HomeMy WebLinkAboutNORTHWEST ASPHALT V ?LW
Northwest Asphalt
Renton, Washington
Storm Drainage Report
Prepared For:
Ty H. Ribera Construction, Inc.
Prepared By:
Pacific Engineering Design, Inc.
November 6, 2000 PEDI Job No. 00040
CITY Or FIBITON
RECEIVED
NOV 0 7 2000
BUILDING DIV60N
Storm Drainage Report
Northwest Asphalt
Renton, Washington
Renton Project No. LUA00-115
Renton Permit No. B000485
November 6, 2000
Prepared For
Ty H. Ribera Construction
13029 136th Avenue, SE
Renton, WA 98059
(425) 430-1300
Prepared By
Pacific Engineering Design, Inc.
4800 S. 188th Street, Suite 360
Seattle, Washington 98188
(206) 431-7970
I� t�
Table of Contents
Section 1 Project Overview................................................................ 2
Section 2 Site Analysis and Design.................................................... 3
Section 3 Conveyance System and ESC Analysis and Design.......... 4
Section 4 Drainage Calculations ........................................................ 5
Section 1: Project Overview
In response to the City of Renton's comments, the grading plan has been revised and a
stormwater facility has been designed. Per City of Renton regulations, the criteria used in
the design of the storm drainage system were the 1990 King County Surface Water
Design Manual.
This permit application includes proposed grading as well as work that has already been
completed. It is estimated that an area of 0.82 acres has already been filled. The owner
proposes to fill an additional area of 1.45 acres. The total area of post-construction
impervious surface is 3.23 acres (which includes 1.78 acres of existing impervious and
assumes that the entire 1.45 of fill area will be impervious surface).
The grading was revised in order to provide a buffer for the offsite wetland that exists
adjacent to the southwest corner of the site. This wetland will be retained as part of the
ongoing construction of the neighboring Maplewood Plat. Per the City of Renton, the
buffer has been established at 37.5 feet. A wetlands biologist has designed a planting
plan for this area. The proposed fill will be to the north and east of this area. The pond
will be constructed in the new fill area. The bioswale will convey the outflow from the
detention pond to its historical release point near the offsite wetland.
To mitigate drainage impacts to the surrounding watershed from both the proposed and
previous fills, a stormwater retention/detention pond will be constructed on the southern
portion of the site. A biofiltration swale downstream of the pond will provide water
quality treatment. This swale design will allow for sedimentation of the on-site
stormwater runoff. The outflow control structure and live storage have been designed
such that discharge from the pond will be limited to estimated pre-development levels.
Discharge from the swale will outlet at the edge of the wetland buffer and flow downhill
and offsite into the wetland itself.
Section 2: Site Analysis and Design
The property lies within the drainage basin of the lower Cedar River. The flow of surface
water across the site is generally to the southwest. Immediately downstream of the site,
stormwater runoff passes into a large offsite wetland (approximately 1 acre). This
wetland will have a constructed outlet and will be incorporated into the drainage system
of the neighboring plat of Maplewood Estates. As outflow from the wetland enters the
storm drainage system, it will be conveyed into the storm drainage pond that is part of the
new construction.
Downstream flooding is not considered a major risk at this site. Flow leaving the site
will be restricted to pre-existing levels and water quality treatment will be provided. This
should minimize impact to the downstream area and the surrounding watershed. The
large wetland area just downstream of the project site will provide storage volume for
larger storm events. There are no anticipated backwater effects that could possibly
impact offsite regions upstream of the subject property.
Site hydrology has been analyzed using Waterworks software. The site area was
analyzed as a single drainage basin. The pond and outflow control structure were sized to
match the 2 and 10-year 24-hour storm events. The existing- et"conditions use in
the analysis are the estimated site condi ' ns prior-to recent fill�hese nclude an
existing impervious area of 1.78 acres. In this analysis,the remainder of the pre-existing
site was assumed to be grassy. In calculating the post-development flows, it was
assumed that all of the proposed fill area will be impervious surface. (See following
Drainage calculations)
The required water quality treatment for this site will be satisfied by the construction of a
bioswale. All of the discharge from the detention pond will be routed through the
bioswale before being released near the offsite wetland.
2
Section 3: Conveyance System and ESC Analysis and Design
The placement of the detention pond and the site grading will serve to convey most of the
site's stormwater runoff into the detention pond. This will provide water quality
treatment of runoff from the on-site areas most likely to contain sediment or other
pollutants. During construction, a temporary pond will serve as an erosion and sediment
control pond to treat site runoff. On-site flows will be conveyed into the pond and
retained, to allow sedimentation (see Erosion and Sediment Control calculations).
The wetland adjacent to the southwestern corner of the property will be protected by a
37.5-foot buffer. Just outside of this buffer, silt fences will be installed along the
southern and western edges of the property. These are intended to limit the transport of
sediment from the site during construction activities. Constructed fill slopes will be
vegetated in order to protect against erosion. The detention pond will provide a half-foot
of dead storage depth. This volume will allow for some sedimentation of site runoff. As
a further water quality protection, a bioswale will convey and treat discharge from the
pond prior to its release.
Outflow from the pond will be restricted by a FROP-T control structure located in a
manhole adjacent to the pond. The manhole will provide access for maintenance to the
control structure. There will be 4 feet of dead storage in the manhole below the outlet
that will provide some volume for sediment. The control structure consists of a 12-inch
diameter riser pipe equipped with 2 orifices to meter flow. The riser pipe connects to an
outlet pipe that empties onto the bioswale.
All of the pond discharge will pass through the control control structure and be released
onto the bioswale. Outflow from the bioswale will be released on-site. Installation of a
flow spreader and rock pad at this release point will disperse flow and prevent erosion.
The bioswale has been designed per the KCSWDM and is intended to provide removal of
suspended solids as well as biological uptake of pollutants (See the Swale Design
calculations following this section).
4
Section 4:
Drainage Calculations
OAJ
Al" ;s
Ilk
aj
dr� CCT
a w w�wi� w� 14 ✓ I N �A
UR
g
SIR
I ON4•a ��:
-
4
lst € ,r ,¢� dk€ks.' ,, pp��, 'tr'R�'I �R�x.:Z.� _ - ___._.' ('�• g Ce I
i����9"t€6R'�'dC9� 2:�[C i k�(M.d4 k(.F �a� aR tlCx'a ( i.i'� • l�tG A/Q�6/Yj 4 �l L
k
RIP
ARw€RaWS"r un€RI16RGP�'" y� 4
OW Rtikka Arl Rpc
on
RaKIM
.; n`€ '{, s,?" +�
e�"ks. k €pz 4
4rr'4
"�R
R�;:ck s4;ttfR„,€IkyR gel"air{ K� ,`RCu .d'�
r
i
AsP�,.(t
tit : 1061
off.
PACIFIC ENdNEERINQ DESIGN INC. PHONE LOG ❑ CONFERENCE ❑
CIVIL ENGINEERING AND PLANNING CONSULTANTS MEMO ❑ INFO ❑ DISTRIBUTION:
PROJECT t j2"Ji PROJECT NO. Q 66 41
INCOMING CALL ❑
DATE QTIME OUTGOING CALL ❑
PERSON +Gy t- h I Lk PHONE NO.
Co FAX NO. FILE ❑
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
I ta. •
.. F .fi. A 0..
:....:....:... :..................
I.... .... .... .... �-�;.� .... .... ...Alkr�!d e) ... 14. .E . Gl .... C .
�.I \ r
:....:........................
'....:....:....:....:....�.................:....:....:....:.. .:
:....:....:....:... ..:..`V 1 t:.... 1�1h : �a�I1K :�I ��/� ... .. ... .... .................................................
11t
.... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... CTr - .. s. .... ....`. .... .... .... .... .... .... .... .... .... .... .... ....
:....:....:....
...... : . ... ..I. ..:............. :....:....�:.i . .; :. . :. .�,,.. tl�.vi:oVS....:rsd�'fa[Ie. : �- : �:`9•tO�t:�:.^.:�..�.�2..:^ 1 .:78�a�:... ..
:.... ....:....:`.. .... .. ... .
4-6 5±+.dp' 4-:7 :(.'�� 3', id a
f
tA&
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.... .... .... . 4.'� �. . ...1�✓ ''.. ..f!'` Cwt!� 'nir�. ..a.�Ca. .... 6. .28'4 .1 ...'.... 1�. ' S` �. .... .... .... .... ..
I.... .... ....`..:....:•
.
:....:.. .:....
.... .... .... .... .... .... .... .... .
...:....:....:.. ......:....:.. ... .:.. .:....... .:....:...... ....:... . . ... ............ ............. .
. ..... SIGNATURE
41300 S. 1 BBTH ST., SUITE 360, SEATTLE, WASHINGTON BB 1 BB 20B/431-797O FAX/431-7J75
10/5/00 9 : 38 : 50 am Pacific Engineering Design Inc page 1
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
BASIN SUMMARY
BASIN ID: EXIST002 NAME: EXISTING 2-YEAR STORM EVENT
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 4 . 78 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 2 . 00 inches AREA. . : 3 . 00 Acres 1. 78 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 85 . 00 98 . 00
TC. . . . : 29 . 78 min 29 . 78 min
ABSTRACTION COEFF: 0 . 20
TcReach - Sheet L: 300 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 . 0333
TcReach - Shallow L: 250 . 00 ks : 11. 00 s : 0 . 0320
TcReach - Shallow L: 30 . 00 ks : 5 . 00 s : 0 .2700
TcReach - Shallow L: 220 . 00 ks : 5 . 00 s : 0 . 0550
PEAK RATE: 1. 06 cfs VOL: 0 .45 Ac-ft TIME: 510 min
BASIN ID: EXISTO10 NAME: EXISTING 10-YEAR STORM EVENT
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 4 . 78 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 2 . 90 inches AREA. . : 3 . 00 Acres 1. 78 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 85 . 00 98 . 00
TC. . . . : 29 . 78 min 29 . 78 min
ABSTRACTION COEFF: 0 . 20
TcReach - Sheet L: 300 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 . 0333
TcReach - Shallow L: 250 . 00 ks : 11 . 00 s : 0 . 0320
TcReach - Shallow L: 30 . 00 ks : 5 . 00 s : 0 . 2700
TcReach - Shallow L: 220 . 00 ks : 5 . 00 s : 0 . 0550
PEAK RATE: 1. 86 cfs VOL: 0 . 75 Ac-ft TIME: 510 min
10/5/00 9 : 40 : 1 am Pacific Engineering Design Inc page 1
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
---------------------------------------------------------------------
---------------------------------------------------------------------
BASIN SUMMARY
BASIN ID: DEV002 NAME: DEVELOPED 2-YEAR STORM EVENT
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 4 . 79 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPElA PERV IMP
PRECIPITATION. . . . : 2 . 00 inches AREA. . : 1. 55 Acres 3 . 24 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00
TC. . . . . 5 . 00 min 5 . 00 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 300 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 . 0333
TcReach- Shallow L: 250 . 00 ks : 11. 00 s : 0 . 0320
TcReach - Shallow L: 30 . 00 ks : 5 . 00 s : 0 .2700
TcReach - Shallow L: 220 . 00 ks : 5 . 00 s : 0 . 0550
PEAK RATE: 1. 65 cfs VOL: 0 . 57 Ac-ft TIME: 500 min
BASIN ID: DEV010 NAME: DEVELOPED 10-YEAR STORM EVENT
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 4 . 79 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 2 . 90 inches AREA. . : 1. 55 Acres 3 . 24 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00
TC. . . . . 5 . 00 min 5 . 00 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 300 . 00 ns : 0 . 1500 p2yr: 2 . 00 s : 0 . 0333
TcReach - Shallow L: 250 . 00 ks : 11. 00 s : 0 . 0320
TcReach - Shallow L: 30 . 00 ks :5 . 00 s : 0 . 2700
TcReach - Shallow L: 220 . 00 ks :5 . 00 s : 0 . 0550
PEAK RATE: 2 . 62 cfs VOL: 0 . 90 Ac-ft TIME: 490 min
Cross Section
Cross Section for Trapezoidal Channel
Project Description
Project File p:lsdsk\proj100040\flow master\bioswale.fm2
Worksheet Northwest Asphalt Bioswale
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Bottom Width
Section Data
Mannings Coefficient 0.350
Channel Slope 0.020000 ft/ft �QtJI<vZEQ �wPv� iC. 4 t' � PA►2C��/�
14
Depth 0.50 ft
Left Side Slope 3.000000 H : V
Right Side Slope 3.000000 H : V
Bottom Width 8.20 ft EVE`e
Discharge 1.65 cfs
3
0.50 ft
J 1
8.20 ft V
H 1
NTS
17 /
10/09/00 FlowMaster v5.13
01:36:36 PM Haestad Methods,Inc. 37 Brookside Road Waterbury,CT 06708 (203)755-1666 Page 1 of 1
Northwest Asphalt Bioswale
Worksheet for Trapezoidal Channel
Project Description
Project File p:\sdsk\proj\00040\flow master\bioswale.fm2
Worksheet Northwest Asphalt Bioswale
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.030
Channel Slope 0.022500 ft/ft
Left Side Slope 3.000000 H : V
Right Side Slope 3.000000 H : V
Bottom Width 8.00 ft
Discharge 4.00 cfs iQ q c 6 flA96-5- 15
Results ..r
Depth 0.20 ft ¢ V151- ^. 5=tv
Flow Area 1.68 ftZ '
Wetted Perimeter 9.24 ft
Top Width 9.17 ft
Critical Depth 0.19 ft
Critical Slope 0.023395 ft/ft
Velocity 2.38 ft/s
Velocity Head 0.09 ft
Specific Energy 0.28 ft
Froude Number 0.98
Flow is subcritical.
'rH t5 Stt�>�; �q��-• -r=-�� DES t g
ill ru Aew Ca at✓E Y Tff� f D� - 1'E'rg .�T� � .
10/10/00 FlowMaster v5.13
10:43:30 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203)755-1666 Page 1 of 1
1019100 3 : 24 : 14 pm Pacific Engineering Design Inc page 2
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
---------------------------------------------------------------------
---------------------------------------------------------------------
STAGE STORAGE TABLE
CUSTOM STORAGE ID No. DES VOL
Description: -T= � STORAGE IN DESIGN POND
STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE---->
(ft) ---cf--- --AC-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft-
446.50 0.0000 0.0000 447.40 734.95 0.0169 448.30 2023 0.0464 449.20 3973 0.0912
446.60 61.950 0.0014 447.50 841.25 0.0193 448.40 2239 0.0514 449.30 4189 0.0962
446.70 123.90 0.0028 447.60 947.55 0.0218 448.50 2456 0.0564 449.40 4406 0.1011
446.80 185.85 0.0043 447.70 1054 0.0242 448.60 2673 0.0614 449.50 4623 0.1061
446.90 247.80 0.0057 447.80 1160 0.0266 448.70 2889 0.0663 449.60 4839 0.1111
447.00 309.75 0.0071 447.90 1266 0.0291 448.80 3106 0.0713 449.70 5056 0.1161
447.10 416.05 0.0096 448.00 1373 0.0315 448.90 3323 0.0763 449.80 5272 0.1210
447.20 522.35 0.0120 448.10 1589 0.0365 449.00 3539 0.0813 449.90 5489 0.1260
447.30 628.65 0.0144 448.20 1806 0.0415 449.10 3756 0.0862 450.00 5706 0.1310
,STo(LA-6-9;- VaL,L)M6�- tjL) vo
�oTira j.A 5 Ev.
10/9/00 3 : 24 : 14 pm Pacific Engineering Design Inc page 1
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
STAGE STORAGE TABLE
CUSTOM STORAGE ID No. DES_LIVE
Description: LIVE STORAGE IN DESIGN POND
STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE---->
(ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --AC-Ft- (ft) ---cf--- --Ac-Ft-
447.00 0.0000 0.0000 447.80 850.40 0.0195 448.60 2363 0.0542 449.40 4096 0.0940
447.10 106.30 0.0024 447.90 956.70 0.0220 448.70 2580 0.0592 449.50 4313 0.0990
447.20 212.60 0.0049 448.00 1063 0.0244 448.80 2796 0.0642 449.60 4529 0.1040
447.30 318.90 0.0073 448.10 1280 0.0294 448.90 3013 0.0692 449.70 4746 0.1090
447.40 425.20 0.0098 448.20 1496 0.0344 449.00 3230 0.0741 449.80 4963 0.1139
447.50 531.50 0.0122 448.30 1713 0.0393 449.10 3446 0.0791 449.90 5179 0.1189
447.60 637.80 0.0146 448.40 1930 0.0443 449.20 3663 0.0841 450.00 5396 0.1239
447.70 744.10 0.0171 448.50 2146 0.0493 449.30 3879 0.0891
10/9/00 3 : 23 : 39 pm Pacific Engineering Design Inc page 1
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
---------------------------------------------------------------------
---------------------------------------------------------------------
DISCHARGE STRUCTURE LIST
MULTIPLE ORIFICE ID No. HOLE
Description: ORIFICES FOR OUTFLOW CONTROL
Outlet Elev: 447 . 00
Elev: 445 . 00 ft Orifice Diameter: 5 . 7891 in.
Elev: 448 . 50 ft Orifice 2 Diameter: 5 .4844 in.
COMBINATION DISCHARGE ID No. OUTLET
Description: OUTFLOW CONTROL STRUCTURE
Structure: HOLE Structure:
Structure: RISER Structure:
Structure:
RISER DISCHARGE ID No. RISER
Description: 12" DIAMETER RISER PIPE
Riser Diameter (in) : 12 . 00 elev: 449 . 00 ft
Weir Coefficient. . . : 9 . 739 height : 450 . 00 ft
Orif Coefficient. . . : 3 . 782 increm: 0 . 10 ft
1019100 3 : 24 : 32 pm Pacific Engineering Design Inc page 1
NW ASPHALT
DRAINAGE CALCULATIONS
PED #00040
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> OUTFLOW STORAGE
<--------DESCRIPTION---------> (cfs) (cfs) --id- --id- <-STAGE> id (cfs) VOL (cf)
MATCH 2-YEAR STORM ........... 1.06 1.65 DES LIVE OUTLET 448.29 1 1.03 1689.01 cf
MATCH 10-YEAR STORM .......... 1.86 2.62 DES LIVE OUTLET 448.91 2 1.18 3043.22 cf
PACIFIC ENaINEERIN® ®ESK3N INC. PHONE LOG ❑ CONFERENCE ❑
DISTRIBUTION:
CIVIL ENGINEERING AND PLANNING CONSULTANTS MEMO ElINFO ❑
r
PROJECT '�.o K r' F' PROJECT NO. . j,m
INCOMING CALL ❑
I DATE _ —' � TAPE OUTGOING CALL ❑
PERSON PHONE NO.
COMPANY FAX NO. FILE O
i....:........................:...
:....:....:....:....:....i....:.... .... .. .c :... .... .....i ......i
. . .
............:... ..
�enP[i�rF ZF 'tl,$- ' : ' 'ats':i` ZI�7rSrC't: 'r'�. 2 �Gs�r✓30�"t'c.
..... :....:.........>>
t....:........... ..t.� Fr`�"F!?!'�t??.it..�i.... .l.A .
:J
......:....:.......................................
_. :4. . ..�. T .tic. �:Z,: :� r �rtt#-. zf, �f•-? ff"�' 't?.a
�. . '. �... R.
.:....................................................
b0.
• -� . ........................
.SlZ t�FIG
...:....: ...: ,.. . :..
. : .
D -. . -. .ao — *. _� MSc-: ! ii' J#��vE.
.. ::4
......................................................... ... .......
. . . . . . . . . . . . . .
. . . . . . . . . . : . .
'.
43 .. .5 .
� .� .jft.
S:. �.. q.. .�..
L...:....:....:....:....:....:....:...
. . .:....:....:... ........... ...
$' : 'SIGNAT<URIE
4800 S. 1 SSTH ST., SUITE 380, SEATTLE, WASHINGTON 981 88 206/431—7970 FAX/431—7975
poll
� "•/L-L Get.q� <./✓G t.on,6� .'C.
�'f �►�S �1<� con s�c-�-TKO
Ae—
C.✓i�o� �.l if.. , T r
/S
[IlCentrallSys2lPI4ZZAIMrSIDIDataIRENTON I.SIDJ Scale 1:3884.178
Ply
AL
MrSID Viewer
[IlCentrallSys2lPI4ZZAIMrSIDIDataIRENTON 2.SID] Scale 1:3570.317
MrSID Viewer