Loading...
HomeMy WebLinkAboutMFP24002985.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24002985 IVR Number: 24002985 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:06/11/2024Application Date:2143701210Parcel Number: 520 SW SUNSET BLVD Permit Type:06/26/2024Issue Date:Franchise Permit Work Class:06/26/2025Expiration Date:Minor Utility Job Number: 101174815Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REPLACE DAMAGED POLES AT P03) 317764 165650 AND P02 (317748 165645). CREW TO REPLACE EXISTING OH WIRE BETWEEN P03 P02. CREW TO PARK AT P01 (317748 165632) TO SWING EXISTING OH SERVICE WIRE. NO HS CUTS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101174815 520 SW Sunset Blvd Tony Contreras 206-637-3648 Monday Friday 9:00am 3:00pm Scott Warlick CED 6/26/2024 MFP24002985 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG #520P01P02P03STEVENS AVE SW BUSSTOPBUSSTOPSW SUNSE T B LVDSW SUNSET BLVDSW SUNSET BLVDSTE V E N S A V E S W SW 3RD PL111111111010 LIND AVE SW11112020131112111112111111111211111111121111111113111111111111 ARRW-BRDR11-2STREETCLOSEDW20-1ROAD WORK AHEA D RIGHT L A N E CLOS E D AHEA D W20-5RW4-2R35 0 ' ≥350'≥350 '≥W20-1ROADWORKAHEAD350'≥W20-1ROADWORKAHEAD10 0 ' ≥ W20-1 ROADWORKAHEAD100'≥W20-1ROADWORKAHEAD100'≥ 100'≥ W20- 3 ROADCLOSEDAHEADLOCALACCESSONLYSTREET CLOSEDTOTHRU TRAFFICR5-133R11-4S/WCLOSEDR9-9DETOURM4-9BMOVE BUS STOP 75' WEST.KING COUNTY METRO WILL BECONTACTED AT 206-477-1150 FIVE DAYSIN ADVANCE OF SCHEDULED DATE.RESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREADA COMPLIANTCURB RAMPCUSTOMER OUTREACH TO INFORMRESIDENTS OF ROAD CLOSUREPRIOR TO WORK START.CREW TO FACILITATE EMERGENCYVEHICLES ACCESS WHEN NEEDED.1818NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com1 OF 3520 SW Sunset Blvd, Renton0 51495504906/05/2024LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYCHEVRONARROW BOARDPOLEMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flagges shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-11050MFP24002985 WORK A R E A DETOURM9-4RDET O U R M4-9LProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVFlaviana Nunes425-424-7386flaviana.rodriguesnunes@pse.com2 OF 3520 SW Sunset Blvd, Renton0 51495504906/05/2024TEMPORARY TRAFFIC CONTROL PLANDETOUR MAP FOR CLOSURE ON STEVENS AVE SWPuget Sound EnergyTraffic Control Supervisor:Flaviana R. NunesCard No. 013414Card Exp. 11/2026flaviana.rodriguesnunes@pse.com(425)424-7386NMFP24002985 #520 P01 P02 P03 STEVENS AVE SW18 18 BUS STOP BUS STOP SW SUN S E T B L V D SW SUNSET BLVD STEVENS AVE SWSW 3 R D P L 11 11 STEVENS AVE SW11 11 101013 11 12 11111211111111121111111113111111111111RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS BOTH SIDES OF WORK AREA STOP STOP STOP W20-1ROADWORKAHEADW20-4ONE LANEROADAHEAD100'≥100'≥100'≥W20-7AW20- 1ROADWORKAHEAD BEPREPAREDTOSTOPW3-4 100'≥ 100'≥ 100'≥W20-7AW20-1RO A D W O R K AH E A D W20-4ON E L A N E RO A D AH E A D100'≥100'≥100'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4350'≥ 350'≥ 350'≥ W20-7A W20-1ROADWORKAHEAD BEPREPAREDTOSTOPW3-4 350'≥350'≥350'≥W20-7AN SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 3 OF 3520 SW Sunset Blvd, Renton 0 514955049 06/05/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, signaling and flagges shall conform to WAC 296-155-305. Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY FLAGGER STOP POLE TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Flaviana R. Nunes Card No. 013414 Card Exp. 11/2026 flaviana.rodriguesnunes@pse.com (425)424-7386X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-11050 MFP24002985 357 380 400 440 361 523 520 524 371 532 438 525 SW SUNS E T B L V DSTEVENS AVE SWSW SUNSET BLVD STEVENS AVE SWDWY #6 CUBEAR 17 65' EOP 100' ROW 317724-165626 317747-165598 317748-165632 317748-165645 50 KVA 120/240V (B) 317764-165650 37.5 kVA 120/240V (B) T92644 (25T) 317736-165648 317735-165648#2 ACSRCREW TO SWING OH SVC WIRE TO NEW METER LOCATION 604 510 TREE REMOVAL REQUIRED 317766-165637 15 kVA 120/240V (B)EAR17DEEP SET POLE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.4782, -122.2247 Owner / Developer Contact Info officeATTN: DOUGLAS DO 520 SW SUNSET BLVD RENTON, WA 98057 ALLYSSA MONTAGUE 425-309-2407 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE EAR-17 11/23 187.00 128.00 205.00 0.00 1.89 0.00 187.00 129.89 205.00 Service OH Misc Xfmr Transfer Pole & Wire Removal Superior ORDER#NOTIF# PWR PROJECT PHASE 593258515514962230 593258514 583076923 108156349 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. SCALE: 1" = 50'101174815THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101174815514955049 CIRCUIT FEET ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1580 SQ. FT. 200 AMPS ELECTRIC 12.9 KW 80A 2.8 % 3.0 % 00 1"2" 00 50'100' PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. CONTRERAS 206-637-3648 5/3/24 H. DAY 253-243-5816 5/3/24 H. DAY 253-243-5816 5/3/24 NOT REQUIRED RENTON DOUGLAS DO OH L/E, OH SEC WRECKOUT, B/O POLE, POLE REPLACE & MOD SERVICE 520 SW SUNSET BLVD, RENTON, WA, 98057 N/A N/A N/A 101174815 AS SHOWN 1 OF 1 KING N/A N/A CSPSKEPM SW 18-23N-05E N/A N/A 2305E071 2305E076 2305E071 EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:TONY CONTRERAS 206-637-3648 TONY.CONTRERAS@PSE.COM JOB SITE JOB SITE SITE SPECIFIC NOTES AT P01: 317748-165632 -EXISTING 40' FOREIGN OWNED SERVICE POLE TO REMAIN. AT P02: 317748-165645 (REPLACE) -TOP EXISTING POLE 2017 35' CL-2 POLE AT COMMS LEVEL -REMOVE ALL PSE EQUIPMENT -INSTALL (1) 50' CL-3 DISTRIBUTION POLE W/ GROUNDS AS STAKED (DEEP SET) 6010.1000 (PD503) -INSTALL 1Ø SINGLE PHASE DEADEND FRAMING PER STD 6031.1040 (DE2115) -INSTALL (1) STIRRUP & HOT CLAMP, TAP B PHASE (MID: 2254000 & 2153100) -INSTALL (1) 50KVA 120/240V OH XFMR W/LB C/O (FUSE @ 15T) 6025.1000 (TRFRXF) -INSTALL (2) 4" RIGID CLEVIS, NEUTRAL IN COMMON POSITION PER STD 6015.1000 (INDNRC) -TRANSFER EXISTING SERVICES TO NEW OH TRF -INSTALL GRID NUMBER -POLE STUB TO BE REMOVED ONCE COMMS ARE TRANSFERRED AT P03: 317764-165650 (REPLACE) -TOP EXISTING B/O POLE 1987 40' CL-3 POLE AT COMMS LEVEL -REMOVE ALL PSE EQUIPMENT -INSTALL (1) 45' CL-3 DISTRIBUTION POLE W/ GROUNDS AS STAKED 6010.1000 (PD453) -INSTALL 1Ø SINGLE PHASE DOUBLE DEADEND FRAMING PER STD 6031.1043 (DDE2115) -TRANSFER (1) 12KV 200 AMP OH/UG TERMINATION AND OH FUSE TO NEW POLE -INSTALL (1) STIRRUP & HOT CLAMP, TAP B PHASE (MID: 2254000 & 2153100) -TRANSFER EXISTING 37.5KVA 120/240V XFMR TO NEW POLE -INSTALL (2) 4" RIGID CLEVIS, NEUTRAL IN COMMON POSITION PER STD 6015.1000 (INDNRC) -TRANSFER (4) 3" SECONDARY RISERS ON NEW STANDOFF BRACKETS TO NEW POLE -TRANSFER (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS TO NEW POLE -TRANSFER EXISTING SERVICES TO NEW OH TRF -INSTALL GRID NUMBER -POLE STUB TO BE REMOVED ONCE COMMS ARE TRANSFERRED M01 AT "520": NEW METER BASE -INSTALL 200A METER M02 AT "520": EXISTING METER BASE -REMOVE EXISTING METER SITE SPECIFIC NOTES -SEE SITE PLAN AND TABLES FOR NEW INSTALLS AND REMOVALS 3-13 2X3-3 2-129 3-10 WIRE STRINGING PRIMARY & SECONDARY Location Usage Wire Size & Type Quantity of wires Length (per wire)TotalFromTo P03 P02 PRI #2 ACSR 1 160' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS Wk Loc Pole Data Pole TEL TV FIBER TRAN RMVD ID NUMBER Grid #Length Class Year TOPPED RMVD P02 317764-165650 35'2 2017 P03 317748-165645 40'3 1987 POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02 317764-165650 45'CL-3 P03 317748-165645 45'CL-3 SECONDARY CABLE REMOVAL TABLE Work Location Wire Size Quantity Length (per conductor) Remarks From To P03 P02 1/0 OH TPX 1 160' MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING 18" MIN 18" MIN 24" MAX *FLASHING IN COURSES OF SHINGLES MINIMUM 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERS OR STUDS WITH HOLE BORED FOR SNUG FIT 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERS AND AGAINST ROOF SHEATHING RIGID STEEL CONDUIT STRUCTURAL FRAMING AND FINISH MATERIALS STUD GROUND * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING FRONT VIEW GALVANIZED LAG-BOLT INTO FRAMING MEMBER HEAVY-WALL STRUT-TYPE CHANNEL HEAVY-WALL STRUT-TYPE CHANNEL 18" MIN 24" MAX * SERVICE DROP DETAIL BLOCKING BETWEEN MAST AND BUILDING 5/16" U-BOLTS 2" x 6" BACKING SHIM METER BASE/SOCKET AND FASTEN WITH SCREWS FLUSH METER SOCKET GROUND RIGID STEEL STRUCTURAL FRAMING AND FINISH MATERIALS 24" MAX * SERVICE DROP SERVICE BRACKET FLASHING MAST HEIGHT BELOW 26" METER FLUSH MOUNTED SERVICE DROP WEATHERHEAD MINIMUM 2' x 6" BETWEEN RAFTERS WITH HOLE BORED FOR SNUG FIT RIGID STEEL CONDUIT UN-GUYED SERVICE MAST DETAIL SCALE: NONE Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 50kVA 120/240v 6211350 P02 317748-165645 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites SERVICE LINE (UTILITY OWNED) SERVICE MAST CONNECTION POINT 24' 16-1/2' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE TOP VIEW 18" MIN 3' MIN WORKING SPACE 18" MIN 3' MIN 4' MIN 6' MAX 5' PREFERRED 6" MIN 6' MAX 3' MIN 3' MIN Neare s t S i d e W a l l or Ob s t r u c t i o n An y O b s t r u c t i o n Ab o v e M e t e r Me t e r E n c l o s u r e Working SpaceMETER CLEARANCES SCALE: NONE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. 3-11 New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P03 317764-165650 37.5kVA 2-129 Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CLDirection of Vehicular TrafficC LTOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P03) SCALE: NONE 4'x4' Work Pit T. Van Santford 253-318-6897 08/07/2024 RESTORATION PER CITY OF RENTON STANDARDS MFP24002985