Loading...
HomeMy WebLinkAboutConcrete Compressive Strength Test.Southport Park Avenue Extension (T).2021-12-03.M7211711.0003ARev2Report Number: Service Date: Report Date: Task: Client Renton, WA 1095 Lake Washington Blvd. North Southport Park Avenue Extension (T)SECO Development Attn: Accounts Payable 1133 Lake Washington Blvd N Ste 90 Renton, WA 98056-6489 425-742-9360 Lynnwood, WA 98036-6365 20225 Cedar Valley Rd Ste 110 M7211711.0003A 12/03/21 12/30/21 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: M7211711 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 0442A Miles Material Information 0655 1149 Plant: Ticket No.: 202 267493 Field Test Data Test Air Content (%): Result Specification 4 3/4 4.7 64 Max 90 37 4,000 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:12/03/21 0745 Joseph Allen Clear 11 11 15 0 North end of west half of ramp slab.Sample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Park Ave North extension ramp and sidewalk. Placement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Max Strength Comp Frac No.ID Spec Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested ByCond. 1 1 3.99 12.5 12/06/21 12/10/21 7 45,910 3 3,670 MAGGood 1 2 3.99 12.5 12/06/21 12/31/21 28 62,200 3 4,970 ASKGood 1 3 4.00 12.57 12/06/21 12/31/21 28 62,330 2 4,960 ASKGood 1 4 3.99 12.5 12/06/21 12/31/21 28 63,400 3 5,070 ASKGood Average (28 days) 5,000 Initial Cure:Final Cure:Covered with Plastic Moist Room Sample Description:4-inch diameter cylinders Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. 60 cubic yards placed. Samples Made By: Mayes/Terracon Special Inspections / Materials TestingServices: Reported To: Contractor: Report Distribution: (1) City of Renton WA, Michael Sippo (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Mark Gordon (1) SECO Development, Derek Janke Mark Gordon Department Manager III SECO Development Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Mayes/Terracon Rep.: Joseph Allen The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1CR0001, 11-16-12, Rev.6