Loading...
HomeMy WebLinkAboutSS21002858 Groundwater Discharge - Park Ave NDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Sewer Ground Water Discharge Permit: SS21002858 IVR Number: 21002858 Permit Informaon Permit Name:Park Avenue North Extension Project Address/Locaon :06/18/2021Application Date:0823059027Parcel Number:1095 LAKE WASHINGTON BLVD N Permit Type:06/18/2021Issue Date:Sewer Permit Work Class:06/20/2022Expiration Date:Ground Water Discharge Description:Groundwater Discharge Permit for installation of Ductbank. Discharge from Baker Tank directly into King County Sewer Main. Park Ave N extension. CAG 17 082. Contacts Name Address PhoneTypeBilling Hebe Bernardo City of Renton - Transportation 1055 s grady way renton, WA 98057 C: (206) 503-4194Applicant Gary Merlino Gary Merlino Construction Co Inc 9125 10th Ave S Seattle, WA 98108-4612 B: (206) 762-9125Contractor Business License Number: 24454Construction Contractor: GARYMCC150MW Business License Number: 26062Construction Contractor: GARYMCC150MW Business License Number: 36985Construction Contractor: GARYMCC150MW Business License Number: 39705Construction Contractor: GARYMCC150MW Business License Number: 4016Construction Contractor: GARYMCC150MW Ross Widener Widener & Associates 10108 32nd Ave W, Suite D Everett, WA 98204 B: (425) 503-3629EngineerX Jeanette Widener DGK Inc dba Widener and Associates 1902 120th Pl SE Everett, WA 98208 B: (425) 332-3961 C: (425) 418-7162 O: (425) 332-3971 Engineer Mike Colville Gary Merlino Construction Company Inc C: (206) 423-6249On-Site Contact SOUTHPORT LLC 1083 Lake Washington Blvd N Renton, WA 98056 Owner CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Mark Clement BOEING COMPANY THE 737 Logan ave N. MC 66-102 Renton, WA 98055 B: (425) 229-4279Owner BNSF BNSF 625 S 4th StOwner General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Sanitary Sewer billing commences when this permit is finaled. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Page 1 of 3THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Sewer Ground Water Discharge Permit: SS21002858 (Date)(Signature) Page 2 of 3THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES