Loading...
HomeMy WebLinkAboutPermit PAG-18-001 PUGET The fr ner°gy To Do Great Things PERMIT FOR LIMITED USE OF OPERATING PROPERTY PERMIT NO. 20-23-05-01122018 THIS LIMITED USE PERMIT made this day of February, 2018("Effective Date") by and between PUGET SOUND ENERGY, INC., a Washington corporation ("PSE" herein)and the City of Renton ("Permittee" herein). In consideration of the mutual promises of the parties and for other good and valuable consideration, the receipt and sufficiency of which are acknowledged, the parties agree as follows: 1. Property. PSE hereby grants permission to Permittee to use the real property described on Exhibit "B"and as depicted on Exhibit"C"attached hereto and incorporated by this reference(the"Property"herein) situated in King County, Washington, subject to the terms and conditions of this Permit. 2. Term. Unless otherwise terminated pursuant to the terms hereof, this Permit will commence on the Effective Date and will expire on the date that is ten (10) years from the Effective Date (the "Term"). 3. Rent. This Permit is granted for and in good and valuable consideration to be derived therefrom ("Rent"). 4. Use. Permittee may use the Property for operation and maintenance of an existing sewer line and construction of replacement sewer line, appurtenances, and associated access improvements. ANY ADDITIONAL USE OF THE PROPERTY REQUIRES PSE'S PRIOR WRITTEN APPROVAL, WHICH PSE MAY WITHHOLD IN ITS SOLE AND ABSOLUTE DISCRETION. Permittee acknowledges that the Property is an operating utility property of PSE and that PSE may use same for the purposes of its utility business as fully as if this Permit had not been given. Permittee shall not erect any building or structures of any kind on the Property,or use the Property for any purpose other than specified in this Paragraph. Permittee shall comply with all laws and ordinances applicable to the Property and Permittee's use thereof and shall keep the Property free from any and all liens which might arise as a result of Permittee's use and occupancy of the Property. Execution of this Permit shall not override or alter existing easement rights of use of the Permittee on the Property. 5. Indemnity; Environmental. a. General Indemnity. Permittee acknowledges that the Property is subject to the hazards incident to the operation of electric and gas utility systems. Permittee hereby agrees that PSE shall not be liable for (i)any damage, injury, loss, expense or death suffered by Permittee or Permittee's agents, employees, permittees, assignees, invitees, or contractors (collectively, the "Permittee Parties") on the Property, or(ii)any damage, injury, loss, expense or death suffered by third parties, resulting from the use of the Property. Permittee will defend, indemnify and hold PSE and its affiliates,agents,servants,directors, officers and employees(the"PSE Parties")harmless from and against any and all losses,claims,demands, actions, fines, suits, damages, penalties, liabilities, expenses, and costs (including, without limitation, reasonable attorneys' fees) resulting from allegations or claims brought against PSE or the PSE Parties occasioned by (i) injuries or damages to any person or entity or damage to, or theft or loss of, property occurring in or about the Property caused by Permittee's or any Permittee Party's use of the Property, or (ii)any actual or alleged breach of this Permit by Permittee. b. Environmental Indemnity. Permittee will defend, indemnify and hold PSE and the PSE Parties harmless from and against any and all losses, claims, demands, actions, fines, suits, damages, penalties, liabilities, expenses(including, without limitation, remediation, removal, repair, corrective action, or cleanup expenses), and costs(including, without limitation, reasonable attorneys'fees, consultant fees, or expert fees)which are brought or recoverable against,or suffered or incurred by PSE or any PSE Parties, which arise from or relate in any way to Hazardous Materials that are brought onto the Property by Permittee or any of the Permittee Parties. As used herein,"Hazardous Materials"means and includes any substance, material,waste, pollutant, or contaminant listed or defined as hazardous or toxic, under any Environmental Requirements, asbestos and petroleum, including crude oil or any fraction thereof, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas); and "Environmental Requirements" means and includes all applicable present and future statutes, regulations, ordinances, rules, codes,judgments, orders or other similar enactments of any governmental authority or agency regulating or relating to health, safety, or environmental conditions on, under, or about the Property or the environment, including, without limitation, the following: the Comprehensive Environmental Response, Compensation and Liability Act;the Resource Conservation and Recovery Act; the Model Toxics Control Act, and any regulations or policies promulgated or issued thereunder. c. General Provisions. Without limiting the generality of the foregoing, for purposes of the indemnities provided pursuant to this Permit, Permittee hereby waives its immunity under the Washington State Industrial Insurance Act, Title 51 RCW, and all other applicable industrial insurance/worker's compensation acts or their equivalent in the applicable jurisdiction. In case any action or proceeding is brought against PSE.or any PSE Party and such claim is a claim from which Permittee is obligated to indemnify pursuant to this Section, then Permittee, upon notice from PSE, shall resist and defend such action or proceeding with respect to that claim (by counsel reasonably satisfactory to PSE) at Permittee's expense. The furnishing of insurance required hereunder will not limit the Permittee's obligations under this Secti.. he .e ..ations of Permittee under this Section will survive termination or expiration of this dr Per 'Zke • -4),,e lure r'— Date 3. Insurance. a. Policies. Permittee shall at all times during the Term,at its sole cost and expense, procure and maintain, or cause its agents, contractors and subcontractors to procure and maintain, in full force: i. Insurance in accordance with the applicable laws relating to Workers' Compensation and Employers'Liability insurance, regardless of whether such coverage or insurance is mandatory or merely elective under the law; ii. Commercial Auto Liability coverage including owned, hired and non-owned autos with limits of $2,000,000 per occurrence for bodily injury (including death) and property damage; iii. Commercial General Liability coverage on an "occurrence" basis, including coverage for products/completed operations, explosion, collapse and underground hazards, broad form property damage, blanket contractual liability, independent contractors and personal injury, with coverage limits of $2,000,000 for bodily injury (including death) and damage to property; and iv. Umbrella Excess Liability coverage with limits not less than $1,000,000 per occurrence. b. Insurance Requirements. All insurance required to be held by Permittee under this Permit shall: i. Be placed with such insurers and under such forms of policies as may be acceptable to PSE, having A.M. Best's Financial Security ratings of at least A-;VII; ii. With the exception of Workers' Compensation and Employers' Liability, be endorsed to name PSE as an additional insured; iii. With the exception of Workers' Compensation and Employers' Liability, apply severally and not collectively to each insured against whom claim is made or suit is brought, except that the inclusion of more than one insured shall not operate to increase the insurance company's limits of liability as set forth in the insurance policy; and iv. Provide that the policies will not be canceled or their limits or coverage reduced or restricted without giving at least thirty (30) days prior written notice to the Real Estate Department of Puget Sound Energy at its home office: Puget Sound Energy, PO Box 97034 PSE-10S, Bellevue,Washington 98009-9734. c. General Provisions. All insurance or self-insurance maintained by PSE is excess and not contributory insurance with the insurance required within this Section 6. Permittee shall ensure that any policies of insurance that Permittee or Permittee's agents, contractors or subcontractors carry against loss of or damage to property(including, but not limited to tools, equipment,vehicles,watercraft and aircraft)or against liability for property damage or bodily injury(including death) shall include a waiver of the insurer's right of subrogation against PSE. To the extent allowed by its policies, Permittee hereby waives all rights of subrogation or otherwise that Permittee may have against PSE or any insurance company arising from any risk to the extent covered by, or would have been covered by, Permittee's insurance required hereunder. Permittee shall furnish to PSE insurance certificates, or copies of policies if requested, upon mutual execution of this Permit,and thereafter,fifteen(15)days prior to the expiration date of such policies. The requirements of this Section 6 and the acceptability to PSE of insurers and insurance to be maintained by Permittee are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Permittee under this Permit. 7. Assignment; Termination.This Permit is not assignable. PSE may terminate this Permit for any reason upon ninety(90)days' notice to Permittee. 8. Surrender and Holdover. Upon expiration or earlier termination of this Permit, Permittee shall remove any personal property or facility which Permittee has placed upon the Property and shall otherwise restore the Property to as good a condition as it was prior to the issuance of this Permit. If Permittee remains in possession of the Property after the expiration or earlier termination of the Term, such possession will be month-to-month at a rate of 150% of the Rent. 9. Default. Permittee will be in default if Permittee fails to(a) pay any amount due under this Permit within 5 days after such amount is due, or(b)comply with any other provision of this Permit within 10 days after receipt of notice, provided that where any such default cannot reasonably be cured within a 10 day period,Permittee will not be in default if Permittee commences to cure the failure within the 10 day period, and thereafter diligently pursues the cure (but in no event shall such extended cure period exceed sixty (60) days). If Permittee is in default pursuant to this Section, PSE may terminate this Permit immediately upon notice to Permittee and/or pursue any other remedies at law or in equity. 10. Consequential Damages. PSE will not be liable to Permittee for consequential damages, such as lost profits or interruption of Permittee's business. 11. No Waiver. No waiver by PSE of any provisions of this Permit is a waiver of any other provisions hereof or of any subsequent breach by Permittee. 12. Miscellaneous. This Permit is governed by the laws of the State of Washington, excluding its conflicts of law rules. If any provision of this Permit is determined by any court or governmental authority to be unenforceable,the parties intend that this Permit be enforced as if the unenforceable provisions were not present and that any partially valid and enforceable provisions be enforced to the extent that they are enforceable. This Permit constitutes the complete and final agreement of the parties pertaining to the Property and supersedes the parties' prior agreements, understandings and discussions relating to the Property. No modification of this Permit is binding unless it is in writing and signed by PSE and Permittee. This Permit may be executed in any number of counterparts, each of which will be deemed an original and all of which counterparts together constitutes on agreement with the same effect as if the parties had signed the same signature page. EXECUTED as of the date first above written. ACCEPTED: City of Re . tip Puget Sound Energy, Inc. By: By: /, l S . Real E ate Rep Address: /05� �,L53! !C Phone: - Z Z't- ` n SEE SHT.2 \ POINT D EXHIBIT n C \L=49.51' PAGE 1 OF 4 R=196.00' 58'W' 00 ° N15 A=14°28'20" S22°40'20"W 1, 5°00' 4 5.79' - ,Io11II1II�IIII�IIII01111 `--/ \ 202305-9013(PTN) L=139.16' III III III - R=196..00' \ \ d=47°10 44" IIIA HIH In IIIIIIIIIIIIIII R-196 A=02°07'43" N648 07 2"VV NTS \\\ r•., L=88.11' R= \ A=25°54'22" • IN \ 202305-9013 N•\ \3�'h �(5 o �``� �^ 202305-9114 N. POINT C-T.P.O.B. N32°23'02"W N32°23'02"W 16.93' / 39.76' 96. '//�_,� LR==98.4549'' \ N22°23'12"E 32.63'77- d=56°06 3" h \ ,N, A),N26°03'28"E 69.53' 2 � / \FTti t • J. L�a� � 'S'O • , )\.::'..• • F was''�9� i < ..• .,...:0 , i N32°31'05"E • --r ', i 38.27' i �9 _ y c . 36102 :a6 t �S o S9„ $ 'S.'•IEGIcTER�•'`}4 % 11, N32°31'05"E 6'• ,1-6*:, l k 1 LP 44'.5 • 30.00' P.O.C. / I NOTE:THIS INFORMATION DOES j NOTE:PROPERTY LINE DIMENSIONS NOT REPRESENT A BOUNDARY I COMPILED FROM CALCULATED AND TCP AREA=6,9021 SQF SURVEY OR PROPERTY OWNERSHIP I RECORD SOURCES SW1/4,SEC 20,T23N.,RO5E.,W.M. CIOCITY OF RENTON StanteC THUNDER HILLS SEWER INTERCEPTOR REHABILITATION • 11130 NE 33rd Place, TEMPORARY CONSTRUCTION PERMIT PARCEL 202305-9013 Bellevue WA 98004 SCALE PLOTTING DATE DRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL tV N89°39`267"W_ 06 (DIAL) EXHIBIT "C" SEE SHT.3—/ (RADIAL) PAGE 2 OF 4 L=18.60' L=70.68' R=108.50' R=74.00' I������I)(III III���Iii���;l A=09°49'20" A=54°43'24" , NO2°03'01"E \ N52°40'23"W 24.36' i 36.51' III IIIIIIIIIIillllil 1 N" -- POINT H L=64.41' III III! (IIII I III R=71.00' 202305-9088 A=51"5826" NTS 202305-9084 I N00°464' 66.64' L=71.10' I R=89.00' A=45°46'29" POINT G N46°28'27'W • 7.32' L=33.46' N46°28'27"W 40.43' R=106.00' 202305-9012(PTN A=18°05'07" Nq4 32126 2 \ POINT F L=37.04' "- 3!.'" 1l 5 R=106.00' 202305-9013(PL=18.01'NO OD\P\l 1 \ I N08°22'07"W 1 13" 202305-9014 28.41' — R=210.94' - �- \.l A=04°53'33" 0"W(RAO±' p\P viii iiMIW r.♦��c� N74°31'45"E OINT E p9p6°�l� J. L "•"� 6.76' P.O.B.��N66 • 1�'� L=28.54' : 2305 5.83' � R=80.17' v . !!l--- ,0 °1216 D1A�l A=32°45'17„ °,n . 3.:02 .• Or L=46.38' $ ' ..':RSG ��''' • N14°49'08'W R=162.26' i SINAL LAIS�w 52.98' A=16°22'43" i 4``H%%%1•%W'W "ti ii 864412-0000(CONDO) N31"37'O1'9N NOTE:PROPERTY LINE DIMENSIONS 68.66' ICOMPILED FROM CALCULATED AND RECORD SOURCES /0*-- NOTE:THIS INFORMATION DOES /lilk'3`3pNOT REPRESENT A BOUNDARY 3 ;SURVEY OR PROPERTY OWNERSHIP TCP AREA=2,484±SQF / NW1/4&SW 1/4,SEC 20,T23N.,RO5E.,W.M. CITY OF RENTON StaI1tG'C THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, TEMPORARY CONSTRUCTION PERMIT PARCELS 202305-9013,202305-9012 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL EXHIBIT "C" 202305-9112 SEE SHT.4 NOTE:THIS INFORMATION DOES PAGE 3 OF 4 \ LOT 2 NOT REPRESENT A BOUNDARY LLA-012-079 SURVEY OR PROPERTY OWNERSHIP •'IIIIII1I1IIII111111II, i NOTE:PROPERTY LINE DIMENSIONS L=364.99' �COMPILED FROM CALCULATED AND ��� IIIIIIII)��� Ill AR=1785.32'=11°42'49" ( RECORD SOURCES m111I(HF IIIIIIII�10 \ / NTS , Z4 NLI0C afr t i G / . of wAs�jJ S47 .f9 7. Gs 1 „ \ AP\ ,. : .. _, . /2 3:802 ,R„ • \ 5 Ct'ss•!�.tGI•TER�*. y' 1%1,.LANA vti`aSSSS W..%WHv ,.wm e v N41°45'06'W 100.25' \ \ N27°49'28"E 10.78' L=57.86' R=272.08' A=12°11'00" 1 N87°25'35"E 16.07' -� POINT J 5'43"E `L=53.77 10' L=3274 7 _ R=272.08 R=241.77' — _ A=11°19'22" 35' I I A=08°58'15" _241�7 S88°24'54"E(RADIAL) �piA = , 202305-9010 10 Sig°4710 65.57' 202305-9012(PTN) 17.5' R=554.07' -------- L=38.24' ' � A=06°46'51" p\W R=99.12' „ ,,\NRP � i °6 '16" ` st3 N51°35'34"W 49.70'.S87°25'35'W 46.14'0 03" `— I .`'— NO2°34'25'W 30.00' S83°14'21"E (RADIAL) — N897.80'S"E T.P.O.B. N87°25'35"E 50.80'-------�--_. N78°5p' POINT I-T.P.O.B. !� (RADIAL SEE SHT.3 TCP AREA=4,595±SOF NW1/4,SEC 20,T23N.,RO5E.,W.M. 5 CITY OF RENTON Stal'1teC THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, TEMPORARY CONSTRUCTION PERMIT PARCEL 202305-9012 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL - ' / POINT EXHIBIT "C" I-405 RNV \ Aii011 PAGE 4 OF 4 - N40°12'29"W \'‘� 39.34' \ NI, ° L=46.63' 202305-9005 Alight yoR=196.50' L=24.57' `, A=13°35'50" 1111011"R=53.50' IlllllIIIII A=26°18'45" \ \ POINT N NTS .41 `1-*/ " • • • N63 L=48.32' N12°31'17'W : ' 1 1 i R=196.50' A=14°05'22"\ 68.66' I �b " 2• i S69°12'24"E i 4.14' f 1 ;i 202305-9070 r bi i `-‘441, POINT M-T.P.O.B. i " , •8o %• L=21.47' / `'NAL •LIO) • • R=103.50' N12°31'17'W y A=11°53'04" 8.06' ••%W%%%w///////N//Nl N24°24'21"W__________\ 102.26' \ 202305-9112 N22°50'32'W LOT 2 90.40' ‘ LLA-012-079 POINT L N19°15'25'W \ 19.29' 202305-9113 N19°15'25"W POINT K 95� LOT 1 93.56' \ /14 SRP -2 LLA-012-079 -sip 3- i L=21.64 f 22"� .R02° 3'1 Sgt- – - 0=02°53'11" j L=24.13' 1 R=429.56' L202305 9112 A=03°13'08" SEE SHT.4 \ LOT2 LLA-012-079 NOTE:THIS INFORMATION DOES NOTE:PROPERTY LINE DIMENSIONS I NOT REPRESENT A BOUNDARY COMPILED FROM CALCULATED AND TCP AREA=4189±SOF SURVEY OR PROPERTY OWNERSHIP RECORD SOURCES NW1/4,SEC 20,T23N.,RO5E.,W.M. CIOCITY OF RENTON Stantec THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, TEMPORARY CONSTRUCTION PERMIT PARCELS 202305-9070,202305-9005 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL EXHIBIT"B" TEMPORARY CONSTRUCTION PERMIT That portion of the real property described in Exhibit"A" herein, lying in the Northeast quarter of the Southwest quarter, in the Southeast quarter of the Northwest quarter, and within Government Lots 1 and 3, Section 20, Township 23 North, Range 5 East, W.M., in King County, Washington, further described as follows: A parallel 10-foot wide strip of land lying easterly of and adjacent to the easterly 17.50 feet, and a parallel 10-foot wide strip of land lying westerly of and adjacent to the westerly 17.50 feet of the following described strip of land: A 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: Commencing at the centerline intersection of South Ethier Road and Grant Ave. South; Thence North 57°06'59"West along said centerline 92.14 feet; Thence North 32°31'05" East 30.00 feet to a point on the northeasterly margin of South Ethier Rd.; Thence continuing North 32°31'05" East 38.27 feet; Thence North 26°03'28" East 69.53 feet; Thence North 22°23'12" East 32.63 feet to the beginning of a curve concave to the West having a radius of 98.49 feet; Thence northwesterly 96.45 feet along said curve through a central angle of 56°06'43"; Thence North 32°23'02"West, non-tangent to said curve, 16.93 feet to "Point C", lying on the northwesterly line of "Parcel 1" as shown on Record of Survey, Recording Number 8105149005, Records of King County, Washington lying North 26°10'50" East 220.44 feet from the southwesterly corner of said Parcel,said line also being now or formerly known as the southeasterly margin of the Bonneville Power Administration right of way,Auditor's File Number 5178076, Records of King County, Washington, and the True Point of Beginning; EXHIBIT"B" (CONTINUED) Thence continuing North 32°23'02" West 39.76 feet to the beginning of a curve concave to the Southwest having a radius of 194.87 feet; Thence northwesterly 88.11 feet along said curve through a central angle of 25°54'22"; Thence North 62°11'42"West, non-tangent to said curve, 48.07 feet to the beginning of a curve concave to the Northeast having a radius of 169.00 feet; Thence northwesterly 139.16 feet along said curve through a central angle of 47°10'44"; Thence North 15°00'58" West 24.14 feet to the beginning of a curve concave to the Southwest having a radius of 196.00 feet; Thence northwesterly 7.28 feet along said curve through a central angle of 02°07'43"to"Point D", said point also being on the southeasterly line of Thunderhill Condominium Division 3, Recording Number 7908100851, Records of King County, Washington, bearing South 22°40'20"West 5.79 feet from the most easterly corner of said Division 3, and the terminus of said centerline description. TOGETHER WITH a parallel 10-foot wide strip of land lying easterly of and adjacent to the easterly 17.50 feet, and a parallel 10-foot wide strip of land lying westerly of and adjacent to the westerly 17.50 feet of the following described strip of land: A 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: Commencing at the aforementioned "Point D"; Thence northwesterly 49.51 feet along said curve through a central angle of 14°28'20"; Thence North 31°37'01" West 68.66 feet to the beginning of a non- tangent curve concave to the Southwest, having a radius of 162.26 feet and a radial bearing to which bears North 58°33'07" East; EXHIBIT"B" (CONTINUED) Thence northwesterly 46.38 feet along said curve through a central • angle of 16°22'43"to the beginning of a curve concave to the Northeast having a radius of 80.17 feet; Thence northwetterly 45.83 feet along said curve through a central angle of 32°45'17'; Thence North 14°49'08"West, non-tangent to said curve, 52.98 feet to the beginning of a non-tangent curve concave to the southwest having a radius of 111.08 feet and a radial bearing to which bears North 77°12'18" East; Thence northwesterly 28.54 feet along said curve through a central angle of 14°43'22"to the beginning of a non-tangent curve concave to the Northeast having a radius of 210.94 feet and a radial bearing to which bears North 66°09'06" East; Thence northwesterly 51.54 feet along said curve through a central angle of 14°00'00" to "Point E", said point being on the northeasterly projection of the North line of said Division 3 bearing North 74°31'45" East 6.76 feet from the Northeast corner of said Division 3, said point also being the beginning of a non-tangent curve concave to the Northeast having a radius of 210.94 feet and a radial bearing to which bears South 80°09'06" West and the True Point of Beginning of said centerline description; Thence northwesterly 18.01 feet along said curve through a central angle of 4°53'33"; Thence North 8°22'07"West, non-tangent to said curve, 28.41 feet to the beginning of a curve concave to the Southwest having a radius of 106.00 feet; Thence northwesterly 37.04 feet along said curve through a central angle of 20°01'13"to"Point F",said point being on the South line of said Southeast quarter of the Northwest quarter and the beginning of a curve concave to the Southwest having a,radius of 106.00 feet and a radial bearing to which bears North 61°36'40" East; Thence northwesterly 33.46 feet along said curve through a central angle of 18°05'07"; EXHIBIT"B" (CONTINUED) Thence North 46°28'27"West 7.32 feet to"Point G", said point being on the northerly margin of the now or formerly P. S. P & L. Co. Right-of- Way, AFN 5687370, records of King County, Washington, and bears North 74°32'17" East 126.02 feet from said South line of said Government Lot 3, as measured along said northerly margin, and the terminus of said centerline description; TOGETHER WITH a parallel 10-foot wide strip of land lying easterly of and adjacent to the easterly 17.50 feet, and a parallel 10-foot wide strip of land lying westerly of and adjacent to the westerly 17.50 feet of the following described strip of land: A 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: Commencing at the aforementioned "Point G" Thence North 46°28'27" West 40.43 feet to the beginning of a curve concave to the Northeast having a radius of 89.00 feet; Thence northwesterly and northerly along said curve 71.10 feet through a central angle of 45°46'29"; Thence North 0°41'57" West 66.64 feet to the beginning of a curve concave to the Southwest having a radius of 71M0 feet; Thence northwesterly along said curve 64.41 feet through a central angle of 51°58'26"; Thence North 52°40'23" West 36.51 feet to the beginning of a curve concave to the Northeast having a radius of 74.00 feet; Thence northwesterly along said curve 70.68 feet through a central angle of 54°43'24"to a point hereinafter referred to as "Point H" Thence North 2°03'01" East 24.36 feet to the beginning of a non- tangent curve concave to the Southeast having a radius of 108.50 feet and a radial bearing to which bears North 89°39'26"West; Thence northeasterly along said curve 18.60 feet through a central angle of 9°49'20"to "Point I", said point being on the southerly margin EXHIBIT"B" (CONTINUED) of the now or formerly Diablo—Seattle Transmission Right-of-Way, AFN 3560496, Records of King County, Washington, which bears North 87°25'35" East 50.80 feet from the westerly line of said Government Lot 3,as measured along said margin, being the beginning of a non-tangent curve concave to the Southeast having a radius of 108.50 feet and a radial bearing to which bears North 79°50'06"West and the True Point of Beginning of said centerline description; Thence northeasterly along said curve 6.31 feet through a central angle of 3°20'03"to the beginning of a non-tangent curve concave to the West having a radius of 99.12 feet and a radial bearing to which bears South 83°14'21" East; • Thence northerly along said curve 38.24 feet through a central angle of 22°06'16" to the beginning of a non-tangent curve concave to the Northeast having a radius of 554.07 and a radial bearing to which bears South 73°44'39"West; Thence northwesterly along said curve 65.57 feet through a central angle of 6°46'51' to the beginning of a non-tangent curve concave to the Northeast having a radius of 241.77 and a radial bearing to which bears South 79°47'10"West; Thence northwesterly along said curve 37.85 feet through a central angle of 8°58'15" to the beginning of a non-tangent curve concave to the West having a radius of 272.08 feet and a radial bearing to which bears South 88°24'54" East; Thence northwesterly along said curve 53.77 feet through a central angle of 11°19'22"to "Point J", said point being on the northerly margin of said transmission right-of-way, which bears North 87°25'35" East 16.07 feet from the Southeast corner of Lot 1, City of Renton Lot Line Adjustment Number LLA-012-79, Recoded under Recording Number 7910250679, Records of King County, Washington, and the terminus of said centerline description; TOGETHER WITH a parallel 10-foot wide strip of land lying adjacent easterly and a 10-foot wide strip lying adjacent northerly of the following described line: Commencing at the aforementioned "Point I" EXHIBIT"B" (CONTINUED) Thence along said southerly margin North 87°25'35" East 97.80 feet to the True Point of Beginning; Thence North 2°34'25" West 30.00 feet; Thence South 87°25'35"West 46.14 feet; Thence North 51°35'34" West 49.70 feet to a line 17.5 feet easterly of and parallel with said described centerline and the terminus of said described line; TOGETHER WITH A parallel 10-foot wide strip of land lying easterly of and adjacent to the easterly 12.50 feet, and a parallel 10-foot wide strip of land lying westerly of and adjacent to the westerly 12.50 feet of the following described strip of land: A 25-foot wide strip of land lying 12.50 feet on each side of the following described centerline: Commencing at the aforementioned "Point J", said point, being the beginning of a non-tangent curve concave to the Southwest having a radius of 272.08 feet and a radial bearing to which bears North 80°15'43" East; Thence along said curve 57.86 feet through a central angle of 12°11'00"; Thence North 27°49'28"West, non-tangent to said curve, 10.78 feet; Thence North 41°45'06" West 100.25 feet to the beginning of a curve concave to the Northeast having a radius of 1785.32 and a radial bearing to which bears South 55°27'26" West; Thence northwesterly along said curve 364.99 feet through a central angle of 11°42'49" to the beginning of a non-tangent curve concave to the Northeast having a radius of 429.56 feet and a radial bearing to which bears South 67°17'22"West; EXHIBIT"B" (CONTINUED) Thence northwesterly along said curve 24.13 feet through a central angle of 3°13'08"to"Point K", said point being the beginning of a curve concave to the Northeast having a radius of 429.56 feet and a radial bearing to which bears South 70°30'30"West; Thence northwesterly along said curve 21.64 feet through a central angle of 2°53'11'; Thence North 19°15'25"West 93.36 feet to"Point L"; Thence North 19°15'25"West 19.29 feet; Thence North 22°50'32"West 90.40 feet; Thence North 24°24'21" West 102.26 feet to the beginning of a curve concave to the Northeast having a radius of 103.50 feet; Thence along said curve 21.47 feet through a central angle of 11°53'04"; Thence North 12°31'17" West 8.06 feet to "Point M", said point being on the southerly margin of the now or formerly Puget Sound Power & Light Company Intermountain Power Number 2 Right-of-Way, said point also being on the northerly line of Lot 2, City of Renton LLA 012- 79, recorded under Recording Number 7910250679, records of King County, Washington, bearing South 69°12'24" East 4.14 feet, as measured along said northerly line, from the Northwest corner of said Lot 2, and being the True Point of Beginning of said centerline description; Thence continuing North 12°31'17"West 68.66 feet to the beginning of a curve, concave to the Southwest, having a radius of 196.50 feet; Thence northwesterly along said curve 48.32 feet through a central angle of 14°05'22"to"Point N",said point being on the southerly margin of the now or formerly Puget Sound Power and Light Company's Beverly No. 1 Transmission Line Right-of-Way and the beginning of a curve concave to the Southwest with a radius of 196.50 and a radial bearing to which bears North 63°23'21" East; Thence northwesterly along said curve 46.63 feet through a central angle of 13°35'50"; EXHIBIT"B" (CONTINUED) Thence North 40°12'29" West 39.34 feet to the beginning of a curve, concave to the Northeast, having a radius of 53.50 feet; Thence northwesterly along said curve 24.57 feet through a central angle of 26°18'45" to "Point 0", said point being on the southeasterly margin of 1-405 and the terminus of said centerline description. The sidelines of described easement to be extended or shortened to maintain continuous width and to terminate at the margins and property lines where described centerlines terminate. , 7 • WAS .441 4 0 ,* `11vaj,r ) \ EXHIBIT "C" SEE SHT.2 �\ POINT D PAGE 1 OF 4 L=49.51' R=196.00' S22°40'20'W ,, N15°00'58"W A=14°28'20" 5.79' i 24.14' 911II1II110011IIII111P,,. R13699.1060'' II IIIlIIi IIII =7.28' IIlIIIIIIIIII — R=196.00' =47°10'44\ ,` " 202305-9013(PTN) A=02°07'43" N62°11'42"W\ NTS 48.07' \\NN. L=88.11' R=194.87' ,,, ` A=25°5422" \ " ,:11:3 202305-9114 POINT C-T.P.O.B. N32°23'02'W 202305-9013 N32°23'02'W ✓ 16.93' / 39.76' L=96.45' \ f-�/ R=98.49' \ N22°23'12"E 32.63' ` A=56°06'43" h ti N Gj' N26°03'28"E 69.53' / � ` AT i ./ ////NIIeeeee �Y.a hvya 4: \ `7`L, Q4 • „1/4,,Q,..• J. L 441 v 'Q 19.0 / / k / ••-.---„ 4. , ` c.Q ^ >: -r.,..ii,..; N32°31'05"E • -� 38.27' / r ♦ 4/6j„9.7 � . 368(2 •:" ` " 06%4 Sg e ssLO ALSLA?3� '7 N 30.0005"E 9ih, t P.O.C. / NOTE:THIS INFORMATION DOES NOTE:PROPERTY LINE DIMENSIONS NOT REPRESENT A BOUNDARY COMPILED FROM CALCULATED AND EASEMENT AREA=12,115±SQF SURVEY OR PROPERTY OWNERSHIP RECORD SOURCES SW1/4,SEC 20,T23N.,RO5E.,W.M. 5CITY OF RENTON Stantec THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, PERMANENT EASEMENT PARCEL 202305-9013 Bellevue WA 98004 SCALE PLOTTING DATE DRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 IMM V:\2002\...3611\esmt I MJL /� N89°39 26"W ` «OPAL) EXHIBIT "C" SEE SHT.3 _____/„.„.„----------, (RADIAL) PAGE 2 OF 4 L=18.60' L=70.68' R=108.50' R=74.00' A=09°49'20" A=54°4324" 1IIIA[[[[IIIIIIIIilIIIIII,.. NO2°03'01"E N52°40'23"W\ IIIllIIIIIIIII III III POINT H I �� 36.5L=64.41' Illllllh IIII�IIIIIII • R=71.00' 202305-9088 A=5105826" NTS 202305-9084 IN00°66.64'.64' , I L=71.10' R=89.00' A=45°46'29" POINT G N46°28'27'W ` 7.32' N46°28'27"W 40.43' \ L=33.46' , R=106.00' i =18°05'07" N14 32126 2 \ POINT F 202305-9012(PTN) �o„s.I/' 5� L=37.04' R=106.00' 202305-9013(PTN) N63 p1P�� —1T 5 A=20°01'13” L=18.01' ------ � ` N08°22'07"W 202305-901428.41' 28_41' _----- 1 I D=04°53'33" -g80'0906�(�----" - � NTMI AVAVINA���.%���1e••. N74°31'45"E 6" --. 7 �, 6.76' POINTE 66 09 Z J. L y P.O.�N k CY''' F WAS i• S L=51.54' L=28.54' 202305-9116 ti: O �J ''.Q R=111.08' k ,•; .w R=210.94' t :: ' I -,io'•.0 _ A=14°00'00" =14°43L 45.83' K'r ,�• 2 . 6 _ R=80.17' e • / k / 1Ak-1 A=32°45'17" i `.•. 0 e-i= . 1218`RPO $ 31802 s 802. .:. %• N77° % L=46.38' i 'c's••h'�G TEgg,' •'4L • N14°49'08'W /// / R=162.26' i sJo�AL LANA • 52.98' A=16°22'43" • f •••• veeowem/mg;-` 864412-0000(CONDO) N31°37'01"W NOTE:PROPERTY LINE DIMENSIONS 68.66' COMPILED FROM CALCULATED AND , RECORD SOURCES A„N/ O NOTE:THIS INFORMATION DOES I NOT REPRESENT A BOUNDARY - \� [SURVEY OR PROPERTY OWNERSHIP EASEMENT AREA=4,345±SQF / NW1/4&SW 1/4,SEC 20,T23N.,RO5E.,W.M. CITY OF RENTON StantTHUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, PERMANENT EASEMENT PARCEL 202305-9013, 202305-9012 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL L ! NOTE:THIS INFORMATION DOES EXHIBIT ��V�� SEE SHT.4 NOT REPRESENT A BOUNDARY PAGE 3 O F 4 \ SURVEY OR PROPERTY OWNERSHIP 111111111111011111111111111' \ 1 NOTE:PROPERTY LINE DIMENSIONS COMPILED FROM CALCULATED AND \ L=364.99' RECORD SOURCES III (IIIIIIIIIIII (III 0=11$42 as" IIIIIIIIIII I1VIII \ 202305-9112 ' NTS .?IIIA HNI/IA��R kV?i���+"941'* LOT 2 Z1 ' it 0 \ LLA-012-079 - Z ,.J: .,L Zk ,, • orhJ�S 4 741. �l'i' ,'... J !"' .moo \ 6� e z. ` 6802 ,•.v �ssONALSLAN. �4L N41°45'06'W 100.25' • • 202305-9112 \,,/'_- LOT 2 N27°49'28"E 10.78' LLA-012-079 L=57.86' R=272.08' " A=12°11'00" N87°25'35"E 16.07' / - �,` POINT J -643"c,-__,%--- LL=53.77 L=37.85' _ R=272.08 R=241.77' A=11°19'22" - A=08°58'15" S88°24'54"E(RADIAL) RAp ---- � 1715 S7--4710" -- 202305-9010 202305-9012(PTN) /-- 65 4.0 � R=554.07 �/� A=06°496.\514' 1l�,p\ \\ 1 R=99.12' 9i - N51°35'34"W 49.70'. \ A=22°06'16" �S87°25'35"W 46.14' R=1108!50' S83°14'21" ' �_ NO2°34'25'W 30.00' A=03°20'03" - --,-E� N87°25`35"E '-T.P.O.B. (RADIAL) Ili J7. N87°25'35"E 50.80' - _79°50'06" POINT I-T.P.O.B. 9 Pr .W(RADIAL) EASEMENT AREA=9,997±SOF NW1/4,SEC 20,T23N.,RO5E.,W.M. COCITY OF RENTON Stall±@C THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, PERMANENT EASEMENT PARCEL 202305-9012 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 ( IMM V:\2002\...3611\esmt I MJL / J \ POINT O EXHIBIT "C" I-405 RNV PAGE 4 OF 4 AdgiN40°12'29"W ,s,..(7 39.34' - KL6L=46.63' 202305-9005 'Agit yo R=196.50' L=24.57' �`L A=13°35'50" 1911111111101111111111 111Ill10111111 lll R=53.50' A=26°18'45" IIl II POINT N NTS /7, -' ° l J L 63 2321 L=48.32' ` ° • tiG\A c IhAsji `9, N N12 31 17W .'.• R=196.5068.66' A=14°05'22", ( o`: r S69°12'24"E ♦ ?p : 4.14' i/ 202305-9070 POINT M-T.P.O.B. e °- •, .8oz ....:y L=21.47 I�VAL LW) R=103.50' N12°31'17"W A=11°53'04" 8.06' I %%%%♦••••• eeeeeeefeeme,' N24°24'21"W \ 102.26' \ N22°50'32"W----tea 90.40' , \ POINT L 202305-9112 N19°15'25'W \ LOT 2 19.29' LLA-012-079 - ...- POINT N19°15'25"W POINT K 0�, X2 __::-______„---- 202305-9113 LOT 1 93.56' `/�e LLA-012-079 sip, �O\P L=21.64 ' 2 R=429.56----�, �sg�°,��2 A=02°53'11" _ L=24.13' kr R=429.56' A=03°13'08" \\ i NOTE:THIS INFORMATION DOES I NOTE:PROPERTY LINE DIMENSIONS NOT REPRESENT A BOUNDARY 'COMPILED FROM CALCULATED AND EASEMENT AREA=5,607±SQF SURVEY OR PROPERTY OWNERSHIP RECORD SOURCES NW1/4,SEC 20,T23N.,RO5E.,W.M. 5CITY OF RENTON Stantec THUNDER HILLS SEWER INTERCEPTOR REHABILITATION 11130 NE 33rd Place, PERMANENT EASEMENT PARCEL 202305-9070, 202305-9005 Bellevue WA 98004 SCALE PLOTTING DATEDRAWN FILE PATH CHECKED phone:(425)869-9448 NTS 11/7/2017 I IMM V:\2002\...3611\esmt I MJL EXHIBIT"B" PERMANENT EASEMENT That portion of the real property described in Exhibit"A" herein, lying in the Northeast quarter of the Southwest quarter, in the Southeast quarter of the Northwest quarter, and within Government Lots 1 and 3, Section 20, Township 23 North, Range 5 East, W.M., in King County, Washington, further described as follows: A 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: Commencing at the centerline intersection of South Ethier Road and Grant Ave. South; Thence North 57°06'59"West along said centerline 92.14 feet; Thence North 32°31'05" East 30.00 feet to a point on the northeasterly margin of South Ethier Rd.; Thence continuing North 32°31'05" East 38.27 feet; Thence North 26°03'28" East 69.53 feet; Thence North 22°23'12" East 32.63 feet to the beginning of a curve concave to the West having a radius of 98.49 feet; Thence northwesterly 96.45 feet along said curve through a central angle of 56°06'43"; Thence North 32°23'02"West, non-tangent to said curve, 16.93 feet to "Point C", lying on the northwesterly line of "Parcel 1" as shown on Record of Survey, Recording Number 8105149005, Records of King County, Washington lying North 26°10'50" East 220.44 feet from the southwesterly corner of said Parcel,said line also being now or formerly known as the southeasterly margin of the Bonneville Power Administration right of way,Auditor's File Number 5178076, Records of King County, Washington, and the True Point of Beginning; Thence continuing North 32°23'02"West 39.76 feet to the beginning of a curve concave to the Southwest having a radius of 194.87 feet; Thence northwesterly 88.11 feet along said curve through a central angle of 25°54'22"; EXHIBIT "B" (CONTINUED) Thence North 62°11'42"West, non-tangent to said curve, 48.07 feet to the beginning of a curve concave to the Northeast having a radius of 169.00 feet; Thence northwesterly 139.16 feet along said curve through a central angle of 47°10'44"; Thence North 15°00'58" West 24.14 feet to the beginning of a curve concave to the Southwest having a radius of 196.00 feet; Thence northwesterly 7.28 feet along said curve through a central angle of 02°07'43"to"Point D", said point also being on the southeasterly line of Thunderhill Condominium Division 3, Recording Number 7908100851, Records of King County, Washington, bearing South 22°40'20"West 5.79 feet from the most easterly corner of said Division 3, and the terminus of said centerline description. TOGETHER WITH a 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: Commencing at the aforementioned "Point D"; Thence northwesterly 49.51 feet along said curve through a central angle of 14°28'20"; Thence North 31°37'01" West 68.66 feet to the beginning of a non- tangent curve concave to the Southwest, having a radius of 162.26 feet and a radial bearing to which bears North 58°33'07" East; Thence northwesterly 46.38 feet along said curve through a central angle of 16°22'43"to the beginning of a curve concave to the Northeast having a radius of 80.17 feet; Thence northwesterly 45.83 feet along said curve through a central angle of 32°45'17'; Thence North 14°49'08"West, non-tangent to said curve, 52.98 feet to the beginning of a non-tangent curve concave to the southwest having a radius of 111.08 feet and a radial bearing to which bears North 77°12'18" East; EXHIBIT "B" (CONTINUED) Thence northwesterly 28.54 feet along said curve through a central angle of 14°43'22"to the beginning of a non-tangent curve concave to the Northeast having a radius of 210.94 feet and a radial bearing to which bears North 66°09'06" East; Thence northwesterly 51.54 feet along said curve through a central angle of 14°00'00" to "Point E", said point being on the northeasterly projection of the North line of said Division 3 bearing North 74°31'45" East 6.76 feet from the Northeast corner of said Division 3, said point also being the beginning of, a non-tangent curve concave to the Northeast having a radius of 210.94 feet and a radial bearing to which bears South 80°09'06" West and the True Point of Beginning of said centerline description; Thence northwesterly 18.01 feet along said curve through a central angle of 4°53'33"; Thence North 8°22'07"West, non-tangent to said curve, 28.41 feet to the beginning of a curve concave to the Southwest having a radius of 106.00 feet; Thence northwesterly 37.04 feet along said curve through a central angle of 20°01'13"to"Point F",said point being on the South line of said Southeast quarter of the Northwest quarter and the beginning of a curve concave to the Southwest having a radius of 106.00 feet and a radial bearing to which bears North 61°36'40" East; Thence northwesterly 33.46 feet along said curve through a central angle of 18°05'07"; Thence North 46°28'27"West 7.32 feet to"Point G", said point being on the northerly margin of the now or formerly P. S. P & L. Co. Right-of- Way, AFN 5687370, records of King County, Washington, and bears North 74°32'17" East 126.02 feet from said South line of said Government Lot 3, as measured along said northerly margin, and the terminus of said centerline description; TOGETHER WITH a 35-foot wide strip of land lying 17.50 feet on each side of the following described centerline: EXHIBIT "B" (CONTINUED) Commencing at the aforementioned "Point G" Thence North 46°28'27" West 40.43 feet to the beginning of a curve concave to the Northeast having a radius of 89.00 feet; Thence northwesterly and northerly along said curve 71.10 feet through a central angle of 45°46'29"; Thence North 0°41'57" West 66.64 feet to the beginning of a curve concave to the Southwest having a radius of 71.00 feet; Thence northwesterly along said curve 64.41 feet through a central angle of 51°58'26"; Thence North 52°40'23" West 36.51 feet to the beginning of a curve concave to the Northeast having a radius of 74.00 feet; Thence northwesterly along said curve 70.68 feet through a central angle of 54°43'24"to a point hereinafter referred to as"Point H" Thence North 2°03'01" East 24.36 feet to the beginning of a non- tangent curve concave to the Southeast having a radius of 108.50 feet and a radial bearing to which bears North 89°39'26"West; Thence northeasterly along said curve 18.60 feet through a central angle of 9°49'20"to "Point I", said point being on the southerly margin of the now or formerly Diablo—Seattle Transmission Right-of-Way, AFN 3560496, Records of King County, Washington, which bears North 87°25'35" East 50.80 feet from the westerly line of said Government Lot 3,as measured along said margin, being the beginning of a non-tangent curve concave to the Southeast having a radius of 108.50 feet and a radial bearing to which bears North 79°50'06"West and the True Point of Beginning of said centerline description; Thence northeasterly along said curve 6.31 feet through a central angle of 3°20'03"to the beginning of a non-tangent curve concave to the West having a radius of 99.12 feet and a radial bearing to which bears South 83°14'21" East; Thence northerly along said curve 38.24 feet through a central angle of EXHIBIT"B" (CONTINUED) 22°06'16" to the beginning of a non-tangent curve concave to the Northeast having a radius of 554.07 and a radial bearing to which bears South 73°44'39"West; Thence northwesterly along said curve 65.57 feet through a central angle of 6°46'51' to the beginning of a non-tangent curve concave to the Northeast having a radius of 241.77 and a radial bearing to which bears South 79°47'10" West; Thence northwesterly along said curve 37.85 feet through a central angle of 8°58'15" to the beginning of a non-tangent curve concave to the West having a radius of 272.08 feet and a radial bearing to which bears South 88°24'54" East; Thence northwesterly along said curve 53.77 feet through a central angle of 11°19'22"to "Point J", said point being on the northerly margin of said transmission right-of-way, which bears North 87°25'35" East 16.07 feet from the Southeast corner of Lot 1, City of Renton Lot Line Adjustment Number LLA-012-79, Recoded under Recording Number 7910250679, Records of King County, Washington, and the terminus of said centerline description; TOGETHER WITH those portions lying easterly of said described centerline and westerly and southerly of the following described line: Commencing at the aforementioned "Point I" Thence along said southerly margin North 87°25'35" East 97.80 feet to the True Point of Beginning; Thence North 2°34'25" West 30.00 feet; Thence South 87°25'35"West 46.14 feet; Thence North 51°35'34" West 49.70 feet to the easterly margin of the 35' wide permanent easement previously described herein and the terminus of said described line; TOGETHER WITH a 25-foot wide strip of land lying 12.50 feet on each side of the following described centerline: EXHIBIT"B" (CONTINUED) Commencing at the aforementioned "Point J", said point, being the beginning of a non-tangent curve concave to the Southwest having a radius of 272.08 feet and a radial bearing to which bears North 80°15'43" East; Thence along said curve 57.86 feet through a central angle of 12°11'00'; Thence North 27°49'28"West, non-tangent to said curve, 10.78 feet; Thence North 41°45'06" West 100.25 feet to the beginning of a curve concave to the Northeast having a radius of 1785.32 and a radial bearing to which bears South 55°27'26"West; Thence northwesterly along said curve 364.99 feet through a central angle of 11°42'49" to the beginning of a non-tangent curve concave to the Northeast having a radius of 429.56 feet and a radial bearing to which bears South 67°17'22"West; Thence northwesterly along said curve 24.13 feet through a central angle of 3°13'08"to "Point K", said point being the beginning of a curve concave to the Northeast having a radius of 429.56 feet and a radial bearing to which bears South 70°30'30"West; Thence northwesterly along said curve 21.64 feet through a central angle of 2°53'11"; Thence North 19°15'25" West 93.36 feet to"Point L"; Thence North 19°15'25"West 19.29 feet; Thence North 22°50'32"West 90.40 feet; Thence North 24°24'21" West 102.26 feet to the beginning of a curve concave to the Northeast having a radius of 103.50 feet; Thence along said curve 21.47 feet through a central angle of 11°53'04"; EXHIBIT "B" (CONTINUED) Thence North 12°31'17" West 8.06 feet to "Point M", said point being on the southerly margin of the now or formerly Puget Sound Power& Light Company Intermountain Power Number 2 Right-of-Way, said point also being on the northerly line of Lot 2, City of Renton LLA 012- 79, recorded under Recording Number 7910250679, records of King County, Washington, bearing South 69°12'24" East 4.14 feet, as measured along said northerly line, from the Northwest corner of said Lot 2, and being the True Point of Beginning of said centerline description; Thence continuing North 12°31'17"West 68.66 feet to the beginning of a curve, concave to the Southwest, having a radius of 196.50 feet; Thence northwesterly along said curve 48.32 feet through a central angle of 14°05'22"to"Point N", said point being on the southerly margin of the now or formerly Puget Sound Power and Light Company's Beverly No. 1 Transmission Line Right-of-Way and the beginning of a curve concave to the Southwest with a radius of 196.50 and a radial bearing to which bears North 63°23'21" East; Thence northwesterly along said curve 46.63 feet through a central angle of 13°35'50"; Thence North 40°12'29" West 39.34 feet to the beginning of a curve, concave to the Northeast, having a radius of 53.50 feet; Thence northwesterly along said curve 24.57 feet through a central angle of 26°18'45" to "Point 0", said point being on the southeasterly margin of 1-405 and the terminus of said centerline description. J The sidelines of described easement to be extended or shortened to maintain continuous width and to terminate at the margins and property lines where described centerlines terminate. /1— --.20_,14-"---1.. ,, f��7„; NAS iil n 1' !� �_ r I 7 • A ! G f i