASSEMBLY EA. 1 $1,000.00 $1,000.00 $400.00 $400.00 61 MOVING EXISTING FIRE HYDRANT EA. 2 $1,700.00 $3,400.00 $1,200.00 $2,400.00 62 FIRE HYDRANT ASSEMBLY EA. 2 $2,500.00 $5,000.00 $2,400.00 $4,800.00 63 STEEL CASING 450 MM DIAM. M 18 $165.00 $2,970.00 $70.00 $1,260.00 64 STEEL CASING 600 MM DIAM. M 10 $215.00 $2,150.00 $100.00 $1,000.00 65 SERVICE CONNECTION NEAR SIDE EA 1 $750.00 $750.001 $800.00 1 $800.00 66 1 ISERVICE CONNECTION FAR SIDE EA. 1 $875.00 $875.001 $800.00 1 $800.00 Page 1 of 4 Elliott Bridge #3166- Replacement CIP 401288, Contract C43011C King C nty Engineers Estimate Pacific Road & Bridge ITEM NO. STD ITEM ITEM DESCRIPTION UNIT MEASU RE ITEM QUAN TITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 67 BLOWOFF ASSEMBLY 100 MM EA. 2 $2 100.00 $4,200.00 $1 350.00 $2 700.00 68 COMBINATION AIR RELEASE/AIR VACUUM VALVE ASSEMBLY 50 MM D EA. 1 $2 300.00 $2 300.00 $1 600.00 $1 600.00 69 QUARRY SPALLS - WATER TONNE 18 $28.00 $504.00 $70.00 $1 260.00 70 FOUNDATION MATERIAL - WATER TONNE 48 $28.00 $1 344.00 $50.00 $2 400.00 71 BANK RUN GRAVEL FOR TRENCH BACKFILL - WATER TONNE 240 $17.00 $4 080.00 $15.00 $3 600.00 72 CRUSHED SURFACING - WATER TONNE 91 $28.00 $2 548.00 $30.00 $2 730.00 73 ASPHALT CONCRETE PATCH - WATER S.M. 50 $40.00 $2 000.00 $50.00 $2 500.00 STRUCTURE 74 1 4006 ISTRUCTURE EXCAVATION CLASS A INCL. HAUL C.M. 212 $30.00 $6 360.00 $21.00 $4 452.00 75 4013 SHORING OR EXTRA EXCAVATION CLASS A L.S. 1 $10 000.00 $10 000.00 $2 800.00 $2 800.00 76 4025 GRAVEL BACKFILL FOR WALLS C.M. 191 $40.00 $7 640.00 $31.00 $5 921.00 77 7167 BACKFILL FOR ROCK WALL TONNE 108 $35.00 $3 780.00 $20.00 $2 160.00 78 SOIL EXCAVATION FOR SHAFT INCL. HAUL C.M. 504 $450.00 $226 800.00 $675.00 $340 200.00 79 FURNISHING & PLACING TEMP. CASING FOR 2.44 M DIAM. SHAFT M 52 $700.00 $36 400.00 $1,000.00 $52 000.00 80 FURNISHING & PLACING TEMP. CASING FOR 3.05 M DIAM. SHAFT M 24 $850.00 $20 400.00 $1 000.00 $24 000.00 81 FURNISHING PERMANENT CASING FOR 3.05 M DIAM. SHAFT M 6 $3 016.00 $18 096.00 $2 000.00 $12 000.00 82 PLACING PERMANENT STEEL CASING FOR 3.05 M DIAM. SHAFT EA. 2 $2 500.00 $5 000.00 $1 500.00 $3 000.00 83 CSL ACCESS TUBE FOR SHAFT M 748 $26.00 $19 448.00 $13.00 $9 724.00 84 REMOVING OBSTRUCTIONS EST. 1 $24 000.00 $24 000.00 $24 000.00 $24 000.00 85 STEEL REINFORCING BAR FOR SHAFT Kq 64800 $2.40 $155,520.00 $1.58 $102 384.00 86 4149 STEEL REINF. BAR FOR BRIDGE SUBSTRUCTURE INCL WINGWALLS Kq 46200 $1.95 $90,090.00 $1.50 $69 300.00 87 4322 CONCRETE CL. 4000 FOR BRIDGE SUBSTRUCTURE INCL WINGWALL C.M. 376 $660.00 $248,160.001 $495.00 $186 120.00 88 4322 CONCRETE CL. 4000 FOR BIKE PATH UNDERCROSSING C.M. 1 32 $480.00 $15 360.00 $769.00 $24 608.00 89 CONCRETE CL. 4000P FOR SHAFTS C.M. 463 $300.00 $138 900.00 $172.00 $79 636.00 90 4230 STRUCTURAL CARBON STEEL L.S. 1 $278 400.00 $278 400.00 $265 000.00 $265 000.00 91 4235 STRUCTURAL LOW ALLOY STEEL L.S. 1 $1 781 400.00 $1 781 400.00 $1 500 000.00 92 4307 FABRIC PAD BEARING - SUPERSTRUCTURE EA. 8 $7 200.00 $57 600.00 $5 900.00 $47 200.00 93 4312 DISC BEARING - SUPERSTRUCTURE EA. 4 $9 600.00 $38 400.00 $6 300.00 $25 200.00 94 4311 ROADWAY DECK L.S. 1 $591 100.00 $591 100.00 $661 000.00 $661 000.00 95 4360 BRIDGE RAILING TYPE BP M 270.4 $234.00 $63 273.60 $159.00 $42 993.60 96 4415 TRAFFIC BARRIER M 1 135.2 $200.00 $27 040.00 $255.00 $34 476.00 97 4416 PEDESTRIAN BARRIER M 135.2 $200.00 $27 040.00 $255.00 $34 476.00 98 1 IBIKE PATH UNDERCROSSING L.S. 1 $249 730.45 $249 730.45 $114 400.00 $114 400.00 SURFACING 99 5020 BALLAST TONNE 390 $15.00 $5 850.00 $19.00 $7 410.00 100 5100 CRUSHED SURFACING BASE COURSE TONNE 3425 $20.00 $68 500.00 $18.00 $61 650.00 101 5120 CRUSHED SURFACING TOP COURSE TONNE 650 $20.00 $13 000.00 $20.00 $13 000.00 ASPHALT TREATED BASE 102 5510 ASPHALT TREATED BASE TONNEI 2776 $50.00 $138,800.00 $39.00 $108,264.00 CEMENT CONCRETE PAVEMENT 103 5656 1 BRIDGE APPROACH SLAB S.M. 222 $150.00 $33,300.00 $204.00 $45,288.00 104 5679 CEMENT CONC. PAVEMENT - INCLUDING DOWELS C.M. 23 $400.00 $9,200.00 $325.00 $7,475.05 ASPHALT CONCRETE PAVEMENT 105 5764 ASPHALT CONC. PAVEMENT CL. A TONNE 355 $150.00 $53,250.00 $44.00 $15,620.00 106 5765 ASPHALT CONC. PAVEMENT CL. B TONNE 4280 $40.00 $171,200.00 $44.00 $188,320.00 EROSION CONTROL AND PLANTING 107 6403 ESC LEAD DAY 300 $100.00 $30,000.00 $0.01 $3.00 108, 6414 SEEDING, FERTILIZER AND MULCHING - EROSION CONTROL MIX HA 1 ... $9,500.00 $9,500.00 $2,785.00 $2,785.00 109 6414 SEEDING, FERTILIZER AND MULCHING - UPLAND MIX HA $11,875.00 $23,750.00 $3,520.00 $7,040.00 1 10 6414 SEEDING AND MULCHING - WETLAND MIX HA 1.7 $14,250.00 $24,225.00 $11,000.00 $18,700.00 1 11 6454 EROSION CONTROL BLANKET S.M. 3900 $4.00 $15,600.00 $1.80 $7,020.00 1 12 6464 PLASTIC COVERING S.M. 3900 $1.50 1 $5,850.00 $1.80 $7,020.00 1 1 3 6463 CHECK DAM M 72 $40.00 1 $2,880.00 $16.00 $1,152.00 1 1 4 6468 STABILIZED CONSTRUCTION ENTRANCE S.M. 3300 $15.00 $49,500.00 $13.20 $43,560.00 1 15 6470 STREET CLEANING HR 200 $90.00 $18,000.00 $95.00 $19,000.00 1 16 6471 INLET PROTECTION EA. 16 $70.00 $1,120.00 $55.00 $880.00 1 17 6405 TOPSOIL TYPE A C.M. 1025 $40.00 $41,000.001 33.00 1 $33,825.00 1 18 6410 TOPSOIL TYPE B C.M. 2198 $48.00 $105,504.00 $10.00 $21,980.00 1 1 9 6554 DOUGLAS FIR EA. 743 $100.00 $74,300.00 $11.00 $8,173.00 120 6554 WESTERN RED CEDAR EA. 544 $100.00 $54,400.00 $15.00 $8,160.00 121 6554 WESTERN HEMLOCK EA. 199 $110.00 $21,890.00 $12.00 $2,388.00 122 6553 BIGLEAF MAPLE EA. 35 $100.00 $3,500.00 $24.00 $840.00 123, 6553 RED ALDER EA. 69 $75.00 $5,175.00 $10.00 $990.00 124 6553 PACIFIC DOGWOOD EA. 32 $75.00 1 $2,400.00 $125.00 $4,000.00 1 25 6553 OREGON ASH EA. 89 $75.00 1 $6,675.00 $140.00 $12,460.00 126 6553 VINE MAPLE EA. 353 $35.00 $12,355.00 $23.00 $8,119.00 127 6553 RED -OSIER DOGWOOD EA. 1090 $35.00 $38,150.00 $15.00 $16,350.00 128 6556 KINNICKINNICK EA. 650 $25.00 $16,250.00 $5.50 $3,575.00 129 6556 FLOWERING RED CURRANT EA. 483 $25.00 $12,075.00 $9.50 $4,588.50 130 6556 NOOTKA ROSE EA. 2615 $25.00 $65,375.00 $8.25 $21,573.75 131 6556 SCOULER'S WILLOW EA. 1 172 $25.00 $4,300.00 $1.50 $258.00 132 6556 SNOWBERRY EA. 919 $25.00 $22,975.00 $8.50 $7,811.50 1 33 6556 HIGHBUSH CRANBERRY EA. 187 $25.00 $4,675.00 $13.50 $2,524.50 134 6556 SALAL EA. 3291 $10.00 1 $32,910.00 $5.30 $17,442.30 135 6558 LONG LEAF OREGON GRAPE EA. 314 $10.00 $3,140.00 $5.75 $1,805.50 136 6556 SWORDFERN EA. 877 $10.00 $8,770.00 $4.00 $3,508.00 137 6554 SITKA SPRUCE EA. 71 $110.00 $7,810.00 $18.00 $1,278.00 1 38 6553 BITTER CHERRY EA. 32 $100.00 $3,200.00 $13.50 $432.00 39 6553 WESTERN CRABAPPLE EA. 129 $Inn rin $12,900.00 $24.50 $3 160.50 Page 2 of 4 Elliott Bridge #3166- Replacement CIP 401288, Contract C4301 1C - ... , .. .. .;: .. . .. .; .;.....:.;:....,.;;:.. " '' ' ..... '. Kin Count En ineers Estimate Pacific Road 8 Bridge ITEM NO. STD ITEM ITEM DESCRIPTION UNIT MEASU RE ITEM QUAN TITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 1401 6556 ICOMMON NINEBARK EA. 817 $35.00 $28 595.00 $6.60 $5 392.20 141 6556 SALMONBERRY EA. 825 $25.00 $20 625.00 $1.80 $1 485.00 142 6557 HARDSTEM BULRUSH EA. 1758 $10.00 $17 580.00 $1.25 $2 197.50 143 6558 LOW OREGON GRAPE EA. 709 $10.00 $7 090.00 $5.50 $3 899.50 144 6557 SMALL -FRUITED BULRUSH EA. 3494 $10.00 $34 940.00 $1.05 $3 668.70 145 6557 BUR REED - SE EA. 813 $10.00 $8 130,00 $1.00 $813.00 146 6557 BURR REED - SP EA. 1215 $10.00 $12 150.00 $1.00 $1 215.00 147 6557 MARSH SPEEDWELL EA. 1 841 $10.00 $8 410.00 $1.00 $841.00 1481 6553 IPAPER BIRCH EA. 4 $100.00 $400.00 $10.00 $40.00 149 6553 BLACK COTTONWOOD EA. 54 $100.00 $5 400.00 $10.00 $540.00 150 6553 PACIFIC WILLOW EA. 231 $75.00 $17,325.00 $1.50 $346.50 151 6556 WESTERN BEAKED HAZEL EA. 66 $13.00 $858.00 $5.50 $363.00 152 6556 BLACK HAWTHORN EA. 307 $13.00 $3 991.00 $22.00 $6 754.00 153 6556 OCEANSPRAY EA. 1075 $13.00 $13 975.00 $3.80 $4 085.00 154 6556 TWINBERRY EA. 976 $13.00 $ 2,688.001 $3.75 $3660.00 155 6556 INDIAN PLUM EA. 1 135 $13.00 $1 755.00 $4.00 1 $540.00 1561 6556 IMOCK ORANGE EA. 763 $13.00 1 $9 919.00 $4.00 1 $3 052.00 157 6556 CASCARA EA. 588 $13.00 1 $7 644.00 $11.25 1 $6 615.00 158 6556 SWAMP GOOSEBERRY EA. 145 $13.00 $1 885.00 $4.00 1 $580.00 159 6556 THIMBLEBERRY EA. 884 $13.00 $11492.00 $4.00 $3536.00 160 6556 HOOKER'S WILLOW EA. 784 $13.00 $10 192.00 $1.50 $1 176.00 161 6556 SITKA WILLOW EA. 584 $13.00 $7 592.00 $1.75 $1 022.00 00 $48.00 163 6556 RED ELDERBERRY EA. 427 $13.00 $5 551.00 $4.00 $1 708.00 164, 6556 BALD -HIP ROSE EA. 16 $13.00 $208.00 $4.00 $64.00 165 WESTERN CEDAR PLUGS EA. 350 $2.50 1 $875.00 $3.00 $1,050.00 166 6557 SLOUGH SEDGE EA. 1121 $4.00 $4484.00 $1.75 $1961.75 167 6557 SAWBEAK SEDGE EA. 2089 $4.00 $8 356.00 $1.75 $3 655.75 168 6557 SPIKE RUSH EA. 1209 $4.00 $4836.00 $1.75 $2 115.75 169 6557 BALTIC RUSH EA. 986 $4.00 $3 944.00 $1.75 $1 725.50 170 6557 DAGGER -LEAF RUSH EA. 986 $4.00 $3 944.00 $1.75 $1 725.50 171 6557 SKUNK CABBAGE EA. 90 $13.00 $1 170.00 $7.50 $675.00 172, 6438 COMPOST C.M. 2123 $25.00 $53 075.00 $31.00 $65 813.00 173 6530 SOIL AMENDMENT C.M. 2660 $9.00 $23,940.001 $21.00 $55 860.00 174 6580 BARK OR WOOD CHIP MULCH C.M. 5647 $5.00 $28 235.00 $15.00 $84 705.00 175 TIRE WASH EA. 4 $3 000.00 $12 000.00 $2 600.00 $10 400.00 176 STRAW MULCH S.M. 2840 $3.00 $8,520.00 $0.50 $1 420.00 1 77 SOIL TESTING EA. 14 $250.00 $3,500.00 $150.00 $2,100.00 178 NOXIOUS WEED CONTROL F.A. 1 $7,500.00 $7,500.00 $7,500.00 $7,500.00 179 7511 TEMPORARY SEDIMENT TRAP EA. 5 $2,000.00 $10,000.00 $800.00 $4,000.00 1801 SILT FENCE M 864 $12.00 1 $10,368.00 $14.75 $12,744.00 181 6489 EROSION/ WATER POLLUTION CONTROL EST. 1 $60,000.00 $60,000.00 $60,000.00 $60,000.00 182 COIR PATCH STAKING EA. 1069 $2.50 $2,672.50 $5.00 $5,345.00 183 SALVAGED PLANT MATERIAL EA. 1000 $1.50 $1,500.00 $10.00 $10,000.00 184 TRANSPLANTED PLANT MATERIAL EA. 300 $13.00 $3,900.00 $20.00 $6,000.00 1 85 6605 PLANT ESTABLISHMENT $40,000 MINIMUM L.S. 1 $40,000.00 $40,000.00 $40,000.00 $40,000.00 TRAFFIC 186 6751 BEAM GUARDRAIL TYPE 1 M 838 $40.00 $33,520.00 $48.50 $40,643.00 187 6760 BEAM GUARDRAIL TRANSITION SECTION TYPE 10 EA. 3 $1,300.00 $3,900.00 $1,270.00 $3,810.00 188 6760 BEAM GUARDRAIL TRANSITION SECTION TYPE 11 EA. 4 $1,300.00 $5,200.00 $1,270.00 $5,080.00 189 6716 BEAM GUARDRAIL FLARED TERMINAL EA. 29 $1,800.00 $52,200.00 $1,785.00 $51,765.00 190 6771 BEAM GUARDRAIL ANCHOR TYPE 1 EA. 13 $350.00 $4,550.00 $535.00 $6,955.00 191 6781 TEMPORARY CONC. BARRIER M 12 $35.00 $420.00 $80.00 $960.00 192 7447 TRUCK MOUNTED IMPACT ATTENUATOR EA. 1 $4,000.00 $4,000.00 $5,000.00 $5,000.00 193 7449 OPERATION OF TRUCK MOUNTED IMPACT ATTENUATOR HR 120 $45.00 $5,400.001 $1.00 $120.00 194 6806 PAINT LINE M 1 3553 $0.45 $1,598.85 $0.35 $1,243.55 195 6817 PAINTED WIDE LINE M 513 $2.50 $1,282.50 $0.50 $256.50 196 6857 1 PLASTIC CROSSWALK LINE S.M. 51 $45.00 $2,295.00 $20.00 $1,020.00 197 6859 PLASTIC STOP LINE M 43 $15.00 $645.00 $10.00 $430.00 198 6860 PAINTED TRAFFIC ARROW EA. 2 $50.00 $100.00 $40.00 $80.00 199 6833 PLASTIC TRAFFIC ARROW EA. 16 $60.00 $960.00 $40.00 $640.00 200 6871 PLASTIC TRAFFIC LETTER EA. 15 $60.00 $900.00 $20.00 $300.00 201 6884 RAISED PAVEMENT MARKER TYPE 2 HUND 3 1 $400.00 $1,200.00 $350.00 $1,050.00 202 6888 TEMPORARY PAVEMENT MARKING M 600 $1.00 $600.00 $1.75 $1,050.00 203 6890 PERMANENT SIGNING L.S. 1 $2,360.00 $2,360.00 $11,500.00 $11,500.00 204 1 6904 ILLUMINATION SYSTEM COMPLETE L.S. 1 $115,000.00 $115,000.00 $115,000.00 $115,000.00 205 DETOUR SIGNING L.S. 1 $12,000.00 $12,000.00 $8,300.00 $8,300.00 206 6954 TRAFFIC SAFTEY DRUM EA. 33 $60.00 $1,980.00 $60.00 $1,980.00 207 6958 TYPE III BARRICADE EA. 7 $150.00 $1,050.00 $150.00 $1,050.00 208 6979 TRAFFIC CONTROL LABOR HR 1 1905 $35.00 1 $66,675.00 $36.00 $68,580.00 209 TRAFFIC CONTROL LABOR - POLICE OFFICER HR 1000 $35.00 $35,000.00 $0.10 $100.00 210 CAST -IN -PLACE CONC. BARRIER ON STRUCTURAL EARTH WALL M 34 $375.00 $12,750.00 $935.00 $21,590.00 211 MODIFICATION OF EXISTING TRAFFIC SIGNAL SYSTEM L.S. 1 $120,000.00 $120,000.00 $108,000.00 $108,000.00 OTHER ITEMS CONC. CURB AND GUTTER M 250 $30.00 $7,500.00 $39.50 $9,875.00 3EXTRUDED CURB M 565 $14.00 $7,910.00 $10.00 $5650. 10 1212 4WATER LCEMENT MGAL 10 $500.00$5,000.00 $200.00 $2000.00 5STRUCTURE SURVEYING L.S. 1 $5,000.00 $5000.00 $60000.00 $60000.00 6ROADWAY SURVEYING L.S. 1 $7 500.00 $7 500.00 $45 000.00 $45 000.00 Page 3 of 4 Elliott Bndge #3166- Replacement CIP 401288, Contract C43011C ..................................................................................................................................................... . Countv En ineers Estimate Pacific Road & Bridge ITEM NO. STD ITEM ITEM DESCRIPTION UNIT MEASU RE ITEM QUAN TITY UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST 2171 7045 IMONUMENT CASE AND COVER EA. 13 $250.00 $3,250.00 $400.00 $5 200.00 2 1 8 7380 JADJUST MONUMENT CASE AND COVER EA. 2 $200.00 $400.00 $300.00 $600.00 219 7055 CEMENT CONC. SIDEWALK S.M. 726 $28.00 $20,328.00 $30.00 $21 780.00 220 7091 HIGH VISIBILITY FENCE M 420 $10.00 $4 200.00 $6.50 $2 730.00 221 7083 COATED CHAIN LINK FENCE TYPE 3 M 300 $40.00 $12,000.00 $47.50 $14,250.00 222 7089 COATED CHAIN LINK FENCE TYPE 6 M 12 $40.00 $480.00 $110.00 $1 320.00 222 7101 SINGLE 1.8 M COATED CHAIN LINK GATE EA. 1 $350.00 $350.00 $960.00 $960.00 223 7106 DOUBLE 6 M COATED CHAIN LINK GATE EA. 3 $1,200.00 1 $3 600.00 $1 070.00 $3,210.00 2241 7147 FIXED BOLLARD EA. 2 $600.00 $1 200.00 $500.00 $1 000.00 225 7148 REMOVABLE BOLLARD EA. 4 $750.00 $3000.00 $750.00 $3000.00 226 7155 ROCK FACING S.M. 162 $161.00 $26082.00 $80.00 $12,960.00 227 7169 STRUCTURAL EARTH WALL S.M. 211 $450.00 $94 950.00 $265.00 $55 915.00 228 7170 BACKFILL FOR STRUCTURAL EARTH WALL INCL. HAUL C.M. 784 $45.00 $35 280.00 $24.00 $18 816.00 229 7535 CONST. GEOTEXTILE FOR DITCH LINING S.M. 929 $3.00 $2 787.00 $2.00 $1 858.00 230 7550 CONST. GEOTEXTILE FOR UNDERGROUND DRAINAGE S.M. 4220 $5.00 $21 100.00 $1.80 $7 596.00 231 7480 ROADSIDE CLEANUP EST. 1 $10 000.00 $10 000.00 $10 000.00 $10 000.00 232 7400 TRAINING HR 1600::: $4.00 $6 400.00 $1.50 $2 400.00 233 7563 MAILBOX RELOCATION EA. 9 $200.00 $1 800.00 $100.00 $900.00 234 SPILL PREVENTION PLAN L.S. 1 $1 000.00 $1 000.00 $400.00 $400.00 235 40 MIL GEOMEMBRANE BARRIER S.M. 2158 $3.20 $6 905.60 $10.00 $21 580.00 236 SPECIAL WOOD FENCE M 112 $35.00 $3 920.00 $97.50 $10 920.00 237 HYDROGEN SULFIDE CONTROL FACILITIES L.S. 1 $60 000.00 $60 000.00 $16 400.00 $16 400.00 238 ELECTRICAL SYSTEM FOR HYDROGEN SULFIDE CONTROL FACILITIE 3 L.S. 1 $13 500.00 $13 500.00 $17 000.00 $17 000.00 239 LOW PERMEABILITY SCREENINGS C.M. 125 $25.00 1 $3 125.00 $39.00 $4 875.00 240 LOG FOR STREAM CHANNEL CONSTRUCTION - WITHOUT ROOTWAI EA. 35 $1 900.00 $66 500.00 $375.00 $13 125.00 241 LOG FOR STREAM CHANNEL CONSTRUCTION - WITH ROOTWAD EA. 73 $2 500.00 $182 500.00 $400.00 $29 200.00 242 KEY BOULDERS EA. 75 $275.00 $20 625.00 $24.00 $1 800.00 243 BOULDERS TONNE 151 $65.00 $9 815.00 $45.00 $6 795.00 244 WOVEN COIR MATTING S.M. 2800 $7.00 $19 600.00 $4.20 $11 760.00 245 NON -WOVEN COIR MATTING S.M. 1100 $5.00 $5 500.00 $2.75 $3 025.00 246 FLOW SPUTTER LOG INSTALLATION EA. 1 $6 000.00 $6 000.00 $2 600.00 $2 600.00 247 CONFLUENCE LOG STRUCTURE EA. 1 $65 000.00 $65 000.00 $4 900.00 $4 900.00 2481 WOODY DEBRIS CLUSTER EA. 6 $4 000.00 $24 000.00 $1 100.00 $6 600.00 249 200 mm DIA. NATURAL GAS STEEL PIPE SLEEVES AND INSERTS L.S. 1 $6 000.00 $6 000.00 $12 000.00 $12 000.00 250 CONTAINMENT L.S. 1 $15 000.00 $15 000.00 $14 400.00 $14 400.00 251 WOOD FOR FLOODPLAIN RECRUITMENT L.S. 1 $5 000.00 $5 000.00 SUBTO TOTAL CONSTRUCTION COST $9,860,667.14 $8,330,588.85 Page 4 of 4 King County King County Procurement and Contract Services Division Department of Executive Services 8th Floor, Exchange Building, Contracts 821 Second Avenue Seattle, Washington 98104 ELLIOTT BRIDGE #3166 (149th Ave SE crossing Cedar River) Contract No. C43011 C Project No. 401288 Fed. Aid No. R44118 R44127 Fed. Aid No. BRS-M-1 71 (001) This project provides for the improvements to Elliott Bridge by clearing and grubbing, grad- ing, constructing a new cement concrete bridge, shaft construction, surfacing, drainage, installing water lines, sanitary seer, paving with asphalt concrete pavement, cement con- crete curb, gutter and sidewalk, removing an existing steel structure, surveying, installing illumination and signal, plantings, seeding, stream enhancements, traffic control, and other work, in accordance with the following Special Provisions in conjunction with the 2002 Standard Specifications for Road, Bridge and Municipal Construction (English Edition), is- sued by the Washington State Department of Transportation and the American Public Works Association, Washington State Chapter, and the 1993 King County Road Standards, which were adopted by the King County Council. The contract documents may be purchased only at the King County Department of Trans- portation's Map and Information Counter, 1 st Floor, 201 South Jackson Street, Seattle, WA 98104-3856. The cost for each set of plans, specifications, and form of contract docu- ments is $10.88, $15.00 if mailed; neither is refundable. This information is available in alternate formats for individuals with disabilities upon advance request by calling 206-684-1327, TTY Relay: 711. A list of the planholders for this project can be obtained on the web at http://www.metroke.goy/finance/procurement/Efp rfq itb/new.aso or by calling (206) 296-6548 TTY Relay: 711. King County encourages the utilization of minority -owned businesses ("MBEs") and women -owned businesses ("WBEs") (collectively, "M/WBEs") in County contracts. The fol- lowing identifies the types of subcontracting opportunities that may be available on this Contract and are provided only for informational purposes: grading, surfacing, shaft con- struction, drainage, water line construction, sanitary sewer, asphalt concrete paving, rock ELLIOTT BRIDGE #3166 (149th Ave SE crossing Cedar River) and earth walls, constructing cement concrete curb, gutter, and sidewalk, fence and bollard installation, illumination and signal installation, seeding, planting, pavement marking, guard- rail installation, and labor for traffic control. The following is applicable to federal aid projects: King County, in accordance with Title IV if the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation, issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. Disadvantaged Business Enterprise(DBE) Participation: For this federally -funded project, the Contractor shall meet the following subcontracting amount: DBE participation shall be at least 10% of the contract total. Prospective Bidders desiring an explanation or interpretation of the bid documents are di- rected to Section 1-02.4(1) of the 2002 Washington State Department of Transportation (WSDOT) Standard Specifications (English Edition). Inquiries must be submitted in writing and re- ceived by the County a minimum of three business days prior to the bid opening date. Direct all correspondence concerning explanation or interpretation to: King County Department of Transportation Road Services Division M.S. KSC-TR-0224 King Street Center, 2nd Floor 201 South Jackson Street Seattle, WA 98104-3856 Attention: Supervising Engineer Jerrold Brais As an alternative to mailing, inquiries may be faxed to the attention of Supervising Engineer Jerrold Brais at (206) 296-0565. The inquiring firm's contact person and return address or fax number must be clearly identifiable on the fax submittal to allow for written response by the County. King County will receive sealed bids only until 2:00 P.M., April 29, 2004: King County Procurement and Contract Services Division Department of Executive Services 8th Floor, Exchange Building 821 Second Avenue Seattle, WA 98104 2 ELLIOTT BRIDGE #3166 (149th Ave SE crossing Cedar River) The estimated cost of this project is $9,250,000 to $10,000,000 the project shall be com- pleted within 360 working days. All bids received will be opened in public at the time and place herein specified and all bid- ders and other persons who may be interested in any bid, or the subject matter for which the bids are called, are hereby invited to be present at the opening of such bids. A 100 percent performance bond will be required of the successful bidders, unless the sum of the bid is under $1,000. All bid proposals shall be accompanied by a bid deposit in the form of a Surety Bond, Postal Money Order, Cash, Cashier's Check, or Certified Check in an amount equal to five percent of the amount of the bid proposed. Upon failure of the successful bidder to enter into the contract and to furnish a Contractor's bond within ten days after Notice of Award of Bid —exclusive of the day of notice —the amount of the bid deposit will be forfeited to King County. King County reserves the right to reject any or all bids and to waive formalities. No bids will be accepted after the time and date shown above. KING COUNTY PURCHASING AGENCY First Publication: April 1, 2004 Last Publication: April 8, 2004 GAW/NWORD CONTRACTS\CONTRACT ARCHIVE�ELLIOTTBRIDGENO.3166\ELLIOTTBRIDGEN0.3166 INV PRINTED 41112004