HomeMy WebLinkAboutSS21002858 Groundwater Discharge - Park Ave NDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Sewer Ground Water Discharge Permit: SS21002858
IVR Number: 21002858
Permit Informaon
Permit Name:Park Avenue North Extension Project
Address/Locaon :06/18/2021Application Date:0823059027Parcel Number:1095 LAKE WASHINGTON BLVD N
Permit Type:06/18/2021Issue Date:Sewer
Permit Work Class:06/20/2022Expiration Date:Ground Water Discharge
Description:Groundwater Discharge Permit for installation of Ductbank. Discharge from Baker Tank directly into King County
Sewer Main. Park Ave N extension. CAG 17 082.
Contacts
Name Address PhoneTypeBilling
Hebe Bernardo
City of Renton - Transportation
1055 s grady way
renton, WA 98057
C: (206) 503-4194Applicant
Gary Merlino
Gary Merlino Construction Co Inc
9125 10th Ave S
Seattle, WA 98108-4612
B: (206) 762-9125Contractor
Business License Number: 24454Construction Contractor: GARYMCC150MW
Business License Number: 26062Construction Contractor: GARYMCC150MW
Business License Number: 36985Construction Contractor: GARYMCC150MW
Business License Number: 39705Construction Contractor: GARYMCC150MW
Business License Number: 4016Construction Contractor: GARYMCC150MW
Ross Widener
Widener & Associates
10108 32nd Ave W, Suite D
Everett, WA 98204
B: (425) 503-3629EngineerX
Jeanette Widener
DGK Inc dba Widener and Associates
1902 120th Pl SE
Everett, WA 98208
B: (425) 332-3961
C: (425) 418-7162
O: (425) 332-3971
Engineer
Mike Colville
Gary Merlino Construction Company Inc
C: (206) 423-6249On-Site
Contact
SOUTHPORT LLC 1083 Lake Washington Blvd N
Renton, WA 98056
Owner
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Mark Clement
BOEING COMPANY THE
737 Logan ave N. MC 66-102
Renton, WA 98055
B: (425) 229-4279Owner
BNSF BNSF 625 S 4th StOwner
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Sanitary Sewer billing commences when this permit is finaled.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 3THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Sewer Ground Water Discharge Permit: SS21002858
(Date)(Signature)
Page 2 of 3THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES