HomeMy WebLinkAboutS_S&EE_3-18-17_Geotechnical_Report_Gate_D-50_Modification_170425_v1
Rpt1707 S&EE
S&EE
SOIL & ENVIRONMENTAL ENGINEERS, INC.
16625 Redmond Way, Suite M 124, Redmond, Washington 98052, www.SoilEnvironmental.com (425) 868-5868
March 18, 2017
Ms. Cynthia Johnson
The Boeing Company
Cynthia.a.johnson4@boeing.com
CC: Mr. Michael Sullivan
Letter Report
Geotechnical Engineering Services
Proposed Gate D-50 Modification
Boeing Renton Plant
Dear Cynthia:
INTRODUCTION
Soil & Environmental Engineers, Inc. (S&EE) has been retained by you to perform a geotechnical evaluation
for the above-referenced project. The project will involve re-configuration of the traffic flow through the
existing D-50 gate. I understand that new underground electrical lines will be constructed, some minor re-
grading will be performed, and new asphalt pavement will be installed.
SURFACE AND SUBSURFACE CONDITIONS
The project site is located in the southeastern portion of Renton Municipal Airport. Figure 1, which is
included at the end of this report, shows the site location. The existing gate is surrounded by buildings, and
the site surface is covered with asphalt pavement. The gate is accessed by East Perimeter Road which
borders the west side of Cedar river and its levee. The site surface is relatively flat.
S&EE performed a previous soil test boring, B-2, at the location shown in Figure 1. Based on our
knowledge of soil conditions in the area, it is our opinion that the boring data are representative of the
subsurface conditions at D-50 gate.
The boring shows that the subsurface conditions at the site include fill over alluvial soils. The former is about
10 to 11 feet thick and consists of loose to medium dense silty sand, gravel and sand. The alluvial soils
include a soft to medium dense silt and sand layer to a depth of about 30 feet, then dense to very dense sand
and gravel below. This sand and gravel layer turns into a dense silty sand at a depth of 97.5 feet. Boring B-2
was terminated in this soil.
Ms. Cynthia Johnson
March 18, 2017
Page 2
Rpt1707 S&EE
Groundwater was encountered at a depth of 7 feet during the drilling of Boring B-2. Based on our experience
in the project area, the groundwater depth will vary with season and precipitation, and will fluctuate between
depths of 5 to 10 feet.
CONCLUSION AND RECOMENDATION
General
It is our opinion that the proposed project is feasible from a geotechnical standpoint. The areas disturbed by
construction will be stabilized and should remain stable. It is our further opinion that the project will not incur
any soil instability.
Underground Utility Construction
Subgrade preparation and trench backfill should be monitored by a site inspector from our office. All loose
soil cuttings should be removed from the excavation subgrade prior to the placement of bedding materials.
In the event that soft or loose soil is encountered at subgrade, the subgrade should be over-excavated for a
minimum of 6 inches. A non-woven geotextile having a minimum grab tensile strength of 200 pounds should
be installed at the bottom of the over-excavation and the over-excavation be backfilled with 1-1/4” minus
crushed rock. The geotextile should be installed flat with all wrinkles removed and have 12 inches overlap.
The rock should be compacted to a firm a non-yielding condition using a mechanical compactor approved by
our site inspector.
The onsite soils are suitable for use as backfill. The soils are slightly moisture sensitive. As such, the
contractor should protect the excavated soils from rain.
Pavement
We recommend that all pavement subgrades be proof-rolled to identify areas of soft, wet, organic, or
unstable soils. Proof-rolling should be accomplished with a heavy (12-ton) vibratory roller, front-end-
loader, or loaded dump truck (or equivalent) making systematic passes over the subgrade while being
observed by a site inspector from our office. In areas where unstable and/or unsuitable subgrade soils are
observed, the subgrade should be over-excavated a minimum 6 inches. Woven geotextile having a
minimum 200 pounds grab tensile strength may be necessary for additional subgrade stabilization. The
geotextile, if used, should be placed with 12-inch overlaps with all wrinkles removed.
LOGAN AVEEXIT 5
900
515
900
EXIT 4
EXIT 4A
405
405
167
EXIT 4B
405
169
167
D9
D40
D35
D30
EXIT 2B
From
Issaquah
From
Bellevue
4-04 Medical Clinic Safety LK WASHINGTON BLVD N From
Seattle
LAKE WASHINGTON
Boeing Employees Flying Association
RA
I
N
I
E
R
A
V
E
N
4-41
4-20
4-21
4-69
4-402
4-78
4-77 4-79
4-71 4-42 4-45
Apron D
5-27
5-403 5-288
9
7
1
16 17
15 12 13A
14 10-18 GARDEN AVE
N
N EVA NEDRAGEVA KRAPN 8TH ST
11
10-16
10-13
4-89
4-88Badge Office
10-20
10-80 Hub 4-17 4-90 4-75 4-81 4-82 4-83 4-86
Renton
Airport
From
I-5
From
Longacres
Park
From
Kent
and
Auburn
From
Enumclaw Apron A Apron BRAINIER AVE N AIRPORT WAY
RE
N
T
O
N
A
V
E
S
S 3RD ST
S 2ND ST
Renton Stadium 5-09 5-02
S U N S E T B L V D W BENSON RD
S
M.
L
.
K
I
N
G
J
R
W
A
Y
S
SW 10TH
S
T
OAKESDALE AVE
SW
SW 19TH ST
SW 16TH ST DNOMYAR WS EVA WS EVA DNILTALBOT RD S EVA NIAM HOUSER WAY N LOGAN AVE N CEDAR RIVER
N
1
S
T
S
T
BRONSON W AY N
S 4TH ST
N 3RD ST
N 4TH ST N NEDRAG S EVA TTENRUBLOGAN AVE S SW 7TH ST
GRADY WA
Y
S
W
N EVA YROTCAFMONSTER RD 5-50 5-51 N EVA SMAILLIW7-206 Triton Tower Two
7-207 Triton Tower Three
From
Seattle
5-08
Washington – Renton
North 8th and Park Avenue North, Renton, WA 98055
N 5TH ST
N 6TH ST
N 8TH ST
5-45
Revised 03-09
Boeing North Bridge
Boeing South
Bridge
7-244 Rivertech Corporate Center HOUSER WAY BYPASS Copyright 2009© The Boeing Company. All rights reserved.PARK AVE N WELLS AVE N POWELL AVE SW NACHES AVE 4-95Shed
4-96GuardShack
Employee gates
AMS Turnstile gates
Fence lines
Boeing property
General parking
Restricted parking
Bus stop
Helistop
51 52 53 54 55
51 52 53 54 55
A
B
C
D
E
F
A
B
D
E
F
C
D44
D41
D4
D32