Loading...
HomeMy WebLinkAboutConcrete Observation.Southport Park Avenue Extension (T).C19002723.2021-12-07.M7211711.0004CONCRETE OBSERVATION REPORT Report Number:M7211711.0004 Service Date:12/07/21 20225 Cedar Valley Rd Ste 110 Report Date:12/08/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project SECO Development Southport Park Avenue Extension (T) Attn: Accounts Payable 1095 Lake Washington Blvd. North 1133 Lake Washington Blvd N Ste 90 Renton, WA Renton, WA 98056-6489 Project Number: M7211711 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Marco Martinez Reported To:SECO Development Contractor:SECO Development Report Distribution: (1) City of Renton WA, Michael Sippo (1) Mayes Testing Engineers, Inc, Belinda Rix(1) Mayes Testing Engineers, Inc, Mark Gordon (1) SECO Development, Derek Janke Reviewed By:__________________________________ __ Dennis Sanborn Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.CT0001, 10-16-13, Rev.10 Page 1 of 1 Permit No.: C19002723 GENERAL INFORMATION Driveway Ramp Slab and Sidewalk Concrete Placement Observed the concrete placement for the final half of the west driveway ramp, about 105’ of sidewalk section on the south of the project, and (2) sections of sidewalk next to the building entrance adjacent to the project site. CONCRETE PLACEMENT Observed concrete placement as follows: Element Location Yardage Supplier Mix ID Mix Description See above See above 37.25 Miles 0442A 4000 psi at 28 days Placement Method: Truck chute Consolidation Method: Mechanical TESTS PERFORMED The following field tests were performed: Slump (5”), Air Content (4.6%), Concrete Temp. (60°F), Ambient Temp. (42°F). A total of (4) compressive strength specimens [1 Set] was fabricated for lab-curing. The results of observation(s) for today were reported to the contractor. COMPLIANCE STATEMENT To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications.