Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRVTI GARP*NER
E N G I N E E R S I N C . {� ►) i' � J
i
1
,, a i,. f dG -'�'..t. •`' i' �
- - .� . � •; ..ter,
�` `��v.�I.AP/✓Z'C/WI,dl
d �- - "Tilw Pam•
s-
.e Ar
'� k.f. �•K�-,..it� ;, gip .qr; ,l•e� .d f•;,�� +' 1.-
Boa '"
aMo
Y' +ry°Si�-�-��ry�i � �yr•,�,;`�:� �.Yi�. �,ri� �LiR'y."'y K -,.
���i -.Zr1�Iihr .ir�� iReQl .a�ne++lFi1w�` ��u?•' ii�fi
t .,.-�,n�anr.-r�mm+.R+++e-•�...s.+.w.c•••..wr..w-,.v..t= .r_...,. �_
4 4
V
/YID IBC RilreAW.R6E
—�- /�LDW_IR7
=15 ,
OD
ST RB
FICT � 16 z � �HARQiE �4siu
SR 6V PA5fDR ExGE55 RUAILV-F
ED F�fE4dENCy Ot/EF�FLDh/
Because of the elaborate maintenance
required, it is doubtful that it would
be feasible to provide sufficient
storage for the 'max' 24-hour storm
(about 3-3.5 inches in the Seattle Construction. A considerable amount of
area) in order to eliminate the need recharge occurs through the side walls
for an overflow storm system. In --- ------- --- --- ------
practice, a major factor in sizing will - of the basin, so it is preferable that
be the available land. these should ba constructed- of pervious
_ _ __- - -_
material . Gab ions make ide-al sidewalls.
The base of the basin must be kept free
Dimensions. The dimensions of a of silt. In some circumstances it may
storage basin can be varied consid- be desirable to spread 2" of coarse
erably. The 88,000 cubic yard basin at sand over they base to improve infil-
Burlington, New Jersey is 27 ' deep. tration.
Side Slopes . Where these are grass, .SwALE
there should be a shallow Swale to -
prevent runoff from side slopes from
reaching the basin.
Sediment Trap. Runoff collected should
pass into a sediment trap before dis-
charging into the basin.
Landscaping. Wherever possible, the
design of the recharge basin should be Gabions - Standard Sizes - Ft.
carefully fitted with surrounding
topography. Length Width Height
Security and Safety. Recharge basins 6 3 l '-1 '6" or 3 '
with a depth in excess of 30" must be 9 3 of
fenced to prevent trespassing. Six- 12 3 "
foot cyclone fencing is adequate in
most cases.
Maintenance. At least once each year
the accumulated silt must be scraped
off the bottom and the base cultivated.
6s '
r
CITY OF BELLEVUE
STORM & SURFACE
WATER DRAINAGE
DESIGN STANDARDS
3
1986
1
infiltration rate is 0.5 inches/hour or greater no
storage is needed for the pervious surfaces) , and to
reduce the storage required for the impervious areas.
The total quantity of water infiltrated during the 4
hours of the design storm is calculated by multiplying
the total_ square f ootage_ of the trench bottom or sump
.plus one half the square foot area of the sidewalls
times the_total infiltration for the 4-hour time perio-
(sustained rate), and dividing by 12 to obtain the
volume of water infiltrated in cubic feet.
F. Site, Soil and Infiltration Data Requirements for
Construction of Recharge Systems.
1 . General Data Requirements:
a. The proposed site must have favorable topography
to satisfy functional requirements for
construction of a recharge system.
b. The required data must be tabulated and submitted
in accordance with the guidelines below.
C. A log of the soils and infiltration test data must
be submitted to reveal site soil conditions and
infiltration rates.
d. An adequate number of test holes shall be located
over the proposed site to substantiate
representative conditions for the design of
recharge systems, and as a minimum condition, test
holes shall be located in each area and at the
elevation proposed for infiltration.
e. Minimum depth to groundwater shall be greater than
four feet.
f. Impervious strata shall be at a depth greater than
two feet below the bottom of the proposed
infiltration trench.
2. Soil Data Requirement: The log must describe soil type
and depth as well as the location being indicated on a
site map. Classification may be in general terms such
as loose sand, sandy silt, clay hardpan, rock, etc. or
classification may be in specific terms as described by
the U.S. Department of Agriculture.
IV-13
1 '
OLYMPI�, CONSTRUCTION CASTINGS
DIVISION OF OLYMPIC FOUNDRY(1984)INC.
5200 Airport Way South . Seattle,Washington 98108
co,�ry ,9 Telephone: (206)764-6240
�STiNps, SINGE
0�
(!fL-a �
1Aec,e- ads i
MANUFACTURERS OF
MUNICIPAL CASTINGS WATERWORKS FITTINGS MARINE HARDWARE
By M'r
I'L Date 2u 'yS PROJECT 6 V F
` DNER ENGINEERS,INC. Sheet or
CONSULTING ENGINEERS•SINCE 1883 Chatke 5- 1 � Z
Job Na
'� �/ti �_��7�� r 10ti sys��� i9Ni4� ys � s - � gT 1
c �
I._ of Z yoo _ Z 3,3
onsrt,- _ "� .:fir � x /, d X O , 70 J2.,7
2._G,3 v 7Za�l'.c t
16,
l � ff crc
2i 7
-7I _lN
_fin-mF, ) +rl3*ar, Ra+e . 'X= ,- -"c FS
T i
.10
T �� AW 4tom.4t l
By M r
Date.
PROJECT Shut Of
ENGINEERS,INC.CONSULTING ENGINEERS•SINCE 1883 Chkd
Oats
Job Noy
� ti 0A L 7- iZ
O ? 3,3 /YI
3X60
Leo = /• � " ��r_
0 , 7 v = -2,7 ',Fs
3, 3 clrs
0 �4 eyvlVa/enf 7 ��� =- /�• �( w, 22. 8 fJCfCS
Z' 7
2 TXr-
.�. X 0
US = 2 Ze-) x -25z 44 70
LJT = 71Ox -.2. " k �. � _ � 1 / Ff
�'-f- 7U �tJ�l Q �—
a ►
GARDNER ENGINEE7 INC.
CONSULTING ENGINEERS e SINCE 1883
SUITE 300 02124 FOURTH AVENUE
Seattle, Washington 98121 DATE w ' _ Job NO.
(206) 728-1883
ATTENTION
In
RE:
TO
GENTLEMEN:
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifics
❑ Copy of letter ❑ Change order ❑
COPIES DATE NO. DES RIPTION
hl
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
-XFor review and comment ❑
❑ FOR BIDS DUE _19 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
Q
COPY TO
SIGNED: 'C "
It enclosures are not as noted, kindly notify us at once.
♦ . i
OLYMPIC CONSTRUCTION CASTINGS
DIVISION OF OLYMPIC FOUNDRY(1984)INC.
5200 Airport Way South . Seattle,Washington 98108
Telephone: (206) 764-6240
C4St NGS SINGE i9�
Ig
3az
zz o
/7g,
4,00
2qz
30 0
�D
/'Z 5
3S
3
MANUFACTURERS OF
MUNICIPAL CASTINGS WATERWORKS FITTINGS MARINE HARDWARE
r
G RDNER ENGINEERS INC. Mortimer H.Thomas,P.E.
s 'Thomas P.Fitzmorris,P.E.
CONSULTING ENGINEERS•SINCE 1883 Leonard J.Locke,P.E.
SUITE 300•2124 FOURTH AVENUE
Seattle, Washington 98121
(206) 728-1883
R.V.T. I.
STORM DRAINAGE
INFILTRATION SYSTEM ANALYSIS
® �0� 11.14 � ��M
Area 24.0 Acres
TC - 10min + 2400/4 = 20 min.
f v. .
ilv = 1 . 1 in/hr
u�
312q,��S
Q = 24. x 0.7 x 1. 1 = 18.5 CFS
Q offsite = 3.3 CFS
TOTAL 21.8 CFS
Infiltration Trench
L = 2500' W [5 ' + (2xl .5 ' )] = 8'
I = 2 min/inch
Infiltration Rate = 2500 x 8 = 13. 9 CFS
2 x 12 x 60
Use 13.9 as release rate - compute storage
Qo 241x 3.9 = 0.83 cfs/Acre C
T = -25 + 1762 - 21. 1
0.83
Vs T8+025 - 40(0.83)T = 590 ft3
_ CITY OF nENTO.'d
UT = 590x24x0.7 = 9,900ft3
4
Storage in Rock = 0.3 x 2500 x 5 x 1.5 = 3600 ft3 APR 1 05
Storage in 2500 of 18" pipe = BUILDING/IZ�^NiNG DL P T.
2500 x 1.5 x 1.5 _ 4400 ft3
4 10,000 ft Total
�a.
/Vofi� /hAt�'�'�/ 1 '/h�n. Cove✓
min, Grp de
Ale
Use T f of'N�w Cv,-��- le" Ccv�✓ Grn✓c/
as Fir,. Grna/C PERF. yyA �iH�✓ FQ6���
P/PC
v
wasti Cd
Gro vc/
J
Sr Op
iA4FiZ-TAW F/o-1J
,D,5—%,4/L
• CONSULTANTS -
William L.Shannon,P.E.
Stanley D.Wilson, P.E. -
SHANNON & WILSON, INC. W-4322-02
Geotechnical Consultants
Engineering and Applied Geosciences
1105 North 38th Street - P.O. Box C-30313 • Seattle, WA 98103-8067 • (206) 632-8020 - Cable: GEOSAW
February 4, 1985
Gardner Engineers 0 D
Marketplace One Building
Seattle, WA 98121
FEB G 1985
Attn: Mr. Mort Thomas
RE: PROPOSED STORM WATER DISPOSAL SYSTEM GARDNER ENGINEERS, INC.
RENTON VOCATIONAL TECHNICAL INSTITUTE (RVTI)
Dear Mr. Thomas:
We are continuing to develop design input for the storm water disposal system
at the referenced site. We are submitting preliminary information by this
letter so that you can continue your design while we complete our work.
We have completed ten ( 10) percolation tests at the locations shown on the
site plan, Figure 1. The percolation test results are presented in Table 1 .
The percolation tests were each performed as follows:
1) An 8- to 11-inch-diameter hole, generally 20 to 30 inches deep, was
excavated.
2) The hole was filled with water one time to soak the native soils.
3) The hole was filled a second time, and after the water level dropped to 6
inches above the bottom of the hole, the time that it took for the water
level to drop each of the final six 1-inch increments was recorded.
4) The percolation or the infiltration rate was calculated by two methods:
1) as the average of the six 1-inch increments for the actual recorded
time; and 2) by projecting a straight-line solution for the average
infiltration rate (see attached plots) . The straight-line solution method
provides a more conservative design parameter since variations in the
infiltration rate are averaged.
The infiltration rate varied with soil type. The infiltration was quickest in
sandy Gravel and gravelly Sand, and slowest in silty fine Sand. The type of
soil is likely to vary randomly along the length of any buried distribution
pipe, and it is not practical to select different infiltration rates for
different sections. We recommend that a representative rate be conservatively
selected from Table 1 for the entire site. This is recommended since true
steady-state conditions were not obtained during the percolation tests.
Raymond P. Miller, P.E. George Yamane, P.E. Harvey W. Parker, P E.
Senior Vice President &Manager Vice President Vice President
Senior Associates: H.H. Druebert,P.E., Thomas E. Kirkland. P.E., Atef A.Azzam
gcenriotcc 1111 u., A rZiff
Gardner Engineers
Attn: Mr. Mort Thomas W-4322-02
February 4, 1985
Page 2
We have reviewed the published geologic and groundwater information for the
area, and plan to complete the proposed three borings along Kirkland Avenue
Northeast the week of February 4, 1985. We will meet with you to discuss all
results after the borings are completed.
Based on our discussions with the Washington State Department of Ecology
(WDOE) , we understand that there are no state regulations for this type of
storm water disposal system unless industrial waste (i .e. , chemicals and
metals designated as hazardous waste under state and federal guidelines) are
spilled or discharged into the system. We suggest that Mr. Dick Houghton,
Director of Public Works for the City of Renton, be consulted for local
regulation for storm water disposal systems.
Incorporation of an oil/water separator into the storm water disposal system
would significantly reduce the potential for clogging of the drainfield. We
have included a copy of WDOE Bulletin 82-1 entitled "Design Criteria for
Gravity Oil/Water Separators" dated January 1982, which may assist you in
designing the system. One local source of manufactured passive oil/water
separator systems is Mr. John Leonard of Northwest Power & Plant Equipment
Company at (206)324-8880 in Seattle.
If you have additional questions, please call Mr. Ted Vogelpohl or me at
(206)632-8020.
Sincerely,
SHANNON & WILSON, INC.
ILIn". UZ U�
Steven R. Bruce
Hydrogeologist
Reviewed by:
George manP.E.
Vice Pr sid t
SRB/000
Encls: Figure 1, Site Plan
Table 1, Summary of Percolation Tests
Percolation Test Data Plots
Copy of WDOE Bulletin 82-1
cc: The Campanella Group
FOR ADDfTIONAL DROVING LANE
20'SETBACK II 2 ! -
•7 ..T—.
\ ±•\,
r+� — / �- -- EXISTB+2P-(81G— —- '� +• '- r_ T - N` —� �!� I ` f' �i'' "
4p ' .—J^ 92 . 'O RARKNO `-� �r�oa NEW _ O O i �•e —
-! L'— !, 113 rt `- `- ENTRANCE \ _O - • . �- -
o
� e I ►_—._. ----"---.--•-ti• - , ' �__ �. a.o �w i„?1•/ / '_.c— Tom_ °
i rA- ;�'" ' i _--- - - o - - - -- ` _* _ FOODS i
y - `• /�j -
_ lot FLOOR ELEV a3f/.0 -
�• COST -i d- �� j - ,TP-3 l P-s I 2nd FLOOR ELEV 35s.0 a
/ �_.. rd F >l70
`• _ - i -ma`s -- / IBM,
TP-9
�\ ✓� ,mil
• 7 _ yv fi AUTOMOTIVE L
-.CARP ENTRY/ANEW �" v
FLOOR I LEV 343.0 •,•� ••-
FLOOR__ffiEVL345A TP-11
ILIL
\ --tom - • -� -� /� ' . - - ; ' - - � / / � '
v NEW PARKBKi
Ike' _ - . _ ELECTRONICS
1•t FLOOR ELEV 339.0
- , - +,off 1TP e f'T� 2nd FLOG LEY 355.0
NEW SIDEWALK, TP 19:1 a 8A0 �e y 3.d FLOALEV 370o TP-12\
CURB. a GLITTER - - - - - 6 _ T P-5 - _ 913
ALONG SEVENTH STREET - " l - - _ _ EMERGENCY FIRE ACCESS .
'', . _•_ - — i — - - - Kirkland- - -e------- - --- - - - -
- i _
EW CURB i GUTTER ALONG NEW FENCE I I
A KR R
KLAND AND JEFFERSON AVENUES ALONG KKLAND AND JEFFERSON AVENUES I L 0'SETBACK
\ \ •I� EMERGENCY FIRE ACCESS
\\ \ 20'SETBACK
Z Nor
NOTES B-1 INDIC/
LOCAL
1. THIS PLAN BASED ON AN UNDATED SITE DEVELOPMENT
PLAN PROVIDED BY THE CAMPANELLA GROUP, INC. TP-1 INDICT
2. ELEVATION DATUM: CITY OF RENTON BENCHMARK NO. 514,
LOCAI
ELEV. 323.52, NATIONAL GEOCETIC VERTICAL DATUM. 5 INDIC1
0 0 100 200 300 TEST I
SCALE IN FEET
iI !
Monroe Avenue Northeast_
=z _ 'a �C)7_ FWST O MIIKM EXISTING PARKING
.150
0
/ `
8� �.�,��^ B-2 TP-13 -- --� -
�.
_ 1 -
I FOODS _ , ARKING 1 POWER LNE E_ASEMENT C _
*32
lot FLOOR ELEV 339.0- i �— —
2nd FLOOR ELEV 355.0
3rd FLOOR ELEV 270. > i �• — t t 1 ( —
FUTORE I i
i BUIL TNG EXISTING s f
i
I TP-11
EXISTING 'I
L El .- I
t
ELECTRONICS
d i
lot FLOOR ELEV 339.0
` Ej-
Flo 2nd FLOO�LEV 355.0 `- �. �'�
_ _
3rd FLOG LEV 370.0 TP-12 --" '„ EXISTING �
EWRGENCY FIRE ACCESS 3 a a 0 f � �_ -� `'4 10
- - - _ - - - �3T ! b
LL 1
EXISTING PARKING _ r �----
\ \ 38
EXISTIN-14
G =t`
TP
AVEtNIES I I O'SETBACK � \ as 0 \� �{
e, HEALTH .I
ALDDIMON
330
TP-15 �I
LEGEND aaw�J�— ✓ +�Sr !
B-1 INDICATES APPROXIMATE TRUCK BORING
LOCATION
1 2 \�\\\ Vl�d '•�`\ ! ?' RENTON VOCATIONAL
TP-1 INDICATES APPROXIMATE TEST PIT a I�, e i TECHNICAL INSTITUTE
LOCATION (1 c ,
TP-16
5 INDICATES APPROXIMATE PERCOLATION `,•�� , � �
Q TEST LOCATION ; ; `' ;:.f 36- SITE & EXPLORATION PLAN
DECEMBER 1984 W-4322-01
N FEET
' j ,• '` �� 0 SHANNON 81 WILSON, INC.
`� ( `` • • .. . -� G•otechnical Consultants FIG. 2
.; rtr .r
TABLE 1 W-4322-02
SUMMARY OF PERCOLATION TESTS
Averaged Plotted
Diameter of Depth Interval Tested Infiltration Rate Infiltration Rate
Test l Test Hole ( inches) ( inches below ground surface) (minutes/inch)2 (minutes/inch)3 Soil Type4
5 8 20-26 0.7 0.7 Fine to medium SAND
6 8 24-30 2.0 2.4 Gravelly, slightly silty, fine
to medium SAND
7 8 24-30 0.4 0.4 Gravelly, fine to medium SAND
8 10 23-29 2.1 2.7 Silty, fine to medium SAND
8A 8 24-30 1 .7 1.9 Slightly silty to silty, fine
SAND
9 11 26-32 0.2 0.2 Sandy GRAVEL
10 8 23-29 1 .1 1.2 Slightly silty, gravelly, fine
to medium SAND
11 8 20-26 3.4 3.9 Silty, gravelly, fine to
medium SAND
12 8 25-31 1.8 2.2 Slightly silty to silty, fine
SAND
13 8 24-30 0.3 0.4 Gravelly, fine to medium SAND
1 See Figure 1 , Site Plan, for test location.
2 The averaged infiltration rate (minutes required for water level to drop 1-inch) was measured for each inch of the 6-inch interval
shown, and an average of the infiltration rates was determined.
3 The plotted infiltration rate (minutes required for water level to drop 1-inch) is based on a straight-line projection of the average
rate of infiltration at the depth interval tested. The plots are included in this letter.
4 Description of soil within zone tested.
}
GARDNER ENGINE14 ;INC. LIFT M OF UMZZ zA DCTCTzZL
CONSULTING ENGINEERS e SiiYCE 1883
SUITE 300•2124 FOURTH AVENUE
Seattle, Washington 98121 DATE JOB NO.
(206) 728-1883
ATTENTION
RE
TO — �P'ft'fw
GENTLEMEN:
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ SpecificF
❑ Copy of letter ❑ Change order ❑
COPIES DATE NO. DESCRIPTION
qff
day
r + m & VIti
THESE ARE TRANSMITTED as checked below:
❑ for approval ❑ Approved as submitted ElResubmit copies for approval
E For your use ❑ Approved as noted ❑ Submit copies for distribution
R6 As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment
❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
F .
Engr.Division
" rA
COPY TO
SIGNED:
If enclosures are not as noted, kindly notify us it one
Mortimer 1I.Thonim,P.E.
�DNER ENGINEL__3,INC. LA"iar P.rA)Ae.r is,.E.P.E.
CONSULTING ENGINEERS •SINCE 1883 L�ecuiard J.Lcx ke,P.E.
SUITE 300.2124 FOURTH AVENUE 1 Apri 1 1985
Seattle, Washington 98121
(206)78-1883 File: 5172
`-'
R.V.T. 1 .
STORM DRAINAGE
INFILTRATION SYSTEM ANALYSIS
AREAS I & II Area = 20.4 Acres
TIC = 10 + 2400 = 20 mm.
4x60
I10 = 1.1 in/hr
C = 0.70
Q = 20.4 x 0.70 x 1.1 = 15.7 CFS
Q uffsite = 3.3 CFS
Q Total 19.0 CFS
Infiltration Trench L = 2500'
W = [ 5' + (2x1.5' )] = 8'
I = 2 min/inch
Infiltration Rate = 2500 x 8 = 13.9 CFS
2 x 12 x 60 f Engr.Division
City of Renton,WA
Use 13.9 CFS as "release rate" - compute storage r'[`-
or
Qo = 13.9 = 0.973 CFS/Acre C
20.4 x 0.70
T = -25 + 1762 = 17.55 In 8 1986
0.973
Vs = 2820 T - 40 (0.973) T = 480 Ft 3
T + 25
VT = 480 x 20.4 x 0.70 = 6,855 Ft 3
Storage in Rock = 0.3 x 2500 x 5 x 1.5 = 3600 Ft 3
Storage in 18" pipe = 2500 x 0.75 x 0.7577=4400 Ft 3
TOTAL STORAGE 8000 Ft 3
t
1 AREA 1 I AREA
Cl 11
AREA
J
w.rrw wuwr►�crwcr rsmw+
I i �
f
r
r
4
3 IN �I s
rv�s1CIbW t
i
Gardner Encineerc Inc,
;DINT 13EARIN6 DISTRNCE NDkTN1N6 EASTINS
170 Inverse bearings}
Figure i is •ade up of these following points...
995 EV BOB 807 R1000 810 Ell 9" 99E
99E: 10,867.5669 9,464.2728 '
N 0-29-24.03 W 1,055.901B
F07 11,943.4301 9,45`.2425
N 3-10-50.15 W 302.3787
BOB 1A. 245.3430 5,43E.4655
N 56-49-16.77 E 64.96BB
ED9 12,278.9779 9,494.05C'i�
S 31-10-43,34 E 819.5200
Delta = 30- 59- 55
Radius = 819.520 Curve length = 443.383
Tangent = 227.262 Chord = 437,9S5
1000 11,577.B320 9,918.3229
N 0-10-40-34 W 619.5200
Ell 12,397,3480 9,915.7470
N'' B9-49-11,41 E 46.7170
Ell 12,397,4949 9,962.463B
5 0-10-46.52 E 1,529,048E
999 10786E.4536 9,967.2713
N B7-49-25.98 N 503.3615 '
996 10,667,5669 9,464.2728
Ar#a_; '750764;1167>xq.-.4mi
Aria = -.17.2352 arms
Erro- cf closure :. 1 in I000G000.00GU
--------------------------------------------------------------------------------
qJanuary 6, 1986
THE
Engr.Division
CAMPANELLA � City of Renton,WAGROUP INC.
ARCHITECTS
CONSULTANTS
PLANNERS City of Renton Public Works
200 Mill Ave. South
Renton, WA 98055 'JAN T 1M
Attn: Mr. Bob Bray
Subj : RENTON VOCATIONAL TECHNICAL INSTITUTE
RENTON, WASHINGTON
Re: Street Construction along Northeast 7th Street
Dear Mr. Bray:
Please be advised that Merlino Construction has
installed curb cut and drive entry to the Construction
Technology Building in a inconsistent location. This
inconsistency is in regards to our contract documents
and the location indicated therein.
We are formerly requesting that Merlino Construction
relocate the existing entry to the correct location.
This correction must be made to accommodate the grading
and parking areas involved in the Construction
Technology Building parking lot and entry.
If you have any questions, please contact our firm.
Respectfully,
Dennis C. Kabba, AIA
Construction Administrator
DCK/krp
cc: Neal Rudd, MAM
Brian Swanson, MAM
Mike Curran, MAN
William 0. Belmondo, RSD
Peg Staehley, Gardner Engineers
Jim Hanson, Renton Building Department
Suite 400, Maritime Building 911 Western Avenue Seattle, WA 98104 (206) 467-7666