HomeMy WebLinkAboutConcrete Observation.Southport Park Avenue Extension (T).C19002723.2021-12-03.M7211711.0003CONCRETE OBSERVATION REPORT Report Number:M7211711.0003 Service Date:12/03/21 20225 Cedar Valley Rd Ste 110 Report Date:12/06/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project SECO Development Southport Park Avenue Extension (T) Attn: Accounts Payable 1095 Lake Washington Blvd. North 1133 Lake Washington Blvd N Ste 90 Renton, WA Renton, WA 98056-6489 Project Number: M7211711 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Joseph Allen Reported To:SECO Development Contractor:SECO Development Report Distribution: (1) City of Renton WA, Michael Sippo (1) Mayes Testing Engineers, Inc, Belinda Rix(1) Mayes Testing Engineers, Inc, Mark Gordon (1) SECO Development, Derek Janke Reviewed By:__________________________________ __ Dennis Sanborn Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.CT0001, 10-16-13, Rev.10 Page 1 of 1 Permit No.: C19002723 GENERAL INFORMATION On site for concrete placement inspections of the west half of the ramp and sidewalk for the Park Avenue north extension. The ramp and sidewalk inspected to plan and notes on C401 of project drawings. The ramp reinforcement was placed per detail 8/C410, and the sidewalk to detail 7/C410 and is non-reinforced. CONCRETE PLACEMENT Observed concrete placement as follows: Element Location Yardage Supplier Mix ID Mix Description See above See above 60 Miles 0442A 4000 psi at 28 day Placement Method: pump and truck discharge Consolidation Method: mechanical TESTS PERFORMED The following field tests were performed: Slump (4-3/4”), Air Content (4.7%), Concrete Temp. (67°F), Ambient Temp. (37°F). A total of (4) compressive strength specimens [1 Set] were fabricated for lab-curing. The results of observation(s) for today were reported to the contractor. COMMENTS Ramp was placed via pump and mechanically vibrated for consolidation. Sidewalk was placed from truck chute and was hand-vibrated for consolidation. COMPLIANCE STATEMENT To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications.